JP4996107B2 - Order priority calculation device based on management index, order priority calculation method based on management index, order priority calculation program based on management index - Google Patents

Order priority calculation device based on management index, order priority calculation method based on management index, order priority calculation program based on management index Download PDF

Info

Publication number
JP4996107B2
JP4996107B2 JP2006041192A JP2006041192A JP4996107B2 JP 4996107 B2 JP4996107 B2 JP 4996107B2 JP 2006041192 A JP2006041192 A JP 2006041192A JP 2006041192 A JP2006041192 A JP 2006041192A JP 4996107 B2 JP4996107 B2 JP 4996107B2
Authority
JP
Japan
Prior art keywords
product
demand
order
processing unit
central processing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2006041192A
Other languages
Japanese (ja)
Other versions
JP2007219941A (en
Inventor
あん平 森元
洋和 山名
賢 佐藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Askul Corp
Original Assignee
Askul Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Askul Corp filed Critical Askul Corp
Priority to JP2006041192A priority Critical patent/JP4996107B2/en
Publication of JP2007219941A publication Critical patent/JP2007219941A/en
Application granted granted Critical
Publication of JP4996107B2 publication Critical patent/JP4996107B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

本発明は、商品管理及び経営管理についての技術に関する。   The present invention relates to a product management and business management technology.

商品の販売や供給を行うサプライヤーや小売業者,卸売業者等は、商品の発注量や発注時期等を極力明確にする必要がある。そこで、従来、商品の発注量や発注時期を算出するための装置が発明された。   Suppliers, retailers, wholesalers, etc. that sell and supply products need to make the order quantity and timing of products as clear as possible. Therefore, conventionally, an apparatus for calculating the order quantity and order time of a product has been invented.

特許文献1に記載の安全在庫量算出装置は、(式7)により、ある商品(物品)に対する需要の標準偏差と過去の出荷量の標準偏差σ,リードタイムL,安全係数k,短納期確率(顧客の要求納期がその製品に使用される部品・材料のリードタイムLよりも短い注文である確率のこと)Pbから安全在庫量SSを計算する。
SS=Pb×k×√N×σ (式7)
The safety stock quantity calculation device described in Patent Document 1 uses (Expression 7) to calculate a standard deviation of demand for a certain product (article) and a standard deviation σ of a past shipment quantity, a lead time L, a safety coefficient k, and a short delivery time probability. (The probability that the customer's required delivery date is an order shorter than the lead time L of the parts and materials used for the product) The safety stock SS is calculated from Pb.
SS = Pb × k × √N × σ (Formula 7)

さらに、(式8)により、この式から商品を発注するべき時期(すなわち、商品を発注すべき時点での商品在庫数)である発注点Oを算出することができる。尚、(式8)におけるAとは、商品の需要(数)の平均値を示している。
O=A×LL+SS (式8)
Furthermore, from (Equation 8), it is possible to calculate the order point O that is the time when the product should be ordered (that is, the number of products in stock at the time when the product is ordered). In addition, A in (Formula 8) has shown the average value of the demand (number) of goods.
O = A × LL + SS (Formula 8)

このように、従来の安全在庫量算出装置によれば、現実的な安全在庫量を設定することができると共に、未来在庫に基づいて商品等のオーダーを行う場合にも在庫量を適切に設定できる。
特許第3698433号公報
As described above, according to the conventional safety inventory quantity calculation device, it is possible to set a realistic safety inventory quantity, and to appropriately set the inventory quantity even when ordering products etc. based on the future inventory. .
Japanese Patent No. 3698433

しかしながら、従来の発明は、適切な在庫量を設定して商品の欠品を防止することは考慮されていたが、前もって商品の欠品を把握した上での具体的な措置までは講じられていなかった。   However, in the conventional invention, it has been considered to set an appropriate inventory amount to prevent a product shortage, but specific measures are taken after grasping the product shortage in advance. There wasn't.

すなわち、従来の発明は、商品が欠品しないように商品の在庫数量や発注量を調整することはできたが、ある商品が欠品することによる損失を考慮しつつ、商品の在庫数量や発注量を調整するということまでは考えられていないのが現状であった。   In other words, the conventional invention was able to adjust the inventory quantity and order quantity of the product so that the product does not run out, but considering the loss due to the missing product, At present, it was not even considered to adjust the amount.

本発明は、このような点に鑑みてなされたものであり、在庫を抱える問屋業(サプライヤーや卸業者等)において、商品の適切な発注を行い、商品の在庫管理を効率的に行うことができる経営指標に基づく発注優先順位算出装置、経営指標に基づく発注優先順位算出方法、経営指標に基づく発注優先順位算出プログラムを提供することを課題とする。   The present invention has been made in view of such points, and in a wholesaler business that has inventory (suppliers, wholesalers, etc.), it is possible to appropriately place an order for products and efficiently manage the inventory of the products. It is an object of the present invention to provide an order priority calculation device based on a management index, an order priority calculation method based on a management index, and an order priority calculation program based on a management index.

本発明は上記事項に鑑みてなされたものであり、すなわち本発明は、商品の在庫数量を算出する在庫数量算出部と、商品一つあたりの受注件数を算出する受注件数算出部と、在庫数量算出部により算出された在庫数量と、受注件数算出部により算出された受注件数とから、商品が欠品した場合の影響度を算出する影響度算出部とを備えることを特徴とする。   The present invention has been made in view of the above matters, that is, the present invention relates to an inventory quantity calculation unit that calculates the inventory quantity of a product, an order quantity calculation unit that calculates the number of orders received per product, and an inventory quantity. And an influence degree calculating section for calculating an influence degree when a product is out of stock from the inventory quantity calculated by the calculating section and the order number calculated by the order number calculating section.

本発明における影響度とは、例えば、ユーザ1件あたりの受注数量から算出される「本日発注を行わなかった時に発生する欠品が与える影響」を表す指数,商品を売るための機会が失われたことによる損失を表す指数(機会損失額),粗利額を表す指数,商品の在庫金額を示す指数,才数を示す指数等のことである。   The degree of influence in the present invention refers to, for example, an index representing “the influence of a shortage that occurs when an order is not placed today” calculated from the order quantity per user, and the opportunity to sell the product is lost. An index indicating a loss due to a loss (opportunity loss amount), an index indicating a gross profit amount, an index indicating a stock amount of goods, an index indicating a talent, and the like.

つまり、本発明によれば、様々な経営指標からそれらに対応する影響度を算出することができる。このように、算出された影響度に基づいて、優先度の高い順に発注を行うことができる。そのため、問屋業は俗人的な方法ではなく適切な時期に適切な量の発注を行うことができる。   That is, according to the present invention, it is possible to calculate the degree of influence corresponding to them from various management indexes. In this way, it is possible to place orders in descending order of priority based on the calculated degree of influence. For this reason, wholesalers can place an appropriate amount of orders at an appropriate time rather than a secular way.

