JP4440620B2 - Column pile connection structure - Google Patents

Column pile connection structure Download PDF

Info

Publication number
JP4440620B2
JP4440620B2 JP2003415355A JP2003415355A JP4440620B2 JP 4440620 B2 JP4440620 B2 JP 4440620B2 JP 2003415355 A JP2003415355 A JP 2003415355A JP 2003415355 A JP2003415355 A JP 2003415355A JP 4440620 B2 JP4440620 B2 JP 4440620B2
Authority
JP
Japan
Prior art keywords
pile
insertion hole
bolt insertion
column
short pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2003415355A
Other languages
Japanese (ja)
Other versions
JP2005171684A (en
Inventor
建造 宇佐見
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daiwa House Industry Co Ltd
Original Assignee
Daiwa House Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daiwa House Industry Co Ltd filed Critical Daiwa House Industry Co Ltd
Priority to JP2003415355A priority Critical patent/JP4440620B2/en
Publication of JP2005171684A publication Critical patent/JP2005171684A/en
Application granted granted Critical
Publication of JP4440620B2 publication Critical patent/JP4440620B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Foundations (AREA)

Description

本発明は、柱杭接合構造に関する。さらに詳しくは、杭の位置にずれが生じても柱の接合が支障なくなし得る柱杭接合構造に関する。   The present invention relates to a column pile joint structure. More specifically, the present invention relates to a column pile joint structure in which the columns can be joined without any trouble even if the pile position is shifted.

従来より、鋼構造柱脚部において、基礎梁を省略した接合方として柱と杭とをボルト・ナット接合してなる柱杭接合構造が用いられている。   Conventionally, in a steel structure column base, a column pile joint structure in which a column and a pile are joined to each other by bolts and nuts is used as a joining method in which a foundation beam is omitted.

この接合構造においては、一般的に杭の位置にずれを生ずるため、このずれを吸収しながら柱を接合する柱杭接合構造が各種提案されている。   In this joint structure, since the position of the pile generally shifts, various column pile joint structures for joining the columns while absorbing the shift have been proposed.

その第1の例は、図4に示すように、柱のベースプレートとボルト接合される杭側プレート101に杭挿通孔102を杭100のずれた位置に合わせて加工し、ついでその杭挿通孔102に杭100上端を嵌挿して杭100と杭側プレート101とを溶接接合するものである。   In the first example, as shown in FIG. 4, a pile insertion hole 102 is machined in a pile side plate 101 that is bolted to a base plate of a column so that the pile 100 is displaced, and then the pile insertion hole 102 is processed. The pile 100 and the pile side plate 101 are welded and joined by inserting the upper end of the pile 100 into the pile.

その第2の例は、図5に示すように、杭側プレート111を杭110のずれにかかわらず、柱心に合わせて溶接接合するものである。   In the second example, as shown in FIG. 5, the pile side plate 111 is welded and joined to the column center regardless of the displacement of the pile 110.

その第3の例は、図6に示すように、杭側プレート121にルーズホール122を設けるものである。   The 3rd example provides the loose hole 122 in the pile side plate 121 as shown in FIG.

その第4の例は、図7に示すように、杭140に鍔141を設けるとともに、杭側プレート142に杭140の位置ずれを吸収できる杭挿通孔143を設けておき、杭側プレート142を鍔141に載置して位置決め後に、杭挿通孔143と杭140との隙間を溶接にて埋めるようにするものである。   In the fourth example, as shown in FIG. 7, a pile 141 is provided on the pile 140 and a pile insertion hole 143 capable of absorbing the displacement of the pile 140 is provided on the pile side plate 142. After being placed on the rod 141 and positioned, the gap between the pile insertion hole 143 and the pile 140 is filled by welding.

その第5の例は、図8に示すように、杭側プレート151下面に杭150の位置ずれを吸収できるサイズの短管152を設けておき、その短管152を杭150上端部に挿通した後に杭側プレート151の位置決めをなし、ついで杭150にコンクリートを充填して短管152を固定するものである。   In the fifth example, as shown in FIG. 8, a short pipe 152 of a size capable of absorbing the displacement of the pile 150 is provided on the lower surface of the pile side plate 151, and the short pipe 152 is inserted into the upper end of the pile 150. Later, the pile side plate 151 is positioned, and then the pile 150 is filled with concrete and the short pipe 152 is fixed.

