JP4352404B2 - Paint scattering prevention device for painting power transmission tower and painting method for power transmission tower - Google Patents

Paint scattering prevention device for painting power transmission tower and painting method for power transmission tower Download PDF

Info

Publication number
JP4352404B2
JP4352404B2 JP2004332119A JP2004332119A JP4352404B2 JP 4352404 B2 JP4352404 B2 JP 4352404B2 JP 2004332119 A JP2004332119 A JP 2004332119A JP 2004332119 A JP2004332119 A JP 2004332119A JP 4352404 B2 JP4352404 B2 JP 4352404B2
Authority
JP
Japan
Prior art keywords
net
arm
power transmission
frame
painting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2004332119A
Other languages
Japanese (ja)
Other versions
JP2006142135A (en
Inventor
芳晴 高野
亮治郎 山内
宏久 高橋
雅博 宮本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hokkaido Electric Power Co Inc
Original Assignee
Hokkaido Electric Power Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hokkaido Electric Power Co Inc filed Critical Hokkaido Electric Power Co Inc
Priority to JP2004332119A priority Critical patent/JP4352404B2/en
Publication of JP2006142135A publication Critical patent/JP2006142135A/en
Application granted granted Critical
Publication of JP4352404B2 publication Critical patent/JP4352404B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Details Or Accessories Of Spraying Plant Or Apparatus (AREA)
  • Application Of Or Painting With Fluid Materials (AREA)

Description

本発明は、塗装が剥げたり発錆した送電鉄塔を再塗装するための送電鉄塔塗装時の塗料飛散防止装置及び送電鉄塔の塗装工法に関する。   The present invention relates to a paint scattering prevention device and a power transmission tower coating method for repainting a power transmission tower that has been peeled off or rusted.

塗装を施して設置した送電鉄塔も、経年により塗膜が剥離して発錆することは避けられず、鋼材の耐久性が損なわれると共に、景観を損なうという問題が生じる。そこで、一定期間毎に或は発錆状態に応じて送電鉄塔には再塗装を行うことが必要であるが、送電鉄塔は設置場所によっては近傍に人家や建屋が存在していることや、高さが70m程のものもあることから、塗装時に塗料が滴下するのを防止し、また風力によって送電鉄塔の周囲に塗料が飛散する事態を防止する必要がある。   The power transmission tower installed with paint is also inevitable that the coating film peels off and rusts over time, and the durability of the steel material is impaired and the landscape is damaged. Therefore, it is necessary to repaint the power transmission tower every certain period or according to the rusting state. Depending on the installation location of the power transmission tower, however, Since some of them have a length of about 70 m, it is necessary to prevent the paint from dripping during painting, and to prevent the paint from being scattered around the transmission tower by wind power.

そこで、塗装時における塗料の滴下や飛散の問題を解決する技術として、鉄塔体から横方向に突出するアームの下側に塗料落下防止ネットを配設する簡単な方法が用いられている。また、送電線に対して接近してはいけない距離よりも長い絶縁操作棒と、この絶縁操作棒の先端部に支持され、碍子連の上部に係脱されて、碍子連への塗装材の落下を防止する保護板と、碍子連上部に係合された保護板から塔体にわたってアームの下方に張設される絶縁ネットと、塔体に回転可能に取付けられ、絶縁ネットを巻き取るドラムと、ドラムを回転操作するハンドルとを備える送電鉄塔塗装時における塗装飛散防止装置がある(特許文献1)。
特開平7−155656号公報
Therefore, as a technique for solving the problem of dripping or scattering of paint during painting, a simple method is used in which a paint fall prevention net is disposed on the lower side of the arm protruding laterally from the steel tower body. Also, the insulation operation rod that is longer than the distance that should not be approached to the transmission line, supported by the tip of this insulation operation rod, is engaged and disengaged at the top of the insulator series, and the coating material falls to the insulator series A protection plate for preventing the above, an insulation net stretched below the arm from the protection plate engaged with the upper part of the insulator series, and a drum that is rotatably attached to the tower body and winds up the insulation net, There is a paint scattering prevention device at the time of painting a power transmission tower including a handle for rotating a drum (Patent Document 1).
Japanese Patent Laid-Open No. 7-155656

