JP4860250B2 - Gas shut-off device - Google Patents

Gas shut-off device Download PDF

Info

Publication number
JP4860250B2
JP4860250B2 JP2005341647A JP2005341647A JP4860250B2 JP 4860250 B2 JP4860250 B2 JP 4860250B2 JP 2005341647 A JP2005341647 A JP 2005341647A JP 2005341647 A JP2005341647 A JP 2005341647A JP 4860250 B2 JP4860250 B2 JP 4860250B2
Authority
JP
Japan
Prior art keywords
flow rate
signal
unit
valve
abnormal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2005341647A
Other languages
Japanese (ja)
Other versions
JP2007147430A (en
Inventor
卓久 大谷
浩一 植木
一高 浅野
裕治 中林
龍雄 藤本
守 鈴木
健一郎 湯浅
望 長井
祥子 甲野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Panasonic Corp
Tokyo Gas Co Ltd
Panasonic Holdings Corp
Original Assignee
Panasonic Corp
Tokyo Gas Co Ltd
Matsushita Electric Industrial Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Panasonic Corp, Tokyo Gas Co Ltd, Matsushita Electric Industrial Co Ltd filed Critical Panasonic Corp
Priority to JP2005341647A priority Critical patent/JP4860250B2/en
Publication of JP2007147430A publication Critical patent/JP2007147430A/en
Application granted granted Critical
Publication of JP4860250B2 publication Critical patent/JP4860250B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Measuring Volume Flow (AREA)

Description

本発明はガス遮断装置がガス通路を開閉栓したときに、測定条件想定外の流量に基づく異常判定を実施しないようにするものである。   In the present invention, when the gas shut-off device opens and closes the gas passage, the abnormality determination based on the flow rate that does not assume the measurement condition is not performed.

従来、この種のガス遮断装置は、特許文献1に記載されているように構成されている。   Conventionally, this type of gas shut-off device is configured as described in Patent Document 1.

図5は、特許文献1に記載された従来のガス遮断装置を示すものである。図5に示すように、ガス通路内を通過するガス流量に対応して流量信号aを出力する流量検出部1と、前記流量検出部1の前記流量信号aを受け取ると流量bを算出する流量算出部2と、前記流量算出部2の前記流量bを受け取ると予め保持している判定値と比較し異常であれば弁閉信号cを出力する異常流量判定部3と、前記異常流量判定部3の前記弁閉信号cまたは復帰入力部8の弁開信号eあるいはセンサ異常判定部6の前記弁閉信号cを受け取ると弁駆動信号dを出力する弁駆動部4と、前記弁駆動部4の前記弁駆動信号dを受け取るとガス通路を開栓または閉栓する弁5と、前記流量検出部1の前記流量信号aが予め定められた異常条件に合致するかどうかの異常判定を実施し異常成立時にのみ前記弁閉信号cを出力する前記センサ異常判定部6と、前記流量算出部2の前記流量bを受け取ると前記流量bを積算して保持する積算部7と、外部より復帰入力を受け付けると前記弁開信号eを出力する前記復帰入力部8とから構成されている。
特許第3624642号公報
FIG. 5 shows a conventional gas cutoff device described in Patent Document 1. In FIG. As shown in FIG. 5, the flow rate detection unit 1 that outputs a flow rate signal a corresponding to the gas flow rate that passes through the gas passage, and the flow rate b that calculates the flow rate b when the flow rate signal a of the flow rate detection unit 1 is received. When the flow rate b of the flow rate calculation unit 2 is received, the calculation unit 2, the abnormal flow rate determination unit 3 that outputs a valve closing signal c if it is abnormal as compared with a determination value held in advance, and the abnormal flow rate determination unit 3, when the valve closing signal c of 3 or the valve opening signal e of the return input unit 8 or the valve closing signal c of the sensor abnormality determination unit 6 is received, the valve driving unit 4 outputs a valve driving signal d, and the valve driving unit 4 When the valve driving signal d is received, the valve 5 that opens or closes the gas passage and the flow rate signal a of the flow rate detection unit 1 is subjected to an abnormality determination to determine whether or not it meets a predetermined abnormal condition. The sensor that outputs the valve closing signal c only when it is established. The abnormality determination unit 6, the integration unit 7 that integrates and holds the flow rate b when receiving the flow rate b of the flow rate calculation unit 2, and the return input that outputs the valve opening signal e when receiving a return input from the outside Part 8.
Japanese Patent No. 3624642

しかしながら、前記従来の構成では流量検出部1で検出した流量信号aに基づき、異常流量判定、センサ異常判定、積算を実施するよにしているので、流量信号aが現在使用しているガス種と異なる気体(例えば、熱量転換時やガス遮断装置の設置・交換時)が不均一に混合すると測定条件想定外の流量(不均一でガスの層が出来ると超音波の伝搬が均一になっている時と異なる伝わり方となるため)を示す可能性がある。   However, in the conventional configuration, abnormal flow determination, sensor abnormality determination, and integration are performed based on the flow signal a detected by the flow detection unit 1, so that the flow type signal a When different gases (for example, when changing the amount of heat or when installing or replacing a gas shut-off device) are mixed non-uniformly, the flow rate is not as expected for the measurement conditions (if the gas layer is non-uniform, the propagation of ultrasonic waves is uniform. There is a possibility of showing different ways).

超音波式ガス遮断装置の流量計測は上流側から下流側と下流側から上流側とセンサの送受信を切替、伝搬時間Tの差から流速を求める構成になっている。すなわち、発信側のセンサから出力された超音波を受信側では図6に示すような波形として取得し、Vのレベルを3波目が超えその後に初めてゼロクロスする時点を伝搬時間Tとして測定している。このため波形全体が適正な大きさでなければ異常な流速を算出することとなる。   The flow rate measurement of the ultrasonic gas shut-off device is configured to switch the transmission and reception of the sensor from the upstream side to the downstream side and from the downstream side to the upstream side, and obtain the flow velocity from the difference in the propagation time T. That is, the ultrasonic wave output from the sensor on the transmitting side is acquired as a waveform as shown in FIG. 6 on the receiving side, and the time when the third wave exceeds the third wave and zero crosses for the first time is measured as the propagation time T. Yes. For this reason, if the entire waveform is not an appropriate size, an abnormal flow velocity is calculated.

この適正な波形をつくるために波形の最大ピークをVH、VLの間に入るように都度ゲイン補正し、波形の3波目が常に初めてVのレベルを超えるようにしている。従って、ゲイン補正が想定外の変動(ゲインの上げ下げが追従できないくらい変化した場合や、上下限値に張り付いた場合等で適正な波形が得られないような場合)を必要とされたときに計測した流速が異常(例えば2波目や4波目で初めてVのレベルを超えた場合や、全ての波形のピークがVのレベルを超えない場合等)となる可能性があるという課題を有していた。   In order to create an appropriate waveform, the gain is corrected so that the maximum peak of the waveform falls between VH and VL so that the third wave of the waveform always exceeds the V level for the first time. Therefore, when the gain correction requires unexpected fluctuations (when the gain increases or decreases cannot be followed, or when an appropriate waveform cannot be obtained due to sticking to the upper and lower limits). There is a problem that the measured flow velocity may become abnormal (for example, when the V level exceeds the V level for the first time at the second or fourth wave, or when the peak of all waveforms does not exceed the V level). Was.