尚、本発明の経営指標に基づく発注優先順位算出装置は、商品を発注しても商品が納入するまでに欠品が発生してしまう場合(緊急度が高い場合)と、商品の発注から商品が納入するまでに欠品は生じない場合(緊急度が低い場合)との二つのパターンに分けて考える。   In addition, the order priority calculation device based on the management index of the present invention has a case where a shortage occurs before the product is delivered even when the product is ordered (when the urgency is high), and from the order of the product to the product. Think of it in two patterns: when there is no shortage before delivery (when urgency is low).

また、緊急度が高い場合の本発明の経営指標に基づく発注優先順位算出装置は、発注した商品が到着するまでに必要な数量を算出するリードタイム需要量算出部をさらに有し、影響度算出部は、需要量算出部により算出されたリードタイム需要量から、在庫数量算出部により算出された在庫数量を減じた値に、受注件数算出部により算出された、その商品一つあたりの受注件数を除して、商品が欠品した場合の影響度を算出する構成とすることもできる。   In addition, the order priority calculation device based on the management index of the present invention when the degree of urgency is high further includes a lead time demand amount calculation unit for calculating the quantity required until the ordered product arrives, and calculates the influence level The number of orders received per product calculated by the order quantity calculation unit is calculated by subtracting the inventory quantity calculated by the inventory quantity calculation unit from the lead time demand quantity calculated by the demand quantity calculation unit. In other words, the degree of influence when the product is missing can be calculated.

当然ながら、商品を発注すると商品が納入されるまでに時間を要する。この時間のことをリードタイムといい、商品が欠品しないようにするためには、このリードタイムの間の商品の需要を在庫数量でまかなわねばならない。   Of course, when an item is ordered, it takes time until the item is delivered. This time is called a lead time, and in order to prevent the product from being out of stock, the demand for the product during this lead time must be covered by the inventory quantity.

本発明の経営指標に基づく発注優先順位算出装置によれば、このリードタイムの間に必要な商品の需要量を算出することができるため、在庫数量がリードタイム中の需要量を下回らないように予め管理することもできる。   According to the order priority calculation device based on the management index of the present invention, it is possible to calculate the demand amount of the necessary product during this lead time, so that the inventory quantity does not fall below the demand amount during the lead time. It can also be managed in advance.

また、本発明の経営指標に基づく発注優先順位算出装置によれば、リードタイムの間に必要な商品の需要量を考慮した上で商品が欠品した場合の影響度を算出することができるため、その影響度に応じて発注量をコントロールすることができる。これにより、商品の在庫管理も適当に行うことができる。   Further, according to the order priority calculation device based on the management index of the present invention, it is possible to calculate the degree of influence when a product is missing, taking into account the demand for the required product during the lead time. The order quantity can be controlled according to the degree of influence. Thereby, inventory management of goods can also be performed appropriately.

さらに、緊急度が低いときの本発明の経営指標に基づく発注優先順位算出装置は、商品の発注をするために商品の在庫数量を算出する発注点算出部とをさらに有し、影響度算出部は、発注点算出部により算出された在庫数量から、在庫数量検出部により算出された在庫数量を減じた値に、受注件数算出部により算出された、その商品一つあたりの受注件数を除して、商品が欠品した場合の影響度を算出する構成とすることもできる。   Further, the order priority calculation device based on the management index of the present invention when the degree of urgency is low further includes an order point calculation unit for calculating the inventory quantity of the product in order to order the product, and the influence degree calculation unit Is obtained by subtracting the number of orders received for each product calculated by the number of orders received from the inventory quantity calculated by the order quantity calculator from the inventory quantity calculated by the inventory quantity detector. Thus, it is possible to calculate the degree of influence when a product is missing.

発注点算出部は、商品の在庫が十分にある状態(安全在庫状態)で、その状態を保つために商品の発注を行うべきタイミングを算出する。発注を行うタイミングは、商品の在庫数量で決定すると好ましい。例えば、商品の在庫数量が、100個(その他にも商品の単位を示す箱や才等)よりも少なくなったら発注を行うというように、発注のタイミングを決定する。   The order point calculation unit calculates the timing at which the product should be ordered in order to maintain the state in which the product is sufficiently in stock (safe stock state). The timing for placing an order is preferably determined by the inventory quantity of the product. For example, the ordering timing is determined such that an order is placed when the inventory quantity of the product is less than 100 (in addition, a box or a gift indicating the unit of the product).

このように、商品の在庫が安全在庫数量を満たしつつ、商品の発注を行うことができるため、商品が欠品してしまうことを防ぐことができる。   In this way, since the product stock can be ordered while the stock of the product satisfies the safety stock quantity, it is possible to prevent the product from being out of stock.

さらに、商品の安全在庫数量を加味してさらなる商品の発注を行うことができることにより、過剰な発注を行うことを防止し、適切な在庫管理を行うことができる。   Furthermore, since it is possible to place an order for further products in consideration of the safe stock quantity of the products, it is possible to prevent excessive ordering and perform appropriate inventory management.

しかながら、何らかの理由で、その商品の需要に大幅なズレが生じ、現段階で欠品を免れることができない商品が発生する可能性は払拭できない。   However, for some reason, there is a great gap in the demand for the product, and the possibility that a product that cannot be out of stock at this stage cannot be eliminated.

そこで、本発明の経営指標に基づく発注優先順位算出装置は、影響度算出部により算出された影響度の高い順に優先順位を設定する優先順位設定部をさらに有する構成とすると好ましい。   Therefore, it is preferable that the order priority calculation device based on the management index of the present invention further includes a priority setting unit that sets the priority in descending order of the degree of influence calculated by the degree of influence calculation unit.

このように、欠品の可能性が高く緊急度の高い商品から発注の優先順位をつけることができるため、商品を欠品させてしまうことを未然に防ぐことができる。   In this way, it is possible to prioritize ordering from highly urgent products with a high possibility of missing items, so that it is possible to prevent the products from being missing.

また、影響度(指数)を機会損失額とすると、緊急度が高い場合の本発明の経営指数算出装置は、商品の単位あたりの売上金額を算出する単位売上算出部を有する構成とすると好ましい。そして、影響度算出部は、需要量算出部により算出されたリードタイム需要量から、在庫数量算出部により算出された在庫数量を減じた値に、単位売上算出部により算出された単位あたりの売上金額を除して利益の損失度を算出するようにする。   Further, when the degree of influence (index) is an opportunity loss amount, it is preferable that the management index calculation apparatus of the present invention when the urgency is high has a unit sales calculation unit for calculating the sales amount per unit of the product. Then, the impact calculation unit calculates the sales per unit calculated by the unit sales calculation unit to the value obtained by subtracting the inventory quantity calculated by the inventory quantity calculation unit from the lead time demand calculated by the demand calculation unit. Divide the amount to calculate the degree of profit loss.

