JP4679506B2 - Floating structure, method for manufacturing floating structure including prefabricated room unit, method for forming prefabricated room unit, and prefabricated room unit - Google Patents
Floating structure, method for manufacturing floating structure including prefabricated room unit, method for forming prefabricated room unit, and prefabricated room unit Download PDFInfo
- Publication number
- JP4679506B2 JP4679506B2 JP2006505650A JP2006505650A JP4679506B2 JP 4679506 B2 JP4679506 B2 JP 4679506B2 JP 2006505650 A JP2006505650 A JP 2006505650A JP 2006505650 A JP2006505650 A JP 2006505650A JP 4679506 B2 JP4679506 B2 JP 4679506B2
- Authority
- JP
- Japan
- Prior art keywords
- room unit
- pipe
- boundary surface
- floating structure
- service gap
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000000034 method Methods 0.000 title claims abstract description 21
- 238000004519 manufacturing process Methods 0.000 title claims description 8
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 28
- 238000004378 air conditioning Methods 0.000 claims description 15
- 230000035515 penetration Effects 0.000 claims description 10
- 239000010865 sewage Substances 0.000 claims description 10
- 239000000498 cooling water Substances 0.000 claims description 9
- 230000005494 condensation Effects 0.000 claims 1
- 238000009833 condensation Methods 0.000 claims 1
- 238000010616 electrical installation Methods 0.000 claims 1
- 238000009434 installation Methods 0.000 abstract description 7
- 238000009417 prefabrication Methods 0.000 abstract 2
- 230000008878 coupling Effects 0.000 description 4
- 238000010168 coupling process Methods 0.000 description 4
- 238000005859 coupling reaction Methods 0.000 description 4
- 239000003129 oil well Substances 0.000 description 2
- 238000003466 welding Methods 0.000 description 2
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 238000005304 joining Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000003860 storage Methods 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B29/00—Accommodation for crew or passengers not otherwise provided for
- B63B29/02—Cabins or other living spaces; Construction or arrangement thereof
- B63B29/025—Modular or prefabricated cabins
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B29/00—Accommodation for crew or passengers not otherwise provided for
- B63B29/16—Soil water discharges
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63J—AUXILIARIES ON VESSELS
- B63J2/00—Arrangements of ventilation, heating, cooling, or air-conditioning
- B63J2/02—Ventilation; Air-conditioning
- B63J2/04—Ventilation; Air-conditioning of living spaces
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Hydrology & Water Resources (AREA)
- Tents Or Canopies (AREA)
- Residential Or Office Buildings (AREA)
- Fire-Extinguishing By Fire Departments, And Fire-Extinguishing Equipment And Control Thereof (AREA)
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
- Physical Or Chemical Processes And Apparatus (AREA)
- Duct Arrangements (AREA)
- Floor Finish (AREA)
- Bridges Or Land Bridges (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Sewage (AREA)
Abstract
Description
本発明は、浮遊構造体(例えば、船舶)を製造する方法に係わり、この方法では、浮遊構造体の胴部が形成され、該胴部にはデッキ構造体または対応する支持構造体が設けられ、また、前記方法では、主境界表面体を設けることによって部屋単位体(部屋ユニット)が予備組立てされ、前記主境界表面体が、例えば部屋単位体の複数の壁および天井構造体と、内部取付け部品の少なくとも一部と、該内部取付け部品に関連して部屋単位体境界面の外側に配置される手段(例えば、衛生設備用入り側および出側ダクト、水管、および/または、電気設備)とを含み、もって、部屋単位体の外側に凹形状の役務間隙が形成されるように、部屋単位体の前記主境界表面体が構成される。 The present invention relates to a method of manufacturing a floating structure (e.g., a ship), in which a body of a floating structure is formed, and the body is provided with a deck structure or a corresponding support structure. Also, in the method, a room unit body (room unit) is pre-assembled by providing a main boundary surface body, and the main boundary surface body includes, for example, a plurality of wall and ceiling structures of the room unit body and an internal attachment. At least some of the parts and means (eg, sanitary equipment entry and exit ducts, water pipes, and / or electrical equipment) disposed outside the room unit interface in relation to the internal mounting parts; The main boundary surface body of the room unit body is configured such that a concave service gap is formed outside the room unit body.
浮遊構造体の製造およびプレハブ式部屋単位体の製造と、該部屋単位体の運搬および浮遊構造体への設置は、すでに公知である。部屋単位体の設置に続き、管または管継ぎ手を介して浮遊構造体の各系に部屋単位体を接続し、かつ部屋単位体相互を接続するには、多大の時間を要し、費用増を招く多くの付加的作業が必要である。通常、これらの作業は、部屋単位体が設置された後、浮遊構造体内の部屋単位体外部に形成された役務間隙内で行われる。
特に船舶(例えば、船、油井掘削装置等)の場合、前記後続作業は、限られたスペース内で危険な火を扱う溶接その他の作業を含み、これらの不利な点に加えて、浮遊構造体を製造するに当たっては、かなりの危険が伴う。浮遊構造体内の作業条件は、この理由のため、困難かつ危険でもある。
The manufacture of floating structures and the manufacture of prefabricated room units and the transportation and installation of the room units on floating structures are already known. Following the installation of the room units, it takes a lot of time and costs to connect the room units to each system of the floating structure via pipes or pipe joints and to connect the room units to each other. A lot of additional work is required. Normally, these operations are performed in a service gap formed outside the room unit body in the floating structure after the room unit body is installed.
Especially in the case of ships (eg ships, oil well drills, etc.), the subsequent work includes welding and other work dealing with dangerous fires in a limited space, in addition to these disadvantages, floating structures There are considerable dangers in the production. The working conditions within the floating structure are also difficult and dangerous for this reason.