本発明は、前記従来の課題を解決するもので、測定条件想定外の流量信号に基づく判定を回避するために測定条件想定外となりうる可能性がある弁開閉時(例えば、熱量転換時やガス遮断装置の設置・交換時含めた遮断、復帰のタイミング)において、一過性(ガス種と異なる気体が均一化するまでの間)の異常な流量信号を任意の時間バイパスして異常
判定処理を回避するガス遮断装置を提供することを目的とする。
The present invention solves the above-described conventional problems, and avoids a determination based on a flow rate signal that does not assume the measurement condition, so that the measurement condition may not be assumed (for example, when the heat amount is changed or gas is changed). In the shutdown / return timing including when installing and replacing the shut-off device, the abnormal flow signal that is transient (until the gas different from the gas type becomes uniform) can be bypassed for an arbitrary period of time to perform an abnormality determination process. An object of the present invention is to provide a gas shut-off device that can be avoided.

前記従来の課題を解決するために、本発明のガス遮断装置は、異常バイパス部が異常流量判定部の弁閉信号または復帰入力部の弁開信号を受け取ると任意の時間バイパス信号を出力し、センサ異常判定部はバイパス信号があれば異常判定を停止するようにしたものである。   In order to solve the conventional problem, the gas shutoff device of the present invention outputs a bypass signal for an arbitrary time when the abnormal bypass unit receives the valve close signal of the abnormal flow rate determination unit or the valve open signal of the return input unit, The sensor abnormality determination unit stops the abnormality determination if there is a bypass signal.

これによってガス遮断装置が弁を開閉栓したときに発生する可能性のある一過性の異常な流量信号を任意の時間バイパスすることで、測定条件想定外の流量に基づく異常判定処理を回避することができる。   This bypasses the transient abnormal flow signal that may occur when the gas shut-off device opens and closes the valve for an arbitrary period of time, thereby avoiding an abnormality determination process based on a flow rate that is not expected of the measurement conditions. be able to.

本発明のガス遮断装置は任意の時間センサ異常判定をバイパスすることが可能となり、一過性の異常な流量信号を排除することが可能となる。従って、センサや計測回路が物理的に破損または故障しているような永続的なものと、一過性の異常な流量信号に基づくものとを切り分けることが可能となり、システムの信頼性を向上させることができる。   The gas shut-off device of the present invention can bypass any time sensor abnormality determination, and can eliminate a transient abnormal flow signal. Therefore, it is possible to distinguish between a permanent sensor or measurement circuit that is physically damaged or malfunctioning and a sensor or measurement circuit that is based on a transient abnormal flow signal, thereby improving system reliability. be able to.

第1の発明は、ガス通路内を通過するガス流量が異常であると判定時に前記ガス通路内のガスの流れを遮断する弁を設けたガス遮断装置において、前記ガス通路内を通過するガス流量に対応した物理量を検出するセンサを設け流量信号を出力する流量検出部と、前記流量検出部の流量信号を入力し流量を算出する流量算出部と、前記流量算出部が算出した流量値と予め保持している判定値とを比較し異常であれば弁閉信号を出力する異常流量判定部と、前記流量検出部からの流量信号が予め定められた異常条件に合致した場合には弁閉信号を出力するセンサ異常判定部と、弁閉状態から弁開状態への復帰入力を外部通信またはガス遮断装置に設けられたスイッチ等から入力すると弁開信号を出力する復帰入力部と、前記異常流量判定部の弁閉信号または前記復帰入力部の弁開信号あるいは前記センサ異常判定部の弁閉信号を入力し弁駆動信号を出力する弁駆動部と、前記弁駆動部の弁駆動信号を受け取るとガス通路を開栓または閉栓する弁と、前記異常流量判定部の弁閉信号または前記復帰入力部の弁開信号を入力し所定時間バイパス信号を出力する異常バイパス部とを備え、前記センサ異常判定部が、前記異常バイパス部からのバイパス信号がなければ前記流量検出部の流量信号が予め定められた異常条件に合致するかどうかの異常判定を実施し異常成立時に弁閉信号を出力し、前記異常バイパス部からのバイパス信号があれば予
め定められた異常条件の判定を停止するとともに、前記異常バイパス部は、前記異常流量判定部の弁閉信号または前記復帰入力部の弁開信号の入力を起点として所定時間前記流量検出部の流量信号の判定をバイパスすることで、前記センサ異常判定部が測定条件想定外の流量信号を異常と判定しないようにできる。
A first aspect of the present invention is a gas shut-off device provided with a valve that shuts off a gas flow in the gas passage when it is determined that the gas flow rate in the gas passage is abnormal. A flow rate detection unit that outputs a flow rate signal by providing a sensor that detects a physical quantity corresponding to the flow rate, a flow rate calculation unit that inputs a flow rate signal of the flow rate detection unit and calculates a flow rate, and a flow rate value calculated by the flow rate calculation unit in advance An abnormal flow rate determination unit that outputs a valve closing signal if it is abnormal by comparing with a determination value that is held, and a valve closing signal when the flow rate signal from the flow rate detection unit matches a predetermined abnormal condition A sensor abnormality determination unit that outputs a valve, a return input unit that outputs a valve open signal when a return input from the valve closed state to the valve open state is input from an external communication or a switch provided in the gas shut-off device, and the abnormal flow rate Judgment valve closed Or a valve driving signal for inputting a valve opening signal of the return input unit or a valve closing signal of the sensor abnormality determining unit and outputting a valve driving signal, and a gas passage is opened when the valve driving signal of the valve driving unit is received. Or a valve for closing, and an abnormal bypass unit that inputs a valve closing signal of the abnormal flow rate determination unit or a valve opening signal of the return input unit and outputs a bypass signal for a predetermined time, and the sensor abnormality determination unit includes the abnormality If there is no bypass signal from the bypass unit, an abnormality determination is performed as to whether or not the flow rate signal of the flow rate detection unit matches a predetermined abnormal condition, and a valve closing signal is output when the abnormality is established. If there is a bypass signal, the determination of the predetermined abnormal condition is stopped, and the abnormal bypass unit inputs the valve close signal of the abnormal flow rate determination unit or the valve open signal of the return input unit. By bypassing the determination of the predetermined time the flow detector of the flow signal as a point, it can be such that the sensor abnormality determination unit determines that no abnormal flow signal unexpected measurement conditions.

