JP4448729B2 - Lining concrete curing device - Google Patents

Lining concrete curing device Download PDF

Info

Publication number
JP4448729B2
JP4448729B2 JP2004120481A JP2004120481A JP4448729B2 JP 4448729 B2 JP4448729 B2 JP 4448729B2 JP 2004120481 A JP2004120481 A JP 2004120481A JP 2004120481 A JP2004120481 A JP 2004120481A JP 4448729 B2 JP4448729 B2 JP 4448729B2
Authority
JP
Japan
Prior art keywords
pipe
curing
lining concrete
tunnel
movable carriage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2004120481A
Other languages
Japanese (ja)
Other versions
JP2005299323A (en
Inventor
俊夫 安部
利昭 小野
正三 安永
雅彦 小林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nishimatsu Construction Co Ltd
Original Assignee
Nishimatsu Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nishimatsu Construction Co Ltd filed Critical Nishimatsu Construction Co Ltd
Priority to JP2004120481A priority Critical patent/JP4448729B2/en
Publication of JP2005299323A publication Critical patent/JP2005299323A/en
Application granted granted Critical
Publication of JP4448729B2 publication Critical patent/JP4448729B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Description

本発明は、覆工コンクリートの養生装置に関する。   The present invention relates to a curing apparatus for lining concrete.

トンネル覆工コンクリートにおいて、乾燥収縮によるクラック防止のための養生対策が行われる。
例えば、覆工コンクリート面に当接される保水シートの背面を空気チューブで押えておき、保水シートである不織布に取り付けた有孔導水管から水を供給して湿潤養生する技術がある(特許文献1参照)。
また、覆工コンクリートの内周側に、ほぼ同じ曲率に湾曲したシートを配置して、そのシートと覆工コンクリートとの間に形成される半リング状空間に超音波加湿器を設置することで、超音波加湿器の作動で発生する水蒸気により湿潤養生する技術もある(特許文献2参照)。
なお、覆工コンクリートの養生用テレフォームを盛り替えていく技術もある(特許文献3参照)。
特開平10−102773号公報 特開2000−73696号公報 特開2003−155898号公報
In tunnel lining concrete, curing measures are taken to prevent cracks due to drying shrinkage.
For example, there is a technique in which the back surface of a water retaining sheet that is brought into contact with the lining concrete surface is pressed with an air tube, and water is supplied from a perforated water conduit attached to a nonwoven fabric that is a water retaining sheet to wet and cure (Patent Document) 1).
In addition, by placing a sheet curved to approximately the same curvature on the inner peripheral side of the lining concrete, an ultrasonic humidifier is installed in the semi-ring-shaped space formed between the sheet and the lining concrete. There is also a technique for wet curing with water vapor generated by the operation of an ultrasonic humidifier (see Patent Document 2).
In addition, there is also a technique of rearranging the lining concrete curing teleform (see Patent Document 3).
Japanese Patent Laid-Open No. 10-102773 JP 2000-73696 A JP 2003-155898 A

しかし、保水シートに取り付けた有孔導水管から水を供給して湿潤養生する技術は、導水配管に加え、保水シートとしての不織布、さらに保水シートの背面を押える空気チューブを必要とすることから、設備・管理・移動のコストが高い問題がある。
また、覆工コンクリートとその内周側に配置したシートとの間に半リング状空間を形成して、超音波加湿器から発生する水蒸気により湿潤養生する技術も、超音波加湿器の電気配線・水の供給を必要とすることから、同様に設備・管理・移動のコストが高い問題がある。
なお、覆工コンクリートの養生用テレフォームを盛り替えていく技術の場合、養生用テレフォーム自体が大掛かり・複雑で設備・管理・移動のコストが高い問題があった。
However, the technology for supplying moisture from the perforated water conduit attached to the water retaining sheet and moisturizing it requires a non-woven fabric as the water retaining sheet and an air tube that presses the back of the water retaining sheet in addition to the water conduit. There is a problem that the cost of equipment, management and movement is high.
In addition, the technology of forming a semi-ring-shaped space between the lining concrete and the sheet arranged on the inner circumference side and moistening with water vapor generated from the ultrasonic humidifier is also used for the electrical wiring and the ultrasonic humidifier. Since water supply is required, there is a problem that the cost of equipment, management, and movement is high as well.
In the case of the technology for rearranging the lining concrete curing teleform, there is a problem that the curing teleform itself is large and complicated, and the cost of equipment, management and movement is high.