本発明の目的は、前記欠点が除かれ、かつ予備組立て段階が、可及的に完全で、費用効果よく実施できるような方法を得ることである。 The object of the present invention is to obtain a method in which the disadvantages are eliminated and the pre-assembly stage is as complete as possible and can be carried out cost-effectively.
この目的は、本発明により請求項1に開示された特徴を有する方法によって達成される。
本発明の基本思想は、浮遊構造体のところへ搬送され浮遊構造体に組み込まれる予備組立てされた部屋単位体が、部屋単位体の直接周囲に配置される設備や構造体を含み、該設備や構造体が、浮遊構造体の居住系の一部を形成し、かつ少なくとも当該部屋単位体に、好ましくは他の部屋単位体にも役立つように、浮遊構造体を製造することである。実際には、このことは、部屋単位体を搬送し浮遊構造体内に設置する前に、すでに予備組立て時に部屋単位体の役務間隙を設けて、役務間隙に浮遊構造体の各系に関連する部材を装備することを意味する。その場合、装備される部材は当該部屋単位体の部材のみでなく、また該部材には配管その他の媒体搬送部材、それらと接続される連結用構造体、操作および制御手段のいずれかまたは2つ以上が含まれる。それによって、前記部材の少なくとも一部が、予備組立て時に、役務間隙側面の、部屋単位体の外側で境界表面体に取り付けられる。このようにして、浮遊構造体の系に関連する部品をも有する部屋単位体は、浮遊構造体のところへ運ばれ、浮遊構造体内に設置されるが、このことは、実際には、部屋単位体の予備組立てに関連して、浮遊構造体の組み立て過程のかなりの部分を、浮遊構造体とは別の場所に移して行わねばならないことを意味する。
This object is achieved according to the invention by a method having the features disclosed in claim 1.
The basic idea of the present invention includes a facility or structure in which a pre-assembled room unit that is transported to a floating structure and incorporated in the floating structure is disposed directly around the room unit. The floating structure is manufactured so that the structure forms part of the living system of the floating structure and serves at least the room unit, preferably other room units. In practice, this means that before the room unit is transported and installed in the floating structure, a service gap of the room unit is already provided at the time of preliminary assembly, and the members related to each system of the floating structure are provided in the service gap. Means to equip. In that case, the member to be equipped is not only a member of the room unit body, and the member includes any one or two of a pipe and other medium transport members, a connecting structure connected to them, and an operation and control means. The above is included. Thereby, at least a part of said member is attached to the boundary surface body outside the room unit on the side of the service gap during pre-assembly. In this way, the room unit body that also has parts related to the system of the floating structure is transported to the floating structure and installed in the floating structure, but this is actually the room unit. In connection with the pre-assembly of the body, this means that a significant part of the assembly process of the floating structure must be transferred to a location separate from the floating structure.
この構成の利点は、第1に、役務間隙内に部材を配置する作業を、浮遊構造体内に部屋単位体を設置する際に部屋単位体間の役務間隙等の限られた空間内で行うのではなく、開放空間内で行うことができる(予備組立てと関連して)点である。この解決策によって、また多量の配管その他の設備品を別々に浮遊構造体のところへ運搬して、それらを狭い通路に沿って部屋単位体に関連する適切な場所へ移動させる必要もなくなる。
これによって、また出来るだけ機能的に、例えば必要なサービス、修理および調整作業、使用時に要求される全般的な接近性を考慮に入れて、役務間隙内へ部材を配置することも可能になる。このようにすることで、部材の配置も一定になり、言い換えると標準化され、それによって、浮遊構造体の計画も合理化される。必要とされる部材の量も、より正確に計画でき、そのことが、また時間通りの部材調達に好影響を与えるだろう。
The advantage of this configuration is that, firstly, the work of arranging the members in the service gap is performed in a limited space such as the service gap between the room unit bodies when the room unit bodies are installed in the floating structure. Rather, it can be done in open space (in connection with pre-assembly). This solution also eliminates the need to transport large amounts of piping and other equipment separately to the floating structure and move them along a narrow passage to the appropriate location associated with the room unit.
This also makes it possible to place the components in the service gap as functionally as possible, taking into account, for example, the necessary service, repair and adjustment work, and the general accessibility required during use. By doing so, the arrangement of the members becomes constant, in other words, standardized, thereby rationalizing the plan of the floating structure. The amount of parts needed can also be planned more accurately, which will also have a positive impact on timely parts procurement.
言い換えると、浮遊構造体自体の装備作業と、浮遊構造体の組み立ておよび装備作業の部品供給との両方が、本発明によって最適化できる。
予備組立てに関連して部屋単位体に接続される部材は、例えば、浮遊構造体の雑排水配管、汚水配管、清浄水配管、凝縮水または排出配管、冷却水配管、消火水配管のいずれかまたは2つ以上の部材の一部分である。
これに加えて、空調設備配管の一部分と空調設備とが役務間隙に配置できる。
In other words, both the installation work of the floating structure itself and the assembly of the floating structure and the supply of parts for the installation work can be optimized by the present invention.
The member connected to the room unit in relation to the pre-assembly is, for example, a floating drainage structure drainage pipe, sewage pipe, clean water pipe, condensed water or discharge pipe, cooling water pipe, fire fighting water pipe, or It is part of two or more members.
In addition, a part of the air conditioning equipment piping and the air conditioning equipment can be arranged in the service gap.