第2の発明は、ガス通路内を通過するガス流量が異常であると判定時に前記ガス通路内のガスの流れを遮断する弁を設けたガス遮断装置において、前記ガス通路内を通過するガス流量に対応して流量信号を出力する流量検出部と、前記流量検出部の流量信号を入力し流量を算出する流量算出部と、前記流量算出部が算出した流量値と予め保持している判定値とを比較し異常であれば弁閉信号を出力する異常流量判定部と、弁閉状態から弁開状態への復帰入力を外部より受け付けると前記弁開信号を出力する復帰入力部と、前記異常流量判定部の弁閉信号または復帰入力部の弁開信号を入力し弁駆動信号を出力する弁駆動部と、前記弁駆動部の弁駆動信号を入力しガス通路を開栓または閉栓する弁と、前記異常流量判定部の弁閉信号または前記復帰入力部の弁開信号を入力し所定時間前記流量算出部からの流量値の出力を停止する積算バイパス部と、前記積算バイパス部からの流量値を受け取ると流量値を積算して保持する積算部とを備えることにより、前記積算バイパス部が前
記異常流量判定部の弁閉信号または前記復帰入力部の弁開信号の入力を起点として所定時間前記積算バイパス部からの流量値の出力を停止することで、前記積算部が測定条件想定外の流量値を積算しないようにできる。
According to a second aspect of the present invention, in the gas shut-off device provided with a valve for shutting off the gas flow in the gas passage when it is determined that the gas flow rate in the gas passage is abnormal, the gas flow rate passing through the gas passage A flow rate detection unit that outputs a flow rate signal in response to the flow rate, a flow rate calculation unit that inputs a flow rate signal of the flow rate detection unit to calculate a flow rate, a flow rate value calculated by the flow rate calculation unit, and a determination value that is held in advance An abnormal flow rate determination unit that outputs a valve closing signal if abnormal, a return input unit that outputs the valve opening signal when receiving a return input from the valve closed state to the valve open state from the outside, and the abnormality A valve driving unit that inputs a valve closing signal of a flow rate determination unit or a valve opening signal of a return input unit and outputs a valve driving signal; a valve that inputs a valve driving signal of the valve driving unit and opens or closes a gas passage; , The valve closing signal of the abnormal flow rate determination unit or the An integration bypass unit that inputs a valve opening signal of the return input unit and stops outputting the flow rate value from the flow rate calculation unit for a predetermined time, and an integration that accumulates and holds the flow rate value when receiving the flow rate value from the integration bypass unit The integrated bypass unit stops the output of the flow rate value from the integrated bypass unit for a predetermined time from the input of the valve closing signal of the abnormal flow rate determining unit or the valve opening signal of the return input unit. Thereby, it is possible to prevent the integration unit from integrating the flow rate value that is not expected of the measurement conditions.

第3の発明は、ガス通路内を通過するガス流量が異常であると判定時に前記ガス通路内のガスの流れを遮断する弁を設けたガス遮断装置において、前記ガス通路内を通過するガス流量に対応して流量信号を出力する流量検出部と、前記流量検出部の流量信号を入力しガス流量を算出する流量算出部と、流量値を受け取ると予め保持している判定値と比較し異常であれば弁閉信号を出力する前記異常流量判定部と、前記異常流量判定部の弁閉信号または前記復帰入力部の弁開信号を受け取ると弁駆動信号を出力する弁駆動部と、前記弁駆動部の弁駆動信号を入力し前記ガス通路を開栓または閉栓する弁と、閉栓状態から開栓状態への復帰入力を受け付けると弁開信号を出力する復帰入力部と、前記異常流量判定部の弁閉信号または復帰入力部の弁開信号を受け取ると所定時間前記流量算出部からの流量値の出力を停止する流量バイパス部と、前記流量バイパス部が前記異常流量判定部の前記弁閉信号または前記復帰入力部の前記弁開信号を起点として任意の時間前記流量バイパス部からの流量値の出力を停止することで、前記異常流量判定部が測定条件想定外の前記流量を判定しないようにすることができる。   According to a third aspect of the present invention, in the gas shut-off device provided with a valve for shutting off the gas flow in the gas passage when it is determined that the gas flow rate in the gas passage is abnormal, the gas flow rate passing through the gas passage A flow rate detection unit that outputs a flow rate signal in response to the flow rate, a flow rate calculation unit that inputs a flow rate signal of the flow rate detection unit to calculate a gas flow rate, and an abnormality compared with a judgment value that is held in advance when the flow rate value is received If so, the abnormal flow determination unit that outputs a valve close signal, the valve drive unit that outputs a valve drive signal when receiving the valve close signal of the abnormal flow determination unit or the valve open signal of the return input unit, and the valve A valve that opens and closes the gas passage by inputting a valve drive signal of the drive unit, a return input unit that outputs a valve open signal when receiving a return input from the closed state to the open state, and the abnormal flow rate determination unit Valve closing signal or return input A flow rate bypass unit that stops output of a flow rate value from the flow rate calculation unit for a predetermined time upon receipt of an open signal; and By stopping the output of the flow rate value from the flow rate bypass unit for an arbitrary time from the starting point, it is possible to prevent the abnormal flow rate determination unit from determining the flow rate outside the assumption of the measurement conditions.

第4の発明は、特に第1の発明のセンサ異常判定部を、前記異常バイパス部からの前記バイパス信号があれば流量算出部の流量が所定以上の場合、予め定められた異常条件の判定を実施し異常否成立になるとパージ完了信号を出力し、前記流量算出部の前記流量が所定未満の場合は予め定められた異常条件の判定を停止するものとし、前記センサ異常判定部の前記パージ完了信号を受け取るとパージ完了表示をする表示部と、前記センサ異常判定部の前記パージ完了信号を受け取ると外部に通報する外部通信部とにより、異常判定が否成立状態で前記流量算出部からの前記流量が所定以上流れていることで異常状態が確実に解除されガスを正常に使うことが可能となったことを表示し通報することができる。 A fourth invention is, in particular sensor abnormality determination unit of the first invention, when the flow rate of the flow rate calculation unit if the bypass signal from the abnormality bypass section is equal to or greater than a predetermined, the determination of the predetermined abnormal condition When a failure is established, a purge completion signal is output. When the flow rate of the flow rate calculation unit is less than a predetermined value , the determination of a predetermined abnormal condition is stopped, and the purge of the sensor abnormality determination unit is stopped. When a completion signal is received, a display unit that displays purge completion and an external communication unit that notifies the outside when the purge completion signal of the sensor abnormality determination unit is received are output from the flow rate calculation unit when the abnormality determination is not established. It is possible to display and report that the abnormal state has been reliably canceled and the gas can be used normally when the flow rate is higher than a predetermined value.

以下、本発明の実施の形態について、図面を参照しながら説明する。なお、この実施の形態によって本発明が限定されるものではない。   Hereinafter, embodiments of the present invention will be described with reference to the drawings. Note that the present invention is not limited to the embodiments.

(実施の形態1)
図1は、本発明の実施の形態1におけるガス遮断装置の機能ブロック図を示すものである。
(Embodiment 1)
FIG. 1 shows a functional block diagram of a gas cutoff device in Embodiment 1 of the present invention.

図1において、流量検出部11はガス通路内を通過するガス流量(例えば、ガス通路内に対向した超音波センサを取り付け超音波の伝播時間の違いからガス流量を検知してもよいし、ガス通路内にガスが流れる経路を作成しガスが経路を流れるときに発生する振動からガス流量を検知しても同様の効果が得られる)に対応して流量信号Aを出力する。   In FIG. 1, the flow rate detection unit 11 may detect a gas flow rate based on a difference in propagation time of ultrasonic waves by attaching an ultrasonic sensor facing the gas passage (for example, an ultrasonic sensor facing the gas passage) A flow rate signal A is output in correspondence with a flow path A in which a gas flow is created and a gas flow rate is detected from vibration generated when the gas flows in the passage.

