Japan
Prior art keywords
workpiece
clamp
positioning
main clamp
sub
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2000301497A
Other languages
Japanese (ja)
Other versions
JP2002102961A (en
Inventor
健一郎 坂本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Amada Co Ltd
Original Assignee
Amada Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Amada Co Ltd filed Critical Amada Co Ltd
Priority to JP2000301497A priority Critical patent/JP4708544B2/en
Publication of JP2002102961A publication Critical patent/JP2002102961A/en
Application granted granted Critical
Publication of JP4708544B2 publication Critical patent/JP4708544B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Accessories And Tools For Shearing Machines (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、ワークに板材加工を行う板材加工機の前方に配置された旋回式マニピュレータによって板材のワークを搬入する際に効率よく掴み換えを行って作業工程の時間短縮が図れるワーク位置決め搬入装置に関する。
【0002】
【従来の技術】
従来、ベンディング加工機、シャーリングマシン等の板材加工機へのワーク供給装置としての旋回式マニピュレータは、実開平1−60729号公報や特開平3−42135号公報に示されているようにすでに使用されている。
【0003】
この旋回式マニピュレータは、メインクランプ(旋回クランプ)により上下からワークを挟んだ状態で、前後動作と水平面内で旋回動作が行われるので、複数辺を剪断したり、また煩雑な板取を行うときなどに効率が高いものである。
【0004】
より詳しくは、図16に示されているように、マニピュレータ101では当初のワークWの原点設定時にメインクランプ103(旋回クランプ)でワークWのほぼ中心(重心付近)が把持され、マニピュレータ101が前進してシャーリングマシン105で剪断加工が連続して行われる。
【0005】
マニピュレータ101の可動範囲が限界に達した場合は、クランプ位置を後方に掴み換える動作が必要になる。しかし、メインクランプ103(旋回クランプ)は上下から挟み込む構造上、ワークWをシャーリングマシン105の剪断加工部に送り込む可動範囲の限界(リフトリミットあるいはストロークリミット)があり切断不可の部分が生じてくる。
【0006】
例えば、図17ではマニピュレータ101を用いずに、作業者がワークWを切断工程1〜6までの工程を経て材料1〜材料5までの短冊加工が行われる場合である。この同じ短冊加工が、マニピュレータ101を用いて行われる場合は、図18に示されているようにワークWのほぼ中心がメインクランプ103でクランプされているので、切断工程1、2が行われた後、ワークWが旋回されて切断工程3、4が行われる。しかし、メインクランプ103の可動範囲限界(リフトリミットあるいはストロークリミット)内は切断不可となる。
【0007】
そこで、実開平1−60729号公報に示されているシャーリングマシン105では、残材の後端部を把持して送るためのサブクランプ(図示省略)が別途設けられている。また、特開平3−42135号公報に示されているシャーリングマシン105では、メインクランプ103とサブクランプ(図示省略)が備えられ、製品端部の立ち上がりの移動状況を把握し効率の良いクランプ上下移動が行われる。
【0008】
【発明が解決しようとする課題】
ところで、従来のマニピュレータ101においては、メインクランプ103で上下からワークWのほぼ中心がクランプされ、このクランプ位置でメインクランプ103の可動範囲で剪断加工が行われた後、1回〜複数回の掴換えが行なわれ、最終的にサブクランプで送り込むという工程が踏まれる。このクランプ動作中の時間はロスするという問題点があった。
【0009】
また、メインクランプ103にサブクランプも加わり、ワークWの旋回や掴み換え動作等が入る切断工程が行なわれるために、制御装置への入力内容が複雑になるので、入力時間の遅延、入力ミスが発生するという問題点があった。
【0010】
また、従来のサブクランプはメインクランプ103の後方に位置しており、このサブクランプでワークを送り込むとしてもメインクランプ103の可動範囲を越えることが難しいため、依然として切断不可の部分が生じるという問題点があった。
【0011】
本発明は叙上の課題を解決するためになされたもので、その目的は、マニピュレータによってワークを供給する際に、全体の工程を考慮して掴み換え回数が最も少ない位置をクランプすることで、制御装置の入力内容の簡易化、作業者入力時間の短縮、入力ミスの削減を図り、生産性の向上を図り得るワーク位置決め搬入装置を提供することにある。
【0014】
課題を解決するための手段
上記に鑑みて、この発明のワーク位置決め搬入装置は、ワーク搬入テーブルに載置したワークを板材加工機の加工部に前方から供給位置決めするワーク位置決め搬入装置において、
前記ワーク搬入テーブルに、ワーク搬入方向に対してワークの前後左右を位置決めする突当て部材と、この突当て部材に前記ワークを突当てるワーク引寄せ装置とからなる原点位置決め装置を設け、この原点位置決め装置により位置決めされたワークを上下からクランプし水平面内に旋回自在、前後動自在のメインクランプと、前記ワークの後端をクランプし前後動自在のサブクランプとを設け、ワークの原点位置決め時にワークの中心を前記メインクランプでクランプした場合の工程シミュレーションを事前に行なうと共にこの工程シミュレーションにおける第1回目以降の掴み換え位置を算出した後に、実際の原点位置決め時のメインクランプの把持位置を前記工程シミュレーションで算出された第1回目以降の掴み換え位置にあるいは、実際の第1回目以降の掴み換え時のメインクランプの把持位置を前記工程シミュレーションで算出されたそれ以降の掴み換え位置に変更補正をすると共に、この変更補正に基づいて前記原点位置決め装置とメインクランプの作動・位置決めの指令を発生する制御装置を設けてなることを特徴とするものである。
【0015】
したがって、ワークを原点位置決め時にメインクランプをワークのほぼ中心位置からオフセットするとき、あるいは掴み換えを行うときは、制御装置においてメインクランプでクランプした場合の工程シミュレーションを事前に行うことにより、実際では余分な掴み換え動作を排除して効率よく掴み換えをするので、工程時間の短縮が図られる。
【0016】
また、この発明のワーク位置決め搬入装置は、ワーク搬入テーブルに載置したワークを板材加工機の加工部に前方から供給位置決めするワーク位置決め搬入装置において、
前記ワーク搬入テーブルに、ワーク搬入方向に対してワークの前後左右を位置決めする突当て部材と、この突当て部材に前記ワークを突当てるワーク引寄せ装置とからなる原点位置決め装置を設け、この原点位置決め装置により位置決めされたワークを上下からクランプし水平面内に旋回自在、前後動自在のメインクランプと、前記ワークの後端をクランプし前記メインクランプよりも前記剪断加工部に接近可能に前後動自在のサブクランプとを設け、ワークの原点位置決め時にワークの中心を前記メインクランプでクランプした場合の加工の工程シミュレーションを事前に行なうと共にこの工程シミュレーションの加工の工程の中において第1回目以降の掴み換え動作およびサブクランプの把持動作が必要な各々の工程を算出する第1の演算を行い、この第1の演算で算出された各工程のうちの、サブクランプの最終把持位置を算出する第2の演算を行い、実際のメインクランプによって行われる原点位置決め時の把持動作位置を第2の演算で算出された前記最終把持位置にあるいは、実際の第1回目以降の掴み換え時のメインクランプの把持位置を第2演算で算出された最終把持位置に変更補正すると共に、この変更補正に基づいて前記原点位置決め装置とメインクランプ及びサブクランプの作動・位置決めの指令を発生する制御装置を設けてなることを特徴とするものである。
【0017】
したがって、ワークを短冊材に加工する場合の剪断加工では、制御装置において工程シミュレーションを事前に行い、メインクランプおよびサブクランプでの把持動作が必要な各工程を第1の演算で行うことにより全体の工程を把握し、メインクランプおよびサブクランプの可動範囲に基づいて前記全体の工程の中から第2演算により最終把持位置が算出され、実際では余分な掴み換え動作及びメインクランプの旋回動作をしなくとも効率よくサブクランプによる把持が行われるので、工程時間の短縮が図られる。
【0018】
【発明の実施の形態】
以下に、本発明のワーク位置決め搬入装置の実施の形態について、図面を参照して説明する。
【0019】
本実施の形態に係わる板材加工機としての例えばシャーリングマシン1には図1に示されているように、その剪断加工部へ板状のワークWを搬入するためのフロントテーブル3(ワーク搬入テーブル)が設けられている。
【0020】
フロントテーブル3の上面には図2に示されているようにワークWがいずれの方向にも円滑に移動自在となるよう多数のフリーベア5(フリーベアリング)が設けられており、フロントテーブル3の図2において左側にはワークWを載置するためのワークテーブル7が隣接して設けられている。
【0021】
なお、本実施の形態では、以下、ワークWがワークテーブル7からフロントテーブル3へ搬送されるワーク搬送方向を「X方向」といい、フロントテーブル3からシャーリングマシン1の剪断加工部へ搬入されるワーク搬入方向を「Y方向」という。また、後述のグリッパ9のX方向に往復動する移動軸を「U軸」とし、フロントテーブル3のX方向の長さのほぼ中央を通過するY方向に向かう中心線を「Y軸」とする。シャーリングマシン1によるワークWの剪断線はX方向となる。
【0022】
図1及び図2を参照するに、前記フロントテーブル3にはワークテーブル7へ載置されたワークWをクランプするグリッパ9が備えられ、このグリッパ9はクランプされたワークWをフロントテーブル3の原点決め位置付近へ搬入するために、フロントテーブル3のほぼ左右端に渡りX方向に往復動自在に設けられている。
【0023】
グリッパ9は、前記フロントテーブル3の図2の上位置に配されたU軸にキャレッジ用モータ(図示省略)で回転されるボールねじ等によって駆動され、ワークテーブル7上のワークWをクランプしてフロントテーブル3上へ搬入すると共に、グリッパ9自体がグリッパ昇降シリンダ等の作動により上昇してグリッパ9のクランプ部がフロントテーブル3上のワークパスラインPLに対して出没自在となっている。
【0024】
図2を参照するにフロントテーブル3には、前記グリッパ9が走行するU軸ラインに対してシャーリングマシン1の剪断加工部側(図2において上方側)に2つのピンゲージ11(突当て部材)が設けられている。また、前記各ピンゲージ11の近傍にはフロントテーブル3上のワークWをクランプして前記各ピンゲージ11へ突き当てるべく移動せしめるためのワーク引寄せ装置13が設けられている。なお、前記2つのピンゲージ11とワーク引寄せ装置13とからワーク原点位置決め装置15が構成されている。
【0025】
なお、前記ピンゲージ11及びワーク引寄せ装置13は図示せざるピンゲージ可動支持体に設けられており、このピンゲージ可動支持体は例えばフロントテーブル3の架台にX方向に軸承されてピンゲージ用駆動モータ(図示省略)により回転駆動されるX軸用ボールネジに螺合されている。なお、前記ピンゲージ11のピンゲージ用駆動モータは後述の制御装置17に電気的に接続されている。
【0026】
より詳しくは、ワーク引寄せ装置13はワークWをクランプするクランパ(図示省略)が備えられており、このクランパによりクランプされたワークWをピンゲージ11の方向へ移動せしめる構造となっている。ワーク引寄せ装置13は後述の制御装置17に電気的に接続されている。
【0027】
図1及び図2を参照するに、前記フロントテーブル3には、ワークWを上下からクランプ・アンクランプ自在で把持したワークWを水平方向に所望の角度で回転すると共にワークWをY方向に前後動せしめるマニピュレータ19(ワーク位置決め搬入装置)が設けられている。
【0028】
より詳しくは、マニピュレータ19はY軸と平行なボールねじ(図示省略)をサーボモータ等で適宜駆動制御することによって、ベース21上をY方向に走行自在に設けられている。
【0029】
さらに、マニピュレータ19は上フレーム23、支柱フレーム25、下フレーム27からなり、上フレーム23と下フレーム27のY方向前方側の先端にはワークWをクランプして回転位置決めするメインクランプ29が設けられている。このメインクランプ29は上フレーム23のY方向前方側の先端の上クランパ31と下フレーム27のY方向前方側の先端の下クランパ33とから構成されている。
【0030】
図1を参照するに、メインクランプ29は、下フレーム27の先端にC軸用モータ35により回転駆動されるワーククランプ軸37が垂直方向に軸承されており、このワーククランプ軸37(C軸)の先端には下クランパ33が装着されている。一方、上フレーム23の先端には図3に示されているようにブラケット23Aが固定されており、このブラケット23Aの上部に設けられたメインクランプ用シリンダ39のピストンロッド41の下端に上クランパ31が設けられており、前記ワーククランプ軸37の先端の下クランパ33に接離可能に昇降自在にであって、回転自在である。
【0031】
また、マニピュレータ19にはメインクランプ29より図1において左側の前方の位置でワークWの後端をクランプし前後動自在で且つ上下動自在のサブクランプ43が設けられている。
【0032】
より詳しくは、サブクランプ43は図3〜図5に示されているように上フレーム23の先端のブラケット23Aにメインクランプ用シリンダ39より前方に位置して上部に支持ブラケット45が立設されている。この支持ブラケット45に設けられたサブクランプ用シリンダ47のピストンロッド49の下端には、複数のサブクランプ43を支持するための可動フレーム51が連結されており、この可動フレーム51は上フレーム23の先端の下部に設けられたガイド部材53に案内されて上下動可能に設けられている。
【0033】
なお、可動フレーム51は図4に示されているようにほぼ水平方向に長い角パイプ等の部材で構成されており、可動フレーム51の下面には図4において左右に2個づつ合計4個のサブクランプ用アーム55が図3において逆L字形状をなすように設けられている。
【0034】
各サブクランプ用アーム55の先端には例えばジョー駆動シリンダ57により作動してワークWの端縁を把持可能な上クランプジョーと下クランプジョーからなるサブクランプ部43Aが設けられている。
【0035】
したがって、サブクランプ43は図3に示されているようにメインクランプ29より前方の位置でワークWをクランプしてマニピュレータ19の移動により前後動自在であるので、シャーリングマシン1のカットラインに近い位置までワークWを送ることが可能になるため、メインクランプ29の可動範囲を超えるワーク送りが可能になる。
【0036】
また、可動フレーム51がサブクランプ用シリンダ47で上下動されることにより各サブクランプ部43Aが昇降自在であるので、メインクランプ29でクランプしてワーク送りをするときにはサブクランプ43が全体的に上昇されることにより邪魔にならない。
【0037】
なお、マニピュレータ19の前述した各駆動装置は後述の制御装置17に電気的に接続されている。
【0038】
図1を参照するに、57は上下の直線刃59、61を有する一般的な剪断加工機であって、63はワークWを押える板押え装置、65は上刃59を上下動せしめるラムで、しかも67はラム65を駆動する流体圧シリンダである。
【0039】
ラム65の前方には複数個の板押え装置63が適宜間隔を介して前板69に並設されている。なお、この板押え装置63はシャーリングマシン1に附属するもので、剪断前に下降してワークWを押え、ラム65が上昇後にワークWを離すのが一般的であるが、前述した上下クランパ31、33のアンクランプ時の押え具としても機能させるためにアンクランプ時にラム65の上下動とは連動せずに独自に作動することも可能なように設定されている。
【0040】
すなわち、制御装置17内のラム駆動制御部71から独立した板押え駆動制御部73を別途にし、マニピュレータ駆動制御部75(マニピュレータ制御装置)に接続する中央制御部77に接続する構成となっている。
【0041】
なお、中央制御部77にはワークWの大きさ、切断位置、メインクランプ29の可動範囲等のデータを入力する入力装置79、表示装置81、入力されたデータを記憶するメモリ83、入力されたデータを予め設定されている演算式に基づいて種々の計算をする演算装置85、予め入力されているメインクランプ29の可動範囲やクランプ幅、マニピュレータ19の上フレーム23の懐の最大距離と前記演算装置85で計算されて得られた計算値とを比較判断して最適の剪断工程を選択する比較判断装置87が設けられている。
【0042】
上記構成により、図2においてワークテーブル7に載置されたワークWは2つのグリッパ9によりクランプされ、X方向に移動されてフロントテーブル3のほぼ中央へ搬送される。
【0043】
ワークWの基準面BLは図14において上方と右方の2辺であって、ピンゲージ11がフロントテーブル3の上面より上方へ突出する。
