JP4501249B2 - Steel pipe pile and its construction method - Google Patents

Steel pipe pile and its construction method Download PDF

Info

Publication number
JP4501249B2
JP4501249B2 JP2000235490A JP2000235490A JP4501249B2 JP 4501249 B2 JP4501249 B2 JP 4501249B2 JP 2000235490 A JP2000235490 A JP 2000235490A JP 2000235490 A JP2000235490 A JP 2000235490A JP 4501249 B2 JP4501249 B2 JP 4501249B2
Authority
JP
Japan
Prior art keywords
steel pipe
pipe pile
pile
ground
tip
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2000235490A
Other languages
Japanese (ja)
Other versions
JP2002047647A (en
Inventor
公寿 高野
正宏 林
敏雄 篠原
玄 森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JFE Steel Corp
Original Assignee
JFE Steel Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JFE Steel Corp filed Critical JFE Steel Corp
Priority to JP2000235490A priority Critical patent/JP4501249B2/en
Publication of JP2002047647A publication Critical patent/JP2002047647A/en
Application granted granted Critical
Publication of JP4501249B2 publication Critical patent/JP4501249B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、先端開口部を閉塞した鋼管杭及びその施工方法に係り、特に大径の鋼管コンクリート杭を造成する場合に有効な鋼管杭及びその施工方法に関するものである。
【0002】
【従来の技術】
鋼管杭等を地盤中に貫入する際に内部に土砂が侵入するのを防止するために、先端開口部に蓋状部材を取付けて閉塞した鋼管杭又はコンクリート杭(以下、先端閉塞杭という)はいくつか提案されている。また、この先端閉塞杭の施工方法には、杭体の頭部に打撃を加えて地盤に貫入させる打撃工法、杭体を設置する地盤にあらかじめ孔を掘削してその孔に杭体を設置するプレボーリング法、あるいは、杭体の先端部近傍に取付けた翼の木ねじとしての作用により杭体を回転埋設する工法などある。さらに、先端部が開放された鋼管杭の中掘を行い、先端部のみにコンクリートを打設する発明も提案されている。
【0003】
先端閉塞杭には、掘削用の先端沓を取り付けるもの、地盤による先端地盤の支持力特性を向上させるものなどがあり、以下にその一例を示す。
特開昭55−119822号公報には、コンクリート杭の先端開口部に挿入される筒部と、この筒部の下端部に連設すると共にコンクリート杭の下端面に係止する鍔部とからなり、コンクリート杭の支持力を補強する鋼管部材が記載されている。
また、特開昭55−155823号公報には、羽根付き鋼管の先端部に、羽根付き鋼管より大径で下面に三角リブを有する拡大シューを取付けた杭が記載されている。
【0004】
特開昭60−55119号公報には、杭の先端開口部に、杭より大径で土砂上昇口、掘削刃等を有する端板を装着した既製杭が記載されており、また、特開昭62−29614号公報には、下端部にアンカー部材が固着された既製杭が記載されている。
さらに、特開平9−242068号公報には、掘削刃を有し鋼管の先端開口部に上方への移動と回動が拘束された底板が設けられた場所打ち杭が記載されている(これら5件の発明を一括して、従来技術1という)。
【0005】
次に、先端閉塞杭の打撃工法は、杭体の頭部にハンマー等で打撃力を加え、その打撃力で杭先端部及び杭周面地盤を構成する土砂を、深さ方向や側方へ排除しながら、かつ締固めを行ない、杭体を地盤に貫入させて設置するようにしたものである(従来技術2)。
【0006】
また、先端閉塞杭のプレボーリング工法は、杭体の設置に先き立ってドリル等で地盤に孔をあけ、通常、セメントミルク等で空隙を満たして地質の崩壊を抑えながら、この空隙に杭体を建て込むようにしたものである(従来技術3)。
【0007】
先端閉塞杭の先端部近傍に取り付けた翼の木ねじとしての作用により杭体を回転埋設する工法は、小径の鋼管杭を対象にいくつか実用化されている。
特公平2−62648号公報に記載された鋼管杭の埋設工法は、鋼管製の杭本体の下面に底板を固設し、この底板に掘削刃を設けると共に、杭本体の下端部外周面にこの杭本体の外径のほぼ2倍強の外径を有する翼幅の大きいねじ込み用の螺旋翼をほぼ一巻にわたり突設した鋼管杭を、軟弱地盤にねじ込むように回転させながら地中に押圧し、下端の掘削刃によって杭本体先端の土砂を掘削軟化させ、杭側面の未掘削土砂中に螺旋翼を食い込ませて、土の耐力を反力として杭体を回転掘進しつつ掘削軟化した土砂を杭側面に押し出して圧縮し、無排土で地中に杭体をねじ込んで設置するようにしたものである(従来技術4)。
【0008】
また、特公平4−58850号公報に記載された鋼管杭の埋設工法は、鋼管杭の下端部を掘削刃とグラウト噴出口を有する底板で閉塞するとともに、鋼管の外径のほぼ2倍の外径を有する螺旋翼を鋼管杭の下端外周面にほぼ一巻きに固着した鋼管杭を、回転埋設中及び埋設後にグラウト噴出口よりセメントミルクを噴出して周面地盤を強化するようにしたものである(従来技術5)。
【0009】
さらに、先端部が開放された鋼管杭の中掘りを行い、先端部のみにコンクリートの打設する工法として、特公平5−517305号公報に記載されたものがある。この施工方法は、地盤を掘削してその孔に鋼管を建て込み、支持層部を拡底掘削して先端部にコンクリートを打設し、掘削土を鋼管内に埋め戻すようにしたものである(従来技術6)。
【0010】
【発明が解決しようとする課題】
従来技術1の各先端閉塞杭は、施工の途中で先端部に取付けた蓋状部材を杭体内方向に移動し又は取り外すことができない。このため、施工中に別途の手段を用いて杭体先端部の掘削を行うことができない。
【0011】
従来技術2の打撃工法は、杭径が大きくなると周面地盤の貫入抵抗は杭径分の増加であるが、杭体の先端部が閉塞されているため、先端地盤の貫入抵抗は杭径の2乗に比例して増加する。このため、外径が600mm以上の先端閉塞杭では、地盤の所定の深さまでの貫入、特に硬い中間層の打ち抜きや先端支持層への根入れは、実際上不可能である。
【0012】
また、従来技術3のプレボーリング工法では、杭径が大きくなると先行掘削による土量が増え、かつ、杭の設置に先立って孔内に満たされていたセメントミルク等が、先端閉塞の杭体の設置に伴い杭体の体積分だけ排出されることになり、排出土やセメントミルクの処理に多大なコストがかかることになる。
【0013】
先端部に翼を取り付けた鋼管杭の埋設工法において、従来技術4に係る工法は、鋼管杭の外径が300mm未満の範囲で広く実用化されている。この埋設工法は鋼管の先端部が底板で閉塞されているために、比較的大きな先端支持力を確保することができるが、螺旋翼が地盤から受ける反力が大きいために、回転貫入に要するトルクが非常に大きくなるばかりでなく、貫入能率が悪くなる。発明者らの行った現場試験によると、支持層貫入に必要なトルクは、軟弱地盤貫入時のトルクの3〜5倍に増加する。
【0014】
このため、杭体を回転するために大きな能力のモータと、これを搭載するためのベースマシンが必要になると共に、杭体のねじりモーメントが大きくなって設計上必要な厚さよりも大きな厚さの鋼管が施工上必要となる場合が多い。また、ねじりに弱いコンクリート杭は適用することができない。さらに、鋼管の外径が600mmを超えると、施工に必要なトルクが大きくなりすぎて特殊な大型機械が必要になり、実用的でない。
【0015】
従来技術5の鋼管杭の埋設工法は、杭体の先端部からセメントミルクを噴出して螺旋翼で土砂と攪拌混合するため、螺旋翼による支持層地盤の乱れは多少回復する。しかし、攪拌混合のための回転が螺旋翼だけの一方向であるため、土砂とセメントミルクとの十分な攪拌は期待できない。特に、地盤が粘性土である場合、攪拌混合は不均一になりやすい。また、セメントミルクを噴出しない場合に比べて回転トルクは若干低減できるものの、閉塞された杭先端部近傍の土砂が移動しにくいため、回転トルクの大幅な低減は期待できない。さらに、土砂の攪拌混合の範囲が螺旋翼部分のみであり、螺旋翼の面積分の地盤支持力しか期待できない。
【0016】
従来技術6の施工方法では、先端部開放のため、杭が設置される位置にあるすべての土砂を一旦掘削する必要があり、掘削土量が多くなるばかりでなく、現地盤を緩めて杭の支持力特性を悪化させるおそれがある。
【0017】
本発明は、上記の課題を解決するためになされたもので、先端開口部が閉塞された大径の鋼管杭を地盤中に設置することができ、その上地盤本来の支持能力を発揮することのできる鋼管杭及びその施工法を提供することを目的としたものである。
【0018】
【課題を解決するための手段】
本発明に係る鋼管杭は、蓋体によって先端部が閉塞された鋼管杭であって、前記蓋体の上面中心部にロッドが固定され、前記鋼管杭の施工中においても外部からの操作によって前記ロッドを回転させることにより、前記蓋体を着脱可能、かつ外部へ引き上げ可能に構成したものである。
また、上記の鋼管杭を、翼付きねじ込み式鋼管杭で構成したものである。
【0019】
また、本発明に係る鋼管杭の施工方法は、上記の鋼管杭を地盤に貫入する工程と、前記鋼管杭の先端部が支持層又はその近傍に達したときは該鋼管杭を地盤中に残置した状態で蓋体を鋼管杭から抜き出す工程と、前記地盤中に残置された鋼管杭内にドラムバケットを挿入して支持層を掘削する工程、及び前記ドラムバケットを抜き出す工程と、前記掘削部及び鋼管杭内にコンクリートを打設する工程とからなるものである。
【0020】
さらに、上記の鋼管杭の施工方法において、鋼管杭の先端部が支持層に達する前に硬い地盤又はその近傍に達したときは、該鋼管杭を地盤中に残置した状態で前記蓋体を鋼管杭から抜き出す工程と、前記地盤中に残置された鋼管杭内にドラムバケットを挿入して前記硬い地盤を掘削する工程、及び硬い地盤の掘削が終ったときは前記ドラムバケットを抜き出す工程と、前記鋼管杭の先端開口部を蓋体により再び閉塞する工程とを備えたものである。
【0021】
【発明の実施の形態】
[実施の形態1]
図1は本発明の実施の形態1に係る鋼管杭の要部の断面説明図である。
図において、2は先端部が開口された鋼管杭1を構成する鋼管で、先端部近傍の内周面にはめねじ3が設けられている。5は鋼管2の先端開口部を開閉する蓋体で、外周には鋼管2のめねじ3に螺合するおねじ6が設けられている。7は蓋体5の上面中心部に固定されたロッドである。
【0022】
次に、図2、図3により上記のように構成した鋼管杭1の施工方法の一例について説明する。なお、本例は、軟弱層Sと支持層Bからなる地盤に打撃工法により鋼管杭1を設置するようにしたものである。また、鋼管杭1は、図1に示すように、先端部に設けためねじ3に蓋体5のおねじ6を螺入して、先端開口部が閉塞されているものとする。
【0023】
(1)先ず、図2(a)に示すように、鋼管杭1を打撃工法により地盤に貫入し、図2(b)に示すように、その先端部を支持層B内に位置させる。
(2)ついで、ベースマシン等(図示せず)に搭載した駆動モータにロッド7を取付け、図2(c)に示すように、ロッド7を回転して蓋体5のおねじを鋼管2のめねじ3から外し、外部に引き上げる。
(3)ついで、図2(d)に示すように、鋼管杭1内にドラムバケット15を挿入して回転し、支持層を掘削する。
【0024】
このドラムバケット15は、その一例を図4に示すように、ドラム状の本体16と、その底部に外部からの操作により開閉可能に設けられ、掘削した土砂を本体16内に取り込む下部掘削刃17と、外壁に設けられ外部からの操作により左右方向に展開する複数の側部掘削刃18とからなっている。19は一端が本体16の天面に取付けられ、他端が例えばベースマシンに搭載された駆動モータに取付けられて回転するロッドである。
【0025】
(4)そして、図2(e)に示すように、ドラムバケット15の側部掘削刃18を徐々に展開してロッド19を回転し、下部掘削刃17と共に支持層Bを掘削して拡底部25を造成し、同時に底部から本体16内に土砂を取り込む。
拡底部25の掘削が終ったときは、側部掘削刃18を元の位置に戻し、ドラムバケット15を鋼管杭1から引き抜く。
(5)引き上げられたドラムバケット15は、図2(f)に示すように、鋼管杭1の近傍あるいは所定の場所において、下部掘削刃17を開放し、本体16内に取り込んだ土砂31を地上に排出する。また、必要に応じて、このとき又は後述のコンクリート30の打設後に鋼管杭1をその先端部が拡底部25の中央部近傍に達するまで貫入する。
【0026】
(6)ついで、図3(a)に示すように、鋼管杭1内にトレミー管14を貫入し、拡底部25及び鋼管杭1内の全長あるいは所定の高さまでコンクリート30を打設して鋼管コンクリート杭を造成する。
(7)そして、図3(b)に示すように、トレミー管14を引きあげ、必要に応じて、図3(c)に示すように、鋼管杭1内に土砂31を投入する。
【0027】
上記の説明では、拡底部25の掘削及び土砂の搬出にドラムバケット15を用いた場合を示したが、ドラムバケット15に代えてグラブバケットを用いてもよい。このグラブバケット20は、例えば図5に示すように、外部からの操作により開閉される掘削刃21を有し、この掘削刃21により支持層を掘削すると共に、掘削刃21を中心方向に回動させて土砂を抱え込み、外部に搬出するようにしたものである。なお、支持層Bの掘削、拡底部25の形成及び土砂の搬出に使用する装置は、上述のドラムバケット15やグラブバケット20に限定するものではなく、他の装置を用いてもよい(以下、これらを総称してドラムバケットという)。
【0028】
上記のような施工方法によれば、少ない排土で大径の鋼管杭を早い速度で設置することができ、その上大きな先端支持力を得ることができる。なお、上記の説明では、ドラムバケットにより拡底部25を形成し、拡底部25及び鋼管杭1内にコンクリート30を打設した場合を示したが、拡底部25を省略し、鋼管杭1内にコンクリート30を打設するようにしてもよい。
【0029】
上記の説明では、軟弱層Sと支持層Bからなる地盤に本実施の形態に係る鋼管杭1を設置する場合について説明したが、施工する地盤には、図6に示すように、軟弱層Sと支持層Bとの間に軟弱層Sより硬い地盤の中間層Iが存在する場合がある。
このような場合は、図6(a)に示すように、蓋体5により先端開口部を閉塞した状態で鋼管杭1を打撃工法により軟弱層Sに貫入する。そして、図6(b)に示すように鋼管杭1の先端部が中間層I又はその近傍に達したときは、ロッド7を回転して蓋体5を鋼管杭1から外して上昇させ、引き上げる。
【0030】
ついで、図6(c)に示すように、鋼管杭1内にドラムバケット15を挿入し、下部掘削刃17により中間層Iを掘削し、鋼管杭1を貫入する。中間層Iを通過したときはドラムバケット15を引き上げて本体16内に取り込んだ土砂を外部に排出する。そして、図6(d)に示すように、蓋体5を鋼管杭1内に挿入して先端部に装着し、再び先端開口部を閉塞した状態で次の軟弱層Sに貫入する。以下、図2、図3で説明した(b)以降の工程により施工する。なお、中間層Iに続いて支持層Bまで硬い地盤が存在する場合は、ドラムバケット15を引き上げることなく、引続いてドラムバケット15により地盤を掘削すればよい。
【0031】
図7、図8は本実施の形態に係る鋼管杭の他の例を示すもので、図7の鋼管杭1は、図1の鋼管杭1において、蓋体5の下面を逆円錐形に形成したものであり、地盤への貫入を容易にしたものである。
また、図8の鋼管杭1は、ドラム状の蓋体5の側壁に1個又は複数個の逆L字状のキー溝8を設けると共に、鋼管2の先端部近傍の内周面にキー溝8に対応してキー9を設けたものである。そして、鋼管杭1の先端開口部を閉塞するときは、蓋体5を下降させてキー溝8をキー9に嵌合したのち回動し、キー9をキー溝8の水平部に位置させる。これにより、蓋体5はその位置に保持され、上下方向に移動することはない。
また、蓋体5を鋼管2から外すときは、蓋体5を反対方向に回動させて引き上げれば、容易に取り外すことができる。
【0032】
本実施の形態によれば、鋼管杭1の先端部に施工中でも着脱可能な蓋体5を設け、この蓋体5により先端開口部を閉塞した状態で鋼管杭1を地盤に貫入し、杭先端部が硬い地盤である中間層Iや支持層B又はその近傍に到達したきは、鋼管杭1を地盤中に残置した状態で蓋体5を取外して引き上げ、鋼管杭1内に地盤の掘削手段であるドラムバケット15を挿入して掘削することにより、硬い地盤でも大径の鋼管杭1を容易に貫入することができる。また、掘削した土砂をドラムバケット15内に取り込んで外部に排出するようにしたので、鋼管杭1内に土砂が侵入することがなく、そのままの状態でコンクリート30を打設することにより、容易に鋼管コンクリート杭を造成することができる。
さらに、蓋体5を引き上げて鋼管杭1内にドラムバケット15を挿入し、支持層Bに拡底部25を形成してコンクリート30を打設するようにしたので、先端支持力の大きい鋼管コンクリート杭を造成することができる。なお、本実施の形態では打撃工法により鋼管杭1を貫入する場合を示したが、圧入工法によって鋼管杭1を貫入してもよい。