流量算出部12は流量検出部11の流量信号Aを受け取ると流量Bを算出する。   When the flow rate calculation unit 12 receives the flow rate signal A from the flow rate detection unit 11, the flow rate calculation unit 12 calculates the flow rate B.

異常流量判定部13は流量算出部12の流量Bを受け取ると予め保持している判定値(例えば、ガス遮断装置が許容している最大通過ガス流量でもよいし、少量のガス流量が継続して流れ続けて許容時間を超えた場合でもよい)と比較し異常であれば弁閉信号Cを出力する。   When the abnormal flow rate determination unit 13 receives the flow rate B of the flow rate calculation unit 12, the determination value held in advance (for example, the maximum flow rate gas flow allowed by the gas shut-off device may be used, or a small amount of gas flow rate continues. The valve closing signal C is output if there is an abnormality as compared with the case where the allowable time is exceeded after the flow continues.

弁駆動部14は異常流量判定部13の弁閉信号Cまたは復帰入力部16の弁開信号Eあ
るいはセンサ異常判定部18の弁閉信号Cを受け取ると弁駆動信号D(例えば、弁15を開栓または閉栓するように駆動させる信号)を出力する。
When the valve drive unit 14 receives the valve close signal C of the abnormal flow rate determination unit 13, the valve open signal E of the return input unit 16 or the valve close signal C of the sensor abnormality determination unit 18, the valve drive signal D (for example, opens the valve 15). Output a signal to drive the stopper or the stopper.

弁15は弁駆動部14の弁駆動信号Dを受け取るとガス通路を開栓または閉栓する。   When the valve 15 receives the valve drive signal D of the valve drive unit 14, the valve 15 opens or closes the gas passage.

復帰入力部16は外部より復帰入力(例えば、ボタンによる入力でも良いし、リードスイッチのような非接触のものでも良いし、通信電文による入力でも同等の効果が得られる)を受け付けると弁開信号Eを出力する。   When the return input unit 16 receives a return input from the outside (for example, an input by a button, a non-contact type such as a reed switch, or the same effect can be obtained by an input by a communication message), a valve opening signal is received. E is output.

異常バイパス部17は異常流量判定部13の弁閉信号Cまたは復帰入力部16の弁開信号Eを受け取ると任意の時間(例えば、ガス種と異なる気体が均一化するまでの10分間としても良いし、無条件1時間等に設定してもよい)バイパス信号Fを出力(任意の時間が経過する前に弁閉信号Cまたは弁開信号Eが再度発生する場合は、任意の時間を再スタートさせて延長してもよい)する。   When the abnormal bypass unit 17 receives the valve closing signal C of the abnormal flow rate determining unit 13 or the valve opening signal E of the return input unit 16, the abnormal bypass unit 17 may have an arbitrary time (for example, 10 minutes until the gas different from the gas type becomes uniform). (It may be set unconditionally for 1 hour, etc.) Outputs bypass signal F (if valve closing signal C or valve opening signal E occurs again before the arbitrary time elapses, restart the arbitrary time) Can be extended).

センサ異常判定部18は異常バイパス部17からのバイパス信号Fがなければ流量検出部11の流量信号Aが予め定められた異常条件(例えば、連続でセンサからの信号がない場合や、ゲイン補正の値が上下限値に張り付く場合など)に合致するかどうかの異常判定を実施し異常成立時にのみ弁閉信号Cを出力する。異常バイパス部17からのバイパス信号Fがあれば予め定められた異常条件の判定を停止する。   If there is no bypass signal F from the abnormal bypass unit 17, the sensor abnormality determination unit 18 determines that the flow rate signal A of the flow rate detection unit 11 is a predetermined abnormal condition (for example, when there is no continuous signal from the sensor, An abnormality determination is performed as to whether or not the value matches the upper and lower limit values, and the valve closing signal C is output only when the abnormality is established. If there is a bypass signal F from the abnormal bypass unit 17, the determination of a predetermined abnormal condition is stopped.

以上のように構成されたガス遮断装置について、以下その動作、作用を説明する。   The operation and action of the gas shut-off device configured as described above will be described below.

まず、弁閉信号Cまたは弁開信号Eが発生(また地震、警報器、圧力低下・上昇等の他のセンサにより異常を検出した場合であっても良いし、有線または無線による通信で弁の開閉を指示された場合でも良い)すると任意の時間バイパス信号Fを出力する。
そして、バイパス信号Fがあれば予め定められた異常条件の判定を停止することとなる。
First, the valve closing signal C or the valve opening signal E is generated (or an abnormality may be detected by another sensor such as an earthquake, an alarm device, a pressure drop / rise, etc. The bypass signal F is output for an arbitrary time.
If there is a bypass signal F, the determination of a predetermined abnormal condition is stopped.

以上のように、本実施の形態においてはセンサ異常判定部18が、流量検出部11からのガス遮断装置が弁を開閉栓したとき発生する可能性のある一過性の異常な流量信号Aを排除することができ、異常な流量信号Aに基づくセンサ異常判定を回避することができる。   As described above, in the present embodiment, the sensor abnormality determination unit 18 generates the transient abnormal flow signal A that may be generated when the gas shut-off device from the flow detection unit 11 opens and closes the valve. It is possible to eliminate the sensor abnormality determination based on the abnormal flow rate signal A.

(実施の形態2)
図2は、本発明の実施の形態2におけるガス遮断装置の機能ブロック図を示すものである。
(Embodiment 2)
FIG. 2 shows a functional block diagram of the gas cutoff device according to Embodiment 2 of the present invention.

図2において、流量検出部11はガス通路内を通過するガス流量に対応して流量信号Aを出力する。流量算出部12は流量検出部11の流量信号Aを受け取ると流量Bを算出する。   In FIG. 2, the flow rate detection unit 11 outputs a flow rate signal A corresponding to the gas flow rate passing through the gas passage. When the flow rate calculation unit 12 receives the flow rate signal A from the flow rate detection unit 11, the flow rate calculation unit 12 calculates the flow rate B.

異常流量判定部13は流量算出部12の流量Bを受け取ると予め保持している判定値と比較し異常であれば弁閉信号Cを出力する。   When the abnormal flow rate determination unit 13 receives the flow rate B of the flow rate calculation unit 12, the abnormal flow rate determination unit 13 compares the determination value stored in advance and outputs a valve closing signal C if abnormal.

弁駆動部14は異常流量判定部13の弁閉信号Cまたは復帰入力部16の弁開信号Eを受け取ると弁駆動信号Dを出力する。弁15は弁駆動部14の弁駆動信号Dを受け取るとガス通路を開栓または閉栓する。   When the valve drive unit 14 receives the valve close signal C of the abnormal flow rate determination unit 13 or the valve open signal E of the return input unit 16, the valve drive unit 14 outputs the valve drive signal D. When the valve 15 receives the valve drive signal D of the valve drive unit 14, the valve 15 opens or closes the gas passage.

復帰入力部16は外部より復帰入力を受け付けると弁開信号Eを出力する。   The return input unit 16 outputs a valve opening signal E when receiving a return input from the outside.