【0044】
前記ワークWはグリッパ9から開放されると共にワーク引寄せ装置13のクランパによりクランプされ、2つのピンゲージ11と2つのグリッパ9の基準へ突き当てるように斜めに移動され、図14に示されているように原点位置決めされる。
【0045】
ワークWの4辺が耳切り切断されるときは、メインクランプ29により旋回される旋回動作がある。ワークWはメインクランプ29の上・下クランパ31,33,により把持される。マニピュレータ19はY方向に前進してワークWの所望の位置をシャーリングマシン1の剪断加工部へ搬入したときに停止する。
【0046】
剪断加工後にワークWが上・下クランパ31,33,によりクランプされマニピュレータ19が後退し、ワーククランプ軸37(C軸)の回転によりワークWがフロントテーブル3上で適宜角度回転される。マニピュレータ19が再びY方向へ前進し、ワークWの所望の位置がシャーリングマシン1の加工位置へ位置決めされ剪断加工される。以上の工程が繰り返されて、図14においてワークWの4辺が耳切り切断される。
【0047】
図15は、左右の2辺の耳切り剪断加工が行われた後に、剪断位置1〜4の短冊加工が行われる場合について示されている。この短冊加工とは、X又はY方向の一方向のみの切断加工のみで済むもので、このような短冊加工がメインクランプ29とサブクランプ43を用いて行なわれる場合は、掴み換え動作を行なう必要がある。
【0048】
次に、本発明の実施の形態における主要部に係わるマニピュレータ制御装置75(マニピュレータ駆動制御部)について、主として短冊加工を例にとって詳しく説明する。
【0049】
マニピュレータ駆動制御部75では、ワークWの原点位置決め時にワークWの中心を前記メインクランプ29でクランプした場合の工程シミュレーションが事前に行なわれる。この工程シミュレーションにおいて第1回目以降の掴み換え位置を算出した後に、実際の原点位置決め時のメインクランプ29の把持位置が前記工程シミュレーションで算出された第1回目以降の掴み換え位置にあるいは、実際の第1回目以降の掴み換え時のメインクランプの把持位置が前記工程シミュレーションで算出されたそれ以降の掴み換え位置に変更補正される。
【0050】
この変更補正に基づいて前記原点位置決め装置とメインクランプ29へ作動・位置決めの指令が発生される。
【0051】
短冊加工においては、メインクランプ29の掴み換え動作とサブクランプ43動作が不要の第1パターンと、メインクランプ29の掴み換え動作が必要で且つサブクランプ43動作が不要の第2パターンと、メインクランプ29の掴み換え動作とサブクランプ43動作が必要の第3パターンとの3つのパターンに分類できる。
【0052】
なお、図12(A)〜(E)を参照するに、メインクランプ29で掴み換えされる場合は、図12(A)においてメインクランプ29により把持されたワークWはシャーリングマシン1の剪断加工部に位置決めされて切断され、図12(B)において板押え装置63が下降してワークWがテーブルに押圧されて固定される。この状態で図12(C)においてメインクランプ29の掴み換えが行われる。図12(D)でメインクランプ29によりワークWはシャーリングマシン1の剪断加工部に位置決めされて切断される。図12(E)でキッカー89により残材が搬出される。
【0053】
また、図13(A)〜(E)を参照するに、メインクランプ29からサブクランプ43に掴み換えされる場合は、図13(A)においてメインクランプ29により把持されたワークWはシャーリングマシン1の剪断加工部に位置決めされて切断され、図13(B)において板押え装置63が下降してワークWがテーブルに押圧されて押さえられる。この状態で図13(C)においてメインクランプ29がワークWを解除してマニピュレータ19が後退し、サブクランプ43で掴み換えが行われる。図13(D)でサブクランプ43によりワークWはシャーリングマシン1の剪断加工部に位置決めされて切断される。図13(E)でキッカー89により残材が搬出される。
【0054】
第1パターン(メインクランプ29の掴み換え動作とサブクランプ43動作が不要)は、例えば図6及び図7に示されているように工程シミュレーション時の原点位置決め時に掴んだメインクランプ29の位置で工程1〜2までの全ての剪断工程が完了してしまう場合である。このときは工程1で剪断された後にメインクランプ29により180°旋回され、次いで剪断加工位置に位置決めされ工程2の剪断が行なわれる。
【0055】
工程シミュレーションにおいて、(1)原点位置決め以降の掴み換えが不要であ ること、(2)メインクランプ29の可動範囲内で最終工程まで終了すること、(3)メインクランプ29からワークWの最大対角L(図14参照)が上フレーム23の懐の最大距離より小さいこと、の条件が判断されたときは、この第1パターンである。
【0056】
第2パターン(メインクランプ29の掴み換え動作が必要で且つサブクランプ43動作が不要)は、工程シミュレーション時の原点位置決め時に掴んだメインクランプ29の位置から最終工程終了まで、メインクランプ29の掴み換え動作のみで最終工程に到達でき、サブクランプ43は使用されない場合である。
【0057】
例えば、一枚のワークWから4回の剪断工程1〜4まであるとき、図8及び図9に示されているように初めにワークWの中央付近を掴み、工程3がメインクランプ29のために邪魔されて切断できないので、工程2が終了した後にメインクランプ29の後方への掴み換えが行なわれる必要がある。次の工程3のときに初めて掴み換えが行なわれるが、工程4がメインクランプ29の可動範囲で十分に剪断可能であるときにはこの工程3で最終掴み換えが行われるものとシミュレーションされるので、このときは、工程シミュレーション上の最終掴み換え位置を工程3とする制御指令コードが工程2の後に挿入される。これにより、工程4での掴み換えは行われないので効率の良い剪断工程が行われる。
【0058】
また、旋回動作が途中の工程に入る場合には、メインクランプ29の最終把持位置は、前述した最大対角Lが上フレーム23の懐の最大距離より小さいこととメインクランプ29のストローク可動範囲内であること、の条件を満たす範囲で、工程シミュレーションで事前に演算される。この演算による最終把持位置でワークWが把持されるよう制御が行われる。
【0059】
上記の演算では原点位置決め時に最終把持位置でクランプするか、あるいは最初の掴み換え時に最終把持位置でクランプするかどうかは、旋回動作の工程位置、掴み換えしようとする位置の最大対角Lの寸法等の条件などに照らして選択が行われることになる。
【0060】
旋回動作が後に控えていない場合は、最大対角Lを条件から外した最終把持位置が選択される。
【0061】
第3パターン(メインクランプ29の掴み換え動作とサブクランプ43動作が必要)は、例えば図10及び図11に示されているように工程4ではメインクランプ29の可動範囲で剪断不可能であるためにサブクランプ43が必要である場合のように、初めて掴み換え動作が必要になったときに、後工程でサブクランプ43が必要であり、且つサブクランプ43可動範囲内であり、且つ後工程で旋回動作が含まれていないとシミュレーションされた場合に、初めの掴み換え動作時にサブクランプ43が使用される。
【0062】
このときは、サブクランプ43の使用に関する制御指令コードが工程2の後に挿入される。これにより、工程3と工程4はサブクランプ43の動作で効率の良い剪断工程が行われる。
【0063】
なお、旋回動作が途中の工程に入る場合には最大対角Lの条件の制約を受けることになるので、メインクランプ29及びサブクランプ43の動作範囲、最大対角Lの条件、を制約の条件として事前の演算が行われる。この演算により各条件の範囲内で最終把持位置ではメインクランプ29を使用するかあるいはサブクランプ43を使用するかの選択が行われる。
【0064】
上記構成から、ワークWを原点位置決め時のメインクランプ29をワークWのほぼ中心位置からオフセットするときは、マニピュレータ駆動制御部75においてメインクランプ29でクランプした場合の工程シミュレーションが事前に行なわれることにより、実際では余分な掴み換え動作を排除して効率よく掴み換えをするので、工程時間の短縮が図られる。
【0065】
また、本発明の他の実施の形態のマニピュレータ駆動制御部75では、ワークWの原点位置決め時にワークWの中心がメインクランプ29でクランプされた場合の加工の工程シミュレーションが事前に行なわれる。この工程シミュレーションの加工の工程の中において第1回目以降の掴み換え動作とサブクランプ43の把持動作とを必要な各々の工程が第1の演算で算出される。この第1の演算で算出された各工程のうちの、サブクランプ43の最終把持位置を算出する第2の演算が行なわれる。
【0066】
実際のメインクランプ29によって行われる原点位置決め時の把持動作位置は、上記の第2の演算で算出された前記最終把持位置あるいは、実際の第1回目以降の掴み換え時のメインクランプの把持位置を第2演算で算出された最終把持位置に変更補正される。マニピュレータ駆動制御部75では、前記変更補正に基づいて原点位置決め装置とメインクランプ29及びサブクランプ43に対して作動・位置決めの指令が発生される。
【0067】
以上のように、ワークWを短冊材に加工する場合の剪断加工では、マニピュレータ駆動制御部75で、メインクランプ29およびサブクランプ43での把持動作の工程シミュレーションが事前に行われ、メインクランプ29およびサブクランプ43の可動範囲に基づいて前記全体の工程の中から最終把持位置が算出されて、実際では余分な掴み換え動作及びメインクランプ29の旋回動作をしなくとも効率よくサブクランプによる把持が行われるため、工程時間の短縮が図られる。
【0068】
なお、この発明は前述した実施の形態の例に限定されることなく、適宜な変更を行うことによりその他の態様で実施し得るものである。本実施の形態の例では板材加工機としてシャーリングマシンを例にとって説明したがレーザ加工機、ベンディング加工機およびその他の板材加工機であっても構わない。
【0070】
発明の効果
以上のごとき発明の実施の形態から理解されるように、本発明によれば、ワークを原点位置決め時のメインクランプをワークのほぼ中心位置からオフセットするとき、あるいは掴み換えを行うときは、制御装置においてメインクランプでクランプした場合の工程シミュレーションを事前に行うことにより、実際では余分な掴み換え動作を排除して効率よく掴み換えができるので、工程時間の短縮を図ることができる。
【0071】
また、本発明によれば、ワークを短冊材に加工する場合の剪断加工では、制御装置において、メインクランプおよびサブクランプでの把持動作の全体の工程を把握するよう工程シミュレーションを事前に行い、メインクランプおよびサブクランプの可動範囲に基づいて最終把持位置を算出して、実際では余分な掴み換え動作及びメインクランプの旋回動作をしなくとも効率よくサブクランプで掴み換えを行なえるので、工程時間の短縮を図ることができる。
【図面の簡単な説明】
【図1】本発明の実施の形態を示すもので、マニピュレータを含むシャーリングマシンの側面図(図2の左側側面図)である。
【図2】本発明の実施の形態を示すもので、フロントテーブルの平面図である。
【図3】本発明の実施の形態を示すもので、マニピュレータのサブクランプの側面図である。
【図4】本発明の実施の形態を示すもので、マニピュレータのサブクランプの正面図である。
【図5】本発明の実施の形態を示すもので、マニピュレータのサブクランプの平面図である。
【図6】本発明の実施の形態に係わる第1パターンにおけるメインクランプ及びサブクランプの掴み換えの要否を示す図表である。
【図7】図6に対応する第1パターンの説明図である。
【図8】本発明の実施の形態に係わる第2パターンにおけるメインクランプ及びサブクランプの掴み換えの要否を示す図表である。
【図9】図8に対応する第2パターンの説明図である。
【図10】本発明の実施の形態に係わる第3パターンにおけるメインクランプ及びサブクランプの掴み換えの要否を示す図表である。
【図11】図10に対応する第3パターンの説明図である。
【図12】本発明の実施の形態に係わるメインクランプの掴み換えの説明図である。
【図13】本発明の実施の形態に係わるサブクランプの掴み換えの説明図である。
【図14】本発明の実施の形態に係わるワークの原点位置決め及び剪断位置の説明図である。
【図15】本発明の実施の形態に係わるワークの剪断位置の説明図である。
【図16】従来におけるマニピュレータを用いたワークの供給状態を示す概略説明図である。
【図17】従来における手動によるワークの短冊加工を示す概略説明図である。
【図18】従来におけるマニピュレータを用いたワークの短冊加工を示す概略説明図である。
【符号の説明】
1 シャーリングマシン
3 フロントテーブル
9 グリッパ
11 ピンゲージ(突当て部材)
13 ワーク引寄せ装置
15 ワーク原点位置決め装置
17 制御装置
19 マニピュレータ(ワーク位置決め搬入装置)
23 上フレーム
29 メインクランプ
43 サブクランプ
51 可動フレーム
55 サブクランプ用アーム
59、61 直線刃
63 板押え装置
73 板押え駆動制御部
75 マニピュレータ駆動制御部
77 中央制御部
87 比較判断装置
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a workpiece positioning and carrying-in apparatus that can efficiently carry out and reduce the work process time when carrying a plate-like workpiece by a swivel manipulator arranged in front of a plate material processing machine that performs plate material processing on the workpiece. .
[0002]
[Prior art]
Conventionally, swivel manipulators as work supply devices for plate material processing machines such as bending machines and shearing machines have already been used as disclosed in Japanese Utility Model Laid-Open Nos. 1-60729 and 3-42135. ing.
[0003]
This swivel manipulator is swiveled back and forth and in a horizontal plane with the work clamped from the top and bottom by the main clamp (swivel clamp), so when shearing multiple sides or performing complicated planing, etc. It is very efficient.
[0004]
More specifically, as shown in FIG. 16, in the manipulator 101, when the origin of the initial workpiece W is set, the main clamp 103 (turning clamp) grips the substantial center (near the center of gravity) of the workpiece W, and the manipulator 101 moves forward. Then, the shearing machine 105 continuously performs the shearing process.
[0005]
When the movable range of the manipulator 101 reaches the limit, it is necessary to move the clamp position backward. However, because the main clamp 103 (swivel clamp) is sandwiched from above and below, there is a limit (lift limit or stroke limit) of the movable range in which the workpiece W is fed to the shearing portion of the shearing machine 105, and a portion that cannot be cut occurs.
[0006]
For example, in FIG. 17, the manipulator 101 is not used, and the worker performs strip processing of the material 1 to the material 5 through the steps 1 to 6 of the workpiece W. When the same strip processing is performed using the manipulator 101, the cutting process 1 and 2 are performed because the center of the workpiece W is clamped by the main clamp 103 as shown in FIG. Then, the workpiece | work W is turned and the cutting processes 3 and 4 are performed. However, cutting is not possible within the movable range limit (lift limit or stroke limit) of the main clamp 103.