本発明の課題は、覆工コンクリートの養生において、水分供給や大掛かりな装置を必要とせず、管理・移動も容易でコスト低減が図れるようにすることである。   It is an object of the present invention to eliminate the need for water supply or a large-scale device for curing lining concrete, and to facilitate management and movement and reduce costs.

以上の課題を解決するため、本発明は、例えば図1から図4に示すように、脱型後の覆工コンクリート1に対する養生装置10であって、流体の供給によりアーチ状に膨らんで覆工コンクリート1面に対しほぼ一様に外周面21が密着する養生バルーン20と、この養生バルーン20をその内周面22で支持して搭載するほぼ門形の移動台車11とを備えることを特徴とする。 In order to solve the above-described problems, the present invention is a curing device 10 for lining concrete 1 after demolding, for example, as shown in FIGS. A curing balloon 20 in which an outer peripheral surface 21 is in close contact with a concrete surface substantially uniformly, and a substantially portal-shaped moving carriage 11 that supports and mounts the curing balloon 20 on an inner peripheral surface 22 thereof. To do.

このように、アーチ状に膨らんだ養生バルーンの外周面を覆工コンクリート面に対しほぼ一様に密着させた状態に保持することで、脱型後の覆工コンクリートの乾燥収縮に起因するクラック防止のための養生が良好に行える。
そして、このようなアーチ状に膨らむ養生バルーンをその内周面で支持するほぼ門形の移動台車に搭載したので、管理・移動も容易でコストも低減できる。また、ほぼ門形の移動台車なので、トンネル内を走行する作業車両が移動台車を通過して通行できる。
In this way, the outer peripheral surface of the curing balloon inflated in an arch shape is held in an almost uniform contact state with the lining concrete surface, thereby preventing cracks caused by drying shrinkage of the lining concrete after demolding Can be cured well.
And since the curing balloon which expand | swells in such an arch shape was mounted in the substantially portal-shaped mobile trolley supported by the internal peripheral surface, management and movement are easy and cost can also be reduced. Moreover, since it is a gate-shaped moving carriage, a work vehicle traveling in the tunnel can pass through the moving carriage.

本発明は、上記の覆工コンクリート養生装置10であって、例えば図1から図4に示すように、前記移動台車11には、トンネル内に設けられる配管2を通す配管通し部15が形成されるとともに、この配管通し部15内で前記配管2を載せて支持する配管受け部16が設けられていることを特徴とする。 The present invention is the above-described lining concrete curing apparatus 10, and as shown in FIGS. 1 to 4, for example, the movable carriage 11 is formed with a pipe passage portion 15 through which the pipe 2 provided in the tunnel is passed. In addition, a pipe receiving portion 16 is provided for placing and supporting the pipe 2 in the pipe passage portion 15.

このように、トンネル内に設けられる配管を、移動台車の配管通し部に通して配管受け部に載せて支持するので、トンネル内の移動とバルーンによる覆工コンクリート面の養生とが良好に行える。   Thus, since the pipe provided in the tunnel is passed through the pipe passing part of the mobile carriage and supported on the pipe receiving part, the movement in the tunnel and the curing of the lining concrete surface by the balloon can be performed satisfactorily.

本発明は、上記の覆工コンクリート養生装置10であって、例えば図1から図4に示すように、前記移動台車11の前後には、その周囲の前記養生バルーン20に対する作業を可能とするための作業階段17が設けられていることを特徴とする。 The present invention is the above-described lining concrete curing device 10, for example, as shown in FIGS. 1 to 4, in order to enable work on the curing balloon 20 around the movable carriage 11 before and after the movable carriage 11. The working stairs 17 are provided.

このように、移動台車の前後に設けた作業階段を用いて、移動台車周囲の養生バルーンに対する点検等の作業が容易に行える。   As described above, using the work stairs provided before and after the moving carriage, it is possible to easily perform an operation such as an inspection for the curing balloon around the moving carriage.