積算バイパス部19は異常流量判定部13の弁閉信号Cまたは復帰入力部16の弁開信号Eを受け取ると任意の時間(例えば、ガス種と異なる気体が均一化するまでの10分間としても良いし、ゲイン補正の値が所定値未満になるまでとしても良い。また復帰入力後のガス通路内に漏れがないことが確認され弁が開栓されるまでの期間としても同等効果が得られる)流量算出部12の流量Bの出力を停止する(任意の時間が経過する前に弁閉信号Cまたは弁開信号Eが再度発生する場合は、任意の時間を再スタートさせて延長してもよい)。   When the integration bypass unit 19 receives the valve closing signal C of the abnormal flow rate determination unit 13 or the valve opening signal E of the return input unit 16, the integration bypass unit 19 may have an arbitrary time (for example, 10 minutes until the gas different from the gas type is made uniform). The gain correction value may be less than the predetermined value, and the same effect can be obtained as a period until the valve is opened after it is confirmed that there is no leakage in the gas passage after the return input) The output of the flow rate B of the flow rate calculation unit 12 is stopped (if the valve closing signal C or the valve opening signal E is generated again before an arbitrary time elapses, the arbitrary time may be restarted and extended. ).

積算部20は積算バイパス部19からの流量Bを受け取ると流量Bを積算して保持(例えば、保持した積算値は有線または無線による通信で外部に出力したり、LCD等に表示される)する。   When the integrating unit 20 receives the flow rate B from the integrating bypass unit 19, the integrating unit 20 integrates and holds the flow rate B (for example, the stored integrated value is output to the outside by wired or wireless communication or displayed on the LCD or the like). .

以上のように構成されたガス遮断装置について、以下その動作、作用を説明する。   The operation and action of the gas shut-off device configured as described above will be described below.

まず、弁閉信号Cまたは弁開信号Eが発生(また地震、警報器、圧力低下・上昇等の他のセンサにより異常を検出した場合であっても良いし、有線または無線による通信で弁の開閉を指示された場合でも良い)すると任意の時間流量Bの出力を停止する。   First, the valve closing signal C or the valve opening signal E is generated (or an abnormality may be detected by another sensor such as an earthquake, an alarm device, a pressure drop / rise, etc. The output of the flow rate B for an arbitrary time is stopped.

以上のように、本実施の形態においては積算バイパス部19が、流量算出部12からのガス遮断装置が弁を開閉栓したとき発生する可能性のある一過性の異常な流量Bを排除することができ、一過性の異常な流量Bを積算することを回避することができる。   As described above, in the present embodiment, the integration bypass unit 19 eliminates the transient abnormal flow rate B that may occur when the gas shutoff device from the flow rate calculation unit 12 opens and closes the valve. Therefore, it is possible to avoid integrating the transient abnormal flow rate B.

(実施の形態3)
図3は、本発明の実施の形態3におけるガス遮断装置の機能ブロック図を示すものである。
(Embodiment 3)
FIG. 3 shows a functional block diagram of the gas cutoff device according to Embodiment 3 of the present invention.

図3において、流量検出部11はガス通路内を通過するガス流量に対応して流量信号Aを出力する。流量算出部12は流量検出部11の流量信号Aを受け取ると流量Bを算出する。   In FIG. 3, the flow rate detector 11 outputs a flow rate signal A corresponding to the gas flow rate passing through the gas passage. When the flow rate calculation unit 12 receives the flow rate signal A from the flow rate detection unit 11, the flow rate calculation unit 12 calculates the flow rate B.

流量バイパス部21は異常流量判定部13の弁閉信号Cまたは復帰入力部16の弁開信号Eを受け取ると任意の時間(例えば、ガス種と異なる気体が均一化するまでの10分間としても良いし、ゲイン補正の値が所定値未満になるまでとしても良い。また復帰入力後のガス通路内に漏れがないことが確認され弁が開栓されるまでの期間としても同等効果が得られる)流量算出部12の流量Bの出力を停止する(任意の時間が経過する前に弁閉信号Cまたは弁開信号Eが再度発生する場合は、任意の時間を再スタートさせて延長してもよい)。   When the flow rate bypass unit 21 receives the valve close signal C of the abnormal flow rate determination unit 13 or the valve open signal E of the return input unit 16, the flow rate bypass unit 21 may have an arbitrary time (for example, 10 minutes until the gas different from the gas type becomes uniform). The gain correction value may be less than the predetermined value, and the same effect can be obtained as a period until the valve is opened after it is confirmed that there is no leakage in the gas passage after the return input) The output of the flow rate B of the flow rate calculation unit 12 is stopped (if the valve closing signal C or the valve opening signal E is generated again before an arbitrary time elapses, the arbitrary time may be restarted and extended. ).

異常流量判定部13は流量バイパス部21からの流量Bを受け取ると予め保持している判定値と比較し異常であれば弁閉信号Cを出力する。   When the abnormal flow rate determination unit 13 receives the flow rate B from the flow rate bypass unit 21, the abnormal flow rate determination unit 13 compares the determination value stored in advance and outputs a valve closing signal C if abnormal.

弁駆動部14は異常流量判定部13の弁閉信号Cまたは復帰入力部16の弁開信号Eを受け取ると弁駆動信号Dを出力する。弁15は弁駆動部14の弁駆動信号Dを受け取るとガス通路を開栓または閉栓する。   When the valve drive unit 14 receives the valve close signal C of the abnormal flow rate determination unit 13 or the valve open signal E of the return input unit 16, the valve drive unit 14 outputs the valve drive signal D. When the valve 15 receives the valve drive signal D of the valve drive unit 14, the valve 15 opens or closes the gas passage.

復帰入力部は外部より復帰入力を受け付けると弁開信号Eを出力する。   When the return input unit receives a return input from the outside, it outputs a valve opening signal E.

以上のように構成されたガス遮断装置について、以下その動作、作用を説明する。   The operation and action of the gas shut-off device configured as described above will be described below.

まず、弁閉信号Cまたは弁開信号Eが発生(また地震、警報器、圧力低下・上昇等の他
のセンサにより異常を検出した場合であっても良いし、有線または無線による通信で弁の開閉を指示された場合でも良い)すると任意の時間流量Bの出力(例えば、ガス通路の閉栓後、流量が発生すると弁が完全に動作していないとみなし再度閉栓を繰り返す異常流量判定機能を有している。このとき誤った流量に基づき弁を駆動し閉栓させるとガス遮断装置の電源である電池を無駄に消費することとなる)を停止する。
First, the valve closing signal C or the valve opening signal E is generated (or an abnormality may be detected by another sensor such as an earthquake, an alarm device, a pressure drop / rise, etc. If the switch is instructed to open and close, the output of the flow rate B at any time (for example, if the flow rate is generated after the gas passage is closed, the valve is regarded as not operating completely and the abnormal flow rate judgment function is repeated to close the plug again. At this time, if the valve is driven and closed based on an incorrect flow rate, the battery as the power source of the gas shutoff device is wasted).

以上のように、本実施の形態においては流量バイパス部21が、流量算出部12からのガス遮断装置が弁を開閉栓したとき発生する可能性のある一過性の異常な流量Bを排除することができ、一過性の異常な流量Bを異常流量判定すること回避することができる。   As described above, in the present embodiment, the flow rate bypass unit 21 eliminates the transient abnormal flow rate B that may occur when the gas shut-off device from the flow rate calculation unit 12 opens and closes the valve. It is possible to avoid a transient abnormal flow rate B from being determined as an abnormal flow rate.