[0007]
Therefore, in the shearing machine 105 shown in Japanese Utility Model Publication No. 1-60729, a sub-clamp (not shown) is separately provided for gripping and feeding the rear end portion of the remaining material. In addition, the shearing machine 105 disclosed in Japanese Patent Laid-Open No. 3-42135 is provided with a main clamp 103 and a sub clamp (not shown), and grasps the rising movement state of the product end and efficiently moves the clamp up and down. Is done.
[0008]
[Problems to be solved by the invention]
By the way, in the conventional manipulator 101, the center of the workpiece W is clamped from above and below by the main clamp 103, and after the shearing process is performed within the movable range of the main clamp 103 at this clamping position, the gripping is performed once to plural times. The exchange is performed, and the process of finally feeding by the sub clamp is performed. There is a problem that the time during the clamping operation is lost.
[0009]
In addition, since a sub-clamp is added to the main clamp 103 and a cutting process including turning of the workpiece W and a gripping change operation is performed, the input content to the control device becomes complicated, so input time delay and input error are reduced. There was a problem that it occurred.
[0010]
In addition, the conventional sub clamp is located behind the main clamp 103, and even if the workpiece is fed by this sub clamp, it is difficult to exceed the movable range of the main clamp 103, so that a portion that cannot be cut still occurs. was there.
[0011]
The present invention has been made to solve the above-mentioned problems, and its purpose is to clamp a position where the number of times of re-handling is smallest in consideration of the whole process when supplying a work by a manipulator, An object of the present invention is to provide a workpiece positioning and carrying-in apparatus capable of improving productivity by simplifying input contents of a control device, shortening an operator input time, and reducing input errors.
[0014]
[ Means for solving the problem ]
In view of the above, The workpiece positioning and loading device of the present invention is a workpiece positioning and loading device that feeds and positions the workpiece placed on the workpiece loading table from the front to the processing portion of the plate material processing machine.
The workpiece carry-in table is provided with an origin positioning device comprising an abutting member for positioning the front, rear, left and right of the workpiece with respect to the workpiece loading direction, and a workpiece attracting device for abutting the workpiece against the abutting member. A workpiece clamped from above and below is clamped from above and below, a main clamp that can be swiveled and moved back and forth in a horizontal plane, and a sub-clamp that can be moved back and forth by clamping the rear end of the workpiece. A process simulation is performed in advance when the center is clamped by the main clamp, and after calculating the first and subsequent gripping positions in the process simulation, the gripping position of the main clamp at the time of actual origin positioning is calculated by the process simulation. At the calculated repositioning position after the first time or The actual gripping position of the main clamp at the first and subsequent gripping changes is corrected to the subsequent gripping position calculated in the process simulation, and the origin positioning device and the main clamp are corrected based on the change correction. And a control device for generating an operation / positioning command.
[0015]
Therefore, when offsetting the main clamp from the approximate center position of the workpiece when positioning the workpiece, or when re-holding the workpiece, it is actually unnecessary to perform a process simulation when clamping with the main clamp in the control device in advance. Therefore, it is possible to reduce the process time because efficient gripping is performed without the need for gripping.
[0016]
Also, The workpiece positioning and loading device of the present invention is a workpiece positioning and loading device that feeds and positions the workpiece placed on the workpiece loading table from the front to the processing portion of the plate material processing machine.
The workpiece carry-in table is provided with an origin positioning device comprising an abutting member for positioning the front, rear, left and right of the workpiece with respect to the workpiece loading direction, and a workpiece attracting device for abutting the workpiece against the abutting member. The workpiece positioned by the device is clamped from above and below, and can be swiveled in a horizontal plane. The main clamp can be moved back and forth, and the rear end of the workpiece can be clamped to move closer to the shearing part than the main clamp. A sub-clamp is provided, and a process simulation of machining is performed in advance when the center of the work is clamped by the main clamp at the time of workpiece origin positioning, and the first and subsequent gripping change operations in the machining process of this process simulation And a first operation for calculating each process that requires a gripping operation of the sub-clamp. Of the steps calculated in the first calculation, the second calculation for calculating the final gripping position of the sub clamp is performed, and the gripping operation position at the time of the origin positioning performed by the actual main clamp is determined. In addition to correcting the change to the final gripping position calculated by the second calculation or the actual gripping position of the main clamp at the first and subsequent gripping changes to the final gripping position calculated by the second calculation. On the basis of the above, the origin positioning device and a control device for generating an operation / positioning command for the main clamp and the sub clamp are provided.
[0017]
Therefore, in the shearing process when a workpiece is processed into a strip material, a process simulation is performed in advance in the control device, and each process that requires gripping operations at the main clamp and the sub clamp is performed by the first calculation. Grasping the process, the final gripping position is calculated by the second calculation from the entire process based on the movable range of the main clamp and the sub clamp, and in practice, no extra grip replacement operation and main clamp turning operation are performed. In both cases, the gripping by the sub-clamp is performed efficiently, so that the process time can be shortened.
[0018]
DETAILED DESCRIPTION OF THE INVENTION
Embodiments of a workpiece positioning and carrying-in apparatus according to the present invention will be described below with reference to the drawings.
[0019]
As shown in FIG. 1, for example, a shearing machine 1 serving as a plate material processing machine according to the present embodiment, a front table 3 (work loading table) for loading a plate-shaped workpiece W into the shearing portion. Is provided.
[0020]
A large number of free bears 5 (free bearings) are provided on the upper surface of the front table 3 so that the workpiece W can move smoothly in any direction as shown in FIG. 2, a work table 7 on which the work W is placed is provided adjacent to the left side.
[0021]