ところで、送電鉄塔の塗装作業において問題となることは、大型送電線は電力供給面で非常に重要な路線が多いことから、塗装作業のために全面的に送電を停止することは困難なことである。しかし、従来の塗料落下防止ネットは風の影響を受け易いために塗料の飛散を防止することは出来ないし、送電線との安全距離を確実に確保することが困難であるという欠点がある。また、特許文献1に示す技術は、風の影響を受けない作業空間をアームを囲繞するように形成するものではなく、塗料の飛散を確実に防止することは出来ないことから、塗装作業時には全面的な送電停止をしない限り作業が不可能であるという問題点がある。このため、飛散防止対策が必須の市街地等に設置してある送電鉄塔の塗装は見合わせざるを得ないのが現状である。   By the way, the problem in painting work for power transmission towers is that it is difficult to completely stop power transmission for painting work because large-sized transmission lines have many very important lines in terms of power supply. is there. However, since the conventional paint drop prevention net is easily affected by wind, it cannot prevent the paint from being scattered, and it is difficult to ensure a safe distance from the power transmission line. In addition, the technique shown in Patent Document 1 does not form a work space that is not affected by wind so as to surround the arm, and cannot reliably prevent the paint from being scattered. There is a problem that work is impossible unless power transmission is stopped. For this reason, the present condition is that the painting of the power transmission tower installed in the city area etc. where the scattering prevention measure is indispensable must be neglected.

本発明は上述した従来技術の諸欠点に鑑みなされたもので、塗装作業時に周囲に塗料が飛散する事態を確実に防止できるし、飛散防止ネットは夜間には縮小できるから、塗装作業の期間中でも夜間は送電が可能であるので生活や産業活動への影響を最小限にできると共に、風による影響を最小限にできる送電鉄塔塗装時の塗料飛散防止装置及び送電鉄塔の塗装工法を提供することを目的とする。   The present invention has been made in view of the above-mentioned drawbacks of the prior art, and can reliably prevent the paint from splashing around during the painting work, and the splash prevention net can be reduced at night, so even during the painting work period. Since power transmission is possible at night, it is possible to minimize the impact on daily life and industrial activities, and to provide a paint scattering prevention device and painting method for power transmission towers that can minimize the effects of wind. Objective.

上述した課題を解決するために構成された請求項1に係る本発明の手段は、塔体と、高さ方向に離間して該塔体から左右の横方向に突設したアームとからなり、該アームの先端側に設けた碍子を介して送電線を支持する送電鉄塔を塗装するための送電鉄塔の塗料飛散防止装置であって、前記アームの位置に対応して前記塔体に取着するフレーム支持金具と、作業空間を形成すべく前記アームの先端側に設置するネットフレームと、該ネットフレームとフレーム支持金具との間に張設する支持索と、前記アームを囲繞して作業空間を形成すべくアームからネットフレームにかけて該支持索に展開可能に掛装する飛散防止ネットとからなる。   The means of the present invention according to claim 1 configured to solve the above-mentioned problem is composed of a tower body and an arm projecting in the lateral direction from the tower body at a distance from the height body, A paint scattering prevention device for a power transmission tower for painting a power transmission tower that supports a power transmission line via an insulator provided on the tip side of the arm, and is attached to the tower body in accordance with the position of the arm A frame support bracket, a net frame installed on the tip side of the arm to form a work space, a support cable stretched between the net frame and the frame support bracket, and surrounding the arm It consists of an anti-scattering net that can be deployed on the support cable from the arm to the net frame to be formed.

そして、前記飛散防止ネットにより形成する作業空間には、底面に塗料落下防止シートを敷設するとよい。   And it is good to lay a paint fall prevention sheet in the bottom in the work space formed by the scattering prevention net.

また、請求項3に係る本発明を構成する手段は、塔体と、高さ方向に離間して該塔体から左右の横方向に突設した複数のアームとからなり、該各アームの先端側に設けた碍子を介して送電線を支持する送電鉄塔を塗装するための送電鉄塔の塗装工法であって、前記アームの位置に対応して前記塔体にフレーム支持金具を取着する工程と、作業空間を形成すべく前記アームの先端側にネットフレームを設置する工程と、該ネットフレームとフレーム支持金具との間に支持索を張設する工程と、前記アームを囲繞して作業空間を形成すべく、アームからネットフレームにかけて飛散防止ネットを該支持索に展開可能に掛装する工程と、該飛散防止ネットにより形成し作業空間内で前記アームを塗装する工程とからなる。   The means constituting the present invention according to claim 3 is composed of a tower body and a plurality of arms protruding in the left and right lateral directions from the tower body so as to be spaced apart from each other in the height direction. A transmission tower painting method for painting a transmission tower that supports a transmission line via an insulator provided on the side, the step of attaching a frame support fitting to the tower body in accordance with the position of the arm; and A step of installing a net frame on the distal end side of the arm to form a work space, a step of stretching a support cable between the net frame and the frame support bracket, and surrounding the arm to form a work space. In order to form, there are a step of detachably hanging a scattering prevention net on the support rope from the arm to the net frame, and a step of forming the scattering prevention net and coating the arm in the work space.