【0033】
[実施の形態2]
図9は本発明の実施の形態2に係る鋼管杭の要部の断面説明図である。なお、図1で説明した鋼管杭と同じ部分にはこれと同じ符号を付し、説明を省略する。
本実施の形態は、図1に示す実施の形態1の鋼管杭1において、鋼管2の下部外周に翼11を設けて、翼付きねじ込み式鋼管杭10(以下、翼付き鋼管杭という)を構成したものである。
【0034】
図10、図11に翼付き鋼管杭10に設けた翼11の一例を示す。図10の例は、鋼管2の先端部近傍の外周に、扇形状の平板からなる鋼製翼11a,11bを溶接により同じ高さ位置に交差して接合し、翼11を構成したものである。
また、図11の例は、鋼管2の先端部近傍の外周に、ドーナツ状の鋼板の一か所を切断して曲げ加工して形成した螺旋翼12を溶接により接合し、翼11を構成したものである。
【0035】
図10、図11により翼11の一例を説明したが、これに限定するものではなく、上述の平板状、螺旋状の外に多角形のものであってもよく、あるいはこれらを複数に分割したものなど、適宜選択することができる。また、その取付位置も適宜設定することができ、必要に応じて軸方向に複数段設けてもよい。なお、翼11は、その外径が鋼管2の外径の1.5〜3.0倍程度のものを用いることが望ましい。
【0036】
次に、図12、図13により本実施の形態に係る翼付き鋼管杭10の施工方法の一例について説明する。
(1)先ず、蓋体5により先端開口部が閉塞された翼付き鋼管杭10の杭頭部を、地上に設置されたベースマシン等(図示せず)に搭載された駆動モータに取付け、翼付き鋼管杭10を回転して、図12(a)に示すように、翼11の木ねじとしての作用により推進させて地盤中に貫入し、図12(b)に示すようにその先端部を支持層B内又はその近傍に位置させる。なお、杭頭部に代えて翼付き鋼管杭10の胴部に駆動モータを取り付けるようにしてもよい。
【0037】
(2)ついで、翼付き鋼管杭10から駆動モータを取外して蓋体5のロッド7を駆動モータに取付け、ロッド7を回転して蓋体5を鋼管2から取り外し、図12(c)に示すように外部に引き上げる。
(3)ついで、図12(d)に示すように、ロッド19が駆動モータに取り付けられたドラムバケット15を翼付き鋼管杭10内に挿入して回転し、支持層Bを掘削する。
(4)そして、図12(e)に示すように、支持層Bに拡底部25を形成し、ドラムバケット15を翼付き鋼管杭10から引き抜き、図12(f)に示すように、ドラムバケット15に取り込んだ土砂を排出する。
【0038】
(5)ついで、図13(a)に示すように、翼付き鋼管杭10内にトレミー管14を挿入し、拡底部25内及び翼付き鋼管杭10の全長あるいは所定の高さまでコンクリート30を打設する。
(6)次に、図13(b)に示すように、トレミー管14を引き上げて鋼管コンクリート杭を造成する。そして、翼付き鋼管杭10を再び駆動モータに取付けて回転し、その先端部が拡底部25の中央部近傍に達するまで貫入する。
なお、必要に応じて、図13(c)に示すように、鋼管コンクリート杭10内に土砂31を投入する。
【0039】
上記のような施工方法によれば、低振動、低騒音、かつ、少ない排土で大径の翼付き鋼管杭10を地盤中に設置することができ、その上内部に土砂が侵入することがないので、土砂を排出することなくコンクリートを打設して鋼管コンクリート杭を造成することができる。また、翼11の及び拡底部25に打設されたコンクリート30により、少ないコンクリートの使用量で大きな先端支持力を得ることができる。
なお、本実施の形態においても、地盤中に中間層Iが存在する場合は、実施の形態1の図6の施工方法で説明したように、翼付き鋼管杭10の先端部が中間層I又はその近傍に達したときは、蓋体5を引き上げてドラムバケット15を挿入し、中間層Iを掘削したのち引き上げて再び蓋体5を挿入して装着すればよい。
【0040】
図14、図15は本実施の形態に係るねじ込み式鋼管杭の他の例を示すもので、図14の例は、図9の蓋体5の下面を逆円錐状に形成したものである。
また、図15の例は、ドラム状の蓋体5の側壁に1個又は複数個の逆L字状のキー溝8を設けると共に、鋼管2の先端部近傍の内周面にキー溝8に対応してキー9を設けたもので、その作用は、図8で説明した鋼管杭の場合と同様である。
【0041】
以上本発明の実施の形態について説明したが、本発明に係る鋼管杭1又は翼付き鋼管杭10の先端開口部を開閉する蓋体5は、鋼管杭1又は翼付き鋼管杭10の貫入時において内部に土砂が侵入するのを防止するためのものであるから、先端開口部を完全に閉塞しなくてもよく、一部が開放されていてもよい。
また、鋼管杭1又は翼付き鋼管杭10に対する蓋体5の着脱機構も前述の例に限定するものではなく、鋼管杭1又は翼付き鋼管杭10の施工中において、外部からの操作により着脱できるものであれば、他の手段を用いてもよい。
【0042】
また、蓋体5の下面に掘削刃を設けてもよく、あるいは、蓋体5に、地盤に水やセメントミルク等を注入するための注入孔を設けてもよい。さらに、鋼管杭1又は翼付き鋼管杭10の先端部近傍の内外周面又はいずれか一方にリブその他の凸部を設け、コンクリートの付着力を高めるようにしてもよい。
【0043】
【実施例】
次に、実施の形態2の翼付き鋼管杭による図12、図13の施工方法についての実施例について説明する。
翼付き鋼管杭10は、先端内周面にめねじ3を有し、外径1000mm、板厚12mm、長さ31mの鋼管2の先端部外周に、外径1800mm、長内径1008mm、短内径1000mm、板厚40mmのドーナツ状の鋼板を2分割した平板からなる鋼製翼を、同じ高さ位置に交差して溶接により接合し、翼11を構成した。
【0044】
また、外周におねじ6を有する厚さ(高さ)40mmのドラム状の鋼材により蓋体5を構成し、上面中心部にロッド7を取付けた。なお、施工する地盤は、地表から23mまではN値3の軟弱層、23〜32mまではN値7の軟弱層、それ以深はN値50の支持層であった。
【0045】
先ず、上部開口部から鋼管2内に蓋体5を挿入し、ロッド7を回転してそのおねじ6を鋼管2のめねじ3に螺合し、先端開口部を閉塞した。
ついで、地上に設置したベースマシンの駆動モータに翼付き鋼管杭10の杭頭部を取付け、回転させながら圧下して翼11の木ねじ作用により軟弱層中を推進させ、貫入した。
そして、杭先端部が支持層に達したときは、駆動モータを翼付き鋼管杭10から取外して蓋体5のロッド7に取付け、ロッド7を回転して鋼管2のめねじ3との螺合を外し、翼付き鋼管杭10を地盤中に残置した状態で蓋体5を引き上げた。
【0046】
次に、ドラムバケット15のロッド19を駆動モータに取付けて翼付き鋼管杭10内に挿入し、ドラムバケット15を回転させて下部掘削刃17により支持層を掘削すると共に、側部掘削刃18を徐々に展開して地表からの深さ35m、最大外径2000mmの拡底部25を掘削した。拡底部25の掘削が終ったときは側部掘削刃18を元の状態に戻し、ドラムバケット15を引き上げてドラムバケット15に取り込んだ土砂を排出した。
【0047】
そして、駆動モータにトレミー管14を取付けて拡底部25及び翼付き鋼管杭10内にコンクリート30を打設し、トレミー管14を引き上げた。コンクリート30の打設高さは、拡底部25の底部から4mであった。
ついで、翼付き鋼管杭10を駆動モータに取付けて回転させ、その先端部が拡底部25の中央部の近傍に達するまで貫入した。これにより、翼11は拡底部25内に位置する。
【0048】
以上の手順により、少ない排土で低振動かつ低騒音で大径の翼付き鋼管杭を短時間で地盤中に設置することができ、また、下部を拡底してコンクリートを打設することにより、翼の存在と相俟って大きな先端支持力を得ることができた。
【0049】
【発明の効果】
本発明に係る鋼管杭は、蓋体によって先端部が閉塞された鋼管杭であって、蓋体の上面中心部にロッドが固定され、前記鋼管杭の施工中においても外部からの操作によって前記ロッドを回転させることにより、前記蓋体を着脱可能、かつ外部へ引き上げ可能に構成し、また、上記の鋼管杭を翼付きねじ込み式鋼管杭で構成したので、施工中においても蓋体を抜き出して別途の掘削手段を内部に挿入し、鋼管杭の先端部近傍の地盤を掘削することができる。
【0050】
さらに、本発明に係る鋼管杭の施工方法は、上記の鋼管杭を地盤中に貫入する工程と、鋼管杭の先端部が支持層又はその近傍に達したときは鋼管杭を地盤中に残置した状態で蓋体を鋼管杭から抜き出す工程と、地盤中に残置された鋼管杭内にドラムバケットを挿入して支持層を掘削する工程、及びドラムバケットを抜き出す工程と、掘削部及び鋼管杭内にコンクリートを打設する工程とによって構成したので、大径の鋼管杭を地盤中に設置することができ、その上少ない排土、少ないコンクリートにより大きな先端支持力を得ることができる。
【0051】
また、上記の各鋼管杭の施工方法において、鋼管杭の先端部が支持層に達する前に硬い地盤又はその近傍に達したときは、鋼管杭を地盤中に残置した状態で蓋体を鋼管杭から抜き出す工程と、地盤中に残置された鋼管杭内にドラムバケットを挿入して硬い地盤を掘削する工程、及び硬い地盤の掘削が終ったときはドラムバケットを抜き出す工程と、鋼管杭の先端開口部を蓋体により再び閉塞する工程とを備えたので、支持層に達する前に中間層の如き硬い地盤が存在する場合でも、大径の鋼管杭を容易に貫入することができる。
【図面の簡単な説明】
【図1】本発明の実施の形態1に係る鋼管杭の断面説明図である。
【図2】図1の鋼管杭の他の施工方法の説明図である。
【図3】図1の鋼管杭の他の施工方法の説明図である。
【図4】図2、図3の施工方法に使用するドラムバケットの一例の説明図である。
【図5】図2、図3の施工方法に使用するグラブバケットの一例の説明図である。
【図6】図1の鋼管杭のさらに他の施工方法の説明図である。
【図7】実施の形態1の鋼管杭の他の例の断面説明図である。
【図8】実施の形態1の鋼管杭のさらに他の例の説明図である。
【図9】本発明の実施の形態2に係る翼付き鋼管杭の断面説明図である。
【図10】実施の形態2の翼の例を示す説明図である。
【図11】実施の形態2の翼の他の例を示す説明図である。
【図12】図9の翼付き鋼管杭の施工方法の他の例の説明図である。
【図13】図9の翼付き鋼管杭の施工方法の他の例の説明図である。
【図14】実施の形態2の翼付き鋼管杭の他の例の説明図である。
【図15】実施の形態2の翼付き鋼管杭のさらに他の例の説明図である。
【符号の説明】
1 鋼管杭
2 鋼管
3 めねじ
5 蓋体
6 おねじ
8 キー溝
9 キー
10 翼付き鋼管杭
11 翼
14 トレミー管
15 ドラムバケット
20 グラブバケット
25 拡底部
30 コンクリート
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a steel pipe pile whose end opening is closed and a construction method thereof, and more particularly, to a steel pipe pile and a construction method thereof effective when a large-diameter steel pipe concrete pile is constructed.
[0002]
[Prior art]
Steel pipe piles or concrete piles (hereinafter referred to as tip closed piles) closed by attaching a lid-like member to the tip opening to prevent intrusion of earth and sand when the steel pipe piles penetrate into the ground Several proposals have been made. In addition, the construction method of this tip blockage pile includes a hammering method in which the head of the pile body is struck and penetrates into the ground, a hole is excavated in advance in the ground where the pile body is installed, and a pile body is installed in the hole There is a pre-boring method or a method of rotating and embedding a pile body by the action of a wood screw attached to the vicinity of the tip of the pile body. Further, there has been proposed an invention in which a steel pipe pile having an open front end portion is dug and concrete is placed only at the front end portion.
[0003]
Tip blocking piles include those that attach excavation tip rods, and those that improve the bearing capacity characteristics of the tip ground due to the ground. Examples of these are shown below.
JP-A-55-119822 comprises a cylindrical portion inserted into the opening of the tip of a concrete pile, and a collar portion that is connected to the lower end portion of the cylindrical portion and is locked to the lower end surface of the concrete pile. A steel pipe member that reinforces the bearing capacity of a concrete pile is described.
Japanese Patent Application Laid-Open No. 55-155823 discloses a pile in which an enlarged shoe having a diameter larger than that of a bladed steel pipe and a triangular rib is attached to the tip of the bladed steel pipe.
[0004]
Japanese Laid-Open Patent Publication No. 60-55119 describes a ready-made pile in which an end plate having a diameter larger than that of the pile and having an earth rising port, a drilling blade and the like is attached to the tip opening of the pile. 62-29614 describes a ready-made pile with an anchor member secured to the lower end.
Furthermore, Japanese Patent Application Laid-Open No. 9-242068 describes cast-in-place piles having a bottom plate that has a drilling blade and is restrained from moving and turning upward at the tip opening of a steel pipe (these 5). The inventions are collectively referred to as Conventional Technology 1).
[0005]
Next, the method of hitting the closed end pile is applied to the head of the pile body with a hammer or the like, and with the hitting force, the earth and sand that constitutes the pile tip and the pile surface ground are moved in the depth direction and to the side. While eliminating, it is compacted and the pile body penetrates into the ground and is installed (Prior Art 2).
[0006]
In addition, the pre-boring method of the closed-end pile is made by drilling a hole in the ground with a drill or the like prior to the installation of the pile body, and normally filling the void with cement milk or the like to suppress the collapse of the geology, The body is built (Prior Art 3).