しかしながら、前記従来例においては次のような問題がある。   However, the conventional example has the following problems.

第1の例においては、杭100の芯ずれ量を正確に測定した後に杭側プレート101に杭挿通孔102の孔加工をする必要があるため、施工の迅速性に欠けるという問題がある。   In the first example, since it is necessary to drill the pile insertion hole 102 in the pile side plate 101 after accurately measuring the misalignment amount of the pile 100, there is a problem that the construction is not quick.

第2の例においては、杭110上端と杭側プレート111下面との溶接が上向き溶接となり施工性が悪いという問題がある。   In the second example, there is a problem that welding between the upper end of the pile 110 and the lower surface of the pile side plate 111 is upward welding, and workability is poor.

第3の例においては、杭120の芯ずれ量を吸収するためには大きなルーズホール122を設ける必要があるので、その分杭側プレート121のサイズが大きくなり経済的でないという問題がある。   In the third example, in order to absorb the misalignment amount of the pile 120, it is necessary to provide a large loose hole 122. Therefore, there is a problem that the size of the pile side plate 121 increases correspondingly and is not economical.

第4の例においては、杭140の芯ずれ量を吸収するために大きな挿通孔を設ける必要があるので、その分杭側プレート142のサイズが大きくなるため、コスト増大を招来するという問題がある。また、相当の溶接肉盛作業が必要となるため、施工性が悪いという問題がある。   In the fourth example, since it is necessary to provide a large insertion hole in order to absorb the misalignment amount of the pile 140, the size of the pile side plate 142 is increased accordingly, which causes an increase in cost. . Moreover, since considerable welding overlay work is needed, there exists a problem that workability is bad.

第5の例においては、杭150の構造が複雑となるため、コスト増大を招来するという問題がある。また、杭側プレート151と杭150上端との隙間からコンクリートを充填しなければならないため、施工性が悪く工期の長期化を招来するという問題もある。   In the fifth example, since the structure of the pile 150 is complicated, there is a problem that the cost is increased. In addition, since concrete must be filled from the gap between the pile side plate 151 and the upper end of the pile 150, there is a problem that workability is poor and the construction period is prolonged.

本発明はかかる従来技術の課題に鑑みなされたものであって、杭の位置にずれが生じても柱の接合が支障なくなし得る柱杭接合構造を提供することを目的としている。   This invention is made in view of the subject of this prior art, Comprising: Even if the shift | offset | difference arises in the position of a pile, it aims at providing the pillar pile joining structure which can perform joining of a pillar without trouble.

本発明の柱杭接合構造は、柱と杭とをボルト接合にて接合する柱杭接合構造であって、柱と杭とを接合する接合部材を備え、
前記接合部材は、柱のベースプレートと接合される接合部材側プレートと、該接合部材側プレート下面に上端が接合される接続短管と、該接続短管の下端内面に接合されかつ下部が前記杭上端部に挿入される裏当て板と、前記接続短管に挿通されるリング状プレートとを備え、
前記接合部材側プレートがボルト挿通孔を有し、そのピッチサークルが前記ベースプレートのボルト挿通孔のピッチサークルと同一とされ、かつ、その孔径が通常のボルト挿通孔の孔径に杭の位置ずれの許容値を加えた大きさとされ、前記リング状プレートがボルト挿通孔および接続短管挿通孔を有し、前記ボルト挿通孔のピッチサークルが前記ベースプレートのボルト挿通孔のピッチサークルと同一とされ、かつ、前記接続短管挿通孔が前記ボルト挿通孔からのボルト挿通に支障を生じないようにされてなることを特徴とする。
The column pile joint structure of the present invention is a column pile joint structure that joins a column and a pile by bolt joining, and includes a joining member that joins a column and a pile,
The joining member includes a joining member side plate joined to a base plate of a column, a connecting short pipe whose upper end is joined to the lower surface of the joining member side plate, and a lower part joined to the inner surface of the lower end of the connecting short pipe A backing plate to be inserted into the upper end portion, and a ring-shaped plate to be inserted into the connecting short pipe,
The joint member side plate has a bolt insertion hole, the pitch circle of which is the same as the pitch circle of the bolt insertion hole of the base plate, and the hole diameter is allowed to be a normal bolt insertion hole diameter displacement. The ring plate has a bolt insertion hole and a connection short pipe insertion hole, the pitch circle of the bolt insertion hole is the same as the pitch circle of the bolt insertion hole of the base plate, and The connecting short pipe insertion hole is configured not to cause a hindrance to bolt insertion from the bolt insertion hole.