そして、前記飛散防止ネットを前記支持索に展開可能に掛装して前記作業空間を形成した後、底面に塗料落下防止シートを敷設する工程を行うとよい。   And it is good to perform the process of laying the coating material fall prevention sheet on the bottom, after suspending the scattering prevention net on the support rope so as to be unfoldable and forming the working space.

本発明は上述の如く構成したから、下記の諸効果を奏する。
(1)アームの先端側にネットフレームを設置し、アームからネットフレームにかけて飛散防止ネットを展設して作業空間を形成するようにしたから、強風時にも塗装作業を安全に行うことができるし、塗料が周囲に飛散する事態を確実に防止することができる。
(2)送電線に対して安全距離を保持するアームからネットフレームに飛散防止ネットを展設したから、飛散防止ネットに影響されることなく夜間には送電することが可能である。
(3)飛散防止ネットは支持索に展開、縮小可能に設けてあるから、作業開始時と終了時におけるネットの開閉が簡単であるし、作業中の天候の急変にも速やかに対応することができる。
(4)ネットフレームと塔体との間に張設する支持索はネットを展開可能に支持するだけでなく、ネットフレームの揺動を抑制するので安全性に優れている。
(5)飛散防止ネットは作業終了後の夜間には縮小して風による影響を受けないようにしたから、飛散防止ネットが騒音源になることがないし、風圧によりネットが裂開するといった事故がない。
(6)作業空間の下側である飛散防止ネットの底面に塗料落下防止シートを敷設したから、塗料が落下する事態を確実に防止することができる。
Since the present invention is configured as described above, the following effects can be obtained.
(1) A net frame is installed at the tip of the arm, and an anti-scattering net is extended from the arm to the net frame to form a work space, so that painting can be performed safely even in strong winds. The situation where the paint is scattered around can be surely prevented.
(2) Since the anti-scattering net is installed on the net frame from the arm that holds a safe distance with respect to the power transmission line, power can be transmitted at night without being affected by the anti-scattering net.
(3) Since the anti-scattering net is provided on the support rope so that it can be expanded and reduced, it is easy to open and close the net at the start and end of work, and to respond quickly to sudden changes in the weather during work. it can.
(4) The support cable stretched between the net frame and the tower body not only supports the net in a deployable manner, but also suppresses the swing of the net frame, and thus is excellent in safety.
(5) Since the anti-scattering net is reduced at night after work to avoid being affected by wind, the anti-scattering net does not become a noise source, and there is an accident such as the net breaking due to wind pressure. Absent.
(6) Since the paint drop prevention sheet is laid on the bottom surface of the anti-scattering net, which is the lower side of the work space, it is possible to reliably prevent the paint from falling.

以下、本発明の実施の形態を図面に基づき詳述する。図において、1は既設の送電鉄塔を構成する塔体を示し、該塔体1は4本の支柱2、2、・・に連結材3、3、・・・を架設して組み上げてある。4、4、・・は高さ方向に離間して、前記塔体1の両側から横方向に略水平に突設した各一対のアームを示し、該各アーム4は塔体1から水平方向に突出し、先端側を当接した一対の主アーム材4A、4Aと、一対の主アーム材4A、4Aの先端に向けて塔体1から斜めに張設した傾斜アーム材4B、4Bと、該傾斜アーム材4Bと主アーム材4Aとの間に連結した補強材4C、4C、・・・とから構成してある。5、5は上端を各アーム4に連結することにより略V字状に吊設した一対の碍子連で、該一対の碍子連5、5の下端に設けた線保持具6に送電線を掛架するようにしてある。なお、塔体1の外側には、作業員が昇降する際の安全を確保するためのエスコートレール7が設けてある(図2及び図3参照)。   Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings. In the figure, reference numeral 1 denotes a tower body that constitutes an existing power transmission tower, and the tower body 1 is assembled by linking connecting members 3, 3,. 4, 4,... Indicate a pair of arms that are spaced apart from each other in the height direction and project substantially horizontally from both sides of the tower body 1. The arms 4 extend horizontally from the tower body 1. A pair of main arm members 4A, 4A protruding and contacting the tip side, inclined arm members 4B, 4B extending obliquely from the tower body 1 toward the tips of the pair of main arm members 4A, 4A, and the inclination It consists of reinforcing materials 4C, 4C,... Connected between the arm material 4B and the main arm material 4A. Reference numerals 5 and 5 denote a pair of insulators suspended in a substantially V shape by connecting the upper ends to the arms 4, and a power transmission line is hung on the wire holder 6 provided at the lower ends of the pair of insulators 5 and 5. It is designed to be mounted. In addition, the escort rail 7 for ensuring the safety at the time of an operator raising / lowering is provided in the outer side of the tower body 1 (refer FIG.2 and FIG.3).