本発明によれば、アーチ状に膨らんで覆工コンクリート面にほぼ一様に外周面が密着する養生バルーンを、その内周面で支持するほぼ門形の移動台車に搭載したので、管理・移動も容易でコストも低減できる。また、トンネル内を走行する作業車両がほぼ門形の移動台車を通過して通行できる。 According to the present invention , the curing balloon that swells in an arch shape and the outer peripheral surface is in close contact with the lining concrete surface is mounted on the substantially portal-shaped moving carriage supported by the inner peripheral surface. And cost can be reduced. In addition, a work vehicle traveling in the tunnel can pass through a gate-shaped movable carriage.

本発明によれば、上記の効果に加え、トンネル内の配管を移動台車内に通して、トンネル内の移動とバルーンによる覆工コンクリート面の養生とが良好に行えるといった利点が得られる。 According to the present invention, in addition to the above-described effects, there is an advantage that the piping in the tunnel is passed through the movable carriage so that the movement in the tunnel and the curing of the lining concrete surface by the balloon can be performed satisfactorily.

本発明によれば、上記の効果に加え、移動台車の前後に設けた作業階段を用いて、周囲の養生バルーンに対する点検等の作業が容易に行えるといった利点が得られる。 According to the present invention, in addition to the above-described effects, there is an advantage that an operation such as an inspection for a surrounding curing balloon can be easily performed using work stairs provided before and after the moving carriage.

以下、図を参照して本発明を実施するための最良の形態を詳細に説明する。
本発明を適用した一実施形態の構成としてトンネル内の覆工コンクリート養生状態を示した図1から図4において、1は覆工コンクリート、2は送風管(配管)、3はスライドセントル、4はレール、10は覆工コンクリート養生装置、11は移動台車、20は養生バルーンである。
図示のように、トンネル内の上部には切羽まで延びる配管である送風管2が図略のアンカー部材の吊り下げ支持により設置されており、覆工コンクリート1を打設して脱型後に、図示ではカバーシートで覆われたスライドセントル3が次のコンクリート打設区間に移動する。
Hereinafter, the best mode for carrying out the present invention will be described in detail with reference to the drawings.
In FIG. 1 to FIG. 4 showing a lining concrete curing state in a tunnel as a configuration of an embodiment to which the present invention is applied, 1 is lining concrete, 2 is a blow pipe (pipe), 3 is a slide centle, 4 is Rail 10 is a lining concrete curing device, 11 is a moving carriage, and 20 is a curing balloon.
As shown in the figure, a blower pipe 2, which is a pipe extending to the face, is installed in the upper part of the tunnel by hanging support of an unillustrated anchor member. Then, the slide center 3 covered with the cover sheet moves to the next concrete placing section.

この実施形態では、スライドセントル3が次区間に移動して露出した覆工コンクリート1の内周面を覆工コンクリート養生装置10の移動台車11に装備した養生バルーン20により密着状態に保持して、覆工コンクリート1を養生する。
養生バルーン20は、膨張・収縮可能なゴムや防水布等の弾性シートを繋ぎ合わせてなるエアーマット状のものである。この養生バルーン20は、図示しない送風機からエアーが送り込まれることにより、図示したように、膨らんで外周面21及び内周面22ともにアーチ状になって、外周面21が覆工コンクリート1の内周面にほぼ一様に密着する。
以上の養生バルーン20は、その内周面22を、図示のように、ほぼ門形の移動台車11の外表面に支持させることにより、移動台車11に搭載されている。
In this embodiment, the slide centre 3 is moved to the next section and the exposed inner peripheral surface of the lining concrete 1 is held in close contact with the curing balloon 20 provided on the moving carriage 11 of the lining concrete curing device 10, Curing lining concrete 1
The curing balloon 20 is in the form of an air mat formed by connecting elastic sheets such as inflatable / shrinkable rubber and waterproof cloth. When the curing balloon 20 is supplied with air from a blower (not shown), the curing balloon 20 swells and becomes an arch shape with both the outer peripheral surface 21 and the inner peripheral surface 22 as shown in the figure, and the outer peripheral surface 21 is the inner periphery of the lining concrete 1. Adheres almost uniformly to the surface.
The above curing balloon 20 is mounted on the movable carriage 11 by supporting the inner peripheral surface 22 thereof on the outer surface of the substantially portal-shaped movable carriage 11 as shown in the figure.