本発明の柱杭接合構造においては、接続短管の中心が、リング状プレートに放射状に設けられた複数のボルト挿通孔の中心から所定量偏心させられてなることを特徴とする。 The column pile joint structure of the present invention is characterized in that the center of the connecting short pipe is decentered by a predetermined amount from the centers of the plurality of bolt insertion holes provided radially on the ring-shaped plate .

本発明の柱杭接合構造は、前記の如く構成されているので、杭の位置が許容範囲内にある限り、杭と柱との接合がなし得るという優れた効果が得られる。   Since the pillar-pile joint structure of the present invention is configured as described above, an excellent effect is obtained that the pile and the pillar can be joined as long as the position of the pile is within an allowable range.

以下、添付図面を参照しながら本発明を実施形態に基づいて説明するが、本発明はかかる実施形態のみに限定されるものではない。   Hereinafter, although the present invention is explained based on an embodiment, referring to an accompanying drawing, the present invention is not limited only to this embodiment.

本発明の一実施形態に係る柱杭接合構造を図1に断面図で示す。   A column pile joint structure according to an embodiment of the present invention is shown in a sectional view in FIG.

柱杭接合構造Kは、図1に示すように、柱10と杭20とを接合部材30を介して接合してなるものとされる。なお、以下の説明では、柱10は300mm角パイプとされ、杭20は270mm丸パイプとされているものとして説明する。   As shown in FIG. 1, the pillar pile joint structure K is formed by joining the pillar 10 and the pile 20 via the joint member 30. In the following description, it is assumed that the pillar 10 is a 300 mm square pipe and the pile 20 is a 270 mm round pipe.

柱10は、図2(a)に示すように、角パイプ11の下端に接合されたベースプレート12を備えてなるものとされる。ベースプレート12は円板とされ、その中心を角パイプ11の軸心に一致させて接合されている。このベースプレート12の外周部には所要数(図示例では12個)のボルト挿通孔12aが同一円周上に等間隔で設けられている。   The column 10 includes a base plate 12 joined to the lower end of the square pipe 11 as shown in FIG. The base plate 12 is a disc and is joined with its center aligned with the axis of the square pipe 11. A required number (12 in the illustrated example) of bolt insertion holes 12a are provided on the outer circumference of the base plate 12 at equal intervals on the same circumference.

ここで、ベースプレート12は例えば600mm丸とされ、ボルト孔のピッチサークルの直径は例えば、460mmとされる。また、ボルト挿通孔12aの孔径は通常のボルト孔と同一とされている。例えばボルトがM24であれば、ボルト挿通孔の孔径は26mmとされる。   Here, the base plate 12 is, for example, 600 mm round, and the diameter of the pitch circle of the bolt holes is, for example, 460 mm. The hole diameter of the bolt insertion hole 12a is the same as that of a normal bolt hole. For example, if the bolt is M24, the diameter of the bolt insertion hole is 26 mm.

接合部材30は、上面が柱10のベースプレート12に当接される接合部材側プレート31と、接合部材側プレート31下面中央に接合されている接続短管32と、接続短管32の下端内面に下部が突出させられて接合されている裏当て板33と、接合部材側プレート31下面外周に当接されるリング状プレート34とからなるものとされる。   The joining member 30 includes a joining member side plate 31 whose upper surface is in contact with the base plate 12 of the column 10, a connecting short pipe 32 joined to the center of the lower surface of the joining member side plate 31, and an inner bottom end of the connecting short pipe 32. The backing plate 33 has a lower portion protruding and joined, and a ring-shaped plate 34 that comes into contact with the outer periphery of the lower surface of the joining member side plate 31.

