JP4663163B2 - Blowing chamber and air conditioning system using the same - Google Patents

Blowing chamber and air conditioning system using the same Download PDF

Info

Publication number
JP4663163B2
JP4663163B2 JP2001193203A JP2001193203A JP4663163B2 JP 4663163 B2 JP4663163 B2 JP 4663163B2 JP 2001193203 A JP2001193203 A JP 2001193203A JP 2001193203 A JP2001193203 A JP 2001193203A JP 4663163 B2 JP4663163 B2 JP 4663163B2
Authority
JP
Japan
Prior art keywords
chamber
side end
main body
connection
blowout
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2001193203A
Other languages
Japanese (ja)
Other versions
JP2003004284A (en
Inventor
茂 小原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sanyo Electric Co Ltd
Original Assignee
Sanyo Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sanyo Electric Co Ltd filed Critical Sanyo Electric Co Ltd
Priority to JP2001193203A priority Critical patent/JP4663163B2/en
Publication of JP2003004284A publication Critical patent/JP2003004284A/en
Application granted granted Critical
Publication of JP4663163B2 publication Critical patent/JP4663163B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Duct Arrangements (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、例えば、室内機からの空調空気を被調和室に吹き出すための吹出しチャンバおよびそれを用いた空気調和システムに関する。
【0002】
【従来の技術】
一般に、全館空調システム等では、建物の階段下等に室内機を設置して、各部屋に形成された複数の吹出しチャンバには、上記室内機からダクトを通じて空調空気を供給する方式が採用されている。
【0003】
【発明が解決しようとする課題】
上記吹出しチャンバが、例えば、床下に設置されて、そのチャンバ本体の吹出し用開口部が被調和室に向けて床面に開口する場合、吹出しチャンバと室内機とのダクト接続作業は床下で行われるために、その連結作業はきわめて困難になるという問題がある。従来の代表的な接続作業例を説明すると、まず、作業員が床下に潜って吹出しチャンバと室内機とをダクトで接続し、その後、床上に戻って、床板に形成された開口部から手を入れて、その開口部の真下にある吹出しチャンバを引き上げ、この引き上げた吹出しチャンバの上部を床板の開口部に固定し、その上に吹出しグリルを取り付ける。
【0004】
しかし、このような接続作業は困難であるばかりか、将来のメンテナンスをも困難にするという問題がある。
【0005】
そこで、本発明の目的は、上述した従来の技術が有する課題を解消し、ダクトの接続作業の簡素化が図れる吹出しチャンバおよびそれを用いた空気調和システムを提供することにある。
【0006】
【課題を解決するための手段】
請求項1記載の発明は、チャンバ本体に形成されたダクト接続孔に接続用ダクトの接続側端部を挿入し、上記チャンバ本体内に突出させた接続側端部の外周部に、固定バンド、パッキンの順に通し、更にフランジ部の筒部を接続側端部の内周部に挿入し、上記チャンバ本体内で固定バンドを締めて接続側端部とフランジ部とを連結し、パッキンがフランジ部で押されてチャンバ本体の内壁部に当接するまで、接続側端部をチャンバ本体外に押し出すと共に、上記フランジ部を上記チャンバ本体の内壁部にねじを用いて固定したことを特徴とする。
【0007】
請求項2記載の発明は、請求項1記載のものにおいて、チャンバ本体の吹出し用開口部が床面に開口し、この開口部に吹出しグリルを備えたことを特徴とするものである。
【0008】
請求項3記載の発明は、室内機の吹出し口に一端が接続されたダクトの他端を吹出しチャンバに接続してなる空気調和システムにおいて、上記吹出しチャンバが、チャンバ本体に形成されたダクト接続孔に接続用ダクトの接続側端部を挿入し、上記チャンバ本体内に突出させた接続側端部の外周部に、固定バンド、パッキンの順に通し、更にフランジ部の筒部を接続側端部の内周部に挿入し、上記チャンバ本体内で固定バンドを締めて接続側端部とフランジ部とを連結し、パッキンがフランジ部で押されてチャンバ本体の内壁部に当接するまで、接続側端部をチャンバ本体外に押し出すと共に、上記フランジ部を上記チャンバ本体の内壁部にねじを用いて固定したことを特徴とする。
【0009】
請求項4記載の発明は、請求項3記載のものにおいて、チャンバ本体の吹出し用開口部が床面に開口し、この開口部に吹出しグリルを備えたことを特徴とするものである。
【0010】
【発明の実施の形態】
以下、本発明の一実施形態を、図面に基づいて説明する。
【0011】
図1は、全館空調システムを示している。この空調システムでは、建物1の外に2台の室外機2,3が設置され、一方の室外機2は冷媒管4を介して屋根裏部屋の室内機5に接続され、他方の室外機3は冷媒管6を介して階段下部屋の室内機7に接続されている。
【0012】
屋根裏部屋の室内機5にはダクト8を介して吸込みチャンバ9が接続されると共に、ダクト10を介して分岐チャンバ11が接続され、この分岐チャンバ11にはダクト12,13を介して吹出しチャンバ14,15がそれぞれ接続されている。一方、階段下部屋には給気ダクト16を介して外気が取り込まれる。この階段下の室内機7には、床下において、分岐チャンバ17が接続され、この分岐チャンバ17にはダクト18,19を介して吹出しチャンバ20,21がそれぞれ接続されている。
【0013】
つぎに、図2を参照して、本実施形態にかかる吹出しチャンバ20(または21)の構造を説明する。
【0014】
この吹出しチャンバ20は、木製箱型のチャンバ本体31を備え、このチャンバ本体31の吹出し用開口部31Aは床面に開口させる(図1)。このチャンバ本体31の側面には円形のダクト接続孔31B、および切り欠き31Cが一体に形成され、このダクト接続孔31Bに接続用ダクト18の接続側端部18Aが挿入され、チャンバ本体31内で、この接続側端部18Aとフランジ本体33とが連結され、このフランジ本体33のフランジ部33Aがチャンバ本体31の内壁部にねじ35を介して固定される。
【0015】
つぎに、図3を参照して、ダクト18の接続手順を説明する。
【0016】
図3Aにおいて、まず、建物1の床板に対し、吹出しチャンバ20を取り付けるための開口41が形成され、この開口近くの床下に、接続用ダクト18の接続側端部18Aを位置させておく。
【0017】
ついで、図3Bに示すように、床板の開口41にチャンバ本体31を上から挿入して、このチャンバ本体31を木ねじ42で床部に固定する。つぎに、床上から開口41、吹出し用開口部31A、ダクト接続孔31Bに手を通し、ダクト接続孔31Bの外に位置する接続用ダクト18の接続側端部18Aを掴み、これをチャンバ本体31内に引き込む。
【0018】
そして、図3Cに示すように、このチャンバ本体31内で、接続側端部18Aとフランジ本体33とを連結する。
【0019】
これを連結する場合、図2を参照して、チャンバ本体31内に突出させた接続側端部18Aの外周部に固定バンド33B、パッキン33Cを通し、接続側端部18Aの内周部にフランジ部33Aの筒部を挿入し、固定バンド33Bを締めて、接続側端部18Aとフランジ部33Aとを連結する。