In the present embodiment, hereinafter, the workpiece conveyance direction in which the workpiece W is conveyed from the workpiece table 7 to the front table 3 is referred to as “X direction”, and is carried from the front table 3 to the shearing unit of the shearing machine 1. The workpiece loading direction is referred to as “Y direction”. In addition, a movement axis that reciprocates in the X direction of the gripper 9 described later is referred to as a “U axis”, and a center line in the Y direction that passes through the approximate center of the length of the front table 3 in the X direction is referred to as a “Y axis”. . The shear line of the workpiece W by the shearing machine 1 is in the X direction.
[0022]
Referring to FIGS. 1 and 2, the front table 3 is provided with a gripper 9 that clamps a work W placed on the work table 7, and the gripper 9 uses the clamped work W as an origin of the front table 3. In order to carry in to the vicinity of the fixed position, the front table 3 is provided so as to be able to reciprocate in the X direction across almost the left and right ends.
[0023]
The gripper 9 is driven by a ball screw or the like rotated by a carriage motor (not shown) on the U-axis disposed at the upper position in FIG. 2 of the front table 3 to clamp the work W on the work table 7. While being carried onto the front table 3, the gripper 9 itself is raised by the operation of the gripper lifting cylinder and the like, so that the clamp portion of the gripper 9 can freely move in and out of the work path line PL on the front table 3.
[0024]
Referring to FIG. 2, the front table 3 has two pin gauges 11 (abutting members) on the shearing part side (upper side in FIG. 2) of the shearing machine 1 with respect to the U-axis line on which the gripper 9 travels. Is provided. Further, in the vicinity of each pin gauge 11, there is provided a work drawing device 13 for clamping the work W on the front table 3 and moving it so as to abut against each pin gauge 11. The two pin gauges 11 and the workpiece attracting device 13 constitute a workpiece origin positioning device 15.
[0025]
The pin gauge 11 and the workpiece pulling device 13 are provided on a pin gauge movable support body (not shown). The pin gauge movable support body is supported on the frame of the front table 3 in the X direction, for example, and is driven by a pin gauge drive motor (not shown). (Omitted) is screwed into the X-axis ball screw that is rotationally driven. The pin gauge drive motor of the pin gauge 11 is electrically connected to a control device 17 described later.
[0026]
More specifically, the workpiece attracting device 13 includes a clamper (not shown) that clamps the workpiece W, and has a structure that moves the workpiece W clamped by the clamper in the direction of the pin gauge 11. The work drawing device 13 is electrically connected to a control device 17 described later.
[0027]
Referring to FIGS. 1 and 2, the front table 3 has a workpiece W that can be clamped and unclamped from above and below by rotating it at a desired angle in the horizontal direction and moving the workpiece W back and forth in the Y direction. A manipulator 19 (work positioning carry-in device) that is moved is provided.
[0028]
More specifically, the manipulator 19 is provided so as to be able to travel in the Y direction on the base 21 by appropriately driving and controlling a ball screw (not shown) parallel to the Y axis with a servo motor or the like.
[0029]
Further, the manipulator 19 includes an upper frame 23, a support frame 25, and a lower frame 27. A main clamp 29 that clamps and rotates and positions the workpiece W is provided at the front ends of the upper frame 23 and the lower frame 27 in the Y direction. ing. The main clamp 29 includes an upper clamper 31 at the front end of the upper frame 23 in the Y direction and a lower clamper 33 at the front end of the lower frame 27 in the Y direction.
[0030]
Referring to FIG. 1, in the main clamp 29, a work clamp shaft 37 that is rotationally driven by a C-axis motor 35 is supported at the tip of a lower frame 27 in the vertical direction. This work clamp shaft 37 (C axis) A lower clamper 33 is attached to the tip of the. On the other hand, a bracket 23A is fixed to the tip of the upper frame 23 as shown in FIG. 3, and the upper clamper 31 is attached to the lower end of the piston rod 41 of the main clamp cylinder 39 provided on the upper portion of the bracket 23A. Is provided so as to be movable up and down so as to be able to contact and separate from the lower clamper 33 at the tip of the work clamp shaft 37 and is rotatable.
[0031]
Further, the manipulator 19 is provided with a sub-clamp 43 that can move back and forth and move up and down by clamping the rear end of the work W at a position on the left front side of the main clamp 29 in FIG.
[0032]
More specifically, as shown in FIGS. 3 to 5, the sub clamp 43 has a bracket 23 </ b> A at the tip of the upper frame 23 positioned in front of the main clamp cylinder 39 and a support bracket 45 erected on the top. Yes. A movable frame 51 for supporting a plurality of sub-clamps 43 is connected to the lower end of the piston rod 49 of the sub-clamp cylinder 47 provided on the support bracket 45, and the movable frame 51 is connected to the upper frame 23. Guided by a guide member 53 provided at the lower end of the tip, it is provided so as to be movable up and down.
[0033]
As shown in FIG. 4, the movable frame 51 is composed of a member such as a square pipe that is long in the horizontal direction. The lower surface of the movable frame 51 has a total of four pieces, two on the left and right sides in FIG. The sub-clamp arm 55 is provided so as to have an inverted L shape in FIG.
[0034]
At the tip of each sub-clamp arm 55, for example, a sub-clamp portion 43 </ b> A composed of an upper clamp jaw and a lower clamp jaw that can be operated by a jaw drive cylinder 57 and can grip the edge of the workpiece W is provided.
[0035]
Accordingly, as shown in FIG. 3, the sub clamp 43 clamps the work W at a position in front of the main clamp 29 and can move back and forth by the movement of the manipulator 19, so that the position of the sub clamp 43 is close to the cutting line of the shearing machine 1. Since the workpiece W can be fed up to, the workpiece can be fed beyond the movable range of the main clamp 29.
[0036]
Further, since the sub-clamp portions 43A can be moved up and down by moving the movable frame 51 up and down by the sub-clamp cylinder 47, when the workpiece is fed by clamping with the main clamp 29, the sub-clamp 43 ascends as a whole. Will not get in the way.
[0037]
Note that the above-described driving devices of the manipulator 19 are electrically connected to a control device 17 described later.
[0038]
Referring to FIG. 1, 57 is a general shearing machine having upper and lower linear blades 59, 61, 63 is a plate pressing device for pressing the workpiece W, 65 is a ram for moving the upper blade 59 up and down, Moreover, 67 is a fluid pressure cylinder that drives the ram 65.
[0039]
In front of the ram 65, a plurality of plate pressing devices 63 are juxtaposed with the front plate 69 with appropriate intervals. The plate holding device 63 is attached to the shearing machine 1 and is generally lowered before the shearing to hold the workpiece W, and after the ram 65 is raised, the workpiece W is released. In order to function as a presser at the time of unclamping 33, it is set so that it can be independently operated without being interlocked with the vertical movement of the ram 65 at the time of unclamping.
[0040]
That is, a plate press drive control unit 73 independent from the ram drive control unit 71 in the control device 17 is separately provided and connected to a central control unit 77 connected to a manipulator drive control unit 75 (manipulator control device). .
[0041]