[0007]
Several methods have been put to practical use for small-diameter steel pipe piles by rotating and embedding pile bodies by acting as wing wood screws attached in the vicinity of the tip of the closed end pile.
The method of burying steel pipe piles described in Japanese Examined Patent Publication No. 2-62648 is that a bottom plate is fixed to the lower surface of a steel pipe pile main body, an excavating blade is provided on the bottom plate, and this is provided on the outer peripheral surface of the lower end of the pile main body. A steel pipe pile projecting approximately one turn of a spiral wing with a large blade width and having an outer diameter almost twice as large as the outer diameter of the pile body is pressed into the ground while rotating so as to be screwed into soft ground. Then, the soil at the tip of the pile body is softened by excavating the bottom of the pile body, and the spiral blades are bitten into the unexcavated soil on the side of the pile, and the softened soil is excavated and softened while rotating the pile body as the reaction force of the soil. The pile body is extruded and compressed on the side of the pile, and the pile body is screwed and installed in the ground without any soil (prior art 4).
[0008]
In addition, the steel pipe pile embedding method described in Japanese Examined Patent Publication No. 4-58850 closes the lower end portion of the steel pipe pile with a bottom plate having a drilling blade and a grout spout, and has an outer diameter almost twice the outer diameter of the steel pipe. A steel pipe pile in which a spiral wing with a diameter is fixed to the outer peripheral surface of the lower end of the steel pipe pile in a single turn is used to reinforce the peripheral ground by ejecting cement milk from the grout outlet during and after the rotary burial. Yes (prior art 5).
[0009]
Furthermore, as a construction method in which a steel pipe pile having an open end portion is dug and concrete is placed only at the end portion, there is one described in Japanese Patent Publication No. 5-517305. In this construction method, the ground is excavated, a steel pipe is built in the hole, the support layer is excavated at the bottom, concrete is placed at the tip, and the excavated soil is backfilled in the steel pipe ( Prior art 6).
[0010]
[Problems to be solved by the invention]
Each front-end blockage pile of prior art 1 cannot move or remove the lid-like member attached to the front-end | tip part in the middle of construction in the pile body direction. For this reason, excavation of a pile body front-end | tip part cannot be performed using another means during construction.
[0011]
In the hitting method of Prior Art 2, when the pile diameter is increased, the penetration resistance of the peripheral ground is increased by the pile diameter, but since the tip of the pile body is blocked, the penetration resistance of the tip ground is the pile diameter. It increases in proportion to the square. For this reason, with a closed end pile with an outer diameter of 600 mm or more, it is practically impossible to penetrate the ground to a predetermined depth, in particular, to punch out a hard intermediate layer or to insert it into the tip support layer.
[0012]
Moreover, in the pre-boring method of the prior art 3, when the pile diameter is increased, the amount of soil by the pre-excavation increases, and the cement milk filled in the hole prior to the pile installation is not With the installation, only the volume of the pile body will be discharged, and processing of the discharged soil and cement milk will be very expensive.
[0013]
In the method of embedding a steel pipe pile with a wing attached to the tip, the method according to the prior art 4 has been widely put into practical use in the range where the outer diameter of the steel pipe pile is less than 300 mm. This embedding method can secure a relatively large tip support force because the tip of the steel pipe is closed by the bottom plate, but the torque required for rotational penetration is high because the reaction force received by the spiral blade from the ground is large. Not only becomes very large, but also the penetration efficiency deteriorates. According to the field test conducted by the inventors, the torque required for the penetration of the support layer increases to 3 to 5 times the torque when the soft ground penetrates.
[0014]
For this reason, a motor with a large capacity for rotating the pile body and a base machine for mounting the same are required, and the torsional moment of the pile body is increased, resulting in a thickness larger than the thickness required for the design. Steel pipes are often required for construction. Also, concrete piles that are vulnerable to torsion cannot be applied. Furthermore, if the outer diameter of the steel pipe exceeds 600 mm, the torque required for the construction becomes too large and a special large machine is required, which is not practical.
[0015]
In the steel pipe pile embedding method of the prior art 5, cement milk is jetted from the tip of the pile body and mixed with the earth and sand by the spiral blade, so that the disturbance of the support layer ground due to the spiral blade is somewhat recovered. However, since the rotation for stirring and mixing is only one direction of the spiral blade, sufficient stirring of earth and sand and cement milk cannot be expected. In particular, when the ground is a viscous soil, the stirring and mixing tends to be uneven. In addition, although the rotational torque can be slightly reduced as compared with the case where cement milk is not ejected, the earth and sand in the vicinity of the closed pile tip portion are difficult to move, and thus a significant reduction in rotational torque cannot be expected. Furthermore, the range of stirring and mixing of the earth and sand is only the spiral blade portion, and only the ground supporting force corresponding to the area of the spiral blade can be expected.
[0016]
In the construction method of Prior Art 6, it is necessary to excavate all the earth and sand at the position where the pile is installed in order to open the tip. Not only the amount of excavated soil increases, There is a risk of deteriorating the bearing capacity characteristics.
[0017]
The present invention was made in order to solve the above-described problems, and a large-diameter steel pipe pile with a closed end opening portion can be installed in the ground, and the original supporting ability of the upper ground is exhibited. Steel pipe pile and its construction Direction The purpose is to provide a law.
[0018]
[Means for Solving the Problems]
The steel pipe pile according to the present invention is a steel pipe pile whose tip is closed by a lid, A rod is fixed to the center of the upper surface of the lid, Even during the construction of steel pipe piles By rotating the rod by an external operation, Detachable lid And can be pulled out It is configured.
Moreover, said steel pipe pile is comprised with the winged screwed-type steel pipe pile.
[0019]
Moreover, the construction method of the steel pipe pile according to the present invention includes a step of penetrating the steel pipe pile into the ground, and the steel pipe pile is left in the ground when the tip of the steel pipe pile reaches the support layer or the vicinity thereof. A step of extracting the lid body from the steel pipe pile in a state of being made, a step of excavating a support layer by inserting a drum bucket into the steel pipe pile left in the ground, a step of extracting the drum bucket, the excavation part and And a process of placing concrete in the steel pipe pile.
[0020]