実施形態において、移動台車11は、図示のように、トンネル内周面に沿うように鋼管パイプを組み上げた左右両側の支柱12及び上方のアーチ部13によりほぼ門形に構成されている。
図示例では、支柱12は例えば3m間隔に6本配置されており、この支柱12の下端部に車輪14が設けられている。この車輪14は、図5に示したように、トンネル内の左右両側に敷設した溝形鋼によるレール4内を転動する。このレール4は、スライドセントル3の移動用も兼ねている。
また、アーチ部13には、送風管2を通す送風管通し部(配管通し部)15が前後方向に貫通して形成されている。この送風管通し部15内には、送風管2を載せて下部及びその両側でローラ16aにより支持する送風管受け部(配管受け部)16が設けられている。この送風管受け部16は例えば6m間隔で4個配置されている。
In the embodiment, as shown in the drawing, the movable carriage 11 is formed in a substantially gate shape by left and right support columns 12 and upper arch portions 13 formed by assembling steel pipe pipes along the inner peripheral surface of the tunnel.
In the illustrated example, six struts 12 are arranged, for example, at intervals of 3 m, and wheels 14 are provided at the lower ends of the struts 12. As shown in FIG. 5, the wheel 14 rolls in the rail 4 made of channel steel laid on both the left and right sides in the tunnel. The rail 4 is also used for moving the slide center 3.
Further, the arch portion 13 is formed with a blower tube passage portion (pipe passage portion) 15 through which the blower tube 2 is passed in the front-rear direction. In the blower tube passage portion 15, a blower tube receiving portion (pipe receiving portion) 16 on which the blower tube 2 is placed and supported by a roller 16 a on the lower portion and both sides thereof is provided. For example, four air duct receiving portions 16 are arranged at intervals of 6 m.

そして、移動台車11の前後に作業階段17が設けられている。作業階段17は、図示のように、支柱12及びアーチ部13に沿って取り付けられており、送風管通し部15の上方にも設けられている。
以上の移動台車11において、左右両側の支柱12及びその上方のアーチ部13の外側に、養生バルーン20がその内周面22で取り付けられている。実施形態では、養生バルーン20が支柱12の間隔に対応して6枚繋げて移動台車11に装備されている。ここで、1枚の養生バルーン20は、覆工コンクリート1に対応した所定の周長及び厚さで例えば80kgと軽量なものである。
なお、養生バルーン20の内周面22の左右両側について、図示例では、垂直な支柱12に沿わせた直線形状となっているが、図3及び図4に点線で示したように、覆工コンクリート1の内周面に沿わせた曲線形状としても良い。
Work stairs 17 are provided before and after the movable carriage 11. As shown in the figure, the work staircase 17 is attached along the support column 12 and the arch portion 13, and is also provided above the blower tube passage portion 15.
In the mobile carriage 11 described above, the curing balloon 20 is attached to the outside of the left and right struts 12 and the arch portion 13 thereabove at the inner peripheral surface 22 thereof. In the embodiment, six curing balloons 20 are connected to the support carriage 12 so as to be connected to the support 12 and are mounted on the movable carriage 11. Here, one curing balloon 20 has a predetermined circumference and thickness corresponding to the lining concrete 1 and is lightweight, for example, 80 kg.
The left and right sides of the inner peripheral surface 22 of the curing balloon 20 have a straight shape along the vertical support column 12 in the illustrated example. However, as shown by the dotted lines in FIG. 3 and FIG. A curved shape along the inner peripheral surface of the concrete 1 may be used.

次に、以上の覆工コンクリート養生装置10を用いた覆工コンクリート1の養生方法について説明する。
先ず、移動台車11の前進に先立ち、前方の作業階段17を使って作業員が、送風管2をアンカー部材から取り外すとともに、そのアンカー部材もトンネル上部から取り外して、送風管2を送風管通し部15内に通し、送風管受け部16のローラ16a上に送風管2を載せておく。
その後、図示しない牽引車両等により移動台車11を前進させ、スライドセントル3が次区間に移動して露出した覆工コンクリート1の養生区間において、移動台車11を停止する。
Next, the curing method of the lining concrete 1 using the above lining concrete curing device 10 will be described.
First, prior to the forward movement of the movable carriage 11, the worker removes the blower pipe 2 from the anchor member using the front work staircase 17 and also removes the anchor member from the upper part of the tunnel so that the blower pipe 2 is connected to the blower pipe passage portion. 15, the blower tube 2 is placed on the roller 16 a of the blower tube receiver 16.
Thereafter, the movable carriage 11 is moved forward by a towing vehicle or the like (not shown), and the movable carriage 11 is stopped in the curing section of the lining concrete 1 exposed by moving the slide center 3 to the next section.