従来、部屋単位体は、デッキ構造体によって支持された浮遊構造体内に複数層として配置され、その場合、予備組立て時にデッキ構造体の貫通案内部材が部材に取り付けられるのが好ましい。また、部材とデッキ構造体の貫通案内部材との間に可撓性連結手段を設けるのも好ましい。予め取り付けたデッキ構造体の貫通案内部材は、こうすることで部屋単位体と一緒に浮遊構造体のところへ運搬され、それにより可撓性連結手段により与えられるゆとりを利用して複数層の部屋単位体間にデッキ構造体を容易に取り付けることができる。このようなわけで、浮遊構造体で行うべき仕上げ作業は、主として複数層間または複数デッキ構造体間の結合作業から成ることになる。
本発明はまた、請求項2に記載されたプレハブ式部屋単位体を作る方法に関するものである。好適実施形態は、請求項10〜請求項14に記載されている。
Conventionally, the room unit is arranged as a plurality of layers in the floating structure supported by the deck structure, and in this case, the penetration guide member of the deck structure is preferably attached to the member at the time of preliminary assembly. It is also preferable to provide a flexible connecting means between the member and the penetration guide member of the deck structure. The penetration guide member of the deck structure attached in advance is thus transported to the floating structure together with the room unit, thereby making use of the space provided by the flexible connecting means to make room for multiple layers. The deck structure can be easily attached between the unit bodies. For this reason, the finishing work to be performed on the floating structure mainly consists of a joining work between a plurality of layers or a plurality of deck structures.
The invention also relates to a method for making a prefabricated room unit according to
以下で、本発明の実施例を添付略示図につき、より詳細に説明する。実施例は一例に過ぎない。
図1には浮遊構造体が符号1で示されている。胴部100を含む浮遊構造体はデッキ構造体または対応支持構造体2を有し、該構造体上には、多数の予備組立てされた少なくとも部分的に装備された部屋単位体3が配置されている。部屋単位体3は、浮遊構造体1の胴部100の下部102と上部103の双方に配置される。図には、部屋単位体の取付け部品に関係する手段と浮遊構造体の系5に関係する部材とが、部屋単位体3の境界表面体4の外側に、どのように配置されるかが、破線で簡略化して示してある。本発明によるこれらの配置については、更に詳しく後述する。
浮遊構造体は、例えば船舶、例えば船、油井掘削装置、その他対応する構造体でよい。したがって、以下で説明する実施例に関係する主題も、全体として浮遊構造体に適用される。
In the following, embodiments of the present invention will be described in more detail with reference to the accompanying schematic drawings. The embodiment is only an example.
In FIG. 1, a floating structure is denoted by reference numeral 1. The floating structure including the
The floating structure may be, for example, a ship, such as a ship, an oil well drilling device, or other corresponding structure. Accordingly, the subject matter relating to the embodiments described below also applies to the floating structure as a whole.
本発明の一実施例についての以下の説明では、説明をはっきりさせるために浮遊構造体を船1と称する。したがって、部屋単位体を船室3と呼び、境界表面体を壁部4と呼ぶことにする。図1では、船室3は、船のいわゆる露天甲板2の下、胴部100の下部101、つまり実際には船の船体部分と、船の露天甲板102の上方、つまり船の船体部分の上部103との両方に配置されている。
これによって、後で詳説する船室構造体の壁構造体は、船の外板または船の各部分を形成するのと同時に形成できる。例えば船室が連なる船内遊歩路を有する客船では、船室構造体の壁構造体が相応に船の内側または船の各部分を形成する。
In the following description of one embodiment of the present invention, the floating structure will be referred to as ship 1 for clarity. Therefore, the room unit body is referred to as the
As a result, the wall structure of the cabin structure, which will be described in detail later, can be formed simultaneously with the formation of the ship skin or each part of the ship. For example, in a passenger ship having an inboard promenade with a series of cabins, the wall structure of the cabin structure accordingly forms the inside of the ship or each part of the ship.
凹部形式の役務間隙10は、船室3の外側に設けられる。例えば船室の基本形状が長方形とすれば、長方形の一角に船室の内方へ引っ込んだ凹部が形成でき、その凹部の形状は、船室の取付け部品または他の機能上の理由に基づいて選択される。これら役務間隙の例は、図4〜図6に示されている。
図2の場合、船室3が2つのデッキ構造体2上に配置されている。配管6の一部が船室3の壁部4に固定され(図示せず)、各部分が相互に、かつ船の系5と第1可撓性連結手段、例えば設置の際にゆとりを与える可撓性の管またはホースを介して連結される。これは、当該プレハブ船室3に直接接続されない部材の一例だが、これらの部材は、船室が船に運ばれる前に、予備組立て時に船室に取り付けることもできる。これらの部材は、例えば、船の雑排水配管、汚水配管、清浄水配管、凝縮水または排水配管、冷却水配管、消火用配管の一部を包含する。
A recess-
In the case of FIG. 2, the
図3には、図2の構成に対応する構成が示されている。この場合、第1配管部分61は、固定手段9、例えば、アームによって壁部4に固定された管クランプ等を介して各船室3の壁部4に取り付けられる。この固定は、また固定ストラップによって直接に壁部に対して行うこともできる。第1配管部分61、例えば船室の内部取付け部品に関係する例えば雑排水配管および汚水配管は、2つ以上の船室に接続される部材である。第1配管部分61は、船室3に接続されるか、またはむしろ船室に配置された入り側および出側ダクトに、例えば可撓性連結手段または従来型の管区分8を介して接続できる。
第1配管部分61は、可撓性第2連結手段71を介して船舶の系5に接続される。図3の重なった船室3に付加された第1配管部分61は、2つの異なる形式で相互接続される。左側の構成では、可撓性第3連結手段72を介して接続され、右側の構成では、前記可撓性の第3連結手段72と連結管63との組み合わせを用いて接続される。デッキ構造体2との関連では、デッキ構造体貫通案内部材13を使用することもできる。貫通案内部材は図5について説明する。
FIG. 3 shows a configuration corresponding to the configuration of FIG. In this case, the
The
可撓性連結手段は、言うまでもなく、従来の管部品または管区分に代えることができ、その逆も可である。
図4および図5の場合、2つの船室3の間に共通の役務間隙10が設けられている。一方の船室3(図の左側)の壁部4の外側には、船室設備に関連する第1手段11(図4)が設置され、該第1手段は、例えば入り側および出側ダクト、水管のいずれかであり、他方の船室3(図の右側)の壁部4の外側には、第2手段12、例えば電気接続箱が設置されている。船の系5に関連する部材、例えば第1配管部分61や第2配管部分62も、同じく役務間隙10内に配置され、これらの双方が固定手段9によって左側の船室3の壁部4に固定される。
The flexible coupling means can of course be replaced by conventional tube parts or tube segments and vice versa.