接合部材側プレート31は、図2(b)に示すように、柱10のベースプレート12と同一直径とされた円板とされ、それにベースプレート12のボルト挿通孔12aに対応させたボルト挿通孔31aが設けられている。ここで、ボルト挿通孔31aの孔径は通常のボルト孔径に杭20のずれ量の許容値を加えたものとされる。例えば、通常のボルト孔径が26mmとされ、杭20のずれ量の許容値が50mmとされていれば、ボルト挿通孔31aの孔径は76mmとされる。   2B, the joining member side plate 31 is a disk having the same diameter as the base plate 12 of the column 10, and a bolt insertion hole 31a corresponding to the bolt insertion hole 12a of the base plate 12 is provided. Is provided. Here, the hole diameter of the bolt insertion hole 31a is obtained by adding an allowable value of the displacement amount of the pile 20 to the normal bolt hole diameter. For example, if the normal bolt hole diameter is 26 mm and the allowable displacement amount of the pile 20 is 50 mm, the hole diameter of the bolt insertion hole 31a is 76 mm.

接続短管32は杭20と同サイズの丸パイプとされ、図2(b)に示すように、その軸心を接合部材側プレート31の中心から杭20のずれ量の許容値の半分(例えば、杭20のずれ量の許容値が50mmであれば25mmとされる。)だけずらして接合部材側プレート31下面に接合されている。なお、ボルト挿通孔31aのピッチサークルの直径は、ボルト挿通孔31aが接続短管32と干渉しないようにされている。   The connection short pipe 32 is a round pipe of the same size as the pile 20, and as shown in FIG. 2B, its axis is half the allowable value of the deviation amount of the pile 20 from the center of the joining member side plate 31 (for example, If the allowable value of the displacement amount of the pile 20 is 50 mm, the allowable value is 25 mm. In addition, the diameter of the pitch circle of the bolt insertion hole 31 a is set so that the bolt insertion hole 31 a does not interfere with the connection short pipe 32.

裏当て板33は、接続短管32から突出している下部が杭20上端部に挿入された状態で溶接接合されることにより、接合部材30と杭20とを一体化するものとされる。また、裏当て板33は、下部の杭20上端部への挿入深さを調整することにより、接合部材側プレート31のレベルを調整するものとされる。   The backing plate 33 is formed by integrating the joining member 30 and the pile 20 by welding and joining with the lower portion protruding from the connecting short pipe 32 being inserted into the upper end portion of the pile 20. The backing plate 33 adjusts the level of the joining member side plate 31 by adjusting the insertion depth to the upper end of the lower pile 20.

リング状プレート34は、図2(c)に示すように、接合部材側プレート31と同一直径の円板の中央部に接続短管32が挿通される接続短管挿通孔34aが設けられるととも、外周部にボルト挿通孔34bが設けられてなるものとされる。   As shown in FIG. 2 (c), the ring-shaped plate 34 is provided with a connection short tube insertion hole 34 a through which the connection short tube 32 is inserted at the center of a disk having the same diameter as the joining member side plate 31. The bolt insertion hole 34b is provided on the outer peripheral portion.

接続短管挿通孔34aは、中心がリング状プレート34の中心から杭20のずれ量の許容値の半分(例えば、杭20のずれ量の許容値が50mmであれば25mmとされる。)ずれた位置にある円形透孔とされる。その孔径は、芯ずれした杭20に当たらず、しかも接合部材側プレート31のボルト挿通孔31aのボルト挿通個所以外を塞ぐようにされている。例えば、杭20が270mm丸とされ、接合部材側プレート31のボルト挿通孔31aの孔径が76mmとされていれば、接続短管挿通孔34aの孔径は例えば360mmとされる。なお、接続短管挿通孔34aの孔の位置および孔径は前記に限定されるものではなく、リング状プレート34の接続短管32への挿通がなし得、しかもボルト挿通孔34bからのボルト挿通がなし得る範囲で適宜調整されてもよい。   The connection short pipe insertion hole 34a has a center shifted from the center of the ring-shaped plate 34 by half the allowable value of the displacement amount of the pile 20 (for example, 25 mm if the allowable value of the displacement amount of the pile 20 is 50 mm). It is a circular through-hole at a certain position. The hole diameter does not hit the pile 20 that has been misaligned, and is blocked so that the bolt insertion hole 31a of the joining member side plate 31 is not a portion other than the bolt insertion portion. For example, if the pile 20 is 270 mm round and the hole diameter of the bolt insertion hole 31 a of the joining member side plate 31 is 76 mm, the hole diameter of the connection short pipe insertion hole 34 a is, for example, 360 mm. The position and the hole diameter of the connection short tube insertion hole 34a are not limited to the above, and the ring plate 34 can be inserted into the connection short tube 32, and the bolt insertion from the bolt insertion hole 34b can be performed. It may be appropriately adjusted within a possible range.

