Prior art keywords
ground improvement
ground
hole
drilling
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2000343619A
Other languages
Japanese (ja)
Other versions
JP2002146770A (en
Inventor
雅典 大内
克美 今井
文彦 木村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Onoda Chemico Co Ltd
Shimizu Corp
Original Assignee
Onoda Chemico Co Ltd
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Onoda Chemico Co Ltd, Shimizu Corp filed Critical Onoda Chemico Co Ltd
Priority to JP2000343619A priority Critical patent/JP4625573B2/en
Publication of JP2002146770A publication Critical patent/JP2002146770A/en
Application granted granted Critical
Publication of JP4625573B2 publication Critical patent/JP4625573B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、改良対象地盤中に硬化材を高圧噴射して攪拌混合することで多数の地盤改良杭を造成する地盤改良工法に関する。
【0002】
【従来の技術】
この種の地盤改良工法においては、地盤中に硬化材を高圧噴射することによる地盤の膨張や変形といった弊害が生じることがある。たとえば、既設地盤改良杭の周囲に新たな地盤改良杭を造成する場合、その新たな地盤改良杭を造成するために噴射した硬化材の体積相当分だけ周囲地盤が膨張し、その結果、既設地盤改良杭に対して過大な側圧が作用してそれを損壊させてしまうことも想定される。
【0003】
従来、そのような問題に対する対策として、二重ロッドや三重ロッドを備えた高圧噴射攪拌機を用いて硬化材を空気や水とともに地盤中に噴射することが行われている。そのようにすると、単に硬化材のみを噴射する場合に比べて硬化材が遠方まで到達し、そのため改良範囲を拡大できる(つまり太径の地盤改良杭を造成できる)ばかりでなく、また硬化材を噴射、地盤改良杭を造成中にスライムを地表に排出させることにより、地盤改良による体積膨張が緩和され地盤変形も軽減される効果があるとされている。
【0004】
【発明が解決しようとする課題】
しかし、上記のように硬化材を空気や水とともに地盤中に噴射する工法では、硬化材のみを噴射する場合に比べてコスト高であるし、それに用いる高圧噴射攪拌機も複雑かつ大掛かりなものとなるばかりでなく、空気や水とともに噴射した硬化材の一部が地表にまで噴出し、この排泥スライムをバキューム車等で回収し産業廃棄物として処分する処理が必要となるという別の問題を生じる。
【0005】
上記事情に鑑み、本発明は地盤改良杭の造成に際しての硬化材噴射による地盤に対する悪影響を防止し得る有効な地盤改良工法を提供することを目的とする。
【0006】
【課題を解決するための手段】
請求項1の発明は、改良対象地盤中に硬化材を噴射して攪拌混合することで多数の地盤改良杭を造成する地盤改良工法において、改良対象地盤に対してまず削孔機を用いて先行削孔を形成するとともに後段において実施する硬化材噴射による地盤体積増加相当分の排土を先行して行い、前記削孔機を引き抜いた後に、先端部に攪拌翼と硬化材噴射孔を有するロッドを備えた高圧噴射攪拌機を用いてそのロッドを先行削孔内に貫入して孔底部に至らしめた後、硬化材噴射孔から先行削孔の周囲に硬化材を噴射せしめつつロッドを引き上げることにより、先行削孔を中心としてその先行削孔よりも太径の地盤改良杭を造成することを特徴とする。
【0007】
請求項2の発明は、請求項1の発明の地盤改良工法を実施する際に、削孔機により形成する先行削孔の径を、高圧噴射攪拌機における攪拌翼の径と同等とすることを特徴とする。
【0008】
請求項3の発明は、請求項1または2記載の地盤改良工法を既設地盤改良杭の相互間において実施することにより、既設地盤改良杭の相互間にそれらの間の間隙を埋める新たな地盤改良杭を造成することを特徴とする。
【0009】
【発明の実施の形態】
本発明の一実施形態を図1〜図4を参照して説明する。本実施形態の地盤改良工法は、図1に示すように、既に造成されている既設地盤改良杭1(以下、既設杭1と略す)の間に、それらの間の間隙を埋めるように新たな地盤改良杭2を造成する場合に本発明を適用したものである。
【0010】
この場合、既設杭1の間に単に硬化材を噴射して新たな地盤改良杭2を造成することでは、既設杭1間の地盤体積が大きく膨張して既設杭1に過大な側圧が作用することが不可避であり、したがって既設杭1が側圧による損壊を受ける懸念があるので、本実施形態では図2〜図4に示す工程で地盤改良杭2を造成することによりそれを有効に防止するようにしている。
【0011】
・先行削孔工程
まず、図2に示すような汎用の削孔機3たとえばスクリューロッド4を備えたアースオーガーを用いて、図1に示すように既設杭1の間に先行削孔5を形成する。その先行削孔5の径は既設杭1の間に形成できる範囲で適宜設定すれば良いが、後段の工程において使用する高圧噴射攪拌機6における攪拌翼8の径と同等程度としておくことが好ましい。そして、先行削孔5を形成する際に、後段での硬化材噴射による地盤体積増加相当分の排土を先行して行う。より具体的には、スクリューロッド4を正転させて地盤に貫入した後、引抜き時に正転および逆転を併用して所定量の排土を行えば良い。
【0012】
なお、既設杭1が鉛直に形成されていないような場合、あるいは既設杭1が途中で側方に膨出しているような場合には、先行削孔5を形成する際にスクリューロッド4が既設杭1に干渉してしまうことも想定されるが、その場合は構わず既設杭1を削ってしまって差し支えない。勿論、削孔機3としてアースオーガーを用いることで、そのような場合であっても既設杭1を支障なく削って先行削孔5を精度良く鉛直に形成することが可能である。
【0013】
・高圧噴射攪拌工程
次いで、図3に示すような高圧噴射攪拌機6を用いて地盤改良杭2の造成を行う。図示例の高圧噴射攪拌機6は汎用のボーリングマシンタイプのもので、硬化材のみを高圧噴射する単管式のロッド7を有し、その先端部に攪拌翼8と硬化材噴射孔(図示されず)を備えたものであり、そのロッド7を先に形成した先行削孔5内に貫入させていく。この際、上記のように先行削孔5の径を攪拌翼8の径と同等程度としておくことによりロッド7の貫入を極めて容易に行うことができ、攪拌翼8およびロッド7には削孔性能を持たせる必要が殆どない。
【0014】
図3(b)に示すように攪拌翼8を先行削孔5の底部に至らしめた後、硬化材噴射孔から硬化材を周囲に高圧噴射し、ロッド7を回転させて攪拌翼8により攪拌混合しつつロッド7を引き上げていく。これにより、(c)に示すように先行削孔5を中心としてそれよりも太径の地盤改良杭2が形成されていく。この際、硬化材の到達範囲は図1に鎖線で示すように既設杭1間の間隙全体にわたるようにする。その硬化材噴射仕様は、排泥量を現場で測定し、これと硬化材の到達距離を考慮して硬化材の噴射時間を設定する(時間当たり噴射量、噴射圧力は一定)。そのような硬化材噴射では、予め改良範囲の一部を排土しているため、既設杭1を傷めることはなく、したがって形成される地盤改良杭2は円筒状にはならず既設杭1の間の間隙の形状に倣ってそれを自ずと埋める形状に形成されることになる。勿論、硬化材噴射により想定される地盤体積増加相当分の排土が既になされているので、既設杭1間において地盤が大きく膨張したり変形することはない。
【0015】
以上のように、アースオーガー等の削孔機3により既設杭1の間に先行削孔5を形成して予め所定量の排土を行った後に、高圧噴射攪拌機6により硬化材を高圧噴射して攪拌することで地盤改良杭2を形成することにより、既設杭1の間の間隙全体を確実に埋めるような地盤改良杭2を効率的に施工することができ、しかも既設杭1に過大な側圧がかかってそれを損壊させてしまう懸念もない。
【0016】
なお、上記実施形態は既設杭1の間に新たに地盤改良杭2を形成する際に適用する場合の例であるが、本発明はそのような場合に適用するに限られず、地盤の膨張や変形が懸念される場合全般に広く適用できるものである。たとえば図5に示すように既存構造物10に接するように地盤改良杭2を形成するような場合において、上記と同様にまず先行削孔5を形成して所定量の排土を行った後、それを中心として硬化材噴射を行って地盤改良杭2をラップさせた状態で形成することで、硬化材噴射による地盤の膨張や変形を防止でき、過大な側圧が既存構造物10にかかるといった悪影響を防止することができる。
【0017】
また、上記実施形態のように先行削孔5の径は攪拌翼8の径と同等とすることが好ましいが、必ずしもそれに限るものでもなく、攪拌翼8に削孔性能を持たせることができるような場合には、先行削孔5を小径に形成してそれを攪拌翼8により拡径しながらロッド7を貫入することでも良い。
【0018】
【発明の効果】
請求項1の発明は、改良対象地盤に対してまず削孔機により先行削孔を形成して後段の硬化材噴射による地盤体積増加相当分の排土を先行して行い、しかる後に、先行削孔の内部からその周囲に硬化材を噴射せしめて先行削孔より太径の地盤改良杭を造成するので、硬化材噴射に伴う地盤の変形や膨張を有効に防止することができ、周辺地盤に対する悪影響を防止することができる。