11は前記アーム4の近傍に位置して塔体1の各支柱2に、外側横方向に向けて突設したフレーム支持金具を示す。該フレーム支持金具11は塔体1の支柱2に固着する略L字状の取付基板11Aと、該取付基板11Aに突設され、エスコートレール7との干渉を避けるために途中をく字状に屈曲した固定基材11Bと、該固定基材11Bの先端側に着脱可能に連結した支持材11Cと、該支持材11Cの上下面及び両側面に配設され、後述する上下支持索23A(24A)、23B(24B)を係脱自在に係着するための複数個の係止環11D、11D、・・・とから構成してある。そして、フレーム支持金具11は、固定基材11Bの下方に位置して基端を支柱2に固着し、先端を支持材11Cの先端側に連結する補強支持具12によって下方から支持してある。   Reference numeral 11 denotes a frame support fitting which is located in the vicinity of the arm 4 and protrudes outwardly in the lateral direction on each column 2 of the tower body 1. The frame support bracket 11 has a substantially L-shaped mounting board 11A that is fixed to the column 2 of the tower body 1 and protrudes from the mounting board 11A, and is formed in a halfway shape in the middle to avoid interference with the escort rail 7. A bent fixed base material 11B, a support member 11C removably connected to the distal end side of the fixed base material 11B, and upper and lower support ropes 23A (24A) described later are disposed on the upper and lower surfaces and both side surfaces of the support material 11C. ), 23B (24B), and a plurality of locking rings 11D, 11D,... The frame support bracket 11 is positioned below the fixed base 11B, has a proximal end fixed to the support column 2, and is supported from below by a reinforcing support 12 that connects the distal end to the distal end side of the support member 11C.

13はアーム4に作業空間Aを形成すべくアーム4に設置したネットフレームを示す。該ネットフレーム13は鋼材を連結して立方体状に構成したもので、主アーム材4A、4Aに締結具14により交差状態に取付けた前後一対の水平支持材15、15と、上下、前後及び内側の5本の側枠材16A、16A、16B、16B、16Cにより四角形に連結した一対の側枠16、16と、該一対の側枠16、16を前側上、下で連結する一対の前支持材17、17と、該前支持材17、17を中央で連結する縦連結材18と、一対の側枠16、16を後側上部で連結する後支持材19と、前支持材17の中央と側枠材16Aの後端側に架設した一対の腹材20、20と、後支持材19から斜め後方に突設され、傾斜アーム材4Bに連結した後部連結材21、21とから構成してある。   Reference numeral 13 denotes a net frame installed on the arm 4 so as to form a work space A in the arm 4. The net frame 13 is formed by connecting steel materials into a cubic shape, and includes a pair of front and rear horizontal support members 15 and 15 attached to the main arm members 4A and 4A in a crossed state by fasteners 14, and upper and lower, front and rear, and inner sides. A pair of side frames 16 and 16 connected in a square shape by the five side frame members 16A, 16A, 16B, 16B and 16C, and a pair of front supports connecting the pair of side frames 16 and 16 on the front side and below. Members 17, 17, a longitudinal connecting member 18 that connects the front supporting members 17, 17 at the center, a rear supporting member 19 that connects the pair of side frames 16, 16 at the rear upper portion, and the center of the front supporting member 17. And a pair of abdominal members 20 and 20 installed on the rear end side of the side frame member 16A, and rear connecting members 21 and 21 that project obliquely rearward from the rear support member 19 and are connected to the inclined arm member 4B. It is.

22は塗装時に塗料が飛散するのを防止するための飛散防止ネットを示す。該飛散防止ネット22はアーム4及びネットフレーム13の側面から下面中央にかけて略L字状に覆うと共にネットフレーム13の前面を覆う一側ネット構成体22Aと他側ネット構成体22Bの2面で構成し、碍子連5、5を避けた構成にしてある。そして、該一側ネット構成体22A及び他側ネット構成体22Bには、風圧を低減しかつ塗料の飛散を防止できるように空気遮断率が約60%のものを用いると共に、後述する支持索23A、24Aを摺動可能に挿通するためのハト目が上側縁に沿って設けてあり、 下側縁に沿って後述する係合環25を係合するためのハト目が設けてある。   Reference numeral 22 denotes a splash prevention net for preventing the paint from splashing during painting. The anti-scattering net 22 is composed of two surfaces, one side net structure 22A and the other side net structure 22B that cover the front surface of the net frame 13 while covering the front surface of the net frame 13 from the side surfaces of the arm 4 and the net frame 13 to the center of the bottom surface. However, the configuration is such that the insulators 5 and 5 are avoided. For the one side net structure 22A and the other side net structure 22B, those having an air blocking rate of about 60% are used so as to reduce the wind pressure and prevent the paint from scattering, and a support rope 23A described later. , 24A is slidably inserted along the upper edge, and along the lower edge is formed a pigeon for engaging an engagement ring 25 described later.