Furthermore, in the construction method of the steel pipe pile described above, when the tip of the steel pipe pile reaches the hard ground or its vicinity before reaching the support layer, the lid is placed in the state where the steel pipe pile is left in the ground. A step of extracting from the pile, a step of excavating the hard ground by inserting a drum bucket into a steel pipe pile left in the ground, and a step of extracting the drum bucket when the excavation of the hard ground is finished, And a step of closing the tip opening of the steel pipe pile again with a lid.
[0021]
DETAILED DESCRIPTION OF THE INVENTION
[Embodiment 1]
FIG. 1 is a cross-sectional explanatory view of a main part of a steel pipe pile according to Embodiment 1 of the present invention.
In the figure, reference numeral 2 denotes a steel pipe constituting a steel pipe pile 1 having an open end, and an internal thread 3 is provided on the inner peripheral surface near the end. Reference numeral 5 denotes a lid that opens and closes the front end opening of the steel pipe 2, and a male screw 6 that is screwed into the female screw 3 of the steel pipe 2 is provided on the outer periphery. Reference numeral 7 denotes a rod fixed to the center of the upper surface of the lid 5.
[0022]
Next, an example of a construction method of the steel pipe pile 1 configured as described above will be described with reference to FIGS. In this example, the steel pipe pile 1 is installed on the ground composed of the soft layer S and the support layer B by a hammering method. In addition, as shown in FIG. 1, the steel pipe pile 1 is provided at the tip, and the screw 6 of the lid 5 is screwed into the screw 3 so that the tip opening is closed.
[0023]
(1) First, as shown in FIG. 2 (a), the steel pipe pile 1 is penetrated into the ground by a striking method, and its tip is positioned in the support layer B as shown in FIG. 2 (b).
(2) Next, the rod 7 is attached to a drive motor mounted on a base machine or the like (not shown), and the rod 7 is rotated to connect the male screw of the lid 5 to the steel pipe 2 as shown in FIG. Remove from the female screw 3 and pull it up.
(3) Next, as shown in FIG. 2 (d), the drum bucket 15 is inserted into the steel pipe pile 1 and rotated to excavate the support layer.
[0024]
As shown in FIG. 4, the drum bucket 15 is provided with a drum-shaped main body 16 and a lower excavating blade 17 that is provided at the bottom of the drum bucket 15 so that it can be opened and closed by an external operation. And a plurality of side excavation blades 18 that are provided on the outer wall and expand in the left-right direction by an external operation. Reference numeral 19 denotes a rod that rotates with one end attached to the top surface of the main body 16 and the other end attached to, for example, a drive motor mounted on a base machine.
[0025]
(4) Then, as shown in FIG. 2 (e), the side excavation blade 18 of the drum bucket 15 is gradually expanded to rotate the rod 19, and the support layer B is excavated together with the lower excavation blade 17 to expand the bottom portion. 25 is created, and at the same time, earth and sand are taken into the main body 16 from the bottom.
When the excavation of the expanded bottom portion 25 is finished, the side excavation blade 18 is returned to the original position, and the drum bucket 15 is pulled out from the steel pipe pile 1.
(5) As shown in FIG. 2 (f), the raised drum bucket 15 opens the lower excavating blade 17 in the vicinity of the steel pipe pile 1 or at a predetermined location, and the earth and sand 31 taken into the main body 16 is grounded. To discharge. Further, if necessary, the steel pipe pile 1 is penetrated until the tip of the steel pile 1 reaches the vicinity of the center of the bottom expanded portion 25 at this time or after placement of the concrete 30 described later.
[0026]
(6) Next, as shown in FIG. 3 (a), the tremely pipe 14 is inserted into the steel pipe pile 1, and the concrete 30 is cast to the full length or a predetermined height within the expanded base 25 and the steel pipe pile 1. Create concrete piles.
(7) And as shown in FIG.3 (b), the tremy pipe 14 is pulled up, and the earth and sand 31 is thrown in in the steel pipe pile 1 as shown in FIG.3 (c) as needed.
[0027]
In the above description, the case where the drum bucket 15 is used for excavation of the expanded bottom portion 25 and the removal of earth and sand has been shown, but a grab bucket may be used instead of the drum bucket 15. For example, as shown in FIG. 5, the grab bucket 20 has a digging blade 21 that is opened and closed by an external operation. The digging blade 21 digs a support layer and rotates the digging blade 21 in the center direction. It is made to carry the earth and sand and carry it out to the outside. In addition, the apparatus used for excavation of the support layer B, formation of the expanded bottom portion 25, and unloading of the earth and sand is not limited to the drum bucket 15 and the grab bucket 20 described above, and other apparatuses may be used (hereinafter, These are collectively called drum buckets).
[0028]
According to the construction method as described above, a large-diameter steel pipe pile can be installed at a high speed with a small amount of soil removal, and a large tip support force can be obtained. In the above description, the bottom portion 25 is formed by the drum bucket and the concrete 30 is placed in the bottom portion 25 and the steel pipe pile 1. However, the bottom portion 25 is omitted and the steel pipe pile 1 is provided. Concrete 30 may be placed.
[0029]
In the above description, the case where the steel pipe pile 1 according to the present embodiment is installed on the ground composed of the soft layer S and the support layer B has been described. However, as shown in FIG. In some cases, an intermediate layer I of ground that is harder than the soft layer S exists between the support layer B and the support layer B.
In such a case, as shown in FIG. 6 (a), the steel pipe pile 1 is penetrated into the soft layer S by the striking method with the end opening closed by the lid 5. And when the front-end | tip part of the steel pipe pile 1 reaches the intermediate | middle layer I or its vicinity as shown in FIG.6 (b), the rod 7 is rotated, the cover body 5 is removed from the steel pipe pile 1, and it raises and pulls up. .
[0030]
Next, as shown in FIG. 6 (c), the drum bucket 15 is inserted into the steel pipe pile 1, the intermediate layer I is excavated by the lower excavating blade 17, and the steel pipe pile 1 is penetrated. When passing through the intermediate layer I, the drum bucket 15 is pulled up and the earth and sand taken into the main body 16 are discharged to the outside. And as shown in FIG.6 (d), the cover body 5 is inserted in the steel pipe pile 1, and it mounts | wears with a front-end | tip part, and penetrates into the next soft layer S in the state which closed the front-end | tip opening part again. Hereinafter, the construction is performed by the processes after (b) described in FIGS. In addition, when the hard ground exists up to the support layer B following the intermediate layer I, the ground may be excavated by the drum bucket 15 without lifting the drum bucket 15.
[0031]
7 and 8 show another example of the steel pipe pile according to the present embodiment. In the steel pipe pile 1 of FIG. 7, the lower surface of the lid 5 is formed in an inverted conical shape in the steel pipe pile 1 of FIG. It is easy to penetrate into the ground.
Further, the steel pipe pile 1 of FIG. 8 is provided with one or a plurality of inverted L-shaped key grooves 8 on the side wall of the drum-shaped lid body 5 and a key groove on the inner peripheral surface in the vicinity of the tip of the steel pipe 2. A key 9 is provided corresponding to 8. And when closing the front-end | tip opening part of the steel pipe pile 1, after turning the cover body 5 and fitting the key groove 8 to the key 9, it rotates, and the key 9 is located in the horizontal part of the key groove 8. FIG. Thereby, the lid 5 is held in that position and does not move in the vertical direction.