4 and 5, a
図5では、第1配管部分61が、可撓性連結手段14(例えば設置にゆとりを与える可撓性の管またはホース)を介して、デッキ構造体2に配置された貫通案内部材13に取り付けられている。デッキ構造体の貫通案内部材13は、予備組立て時に既に第1配管部分61に取り付けておいてもよい。そうすることによって、プレハブ船室組み立て体と共に船のところへ運搬することができる。
図6には、船室3の別の構成が示されている。この場合は、船室3が1室ごとの構成になっており、このため、各船室に専用の役務間隙10が設けられている。役務間隙10は、船の系5同様、水管11に関係する第1配管部分61および第2配管部分62と、船室3の取付け部品に関係する電気設備箱12とを含んでいる。これに加えて、空調設備15が役務間隙内に配置されている。
公知の系では空調設備は、通常、船室3内に設置されるため、船室内の利用可能な空間が狭くなり、船室使用者の快適性も低減する。
In Figure 5, the
FIG. 6 shows another configuration of the
In known systems, the air conditioning equipment is usually installed in the
この図には、既述の種々の手段、部材、連結構造体に加えて、実用手段や制御手段が、どのように機能的に役務間隙内に配置されているかが示されている。電気設備12は、配管部分61,62の頂部に配置されるので、容易に接近可能である。したがって、空調設備15は、同じ役務間隙内の電気設備箱12と向かい合った壁部に設置される。空調設備は、あるいはまた配管部分と電気設備箱との間に配置することもできる。
言うまでもなく、配置に関しては多くの可能な解決策があるため、例えば必要なサービス、修理、使用上の処置を考慮に入れて、それぞれの場合に、最も機能的な配置を選択できる。
この点に影響する別の要因は、もちろん、役務間隙の配置である。例えば図4に示した船室は、互いに対称的に配置されることで、2つの船室に共通の、より広い役務間隙が形成される。図6に示した船室3は、類似の形状を有する順次に配置された船室だが、この場合は、各船室に別個の、より小さい役務間隙が設けられている。
This figure shows how the practical means and the control means are functionally arranged in the service gap in addition to the various means, members, and connecting structures described above. Since the
Needless to say, there are many possible solutions for the arrangement, so that in each case the most functional arrangement can be selected, taking into account the necessary service, repair and usage measures, for example.
Another factor affecting this point is, of course, the placement of service gaps. For example, the cabin shown in FIG. 4 is arranged symmetrically with each other, so that a wider service gap common to the two cabins is formed. The
船室の予備組立てと関連して、巧みに設計された役務間隙は、同じように他のスペース、例えば一時的な貯蔵のためのスペースをも含むことができる。
予備組立てに関連して船室の役務間隙に付加される手段および部材の水平方向の寸法は、役務間隙の幅に限定されるのが好ましく、垂直方向の寸法は、役務間隙の、つまり船室の高さに、もしくは少なくとも、デッキ構造体間のまたは他の対応支持構造体間の高さに限定されるのが好ましい。
船室はまた、群として、例えば2つを重ねて船まで搬送することもでき、その場合には、船室間に実際のデッキ構造体は存在しない。したがって、垂直方向での前記寸法は船室間の高さに応じて制限されることになろう。
実際には、船舶のデッキ構造体間の高さは、例えば2700mmだが、その場合、約2200mmのプレハブ配管が2個の船室と一緒に運ばれる。このことは、船上で仕上げ作業が行われる上で、きわめて重要である。
In conjunction with the cabin pre-assembly, a well-designed service gap can include other spaces as well, such as space for temporary storage.
The horizontal dimension of the means and members added to the cabin service gap in connection with the pre-assembly is preferably limited to the width of the service gap, the vertical dimension being the height of the service gap, i.e. the cabin height. In addition, or at least, it is preferably limited to the height between deck structures or between other corresponding support structures.
The cabins can also be transported as a group, for example, two to the ship, in which case there is no actual deck structure between the cabins. Therefore, the dimension in the vertical direction will be limited depending on the height between cabins.
In practice, the height between the ship deck structures is for example 2700 mm, in which case approximately 2200 mm of prefabricated piping is carried along with the two cabins. This is very important for finishing work on board.
本発明による方法は次の作業を含んでいる。
船舶、または実際にはその船体部分が、自体公知の形式で部分的にまたは全体的に組み立てられる。
船室は、工場の環境内で、しばしば少なくとも壁と天井構造体が組み立てられ、その場合、ドア、窓、加えてバルコニー構造体があればそれも、必要であれば付加できる。壁部は、凹形状の役務間隙が船室に形成されるように構成される。
その後で、船室内部が所望のとおりに装備され、必要な外部との接続が役務間隙の壁部を貫通して行われる。次いで、当該(前記)船室に関連する諸手段や、船舶の居住系に主に関連する他の部材、少なくとも当該船室に、好ましくは他の船室も役立つ部材が、役務間隙内に配置される。これらの手段および部材は、その後の使用に適するように配置されるので、必要な接近性が確保され、かつ役務間隙内にはサービスおよび修理作業に要する十分なゆとりが残される。
The method according to the present invention includes the following operations.
The ship, or indeed the hull part thereof, is partly or wholly assembled in a manner known per se.
The cabin is often assembled with at least walls and ceiling structures in the factory environment, in which case doors, windows, and balcony structures can be added if necessary. The wall is configured such that a concave service gap is formed in the cabin.