【0020】
ついで、固定バンド33Bの突起を、切り欠き31Cに位置あわせした後、フランジ本体33のフランジ部33A、パッキン33Cが、チャンバ本体31の内壁部に当接するまで、接続側端部18Aをチャンバ本体31外に押し退ける。この状態で、フランジ本体33のフランジ部33Aをチャンバ本体31の内壁部にねじ35を用いて固定する。
【0021】
最後に、図3Dに示すように、チャンバ本体31の上端に金属製のフレーム45をビスで固定し、図3Eに示すように、金網46,吹出しグリル47の順に重ね、ビス48で固定する。
【0022】
本実施形態では、チャンバ本体31内で、接続側端部18Aとフランジ本体33とを連結し、このフランジ本体33をチャンバ本体31の内壁部に固定する方法が採用されるため、作業時に、一々床下に潜らなくてもよく、ダクトの接続作業性を向上させることができる。
【0023】
また、チャンバ本体31の取り付け位置は、ダクト18の届く範囲であれば、任意の位置に取り付けが可能である。
【0024】
図4、図5は別の実施形態を示す。
【0025】
この実施形態では、フランジ本体33のフランジ部33Aおよびパッキン33Cの各下端部を、ガイドするための断面L字形のガイド部材51が、チャンバ本体31の内壁部に固定されている。これによれば、図5に示すように、ガイド部材51によって、フランジ部33Aおよびパッキン33Cの各下端部がガイドされ、それらが位置決めされるため、チャンバ本体31内での、いわば手探り状態でのねじ35止め作業が容易になる。
【0026】
以上、一実施形態に基づいて本発明を説明したが、本発明はこれに限定されるものでないことは明らかである。
【0027】
上記吹出しチャンバ20は床下設置のものについて説明したが、これに限定されず、本発明は、例えば、天袋、地袋、天井裏等に設置される吹出しチャンバにも適用可能なことはいうまでもない。
【0028】
【発明の効果】
本発明では、チャンバ本体内で接続側端部とフランジ本体とを連結し、このフランジ本体のフランジ部をチャンバ本体の内壁部に固定するため、ダクトの接続作業性を格段に向上させることができる。
【図面の簡単な説明】
【図1】全館空調システムを示す図である。
【図2】本発明による吹出しチャンバの一実施形態を示す分解斜視図である。
【図3】A〜Eはダクトの接続手順を説明する図である。
【図4】別の実施形態を示す斜視図である。
【図5】図4の断面図である。
【符号の説明】
7 室内機
18 接続用ダクト
18A 接続側端部
20,21 吹出しチャンバ
31 チャンバ本体
31A 吹出し用開口部
31B ダクト接続孔
31C 切り欠き
33 フランジ本体
33A フランジ部
35 ねじ
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to, for example, a blowout chamber for blowing conditioned air from an indoor unit to a conditioned room and an air conditioning system using the same.
[0002]
[Prior art]
Generally, in a whole building air conditioning system, etc., an indoor unit is installed under the stairs of a building, etc., and a method of supplying conditioned air from the indoor unit through a duct to a plurality of blowout chambers formed in each room is adopted. Yes.
[0003]
[Problems to be solved by the invention]
For example, when the blowout chamber is installed under the floor and the blowout opening of the chamber body opens on the floor surface toward the conditioned room, duct connection work between the blowout chamber and the indoor unit is performed under the floor. Therefore, there is a problem that the connecting operation becomes extremely difficult. A typical example of conventional connection work will be described. First, an operator dives under the floor to connect the blowout chamber and the indoor unit with a duct, and then returns to the floor and hands from the opening formed in the floor plate. Then, the blowout chamber just below the opening is pulled up, the upper part of the blown-up blowout chamber is fixed to the opening of the floor plate, and the blowout grill is mounted thereon.
[0004]
However, such connection work is difficult, and there is a problem that future maintenance is also difficult.
[0005]
Accordingly, an object of the present invention is to provide a blow-out chamber and an air-conditioning system using the blow-out chamber that can solve the problems of the conventional techniques described above and simplify duct connection work.
[0006]
[Means for Solving the Problems]
According to the first aspect of the present invention, the connection side end of the connection duct is inserted into the duct connection hole formed in the chamber main body , and a fixing band is formed on the outer peripheral portion of the connection side end projecting into the chamber main body . Insert the cylinder part of the flange part into the inner peripheral part of the connection side end part, and tighten the fixing band in the chamber body to connect the connection side end part and the flange part. The connection side end is pushed out of the chamber main body until it is pushed by and is brought into contact with the inner wall portion of the chamber main body, and the flange portion is fixed to the inner wall portion of the chamber main body with a screw .