Moreover, when removing the cover body 5 from the steel pipe 2, if the cover body 5 is rotated in the opposite direction and pulled up, it can be easily removed.
[0032]
According to the present embodiment, a lid 5 that is detachable even during construction is provided at the tip of the steel pipe pile 1, and the steel pipe pile 1 is penetrated into the ground with the tip opening closed, and the pile tip When reaching the intermediate layer I or the support layer B, which is a hard ground, or the vicinity thereof, the steel pipe pile 1 is left in the ground, the lid 5 is removed and pulled up, and the ground excavation means is placed in the steel pipe pile 1 By inserting the drum bucket 15 and excavating the steel pipe pile 1 having a large diameter can be easily penetrated even on hard ground. In addition, since the excavated earth and sand are taken into the drum bucket 15 and discharged to the outside, the earth and sand do not enter the steel pipe pile 1 and can be easily put by placing the concrete 30 as it is. Steel pipe concrete piles can be created.
Further, the lid 5 is pulled up, the drum bucket 15 is inserted into the steel pipe pile 1, and the bottom portion 25 is formed in the support layer B so that the concrete 30 is placed. Can be created. In addition, in this Embodiment, although the case where the steel pipe pile 1 was penetrated by the hammering method was shown, you may penetrate the steel pipe pile 1 by a press-fitting method.
[0033]
[Embodiment 2]
FIG. 9 is a cross-sectional explanatory view of a main part of a steel pipe pile according to Embodiment 2 of the present invention. In addition, the same code | symbol is attached | subjected to this and the same part as the steel pipe pile demonstrated in FIG. 1, and description is abbreviate | omitted.
In this embodiment, the steel pipe pile 1 according to the first embodiment shown in FIG. 1 is provided with a wing 11 on the outer periphery of the lower portion of the steel pipe 2 to form a winged screwed steel pipe pile 10 (hereinafter referred to as a winged steel pipe pile). It is a thing.
[0034]
An example of the wing | blade 11 provided in the steel pipe pile 10 with a wing | blade in FIG. 10, FIG. 11 is shown. In the example of FIG. 10, steel blades 11a and 11b made of fan-shaped flat plates are joined to the outer periphery in the vicinity of the tip portion of the steel pipe 2 so as to intersect at the same height position by welding, thereby forming the blade 11. .
In the example of FIG. 11, the spiral blade 12 formed by cutting and bending one portion of a donut-shaped steel plate is joined to the outer periphery in the vicinity of the distal end portion of the steel pipe 2 by welding to configure the blade 11. Is.
[0035]
An example of the wing 11 has been described with reference to FIGS. 10 and 11. However, the present invention is not limited to this, and may be a polygonal shape in addition to the flat plate shape and the spiral shape described above, or these may be divided into a plurality of pieces. A thing etc. can be selected suitably. Moreover, the attachment position can also be set suitably and you may provide multiple steps | paragraphs in an axial direction as needed. In addition, as for the wing | blade 11, it is desirable to use the thing whose outer diameter is about 1.5 to 3.0 times the outer diameter of the steel pipe 2. FIG.
[0036]
Next, an example of the construction method of the winged steel pipe pile 10 according to the present embodiment will be described with reference to FIGS.
(1) First, the pile head of the winged steel pipe pile 10 whose end opening is closed by the lid 5 is attached to a drive motor mounted on a base machine or the like (not shown) installed on the ground. As shown in FIG. 12 (a), the steel pipe pile 10 is rotated and propelled by the action of the wood screw of the wing 11, penetrates into the ground, and supports its tip as shown in FIG. 12 (b). Located in or near layer B. In addition, it may replace with a pile head and you may make it attach a drive motor to the trunk | drum of the winged steel pipe pile 10. FIG.
[0037]
(2) Next, the drive motor is removed from the winged steel pipe pile 10, the rod 7 of the lid 5 is attached to the drive motor, the rod 7 is rotated, and the lid 5 is removed from the steel pipe 2, as shown in FIG. Pull up to the outside.
(3) Next, as shown in FIG. 12 (d), the drum bucket 15 with the rod 19 attached to the drive motor is inserted into the winged steel pipe pile 10 and rotated to excavate the support layer B.
(4) Then, as shown in FIG. 12 (e), a bottom expanded portion 25 is formed in the support layer B, the drum bucket 15 is pulled out from the winged steel pipe pile 10, and as shown in FIG. 12 (f), the drum bucket The earth and sand taken in 15 is discharged.
[0038]
(5) Next, as shown in FIG. 13 (a), the tremy pipe 14 is inserted into the winged steel pipe pile 10, and the concrete 30 is driven to the full length of the bottom expanded part 25 and the winged steel pipe pile 10 or to a predetermined height. Set up.
(6) Next, as shown in FIG.13 (b), the tremy pipe 14 is pulled up and a steel pipe concrete pile is formed. Then, the winged steel pipe pile 10 is attached again to the drive motor and rotated, and penetrates until the tip part reaches the vicinity of the center part of the bottom expanded part 25.
In addition, as shown in FIG.13 (c), the earth and sand 31 is thrown in in the steel pipe concrete pile 10 as needed.
[0039]
According to the construction method as described above, it is possible to install a large-diameter winged steel pipe pile 10 in the ground with low vibration, low noise, and a small amount of soil removal, and earth and sand may enter the inside of the pile. Therefore, it is possible to construct a steel pipe concrete pile by placing concrete without discharging earth and sand. Moreover, the large tip support force can be obtained with a small amount of use of the concrete by the concrete 30 placed on the wing 11 and the expanded bottom portion 25.
Also in the present embodiment, when the intermediate layer I exists in the ground, as explained in the construction method of FIG. 6 of the first embodiment, the tip of the winged steel pipe pile 10 is the intermediate layer I or When the vicinity is reached, the lid body 5 is pulled up and the drum bucket 15 is inserted. After excavating the intermediate layer I, the lid body 5 is inserted again and attached.
[0040]
14 and 15 show another example of the screw-type steel pipe pile according to the present embodiment. In the example of FIG. 14, the lower surface of the lid body 5 of FIG. 9 is formed in an inverted conical shape.
Further, in the example of FIG. 15, one or a plurality of inverted L-shaped key grooves 8 are provided on the side wall of the drum-shaped lid 5, and the key grooves 8 are formed on the inner peripheral surface near the tip of the steel pipe 2. Correspondingly, a key 9 is provided, and its action is the same as that of the steel pipe pile described in FIG.
[0041]
Although the embodiment of the present invention has been described above, the lid body 5 that opens and closes the tip opening of the steel pipe pile 1 or the winged steel pipe pile 10 according to the present invention is used when the steel pipe pile 1 or the winged steel pipe pile 10 penetrates. Since it is for preventing soil and sand from entering the inside, the tip opening may not be completely closed, and a part thereof may be opened.
Moreover, the attachment / detachment mechanism of the lid 5 with respect to the steel pipe pile 1 or the winged steel pipe pile 10 is not limited to the above-described example, and can be attached and detached by an external operation during the construction of the steel pipe pile 1 or the winged steel pipe pile 10. Other means may be used as long as it is.