Thereafter, the interior of the cabin is equipped as desired and the necessary external connections are made through the wall of the service gap. Then, various means relating to the (above) cabin and other members mainly relating to the ship's habitat, at least members of the cabin, preferably also serving other cabins, are placed in the service gap. Since these means and components are arranged to be suitable for subsequent use, the necessary accessibility is ensured and sufficient clearance for service and repair work is left in the service gap.
前記手段および部材は、船室または役務間隙の境界線の外へは突出しないように配置される。配管と一緒に使用されるデッキ構造体の貫通案内部材は、後で別個に船舶に設置するか、または船室と一緒に運搬するように配管に容易に取り付けることもできる。
この段階で、プレハブ船室組み立て体は、船のところへ運ぶことができる。船上で行う残りの仕事は、諸手段および部材を船の居住系の関連部品に接続するだけである。例えば、配管との接続は、可撓性ホースおよびスライド式連結部材を用いることにより、僅かな工具を用いるだけで、溶接その他の相応に危険を伴う処置を行うことなしに極めて容易に行うことができる。
このように、船上で行う仕上げ作業は削減され、プレハブ船室の仕上げに関連して行われる作業は、合理的に構成された役務間隙内でより迅速に完了する。
以上の説明および関連図面は、本発明の基本思想を明らかにする意図のものに過ぎない。本発明の詳細は、特許請求の範囲の記載の枠内で変更可能である。
The means and members are arranged so as not to protrude out of the boundary of the cabin or service gap. The penetration guide member of the deck structure used with the piping can be installed separately in the ship later or easily attached to the piping so as to be transported together with the cabin.
At this stage, the prefabricated cabin assembly can be carried to the ship. The remaining work on board is simply connecting the means and components to the relevant parts of the ship's habitat. For example, connection to the pipe, by using a flexible hose and sliding coupling member, only by using a small tool, it is carried out very easily without performing a treatment involving welding other correspondingly dangerous it can.
In this way, the finishing work done on board is reduced and the work done in connection with the finishing of the prefabricated cabin is completed more quickly within a reasonably structured service gap.
The above description and related drawings are only intended to clarify the basic idea of the present invention. The details of the invention may vary within the scope of the claims.
Claims (14)
前記主境界表面体(4)が、部屋単位体の複数の壁および天井構造体と、前記部屋単位体(3)の内部取付け部品の少なくとも一部と、該内部取付け部品に関連して前記部屋単位体(3)の前記主境界表面体(4)の外側に配置される手段(11,12)とを含み、前記手段(11,12)が、衛生設備用入り側および出側管路、水管、および/または、電気設備を含み、また、前記部屋単位体(3)の前記主境界表面体(4)は、前記部屋単位体(3)の外側に凹形状の役務間隙(10)が形成されるように構成される、前記浮遊構造体の製造方法において、
前記部屋単位体(3)の予備組立てに当って、
2以上の部屋単位体(3)に接続されるとともに、前記浮遊構造体(1)の、雑排水配管、汚水配管、清浄水配管、凝縮水または排水配管、冷却水配管、消火用配管、および空調設備配管のうちのいずれかまたは2つ以上の一部をなす、配管およびその他の媒体搬送手段を含む部材(6,15,61,62)が前記役務間隙(10)に配設され、
前記配管およびその他の媒体搬送手段を含む前記部材(6,15,61,62)の少なくとも一部が、予備組立てに当って、前記役務間隙(10)の側で、前記部屋単位体(3)の前記主境界表面体の外側に直接取り付けられ、
予備組立てされた前記部屋単位体(3)が搬送されて、前記浮遊構造体(1)に組み込まれ、
さらに、前記部屋単位体(3)の前記主境界表面体(4)の外側に配置される前記手段(11,12)の少なくとも一部と、前記配管およびその他の媒体搬送手段を含む前記部材(6,15,61,62)が、前記浮遊構造体(1)の、前記雑排水配管、汚水配管、清浄水配管、凝縮水または排水配管、冷却水配管、消火用配管、および空調設備配管のうちのいずれかまたは2つ以上の予め組み込まれた部分に接続されることを特徴とする浮遊構造体の製造方法。A method of manufacturing a floating structure including a ship, wherein a body (100) of the floating structure (1) is formed, the body (100) having a deck structure or corresponding support. A structure (2) is provided, and in the method, the room unit (3) is preassembled by providing a main boundary surface (4);
The main boundary surface body (4) includes a plurality of wall and ceiling structures of a room unit body, at least a part of an internal mounting part of the room unit body (3), and the room in relation to the internal mounting part Means (11, 12) disposed on the outside of the main boundary surface body (4) of the unit body (3), wherein the means (11, 12) are sanitary equipment entry and exit conduits, The main boundary surface body (4) of the room unit body (3) includes a water pipe and / or electrical equipment, and the concave service gap (10) is formed outside the room unit body (3). In the method for manufacturing the floating structure configured to be formed,
In preliminary assembly of the room unit (3),
Connected to two or more room units (3), and the floating structure (1), drainage pipe, sewage pipe, clean water pipe, condensed water or drainage pipe, cooling water pipe, fire fighting pipe, and Members (6, 15, 61, 62) including pipes and other medium transfer means, which are part of any one or more of the air conditioning equipment pipes, are disposed in the service gap (10),
At least a part of the members (6, 15, 61, 62) including the pipes and other medium conveying means is preliminarily assembled to the room unit (3) on the service gap (10) side. Directly attached to the outside of the main boundary surface body of
The pre-assembled room unit (3) is transported and incorporated into the floating structure (1),
Further, the member (11) including at least a part of the means (11, 12) disposed outside the main boundary surface body (4) of the room unit body (3), the pipe and other medium conveying means ( 6, 15, 61, 62) of the floating structure (1) of the miscellaneous drainage pipe, sewage pipe, clean water pipe, condensed water or drainage pipe, cooling water pipe, fire extinguishing pipe, and air conditioning equipment pipe. A method for manufacturing a floating structure, characterized in that the floating structure is connected to any one or two or more previously incorporated parts.