一方、影響度を機会損失額とし、緊急度が低い場合の本発明の経営指数算出装置は、商品の単位あたりの売上金額を算出する単位売上算出部とをさらに有する構成とする。そして、このときの影響度算出部は、発注点算出部により算出された在庫数量から、在庫数量検出部により算出された在庫数量を減じた値に、単位売上算出部により算出された単位あたりの売上金額を除して利益の損失度を算出するようにする。   On the other hand, the management index calculation apparatus according to the present invention in which the degree of influence is an opportunity loss amount and the degree of urgency is low is configured to further include a unit sales calculation unit that calculates a sales amount per unit of the product. Then, the influence degree calculation unit at this time obtains a value obtained by subtracting the inventory quantity calculated by the inventory quantity detection unit from the inventory quantity calculated by the order point calculation unit, and obtains a value per unit calculated by the unit sales calculation unit. Divide the sales amount to calculate the degree of profit loss.

また、影響度を粗利金額を示す指数とすると、緊急度の高い場合の本発明の経営指数算出装置は、商品の単位あたりの粗利益金額を算出する粗利算出部とを有する構成とする。そして、このときの影響度算出部は、需要量算出部により算出されたリードタイム需要量から、在庫数量算出部により算出された在庫数量を減じた値に、粗利算出部により算出された粗利益金額を除して、粗利益度を算出するようにする。   Further, when the degree of influence is an index indicating the gross profit amount, the management index calculation device of the present invention in the case of high urgency is configured to include a gross profit calculation unit that calculates the gross profit amount per unit of the product. . At this time, the influence calculation unit calculates the rough calculation calculated by the gross profit calculation unit to a value obtained by subtracting the inventory quantity calculated by the inventory quantity calculation unit from the lead time demand calculated by the demand calculation unit. Divide the profit amount and calculate the gross profit level.

一方、影響度を粗利金額を示す指数とし、緊急度の低い場合の本発明の経営指数算出装置は、商品の単位あたりの粗利益金額を算出する粗利算出部とさらに有する構成とする。そしてこのときの影響度算出部は、発注点算出部により算出された在庫数量から、在庫数量検出部により算出された在庫数量を減じた値に、粗利算出部により算出された粗利益金額を除して、粗利益度を算出するようにする。   On the other hand, when the degree of influence is an index indicating the gross profit amount and the urgency level is low, the management index calculation apparatus of the present invention further includes a gross profit calculation unit for calculating the gross profit amount per unit of the product. At this time, the influence calculation unit calculates the gross profit amount calculated by the gross profit calculation unit to a value obtained by subtracting the inventory quantity calculated by the inventory quantity detection unit from the inventory quantity calculated by the order point calculation unit. To calculate the gross profit.

このように、本発明の経営指標に基づく発注優先順位算出装置は、商品の在庫管理を行うと共に商品の取り扱いに伴い生じる損失益等を算出することができるため、経営状態の推移や予測などにも利用することができる。   As described above, the order priority calculation device based on the management index of the present invention can manage the inventory of the product and calculate the loss profit etc. caused by the handling of the product. Can also be used.

また、本発明は、商品の発注や商品の管理を行う業者の端末が、商品の在庫数量を算出するステップと、商品一つあたりの受注件数を算出するステップと、在庫数量と受注件数とから、商品が欠品した場合の影響度を算出するステップとを実行することを特徴とする経営指標に基づく発注優先順位算出方法である。   Further, the present invention provides a terminal of a merchant that orders products and manages products, a step of calculating a stock quantity of the product, a step of calculating the number of orders received per product, a stock quantity and the number of orders received. An order priority calculation method based on a management index, characterized in that the step of calculating an influence when a product is missing is executed.

本発明の経営指標に基づく発注優先順位算出方法は、サプライヤーや小売業者等の商品の発注及び在庫管理を行う業者側で行われる。尚、近年では、パーソナルコンピュータを用いて商品の発注や在庫管理を行う場合が多く、本発明の経営指標に基づく発注優先順位算出方法も、サプライヤーや小売業者等の業者側の端末で行うと好ましい。   The ordering priority calculation method based on the management index of the present invention is performed on the merchant side that performs ordering and inventory management of products such as suppliers and retailers. In recent years, ordering of products and inventory management are often performed using a personal computer, and the order priority calculation method based on the management index of the present invention is also preferably performed at a terminal of a supplier such as a supplier or a retailer. .

そのため、本発明は、そのようなパーソナルコンピュータにより実行される経営指標に基づく発注優先順位算出プログラムとすると好ましい。本発明の経営指標に基づく発注優先順位算出プログラムは、商品の発注や商品の管理を行う業者の端末(パーソナルコンピュータ等)に、商品の在庫数量を算出するステップと、商品一つあたりの受注件数を算出するステップと、在庫数量と受注件数とから、商品が欠品した場合の影響度を算出するステップとを実行させることを特徴とする。   Therefore, the present invention is preferably an order priority calculation program based on a management index executed by such a personal computer. The order priority calculation program based on the management index of the present invention includes a step of calculating a stock quantity of a product on a terminal (personal computer or the like) of a trader who orders the product and manages the product, and the number of orders received per product. And a step of calculating the degree of influence when a product is out of stock from the inventory quantity and the number of orders received.

このように、本発明の経営指標に基づく発注優先順位算出方法及び経営指標に基づく発注優先順位算出プログラムによれば、自社内で効率的に且つ適切な在庫管理及び経営管理を行うことができる。   Thus, according to the order priority calculation method based on the management index and the order priority calculation program based on the management index of the present invention, it is possible to efficiently and appropriately manage inventory and management within the company.

尚、本発明の経営指標に基づく発注優先順位算出装置又は経営指標に基づく発注優先順位算出方法,経営指標に基づく発注優先順位算出プログラムを実行する端末としては、パーソナルコンピュータだけでなく、在庫管理や発注を行う際に利用する携帯型の端末(ハンディーターミナル等)や、無線LAN等のネットワークでサーバに接続されている携帯端末(携帯電話機やPDA等)を用いることができる。
このように、持ち運びができる端末で、本発明を実現することにより、倉庫や工場で在庫管理を行いながらタイムリーに商品の発注を行うことができ、在庫管理・発注作業に要する時間を大幅に削減することができる。
The order execution priority calculation device based on the management index of the present invention, the order priority calculation method based on the management index, and the terminal for executing the order priority calculation program based on the management index are not only personal computers but also inventory management and A portable terminal (handy terminal or the like) used when placing an order, or a portable terminal (such as a mobile phone or PDA) connected to a server via a network such as a wireless LAN can be used.
In this way, by implementing the present invention with a portable terminal, products can be ordered in a timely manner while managing inventory in a warehouse or factory, greatly reducing the time required for inventory management and ordering work. Can be reduced.