[0042]
Further, an excavation blade may be provided on the lower surface of the lid 5 or an injection hole for injecting water, cement milk or the like into the ground may be provided in the lid 5. Furthermore, you may make it raise the adhesive force of concrete by providing a rib and other convex parts in the inner peripheral surface near the front-end | tip part of the steel pipe pile 1 or the winged steel pipe pile 10, or any one.
[0043]
【Example】
Next, the Example about the construction method of FIG. 12, FIG. 13 by the steel pipe pile with a wing | blade of Embodiment 2 is demonstrated.
The winged steel pipe pile 10 has a female thread 3 on the inner peripheral surface of the tip, and has an outer diameter of 1800 mm, a long inner diameter of 1008 mm, and a short inner diameter of 1000 mm on the outer periphery of the tip of the steel pipe 2 having an outer diameter of 1000 mm, a plate thickness of 12 mm, and a length of 31 m. A steel wing made of a flat plate obtained by dividing a donut-shaped steel plate having a thickness of 40 mm into two was crossed at the same height position and joined by welding to form a wing 11.
[0044]
Further, the lid 5 was constituted by a drum-shaped steel material having a thickness (height) of 40 mm having the screws 6 on the outer periphery, and the rod 7 was attached to the center of the upper surface. The ground to be constructed was a soft layer with an N value of 3 up to 23 m from the ground surface, a soft layer with an N value of 7 up to 23 to 32 m, and a support layer with an N value of 50 after that.
[0045]
First, the lid body 5 was inserted into the steel pipe 2 from the upper opening, the rod 7 was rotated, the male screw 6 was screwed onto the female screw 3 of the steel pipe 2, and the tip opening was closed.
Next, the pile head of the winged steel pipe pile 10 was attached to the drive motor of the base machine installed on the ground, and it was squeezed while rotating and propelled through the soft layer by the wood screw action of the wing 11 to penetrate.
When the tip of the pile reaches the support layer, the drive motor is detached from the winged steel pipe pile 10 and attached to the rod 7 of the lid 5, and the rod 7 is rotated to engage with the female screw 3 of the steel pipe 2. And the lid 5 was pulled up with the winged steel pipe pile 10 left in the ground.
[0046]
Next, the rod 19 of the drum bucket 15 is attached to the drive motor and inserted into the winged steel pipe pile 10, and the drum bucket 15 is rotated to excavate the support layer by the lower excavation blade 17, and the side excavation blade 18 is Gradually expanded to excavate a bottom expansion 25 having a depth of 35 m from the surface and a maximum outer diameter of 2000 mm. When the excavation of the expanded bottom portion 25 was finished, the side excavation blade 18 was returned to the original state, the drum bucket 15 was lifted up, and the earth and sand taken into the drum bucket 15 was discharged.
[0047]
Then, the tremy pipe 14 was attached to the drive motor, the concrete 30 was placed in the widened portion 25 and the winged steel pipe pile 10, and the tremy pipe 14 was pulled up. The casting height of the concrete 30 was 4 m from the bottom of the expanded bottom portion 25.
Next, the winged steel pipe pile 10 was attached to a drive motor and rotated, and penetrated until the tip portion reached the vicinity of the center portion of the expanded bottom portion 25. As a result, the blade 11 is located in the expanded bottom portion 25.
[0048]
By the above procedure, a low-vibration, low-noise, large-diameter winged steel pipe pile can be installed in the ground in a short period of time with a small amount of soil removed. Combined with the existence of wings, we were able to obtain a large tip support force.
[0049]
【The invention's effect】
The steel pipe pile according to the present invention is a steel pipe pile whose tip is closed by a lid, A rod is fixed to the center of the upper surface of the lid, Even during the construction of steel pipe piles By rotating the rod by an external operation, Detachable lid And can be pulled out In addition, because the above steel pipe pile was composed of a winged screw-in type steel pipe pile, the lid body was pulled out even during construction, and another excavation means was inserted inside, and the ground near the tip of the steel pipe pile was removed. Can be excavated.
[0050]
Furthermore, the construction method of the steel pipe pile according to the present invention includes the step of penetrating the steel pipe pile into the ground, and the steel pipe pile is left in the ground when the tip of the steel pipe pile reaches the support layer or the vicinity thereof. In the state of extracting the lid from the steel pipe pile, inserting the drum bucket into the steel pipe pile left in the ground, excavating the support layer, extracting the drum bucket, and in the excavation part and the steel pipe pile Therefore, a large-diameter steel pipe pile can be installed in the ground, and a large tip supporting force can be obtained with less soil and less concrete.
[0051]
In the construction method of each steel pipe pile, when the tip of the steel pipe pile reaches the hard ground or its vicinity before reaching the support layer, the lid is placed in the state where the steel pipe pile is left in the ground. The process of extracting from the steel pipe pile, the process of excavating the hard ground by inserting the drum bucket into the steel pipe pile left in the ground, the process of extracting the drum bucket when the hard ground is excavated, and the tip opening of the steel pipe pile And the step of closing the part again with the lid, it is possible to easily penetrate a large-diameter steel pipe pile even when a hard ground such as an intermediate layer exists before reaching the support layer.
[Brief description of the drawings]
FIG. 1 is a cross-sectional explanatory view of a steel pipe pile according to a first embodiment of the present invention.
2 is an explanatory view of another construction method of the steel pipe pile of FIG. 1. FIG.
FIG. 3 is an explanatory view of another construction method of the steel pipe pile of FIG. 1;
4 is an explanatory diagram of an example of a drum bucket used in the construction method of FIGS. 2 and 3. FIG.
FIG. 5 is an explanatory diagram of an example of a grab bucket used in the construction method of FIGS. 2 and 3;
6 is an explanatory view of still another construction method of the steel pipe pile of FIG. 1. FIG.
7 is a cross-sectional explanatory view of another example of the steel pipe pile according to the first embodiment. FIG.
FIG. 8 is an explanatory diagram of still another example of the steel pipe pile according to the first embodiment.
FIG. 9 is a cross-sectional explanatory view of a winged steel pipe pile according to a second embodiment of the present invention.
FIG. 10 is an explanatory diagram showing an example of a wing according to a second embodiment.
FIG. 11 is an explanatory view showing another example of the wing of the second embodiment.
12 is an explanatory diagram of another example of the construction method of the winged steel pipe pile of FIG. 9; FIG.
13 is an explanatory view of another example of the construction method of the winged steel pipe pile of FIG. 9; FIG.
FIG. 14 is an explanatory diagram of another example of a winged steel pipe pile according to the second embodiment.
FIG. 15 is an explanatory diagram of still another example of the winged steel pipe pile according to the second embodiment.
[Explanation of symbols]
1 Steel pipe pile
2 Steel pipe
3 Female thread
5 lid
6 Male thread
8 Keyway
9 keys
10 Winged steel pipe pile
11 Wings
14 Tremy Tube
15 drum bucket
20 Grab bucket
25 Widened bottom
30 concrete