接続短管挿通孔34aの位置および孔径をこのようにすることにより、図3に示すように、杭20の位置ずれが許容範囲内であれば、特段の処置をすることなく柱10のベースプレート12と接合部材側プレート31とのボルト接合がなし得る。なお、図3(a)は杭20の芯ずれ量がゼロの場合を示し、図3(b)は杭20の芯ずれ量が許容値の1/4の場合を示し、図3(c)は杭20の芯ずれ量が許容値の1/2の場合を示し、図3(d)は杭20の芯ずれ量が許容値限度にある場合を示す。   By making the position and the hole diameter of the connecting short pipe insertion hole 34a in this way, as shown in FIG. 3, if the displacement of the pile 20 is within an allowable range, the base plate 12 of the column 10 is not subjected to any special treatment. And the joining member side plate 31 can be joined by bolts. 3A shows a case where the misalignment amount of the pile 20 is zero, FIG. 3B shows a case where the misalignment amount of the pile 20 is 1/4 of the allowable value, and FIG. Shows the case where the misalignment amount of the pile 20 is ½ of the allowable value, and FIG. 3D shows the case where the misalignment amount of the pile 20 is within the allowable value limit.

次に、かかる構成とされた柱杭接合構造Kの施工について説明する。   Next, construction of the column pile joint structure K having such a configuration will be described.

手順1:接続短管32にリング状プレート34を挿通した状態で接続部材30を杭20に装着する。つまり、裏当て板33の下部を杭20上端部に挿入する。   Procedure 1: The connecting member 30 is mounted on the pile 20 in a state where the ring-shaped plate 34 is inserted into the connecting short pipe 32. That is, the lower part of the backing plate 33 is inserted into the upper end of the pile 20.

手順2:接続部材側プレート31のレベル調整をした後、接続部材30を杭20に接合する。つまり、裏当て板33の下部と杭20上端を溶接接合する。   Procedure 2: After adjusting the level of the connection member side plate 31, the connection member 30 is joined to the pile 20. That is, the lower part of the backing plate 33 and the upper end of the pile 20 are welded.

手順3:接続部材側プレート31に柱10のベースプレート12を載置して位置決めする。   Procedure 3: The base plate 12 of the column 10 is placed on the connecting member side plate 31 and positioned.

手順4:リング状プレート34側から接続部材側プレート31を通して柱10のベースプレート12にボルトを挿通する。接続部材側プレート31のボルト挿通孔31aの孔径、およびリング状プレート34の接続短管挿通孔34aの孔径は前記の如く設定されているので、特段の処理をすることなくボルトの挿通がなし得る。   Procedure 4: A bolt is inserted into the base plate 12 of the column 10 from the ring-shaped plate 34 side through the connecting member side plate 31. Since the hole diameter of the bolt insertion hole 31a of the connection member side plate 31 and the hole diameter of the connection short pipe insertion hole 34a of the ring-shaped plate 34 are set as described above, the bolt can be inserted without any special treatment. .

手順5:ボルトのベースプレート12上面から突出している部分にナットを螺着して、ベースプレート12と接続部材側プレート31とをボルト接合する。これにより、接合部材30と柱10との接合がなされる。つまり、柱10と杭20とが接合部材30を介して接合される。   Procedure 5: A nut is screwed into a portion of the bolt protruding from the upper surface of the base plate 12, and the base plate 12 and the connection member side plate 31 are bolted. Thereby, the joining member 30 and the column 10 are joined. That is, the column 10 and the pile 20 are joined via the joining member 30.

このように、本実施形態の柱杭接合構造Kによれば、接続部材側プレート31のボルト挿通孔31aの孔径を大きくするとともに、接続短管挿通孔34aを偏心させて設けたリング状プレート34を用いるという簡単な構成により、許容範囲内のある杭20と柱10との接合がなし得る。   Thus, according to the pillar pile joint structure K of the present embodiment, the ring-shaped plate 34 provided with the hole diameter of the bolt insertion hole 31a of the connection member side plate 31 being increased and the connection short pipe insertion hole 34a being eccentric. With a simple configuration of using, the pile 20 and the column 10 within an allowable range can be joined.