前記方法では、前記部屋単位体(3)に主境界表面体(4)が設けられ、該主境界表面体が、前記部屋単位体の壁および天井構造体と、前記部屋単位体(3)の内部取付け部品の少なくとも一部と、前記部屋単位体(3)の前記内部取付け部品に関連して前記主境界表面体(4)の外側に配置される手段(11,12)とを含み、該手段(11,12)が、衛生設備用入り側および出側管路、水管、および/または、電気設備を含み、また、凹形状をなす役務間隙(10)が前記部屋単位体の外側に形成されるように、前記部屋単位体(3)の前記主境界表面体(4)が構成される、前記プレハブ式部屋単位体の形成方法において、
前記部屋単位体(3)の予備組立てに当って、2以上の部屋単位体(3)に接続されるとともに、前記浮遊構造体(1)の、雑排水配管、汚水配管、清浄水配管、凝縮水または排水配管、冷却水配管、消火用配管、および空調設備配管のうちのいずれかまたは2つ以上の一部をなす、配管およびその他の媒体搬送手段を含む部材(6,15,61,62)が前記役務間隙(10)に配設され、かつ、
前記部材(6,15,61,62)の少なくとも一部が、予備組立てに当って、前記役務間隙(10)の側で、前記部屋単位体(3)の前記主境界表面体の外側に直接取り付けられることを特徴とするプレハブ式部屋単位体の形成方法。A method of forming a prefabricated room unit that is at least partially equipped, the room unit (3) comprising a ship having a deck structure or a corresponding support structure (2) Intended to be incorporated into the body (1),
In the method, the room unit body (3) is provided with a main boundary surface body (4), and the main boundary surface body includes a wall and a ceiling structure of the room unit body, and the room unit body (3). Comprising at least a part of an internal mounting part and means (11, 12) arranged outside the main boundary surface body (4) in relation to the internal mounting part of the room unit (3), The means (11, 12) includes sanitary equipment entry and exit lines, water pipes and / or electrical equipment, and a concave service gap (10) is formed outside the room unit. In the method for forming a prefabricated room unit body, wherein the main boundary surface body (4) of the room unit body (3) is configured,
In the pre-assembly of the room unit (3), it is connected to two or more room units (3), and the floating structure (1) has a drainage pipe, a sewage pipe, a clean water pipe, a condensation A member (6, 15, 61, 62) including pipes and other medium conveying means, which forms one or more of water or drainage pipes, cooling water pipes, fire extinguishing pipes, and air conditioning equipment pipes ) Is disposed in the service gap (10), and
At least a part of the members (6, 15, 61, 62) is directly outside the main boundary surface of the room unit (3) on the side of the service gap (10) during preliminary assembly. A method of forming a prefabricated room unit characterized by being attached.
デッキ構造体または対応する支持構造体を有する胴部(100)と、
プレハブ式部屋単位体(3)とを含み、
該プレハブ式部屋単位体(3)が、壁および天井構造体等の主境界表面体(4)と、前記部屋単位体(3)の内部取付け部品の少なくとも一部と、前記部屋単位体(3)の前記境界表面体(4)の外側に配設された、前記内部取付け部品に関係する手段(11,12)とを含み、該手段(11,12)が、衛生設備用入り側および出側管路、水管、および/または、電気設備を含み、
かつ、前記部屋単位体(3)の外側に凹形状の役務間隙(10)が形成されるように、前記部屋単位体(3)の前記主境界表面体(4)が構成されている浮遊構造体において、
前記部屋単位体(3)の予備組立てに当って、2以上の部屋単位体(3)に接続されるとともに、前記浮遊構造体(1)の、前記雑排水配管、汚水配管、清浄水配管、凝縮水または排水配管、冷却水配管、消火用配管、および空調設備配管のうちのいずれかまたは2つ以上の一部をなす、前記配管およびその他の媒体搬送手段を含む部材(6,15,61,62)が前記役務間隙(10)に配設され、
前記配管およびその他の媒体搬送手段を含む部材(6,15,61,62)の少なくとも一部が、予備組立てに当って、前記役務間隙(10)の側で、前記部屋単位体(3)の前記主境界表面体の外側に直接取り付けられている浮遊構造体。A floating structure including a ship,
A barrel (100) having a deck structure or corresponding support structure;
Including a prefabricated room unit (3),
The prefabricated room unit (3) includes a main boundary surface body (4) such as a wall and a ceiling structure, at least a part of internal attachment parts of the room unit (3), and the room unit (3 And means (11, 12) related to the internal mounting part, arranged on the outside of the boundary surface body (4), the means (11, 12) Including side conduits, water pipes and / or electrical installations,
In addition, the floating structure in which the main boundary surface body (4) of the room unit body (3) is configured so that a concave service gap (10) is formed outside the room unit body (3). In the body,
In the preliminary assembly of the room unit (3), it is connected to two or more room units (3), the miscellaneous drainage pipe, sewage pipe, clean water pipe of the floating structure (1), A member (6, 15, 61) that constitutes one or more of condensed water or drainage piping, cooling water piping, fire extinguishing piping, and air conditioning equipment piping, and the piping and other medium conveying means. 62) is disposed in the service gap (10),
At least a part of the members (6, 15, 61, 62) including the pipes and other medium conveying means is preliminarily assembled, and on the side of the service gap (10), the room unit (3) A floating structure directly attached to the outside of the main boundary surface body.