【0019】
請求項2の発明は、削孔機により形成する先行削孔の径を、高圧噴射攪拌機における攪拌翼の径と同等とするので、高圧噴射攪拌機のロッドを先行削孔に対して容易に貫入することができ、攪拌翼やロッドに削孔性能を持たせる必要がない。
【0020】
請求項3の発明は、上記の地盤改良工法を既設地盤改良杭の相互間において実施することで既設地盤改良杭の相互間に新たな地盤改良杭を造成するので、既設地盤改良杭の間の間隙全体を確実に埋めるような地盤改良杭を効率的に施工することができ、しかも既設地盤改良杭に過大な側圧がかかってそれが損壊してしまうような懸念もない。
【図面の簡単な説明】
【図1】 本発明の一実施形態である地盤改良工法の概要を示す図である。
【図2】 同、先行削孔工程を示す図である。
【図3】 同、高圧噴射攪拌工程を示す図である。
【図4】 同、工程図である。
【図5】 本発明の他の実施形態を示す図である。
【符号の説明】
1 既設地盤改良杭(既設杭)
2 地盤改良杭
3 削孔機(アースオーガー)
4 スクリューロッド
5 先行削孔
6 高圧噴射攪拌機
7 ロッド
8 攪拌翼
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a ground improvement method for creating a large number of ground improvement piles by high-pressure jetting of a hardened material into the ground to be improved and stirring and mixing.
[0002]
[Prior art]
In this type of ground improvement method, there are cases where adverse effects such as expansion and deformation of the ground due to high-pressure injection of a hardener into the ground may occur. For example, when creating a new ground improvement pile around the existing ground improvement pile, the surrounding ground expands by the volume equivalent to the volume of the hardened material injected to create the new ground improvement pile. It is also assumed that excessive side pressure acts on the improved pile and destroys it.
[0003]
Conventionally, as a countermeasure against such a problem, a high-pressure jet stirrer provided with a double rod or a triple rod is used to inject a hardening material into the ground together with air or water. In that case, the hardened material reaches farther than when only the hardened material is sprayed, so that the range of improvement can be expanded (that is, a large-diameter ground improvement pile can be created), and the hardened material It is said that by discharging slime to the ground surface during jetting and ground improvement piles, volume expansion due to ground improvement is alleviated and ground deformation is also reduced.
[0004]
[Problems to be solved by the invention]
However, in the method of injecting the hardened material into the ground together with air and water as described above, the cost is higher than in the case of injecting only the hardened material, and the high-pressure jet agitator used therefor is also complicated and large. Not only that, but a part of the hardened material sprayed together with air and water is ejected to the surface of the earth, which causes another problem that the waste mud slime needs to be collected with a vacuum car and disposed of as industrial waste. .
[0005]
In view of the above circumstances, an object of the present invention is to provide an effective ground improvement method capable of preventing an adverse effect on the ground due to injection of a hardener when a ground improvement pile is created.
[0006]
[Means for Solving the Problems]
The invention of claim 1 is a ground improvement method for creating a large number of ground improvement piles by injecting and mixing a hardener into the ground to be improved, and then using a drilling machine first with respect to the ground to be improved. A rod having a stirrer blade and a hardener injection hole at the tip after forming a hole and performing soil removal corresponding to an increase in the ground volume by hardener injection carried out in the subsequent stage, after pulling out the hole drilling machine after allowed to reach the hole bottom by penetrating the rod prior drilling in using a high pressure injection mixer, pulling the rod while allowed injecting a hardening material around the previous drilling of a cured material injection holes Rukoto having a Thus, a ground improvement pile having a diameter larger than that of the preceding drilling hole is formed around the preceding drilling hole.
[0007]
The invention of claim 2 is characterized in that, when the ground improvement method of the invention of claim 1 is carried out, the diameter of the preceding drilling hole formed by the drilling machine is made equal to the diameter of the stirring blade in the high-pressure jet agitator. And
[0008]
The invention of claim 3 is a new ground improvement which fills the gap between existing ground improvement piles by implementing the ground improvement construction method of claim 1 or 2 between existing ground improvement piles. It is characterized by creating piles.