本発明によれば、商品の在庫管理に基づいて経営管理を行うことができる経営指標に基づく発注優先順位算出装置、経営指標に基づく発注優先順位算出方法、経営指標に基づく発注優先順位算出プログラムを提供することが可能となる。   According to the present invention, an order priority calculation device based on a management index capable of performing business management based on inventory management of products, an order priority calculation method based on a management index, and an order priority calculation program based on a management index are provided. It becomes possible to provide.

さらに、本発明によれば、商品の在庫管理に基づいて、商品を取り扱うビジネス上必要な様々な経営指標を算出する発注優先順位算出装置、経営指標に基づく発注優先順位算出方法、経営指標に基づく発注優先順位算出プログラムを提供することもできる。   Furthermore, according to the present invention, an order priority calculation device that calculates various business indicators necessary for business dealing with products based on inventory management of products, an order priority calculation method based on management indicators, and a management indicator An order priority calculation program can also be provided.

以下に本実施形態の発注優先順位算出装置、発注優先順位算出方法、発注優先順位算出プログラムについて図面を参照しながら詳説する。   Hereinafter, an order priority calculation device, an order priority calculation method, and an order priority calculation program according to the present embodiment will be described in detail with reference to the drawings.

本実施形態の発注優先順位算出装置は、製造業者に商品を発注し、小売店又は個人客に販売するサプライヤーの端末であるとして説明する。   The order priority calculation device according to the present embodiment will be described as a supplier terminal that orders a product from a manufacturer and sells the product to a retail store or an individual customer.

(ハードウェア構成)
まず、本実施形態の発注優先順位算出装置のハードウェア構成について説明する。
図1に示すように、本実施形態の発注優先順位算出装置1は、装置全体の制御を司るCPU(Central Prosessing Unit)2と、CPU2の処理に伴うデータを一時的に記憶するメインメモリとしてのRAM3と、CPU2にて実行される初期プログラムが記録されたROM4と、各種プログラム、テーブル、データを記録するHD(Hard Disk)5と、ユーザとのインターフェースとなるディスプレイやプリンタ等の出力装置6及びキーボードやマウス等の入力装置7と、発注優先順位算出装置1をインターネット等の通信回線に接続するための通信モジュール8とを備えている。すなわち、本実施形態の発注優先順位算出装置1は、汎用のパーソナルコンピュータを好適に用いることができる。
(Hardware configuration)
First, the hardware configuration of the order priority calculation device of this embodiment will be described.
As shown in FIG. 1, the order priority calculation device 1 according to the present embodiment is a CPU (Central Processing Unit) 2 that controls the entire device, and a main memory that temporarily stores data associated with the processing of the CPU 2. RAM 3, ROM 4 in which an initial program to be executed by CPU 2 is recorded, HD (Hard Disk) 5 for recording various programs, tables, and data, an output device 6 such as a display or a printer as an interface with a user, and An input device 7 such as a keyboard and a mouse and a communication module 8 for connecting the order priority calculation device 1 to a communication line such as the Internet are provided. That is, a general-purpose personal computer can be suitably used for the order priority calculation device 1 of the present embodiment.

本実施形態に係るHD5には発注優先順位算出プログラムが記録されており、CPU2
がRAM3を介してこのプログラムを読み出すことにより経営指標の算出処理が実行される。尚、発注優先順位算出プログラムの処理手順については後述する。
In the HD 5 according to the present embodiment, an order priority calculation program is recorded, and the CPU 2
Reads out this program via the RAM 3 to execute management index calculation processing. The processing procedure of the order priority calculation program will be described later.

また、サプライヤーは、商品の在庫を考慮しながら商品の発注を行うため、HD5内に商品の在庫を管理するためのデータベース9が構築されている。このデータベース9は、図2に示すように、現在における商品の在庫数量,一日に販売する商品の数量(以下、日販数量と称す),一日に商品を販売する客件数(以下、日販件数と称す),商品一個あたりの客件数,商品を発注してから納入するまでの日数(以下、納入LT(リードタイム)と称す),発注した商品が納入するまでの期間に必要な(需要のある)商品の数量(以下、LT分需要と称す),発注した商品が納入するまでに商品が欠品しないために必要な在庫数量(以下、安全在庫と称す),商品の発注を行う基準となる在庫数量(以下、発注点と称す)が、商品のSKU(Stocking Keeping Unit)毎に関連づけられたものである。   Further, in order for the supplier to place an order for the product in consideration of the stock of the product, a database 9 for managing the stock of the product is built in the HD 5. As shown in FIG. 2, the database 9 includes the current inventory quantity of goods, the quantity of goods sold per day (hereinafter referred to as daily sales quantity), the number of customers who sell products per day (hereinafter referred to as daily sales quantity). ), The number of customers per product, the number of days from when the product is ordered until delivery (hereinafter referred to as delivery LT (lead time)), and the time required until the ordered product is delivered (demand The quantity of the product (hereinafter referred to as demand for LT), the inventory quantity necessary for the product not to be missing before the ordered product is delivered (hereinafter referred to as safety stock), and the criteria for ordering the product. The stock quantity (hereinafter referred to as ordering point) is associated with each SKU (Stocking Keeping Unit) of the product.

CPU2は、データベース9のデータを用いて、ROM4に記録された発注優先順位算出プログラムを読み出すことにより各種の経営指標が算出される。
以上が、本実施形態の発注優先順位算出装置1の構成である。
The CPU 2 uses the data in the database 9 to read out the order priority calculation program recorded in the ROM 4 to calculate various management indexes.
The above is the configuration of the order priority calculation device 1 of the present embodiment.

(経営指標算出処理)
次に、発注優先順位算出装置1により経営指標を算出する処理手順について説明する。尚、本実施形態では、経営指標を、欠品が発生した時の影響度(Demand Shortage Impact,以下DSI指数と称す)として説明する。
(Management index calculation processing)
Next, a processing procedure for calculating a management index by the order priority calculation device 1 will be described. In the present embodiment, the management index is described as the degree of influence when a shortage occurs (Demand Shortage Impact, hereinafter referred to as a DSI index).

まず、CPU2は発注優先順位算出プログラムを読み出し実行する。そして、CPU2は、データベース9を参照し、現在の在庫数量がリードタイム分の需要数量以下であるかを判断する(S01)。   First, the CPU 2 reads and executes an order priority calculation program. Then, the CPU 2 refers to the database 9 and determines whether the current inventory quantity is equal to or less than the demand quantity for the lead time (S01).