23は一側ネット構成体22Aを展開、縮小するための一側ネット展開機構を示し、該一側ネット展開機構23は塔体1に突設した上側のフレーム支持金具11とネットフレーム13の前側上端隅の間に張設した上支持索23Aと、該上支持索23Aに対応して、下側のフレーム支持金具11とネットフレーム13の前側下端の間に張設した下支持索23Bと、ネットフレーム13の前側上端隅及び前側下端隅に夫々設けた滑車23C、23Cと、該各滑車23Cに係合され、途中位置で前記一側ネット構成体22Aの先端に連結した開閉用紐23Dとから構成してある。   Reference numeral 23 denotes a one-side net expansion mechanism for expanding and contracting the one-side net structure 22A. The one-side net expansion mechanism 23 is a front side of the upper frame support metal 11 and the net frame 13 protruding from the tower body 1. An upper support line 23A stretched between the upper end corners, and a lower support line 23B stretched between the lower frame support bracket 11 and the front lower end of the net frame 13 corresponding to the upper support line 23A; Pulleys 23C, 23C provided at the front upper corner and the front lower corner of the net frame 13, respectively, and an opening / closing string 23D engaged with each pulley 23C and connected to the tip of the one-side net structure 22A at an intermediate position. It is composed of

また、24は他側ネット構成体22Bを展開、縮小するための他側ネット展開機構を示し、該他側ネット展開機構24は一側ネット展開機構23と同様に、上側のフレーム支持金具11とネットフレーム13の前側上端隅の間に張設した上支持索24Aと、該上支持索24Aに対応して、下側のフレーム支持金具11とネットフレーム13の前側下端隅の間に張設した下支持索24Bと、ネットフレーム13の前側上端隅及び前側下端隅に夫々設けた滑車24C、24Cと、該各滑車24Cに係合され、途中位置で前記他側ネット構成体22Bの先端に連結した開閉用紐24Dとから構成してある。   Reference numeral 24 denotes an other side net expanding mechanism for expanding and contracting the other side net structure 22B. The other side net expanding mechanism 24, like the one side net expanding mechanism 23, An upper support line 24A stretched between the front upper end corners of the net frame 13, and a lower frame support bracket 11 and a front lower end corner of the net frame 13 corresponding to the upper support line 24A. The lower support rope 24B, pulleys 24C and 24C provided at the front upper corner and the front lower corner of the net frame 13, respectively, are engaged with the pulleys 24C, and are connected to the tip of the other-side net structure 22B at an intermediate position. And the opening / closing string 24D.

かくして、飛散防止ネット22を構成する一対の一側ネット構成体22A及び他側ネット構成体22Bは、左右の上支持索23A(24A)に進退可能に吊り下げられており、下支持索23B(24B)で内側横方向に折り曲げ、両先端側を複数個の係合環25、25、・・・で連結することにより、飛散防止ネット22はアーム4を包むように略凵字状に掛装する。そして、開閉用紐23D、24Dを操作し、飛散防止ネット22を図7及び図8に示すようにカーテンを閉めるように矢示イ方向に展開することにより、アーム4及びネットフレーム13を囲繞して作業空間Aを形成する。26は形成した作業空間Aの底面に敷設した塗料落下防止シートで、一対のネット構成体22A、22Bの隙間を覆うことにより、塗料の落下を確実に防止することができる。上述の構成において、左右の上、下支持索23A(24A)、23B(24B)は、ネットフレーム13が風圧により揺動するのを抑制する働きも有しており、強度性と安全性を図っている。   Thus, the pair of one side net constituting body 22A and the other side net constituting body 22B constituting the anti-scattering net 22 are suspended from the left and right upper support ropes 23A (24A) so as to be able to advance and retreat, and the lower support ropes 23B ( 24B), the scattering prevention net 22 is hooked in a substantially square shape so as to wrap the arm 4 by bending the inner side in the lateral direction and connecting the both ends with a plurality of engagement rings 25, 25,. . Then, the arms 4 and the net frame 13 are surrounded by operating the strings 23D and 24D for opening and closing and unfolding the anti-scattering net 22 in the direction indicated by the arrow so as to close the curtain as shown in FIGS. Working space A is formed. Reference numeral 26 denotes a paint drop prevention sheet laid on the bottom surface of the formed work space A. By covering the gap between the pair of net components 22A and 22B, the paint can be reliably prevented from falling. In the above-described configuration, the left and right upper and lower support ropes 23A (24A) and 23B (24B) also have a function of suppressing the net frame 13 from swinging due to the wind pressure, thereby enhancing strength and safety. ing.