[0007]
According to a second aspect of the present invention, in the first aspect of the present invention, the blowout opening of the chamber main body is opened on the floor surface, and the blowout grill is provided in the opening.
[0008]
A third aspect of the present invention is the air conditioning system in which the other end of the duct, one end of which is connected to the outlet of the indoor unit, is connected to the outlet chamber, and the outlet chamber has a duct connection hole formed in the chamber body. Insert the connection side end of the connection duct into the outer periphery of the connection side end projecting into the chamber body , and pass the fixing band and packing in this order. Insert into the inner periphery, tighten the fixing band in the chamber body to connect the connection side end and the flange part, and until the packing is pushed by the flange part and abuts against the inner wall part of the chamber body, And the flange portion is fixed to the inner wall portion of the chamber body using screws .
[0009]
According to a fourth aspect of the present invention, in the third aspect of the present invention, the blowout opening of the chamber main body is opened on the floor surface, and the blowout grill is provided in the opening.
[0010]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, an embodiment of the present invention will be described with reference to the drawings.
[0011]
FIG. 1 shows the entire building air conditioning system. In this air conditioning system, two outdoor units 2 and 3 are installed outside the building 1, one outdoor unit 2 is connected to the indoor unit 5 in the attic room via the refrigerant pipe 4, and the other outdoor unit 3 is A refrigerant pipe 6 is connected to the indoor unit 7 in the lower stairs room.
[0012]
A suction chamber 9 is connected to the indoor unit 5 in the attic room via a duct 8, and a branch chamber 11 is connected to the branch chamber 11 via a duct 10. , 15 are connected to each other. On the other hand, outside air is taken into the room under the stairs through the air supply duct 16. A branch chamber 17 is connected to the indoor unit 7 under the stairs under the floor, and blowout chambers 20 and 21 are connected to the branch chamber 17 via ducts 18 and 19, respectively.
[0013]
Next, the structure of the blowout chamber 20 (or 21) according to the present embodiment will be described with reference to FIG.
[0014]
The blowout chamber 20 includes a wooden box-type chamber main body 31, and the blowout opening 31A of the chamber main body 31 is opened on the floor (FIG. 1). A circular duct connection hole 31B and a notch 31C are integrally formed on the side surface of the chamber body 31, and the connection side end 18A of the connection duct 18 is inserted into the duct connection hole 31B. The connection-side end portion 18A and the flange main body 33 are coupled, and the flange portion 33A of the flange main body 33 is fixed to the inner wall portion of the chamber main body 31 via a screw 35.
[0015]
Next, the connection procedure of the duct 18 will be described with reference to FIG.
[0016]
3A, first, an opening 41 for attaching the blowout chamber 20 is formed on the floor board of the building 1, and the connection side end 18A of the connection duct 18 is positioned under the floor near the opening.
[0017]
Next, as shown in FIG. 3B, the chamber main body 31 is inserted into the opening 41 of the floor board from above, and the chamber main body 31 is fixed to the floor portion with the wood screw 42. Next, a hand is passed from the floor to the opening 41, the blowout opening 31A, and the duct connection hole 31B, and the connection side end 18A of the connection duct 18 located outside the duct connection hole 31B is grasped, and this is connected to the chamber body 31. Pull in.