ここで、現在の在庫数量がリードタイム分の需要数量以下であると判断した場合、CPU2はDSI指数をαとして算出する(S02)。つまり、DSI指数αを算出する場合というのは、現在の在庫数量がリードタイム分の需要数量内にある場合といえる。   Here, when it is determined that the current inventory quantity is equal to or less than the demand quantity for the lead time, the CPU 2 calculates the DSI index as α (S02). That is, the case where the DSI index α is calculated can be said that the current inventory quantity is within the demand quantity corresponding to the lead time.

DSI指数αを算出するためには、以下に示す式1を用いる。

DSI指数α=(LT分需要−現在の在庫数量)÷(商品一個あたりの受注件数)
(式1)
In order to calculate the DSI index α, Equation 1 shown below is used.

DSI index α = (LT demand-current stock quantity) ÷ (number of orders received per product)
(Formula 1)

図2中のSKU:B,D,Fを例にして説明する。SKU:Bは、現在の在庫数量80,LT分需要120,商品一個あたりの受注件数2.00である。この数値を(式1)に当てはめると、DSI指数α=20.00となる。   A description will be given by taking SKU: B, D, and F in FIG. 2 as an example. SKU: B is the current inventory quantity 80, demand for LT 120, and the number of orders received per product 2.00. When this numerical value is applied to (Equation 1), the DSI index α = 20.00.

同様に、SKU:Dは、現在の在庫数量100,LT分需要120,商品一個あたりの受注件数3.00である。この数値を(式1)に当てはめると、DSI指数α=6.67となる。   Similarly, SKU: D is the current inventory quantity 100, the demand for LT 120, and the number of orders received per product 3.00. When this numerical value is applied to (Equation 1), the DSI index α = 6.67.

また、SKU:Fは、現在の在庫数量90,LT分需要100,商品一個あたりの受注件数5.00である。この数値を(式1)に当てはめると、DSI指数α=2.00となる。   SKU: F is the current inventory quantity 90, the demand for LT 100, and the number of orders received per product 5.00. When this numerical value is applied to (Equation 1), the DSI index α = 2.00.

DSI指数αが算出されると、CPU2は、算出したDSI指数αの大きさを比較して
降順でソートし、優先順位を付す処理を実行する(S03)。SKU:B,D,FのDSI指数αを降順に並べ替えると、SKU:B→D→Fの順になる。
When the DSI index α is calculated, the CPU 2 compares the calculated DSI index α, sorts them in descending order, and executes processing for assigning priorities (S03). When the DSI indices α of SKU: B, D, and F are rearranged in descending order, the order becomes SKU: B → D → F.

一方、ステップ01で、現在の在庫数量がリードタイム分の需要数量以上であると判断した場合、CPU2は、DSI指数をβとして算出する(S04)。つまり、DSI指数βを算出する場合というのは、現在の在庫数量がリードタイム分の需要数量内に無い場合といえる。   On the other hand, if it is determined in step 01 that the current inventory quantity is equal to or greater than the demand quantity for the lead time, the CPU 2 calculates the DSI index as β (S04). That is, the case where the DSI index β is calculated can be said that the current inventory quantity is not within the demand quantity for the lead time.

DSI指数βを算出するためには、以下に示す式2を用いる。
DSI指数β=(発注点−現在の在庫数量)÷(商品一個あたりの受注件数)
(式2)
In order to calculate the DSI index β, Formula 2 shown below is used.
DSI index β = (ordering point-current stock quantity) ÷ (number of orders per product)
(Formula 2)

図2中のSKU:A,C,Eを例にして説明する。SKU:Aは、現在の在庫数量55,発注点60,商品一個あたりの受注件数2.86である。この数値を(式2)に当てはめると、DSI指数β=1.75となる。   A description will be given by taking SKU: A, C, E in FIG. 2 as an example. SKU: A is the current inventory quantity 55, the order point 60, and the number of orders received per product 2.86. When this numerical value is applied to (Equation 2), the DSI index β = 1.75.

同様に、SKU:Cは、現在の在庫数量95,発注点120,商品一個あたりの受注件数5.00である。この数値を(式2)に当てはめると、DSI指数β=5.00となる。   Similarly, SKU: C is the current inventory quantity 95, the ordering point 120, and the number of orders received per product 5.00. When this numerical value is applied to (Equation 2), the DSI index β = 5.00.

また、SKU:Eは、現在の在庫数量140,発注点150,商品一個あたりの受注件数10.00である。この数値を(式2)に当てはめると、DSI指数β=1.00となる。   SKU: E is the current stock quantity 140, the ordering point 150, and the number of orders received per product 10.00. When this numerical value is applied to (Expression 2), the DSI index β = 1.00.

DSI指数βが算出されると、CPU2は、算出したDSI指数βの大きさを比較して降順でソートし、優先順位を付す処理を実行する(S05)。SKU:A,C,EのDSI指数βを降順に並べ替えると、SKU:C→A→Eの順になる。   When the DSI index β is calculated, the CPU 2 compares the calculated DSI index β, sorts them in descending order, and executes processing for assigning priorities (S05). When the DSI indices β of SKU: A, C, E are rearranged in descending order, SKU: C → A → E.

これらの結果を踏まえて、CPU2はDSI指数αとβとを併せて優先順位を決定する処理を実行する(S06)。ステップ02〜ステップ05の処理内容に基づきDSI指数αとβとを併せた優先順位は、SKU:B→D→F→C→A→Eとなる。   Based on these results, the CPU 2 executes a process of determining the priority order by combining the DSI indices α and β (S06). Based on the processing contents of Step 02 to Step 05, the combined priority of the DSI indexes α and β is SKU: B → D → F → C → A → E.

そして、CPU2は優先度の高い順に発注処理を実行し、本処理工程を完了とする(S07)。つまり、図2中のSKU:A〜Fは、ステップ06で決定された、SKU:B→D→F→C→A→Eの順に優先的に商品の発注を行う。   Then, the CPU 2 executes ordering processing in descending order of priority and completes this processing step (S07). That is, SKU: A to F in FIG. 2 place an order for products preferentially in the order of SKU: B → D → F → C → A → E determined in step 06.

これにより、商品が欠品した場合における損失度(影響度)を最小限に抑えることができる。例えば、図4を参照し、商品(SKU)AとBとについて説明する。尚、図4中の商品Aの発注点をA,入荷点をaとし、さらに商品Bの発注点をB,入荷点をbとする。図4は、商品A(又はB)の商品が、発注点A(又はB)の時点で発注され、入荷点a(又はb)の時点で商品が入荷することを示している。   Thereby, it is possible to minimize the degree of loss (influence) when a product is missing. For example, products (SKU) A and B will be described with reference to FIG. In FIG. 4, the ordering point for the product A is A, the arrival point is a, the ordering point for the product B is B, and the arrival point is b. FIG. 4 shows that the product A (or B) is ordered at the order point A (or B), and the product arrives at the arrival point a (or b).