以上、本発明を実施形態に基づいて説明してきたが、本発明はかかる実施形態のみに限定されるものではなく、種々改変が可能である。例えば、本実施形態では、柱10は300mm角とされ、杭20は270mm丸とされているが、本発明の適用は前記サイズに限定されるものではなく、各種サイズの柱10および杭20の組合せに適用できる。   As mentioned above, although this invention has been demonstrated based on embodiment, this invention is not limited only to this embodiment, A various change is possible. For example, in this embodiment, the pillar 10 is a 300 mm square and the pile 20 is a 270 mm round, but the application of the present invention is not limited to the above-mentioned size, and the pillar 10 and the pile 20 of various sizes. Applicable to combinations.

本発明は、杭の位置に位置ずれが許容されている、柱と杭との接合に適用できる。   The present invention can be applied to the connection between a pillar and a pile, in which the displacement of the pile is allowed.

本発明の一実施形態に係る柱杭接合構造の断面図である。It is sectional drawing of the column pile joining structure which concerns on one Embodiment of this invention. 同実施形態に係る柱杭接合構造各部を分離して示す平面図であって、同(a)は柱のものを示し、同(b)は杭側プレートのものを示し、同(c)はリング状プレートのものを示す。It is a top view which isolate | separates and shows each part of the pillar pile | joint structure which concerns on the same embodiment, Comprising: The same (a) shows the thing of a pillar, The same (b) shows the thing of a pile side plate, The same (c) The ring-shaped plate is shown. リング状プレートが杭および杭側プレートのボルト挿通孔と干渉しないことの説明図であって、同(a)は杭の芯ずれ量がゼロの場合を示し、同(b)は杭の芯ずれ量が許容値の1/4の場合を示し、同(c)は杭の芯ずれ量が許容値の1/2の場合を示し、同(d)は杭の芯ずれ量が許容値限度の場合を示す。It is explanatory drawing that a ring-shaped plate does not interfere with the bolt insertion hole of a pile and a pile side plate, Comprising: (a) shows the case where the amount of center misalignment of a pile is zero, (b) shows the center misalignment of a pile (C) shows the case where the misalignment amount of the pile is 1/2 of the allowable value, and (d) shows the case where the misalignment amount of the pile is the allowable value limit. Show the case. 柱杭接合構造の従来例の第1例における杭の2面図であって、同(a)は平面図を示し、同(b)は断面図を示す。It is a 2nd page figure of the pile in the 1st example of the conventional example of a pillar pile joining structure, and (a) shows a top view and (b) shows a sectional view. 柱杭接合構造の従来例の第2例における杭の断面図を示す。Sectional drawing of the pile in the 2nd example of the prior art example of a column pile joining structure is shown. 柱杭接合構造の従来例の第3例の断面図を示す。Sectional drawing of the 3rd example of the prior art example of a column pile joining structure is shown. 柱杭接合構造の従来例の第4例における杭の2面図であって、同(a)は平面図を示し、同(b)は断面図を示す。It is a 2nd page figure of the pile in the 4th example of the conventional example of a pillar pile joining structure, the same (a) shows a top view and the same (b) shows a sectional view. 柱杭接合構造の従来例の第5例の断面図を示す。Sectional drawing of the 5th example of the prior art example of a column pile joining structure is shown.

符号の説明Explanation of symbols

K 柱杭接合構造
10 柱
11 角パイプ
12 ベースプレート
20 杭
30 接合部材
31 接合材側プレート
32 接続短管
33 裏当て板
34 リング状プレート
K pillar pile joint structure 10 pillar 11 square pipe 12 base plate 20 pile 30 joining member 31 joining material side plate 32 connecting short pipe 33 backing plate 34 ring-shaped plate

Claims (2)