Claims (4)

蓋体によって先端部が閉塞された鋼管杭であって、前記蓋体の上面中心部にロッドが固定され、前記鋼管杭の施工中においても外部からの操作によって前記ロッドを回転させることにより、前記蓋体を着脱可能、かつ外部へ引き上げ可能に構成したことを特徴とする鋼管杭。A steel pipe pile whose tip is closed by a lid , wherein a rod is fixed to the center of the upper surface of the lid, and the rod is rotated by an external operation even during construction of the steel pipe pile , A steel pipe pile characterized in that the lid can be detached and pulled up to the outside . 鋼管杭が翼付きねじ込み式鋼管杭である請求項1記載の鋼管杭。The steel pipe pile according to claim 1, wherein the steel pipe pile is a winged screw-type steel pipe pile. 請求項1又は2の鋼管杭を地盤中に貫入する工程と、
前記鋼管杭の先端部が支持層又はその近傍に達したときは該鋼管杭を地盤中に残置した状態で蓋体を鋼管杭から抜き出す工程と、
前記地盤中に残置された鋼管杭内にドラムバケットを挿入して支持層を掘削する工程、及び前記ドラムバケットを抜き出す工程と、
前記掘削部及び鋼管杭内にコンクリートを打設する工程とからなることを特徴とする鋼管杭の施工方法。
A step of penetrating the steel pipe pile of claim 1 or 2 into the ground;
When the tip of the steel pipe pile reaches the support layer or the vicinity thereof, the step of extracting the lid from the steel pipe pile with the steel pipe pile left in the ground; and
Inserting a drum bucket into a steel pipe pile left in the ground and excavating a support layer; and extracting the drum bucket;
A method for constructing a steel pipe pile, comprising the step of placing concrete in the excavation part and the steel pipe pile.
鋼管杭の先端部が支持層に達する前に硬い地盤又はその近傍に達したときは、該鋼管杭を地盤中に残置した状態で前記蓋体を鋼管杭から抜き出す工程と、
前記地盤中に残置された鋼管杭内にドラムバケットを挿入して前記硬い地盤を掘削する工程、及び硬い地盤の掘削が終ったときは前記ドラムバケットを抜き出す工程と、
前記鋼管杭の先端開口部を蓋体により再び閉塞する工程とを備えたことを特徴とする請求項3記載の鋼管杭の施工方法。
When the tip of the steel pipe pile reaches the hard ground or its vicinity before reaching the support layer, the step of extracting the lid from the steel pipe pile with the steel pipe pile left in the ground; and
A step of excavating the hard ground by inserting a drum bucket into the steel pipe pile left in the ground, and a step of extracting the drum bucket when the excavation of the hard ground is completed;
The construction method of the steel pipe pile of Claim 3 provided with the process of closing again the front-end | tip opening part of the said steel pipe pile with a cover body.
JP2000235490A 2000-08-03 2000-08-03 Steel pipe pile and its construction method Expired - Fee Related JP4501249B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000235490A JP4501249B2 (en) 2000-08-03 2000-08-03 Steel pipe pile and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000235490A JP4501249B2 (en) 2000-08-03 2000-08-03 Steel pipe pile and its construction method