(実施の形態4)
図4は、本発明の実施の形態4におけるガス遮断装置の機能ブロック図を示すものである。なお、図1と同一の記号のものは同一の機能のため説明を省略する。
(Embodiment 4)
FIG. 4 shows a functional block diagram of the gas cutoff device according to Embodiment 4 of the present invention. Note that the same reference numerals as those in FIG.

図4において、センサ異常判定部18は異常バイパス部17からのバイパス信号Fがなければ流量検出部11の流量信号Aが予め定められた異常条件に合致するかどうかの異常判定を実施し異常成立時にのみ弁閉信号Cを出力する。   In FIG. 4, if there is no bypass signal F from the abnormal bypass unit 17, the sensor abnormality determination unit 18 performs abnormality determination as to whether or not the flow rate signal A of the flow rate detection unit 11 matches a predetermined abnormal condition, and the abnormality is established. Only when the valve closing signal C is output.

異常バイパス部17からのバイパス信号Fがあれば流量算出部12の流量Bが所定以上(例えば、ガス種と異なる気体が混合している状態を下流側に十分に押し出した量の1000L/h以上の大流量)で場合、予め定められた異常条件の判定を実施し異常否成立(すなわち、一過性の異常な流量ではなくなった)になるとパージ完了信号Gを出力する(このときバイパス信号Fを停止するようにしても良い)。   If there is a bypass signal F from the abnormal bypass unit 17, the flow rate B of the flow rate calculation unit 12 is a predetermined value or more (for example, 1000 L / h or more of the amount that the gas different from the gas type is sufficiently mixed downstream) In the case of a large flow rate), a predetermined abnormal condition is determined, and if a failure is established (that is, the flow rate is no longer a transient abnormal flow), a purge completion signal G is output (at this time, the bypass signal F May be stopped).

なお、パージ完了信号Gにより本発明の実施の形態2の積算バイパスを停止(任意の時間を強制的に経過させる)することで一過性の異常な流量に基づく積算を排除したのち積算を再開させてもよい。   In addition, by stopping the accumulation bypass of the second embodiment of the present invention by the purge completion signal G (forcibly elapses an arbitrary time), the accumulation based on the transient abnormal flow rate is eliminated, and then the accumulation is resumed. You may let them.

また、パージ完了信号Gにより本発明の実施の形態3の流量バイパスを停止(任意の時間を強制的に経過させる)することで一過性の異常な流量に基づく異常流量判定を排除したのち異常流量判定を再開させてもよい。   Further, by stopping the flow rate bypass of the third embodiment of the present invention by the purge completion signal G (forcibly allowing an arbitrary time to elapse), the abnormal flow rate determination based on the transient abnormal flow rate is eliminated, and then an abnormality is detected. The flow rate determination may be resumed.

流量算出部12の流量Bが所定未満(例えば、1000L/h未満)の場合は予め定められた異常条件の判定を停止する。   When the flow rate B of the flow rate calculation unit 12 is less than a predetermined value (for example, less than 1000 L / h), the determination of a predetermined abnormal condition is stopped.

表示部22はセンサ異常判定部18のパージ完了信号Gを受け取るとパージ完了表示(例えば、LCDを用いて表示させてもよい。またLEDやディスプレイ装置を使用しても同様の効果が得られる。なお表示期間を一定時間(例えば60秒間)としてもよいし、人が操作して表示を解除してもよい)をする。   When the display unit 22 receives the purge completion signal G from the sensor abnormality determination unit 18, the display unit 22 may display a purge completion display (for example, using an LCD. The same effect can be obtained by using an LED or a display device. Note that the display period may be a fixed time (for example, 60 seconds), or a person may operate to cancel the display).

外部通信部23はセンサ異常判定部18のパージ完了信号Gを受け取ると外部に通報(例えば、公共の電話回線を使用してガス遮断装置を監視するセンタに通報してもよいし、電話回線の代わりにインターネットや無線通信によっても同様の効果が得られる)する。   When the external communication unit 23 receives the purge completion signal G from the sensor abnormality determination unit 18, the external communication unit 23 may notify the outside (for example, a center that monitors the gas shutoff device using a public telephone line, Instead, the same effect can be obtained by the Internet or wireless communication).

以上のように構成されたガス遮断装置について、以下その動作、作用を説明する。
まず、バイパス信号Fがあり流量Bが所定以上の場合に、予め定められた異常条件の判定を実施し異常否成立であればパージ完了信号Gを出力し、表示出力と外部に通報する。
The operation and action of the gas shut-off device configured as described above will be described below.
First, when there is a bypass signal F and the flow rate B is greater than or equal to a predetermined value, a predetermined abnormal condition is determined, and if an abnormality is not established, a purge completion signal G is output, and the display output is reported to the outside.

以上のように、本実施の形態においてはセンサ異常判定部18が異常状態を脱却したことを検出することができるようになることで、ガスを使用しても大丈夫であることをガス
遮断装置の設置作業者に表示することやガス遮断装置を監視しているセンタに通報することができる。
As described above, in the present embodiment, it becomes possible to detect that the sensor abnormality determination unit 18 has escaped from the abnormal state, so that it is safe to use gas. It is possible to display to the installation worker and report to the center monitoring the gas shutoff device.

実施の形態1〜4おいて一過性の異常な流量信号に基づく誤ったセンサ異常判定(積算および異常流量判定)を排除することが可能となる。そしてセンサや計測回路が物理的に破損または故障しているような永続的なものと、一過性の異常な流量信号に基づく異常とを切り分けることが可能となり、システムの信頼性を向上させることができる。   In the first to fourth embodiments, erroneous sensor abnormality determination (integration and abnormal flow determination) based on a transient abnormal flow signal can be eliminated. In addition, it is possible to distinguish between a permanent sensor or measurement circuit that is physically damaged or faulty and an abnormality based on a transient abnormal flow signal, improving system reliability. Can do.

以上のように、本発明にかかるガス遮断装置は任意の時間判定をセンサ異常判定をバイパスすることが可能となり、一過性の異常な流量信号を排除することが可能となる。従って、センサや計測回路が物理的に破損または故障しているものと、一過性の異常な流量信号に基づくものとを切り分けることが可能となり、システムの信頼性を向上させることができるのでガスを水に置き換えれば、水道メータ等の用途にも適用できる。   As described above, the gas shutoff device according to the present invention can bypass the sensor abnormality determination for arbitrary time determination, and can eliminate a transient abnormal flow signal. Therefore, it is possible to distinguish between a sensor or measurement circuit that is physically damaged or malfunctioning and a sensor or measurement circuit that is based on a transient abnormal flow signal, and the reliability of the system can be improved. If water is replaced with water, it can be applied to uses such as water meters.