まず、発注点Aは、商品Aの安全在庫数量内にあり、発注した商品が納入するまでの間(納入LT)に必要な商品数量は、LT分需要数量にてまかなうことができる。つまり、商品Aは、欠品することなく商品の発注を行うことができる。   First, the order point A is within the safety stock quantity of the product A, and the product quantity required until the ordered product is delivered (delivery LT) can be covered by the demand quantity for LT. In other words, the product A can be ordered without any shortage.

そして、商品Bの発注点Bは、商品BのLT分需要数量外にあり、発注した商品が納入するまでの間に必要な商品数量は、LT分需要数量にてまかなうことができない。すなわち、商品Bは欠品してしまうということになる。   The order point B of the product B is outside the LT demand quantity of the product B, and the product quantity required until the ordered product is delivered cannot be provided by the LT demand quantity. That is, the product B is missing.

また、図4に示すように、商品Cの発注点をC,入荷点をcとする。発注点Cは、商品Cの安全在庫数量内にあり、発注した商品が納入する間での間に必要な商品数量は、LT分需要数量にてまかなうことができる。ただし、商品の需要量が大幅に増えてしまい、LT分需要数量を超えてしまった場合は、欠品が生じてしまう。   In addition, as shown in FIG. 4, the order point of the product C is C, and the arrival point is c. The order point C is within the safety stock quantity of the product C, and the necessary product quantity during the delivery of the ordered product can be covered by the demand quantity for LT. However, if the demand amount of the product greatly increases and exceeds the demand amount for LT, a shortage will occur.

これらのことを考慮すると、商品Aよりも商品Cの発注を優先し、さらに商品Cよりも商品Bの発注を優先して行うとよいことがわかる。   Considering these matters, it is understood that the order of the product C should be given priority over the product A, and the order of the product B should be given priority over the product C.

このように、本実施例の発注優先順位算出装置1によれば、商品の欠品による損失度を最小限に抑えて、効率的に商品の発注を行うことができる。   As described above, according to the order priority calculation apparatus 1 of the present embodiment, it is possible to efficiently place an order for a product while minimizing the degree of loss due to a missing product.

また、本実施例の発注優先順位算出装置1によれば、適宜のタイミングで商品の発注を行うため、在庫数量を不要に増やすことなく、適切な在庫管理を行うことも可能となる。   In addition, according to the order priority calculation apparatus 1 of the present embodiment, since an order for products is made at an appropriate timing, it is possible to perform appropriate inventory management without unnecessarily increasing the inventory quantity.

(その他の実施態様)
上記実施例では、(式1)と(式2)とを利用して、発注優先順位算出装置1により、欠品が発生したときの影響度(DSI指数)を算出しましたが、本発明の発注優先順位算出装置はその他の経営指標を算出することもできる。
(Other embodiments)
In the above embodiment, the degree of influence (DSI index) when a shortage occurs is calculated by the order priority calculation device 1 using (Equation 1) and (Equation 2). The order priority calculation device can also calculate other management indicators.

例えば、損失額や粗利額を算出することができる。尚、損失額や粗利額を算出する場合にも、現在の在庫数量がLT分需要数量以上か、又は現在の在庫数量がLT分需要数量より少ないかの2パターンに分けて算出する。   For example, a loss amount and a gross profit amount can be calculated. Note that when calculating the loss amount and the gross profit amount, the calculation is divided into two patterns, ie, whether the current inventory quantity is greater than the LT demand quantity or the current inventory quantity is less than the LT demand quantity.

まず、現在の在庫数量がLT分需要数量以上の場合の損失額を算出する場合は(式3)を用いる。
損失額a=(LT分需要数量−現在の在庫数量)÷(一個あたりの売上金額)
(式3)
First, (Formula 3) is used when calculating the amount of loss when the current inventory quantity is equal to or greater than the LT demand quantity.
Loss amount a = (LT demand quantity−current inventory quantity) ÷ (sales amount per piece)
(Formula 3)

また、現在の在庫数量がLT分需要数量より少ない場合の損失額を算出する場合は(式4)を用いる。
損失額b=(発注点−現在の在庫数量)÷(一個あたりの売上金額)
(式4)
Further, when calculating the loss amount when the current inventory quantity is smaller than the demand quantity for LT, (Formula 4) is used.
Loss b = (ordering point-current stock quantity) ÷ (sales amount per piece)
(Formula 4)

(式3),(式4)により、商品が欠品することにより発生する具体的な損失額を算出することができる。   According to (Expression 3) and (Expression 4), it is possible to calculate a specific amount of loss that occurs when a product is out of stock.

また、現在の在庫数量がLT分需要数量以上の場合の粗利額を算出する場合は(式5)を用いる。
粗利額a=(LT分需要数量−現在の在庫数量)÷(一個あたりの粗利金額)
(式5)
Further, when calculating the gross profit when the current inventory quantity is equal to or greater than the LT demand quantity, (Formula 5) is used.
Gross profit a = (LT demand quantity-current inventory quantity) / (gross profit per piece)
(Formula 5)

また、現在の在庫数量がLT分需要数量より少ない場合の粗利額を算出する場合は(式6)を用いる。
粗利額b=(発注点−現在の在庫数量)÷(一個あたりの粗利金額)
(式6)
Further, when calculating the gross profit when the current inventory quantity is less than the demand quantity for LT, (Formula 6) is used.
Gross margin b = (Order point-Current inventory quantity) / (Gross margin per piece)
(Formula 6)

(式5),(式6)により、商品が欠品することにより発生する純利益(粗利)金額を算出することができる。   From (Equation 5) and (Equation 6), it is possible to calculate the net profit (gross profit) amount generated when a product is missing.

このように、本発明の発注優先順位算出装置、発注優先順位算出方法、発注優先順位算出プログラムによれば、商品の欠品発生時のユーザによる指示件数という影響度だけでなく、そのほかの経営指標によりビジネスを行う上における様々な影響度を算出することができる。   Thus, according to the order priority calculation device, order priority calculation method, and order priority calculation program of the present invention, not only the degree of influence of the number of instructions given by the user when a product shortage occurs, but also other management indicators It is possible to calculate various degrees of influence on doing business.

本実施例の発注優先順位算出装置のハードウェア構成を示すブロック図である。It is a block diagram which shows the hardware constitutions of the order priority calculation apparatus of a present Example. 商品毎の在庫管理に関するデータを示す表である。It is a table | surface which shows the data regarding stock management for every goods. 本実施例の発注優先順位算出方法の処理手順を示すフローチャートである。It is a flowchart which shows the process sequence of the order priority calculation method of a present Example. 発注点と納入点との関係を示す図である。It is a figure which shows the relationship between an order point and a delivery point.