[0018]
Then, as shown in FIG. 3C, the connection side end 18 </ b> A and the flange main body 33 are coupled within the chamber main body 31.
[0019]
When this is connected, referring to FIG. 2, the fixing band 33B and packing 33C are passed through the outer peripheral portion of the connection side end portion 18A protruding into the chamber body 31, and the flange is connected to the inner peripheral portion of the connection side end portion 18A. The cylindrical portion of the portion 33A is inserted, the fixing band 33B is tightened, and the connection side end portion 18A and the flange portion 33A are coupled.
[0020]
Next, after the projection of the fixing band 33B is aligned with the notch 31C, the connection side end 18A is moved until the flange portion 33A and the packing 33C of the flange main body 33 abut against the inner wall portion of the chamber main body 31. Push away. In this state, the flange portion 33 </ b> A of the flange body 33 is fixed to the inner wall portion of the chamber body 31 using screws 35.
[0021]
Finally, as shown in FIG. 3D, a metal frame 45 is fixed to the upper end of the chamber body 31 with screws, and as shown in FIG. 3E, the metal mesh 46 and the blowout grill 47 are stacked in this order and fixed with screws 48.
[0022]
In the present embodiment, the connection side end 18A and the flange main body 33 are coupled in the chamber main body 31 and the flange main body 33 is fixed to the inner wall of the chamber main body 31. It is not necessary to dive under the floor, and duct connection workability can be improved.
[0023]
The chamber body 31 can be attached to any position within the reach of the duct 18.
[0024]
4 and 5 show another embodiment.
[0025]
In this embodiment, a guide member 51 having an L-shaped cross section for guiding the lower end portions of the flange portion 33 </ b> A of the flange main body 33 and the packing 33 </ b> C is fixed to the inner wall portion of the chamber main body 31. According to this, as shown in FIG. 5, the lower end portions of the flange portion 33 </ b> A and the packing 33 </ b> C are guided and positioned by the guide member 51, so that in the chamber main body 31, in a so-called groping state. The screw 35 can be easily fixed.
[0026]
As mentioned above, although this invention was demonstrated based on one Embodiment, it is clear that this invention is not limited to this.
[0027]
Although the said blowing chamber 20 demonstrated the thing of under floor installation, it is not limited to this, For example, it cannot be overemphasized that the present invention is applicable also to the blowing chamber installed in a top bag, a ground bag, a ceiling back, etc., for example. Nor.
[0028]
【The invention's effect】
In the present invention, the connection side end and the flange main body are coupled in the chamber main body, and the flange portion of the flange main body is fixed to the inner wall portion of the chamber main body, so that the duct connection workability can be significantly improved. .
[Brief description of the drawings]
FIG. 1 is a diagram showing an entire building air conditioning system.
FIG. 2 is an exploded perspective view showing an embodiment of a blowout chamber according to the present invention.
FIGS. 3A to 3E are diagrams for explaining a duct connection procedure; FIGS.
FIG. 4 is a perspective view showing another embodiment.
FIG. 5 is a cross-sectional view of FIG.
[Explanation of symbols]
7 Indoor Unit 18 Connection Duct 18A Connection Side Ends 20, 21 Blowing Chamber 31 Chamber Body 31A Blowing Opening 31B Duct Connection Hole 31C Notch 33 Flange Body 33A Flange 35 Screw