[0009]
DETAILED DESCRIPTION OF THE INVENTION
An embodiment of the present invention will be described with reference to FIGS. As shown in FIG. 1, the ground improvement method of the present embodiment is renewed so as to fill a gap between existing ground improvement piles 1 (hereinafter abbreviated as existing piles 1) that have already been created. The present invention is applied when the ground improvement pile 2 is created.
[0010]
In this case, by simply injecting a hardening material between the existing piles 1 to create a new ground improvement pile 2, the ground volume between the existing piles 1 is greatly expanded, and an excessive lateral pressure acts on the existing pile 1. Therefore, there is a concern that the existing pile 1 may be damaged by the side pressure. Therefore, in the present embodiment, the ground improvement pile 2 is created by the process shown in FIGS. I have to.
[0011]
Pre-drilling process First, using a general-purpose drilling machine 3 as shown in FIG. 2, for example, an earth auger equipped with a screw rod 4, the pre-drilling hole 5 is formed between the existing piles 1 as shown in FIG. To do. The diameter of the preceding drilled hole 5 may be set as appropriate as long as it can be formed between the existing piles 1, but is preferably set to be approximately equal to the diameter of the agitating blade 8 in the high-pressure jet agitator 6 used in the subsequent process. Then, when the preceding drilling hole 5 is formed, the earth removal corresponding to the increase in the ground volume by the subsequent injection of the hardener is performed in advance. More specifically, after the screw rod 4 is rotated forward and penetrates into the ground, a predetermined amount of soil may be discharged by using both forward rotation and reverse rotation during pulling.
[0012]
In addition, when the existing pile 1 is not formed vertically, or when the existing pile 1 bulges sideways in the middle, the screw rod 4 is provided when forming the preceding hole 5. Interference with the pile 1 is also assumed, but in that case, the existing pile 1 may be shaved without any problem. Of course, by using an earth auger as the hole drilling machine 3, even in such a case, it is possible to cut the existing pile 1 without hindrance and to form the preceding hole 5 vertically with high accuracy.
[0013]
-High-pressure jet stirring process Next, the ground improvement pile 2 is created using the high-pressure jet stirring machine 6 as shown in FIG. The high-pressure jet agitator 6 in the illustrated example is of a general-purpose boring machine type, and has a single-tube rod 7 that injects only a hardened material at a high pressure, and has a stirring blade 8 and a hardener injection hole (not shown) at the tip. ), And the rod 7 is inserted into the preceding drilled hole 5 formed earlier. At this time, as described above, the diameter of the preceding hole 5 is set to be approximately the same as the diameter of the stirring blade 8 so that the rod 7 can be penetrated very easily. There is almost no need to have.
[0014]
As shown in FIG. 3 (b), the stirrer blade 8 is brought to the bottom of the preceding hole 5, and then the hardener is injected at a high pressure from the hardener injection hole to the surroundings, and the rod 7 is rotated and stirred by the stirrer blade 8. The rod 7 is pulled up while mixing. Thereby, as shown in (c), the ground improvement pile 2 having a diameter larger than that of the preceding hole 5 is formed. At this time, the reach of the hardened material is set to cover the entire gap between the existing piles 1 as shown by the chain line in FIG. The hardening material injection specification measures the amount of mud discharged on site and sets the injection time of the hardening material in consideration of this and the arrival distance of the hardening material (the injection amount per hour and the injection pressure are constant). In such hardener injection, since a part of the improved range has been removed in advance, the existing pile 1 is not damaged, and thus the ground improved pile 2 formed is not cylindrical and the existing pile 1 is not damaged. It is formed in a shape that naturally fills in the shape of the gap between them. Of course, since the earth equivalent to the increase in the ground volume assumed by the hardener injection has already been made, the ground does not greatly expand or deform between the existing piles 1.