符号の説明Explanation of symbols

1 発注優先順位算出装置
2 CPU
3 RAM
4 ROM
5 HD
6 出力装置
7 入力装置
8 通信モジュール
9 在庫管理データベース
1 Order priority calculation device 2 CPU
3 RAM
4 ROM
5 HD
6 Output device 7 Input device 8 Communication module 9 Inventory management database

Claims (3)

在庫の欠品による影響度を考慮して商品の発注優先順位を算出する発注優先順位算出装置であって、
少なくとも、現在における商品の在庫数量と、一日に販売する商品の数量である日販数量と、一日に商品を販売する客件数である日販件数と、商品一個あたりの客件数である一個あたり件数と、商品を発注してから納入するまでの日数であるリードタイム(LT)と、発注した商品が納入するまでの期間に必要な(需要のある)商品の数量であるLT分需要と、発注した商品が納入するまでに商品が欠品しないために必要な在庫数量である安全在庫と、商品の発注を行う基準となる在庫数量である発注点と、が商品毎に関連付けられたデータベースと、
前記データベースを参照して、発注優先順位を算出する中央処理装置と、
前記中央処理装置の算出結果を出力する出力装置とからなり、
前記中央処理装置は、前記データベースの、在庫数量とLT分需要とを読み出して、在庫数量がLT分需要よりも小さい場合には、優先度の比較的高い第1の影響度指数αを算出し、在庫数量がLT分需要よりも大きい場合には、優先度の比較的低い第2の影響度指数βを算出するとともに、
前記中央処理装置による前記第1の影響度指数αの算出は、前記データベースから読み出したLT分需要から在庫数量を減じた値を一個あたり件数で除し、
前記中央処理装置による前記第2の影響度指数βの算出は、発注点から在庫数量を減じた値を一個あたり件数で除し、
前記で算出された前記第1の影響度指数αの値の大きい順に第1の発注優先順位とし、前記第2の影響度指数βの大きい順に第2の発注優先順位とし、
前記第1の発注優先順位の次に前記第2の発注優先順位を並べて最終的な発注優先順位として出力装置から出力する発注優先順位算出装置。
An order priority calculation device that calculates the order priority of a product in consideration of the impact due to a stock shortage,
At least the current product inventory quantity, the daily sales volume, which is the volume of products sold per day, the daily sales volume, which is the number of customers who sell products per day, and the number of customers per product. Lead time (LT), which is the number of days from when the product is ordered to delivery, the demand for LT, which is the quantity of the product (with demand) required in the period until the ordered product is delivered, A database in which a safety stock, which is a necessary stock quantity so that a product does not run out before delivery, and a reorder point, which is a standard stock quantity for ordering the product, is associated with each product,
Referring to the database, a central processing unit for calculating order priority,
An output device that outputs the calculation result of the central processing unit,
The central processing unit reads the inventory quantity and the LT demand in the database, and if the inventory quantity is smaller than the LT demand, calculates the first influence degree index α having a relatively high priority. When the inventory quantity is larger than the demand for LT, the second influence degree index β having a relatively low priority is calculated,
The calculation of the first influence index α by the central processing unit, the value obtained by subtracting the stock quantity from the LT demand read from the database, divided by the number of cases,
The calculation of the second influence index β by the central processing unit, the value obtained by subtracting the inventory quantity from the order point is divided by the number of cases per piece,
A first order priority in descending order of the first impact value of the exponent α calculated in the, as a second order priority in descending order of the second impact index beta,
An ordering priority calculation device that arranges the second ordering priority next to the first ordering priority and outputs from the output device as a final ordering priority.
在庫の欠品による損失を算出する損失額算出装置であって、
少なくとも、現在における商品の在庫数量と、一日に販売する商品の数量である日販数量と、一日に商品を販売する客件数である日販件数と、商品一個あたり売上金額と、商品を発注してから納入するまでの日数であるリードタイム(LT)と、発注した商品が納入するまでの期間に必要な(需要のある)商品の数量であるLT分需要と、発注した商品が納入するまでに商品が欠品しないために必要な在庫数量である安全在庫と、商品の発注を行
う基準となる在庫数量である発注点と、が商品毎に関連付けられたデータベースと、
前記データベースを参照して、損出額を算出する中央処理装置と、
前記中央処理装置の算出結果を出力する出力装置とからなり、
前記中央処理装置は、前記データベースの、在庫数量とLT分需要とを読み出して、在庫数量がLT分需要よりも大きい場合には、第1の損失額aを算出し、在庫数量がLT分需要よりも小さい場合には、第2の損失額bを算出するとともに、
前記中央処理装置による前記第1の損失額aの算出は、前記データベースから読み出したLT分需要から在庫数量を減じた値を一個あたり売上金額で除し、
前記中央処理装置による前記第2の損失額bの算出は、発注点から在庫数量を減じた値を一個あたり売上金額で除し、
前記第1の損失額aと第2の損失額bとを出力装置から出力する欠品による損失を算出する損失算出装置。
A loss amount calculation device for calculating a loss due to a stock shortage,
At least the current product inventory quantity, the daily sales volume, which is the volume of products sold per day, the daily sales volume, which is the number of customers who sell products per day, the sales amount per product, and the ordering of products. Lead time (LT), which is the number of days from delivery to delivery, demand for LT, which is the quantity of the product (with demand) required in the period until the ordered product is delivered, and until the ordered product is delivered There is a database in which safety stock, which is a stock quantity necessary to prevent a product from being missing, and a reorder point, which is a stock quantity that serves as a basis for ordering products, is associated with each product,
A central processing unit for calculating a loss amount with reference to the database;
An output device that outputs the calculation result of the central processing unit,
The central processing unit reads the inventory quantity and the demand for LT in the database, and if the inventory quantity is larger than the demand for LT, calculates the first loss amount a, and the inventory quantity is the demand for LT. Is smaller than the second loss amount b,
The calculation of the first loss amount a by the central processing unit is performed by dividing the value obtained by subtracting the inventory quantity from the LT demand read from the database by the sales amount per unit,
The calculation of the second loss b by the central processing unit is performed by dividing the value obtained by subtracting the inventory quantity from the order point by the sales amount per piece.
A loss calculation device for calculating a loss due to a shortage of outputting the first loss amount a and the second loss amount b from an output device.
在庫の欠品による粗利額の変動を算出する粗利算出装置であって、
少なくとも、現在における商品の在庫数量と、一日に販売する商品の数量である日販数量と、一日に商品を販売する客件数である日販件数と、商品一個あたりの粗利金額と、商品を発注してから納入するまでの日数であるリードタイム(LT)と、発注した商品が納入するまでの期間に必要な(需要のある)商品の数量であるLT分需要と、発注した商品が納入するまでに商品が欠品しないために必要な在庫数量である安全在庫と、商品の発注を行う基準となる在庫数量である発注点と、が商品毎に関連付けられたデータベースと、
前記データベースを参照して、粗利額を算出する中央処理装置と、
前記中央処理装置の算出結果を出力する出力装置とからなり、
前記中央処理装置は、前記データベースの、在庫数量とLT分需要とを読み出して、在庫数量がLT分需要よりも大きい場合には、第1の粗利額aを算出し、在庫数量がLT分需要よりも小さい場合には、第2の粗利額bを算出するとともに、
前記中央処理装置による前記第1の粗利額aの算出は、前記データベースから読み出したLT分需要から在庫数量を減じた値を一個あたり粗利金額で除し、
前記中央処理装置による前記第2の粗利額bの算出は、発注点から在庫数量を減じた値を一個あたり粗利金額で除し、
前記第1の粗利額aと第2の粗利額bとを出力装置から出力する粗利算出装置。
A gross margin calculation device for calculating a change in gross margin due to a shortage of inventory,
At least the current product inventory quantity, the daily sales quantity that is the quantity of the product sold per day, the daily sales quantity that is the number of customers selling the product per day, the gross profit per product, and the product Lead time (LT), which is the number of days from order placement to delivery, demand for LT, which is the quantity of product (with demand) required in the period until the ordered product is delivered, and the ordered product is delivered A database in which a safety stock, which is a necessary stock quantity so that a product is not missing before the purchase, and a reorder point, which is a standard stock quantity for ordering the product, is associated with each product,
A central processing unit for calculating a gross profit amount with reference to the database;
An output device that outputs the calculation result of the central processing unit,
The central processing unit reads the inventory quantity and the LT demand in the database, and if the inventory quantity is larger than the LT demand, the central processing unit calculates the first gross profit amount a, and the inventory quantity is the LT quantity. If it is less than the demand, calculate the second gross margin b,
The calculation of the first gross profit amount a by the central processing unit is performed by dividing the value obtained by subtracting the inventory quantity from the LT demand read from the database by the gross profit amount per piece.
The calculation of the second gross profit amount b by the central processing unit is performed by dividing the value obtained by subtracting the inventory quantity from the order point by the gross profit amount per piece.
A gross margin calculation device that outputs the first gross margin amount a and the second gross margin amount b from an output device.
JP2006041192A 2006-02-17 2006-02-17 Order priority calculation device based on management index, order priority calculation method based on management index, order priority calculation program based on management index Active JP4996107B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2006041192A JP4996107B2 (en) 2006-02-17 2006-02-17 Order priority calculation device based on management index, order priority calculation method based on management index, order priority calculation program based on management index