The central control unit 77 is input with an input device 79 for inputting data such as the size of the workpiece W, the cutting position, the movable range of the main clamp 29, a display device 81, and a memory 83 for storing the input data. The arithmetic unit 85 for performing various calculations on data based on preset arithmetic expressions, the movable range and clamp width of the main clamp 29, the maximum distance of the upper frame 23 of the manipulator 19, and the above-mentioned calculation. A comparison / determination device 87 is provided for comparing and determining a calculated value obtained by the device 85 and selecting an optimum shearing process.
[0042]
With the above configuration, the workpiece W placed on the workpiece table 7 in FIG. 2 is clamped by the two grippers 9, moved in the X direction, and conveyed to the approximate center of the front table 3.
[0043]
The reference plane BL of the workpiece W is two sides on the upper side and the right side in FIG. 14, and the pin gauge 11 projects upward from the upper surface of the front table 3.
[0044]
The workpiece W is released from the gripper 9 and clamped by a clamper of the workpiece drawing device 13, and is moved obliquely so as to abut against the reference of the two pin gauges 11 and the two grippers 9, as shown in FIG. The origin is positioned as follows.
[0045]
When the four sides of the workpiece W are cut off at the edge, there is a turning motion that is turned by the main clamp 29. The workpiece W is gripped by the upper and lower clampers 31 and 33 of the main clamp 29. The manipulator 19 moves forward in the Y direction and stops when a desired position of the workpiece W is carried into the shearing section of the shearing machine 1.
[0046]
After the shearing process, the workpiece W is clamped by the upper and lower clampers 31 and 33, the manipulator 19 is retracted, and the workpiece W is rotated at an appropriate angle on the front table 3 by the rotation of the workpiece clamp shaft 37 (C axis). The manipulator 19 advances again in the Y direction, and the desired position of the workpiece W is positioned at the machining position of the shearing machine 1 and sheared. The above steps are repeated, and the four sides of the workpiece W are cut off at the edges in FIG.
[0047]
FIG. 15 shows a case where strip processing at the shear positions 1 to 4 is performed after the edge cutting shear processing on the left and right sides is performed. This strip processing requires only cutting in one direction in the X or Y direction. When such strip processing is performed using the main clamp 29 and the sub clamp 43, it is necessary to perform a gripping change operation. There is.
[0048]
Next, the manipulator control device 75 (manipulator drive control unit) related to the main part in the embodiment of the present invention will be described in detail mainly using strip processing as an example.
[0049]
In the manipulator drive control unit 75, a process simulation is performed in advance when the center of the workpiece W is clamped by the main clamp 29 when the workpiece W is positioned at the origin. After calculating the first and subsequent repositioning positions in this process simulation, the gripping position of the main clamp 29 at the time of actual home position positioning is changed to the first and subsequent repositioning positions calculated in the process simulation, or The grip position of the main clamp at the time of the first and subsequent grip replacement is changed and corrected to the subsequent grip replacement position calculated by the process simulation.
[0050]
Based on this change correction, an operation / positioning command is issued to the origin positioning device and the main clamp 29.
[0051]
In strip processing, the first pattern that does not require the gripping change operation of the main clamp 29 and the sub clamp 43, the second pattern that does not require the gripping change operation of the main clamp 29, and the main clamp 29, and the main clamp The pattern can be classified into three patterns, that is, a third pattern that requires 29 gripping change operations and a sub clamp 43 operation.
[0052]
12A to 12E, when the main clamp 29 is used to hold the workpiece W, the workpiece W gripped by the main clamp 29 in FIG. 12A is a shearing portion of the shearing machine 1. In FIG. 12B, the plate pressing device 63 descends and the work W is pressed against the table and fixed. In this state, in FIG. 12C, the main clamp 29 is replaced. In FIG. 12D, the workpiece W is positioned and cut at the shearing portion of the shearing machine 1 by the main clamp 29. In FIG. 12E, the remaining material is carried out by the kicker 89.
[0053]
13A to 13E, when the main clamp 29 is replaced with the sub clamp 43, the workpiece W gripped by the main clamp 29 in FIG. In FIG. 13B, the plate pressing device 63 is lowered and the work W is pressed against the table and pressed. In this state, in FIG. 13C, the main clamp 29 releases the workpiece W, the manipulator 19 moves backward, and the sub-clamp 43 performs gripping. In FIG. 13 (D), the workpiece W is positioned and cut by the shearing portion of the shearing machine 1 by the sub clamp 43. In FIG. 13E, the remaining material is carried out by the kicker 89.
[0054]
The first pattern (the operation for changing the grip of the main clamp 29 and the operation of the sub clamp 43 is unnecessary) is performed at the position of the main clamp 29 that is gripped at the time of origin positioning in the process simulation as shown in FIGS. 6 and 7, for example. This is a case where all the shearing steps from 1 to 2 are completed. At this time, after being sheared in Step 1, the main clamp 29 is turned by 180 °, and then positioned at the shearing position and shearing in Step 2 is performed.
[0055]
In the process simulation, (1) the gripping after the origin positioning is unnecessary, (2) the end of the main clamp 29 within the movable range to the final process, (3) the maximum pair of workpieces W from the main clamp 29 This is the first pattern when the condition that the angle L (see FIG. 14) is smaller than the maximum distance of the upper frame 23 is determined.
[0056]
In the second pattern (the main clamp 29 needs to be replaced and the sub-clamp 43 does not need to be operated), the main clamp 29 can be replaced from the position of the main clamp 29 that is gripped when positioning the origin in the process simulation to the end of the final process. In this case, the final process can be reached only by the operation, and the sub-clamp 43 is not used.
[0057]
For example, when there are four shearing steps 1 to 4 from one workpiece W, as shown in FIGS. 8 and 9, first, the vicinity of the center of the workpiece W is gripped, and step 3 is for the main clamp 29. Therefore, after the process 2 is completed, the main clamp 29 needs to be rearwardly gripped. In the next step 3, the gripping is performed for the first time. However, when step 4 is sufficiently shearable within the movable range of the main clamp 29, it is simulated that the final gripping is performed in this step 3. At that time, a control command code having the final repositioning position on the process simulation as the process 3 is inserted after the process 2. Thereby, since the re-holding in the process 4 is not performed, an efficient shearing process is performed.
[0058]
Further, when the turning operation enters an intermediate process, the final gripping position of the main clamp 29 is that the aforementioned maximum diagonal L is smaller than the maximum distance of the upper frame 23 and that the main clamp 29 is within the stroke movable range. It is calculated in advance by a process simulation as long as it satisfies the condition. Control is performed so that the workpiece W is gripped at the final gripping position by this calculation.
[0059]
In the above calculation, whether to clamp at the final gripping position when positioning the origin, or whether to clamp at the final gripping position at the time of the first gripping, determines the process position of the turning operation, the dimension of the maximum diagonal L of the position to be gripped The selection is made in light of the above conditions.