本発明の実施の形態1におけるガス遮断装置の機能ブロック図Functional block diagram of the gas cutoff device in Embodiment 1 of the present invention 本発明の実施の形態2におけるガス遮断装置の機能ブロック図Functional block diagram of the gas cutoff device in Embodiment 2 of the present invention 本発明の実施の形態3におけるガス遮断装置の機能ブロック図Functional block diagram of the gas cutoff device in Embodiment 3 of the present invention 本発明の実施の形態4におけるガス遮断装置の機能ブロック図Functional block diagram of the gas cutoff device in Embodiment 4 of the present invention 従来のガス遮断装置の機能ブロック図Functional block diagram of a conventional gas shut-off device 受信波形の特性図Characteristics of received waveform

符号の説明Explanation of symbols

11 流量検出部
12 流量算出部
13 異常流量判定部
14 弁駆動部
15 弁
16 復帰入力部
17 異常バイパス部
18 センサ異常判定部
19 積算バイパス部
20 積算部
21 流量バイパス部
22 表示部
23 外部通信部
DESCRIPTION OF SYMBOLS 11 Flow detection part 12 Flow calculation part 13 Abnormal flow determination part 14 Valve drive part 15 Valve 16 Return input part 17 Abnormal bypass part 18 Sensor abnormality determination part 19 Integration bypass part 20 Accumulation part 21 Flow bypass part 22 Display part 23 External communication part

Claims (4)

ガス通路内を通過するガス流量が異常であると判定時に前記ガス通路内のガスの流れを遮断する弁を設けたガス遮断装置において、前記ガス通路内を通過するガス流量に対応した物理量を検出するセンサを設け流量信号を出力する流量検出部と、前記流量検出部の前記流量信号を入力し流量を算出する流量算出部と、前記流量算出部が算出した流量値と予め保持している判定値とを比較し異常であれば弁閉信号を出力する異常流量判定部と、前記流量検出部からの流量信号が予め定められた異常条件に合致した場合には弁閉信号を出力するセンサ異常判定部と、閉栓状態から開栓状態への復帰入力を受け付けると弁開信号を出力する復帰入力部と、前記異常流量判定部の弁閉信号または前記復帰入力部の弁開信号あるいは前記センサ異常判定部の弁閉信号を入力し弁駆動信号を出力する弁駆動部と、前記弁駆動部の弁駆動信号を受け取ると前記ガス通路を開栓または閉栓する弁と、前記異常流量判定部の弁閉信号または前記復帰入力部の弁開信号を入力し所定時間バイパス信号を出力する異常バイパス部とを備え、前記センサ異常判定部が、前記異常バイパス部からのバイパス信号がなければ前記流量検出部の流量信号が予め定められた異常条件に合致するかどうかの異常判定を実施し異常成立時に弁閉信号を出力し、前記異常バイパス部からのバイパス信号があれば予め定められた異常条件の判定を停止するとともに、前記異常バイパス部は、前記異常流量判定部の弁閉信号または前記復帰入力部の弁開信号の入力を起点として所定時間前記流量検出部の流量信号の判定をバイパスすることを特徴としたガス遮断装置。 In a gas shut-off device provided with a valve that shuts off the flow of gas in the gas passage when it is determined that the flow rate of gas passing through the gas passage is abnormal, a physical quantity corresponding to the flow rate of gas passing through the gas passage is detected. A flow rate detection unit that outputs a flow rate signal, a flow rate calculation unit that inputs the flow rate signal of the flow rate detection unit to calculate a flow rate, and a determination that the flow rate value calculated by the flow rate calculation unit is held in advance An abnormal flow determination unit that outputs a valve closing signal if an abnormality is detected by comparing the value, and a sensor abnormality that outputs a valve closing signal when the flow signal from the flow detection unit matches a predetermined abnormal condition A determination unit, a return input unit that outputs a valve opening signal when receiving a return input from the closed state to the open state, a valve closing signal of the abnormal flow rate determining unit, a valve opening signal of the return input unit, or the sensor abnormality Judgment A valve driving unit that inputs a valve closing signal and outputs a valve driving signal; a valve that opens or closes the gas passage when receiving the valve driving signal of the valve driving unit; and a valve closing signal of the abnormal flow determination unit Or an abnormal bypass unit that inputs a valve opening signal of the return input unit and outputs a bypass signal for a predetermined time, and if the sensor abnormality determination unit has no bypass signal from the abnormal bypass unit, the flow rate of the flow rate detection unit Determines whether the signal meets a predetermined abnormal condition, outputs a valve closing signal when an abnormality is established, and stops the determination of the predetermined abnormal condition if there is a bypass signal from the abnormal bypass unit The abnormal bypass unit bypasses the determination of the flow rate signal of the flow rate detection unit for a predetermined time from the input of the valve close signal of the abnormal flow rate determination unit or the valve open signal of the return input unit. Gas cutoff apparatus characterized by. ガス通路内を通過するガス流量が異常であると判定時に前記ガス通路内のガスの流れを遮断する弁を設けたガス遮断装置において、前記ガス通路内を通過するガス流量に対応して流量信号を出力する流量検出部と、前記流量検出部の流量信号を入力し流量を算出する流量算出部と、前記流量算出部が算出した流量値と予め保持している判定値とを比較し異常であれば弁閉信号を出力する異常流量判定部と、閉栓状態から開栓状態への復帰入力を受け付けると弁開信号を出力する復帰入力部と、前記異常流量判定部の弁閉信号または復帰入力部の弁開信号を入力し弁駆動信号を出力する弁駆動部と、前記弁駆動部の弁駆動信号
を入力しガス通路を開栓または閉栓する弁と、前記異常流量判定部の弁閉信号または前記復帰入力部の弁開信号を入力し所定時間前記流量算出部からの流量値の出力を停止する積算バイパス部と、前記積算バイパス部からの流量値を受け取ると流量値を積算して保持する積算部とを備えることにより、前記積算バイパス部が前記異常流量判定部の弁閉信号または前記復帰入力部の弁開信号の入力を起点として所定時間前記積算バイパス部からの流量値の出力を停止することを特徴としたガス遮断装置。
In a gas shut-off device provided with a valve that shuts off the flow of gas in the gas passage when it is determined that the flow rate of gas passing through the gas passage is abnormal, a flow rate signal corresponding to the flow rate of gas passing through the gas passage Compare the flow rate value calculated by the flow rate calculation unit with the judgment value stored in advance. If there is an abnormal flow determination unit that outputs a valve closing signal, a return input unit that outputs a valve opening signal when a return input from the closed state to the open state is received, and a valve closing signal or return input of the abnormal flow determination unit A valve driving unit that inputs a valve opening signal and outputs a valve driving signal; a valve that inputs a valve driving signal of the valve driving unit to open or close a gas passage; and a valve closing signal of the abnormal flow rate determination unit Or input the valve open signal of the return input section The integration bypass unit includes: an integration bypass unit that stops outputting the flow rate value from the flow rate calculation unit for a predetermined time; and an integration unit that integrates and holds the flow rate value when the flow rate value is received from the integration bypass unit. A gas shutoff device characterized in that the unit stops the output of the flow rate value from the integration bypass unit for a predetermined time from the input of the valve close signal of the abnormal flow rate determination unit or the valve open signal of the return input unit.
ガス通路内を通過するガス流量が異常であると判定時に前記ガス通路内のガスの流れを遮断する弁を設けたガス遮断装置において、前記ガス通路内を通過するガス流量に対応して流量信号を出力する流量検出部と、前記流量検出部の流量信号を入力しガス流量を算出する流量算出部と、流量値を受け取ると予め保持している判定値と比較し異常であれば弁閉信号を出力する前記異常流量判定部と、前記異常流量判定部の弁閉信号または前記復帰入力部の弁開信号を受け取ると弁駆動信号を出力する弁駆動部と、前記弁駆動部の弁駆動信号を入力し前記ガス通路を開栓または閉栓する弁と、閉栓状態から開栓状態への復帰入力を受け付けると弁開信号を出力する復帰入力部と、前記異常流量判定部の弁閉信号または復帰入力部の弁開信号を受け取ると所定時間前記流量算出部からの流量値の出力を停止する流量バイパス部と、前記流量バイパス部が前記異常流量判定部の前記弁閉信号または前記復帰入力部の前記弁開信号を起点として任意の時間前記流量バイパス部からの流量値の出力を停止することを特徴としたガス遮断装置。 In a gas shut-off device provided with a valve that shuts off the flow of gas in the gas passage when it is determined that the flow rate of gas passing through the gas passage is abnormal, a flow rate signal corresponding to the flow rate of gas passing through the gas passage A flow rate detection unit that outputs a flow rate signal from the flow rate detection unit and calculates a gas flow rate. The abnormal flow rate determination unit that outputs the valve, the valve drive signal that outputs the valve drive signal when the valve close signal of the abnormal flow rate determination unit or the valve open signal of the return input unit is received, and the valve drive signal of the valve drive unit Is input to open or close the gas passage, a return input unit that outputs a valve open signal when receiving a return input from the closed state to the open state, and a valve close signal or return of the abnormal flow rate determination unit In response to the valve opening signal of the input section Then, a flow rate bypass unit that stops outputting the flow rate value from the flow rate calculation unit for a predetermined time, and the flow rate bypass unit starts from the valve close signal of the abnormal flow rate determination unit or the valve open signal of the return input unit A gas shut-off device, wherein output of a flow rate value from the flow rate bypass unit is stopped for an arbitrary time. センサ異常判定部を、前記異常バイパス部からのバイパス信号があれば流量算出部の流量値が所定値以上の場合、予め定められた異常条件の判定を実施し異常否成立になるとパージ完了信号を出力し前記流量算出部の流量値が所定未満の場合は予め定められた異常条件の判定を停止するものとし、前記センサ異常判定部のパージ完了信号を受け取るとパージ完了表示をする表示部と、前記センサ異常判定部のパージ完了信号を受け取ると外部に通報する外部通信部とを備え、異常判定が否成立状態で前記流量算出部からの流量値が所定値以上であることで異常状態が確実に解除されガスを正常に使うことが可能となったことを表示し通報することを特徴とした請求項1記載のガス遮断装置。
If there is a bypass signal from the abnormal bypass unit, if the flow rate value of the flow rate calculation unit is equal to or greater than a predetermined value , the sensor abnormality determination unit performs a determination of a predetermined abnormal condition, and if a failure is not established, a purge completion signal is output. When the output flow rate value of the flow rate calculation unit is less than a predetermined value , the determination of a predetermined abnormal condition is stopped, and when the purge completion signal of the sensor abnormality determination unit is received, a display unit for displaying a purge completion; An external communication unit that reports to the outside when a purge completion signal from the sensor abnormality determination unit is received, and an abnormal state is detected when the flow rate value from the flow rate calculation unit is greater than or equal to a predetermined value when abnormality determination is not established. 2. The gas shut-off device according to claim 1, wherein the gas shut-off device displays and reports that the gas is surely released and the gas can be used normally.
JP2005341647A 2005-11-28 2005-11-28 Gas shut-off device Active JP4860250B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2005341647A JP4860250B2 (en) 2005-11-28 2005-11-28 Gas shut-off device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2005341647A JP4860250B2 (en) 2005-11-28 2005-11-28 Gas shut-off device

Publications (2)

Publication Number Publication Date
JP2007147430A JP2007147430A (en) 2007-06-14
JP4860250B2 true JP4860250B2 (en) 2012-01-25

Family

ID=38209005

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2005341647A Active JP4860250B2 (en) 2005-11-28 2005-11-28 Gas shut-off device

Country Status (1)

Country Link
JP (1) JP4860250B2 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5540500B2 (en) * 2008-12-19 2014-07-02 パナソニック株式会社 Gas shut-off device
JP5537052B2 (en) * 2009-03-17 2014-07-02 パナソニック株式会社 Gas shut-off device
JP2012242257A (en) * 2011-05-20 2012-12-10 Panasonic Corp Gas shut-off device
JP2012242256A (en) * 2011-05-20 2012-12-10 Panasonic Corp Gas shut-off device
JP5914093B2 (en) * 2012-03-28 2016-05-11 パナソニック株式会社 Gas shut-off device
JP6216601B2 (en) * 2013-10-09 2017-10-18 旭有機材株式会社 Flow control device

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3075654B2 (en) * 1993-07-15 2000-08-14 東京瓦斯株式会社 Gas meter
JP3620060B2 (en) * 1994-03-07 2005-02-16 松下電器産業株式会社 Gas shut-off device
JP2001208590A (en) * 2000-01-24 2001-08-03 Osaka Gas Co Ltd Gas meter
JP2002228504A (en) * 2001-01-31 2002-08-14 Yazaki Corp Gas shut-off device and gas meter
JP5092185B2 (en) * 2001-02-08 2012-12-05 パナソニック株式会社 Flow measuring device
JP2002365117A (en) * 2001-06-06 2002-12-18 Matsushita Electric Ind Co Ltd Gas-blast circuit breaker
JP3828811B2 (en) * 2002-01-18 2006-10-04 矢崎総業株式会社 Gas leak alarm device
JP4199106B2 (en) * 2003-12-26 2008-12-17 矢崎総業株式会社 Flow rate measuring device and abnormality judgment method

Also Published As

Publication number Publication date
JP2007147430A (en) 2007-06-14

Similar Documents

Publication Publication Date Title
JP4860250B2 (en) Gas shut-off device
US20080115840A1 (en) Gas Block Device and Gas Block Method
CN111919094B (en) Gas safety device
JP4060719B2 (en) Gas meter
JP2004125609A (en) Gas-blast circuit-breaker
JP4163168B2 (en) Gas shut-off device
JP5537052B2 (en) Gas shut-off device
JP4024110B2 (en) Ultrasonic flow measuring device
JP4612105B2 (en) Return safety confirmation method and electronic gas meter
JP2004069528A (en) Gas meter
JP4199905B2 (en) Gas shut-off device
JP2007113632A (en) Gas shut-off device
JP3169731B2 (en) Flowmeter
JP4251187B2 (en) Gas security device
JP2009168739A (en) Gas meter with self-diagnostic function
JP4100362B2 (en) Gas shut-off device
JP4296915B2 (en) Gas shut-off device
JP5908772B2 (en) Gas shut-off device
JP2000146658A (en) Gas-flow breaking device
JPH11132819A (en) Gas meter
JP4056547B2 (en) Gas shut-off device
JP2006132795A (en) Gas cut-off device
JP3862476B2 (en) Gas shut-off device
JP2001235145A (en) Gas-protecting device
JP2001336740A (en) Gas-blast circuit-breaking device

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20080325

RD01 Notification of change of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7421

Effective date: 20091001

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20091116

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20110720

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20110726

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20110913

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20111004

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20111102

R151 Written notification of patent or utility model registration

Ref document number: 4860250

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R151

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20141111

Year of fee payment: 3

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250