Claims (4)

チャンバ本体に形成されたダクト接続孔に接続用ダクトの接続側端部を挿入し、上記チャンバ本体内に突出させた接続側端部の外周部に、固定バンド、パッキンの順に通し、更にフランジ部の筒部を接続側端部の内周部に挿入し、上記チャンバ本体内で固定バンドを締めて接続側端部とフランジ部とを連結し、パッキンがフランジ部で押されてチャンバ本体の内壁部に当接するまで、接続側端部をチャンバ本体外に押し出すと共に、上記フランジ部を上記チャンバ本体の内壁部にねじを用いて固定したことを特徴とする吹出しチャンバ。Insert the connection side end of the connection duct into the duct connection hole formed in the chamber body, and pass the fixing band and packing through the outer periphery of the connection side end projecting into the chamber body , and the flange part Is inserted into the inner peripheral portion of the connection side end portion, the fixing band is tightened in the chamber body to connect the connection side end portion and the flange portion, and the packing is pushed by the flange portion so that the inner wall of the chamber body is The blowout chamber is characterized in that the connection side end is pushed out of the chamber body until it abuts against the portion, and the flange portion is fixed to the inner wall portion of the chamber body with a screw . チャンバ本体の吹出し用開口部が床面に開口し、この開口部に吹出しグリルを備えたことを特徴とする請求項1記載の吹出しチャンバ。  2. A blowout chamber according to claim 1, wherein a blowout opening of the chamber body opens on the floor surface, and a blowout grill is provided in the opening. 室内機の吹出し口に一端が接続されたダクトの他端を吹出しチャンバに接続してなる空気調和システムにおいて、
上記吹出しチャンバが、チャンバ本体に形成されたダクト接続孔に接続用ダクトの接続側端部を挿入し、上記チャンバ本体内に突出させた接続側端部の外周部に、固定バンド、パッキンの順に通し、更にフランジ部の筒部を接続側端部の内周部に挿入し、上記チャンバ本体内で固定バンドを締めて接続側端部とフランジ部とを連結し、パッキンがフランジ部で押されてチャンバ本体の内壁部に当接するまで、接続側端部をチャンバ本体外に押し出すと共に、上記フランジ部を上記チャンバ本体の内壁部にねじを用いて固定したことを特徴とする空気調和システム。
In the air conditioning system in which the other end of the duct whose one end is connected to the outlet of the indoor unit is connected to the outlet chamber,
The blowout chamber inserts a connection side end of a connection duct into a duct connection hole formed in the chamber main body , and in the order of a fixing band and a packing in an outer peripheral portion of the connection side end projecting into the chamber main body . Insert the cylindrical part of the flange part into the inner peripheral part of the connection side end part, tighten the fixing band in the chamber body to connect the connection side end part and the flange part, and the packing is pushed by the flange part. The connection-side end is pushed out of the chamber main body until it abuts against the inner wall of the chamber main body, and the flange portion is fixed to the inner wall of the chamber main body using screws .
チャンバ本体の吹出し用開口部が床面に開口し、この開口部に吹出しグリルを備えたことを特徴とする請求項3記載の空気調和システム。  4. The air conditioning system according to claim 3, wherein the blowout opening of the chamber main body opens to the floor surface, and the blowout grill is provided in the opening.
JP2001193203A 2001-06-26 2001-06-26 Blowing chamber and air conditioning system using the same Expired - Fee Related JP4663163B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001193203A JP4663163B2 (en) 2001-06-26 2001-06-26 Blowing chamber and air conditioning system using the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001193203A JP4663163B2 (en) 2001-06-26 2001-06-26 Blowing chamber and air conditioning system using the same

Publications (2)

Publication Number Publication Date
JP2003004284A JP2003004284A (en) 2003-01-08
JP4663163B2 true JP4663163B2 (en) 2011-03-30

Family

ID=19031535

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001193203A Expired - Fee Related JP4663163B2 (en) 2001-06-26 2001-06-26 Blowing chamber and air conditioning system using the same

Country Status (1)

Country Link
JP (1) JP4663163B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4601346B2 (en) * 2004-07-15 2010-12-22 株式会社竹中工務店 Duct branch structure
JP4754317B2 (en) * 2005-10-18 2011-08-24 新日本空調株式会社 Combination structure of duct body and flexible branch
JP6683496B2 (en) * 2016-02-16 2020-04-22 鹿島建設株式会社 Air conditioning equipment in a baseball field

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05264095A (en) * 1992-03-17 1993-10-12 Takasago Thermal Eng Co Ltd Mounting method for filter built-in diffuser and diffuser chamber
JPH1047743A (en) * 1996-08-05 1998-02-20 Kyoritsu Eatetsuku Kk Air conditioning chamber
JPH10232046A (en) * 1997-02-20 1998-09-02 Sanyo Electric Co Ltd Air-conditioning system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05264095A (en) * 1992-03-17 1993-10-12 Takasago Thermal Eng Co Ltd Mounting method for filter built-in diffuser and diffuser chamber
JPH1047743A (en) * 1996-08-05 1998-02-20 Kyoritsu Eatetsuku Kk Air conditioning chamber
JPH10232046A (en) * 1997-02-20 1998-09-02 Sanyo Electric Co Ltd Air-conditioning system

Also Published As

Publication number Publication date
JP2003004284A (en) 2003-01-08

Similar Documents

Publication Publication Date Title
JP3101484B2 (en) Air conditioner
JP4663163B2 (en) Blowing chamber and air conditioning system using the same
JP4425184B2 (en) Method of assembling air conditioner and air conditioner
JPH09210405A (en) Ceiling built-in type air conditioner
JP2010159909A (en) Air conditioner
JP7412149B2 (en) Air conditioning control room
JP3618631B2 (en) Line slit blowing unit and its mounting method
JPS6327617B2 (en)
WO2019225278A1 (en) Air conditioning indoor unit
JP3469722B2 (en) Air conditioner
JPH08270978A (en) Air conditioner
JP5909344B2 (en) Branch chamber for air conditioner
JP4616608B2 (en) Air conditioner
JPH10131391A (en) Building material with air conditioner and mounting structure of air conditioner to building material
JP3731102B2 (en) Ventilation equipment
JP7065326B2 (en) Indoor unit, air conditioner
JPS6027858Y2 (en) Ventilation fan for duct
JPH0410500Y2 (en)
JPS5843337A (en) Air conditioning equipment for private room
JPS6335320Y2 (en)
JPH0236014Y2 (en)
JP3895998B2 (en) Ceiling-embedded air conditioner and method for manufacturing the same
JPH033870Y2 (en)
JPH07167458A (en) Cabinet for air conditioner
JPH06185782A (en) Ceiling recessed type ventilator

Legal Events

Date Code Title Description
A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A712

Effective date: 20040709

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20040709

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20080620

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20100804

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20100817

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20100907

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20100907

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20101207

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20110105

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140114

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140114

Year of fee payment: 3

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313115

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140114

Year of fee payment: 3

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

LAPS Cancellation because of no payment of annual fees