[0060]
If the turning operation is not reserved later, the final gripping position with the maximum diagonal L excluded from the condition is selected.
[0061]
The third pattern (required for the main clamp 29 and the sub-clamp 43) is not shearable within the movable range of the main clamp 29 in step 4 as shown in FIGS. 10 and 11, for example. When the sub-clamp 43 is necessary for the first time, the sub-clamp 43 is necessary in the subsequent process when the re-gripping operation is necessary for the first time, and is within the movable range of the sub-clamp 43, and in the subsequent process. When it is simulated that the turning motion is not included, the sub-clamp 43 is used at the time of the first gripping operation.
[0062]
At this time, a control command code regarding the use of the sub clamp 43 is inserted after the step 2. As a result, in steps 3 and 4, an efficient shearing step is performed by the operation of the sub clamp 43.
[0063]
Note that when the turning operation enters an intermediate process, the condition of the maximum diagonal L is restricted. Therefore, the operation range of the main clamp 29 and the sub clamp 43 and the condition of the maximum diagonal L are limited. A prior calculation is performed. By this calculation, it is selected whether the main clamp 29 or the sub clamp 43 is used at the final gripping position within the range of each condition.
[0064]
With the above configuration, when the main clamp 29 when the workpiece W is positioned at the origin is offset from the substantially center position of the workpiece W, a process simulation when the manipulator drive control unit 75 clamps with the main clamp 29 is performed in advance. Actually, since the gripping is efficiently performed by eliminating the extra gripping operation, the process time can be shortened.
[0065]
Further, in the manipulator drive control unit 75 according to another embodiment of the present invention, a process simulation is performed in advance when the center of the workpiece W is clamped by the main clamp 29 when the origin of the workpiece W is positioned. In the machining process of this process simulation, each process that requires the first and subsequent gripping changing operations and the gripping operation of the sub-clamp 43 is calculated by the first calculation. Of each process calculated in the first calculation, a second calculation for calculating the final gripping position of the sub clamp 43 is performed.
[0066]
The gripping operation position at the time of origin positioning performed by the actual main clamp 29 is the final gripping position calculated by the above-mentioned second calculation or the gripping position of the main clamp at the time of actual grip replacement after the first time. The change is corrected to the final gripping position calculated by the second calculation. The manipulator drive control unit 75 generates an operation / positioning command for the origin positioning device, the main clamp 29, and the sub clamp 43 based on the change correction.
[0067]
As described above, in the shearing process when the workpiece W is processed into a strip material, the manipulator drive control unit 75 performs a process simulation of the gripping operation with the main clamp 29 and the sub clamp 43 in advance. Based on the movable range of the sub-clamp 43, the final gripping position is calculated from the entire process, and in fact, the gripping by the sub-clamping is performed efficiently without performing an extra grip changing operation and a pivoting operation of the main clamp 29. Therefore, the process time can be shortened.
[0068]
In addition, this invention is not limited to the example of embodiment mentioned above, It can implement in another aspect by making an appropriate change. In the example of the present embodiment, a shearing machine has been described as an example of a plate material processing machine, but a laser processing machine, a bending processing machine, and other plate material processing machines may be used.
[0070]
[ The invention's effect ]
As can be understood from the embodiments of the invention as described above, according to the present invention, When offsetting the main clamp when positioning the workpiece from the approximate center position of the workpiece, or when performing gripping, it is actually unnecessary to perform a process simulation in advance when the clamp is clamped with the main clamp in the control device. Since the re-gripping operation is eliminated and the re-grabbing can be performed efficiently, the process time can be shortened.
[0071]
In addition, the present invention According to the above, in the shearing process when a workpiece is processed into a strip material, the control device performs a process simulation in advance so as to grasp the entire process of the gripping operation by the main clamp and the sub clamp, and the main clamp and the sub clamp. The final gripping position is calculated based on the movable range of the actuator, and in fact, the gripping can be performed efficiently with the sub-clamp without the need for extra gripping and main clamp pivoting operations. Can do.
[Brief description of the drawings]
FIG. 1 is a side view (a left side view of FIG. 2) of a shearing machine including a manipulator according to an embodiment of the present invention.
FIG. 2 is a plan view of a front table according to the embodiment of the present invention.
FIG. 3 is a side view of a sub-clamp of a manipulator showing an embodiment of the present invention.
FIG. 4 shows an embodiment of the present invention and is a front view of a sub clamp of a manipulator.
FIG. 5 is a plan view of a sub clamp of a manipulator showing an embodiment of the present invention.
FIG. 6 is a chart showing whether or not it is necessary to replace the main clamp and the sub clamp in the first pattern according to the embodiment of the present invention.
7 is an explanatory diagram of a first pattern corresponding to FIG. 6. FIG.
FIG. 8 is a chart showing whether or not it is necessary to replace the main clamp and the sub clamp in the second pattern according to the embodiment of the present invention.
9 is an explanatory diagram of a second pattern corresponding to FIG. 8. FIG.
FIG. 10 is a chart showing whether or not it is necessary to replace the main clamp and the sub clamp in the third pattern according to the embodiment of the present invention.
FIG. 11 is an explanatory diagram of a third pattern corresponding to FIG.
FIG. 12 is an explanatory view of re-holding of the main clamp according to the embodiment of the present invention.
FIG. 13 is an explanatory view of sub-clamp replacement according to the embodiment of the present invention.
FIG. 14 is an explanatory diagram of a work origin positioning and a shearing position according to an embodiment of the present invention.
FIG. 15 is an explanatory diagram of a shear position of a workpiece according to the embodiment of the present invention.
FIG. 16 is a schematic explanatory view showing a workpiece supply state using a conventional manipulator.
FIG. 17 is a schematic explanatory view showing a conventional manual strip processing of a workpiece.
FIG. 18 is a schematic explanatory view showing strip processing of a workpiece using a conventional manipulator.
[Explanation of symbols]
1 Shearing machine
3 Front table
9 Gripper
11 Pin gauge (butting member)
13 Work drawing device
15 Work origin positioning device
17 Control device
19 Manipulator (Workpiece positioning and loading device)
23 Upper frame
29 Main clamp
43 Sub clamp
51 Movable frame
55 Sub-clamp arm
59, 61 Straight blade
63 Plate holding device
73 Plate presser drive controller
75 Manipulator drive controller
77 Central control unit
87 Comparison judgment device