[0015]
As described above, after the pre-drilled hole 5 is formed between the existing piles 1 by the drilling machine 3 such as an earth auger and a predetermined amount of soil is removed in advance, the high-pressure jet agitator 6 injects the hardened material at a high pressure. By forming the ground improvement pile 2 by stirring, the ground improvement pile 2 can be efficiently constructed so as to reliably fill the entire gap between the existing piles 1, and the existing pile 1 is excessively large. There is no fear of damaging it due to side pressure.
[0016]
In addition, although the said embodiment is an example in the case of applying when forming the ground improvement pile 2 newly between the existing piles 1, this invention is not restricted to such a case, The expansion | swelling of ground, It can be widely applied to cases where deformation is a concern. For example, in the case where the ground improvement pile 2 is formed so as to be in contact with the existing structure 10 as shown in FIG. 5, first, the preceding drilling hole 5 is first formed in the same manner as described above, and then a predetermined amount of soil is discharged. By forming the ground improvement pile 2 in a state of wrapping the ground improvement pile 2 around the center, it is possible to prevent the expansion and deformation of the ground due to the curing material injection, and the adverse effect that excessive side pressure is applied to the existing structure 10 Can be prevented.
[0017]
In addition, the diameter of the preceding hole 5 is preferably equal to the diameter of the agitating blade 8 as in the above embodiment, but the diameter is not necessarily limited thereto, and the agitating blade 8 can be provided with a hole forming performance. In such a case, the leading hole 5 may be formed in a small diameter, and the rod 7 may be penetrated while the diameter thereof is expanded by the stirring blade 8.
[0018]
【The invention's effect】
According to the first aspect of the present invention, first a prior drilling hole is formed on the ground to be improved by a drilling machine, and the earth corresponding to the increase in the ground volume by the subsequent hardening material injection is performed in advance. Since the hardened material is sprayed from the inside of the hole to the periphery to create a ground improvement pile with a diameter larger than that of the preceding hole, it is possible to effectively prevent deformation and expansion of the ground due to the injection of the hardened material. Adverse effects can be prevented.
[0019]
In the invention of claim 2, since the diameter of the preceding drilling hole formed by the drilling machine is made equal to the diameter of the stirring blade in the high-pressure jet agitator, the rod of the high-pressure jet agitator can be easily inserted into the preceding drilling hole. Therefore, it is not necessary to give a hole-drilling performance to the stirring blade and the rod.
[0020]
In the invention of claim 3, a new ground improvement pile is created between the existing ground improvement piles by carrying out the above ground improvement construction method between the existing ground improvement piles. It is possible to efficiently construct a ground improvement pile that reliably fills the entire gap, and there is no concern that the existing ground improvement pile will be damaged due to excessive side pressure.
[Brief description of the drawings]
FIG. 1 is a diagram showing an overview of a ground improvement method according to an embodiment of the present invention.
FIG. 2 is a view showing a preceding drilling step.
FIG. 3 is a view showing a high-pressure jet stirring step.
FIG. 4 is a process diagram of the same.
FIG. 5 is a diagram showing another embodiment of the present invention.
[Explanation of symbols]
1 Existing ground improvement pile (existing pile)
2 Ground improvement pile 3 Drilling machine (earth auger)
4 Screw rod 5 Pre-drilling hole 6 High-pressure jet agitator 7 Rod 8 Stirring blade