本実施の形態による塗料飛散防止装置は上述の構成からなるが、次に送電鉄塔に設置する工程について説明する。先ず、塔体1に設けてあるアーム4の四隅に対応して塔体1の支柱2に4個のフレーム支持金具11、11、・・を取着する。このフレーム支持金具11の取着工程とは別個に、アーム4の先端側にネットフレーム13を設置する。ネットフレーム13の設置作業を図4を参照しつつ説明すると、先ず主アーム材4Aの先端寄りの位置に2本の水平支持材15、15を締結具14、14、・・で強固に取着する。この2本の水平支持材15、15に両側の側枠16、16を接続し、この側枠16、16間に前支持材17、17及び後支持材19を接続し、下側の前支持材17と側枠16、16に一対の腹材20、20を斜めに架設し、後支持材19から突設した後部連結材21、21を傾斜アーム材4Bに連結する。かくして、ネットフレーム13はアーム4の先端側に安定性と安全性に優れた状態で設置される。   The paint scattering prevention apparatus according to the present embodiment has the above-described configuration. Next, a process of installing the transmission tower on the power transmission tower will be described. First, four frame support fittings 11, 11,... Are attached to the column 2 of the tower body 1 corresponding to the four corners of the arm 4 provided in the tower body 1. A net frame 13 is installed on the distal end side of the arm 4 separately from the attachment process of the frame support metal 11. The installation work of the net frame 13 will be described with reference to FIG. 4. First, the two horizontal support members 15 and 15 are firmly attached to the positions of the main arm member 4A near the tip by the fasteners 14, 14,. To do. Side frames 16 and 16 on both sides are connected to the two horizontal support members 15 and 15, front support members 17 and 17 and a rear support member 19 are connected between the side frames 16 and 16, and a lower front support is connected. A pair of abdominal materials 20 and 20 are obliquely installed on the material 17 and the side frames 16 and 16, and the rear connecting members 21 and 21 protruding from the rear support member 19 are connected to the inclined arm member 4B. Thus, the net frame 13 is installed on the distal end side of the arm 4 with excellent stability and safety.

ネットフレーム13をアーム4に設置したら、各ネット構成体22A、22Bの上縁に設けたハト目に挿通した上側の支持索23A、24Aを各フレーム支持金具11とネットフレーム13との間に張設し、また下側の支持索23B、24Bを各フレーム支持とネットフレーム13との間に張設する。これにより、ネット構成体22A、22Bは支持索23A、24Aに掛装した状態になる。そして、ネット構成体22A、22Bの下部側をアーム4の下方に折り、突き合わせた先端側を係合環25、25、・・・で連結する(図10参照)。最後に、ネット構成体22A、22Bによって形成される作業空間Aの底面に塗料落下防止シート26を敷設する(図8及び図10参照)。   When the net frame 13 is installed on the arm 4, the upper support ropes 23 </ b> A and 24 </ b> A inserted through the eyelets provided on the upper edges of the net components 22 </ b> A and 22 </ b> B are stretched between the frame support fittings 11 and the net frame 13. In addition, the lower support ropes 23B and 24B are stretched between each frame support and the net frame 13. Thereby, net structure 22A, 22B will be in the state hung on support rope 23A, 24A. And the lower part side of net structure 22A, 22B is folded down under the arm 4, and the front end side which faced | matched is connected with the engagement rings 25, 25, ... (refer FIG. 10). Finally, a paint drop prevention sheet 26 is laid on the bottom surface of the work space A formed by the net components 22A and 22B (see FIGS. 8 and 10).

塗料飛散防止装置は上述の工程によってアーム4に設置されるものであり、開閉用紐23D、24Dを操作してネット構成体22A、22Bを前方に展開することにより、アーム4を囲繞した状態で作業空間Aを形成する(図10参照)。逆に、非作業時には、塗料落下防止シート26を撤去し、左右のネット構成体22A、22Bの下側縁を係止している係合環25を外し、下部側を図10に破線で示すように垂らした状態にした上で、ネット構成体22A、22Bを矢示ロ方向の後方に引いて縮小させ(図6及び図7参照)、紐等で結束する。これにより、飛散防止ネット22が風に煽られて送電線に接触したり、騒音源になるのを防止すると共に、風圧により飛散防止ネット22が裂開する事態も防止できる。   The paint scattering prevention device is installed on the arm 4 by the above-described process, and operates the opening / closing strings 23D and 24D to deploy the net components 22A and 22B forward, so that the arm 4 is surrounded. A work space A is formed (see FIG. 10). Conversely, when not working, the paint drop prevention sheet 26 is removed, the engagement ring 25 locking the lower edges of the left and right net members 22A and 22B is removed, and the lower side is shown by a broken line in FIG. Then, the net members 22A and 22B are pulled backward in the direction of the arrow B to reduce the size (see FIGS. 6 and 7), and are bound by a string or the like. This prevents the scattering prevention net 22 from being blown by the wind and coming into contact with the power transmission line or becoming a noise source, and also prevents the scattering prevention net 22 from tearing due to wind pressure.