該部屋単位体(3)が、
前記部屋単位体の壁および天井構造体を含む主境界表面体(4)と、
前記部屋単位体(3)の内部取付け部品の少なくとも一部と、
前記部屋単位体(3)の内部取付け部品に関連して前記主境界表面体(4)の外側に配置される手段(11,12)とを含み、該手段(11,12)が、衛生設備用入り側および出側管路、水管、および/または、電気設備を含み、
また、前記部屋単位体(3)の外側に凹形状の役務間隙(10)が形成されるように、前記部屋単位体(3)の前記主境界表面体(4)が構成される、少なくとも部分的に装備がなされた前記プレハブ式部屋単位体において、
2以上の部屋単位体(3)に接続されるとともに前記浮遊構造体(1)の、前記雑排水配管、汚水配管、清浄水配管、凝縮水または排水配管、冷却水配管、消火用配管、および空調設備配管のうちのいずれかまたは2つ以上の一部をなす、前記配管およびその他の媒体搬送手段を含む前記部材(6,15,61,62)が前記役務間隙(10)に配設され、かつ、
前記配管およびその他の媒体搬送手段を含む部材(6,15,61,62)の少なくとも一部が、予備組立てに関連して前記役務間隙(10)の側で、前記部屋単位体(3)の前記主境界表面体(4)の外側に直接取り付けられていることを特徴とする少なくとも部分的に装備がなされたプレハブ式部屋単位体。A prefabricated room unit, at least partially equipped, intended to be incorporated into a floating structure (1) comprising a ship having a deck structure or a corresponding support structure (2),
The room unit (3)
A main boundary surface body (4) including the wall and ceiling structure of the room unit body;
At least a portion of the internal mounting parts of the room unit (3);
Means (11, 12) arranged on the outside of the main boundary surface (4) in relation to the internal mounting parts of the room unit (3), the means (11, 12) comprising sanitary equipment Including incoming and outgoing pipelines, water pipes, and / or electrical equipment,
Further, at least a portion of the main boundary surface body (4) of the room unit body (3) is configured such that a concave service gap (10) is formed outside the room unit body (3). In the prefabricated room unit that is equipped with
Connected to two or more room units (3) and of the floating structure (1), the miscellaneous drainage pipe, sewage pipe, clean water pipe, condensed water or drainage pipe, cooling water pipe, fire fighting pipe, and The member (6, 15, 61, 62) including any one or two or more of the air-conditioning equipment pipes and including the pipe and other medium conveying means is disposed in the service gap (10). ,And,
At least part of the members (6, 15, 61, 62) including the pipes and other medium conveying means are on the side of the service gap (10) in relation to the preliminary assembly, and the room unit (3). At least partly equipped prefabricated room unit, characterized in that it is mounted directly outside the main boundary surface (4).
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FI20030521A FI116616B (en) | 2003-04-07 | 2003-04-07 | Process for the preparation of a liquid structure and of a prefabricated room unit as well as a floating structure and a prefabricated room unit |
PCT/FI2004/050021 WO2004089738A1 (en) | 2003-04-07 | 2004-03-01 | Floating structure and method for producing said floating structure comprising prefabricated room units and a method of forming prefabricated room units and said prefabricated room units |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2006521961A JP2006521961A (en) | 2006-09-28 |
JP4679506B2 true JP4679506B2 (en) | 2011-04-27 |
Family
ID=8565930
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2006505650A Expired - Lifetime JP4679506B2 (en) | 2003-04-07 | 2004-03-01 | Floating structure, method for manufacturing floating structure including prefabricated room unit, method for forming prefabricated room unit, and prefabricated room unit |
Country Status (11)
Country | Link |
---|---|
EP (1) | EP1613528B1 (en) |
JP (1) | JP4679506B2 (en) |
KR (1) | KR101066308B1 (en) |
CN (1) | CN100448741C (en) |
AT (1) | ATE495094T1 (en) |
DE (1) | DE602004031004D1 (en) |
DK (1) | DK1613528T3 (en) |
ES (1) | ES2359565T3 (en) |
FI (1) | FI116616B (en) |
PL (1) | PL1613528T3 (en) |
WO (1) | WO2004089738A1 (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102570354A (en) * | 2011-12-29 | 2012-07-11 | 广新海事重工股份有限公司 | Electric mounting process for navigation bridge of ship |
CN103017123A (en) * | 2012-12-31 | 2013-04-03 | 重庆四联光电科技有限公司 | High-power LED fish-gathering lamp cooling system and cooling method for fishing vessel |
CN106458291B (en) * | 2014-04-01 | 2018-06-15 | 皮基厄工厂有限公司 | Floating structure |
Family Cites Families (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE7716514U1 (en) * | 1977-05-25 | 1977-09-08 | Bremer Vulkan Schiffbau Und Maschinenfabrik, 2820 Bremen | SHIP WITH A NUMBER OF CHAMBERS |
SE456331B (en) * | 1985-04-26 | 1988-09-26 | Acci Handelsbolag | ROOM UNIT, SPECIFICALLY CABIN OR COTTAGE BY VESSEL |
FI75127C (en) * | 1985-11-28 | 1989-08-28 | Waertsilae Oy Ab | HAS DECIDED AS FOLLOWS: |
JPS62236972A (en) * | 1986-04-08 | 1987-10-17 | 日本鋼管株式会社 | Bathroom unit structure for ship |
FI78036C (en) * | 1987-05-27 | 1989-06-12 | Waertsilae Meriteollisuus | Device for cab elements |
JPH02310190A (en) * | 1989-05-23 | 1990-12-25 | Mitsubishi Heavy Ind Ltd | Installing method for cabin unit |
DE4119422C1 (en) * | 1991-06-13 | 1993-01-07 | Lloyd Werft Bremerhaven Gmbh, 2850 Bremerhaven, De | |
EP0731020A1 (en) * | 1995-03-08 | 1996-09-11 | A.T.I.S.A. Aero Termica Italiana S.p.A. | Prefabricated cubicle for sanitary facilities, in particular in the cabins of ships, or the like |
DE19828505A1 (en) * | 1998-06-26 | 2000-01-13 | G & M Montage Ges Fuer Schiffs | Compartment for ships and other floating objects in form of functional and usable three-dimensional unit |
FR2784650B1 (en) * | 1998-10-14 | 2001-01-12 | Alstom Technology | PREFABRICATED LIVING SPACE FOR A VESSEL AND METHOD FOR INSTALLING SUCH PREMISES IN A VESSEL |