そして、送風機によるエアーの供給で養生バルーン20を膨らませると、図示したように、アーチ状になった外周面21が覆工コンクリート1の内周面にほぼ一様に密着した状態になる。この状態は、送風機の運転を継続することで維持される。
ここで、養生バルーン20の覆工コンクリート1への密着状態は、移動台車11の前後の作業階段17を使って作業員により確認する。
所定の養生期間経過後は、送風機の運転を停止して養生バルーン20からエアーを排出し、次の養生区間に移動台車11を前進させる。
なお、移動台車11の前進に伴い、後方の作業階段17を使って作業員が、トンネル上部にアンカー部材を取り付けるとともに、そのアンカー部材に送風管2を再び取り付けていく。
Then, when the curing balloon 20 is inflated by supplying air from the blower, the outer peripheral surface 21 having an arch shape is in close contact with the inner peripheral surface of the lining concrete 1 as illustrated. This state is maintained by continuing the operation of the blower.
Here, the adhesion state of the curing balloon 20 to the lining concrete 1 is confirmed by a worker using the work stairs 17 before and after the movable carriage 11.
After the predetermined curing period has elapsed, the operation of the blower is stopped, air is discharged from the curing balloon 20, and the movable carriage 11 is advanced to the next curing section.
As the movable carriage 11 moves forward, the worker attaches the anchor member to the upper part of the tunnel and reattaches the blower pipe 2 to the anchor member using the rear work staircase 17.

以上のように、アーチ状に膨らんだ養生バルーン20の外周面21を覆工コンクリート1の内周面に対しほぼ一様に密着させた状態に保持することによって、脱型後の覆工コンクリート1の乾燥収縮に起因するクラック防止のための養生を良好に行うことができる。
そして、このようなアーチ状に膨らむ養生バルーン20を移動台車11に装備したことから、管理・移動も容易であり、コストダウンも併せて達成することができる。
また、ほぼ門形の移動台車11であることから、トンネル内を走行する図示しない作業車両が移動台車11を通過して通行でき、作業車両の通行に支障を来すことがない。
As described above, by holding the outer peripheral surface 21 of the curing balloon 20 inflated in an arch shape in a state of being almost uniformly adhered to the inner peripheral surface of the lining concrete 1, the lining concrete 1 after demolding Curing for preventing cracks resulting from drying shrinkage of the resin can be performed well.
Since the moving carriage 11 is equipped with the curing balloon 20 that expands like this in an arch shape, management and movement are easy, and cost reduction can be achieved.
In addition, since it is a gate-shaped mobile carriage 11, a work vehicle (not shown) traveling in the tunnel can pass through the mobile carriage 11, and there is no hindrance to the work vehicle.

なお、以上の実施形態においては、送風機によりバルーンにエアーを供給するようにしたが、他にガスや水等の流体をバルーンに対し供給・排出するようにしても良い。
そして、養生バルーン及び移動台車において、具体的な形状や細部構造等について適宜に変更可能である。
また、配管については、実施形態の送風管に限らず、配水管や他の配管であっても良い。
In the above embodiment, air is supplied to the balloon by the blower, but other fluids such as gas and water may be supplied to and discharged from the balloon.
And in a curing balloon and a moving trolley | bogie, it can change suitably about a specific shape, detailed structure, etc.
Moreover, about piping, it is not restricted to the ventilation pipe of embodiment, A water distribution pipe and another piping may be sufficient.