Publications (2)

Publication Number Publication Date
JP2002047647A JP2002047647A (en) 2002-02-15
JP4501249B2 true JP4501249B2 (en) 2010-07-14

Family

ID=18727690

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000235490A Expired - Fee Related JP4501249B2 (en) 2000-08-03 2000-08-03 Steel pipe pile and its construction method

Country Status (1)

Country Link
JP (1) JP4501249B2 (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006241919A (en) * 2005-03-07 2006-09-14 Haseko Corp Pile construction machine and pile construction method
JP4872561B2 (en) * 2006-09-21 2012-02-08 Jfeスチール株式会社 Construction method of ready-made piles
JP5905230B2 (en) * 2011-10-19 2016-04-20 旭化成建材株式会社 Casing method
JP6589549B2 (en) * 2015-10-20 2019-10-16 Jfeエンジニアリング株式会社 How to build cast-in-place piles
JP6640175B2 (en) * 2017-11-16 2020-02-05 大和ハウス工業株式会社 Construction method of excavated blade-mounted steel pipe and cast-in-place concrete pile for construction of cast-in-place concrete pile

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000110178A (en) * 1998-10-01 2000-04-18 Nippon Steel Corp Soil-improvement method by rotational press-in pipe pile, pipe-jacking burying method for rotational press-in pipe pile, and rotational press-in pipe pile

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60119816A (en) * 1983-12-02 1985-06-27 Tone Koji Kk Formation of continuous pile
JPH07122390B2 (en) * 1993-06-29 1995-12-25 丸五基礎工業株式会社 Drilling method using drilling bucket and drilling bucket used for the method
JPH07293174A (en) * 1994-04-20 1995-11-07 Mitsubishi Constr Co Ltd Drilling bucket for earth drilling construction method

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000110178A (en) * 1998-10-01 2000-04-18 Nippon Steel Corp Soil-improvement method by rotational press-in pipe pile, pipe-jacking burying method for rotational press-in pipe pile, and rotational press-in pipe pile

Also Published As

Publication number Publication date
JP2002047647A (en) 2002-02-15

Similar Documents

Publication Publication Date Title
JP5045971B2 (en) Ready-made piles and tip fittings
WO2004035942A1 (en) Internal excavation method through pile, and foundation pile structure
JP4498348B2 (en) Screwed steel pipe pile
JP4501249B2 (en) Steel pipe pile and its construction method
JP5546000B2 (en) Ground excavation method
JP3937382B2 (en) Construction method of screwed steel pipe pile
JP5545999B2 (en) Ground excavation method
JP3991311B2 (en) Method of burying excavation rod and ready-made pile
JP4360745B2 (en) Construction method of ready-made piles
JP4626113B2 (en) Construction method of screwed steel pipe pile
JP2001303570A (en) Method for drawing out pile
JP4617604B2 (en) Threaded pile and method of construction
KR100932952B1 (en) Piles that have variable end
JP4677690B2 (en) Method for increasing the frictional force of piles
JP4166191B2 (en) Hollow pile embedding method and excavator used therefor
JP3007755U (en) Magnifying head
JP2711357B2 (en) Improvement method of construction ground and its drilling equipment.
KR20190137293A (en) Construction method for rotational penetration pile
JPS6227541Y2 (en)
JP3004267B1 (en) Drilling rig
JP6400151B1 (en) Excavation equipment for both earth removal and no earth removal
JPS6131246B2 (en)
JP3019988B2 (en) Auger for hard ground excavation
JPS5921817A (en) Method and apparatus for constructing buried pile
JP2894674B2 (en) Diameter expanding reaming up method and its device

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20070528

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20090330

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20090908

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20091106

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20100330

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20100412

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130430

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130430

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140430

Year of fee payment: 4

LAPS Cancellation because of no payment of annual fees