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2006041192A JP4996107B2 (en) 2006-02-17 2006-02-17 Order priority calculation device based on management index, order priority calculation method based on management index, order priority calculation program based on management index

Publications (2)

Publication Number Publication Date
JP2007219941A JP2007219941A (en) 2007-08-30
JP4996107B2 true JP4996107B2 (en) 2012-08-08

Family

ID=38497160

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2006041192A Active JP4996107B2 (en) 2006-02-17 2006-02-17 Order priority calculation device based on management index, order priority calculation method based on management index, order priority calculation program based on management index

Country Status (1)

Country Link
JP (1) JP4996107B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5347276B2 (en) * 2008-02-01 2013-11-20 日本電気株式会社 Inventory management support device, inventory management support method, and program
KR102340810B1 (en) * 2021-04-26 2021-12-20 쿠팡 주식회사 Operating method for electronic apparatus for offering information related to order and electronic apparatus supporting thereof

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2541192B2 (en) * 1986-08-04 1996-10-09 トヨタ自動車株式会社 Parts production instruction device
JP2002304452A (en) * 1993-06-04 2002-10-18 Hitachi Ltd Device and method for managing commodity distribution
JPH08279013A (en) * 1995-04-07 1996-10-22 Hitachi Ltd Proper inventory volume setting system
JP2002183264A (en) * 2000-12-15 2002-06-28 Fuji Electric Co Ltd Device and method for planning delivery/vehicle allocation, and recording medium
JP4388713B2 (en) * 2001-03-29 2009-12-24 富士通株式会社 Daily delivery order optimization support system, method and program thereof
JP2003242326A (en) * 2002-02-20 2003-08-29 Hitachi Ltd Support system for coping with sudden event
JP2004118429A (en) * 2002-09-25 2004-04-15 Matsushita Electric Works Ltd Reasonable inventory quantity calculation method and its system
JP4199592B2 (en) * 2003-05-16 2008-12-17 東芝テック株式会社 Order support apparatus and order support program

Also Published As

Publication number Publication date
JP2007219941A (en) 2007-08-30

Similar Documents

Publication Publication Date Title
JP5918410B1 (en) Product sales forecasting system, product sales forecasting method, and non-transitory computer-readable recording medium
JP3698433B2 (en) Safety stock quantity calculation device, safety stock quantity calculation program and order point calculation device
JP5337174B2 (en) Demand prediction device and program thereof
Biçer et al. Optimal dynamic order scheduling under capacity constraints given demand‐forecast evolution
CN102282551A (en) Automated decision support for pricing entertainment tickets
JP5980408B2 (en) Supply rule generation device and supply rule generation program
JP6186537B1 (en) Stock management ordering apparatus, stock management ordering method, and program
JP2012247964A (en) Progress management apparatus and progress management program
JP2005015140A (en) Order quantity calculation system
JP2014032513A (en) Unit price setting device, unit price setting method, and unit price setting program
JP6844304B2 (en) Demand forecast model evaluation device, demand forecast model evaluation method and demand forecast model evaluation program
JP4996107B2 (en) Order priority calculation device based on management index, order priority calculation method based on management index, order priority calculation program based on management index
JP5847137B2 (en) Demand prediction apparatus and program
JP7040441B2 (en) Opportunity loss calculation system, opportunity loss calculation method and opportunity loss calculation program
JP2010256959A (en) Inventory management device, inventory management method, and its program
JP4876479B2 (en) Price presenting apparatus and price presenting program
JP6741470B2 (en) Sales unit price determination program, sales unit price determination method, and sales unit price determination device
JP6809148B2 (en) Program and combination extraction system
JP2014048757A (en) Information processing system, information processing device and program
JP4773855B2 (en) Cost information program
US11704612B2 (en) Supply chain management system, supply chain management method, and supply chain management apparatus
JP2018206329A (en) Inventory control and ordering device, inventory control and ordering method, and program
JP5773619B2 (en) Demand forecasting system
WO2016203879A1 (en) Forecast calculation device and forecast calculation method
Hill et al. Minimum Information Set for Effective Control

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20090105

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20110307

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20110315

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20110516

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20120124

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20120326

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20120417

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20120511

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150518

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 4996107

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250