Claims (3)

改良対象地盤中に硬化材を噴射して攪拌混合することで多数の地盤改良杭を造成する地盤改良工法において、改良対象地盤に対してまず削孔機を用いて先行削孔を形成するとともに後段において実施する硬化材噴射による地盤体積増加相当分の排土を先行して行い、前記削孔機を引き抜いた後に、先端部に攪拌翼と硬化材噴射孔を有するロッドを備えた高圧噴射攪拌機を用いてそのロッドを先行削孔内に貫入して孔底部に至らしめた後、硬化材噴射孔から先行削孔の周囲に硬化材を噴射せしめつつロッドを引き上げることにより、先行削孔を中心としてその先行削孔よりも太径の地盤改良杭を造成することを特徴とする地盤改良工法。In the ground improvement method that creates a large number of ground improvement piles by injecting and mixing the hardened material into the ground to be improved and mixing it, first the pre-drilling hole is formed on the ground to be improved using a drilling machine and the subsequent stage A high-pressure jet agitator equipped with a rod having a stirring blade and a hardener injection hole at the tip after the earth removal corresponding to the increase in the ground volume due to the injection of the hardener carried out in Fig. central after allowed to reach the hole bottom by penetrating the rod prior drilling in by pulling Rukoto rod while allowed injecting a hardening material around the previous drilling of a cured material injection hole, the leading drilling using As a ground improvement construction method, it is characterized by creating a ground improvement pile with a diameter larger than that of the preceding drilling hole. 削孔機により形成する先行削孔の径を、高圧噴射攪拌機における攪拌翼の径と同等とすることを特徴とする請求項1記載の地盤改良工法。The ground improvement method according to claim 1, wherein the diameter of the preceding hole formed by the hole drilling machine is made equal to the diameter of the stirring blade in the high-pressure jet agitator. 請求項1または2記載の地盤改良工法を既設地盤改良杭の相互間において実施することにより、既設地盤改良杭の相互間にそれらの間の間隙を埋める新たな地盤改良杭を造成することを特徴とする地盤改良工法。By carrying out the ground improvement method according to claim 1 or 2 between the existing ground improvement piles, a new ground improvement pile that fills the gap between the existing ground improvement piles is created. The ground improvement construction method.
JP2000343619A 2000-11-10 2000-11-10 Ground improvement method Expired - Lifetime JP4625573B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000343619A JP4625573B2 (en) 2000-11-10 2000-11-10 Ground improvement method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000343619A JP4625573B2 (en) 2000-11-10 2000-11-10 Ground improvement method