本発明を適用した一実施形態の構成を示すもので、トンネル内における覆工コンクリート養生装置による養生状態を示した概略斜視図である。BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a schematic perspective view showing a configuration of an embodiment to which the present invention is applied and showing a curing state by a lining concrete curing device in a tunnel. 図1の覆工コンクリート養生装置による養生状態を側方から示した概略側面図である。It is the schematic side view which showed the curing state by the lining concrete curing apparatus of FIG. 1 from the side. 図2の矢印A−A線に沿って示した図である。It is the figure shown along the arrow AA line of FIG. 図2の矢印B−B線に沿って示した図である。It is the figure shown along the arrow BB line of FIG. 図4の車輪及びレール部分の拡大図である。It is an enlarged view of the wheel and rail part of FIG.

符号の説明Explanation of symbols

1 覆工コンクリート
2 送風管(配管)
3 スライドセントル
4 レール
10 覆工コンクリート養生装置
11 移動台車
12 支柱
13 アーチ部
14 車輪
15 送風管通し部(配管通し部)
16 送風管受け部(配管受け部)
16a ローラ
17 作業階段
20 養生バルーン
21 外周面
22 内周面
1 Lined concrete 2 Blower pipe (pipe)
3 slide center 4 rail 10 lining concrete curing device 11 moving carriage 12 strut 13 arch part 14 wheel 15 blower pipe passage part (pipe passage part)
16 Blower pipe receiving part (pipe receiving part)
16a roller 17 work staircase 20 curing balloon 21 outer peripheral surface 22 inner peripheral surface

Claims (2)

脱型後のトンネル覆工コンクリートに対する養生装置であって、
流体の供給によりアーチ状に膨らんで覆工コンクリート面に対しほぼ一様に外周面が密着する養生バルーンと、
この養生バルーンをその内周面で支持して搭載するほぼ門形の移動台車とを備え、
前記移動台車は、トンネル内周面に沿うように鋼管パイプを組み上げた左右両側の支柱及び上方のアーチ部によりほぼ門形に構成され、
前記左右両側の支柱のそれぞれは、トンネルの長さ方向に間隔をおいて複数本配置され、
前記アーチ部の下方であって、前記左右両側の支柱の上部近くには、それら左右両側の支柱間方向に延びる横向きの鋼管パイプが設けられ、
前記移動台車の前記アーチ部と前記横向きの鋼管パイプとの間には、トンネル内に設けられる送風管としての配管を通す配管通し部が形成されるとともに、この配管通し部内で前記配管を載せて支持する配管受け部が移動台車の前後方向に間隔をおいて複数設けられ、
前記配管受け部は、配管を載せて配管の下部及びその両側でローラにより支持する構成であることを特徴とする覆工コンクリート養生装置。
Curing equipment for tunnel lining concrete after demolding,
A curing balloon that swells in an arch shape due to the supply of fluid, and the outer peripheral surface adheres almost uniformly to the lining concrete surface;
It is equipped with an almost portal-shaped moving carriage that supports and mounts this curing balloon on its inner peripheral surface,
The movable carriage is configured in a substantially gate shape by left and right pillars and upper arches assembled with steel pipe pipes along the inner peripheral surface of the tunnel,
Each of the left and right struts is arranged in a plurality in spaced intervals in the length direction of the tunnel,
Below the arch portion, near the upper portions of the left and right columns, a horizontal steel pipe pipe extending in the direction between the columns on the left and right sides is provided,
Between the arch portion of the movable carriage and the lateral steel pipe pipe, a pipe passage portion for passing a pipe as a blower pipe provided in the tunnel is formed, and the pipe is placed in the pipe passage portion. pipe receiving portion for supporting the plurality et been at intervals in the longitudinal direction of the movable carriage,
The lining concrete curing device according to claim 1, wherein the pipe receiving portion is configured to mount the pipe and to support the lower part of the pipe and the rollers on both sides thereof .
前記移動台車の前後には、その周囲の前記養生バルーンに対する作業を可能とするための作業階段が移動台車から前後に突出する形態で設けられていることを特徴とする請求項1に記載の覆工コンクリート養生装置。 The cover according to claim 1, wherein work stairs for enabling work on the surrounding curing balloons are provided in front and rear of the movable carriage so as to protrude forward and backward from the movable carriage. Engineering concrete curing equipment.
JP2004120481A 2004-04-15 2004-04-15 Lining concrete curing device Expired - Lifetime JP4448729B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2004120481A JP4448729B2 (en) 2004-04-15 2004-04-15 Lining concrete curing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2004120481A JP4448729B2 (en) 2004-04-15 2004-04-15 Lining concrete curing device