Claims (2)

ワーク搬入テーブルに載置したワークを板材加工機の加工部に前方から供給位置決めするワーク位置決め搬入装置において、
前記ワーク搬入テーブルに、ワーク搬入方向に対してワークの前後左右を位置決めする突当て部材と、この突当て部材に前記ワークを突当てるワーク引寄せ装置とからなる原点位置決め装置を設け、
この原点位置決め装置により位置決めされたワークを上下からクランプし水平面内に旋回自在、前後動自在のメインクランプと、前記ワークの後端をクランプし前後動自在のサブクランプとを設け、
ワークの原点位置決め時にワークの中心を前記メインクランプでクランプした場合の工程シミュレーションを事前に行なうと共にこの工程シミュレーションにおける第1回目以降の掴み換え位置を算出した後に、実際の原点位置決め時のメインクランプの把持位置を前記工程シミュレーションで算出された第1回目以降の掴み換え位置あるいは、実際の第1回目以降の掴み換え時のメインクランプの把持位置を前記工程シミュレーションで算出されたそれ以降の掴み換え位置に変更補正をすると共に、この変更補正に基づいて前記原点位置決め装置とメインクランプの作動・位置決めの指令を発生する制御装置を設けてなることを特徴とするワーク位置決め搬入装置。
In a workpiece positioning and loading device for supplying and positioning the workpiece placed on the workpiece loading table from the front to the processing portion of the plate material processing machine,
The workpiece carry-in table is provided with an origin positioning device comprising an abutting member that positions the front, rear, left, and right of the workpiece with respect to the workpiece loading direction, and a workpiece attracting device that abuts the workpiece against the abutting member,
A workpiece clamped by this origin positioning device is clamped from above and below, and a main clamp that can be swung in a horizontal plane and can be moved back and forth, and a sub-clamp that can be moved back and forth by clamping the rear end of the workpiece,
A process simulation is performed in advance when the center of the workpiece is clamped by the main clamp at the time of workpiece origin positioning, and after calculating the first and subsequent gripping change positions in this process simulation, the main clamp of the actual origin positioning is determined. The gripping position after the first time calculated by the process simulation or the gripping position of the main clamp at the time of the actual first or subsequent gripping change after that is calculated by the process simulation. A workpiece positioning and carrying-in apparatus comprising: a correction device for correcting the change to the position and a control device for generating a command for operating and positioning the origin clamp and the main clamp based on the change correction.
ワーク搬入テーブルに載置したワークを板材加工機の加工部に前方から供給位置決めするワーク位置決め搬入装置において、
前記ワーク搬入テーブルに、ワーク搬入方向に対してワークの前後左右を位置決めする突当て部材と、この突当て部材に前記ワークを突当てるワーク引寄せ装置とからなる原点位置決め装置を設け、
この原点位置決め装置により位置決めされたワークを上下からクランプし水平面内に旋回自在、前後動自在のメインクランプと、前記ワークの後端をクランプし前記メインクランプよりも前記剪断加工部に接近可能に前後動自在のサブクランプとを設け、
ワークの原点位置決め時にワークの中心を前記メインクランプでクランプした場合の加工の工程シミュレーションを事前に行なうと共にこの工程シミュレーションの加工の工程の中において第1回目以降の掴み換え動作およびサブクランプの把持動作が必要な各々の工程を算出する第1の演算を行い、この第1の演算で算出された各工程のうちの、サブクランプの最終把持位置を算出する第2の演算を行い、実際のメインクランプによって行われる原点位置決め時の把持動作位置を第2の演算で算出された前記最終把持位置にあるいは、実際の第1回目以降の掴み換え時のメインクランプの把持位置を第2演算で算出された最終把持位置に変更補正すると共に、この変更補正に基づいて前記原点位置決め装置とメインクランプ及びサブクランプの作動・位置決めの指令を発生する制御装置を設けてなることを特徴とするワーク位置決め搬入装置。
In a workpiece positioning and loading device for supplying and positioning the workpiece placed on the workpiece loading table from the front to the processing portion of the plate material processing machine,
The workpiece carry-in table is provided with an origin positioning device comprising an abutting member that positions the front, rear, left, and right of the workpiece with respect to the workpiece loading direction, and a workpiece attracting device that abuts the workpiece against the abutting member,
The workpiece positioned by this origin positioning device is clamped from above and below, and can be swiveled in a horizontal plane. The main clamp can be moved back and forth, and the rear end of the workpiece can be clamped and moved closer to the shearing part than the main clamp. A movable sub-clamp,
A machining process simulation is performed in advance when the center of the workpiece is clamped by the main clamp at the time of positioning of the workpiece origin, and in the machining process of this process simulation, the first gripping change operation and the sub clamp holding operation are performed. The first calculation for calculating each process that requires the first calculation is performed, and the second calculation for calculating the final gripping position of the sub-clamp is performed among the processes calculated in the first calculation. The gripping operation position at the time of origin positioning performed by the clamp is calculated as the final gripping position calculated by the second calculation, or the gripping position of the main clamp at the time of the actual first and subsequent grip replacement is calculated by the second calculation. And correcting the change to the final gripping position, and based on the change correction, the origin positioning device, the main clamp and the sub-clamp Work positioning loading apparatus characterized by comprising providing a hydraulic-positioning of the control device for generating a command.
JP2000301497A 2000-09-29 2000-09-29 Work positioning and loading device Expired - Fee Related JP4708544B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000301497A JP4708544B2 (en) 2000-09-29 2000-09-29 Work positioning and loading device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000301497A JP4708544B2 (en) 2000-09-29 2000-09-29 Work positioning and loading device