本実施の工程によれば、アーム4の先端側にネットフレーム13を設置し、塔体1側とネットフレーム13との間に支持索23A、23B、24A、24Bを張設する作業だけで飛散防止ネット22を設けることができるので、設置作業が容易であるし、安全性に優れている。   According to this process, the net frame 13 is installed on the tip end side of the arm 4 and the support ropes 23A, 23B, 24A, and 24B are stretched between the tower body 1 side and the net frame 13 only. Since the prevention net | network 22 can be provided, installation work is easy and it is excellent in safety.

本発明の実施の形態に係る塗料飛散防止装置を送電鉄塔に設置した状態を示す説明図である。It is explanatory drawing which shows the state which installed the coating material scattering prevention apparatus which concerns on embodiment of this invention in the power transmission tower. フレーム支持金具の平面図である。It is a top view of a frame support metal fitting. フレーム支持金具の側面図である。It is a side view of a frame support metal fitting. アームに設置したネットフレームの斜視図である。It is a perspective view of the net frame installed in the arm. アームに設置したネットフレームの側面図である。It is a side view of the net frame installed in the arm. アームにネットフレームを設置した状態の平面図である。It is a top view of the state which installed the net frame in the arm. アームにネットフレームを設置した状態の側面図である。It is a side view of the state which installed the net frame in the arm. 飛散防止ネットを支持索に掛装した状態の説明図である。It is explanatory drawing of the state which hung the scattering prevention net on the support rope. 飛散防止ネットを展開した状態の説明図である。It is explanatory drawing of the state which expand | deployed the scattering prevention net | network. 図9中のX−Xの位置で切断して示す拡大端面図である。FIG. 10 is an enlarged end view cut along the line XX in FIG. 9.

符号の説明Explanation of symbols

1 塔体
4 アーム
5 碍子
11 フレーム支持金具
13 ネットフレーム
22 飛散防止ネット
23、24 ネット展開機構
23A、24A 上支持索
23B、24B 下支持索
26 塗料落下防止シート
A 作業空間
DESCRIPTION OF SYMBOLS 1 Tower body 4 Arm 5 Insulator 11 Frame support metal fitting 13 Net frame 22 Spattering prevention nets 23 and 24 Net expansion mechanisms 23A and 24A Upper support ropes 23B and 24B Lower support ropes 26 Paint fall prevention sheet A Work space

Claims (4)

塔体と、高さ方向に離間して該塔体から左右の横方向に突設した複数のアームとからなり、該アームの先端側に設けた碍子を介して送電線を支持する送電鉄塔を塗装するための送電鉄塔の塗料飛散防止装置であって、前記アームの位置に対応して前記塔体に取着するフレーム支持金具と、作業空間を形成すべく前記アームの先端側に設置するネットフレームと、該ネットフレームとフレーム支持金具との間に張設する支持索と、前記アームを囲繞して作業空間を形成すべく該アームからネットフレームにかけて該支持索に展開可能に掛装する飛散防止ネットとから構成してなる送電鉄塔塗装時の塗料飛散防止装置。   A power transmission tower that includes a tower body and a plurality of arms that are spaced apart in the height direction and project from the tower body in the lateral direction on the left and right sides, and that supports the power transmission line via an insulator provided on the tip side of the arm. A paint scattering prevention device for a power transmission tower for painting, a frame support fitting attached to the tower corresponding to the position of the arm, and a net installed on the tip side of the arm to form a work space A frame, a support cable stretched between the net frame and the frame support bracket, and a scatter that is deployed on the support cable from the arm to the net frame so as to surround the arm and form a work space. A paint scattering prevention device for painting power transmission towers, which consists of a prevention net. 前記飛散防止ネットにより形成する作業空間は、底面に塗料落下防止シートを敷設してあることを特徴とする請求項1記載の送電鉄塔塗装時の塗料飛散防止装置。   2. The paint splash prevention device for painting a power transmission tower according to claim 1, wherein a work space formed by the splash prevention net has a paint fall prevention sheet laid on the bottom surface. 塔体と、高さ方向に離間して該塔体から左右の横方向に突設した複数のアームとからなり、該各アームの先端側に設けた碍子を介して送電線を支持する送電鉄塔を塗装するための送電鉄塔の塗装工法であって、前記アームの位置に対応して前記塔体にフレーム支持金具を取着する工程と、作業空間を形成すべく前記アームの先端側にネットフレームを設置する工程と、該ネットフレームとフレーム支持金具との間に支持索を張設する工程と、前記アームを囲繞して作業空間を形成すべく、該アームからネットフレームにかけて飛散防止ネットを該支持索に展開可能に掛装する工程と、該飛散防止ネットにより形成した作業空間内で前記アームを塗装する工程とからなる送電鉄塔の塗装工法。   A power transmission tower comprising a tower body and a plurality of arms projecting laterally from the tower body in the left-right direction and spaced apart in the height direction, and supporting a power transmission line via an insulator provided on a tip side of each arm A method of painting a power transmission tower for painting a frame, a step of attaching a frame support bracket to the tower body corresponding to the position of the arm, and a net frame on the tip side of the arm to form a work space A step of installing a support cable between the net frame and the frame support bracket, and a scattering prevention net from the arm to the net frame so as to form a work space surrounding the arm. A power transmission tower painting method comprising a step of deploying a support line in a deployable manner and a step of painting the arm in a work space formed by the scattering prevention net. 前記飛散防止ネットを前記支持索に展開可能に掛装して前記作業空間を形成した後、底面に塗料落下防止シートを敷設する工程を行うことを特徴とする請求項3記載の送電鉄塔の塗装工法。
4. The power tower according to claim 3, wherein a step of laying a paint drop prevention sheet on a bottom surface is performed after the scattering net is detachably mounted on the support rope to form the work space. Construction method.
JP2004332119A 2004-11-16 2004-11-16 Paint scattering prevention device for painting power transmission tower and painting method for power transmission tower Active JP4352404B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2004332119A JP4352404B2 (en) 2004-11-16 2004-11-16 Paint scattering prevention device for painting power transmission tower and painting method for power transmission tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2004332119A JP4352404B2 (en) 2004-11-16 2004-11-16 Paint scattering prevention device for painting power transmission tower and painting method for power transmission tower