FI116128B (en) * | 2000-07-03 | 2005-09-30 | Aker Finnyards Oy | Waste water duct collection arrangements, wastewater duct connection from tapping points to a collection duct, and method for providing a cabin element arrangement with tapping points |
JP2002019692A (en) | 2000-07-11 | 2002-01-23 | Nkk Corp | On-the-sea joining structure of floating body structure and joining method therefor |
-
2003
- 2003-04-07 FI FI20030521A patent/FI116616B/en active IP Right Grant
-
2004
- 2004-03-01 CN CNB2004800093636A patent/CN100448741C/en not_active Expired - Lifetime
- 2004-03-01 ES ES04742232T patent/ES2359565T3/en not_active Expired - Lifetime
- 2004-03-01 KR KR1020057019043A patent/KR101066308B1/en active IP Right Grant
- 2004-03-01 JP JP2006505650A patent/JP4679506B2/en not_active Expired - Lifetime
- 2004-03-01 AT AT04742232T patent/ATE495094T1/en not_active IP Right Cessation
- 2004-03-01 DE DE602004031004T patent/DE602004031004D1/en not_active Expired - Lifetime
- 2004-03-01 EP EP04742232A patent/EP1613528B1/en not_active Expired - Lifetime
- 2004-03-01 DK DK04742232.4T patent/DK1613528T3/en active
- 2004-03-01 WO PCT/FI2004/050021 patent/WO2004089738A1/en active Application Filing
- 2004-03-01 PL PL04742232T patent/PL1613528T3/en unknown
Also Published As
Publication number | Publication date |
---|---|
ATE495094T1 (en) | 2011-01-15 |
CN100448741C (en) | 2009-01-07 |
KR20050118722A (en) | 2005-12-19 |
FI116616B (en) | 2006-01-13 |
PL1613528T3 (en) | 2011-07-29 |
WO2004089738A1 (en) | 2004-10-21 |
CN1774364A (en) | 2006-05-17 |
ES2359565T3 (en) | 2011-05-24 |
EP1613528A1 (en) | 2006-01-11 |
FI20030521A (en) | 2004-10-08 |
JP2006521961A (en) | 2006-09-28 |
DK1613528T3 (en) | 2011-03-14 |
EP1613528B1 (en) | 2011-01-12 |
FI20030521A0 (en) | 2003-04-07 |
KR101066308B1 (en) | 2011-09-20 |
DE602004031004D1 (en) | 2011-02-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP4980340B2 (en) | Method and system for manufacturing a floating structure | |
JP2008529875A (en) | Piping connection structure for aircraft cabin installations | |
CN104718330A (en) | Container building | |
JP4679506B2 (en) | Floating structure, method for manufacturing floating structure including prefabricated room unit, method for forming prefabricated room unit, and prefabricated room unit | |
JPH0350062B2 (en) | ||
KR20120001017U (en) | Room unit for air conditioner of ship | |
EP0605373B1 (en) | Method for the assembly of fixtures and equipment in a ship galley or like space and a fixture and equipment system | |
JPH07248074A (en) | Building internal piping structure | |
JP4749247B2 (en) | Housing housing structure and piping pit structure | |
AU2002300309B2 (en) | Frame For Hot Water Supplier | |
CN115476984B (en) | Arrangement structure of two deck channels of container ship and installation method of arrangement structure | |
JP5133613B2 (en) | Pipe fittings for vent pipe connection | |
JP2934414B2 (en) | Ship room assembly method | |
JP3671230B2 (en) | Ventilation facilities and apartment houses | |
CN117508504A (en) | Method for breaking mail wheel pipe system and construction method | |
JP2019018742A (en) | Vessel and housing quarter structure for offshore floating body structure | |
CN201187653Y (en) | Piping components | |
JPH0674384A (en) | Connecting device for curved pipe with draft path | |
JPH07190469A (en) | Duct construction of central air conditioner | |
JPS62261791A (en) | Method of executing piping | |
JP2010096387A (en) | Composite wall panel for installation of water heater and installation structure of the water heater | |
JPH06264606A (en) | Piping method | |
JP2017509540A (en) | Floating structure | |
JPS62299648A (en) | Ceiling panel duct system | |
JPH02136442A (en) | System toilet |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20070119 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20090807 |
|
A601 | Written request for extension of time |
Free format text: JAPANESE INTERMEDIATE CODE: A601 Effective date: 20091109 |
|
A602 | Written permission of extension of time |
Free format text: JAPANESE INTERMEDIATE CODE: A602 Effective date: 20091116 |
|
A601 | Written request for extension of time |
Free format text: JAPANESE INTERMEDIATE CODE: A601 Effective date: 20091207 |
|
A602 | Written permission of extension of time |
Free format text: JAPANESE INTERMEDIATE CODE: A602 Effective date: 20091214 |
|
A601 | Written request for extension of time |
Free format text: JAPANESE INTERMEDIATE CODE: A601 Effective date: 20100107 |
|
A602 | Written permission of extension of time |
Free format text: JAPANESE INTERMEDIATE CODE: A602 Effective date: 20100115 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20100208 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20100903 |
|
A601 | Written request for extension of time |
Free format text: JAPANESE INTERMEDIATE CODE: A601 Effective date: 20101203 |
|
A602 | Written permission of extension of time |
Free format text: JAPANESE INTERMEDIATE CODE: A602 Effective date: 20101210 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20101216 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20110121 |
|
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20110201 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 4679506 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20140210 Year of fee payment: 3 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
EXPY | Cancellation because of completion of term |