Publications (2)

Publication Number Publication Date
JP2005299323A JP2005299323A (en) 2005-10-27
JP4448729B2 true JP4448729B2 (en) 2010-04-14

Family

ID=35331205

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2004120481A Expired - Lifetime JP4448729B2 (en) 2004-04-15 2004-04-15 Lining concrete curing device

Country Status (1)

Country Link
JP (1) JP4448729B2 (en)

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4589878B2 (en) * 2006-02-02 2010-12-01 前田建設工業株式会社 Lining concrete curing device
JP4722728B2 (en) * 2006-02-27 2011-07-13 株式会社熊谷組 Curing equipment for curing concrete lining in tunnels molded using mobile formwork
JP4676394B2 (en) * 2006-07-19 2011-04-27 西松建設株式会社 Curing equipment for lining concrete and curing method
JP5275115B2 (en) * 2009-04-01 2013-08-28 株式会社マシノ Curing device and curing method for concrete continuum
JP5399840B2 (en) * 2009-09-30 2014-01-29 株式会社安藤・間 Concrete curing method
JP5649939B2 (en) * 2010-12-07 2015-01-07 株式会社竹中土木 Curing method and curing device for tunnel lining concrete
JP5662854B2 (en) * 2011-03-25 2015-02-04 株式会社大林組 Face containment device
JP5859096B2 (en) * 2014-11-10 2016-02-10 株式会社大林組 Face containment device
JP6851845B2 (en) * 2017-02-10 2021-03-31 鉄建建設株式会社 Tunnel silencer and silencer system
CN108457675A (en) * 2018-04-18 2018-08-28 何志杨 A kind of formwork jumbo of automatic lifting walking
JP7248258B2 (en) * 2018-10-01 2023-03-29 鉄建建設株式会社 Tunnel repair method
JP7125056B2 (en) * 2018-10-01 2022-08-24 鉄建建設株式会社 Tunnel repair method

Also Published As

Publication number Publication date
JP2005299323A (en) 2005-10-27

Similar Documents

Publication Publication Date Title
JP4448729B2 (en) Lining concrete curing device
JP5649939B2 (en) Curing method and curing device for tunnel lining concrete
JP5275115B2 (en) Curing device and curing method for concrete continuum
JP2010019067A (en) Lining concrete curing apparatus and construction method
JP3811478B2 (en) Curing method for lining concrete and curing balloon
JP5421413B2 (en) Heating apparatus and method for lining concrete, and lining concrete construction system
JP5091167B2 (en) Concrete curing equipment and curing method
JP5687160B2 (en) Tunnel lining concrete curing equipment
JP5399840B2 (en) Concrete curing method
JP4589878B2 (en) Lining concrete curing device
JP4676394B2 (en) Curing equipment for lining concrete and curing method
JP2014190147A (en) Mobile form device and lining concrete construction method
JP4750166B2 (en) Curing device and curing method for concrete continuum
JP2008202274A (en) Wet curing equipment for lining concrete
JP5876337B2 (en) How to install running water tunnel
JP5204019B2 (en) Curing equipment for lining concrete
JP5118180B2 (en) Curing equipment
JP3996818B2 (en) Work truck for tunnel widening work
JPS6157723A (en) Thrust piping method
JP7045004B2 (en) Construction method of tunnel lining body and formwork for tunnel lining concrete
JP2007231518A (en) Curing method for lining concrete for tunnel, molded by using travelling form
JP4078610B2 (en) Curing method of lining concrete by lining centle
JP2020056201A (en) Tunnel repair method
JP2007239320A (en) Curing method of lining concrete
JP4072109B2 (en) Conveyor support device for tunnel construction equipment

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20070402

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20081120

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20081202

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20090202

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20090714

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20090925

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20090925

A911 Transfer to examiner for re-examination before appeal (zenchi)

Free format text: JAPANESE INTERMEDIATE CODE: A911

Effective date: 20091023

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20100119

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20100125

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130129

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 4448729

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130129

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140129

Year of fee payment: 4

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250