Publications (2)

Publication Number Publication Date
JP2002146770A JP2002146770A (en) 2002-05-22
JP4625573B2 true JP4625573B2 (en) 2011-02-02

Family

ID=18817956

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000343619A Expired - Lifetime JP4625573B2 (en) 2000-11-10 2000-11-10 Ground improvement method

Country Status (1)

Country Link
JP (1) JP4625573B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4741414B2 (en) * 2006-05-17 2011-08-03 株式会社竹中工務店 Construction method and construction equipment for ground improved composite pile structure

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000178962A (en) * 1998-12-11 2000-06-27 Chem Grouting Co Ltd Soil-improvement method

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5751326A (en) * 1980-09-10 1982-03-26 N I T:Kk Soft ground improvement work capable of reducing side pressure
JPH0711135B2 (en) * 1988-07-06 1995-02-08 財団法人土木研究センター Ground improvement method
JPH0396513A (en) * 1989-09-07 1991-04-22 Doboku Kenkyu Center Improvement method of ground
JPH07268859A (en) * 1994-03-28 1995-10-17 Onoda Kemiko Kk Method for improving soil
JPH09317373A (en) * 1996-05-24 1997-12-09 Toyo Constr Co Ltd Method of shaft construction

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000178962A (en) * 1998-12-11 2000-06-27 Chem Grouting Co Ltd Soil-improvement method

Also Published As

Publication number Publication date
JP2002146770A (en) 2002-05-22

Similar Documents

Publication Publication Date Title
JP2008274553A (en) Slope stabilizing method
JP4625573B2 (en) Ground improvement method
KR20100095072A (en) Method and apparatus for improving ground using cement grouting
KR20030024723A (en) The inserting method of steel pipe for Jet Grouting Pile
KR100523116B1 (en) The steel pipe inserting method making use of the rod for injecting super pressure grout in Jet Grouting Pile
JP4648764B2 (en) Jet stirring method and jet stirring device
JP2018059285A (en) Hollow tube for displacement-reduced type compacting sand-pile creation and compacting sand-pile creating method
JPH08144265A (en) Soil improvement method
JP2001182088A (en) Heaving prevention device
JP3005741B2 (en) Ground improvement method
JP3289745B2 (en) Ground improvement method for soft ground
JPH0813471A (en) Mechanical agitation method
JP2700765B2 (en) Underground wall construction method
JP3887557B2 (en) Ground improvement method and its monitoring mechanism
JP2002021063A (en) Method for constructing earth retaining wall
JP3552164B2 (en) High pressure jet injection mixing method
JP3678935B2 (en) Consolidation pile construction method
JPH04360909A (en) Construction of pile
JPH05321511A (en) Construction method for underground vessel in weak ground
JP2022098736A (en) Ground improvement device
JPS6220328B2 (en)
JP2512157B2 (en) Reinforcement method for soft ground
JPH06248645A (en) Construction of ground anchor in hole expanded by high-pressure jet
JP2002004757A (en) Method for preventing cave-in of natural ground
JP2001055885A (en) Injection pipe for natural ground consolidating liquid agent and arranging method therefor

Legal Events

Date Code Title Description
A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20001204

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20070420

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20090401

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20100518

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20100712

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20101012

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20101108

R150 Certificate of patent or registration of utility model

Ref document number: 4625573

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131112

Year of fee payment: 3

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20100712

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131112

Year of fee payment: 3

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131112

Year of fee payment: 3

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term