Publications (2)

Publication Number Publication Date
JP2006142135A JP2006142135A (en) 2006-06-08
JP4352404B2 true JP4352404B2 (en) 2009-10-28

Family

ID=36622417

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2004332119A Active JP4352404B2 (en) 2004-11-16 2004-11-16 Paint scattering prevention device for painting power transmission tower and painting method for power transmission tower

Country Status (1)

Country Link
JP (1) JP4352404B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5858531B2 (en) * 2012-03-09 2016-02-10 住澤塗装工業株式会社 Curing equipment for painting work
JP6300566B2 (en) * 2014-02-19 2018-03-28 株式会社シーテック Method for adjusting base of power transmission tower, scattering prevention method and scattering prevention device
JP2020124664A (en) * 2019-02-04 2020-08-20 東京電力ホールディングス株式会社 Steel tower maintenance method and steel tower maintenance device

Also Published As

Publication number Publication date
JP2006142135A (en) 2006-06-08

Similar Documents

Publication Publication Date Title
JP6312109B1 (en) Safety device for temporary scaffold
JP4352404B2 (en) Paint scattering prevention device for painting power transmission tower and painting method for power transmission tower
JP5150854B2 (en) Protective net for airborne aircraft
JP2009082725A (en) Lifting, stretching, and moving system for suspended and stretched body such as net or sheet using winch
JP4502149B1 (en) Suspension and movement system for a suspended body such as a net or sheet using a winding winch
JP4835929B2 (en) Installation method of steel tower scattering protection net
JP2010046451A (en) Moving system of tent such as net or sheet using winding winch
JP2002013294A (en) Safety halter for building work
JP2943564B2 (en) Gondola equipment
JP5285472B2 (en) Curing sheet opening and closing device
JP2011006199A (en) Leaving device, crane, and rope wiring method
JP3045246B2 (en) How to attach a curing net for gondola work
KR200237756Y1 (en) Placard A Rack System
JP5377361B2 (en) Net extension device for steel pipe support
JP4397256B2 (en) Windbreak snow fence
JP2011038256A (en) Falling object catching net
JP5730435B1 (en) Flag display jig
JP3104755U (en) Hanging device for fall prevention net guide rope
JP2000179158A (en) Protection panel and scattering prevention method
KR101858900B1 (en) The folding cover for Powder cutoff of a vessel under repair
JPH1096326A (en) Protecting hanging floor plate construction
JP7257863B2 (en) Exterior panel hanging tool and exterior panel hanging method
JP3202286U (en) Tip guide ball and master rope deployment tool
JP2002332755A (en) Roof for multipurpose house
JP3927879B2 (en) Plastic sheet setting tool, sheet guide net used therefor, and plastic sheet setting method using the same

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20060306

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20081113

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20090217

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20090630

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20090716

R150 Certificate of patent or registration of utility model

Ref document number: 4352404

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120807

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130807

Year of fee payment: 4

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250