Publications (2)

Publication Number Publication Date
JP2002102961A JP2002102961A (en) 2002-04-09
JP4708544B2 true JP4708544B2 (en) 2011-06-22

Family

ID=18783030

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000301497A Expired - Fee Related JP4708544B2 (en) 2000-09-29 2000-09-29 Work positioning and loading device

Country Status (1)

Country Link
JP (1) JP4708544B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103722115A (en) * 2013-12-31 2014-04-16 辽宁东泰自动化设备制造有限公司 Axial rotating device

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105499423A (en) * 2016-02-03 2016-04-20 江苏龙胜机床制造有限公司 Front feeding device of plate shearer
CN109176499B (en) * 2018-10-25 2024-03-01 苏州工业职业技术学院 Get blowing manipulator

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11347832A (en) * 1998-06-10 1999-12-21 Amada Co Ltd Shearing method and device therefor

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0342135A (en) * 1989-07-07 1991-02-22 Murata Mach Ltd Method for carrying plate stock in bending machine
JPH0788558A (en) * 1993-09-27 1995-04-04 Murata Mach Ltd Control method of plate bending machine
JP3295247B2 (en) * 1994-10-17 2002-06-24 株式会社アマダ Control device for manipulator for panel vendor
JPH11221620A (en) * 1998-02-03 1999-08-17 Amada Co Ltd Bending method and its device

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11347832A (en) * 1998-06-10 1999-12-21 Amada Co Ltd Shearing method and device therefor

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103722115A (en) * 2013-12-31 2014-04-16 辽宁东泰自动化设备制造有限公司 Axial rotating device

Also Published As

Publication number Publication date
JP2002102961A (en) 2002-04-09

Similar Documents

Publication Publication Date Title
US5315906A (en) Automated extrusion processing machine
JP2906116B2 (en) Method and apparatus for progressive machining of long workpieces
WO2012063710A1 (en) Robot hand for bending long material, and system for bending long material
GB2160461A (en) Shearing machine
JPH0839151A (en) Sheet material bending method and device
US4506573A (en) Shearing machine
JP4708544B2 (en) Work positioning and loading device
JP2011093118A (en) Pillar material precutting process machine
JP3393110B2 (en) Automatic processing equipment
JP3167953B2 (en) Precut wood production equipment
JPH07132410A (en) Unit for cutting end of long material
CN217913414U (en) Processing structure that platform and robot laser welding combined together
JP2817931B2 (en) Box-shaped product manufacturing equipment
JPH08108234A (en) Sheet metal working method and work handling robot therefor
JPH11347832A (en) Shearing method and device therefor
JP2703995B2 (en) Knife forming equipment for sheet processing
JP4301651B2 (en) Origin positioning method and apparatus for plate material processing machine
JP4499241B2 (en) Positioning method of workpiece origin in plate processing machine
JP4430159B2 (en) Origin positioning method and apparatus for plate material processing machine
JPH05293553A (en) Automatic plate bending machine
JP3185842B2 (en) Robot hand and its operation method
JP2531486Y2 (en) Cutting machine for metal molds
JP2002066836A (en) Cutting method and apparatus therefor
JPH06155156A (en) Material feeder for cutting machine
KR200379619Y1 (en) device of transfer work for numerical control

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20070815

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20090818

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20100907

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20101029

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20110315

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20110317

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

LAPS Cancellation because of no payment of annual fees