柱と杭とをボルト接合にて接合する柱杭接合構造であって、
柱と杭とを接合する接合部材を備え、
前記接合部材は、柱のベースプレートと接合される接合部材側プレートと、該接合部材側プレート下面に上端が接合される接続短管と、該接続短管の下端内面に接合されかつ下部が前記杭上端部に挿入される裏当て板と、前記接続短管に挿通されるリング状プレートとを備え、
前記接合部材側プレートがボルト挿通孔を有し、そのピッチサークルが前記ベースプレートのボルト挿通孔のピッチサークルと同一とされ、かつ、その孔径が通常のボルト挿通孔の孔径に杭の位置ずれの許容値を加えた大きさとされ、
前記リング状プレートがボルト挿通孔および接続短管挿通孔を有し、前記ボルト挿通孔のピッチサークルが前記ベースプレートのボルト挿通孔のピッチサークルと同一とされ、かつ、前記接続短管挿通孔が前記ボルト挿通孔からのボルト挿通に支障を生じないようにされてなる
ことを特徴とする柱杭接合構造。
It is a column pile joint structure that joins a column and a pile by bolt joint,
It has a joining member that joins the pillar and the pile,
The joining member includes a joining member side plate joined to the base plate of the column, a connecting short pipe whose upper end is joined to the lower surface of the joining member side plate, and a lower part joined to the inner surface of the lower end of the connecting short pipe and the lower part of the pile A backing plate to be inserted into the upper end portion, and a ring-shaped plate to be inserted into the connecting short pipe,
The joint member side plate has a bolt insertion hole, the pitch circle of which is the same as the pitch circle of the bolt insertion hole of the base plate, and the hole diameter is allowed to be a normal bolt insertion hole diameter displacement. It is the size that added the value,
The ring-shaped plate has a bolt insertion hole and a connection short pipe insertion hole, a pitch circle of the bolt insertion hole is the same as a pitch circle of the bolt insertion hole of the base plate, and the connection short pipe insertion hole is the A pillar pile joint structure characterized in that the bolt insertion from the bolt insertion hole is not hindered.
接続短管挿通孔の中心が、リング状プレートに放射状に設けられた複数のボルト挿通孔の中心から所定量偏心させられてなることを特徴とする請求項1記載の柱杭接合構造。 The column pile joint structure according to claim 1 , wherein the center of the connecting short pipe insertion hole is eccentric by a predetermined amount from the center of the plurality of bolt insertion holes provided radially on the ring-shaped plate .
JP2003415355A 2003-12-12 2003-12-12 Column pile connection structure Expired - Fee Related JP4440620B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2003415355A JP4440620B2 (en) 2003-12-12 2003-12-12 Column pile connection structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2003415355A JP4440620B2 (en) 2003-12-12 2003-12-12 Column pile connection structure

Publications (2)

Publication Number Publication Date
JP2005171684A JP2005171684A (en) 2005-06-30
JP4440620B2 true JP4440620B2 (en) 2010-03-24

Family

ID=34734876

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2003415355A Expired - Fee Related JP4440620B2 (en) 2003-12-12 2003-12-12 Column pile connection structure

Country Status (1)

Country Link
JP (1) JP4440620B2 (en)

Also Published As

Publication number Publication date
JP2005171684A (en) 2005-06-30

Similar Documents

Publication Publication Date Title
JP6703307B2 (en) Steel pipe joining method and joining structure
JP4626450B2 (en) Threaded joint structure of metal pipe
JP2009013602A (en) Structure and method for joining steel pipe pile and steel column
JP2017223071A (en) Joining method for and joined structure of steel member
JP2009270429A (en) Coupling structure of steel pipe
JP4440620B2 (en) Column pile connection structure
JP2006037619A (en) Cylinder body connection device
WO2016136980A1 (en) Post and pile joining method and joining structure
JP3609083B1 (en) Construction method of building foundation and joint board for building foundation construction
JP2008308856A (en) Steel pipe pile for under-pinning
JP6685152B2 (en) Column base structure
JP5991622B2 (en) Pile-free welded joint
JP4621570B2 (en) Pile fastening structure and fastener used therefor
JP2010168789A (en) Mechanical coupling for steel pipe pile
DE4436514C2 (en) Pipe compensator
JP2526738B2 (en) Column-beam joint structure
JP6011427B2 (en) Pile joint structure
JP7496248B2 (en) Steel column base structure
JP2003119801A (en) Structure and method for joining steel pipe pile to structure
JP2022144326A (en) Steel pipe pile connection structure
JP7406358B2 (en) Bonding structure and bonding method
JP4200228B2 (en) Steel pipe joint structure
JP6011426B2 (en) Pile joint structure
JP2022177726A (en) Connection structure of steel pipe pile, and method for manufacturing steel pipe pile
JP2005155290A (en) Column-pile joint structure and its construction method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20061113

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20070110

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20090309

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20090512

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20090615

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20100104

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20100107

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130115

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 4440620

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130115

Year of fee payment: 3

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees