JP4198012B2 - Fixed asset management apparatus, fixed asset management system, method, program, and recording medium - Google Patents

Fixed asset management apparatus, fixed asset management system, method, program, and recording medium Download PDF

Info

Publication number
JP4198012B2
JP4198012B2 JP2003300240A JP2003300240A JP4198012B2 JP 4198012 B2 JP4198012 B2 JP 4198012B2 JP 2003300240 A JP2003300240 A JP 2003300240A JP 2003300240 A JP2003300240 A JP 2003300240A JP 4198012 B2 JP4198012 B2 JP 4198012B2
Authority
JP
Japan
Prior art keywords
fixed asset
fixed
information
required time
asset management
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2003300240A
Other languages
Japanese (ja)
Other versions
JP2005071094A (en
Inventor
典夫 伊東
義弘 杉山
淳二 佐藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ricoh Co Ltd
Original Assignee
Ricoh Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ricoh Co Ltd filed Critical Ricoh Co Ltd
Priority to JP2003300240A priority Critical patent/JP4198012B2/en
Publication of JP2005071094A publication Critical patent/JP2005071094A/en
Application granted granted Critical
Publication of JP4198012B2 publication Critical patent/JP4198012B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

本発明は、固定資産管理装置、固定資産管理システム、方法、プログラム、及び記録媒体、より詳細には、固定資産管理の対象となる機器等の照合、管理を行う固定資産管理装置、固定資産管理システム、方法、プログラム、及び記録媒体に関する。   The present invention relates to a fixed asset management apparatus, a fixed asset management system, a method, a program, and a recording medium. More specifically, the present invention relates to a fixed asset management apparatus and a fixed asset management for collating and managing devices and the like that are targets of fixed asset management. The present invention relates to a system, a method, a program, and a recording medium.

従来の固定資産管理では、例えば、各期において各部門の識別コードなどを入力することで、対応する部門の固定資産台帳を紙出力し、実際に対象となる機器に照らし合わせながら管理、調査を実施していた。この際、出力される固定資産台帳は、所定の帳票形式にて印刷され、通常であれば表形式のフォーマットで管理される。   In conventional fixed asset management, for example, by inputting the identification code of each department in each period, the fixed asset ledger of the corresponding department is output on paper, and management and investigation are performed against the actual target equipment. It was carried out. At this time, the output fixed asset ledger is printed in a predetermined form format, and is normally managed in a table format.

固定資産の管理を行う担当者は、印刷された帳票と実際に設置される機器に貼付される品番等を順次照らし合わせることで、調査対象部門の固定資産機器の管理を行っていた。照合された資産管理の結果は、別途担当者によって入力され、その入力された結果が統合的に固定資産管理DBに格納され、格納された固定資産情報は、管理センタで一元管理される。ここで、照合した結果を紙ベースの帳票に記載し、記載された帳票に基づいて元データを確認したり、修正する等していたため、固定資産対象の機器台数が多いような場合には、確認作業に時間がかかり、作業効率が悪かった。   The person in charge who manages the fixed assets managed the fixed asset equipment in the surveyed department by sequentially comparing the printed forms with the part numbers attached to the equipment actually installed. The collated asset management result is separately input by a person in charge, the input result is integratedly stored in the fixed asset management DB, and the stored fixed asset information is centrally managed by the management center. Here, the result of collation was written in a paper-based form, and the original data was confirmed or corrected based on the written form. The confirmation work took time and the work efficiency was poor.

上記のような状況に鑑みて、最近では、人手による作業を軽減するために、コンピュータを利用した固定資産管理システムが提供されている。例えば、固定資産の照合に際し、各種情報が包含されたバーコードをハンディターミナルで読み取り、読み取った内容を表示すると共に、対応する情報をホストから受信し、バーコードデータとホストデータを共に表示できるようにしたものが開示されている(例えば、特許文献1参照)。
また、例えば、特許文献2では、固定資産台帳に相当する電子台帳と、固定資産の配置図である電子マップとの内容を対応付けて閲覧できるようにしたものが開示されている。
また、例えば、特許文献3では、サーバがネットワークを介してコマンドを送信することにより、固定資産管理の調査対象となる情報機器の固定資産情報にアクセスし、各々の情報機器から送信された固定資産情報を統合的に管理できるようにしたものが開示されている。
特開平7−311800号公報 特開2002−304514号公報 特開2003−91637号公報
In view of the above situation, recently, a fixed asset management system using a computer has been provided in order to reduce manual work. For example, when collating fixed assets, barcodes containing various types of information can be read with a handy terminal, the read contents can be displayed, and the corresponding information can be received from the host so that both barcode data and host data can be displayed. (For example, refer to Patent Document 1).
Further, for example, Patent Document 2 discloses a document that can be browsed in association with the contents of an electronic ledger corresponding to a fixed asset ledger and an electronic map that is an arrangement diagram of fixed assets.
Also, for example, in Patent Document 3, the server accesses a fixed asset information of an information device to be investigated for fixed asset management by sending a command via the network, and the fixed asset transmitted from each information device. The information that can be managed in an integrated manner is disclosed.
JP 7-311800 A JP 2002-304514 A JP 2003-91637 A

ここで、固定資産の調査にあたり、調査担当者が作業を効率的に実施するために作業スケジュールを立案する場合、調査対象となる固定資産の状態(例えば、数量,設置場所,設置状態など)に応じて棚卸にかかる所要時間がまちまちとなり、正確な作業スケジュールを作成することが困難であった。特に、前回の固定資産調査にかかった所要時間を目安にしておおよその所要時間を予測するような場合でも、前回の調査時点から固定資産の追加や除却、売却、設置場所の変更、調査担当者の変更等があると、その変動要素を加味した状態で調査にかかる所要時間を予測することができず、結局、正確な作業スケジュールを組むことはできない。このことは、上記特許文献1、特許文献2、特許文献3においても同様であって、固定資産調査の対象となる機器等に対してどの程度調査時間がかかるか、正確に予測できるようにはなっていない。   Here, when investigating fixed assets, the investigator prepares a work schedule in order to carry out work efficiently, depending on the state of the fixed assets to be investigated (for example, quantity, installation location, installation state, etc.) Accordingly, the time required for inventory varies, and it is difficult to create an accurate work schedule. In particular, even when the approximate time required is estimated based on the time required for the previous fixed asset survey, the addition or removal of fixed assets, sale, change of installation location, investigator from the previous survey If there is a change or the like, it is impossible to predict the time required for the investigation in consideration of the variation factors, and it is impossible to make an accurate work schedule after all. This also applies to Patent Document 1, Patent Document 2, and Patent Document 3 described above, so that it is possible to accurately predict how much survey time will be required for a device or the like subject to fixed asset survey. is not.

本発明は、上述のごとき実情に鑑みてなされたものであり、固定資産の調査を行う際に、前回の調査結果及びその前回調査時にかかった所要時間実績から、固定資産の状態(例えば、数量,設置場所,設置状態など)と、その固定資産の調査にかかった所要時間との関係を求めて、この関係に基づき固定資産調査にかかる所要時間見込みを算出できるようにすると共に、算出した所要時間見込みを調査対象とする固定資産に関する情報と共に調査担当者等に通知して効率的な固定資産調査を実施できるようにした固定資産管理装置、固定資産管理システム、方法、プログラム、及び記録媒体を提供すること、を目的としてなされたものである。   The present invention has been made in view of the circumstances as described above. When investigating a fixed asset, the state of the fixed asset (for example, the quantity) is obtained from the previous investigation result and the time required for the previous investigation. , Installation location, installation status, etc.) and the required time for the fixed asset survey, and the estimated required time for the fixed asset survey can be calculated based on this relationship. A fixed asset management device, a fixed asset management system, a method, a program, and a recording medium that notify an investigator, etc., together with information on the fixed asset whose time estimate is to be investigated, so that an efficient fixed asset investigation can be performed. It was made for the purpose of providing.

請求項1の発明は、固定資産の管理を行うための固定資産管理装置において、該固定資産管理装置は、固定資産の種別,数量,設置場所,設置状態のいずれか1又は複数を含む固定資産情報とその固定資産の調査にかかった所要時間実績とを関連付けて部門別に登録した固定資産データベースと、前回の調査時点から固定資産情報の変更があった場合に前記固定資産データベースの固定資産情報を更新する更新手段と、部門を識別するための部門コードの入力を受け付ける部門コード入力手段と、該受け付けた部門コードに応じて前記固定資産データベースから該当する部門の固定資産情報を抽出する固定資産情報抽出手段と、該抽出した各固定資産情報について前記更新手段により更新されているかどうかを判断する更新判断手段と、該更新判断手段によって更新されていると判断された場合、該更新された固定資産の調査にかかる所要時間見込みを、前記前回調査時における固定資産情報とその所要時間実績との関係に基づいて算出する所要時間算出手段とを有することを特徴としたものである。   The invention of claim 1 is a fixed asset management device for managing fixed assets, wherein the fixed asset management device includes any one or more of a fixed asset type, quantity, installation location, and installation status. The fixed asset database that is registered for each department by associating the information with the actual time required to investigate the fixed asset, and the fixed asset information in the fixed asset database when the fixed asset information has changed since the previous survey Update means for updating, department code input means for receiving input of a department code for identifying a department, and fixed asset information for extracting fixed asset information of the corresponding department from the fixed asset database according to the received department code Extraction means; update determination means for determining whether or not each of the extracted fixed asset information has been updated by the update means; and When it is determined that the updated information has been updated by the determination means, the required time for the updated fixed asset survey is calculated based on the relationship between the fixed asset information and the actual required time at the time of the previous survey. And a time calculation means.

請求項2の発明は、請求項1の発明において、前記所要時間算出手段は、前記更新判断手段によって固定資産情報が更新されていないと判断された固定資産に対して、該固定資産の調査にかかる所要時間見込みを、前記前回調査時における所要時間実績とすることを特徴としたものである。   According to a second aspect of the present invention, in the first aspect of the invention, the required time calculation unit is configured to investigate a fixed asset for which the fixed asset information is determined not to be updated by the update determining unit. Such a required time estimate is a required time record at the time of the previous survey.

請求項3の発明は、請求項1又は2の発明において、前記所要時間算出手段は、前記各固定資産情報について求めた所要時間見込みに基づいて前記部門の固定資産調査にかかる所要時間見込みの合計値を算出することを特徴としたものである。   According to a third aspect of the present invention, in the first or second aspect of the invention, the required time calculation means is a total estimated time required for the fixed asset survey of the department based on the estimated required time obtained for each fixed asset information. It is characterized by calculating a value.

請求項4の発明は、請求項3の発明において、該固定資産管理装置は、前記所要時間算出手段によって算出された前記部門の固定資産調査にかかる所要時間見込みの合計値及び対象となる固定資産情報を併せて電子メールによって通知する通知手段を有することを特徴としたものである。   According to a fourth aspect of the present invention, in the third aspect of the invention, the fixed asset management device is configured to calculate a total estimated time required for the fixed asset survey of the department calculated by the required time calculation means and a target fixed asset. It has a notification means for notifying information by e-mail together.

請求項5の発明は、請求項1の発明において、前記所要時間算出手段は、固定資産の数量に基づく所要時間見込みを、前記前回調査時の固定資産情報に含まれる固定資産の数量と、その数量に対する所要時間実績との関係に基づいて算出することを特徴としたものである。   According to a fifth aspect of the present invention, in the first aspect of the invention, the required time calculation means calculates the estimated required time based on the quantity of the fixed asset, the quantity of the fixed asset included in the fixed asset information at the previous survey, The calculation is based on the relationship with the required time record for the quantity.

請求項6の発明は、請求項1又は5の発明において、前記所要時間算出手段は、固定資産の設置場所に基づく所要時間見込みを、前記前回調査時の固定資産情報に含まれる固定資産の設置場所と、その設置場所に対する所要時間実績との関係に基づいて算出することを特徴としたものである。   According to a sixth aspect of the present invention, in the first or fifth aspect of the invention, the required time calculation means calculates the estimated required time based on the installation location of the fixed asset and installs the fixed asset included in the fixed asset information at the previous survey The calculation is based on the relationship between the location and the actual time required for the installation location.

請求項7の発明は、請求項1,5,6のいずれか1の発明において、前記所要時間算出手段は、固定資産の設置状態に基づく所要時間見込みを、前記前回調査時の固定資産情報に含まれる固定資産の設置状態と、その設置状態に対する所要時間実績との関係に基づいて算出することを特徴としたものである。   The invention of claim 7 is the invention according to any one of claims 1, 5 and 6, wherein the required time calculation means sets the estimated required time based on the installation state of the fixed asset in the fixed asset information at the previous survey. The calculation is based on the relationship between the installation state of the included fixed assets and the required time record for the installation state.

請求項8の発明は、請求項1乃至7のいずれか1の発明において、該固定資産管理装置は、固定資産の調査に係わる調査担当者のスキルレベルを少なくとも含む担当者情報を固定資産情報に関連付けて部門別に登録した担当者情報データベースを有し、前記所要時間算出手段は、調査担当者のスキルレベルに基づく所要時間見込みを、前記前回調査時に担当した調査担当者のスキルレベルと、その調査担当者のスキルレベルに対する所要時間実績との関係に基づいて算出することを特徴としたものである。   The invention of claim 8 is the invention according to any one of claims 1 to 7, wherein the fixed asset management device converts the person in charge information including at least the skill level of the person in charge of investigating the fixed asset into the fixed asset information. The person-in-charge information database that is associated and registered for each department has the required time calculation means for estimating the required time based on the skill level of the investigator, the skill level of the investigator who was in charge of the previous investigation, and the investigation The calculation is based on the relationship with the actual time required for the skill level of the person in charge.

請求項9の発明は、請求項1乃至8のいずれか1の発明において、前記固定資産データベースは、過去における固定資産の調査結果及びその調査時にかかった所要時間実績を調査履歴として部門別に登録して有し、前記固定資産管理装置は、前記所要時間算出手段によって所要時間見込みを算出した固定資産と同様の状態であった固定資産の調査結果を前記固定資産データベースから検索し、該検索した調査結果の調査時にかかった所要時間実績と、前記所要時間見込みとを比較することにより該所要時間見込みの妥当性を判定する妥当性判定手段を有することを特徴としたものである。   The invention of claim 9 is the invention according to any one of claims 1 to 8, wherein the fixed asset database registers the past fixed asset survey results and the required time results of the survey as a survey history for each department. The fixed asset management apparatus searches the fixed asset database for a fixed asset survey result that is in the same state as the fixed asset for which the required time estimate has been calculated by the required time calculation means, and the searched survey The present invention is characterized by having a validity determination means for determining the validity of the required time estimate by comparing the actual required time taken at the time of examining the result and the estimated required time.

請求項10の発明は、固定資産の管理を行うための固定資産管理装置を有する固定資産管理システムにおいて、該固定資産管理装置は、固定資産の種別,数量,設置場所,設置状態のいずれか1又は複数を含む固定資産情報とその固定資産の調査にかかった所要時間実績とを関連付けて部門別に登録した固定資産データベースと、前回の調査時点から固定資産情報の変更があった場合に前記固定資産データベースの固定資産情報を更新する更新手段と、部門を識別するための部門コードの入力を受け付ける部門コード入力手段と、該受け付けた部門コードに応じて前記固定資産データベースから該当する部門の固定資産情報を抽出する固定資産情報抽出手段と、該抽出した各固定資産情報について前記更新手段により更新されているかどうかを判断する更新判断手段と、該更新判断手段によって更新されていると判断された場合、該更新された固定資産の調査にかかる所要時間見込みを、前記前回調査時における固定資産情報とその所要時間実績との関係に基づいて算出する所要時間算出手段とを有することを特徴としたものである。   The invention of claim 10 is a fixed asset management system having a fixed asset management device for managing fixed assets, wherein the fixed asset management device is any one of the type, quantity, installation location, and installation state of fixed assets. Or a fixed asset database that is registered for each department by associating fixed asset information that includes multiple items with the actual time required for investigating the fixed asset, and the fixed asset when the fixed asset information has changed since the previous survey. Update means for updating fixed asset information in the database, department code input means for receiving input of a department code for identifying the department, and fixed asset information of the corresponding department from the fixed asset database according to the received department code Fixed asset information extracting means for extracting the information, and whether each of the extracted fixed asset information has been updated by the updating means An update determination means for determining, and when it is determined that the update determination means has updated, the estimated time required for the investigation of the updated fixed asset is the fixed asset information and the actual time required for the previous investigation. Required time calculating means for calculating based on the relationship between

請求項11の発明は、請求項10の発明において、前記所要時間算出手段は、前記更新判断手段によって固定資産情報が更新されていないと判断された固定資産に対して、該固定資産の調査にかかる所要時間見込みを、前記前回調査時における所要時間実績とすることを特徴としたものである。   According to an eleventh aspect of the present invention, in the tenth aspect of the present invention, the required time calculation means investigates the fixed assets for the fixed assets for which the fixed asset information has not been updated by the update determining means. Such a required time estimate is a required time record at the time of the previous survey.

請求項12の発明は、請求項10又は11の発明において、前記所要時間算出手段は、前記各固定資産情報について求めた所要時間見込みに基づいて前記部門の固定資産調査にかかる所要時間見込みの合計値を算出することを特徴としたものである。   The invention of claim 12 is the invention of claim 10 or 11, wherein the required time calculation means is a total of estimated time required for investigating the fixed assets of the department based on the estimated time required for each fixed asset information. It is characterized by calculating a value.

請求項13の発明は、請求項12の発明において、該固定資産管理装置は、固定資産の調査に係わる調査担当者が使用する端末装置とネットワークを介して接続可能とし、前記所要時間算出手段によって算出された前記部門の固定資産調査にかかる所要時間見込みの合計値及び対象となる固定資産情報を併せて電子メールによって前記端末装置に通知する通知手段を有することを特徴としたものである。   According to a thirteenth aspect of the present invention, in the twelfth aspect of the present invention, the fixed asset management device can be connected to a terminal device used by a person in charge of investigating fixed assets through a network, and the required time calculating means It has a notification means for notifying the terminal device by electronic mail together with the calculated total estimated time required for the fixed asset survey of the department and the target fixed asset information.

請求項14の発明は、請求項1乃至9のいずれか1に記載の固定資産管理装置を用いて固定資産管理を行うための固定資産管理方法において、固定資産の種別,数量,設置場所,設置状態のいずれか1又は複数を含む固定資産情報とその固定資産の調査にかかった所要時間実績とを関連付けて部門別に固定資産データベースに登録する登録ステップと、前回の調査時点から固定資産情報の変更があった場合に前記固定資産データベースの固定資産情報を更新する更新ステップと、部門を識別するための部門コードの入力を受け付ける部門コード入力ステップと、該受け付けた部門コードに応じて前記固定資産データベースから該当する部門の固定資産情報を抽出する固定資産情報抽出ステップと、該抽出した各固定資産情報について前記更新ステップにより更新されているかどうかを判断する更新判断ステップと、該更新判断ステップにおいて更新されていると判断された場合、該更新された固定資産の調査にかかる所要時間見込みを、前記前回調査時における固定資産情報とその所要時間実績との関係に基づいて算出する所要時間算出ステップとを有することを特徴としたものである。   The invention of claim 14 is a fixed asset management method for performing fixed asset management using the fixed asset management device according to any one of claims 1 to 9, wherein the type, quantity, installation location, and installation of the fixed asset A registration step that associates fixed asset information that includes one or more of the states with the actual time required to investigate the fixed asset and registers it in the fixed asset database by department, and changes to the fixed asset information from the previous survey An update step for updating the fixed asset information in the fixed asset database when there is, a department code input step for receiving an input of a department code for identifying the department, and the fixed asset database according to the received department code The fixed asset information extraction step for extracting the fixed asset information of the corresponding department from the above, and the update for each of the extracted fixed asset information An update determination step for determining whether or not it has been updated by the step, and if it is determined that the update has been updated in the update determination step, the estimated time required for the inspection of the updated fixed asset is A required time calculation step for calculating based on the relationship between the fixed asset information and the required time record is provided.

請求項15の発明は、請求項14の発明において、前記所要時間算出ステップにおいて、前記更新判断ステップにて固定資産情報が更新されていないと判断された固定資産に対して、該固定資産の調査にかかる所要時間見込みを、前記前回調査時における所要時間実績とすることを特徴としたものである。   According to a fifteenth aspect of the invention, in the fifteenth aspect of the invention, in the required time calculation step, for the fixed asset for which it is determined that the fixed asset information has not been updated in the update determining step, the fixed asset survey is performed. The estimated time required for the above is the actual time required for the previous survey.

請求項16の発明は、請求項14又は15の発明において、前記所要時間算出ステップにおいて、前記各固定資産情報について求めた所要時間見込みに基づいて前記部門の固定資産調査にかかる所要時間見込みの合計値を算出することを特徴としたものである。   The invention of claim 16 is the invention of claim 14 or 15, wherein, in the required time calculation step, a total estimated time required for investigating the fixed assets of the department based on the estimated time required for each fixed asset information. It is characterized by calculating a value.

請求項17の発明は、請求項16の発明において、前記固定資産管理装置と、固定資産の調査に係わる調査担当者が使用する端末装置とがネットワークを介して接続され、前記所要時間算出ステップにて算出された前記部門の固定資産調査にかかる所要時間見込みの合計値及び対象となる固定資産情報を併せて電子メールによって前記端末装置に通知する通知ステップを有することを特徴としたものである。   The invention of claim 17 is the invention of claim 16, wherein the fixed asset management device and a terminal device used by a person in charge of investigating fixed assets are connected via a network, and the required time calculating step is performed. And a notification step of notifying the terminal device by e-mail of the total estimated time required for the fixed asset survey of the department and the target fixed asset information.

請求項18の発明は、請求項1乃至9のいずれか1に記載の固定資産管理装置としての機能を実現するためのプログラムである。   The invention of claim 18 is a program for realizing the function as the fixed asset management apparatus according to any one of claims 1 to 9.

請求項19の発明は、請求項18に記載のプログラムを記録したコンピュータ読み取り可能な記録媒体である。   A nineteenth aspect of the present invention is a computer-readable recording medium on which the program according to the eighteenth aspect is recorded.

本発明によると、固定資産の調査を行う際に、前回の調査結果及びその前回調査時にかかった所要時間実績から、固定資産の状態(例えば、数量,設置場所,設置状態など)と、その固定資産の調査にかかった所要時間との関係を求めて、この関係に基づき固定資産調査にかかる所要時間見込みを算出することができると共に、算出した所要時間見込みを調査対象とする固定資産に関する情報と共に調査担当者等に通知して効率的な固定資産調査を実施することができる。
また、固定資産調査にかかる所要時間見込みが部門別にわかるため、調査部門において精度の高い綿密な作業スケジュールを立案することができる。
According to the present invention, when investigating a fixed asset, the state of the fixed asset (for example, quantity, installation location, installation state, etc.) and its fixation are determined from the previous investigation result and the actual time required for the previous investigation. Obtain the relationship with the time required for investigating the asset, and calculate the estimated time required for the fixed asset survey based on this relationship, along with information on the fixed asset subject to the survey An efficient fixed asset survey can be conducted by notifying the person in charge of the survey.
In addition, since the estimated time required for the fixed asset survey is known for each department, it is possible to plan a precise work schedule with high accuracy in the research department.

図1は、本発明に係わる情報処理装置の内部構成例を示すブロック図で、1はCPU、2はRAM、3はROM、4はHDD等の記憶装置、5は入力装置、6は表示装置、7は通信装置、8は出力装置、9はシステムバスである。本発明の固定資産管理装置、又は固定資産管理システムに係るサーバ装置や端末装置は、図1に示すような情報処理装置、すなわち汎用コンピュータに基づいて構成される。本装置(又はシステム)で取り扱う情報は、その処理時に一時的にRAM2に格納され、必要に応じて、CPU1によって読出し、修正、及び書き込み等が実行される。また、この情報処理装置を本装置(又はシステム)として機能させるためのプログラムは、ROM3又は記憶装置4に格納され、CPU1が適宜RAM2に読み出すことにより実行される。また、処理の途中経過や処理結果は、CRT,LCD等の表示装置6を通じてユーザに提示され、各処理において、ユーザは、キーボード,マウス(ポインティングデバイス)等の入力装置5から必要なパラメータ等を入力指定する。   FIG. 1 is a block diagram showing an internal configuration example of an information processing apparatus according to the present invention. 1 is a CPU, 2 is a RAM, 3 is a ROM, 4 is a storage device such as an HDD, 5 is an input device, and 6 is a display device. , 7 is a communication device, 8 is an output device, and 9 is a system bus. A server device and a terminal device according to the fixed asset management apparatus or the fixed asset management system of the present invention are configured based on an information processing apparatus as shown in FIG. 1, that is, a general-purpose computer. Information handled by this apparatus (or system) is temporarily stored in the RAM 2 at the time of processing, and is read, modified, written, etc. by the CPU 1 as necessary. A program for causing the information processing apparatus to function as the apparatus (or system) is stored in the ROM 3 or the storage device 4 and is executed by the CPU 1 reading it into the RAM 2 as appropriate. Further, the progress of the process and the processing result are presented to the user through a display device 6 such as a CRT or LCD, and in each process, the user inputs necessary parameters from the input device 5 such as a keyboard and a mouse (pointing device). Specify input.

上記プログラムは、表示装置6においてユーザが使用する際に操作が容易となるように、グラフィカルユーザインタフェイス(GUI)を備えるようにするとよい。通信装置7は、ネットワーク等を介して他の情報処理装置と通信を行う。尚、CPU1、RAM2,ROM3,記憶装置4,入力装置5,表示装置6,通信装置7,出力装置8はシステムバス9で接続され、相互にアクセス可能とする。   The program may be provided with a graphical user interface (GUI) so that the user can operate the display device 6 easily. The communication device 7 communicates with other information processing devices via a network or the like. The CPU 1, the RAM 2, the ROM 3, the storage device 4, the input device 5, the display device 6, the communication device 7 and the output device 8 are connected by a system bus 9 and are mutually accessible.

図2は、本発明の一実施形態に係わる固定資産管理装置の内部構成例について説明するためのブロック図で、図中、10は固定資産管理装置で、該固定資産管理装置10は、固定資産の種別,数量,設置場所,設置状態のいずれか1又は複数を含む固定資産情報11aとその固定資産の調査にかかった所要時間実績11bとを関連付けて部門別に登録した固定資産DB11と、前回の調査時点から固定資産情報に関する変更があった場合に固定資産DB11の該当する固定資産情報11aを更新する更新手段12と、部門を識別するための部門コードの入力を受け付ける部門コード入力手段13と、部門コード入力手段13から受け付けた部門コードに応じて固定資産DB11から該当する部門の固定資産情報を抽出する固定資産情報抽出手段14と、固定資産情報抽出手段14によって抽出された各固定資産情報について更新手段12により更新されているかどうかを判断する更新判断手段15と、更新判断手段15によって更新されていると判断された場合、更新された固定資産の調査にかかる所要時間見込みを、前回調査時における固定資産情報11aとその所要時間実績11bとの関係に基づいて算出する所要時間算出手段16と、その算出結果等を電子メールによって通知する通知手段17を備えているものとする。   FIG. 2 is a block diagram for explaining an internal configuration example of a fixed asset management apparatus according to an embodiment of the present invention. In the figure, 10 is a fixed asset management apparatus, and the fixed asset management apparatus 10 is a fixed asset. Fixed asset DB 11 that registers the fixed asset information 11a including any one or more of the type, quantity, installation location, and installation state and the required time record 11b required for the investigation of the fixed asset by department, An update unit 12 that updates the corresponding fixed asset information 11a in the fixed asset DB 11 when there is a change related to the fixed asset information from the time of the survey, a department code input unit 13 that receives an input of a department code for identifying the department, A fixed asset information extractor that extracts the fixed asset information of the corresponding department from the fixed asset DB 11 according to the department code received from the department code input means 13 14, an update determination unit 15 that determines whether or not each fixed asset information extracted by the fixed asset information extraction unit 14 is updated by the update unit 12, and a case where the update determination unit 15 determines that the information is updated The required time calculation means 16 for calculating the estimated required time for the survey of the updated fixed assets based on the relationship between the fixed asset information 11a and the required time record 11b at the time of the previous survey, and the calculation result etc. It is assumed that notification means 17 for notifying by mail is provided.

尚、通知手段17は、電子メールに限定されるものではなく、調査担当者側からの照会に応じて算出結果を出力するようにしてもよい。例えば、電子メールの通知後に調査担当者が、その電子メールを誤って削除したような場合、端末装置から固定資産管理装置10にアクセスして再度算出結果を確認することが可能となる。   Note that the notification means 17 is not limited to electronic mail, and may output a calculation result in response to an inquiry from the investigator side. For example, in the case where the investigator accidentally deletes the e-mail after notification of the e-mail, the calculation result can be confirmed again by accessing the fixed asset management apparatus 10 from the terminal device.

ここで、本発明の固定資産管理装置10の実施形態として、固定資産管理装置10はネットワーク等を介して固定資産DB11にアクセスするようにしてもよい。すなわち、固定資産DB11が固定資産管理装置10と物理的に離散している場合や、また、固定資産DB11が固定資産管理装置10に物理的に含まれている場合のどちらの形態もとりうる。また、固定資産管理装置10には、上記各手段が有する機能を実行するためのプログラムを格納しておく。   Here, as an embodiment of the fixed asset management apparatus 10 of the present invention, the fixed asset management apparatus 10 may access the fixed asset DB 11 via a network or the like. In other words, the fixed asset DB 11 may be physically separated from the fixed asset management device 10 or the fixed asset DB 11 may be physically included in the fixed asset management device 10. The fixed asset management apparatus 10 stores a program for executing the functions of the above means.

固定資産管理装置10は、上記各手段が有する機能をサーバ装置及び端末装置に分散させて実行させる形態としてもよい。また、各種のアプリケーションを動作させる際の基盤となるOS(Operating System)上で機能するグループウェア等により固定資産管理装置10としての機能を実行させるようにしてもよい。上記グループウェアとは、例えば、電子メール,電子掲示板,電子会議,スケジュール管理,文書管理,ワークフロー管理等からなる6つの機能を有している。このグループウェアは多数の企業等において、例えば、営業資料の管理,プロジェクトの管理,企画情報の管理,顧客サービスの管理,組織票の管理等を行うためのアプリケーションとして導入されており、企業における共有情報を増やし、組織の活性化を目的としたエンジニアリングのツールとして広く活用されている。尚、上記グループウェアのかわりにWebを利用して固定資産管理装置10としての機能を実行させる形態としてもよい。   The fixed asset management device 10 may be configured to execute the functions of the above means by distributing them to the server device and the terminal device. In addition, the function as the fixed asset management apparatus 10 may be executed by groupware or the like that functions on an OS (Operating System) serving as a base for operating various applications. The groupware has six functions including, for example, electronic mail, electronic bulletin board, electronic conference, schedule management, document management, workflow management, and the like. This groupware has been introduced in many companies as an application for managing sales materials, project management, planning information management, customer service management, organization chart management, etc. Widely used as an engineering tool to increase information and revitalize organizations. In addition, it is good also as a form which performs the function as the fixed asset management apparatus 10 using Web instead of the said groupware.

図3は、固定資産管理装置10に登録されている固定資産リストの一例を示す図である。この固定資産リストは固定資産を部門別にリスト化したもので、固定資産DB11に登録されている。部門毎の各固定資産に対して、例えば、連続番号,資産番号,資産名称,勘定(種別)科目等を設定して登録する。固定資産リストの作成にあたっては、必要とされる所定の固定資産に関する情報を、例えば各部門の調査担当者が端末装置等から入力して登録する。   FIG. 3 is a diagram illustrating an example of a fixed asset list registered in the fixed asset management apparatus 10. This fixed asset list is a list of fixed assets classified by department, and is registered in the fixed asset DB 11. For example, serial numbers, asset numbers, asset names, account (type) items, etc. are set and registered for each fixed asset in each department. In creating the fixed asset list, for example, a person in charge of survey in each department inputs and registers information related to required fixed assets from a terminal device or the like.

図4は、図3に示した固定資産リストに登録されている各固定資産に関する固定資産情報11aの一例を示す図である。本例は、図3に示した「資産番号20030813」のプリンタに関する固定資産情報について示したもので、例えば、資産番号,資産名称,部門コード,勘定(種別)コード,数量,設置場所(画像データの有無を含む),設置状態,資産調査時において実際に調査にかかった所要時間実績などが登録されている。   FIG. 4 is a diagram showing an example of fixed asset information 11a regarding each fixed asset registered in the fixed asset list shown in FIG. This example shows fixed asset information related to the printer of “Asset No. 20030813” shown in FIG. 3. For example, asset number, asset name, department code, account (type) code, quantity, installation location (image data) ), Installation status, and actual time required for the asset survey.

図5は、図4に示した固定資産情報について更新があった場合に更新処理された固定資産情報(更新情報)11a′の一例を示す図である。本例は、図4に示した固定資産情報11aを登録した時点(前回調査時点)から除却処理等により数量が1台減少した状態(5台→4台)を示している。すなわち、固定資産情報11aの構成に変更があったため、更新手段12が固定資産DB11の固定資産情報11aを更新したものである。このように、除却や売却処理以外にも、固定資産の追加、設置場所の変更など、固定資産情報の構成に何らかの変更があった場合、更新手段12が固定資産DB11の固定資産情報11aを更新する。この際、更新手段12は、更新履歴を固定資産DB11に記憶しておいてもよい。   FIG. 5 is a diagram illustrating an example of fixed asset information (update information) 11a ′ that has been updated when the fixed asset information illustrated in FIG. 4 is updated. This example shows a state (5 units → 4 units) in which the quantity has been reduced by 1 from the time when the fixed asset information 11a shown in FIG. That is, since the configuration of the fixed asset information 11a has changed, the update unit 12 updates the fixed asset information 11a in the fixed asset DB 11. As described above, in addition to the retirement and sale processing, if there is any change in the configuration of the fixed asset information such as addition of fixed assets or change of the installation location, the updating unit 12 updates the fixed asset information 11a in the fixed asset DB 11. To do. At this time, the update unit 12 may store the update history in the fixed asset DB 11.

尚、上記図4及び図5において、1つの資産番号に対して複数の固定資産(プリンタ)が割り当てられた例を示しているが、この場合、各固定資産の資産番号に枝番号を割り当てて識別するようにしてもよい。また、1つの資産番号に1つの固定資産を割り当てるようにしてもよく、この場合、部門において資産番号の異なる複数のプリンタが存在することになる。上記のように各固定資産には、識別可能なように固有の資産番号が割り当てられているものとする。   4 and 5 show an example in which a plurality of fixed assets (printers) are assigned to one asset number. In this case, branch numbers are assigned to the asset numbers of each fixed asset. You may make it identify. Further, one fixed asset may be assigned to one asset number. In this case, there are a plurality of printers having different asset numbers in the department. As described above, each fixed asset is assigned a unique asset number so that it can be identified.

固定資産の調査を行う場合、固定資産管理装置10に対して、調査担当者等が端末装置を用いて部門コード、例えば、図3乃至図5に示した部門コード:12345を入力すると、部門コード入力手段13がこの部門コード(12345)を受け付ける。この際、部門コード以外に、調査担当者,調査期間,調査場所等を含む今回の調査に関する情報を併せて入力するようにしてもよい。   When investigating fixed assets, if a person in charge of investigation inputs a department code, for example, department code: 12345 shown in FIGS. 3 to 5, to the fixed asset management apparatus 10 using a terminal device, the department code The input means 13 receives this department code (12345). At this time, in addition to the department code, information related to the current survey including the person in charge of the survey, the survey period, the survey location, and the like may be input.

次に、固定資産情報抽出手段14は、受け付けた部門コード(12345)に応じて固定資産DB11から該当する部門の固定資産情報、すなわち図3に示した固定資産リストを抽出する。更新判断手段15は、固定資産抽出手段14によって抽出された固定資産リストに含まれる各固定資産について更新手段12によって更新されているかどうかを判断する。この結果、更新されていると判断された固定資産に対して、所要時間算出手段16は、その更新された固定資産の調査にかかる所要時間見込みを、前回調査時における固定資産情報11aとその所要時間実績11bとの関係に基づいて算出する。尚、更新されていない、すなわち固定資産情報に変更がない固定資産に関しては、前回調査時の所要時間実績をそのまま用いるようにする。   Next, the fixed asset information extraction means 14 extracts the fixed asset information of the corresponding department from the fixed asset DB 11, that is, the fixed asset list shown in FIG. 3, according to the accepted department code (12345). The update determination unit 15 determines whether each fixed asset included in the fixed asset list extracted by the fixed asset extraction unit 14 has been updated by the update unit 12. As a result, for the fixed asset that is determined to be updated, the required time calculation means 16 calculates the estimated required time for the updated fixed asset investigation, the fixed asset information 11a at the time of the previous investigation, and the required time. It calculates based on the relationship with the time performance 11b. For fixed assets that have not been updated, that is, the fixed asset information has not changed, the actual time required for the previous survey is used as it is.

上記の具体例として、図4及び図5に示すように、固定資産の数量が変更されている場合、所要時間算出手段16は、固定資産の数量に基づく所要時間見込みを、前回調査時の固定資産情報11aに含まれる固定資産の数量と、その数量に対する所要時間実績11bとの関係に基づいて算出する。図4に示すように前回調査時に数量5台で所要時間実績が1時間であったプリンタの場合、両者の間には1台あたり平均12分かかったという関係が成り立つ。従って、図5に示すように数量4台に変更されている場合(設置場所、設置状態等には変更がないものとする)、その所要時間見込みは、1時間(60分)−12分=48分と算出される。このように、更新された固定資産について所要時間見込みを算出し、最後に、その部門における所要時間見込みの合計値を算出する。そして、通知手段17が、所要時間算出手段16によって算出された所要時間見込みの合計値及び対象となる固定資産情報を併せて電子メールによって調査担当者等に通知する。   As an example of the above, as shown in FIGS. 4 and 5, when the fixed asset quantity is changed, the required time calculation means 16 determines the required time estimate based on the fixed asset quantity at the time of the previous survey. Calculation is made based on the relationship between the quantity of fixed assets included in the asset information 11a and the required time record 11b with respect to the quantity. As shown in FIG. 4, in the case of a printer having a quantity of 5 units and a required time record of 1 hour at the time of the previous survey, there is a relationship that it took an average of 12 minutes per printer. Therefore, as shown in FIG. 5, when the number is changed to 4 (assuming that the installation location, installation state, etc. are not changed), the estimated time required is 1 hour (60 minutes) −12 minutes = Calculated as 48 minutes. In this way, the estimated time required is calculated for the updated fixed asset, and finally, the total value of the estimated time required in the department is calculated. Then, the notifying unit 17 notifies the investigator or the like by e-mail together with the total value of the estimated required time calculated by the required time calculating unit 16 and the target fixed asset information.

ここで、固定資産の設置場所が近く移動時間を無視できるような場合には上記のような方法でも問題ないが、設置場所が遠く移動時間が無視できない場合には、前回調査時において、所要時間実績の内訳を固定資産DB11に登録しておく。すなわち、上記の例において、所要時間実績1時間の内訳が移動時間10分、調査時間50分とした場合、調査に関して1台あたり平均10分かかったという関係が成り立つ。従って、図5に示すように数量4台に変更されている場合、その調査にかかる時間は、50分−10分=40分と算出され、求める所要時間見込みは、40分(調査時間)+10分(移動時間)=50分となる。   Here, if the fixed asset is close to the location where the travel time can be ignored, the above method can be used, but if the location is far away and the travel time cannot be ignored, the time required in the previous survey The breakdown of results is registered in the fixed asset DB 11. That is, in the above example, when the breakdown of the required time record of 1 hour is 10 minutes for the travel time and 50 minutes for the survey time, the relationship that it took 10 minutes on average per vehicle for the survey is established. Therefore, when the number is changed to 4 as shown in FIG. 5, the time required for the investigation is calculated as 50 minutes−10 minutes = 40 minutes, and the required time estimate is 40 minutes (survey time) +10 Minute (travel time) = 50 minutes.

また、固定資産の設置場所が変更されている場合、所要時間算出手段16は、固定資産の設置場所に基づく所要時間見込みを、前回調査時の固定資産情報に含まれる固定資産の設置場所と、その設置場所に対する所要時間実績との関係に基づいて算出するようにしてもよい。これは、固定資産の設置場所の変更に伴って移動時間が変化することに着目したもので、上記例の場合、前回調査時の設置場所である「研究開発棟2階201号室」まで移動に10分かかっていたものが、研究開発棟からさらに2分かかる別の建物に移された場合(数量、設置状態等には変更がないものとする)、その移動にかかる時間は、10分+2分=12分と算出される。従って、求める所要時間見込みは、50分(調査時間)+12分(移動時間)=62分となる。この際、上記のような実際の時間ベースではなく、実際の移動距離に基づいて移動にかかる時間を算出するようにしてもよい。例えば、前回調査時の設置場所である「研究開発棟2階201号室」まで移動距離1kmで10分かかっていたものが、研究開発棟からさらに1km先の別の建物に移された場合(数量、設置状態等には変更がないものとする)、その移動にかかる時間は、10分+10分=20分と算出される。   Further, when the fixed asset installation location has been changed, the required time calculation means 16 calculates the estimated required time based on the fixed asset installation location, and the fixed asset installation location included in the fixed asset information at the previous survey, You may make it calculate based on the relationship with the required time performance with respect to the installation place. This is due to the fact that the travel time changes with the change in the installation location of fixed assets. In the case of the above example, it will be moved to "R & D Building 2nd Floor Room 201" which is the installation location at the previous survey. If something that took 10 minutes is moved from the R & D building to another building that takes another 2 minutes (assuming there is no change in the quantity, installation status, etc.), the time required for the movement is 10 minutes + 2 Calculated as minutes = 12 minutes. Accordingly, the estimated required time is 50 minutes (investigation time) +12 minutes (movement time) = 62 minutes. At this time, the time required for movement may be calculated based on the actual movement distance instead of the actual time base as described above. For example, if it took 10 minutes from the R & D building to another building 1km away from the R & D building 2nd floor, room 201, which was the installation location at the time of the previous survey, It is assumed that the installation state or the like is not changed), and the time required for the movement is calculated as 10 minutes + 10 minutes = 20 minutes.

また、固定資産の設置状態が変更されている場合、所要時間算出手段16は、固定資産の設置状態に基づく所要時間見込みを、前記前回調査時の固定資産情報に含まれる固定資産の設置状態と、その設置状態に対する所要時間実績との関係に基づいて算出するようにしてもよい。これは、固定資産の設置状態の変更に伴って調査時間が変化することに着目したもので、上記例の場合、前回調査時の設置状態が「ラベル確認可能な状態」で調査に50分かかっていたものが、レイアウト変更等によりラベル確認がしにくい状態で設置された場合(数量、設置場所等には変更がないものとする)、その調査にかかる時間は、(50+α)分と算出される。従って、求める所要時間見込みは、(50+α)分(調査時間)+10分(移動時間)=(60+α)分となる。このαには、これまでの経験等に基づいて適切な値を設定するようにする。また、上記ラベルは、資産番号等が記載された識別ラベルで、固定資産に貼付されている。   When the fixed asset installation state has been changed, the required time calculation means 16 calculates the estimated required time based on the fixed asset installation state as the fixed asset installation state included in the fixed asset information at the previous survey. The calculation may be performed based on the relationship with the required time record for the installation state. This is based on the fact that the survey time changes with the change in the fixed asset installation status. In the above example, the installation status at the time of the previous survey was “a state where the label can be confirmed” and it took 50 minutes to investigate. If it was installed in a state where it was difficult to check the label due to a layout change etc. (assuming that there is no change in the quantity, installation location, etc.), the time required for the investigation is calculated as (50 + α) minutes The Accordingly, the estimated required time is (50 + α) minutes (survey time) +10 minutes (movement time) = (60 + α) minutes. An appropriate value is set for α based on past experience and the like. The label is an identification label on which an asset number or the like is written, and is affixed to the fixed asset.

また、固定資産の数量、設置場所、設置状態のいずれか複数が同時に変更されている場合にも、固定資産管理装置10は、上記と同様に、固定資産の調査にかかる所要時間見込みを算出することができる。   In addition, even when any one of the quantity, installation location, and installation state of fixed assets is changed at the same time, the fixed asset management apparatus 10 calculates the estimated time required for investigating the fixed assets as described above. be able to.

本発明によると、固定資産の調査対象とする台数が多いような場合でも、最新の固定資産の状況に応じた調査時間を把握することができるため、調査において確認作業を迅速に行うことができ、作業効率の向上を図ることができる。
また、調査部門に対して調査にかかる所要時間見込みを通知するので、調査部門において作業負荷を容易に把握することができる。
また、固定資産調査にかかる所要時間見込みが部門別にわかるため、調査部門において精度の高い綿密な作業スケジュールを立案することができる。
According to the present invention, even when there are a large number of fixed assets to be surveyed, it is possible to grasp the survey time according to the latest fixed asset status, so that the confirmation work can be quickly performed in the survey. The work efficiency can be improved.
In addition, since the estimated time required for the survey is notified to the survey department, the survey department can easily grasp the work load.
In addition, since the estimated time required for the fixed asset survey is known for each department, it is possible to plan a precise work schedule with high accuracy in the research department.

図6は、本発明の他の実施形態に係わる固定資産管理装置10の内部構成例について説明するためのブロック図で、固定資産管理装置10は、固定資産の調査に係わる調査担当者のスキルレベルを少なくとも含む担当者情報18aを固定資産情報に関連付けて部門別に登録した担当者情報DB18を備えている。本実施形態の所要時間算出手段16は、調査担当者のスキルレベルに基づく所要時間見込みを、前回調査時に担当した調査担当者のスキルレベルと、その調査担当者のスキルレベルに対する所要時間実績18bとの関係に基づいて算出する。   FIG. 6 is a block diagram for explaining an internal configuration example of the fixed asset management apparatus 10 according to another embodiment of the present invention. The fixed asset management apparatus 10 is a skill level of a person in charge of investigating fixed assets. The person-in-charge information DB 18 in which the person-in-charge information 18a including at least is registered for each department in association with the fixed asset information. The required time calculation means 16 of the present embodiment estimates the required time based on the skill level of the investigator, the skill level of the investigator who was in charge of the previous investigation, and the required time result 18b for the skill level of the investigator. It is calculated based on the relationship.

図7は、担当者情報DB18に登録されている担当者情報18aの一例を示す図である。この担当者情報18aは、例えば、担当者名,所属部門,電子メールアドレス,調査に係わるスキルレベル,所要時間実績(前回実績)などを含むものとする。この担当者情報18aには、さらに、管理部門や経理部門等の他部門から調査に立ち会う立会担当者に関する情報を含めておいてもよい。この立会担当者情報は、例えば、担当者名,所属部門,電子メールアドレス等を含むものとする。   FIG. 7 is a diagram showing an example of person-in-charge information 18a registered in the person-in-charge information DB 18. The person-in-charge information 18a includes, for example, a person-in-charge name, a department to which the person belongs, an e-mail address, a skill level related to the survey, a required time result (previous result), and the like. The person-in-charge information 18a may further include information on the person in charge of attending the investigation from another department such as the management department or the accounting department. The attendant information includes, for example, the name of the person in charge, the department to which the person belongs, an e-mail address, and the like.

図6及び図7において、本実施形態における固定資産管理装置10は、固定資産調査を行う担当者の変更、すなわち担当者のスキルレベル(熟練度)の違いに伴って調査時間が変化することに着目したものである。当然ながら、スキルレベルの高いベテラン担当者が調査を行えば、短い調査時間ですみ、スキルレベルの低い新人担当者が調査を行えば、調査時間は長くかかることになる。図7に示すように、前回調査時の担当者のスキルレベルが「2」で所要時間実績が5.5時間であった場合、担当者の変更によって、求める所要時間見込みが変化することが予想される。本実施形態では、担当者のスキルレベルに応じて変化率を予め決めておくことで、調査担当者のスキルレベルに基づく所要時間見込みを算出できるようにする。上記変化率には、これまでの経験等に基づいて適切な値を設定する。   6 and 7, the fixed asset management apparatus 10 according to the present embodiment changes the survey time in accordance with the change of the person in charge who conducts the fixed asset survey, that is, the skill level (skill level) of the person in charge. It is the one that paid attention. Naturally, if a veteran person with a high skill level conducts a survey, the survey time is short, and if a new person in charge with a low skill level conducts a survey, the survey time will take a long time. As shown in Fig. 7, if the skill level of the person in charge at the time of the previous survey was "2" and the required time record was 5.5 hours, the expected required time will change depending on the change of the person in charge. Is done. In the present embodiment, the change rate is determined in advance according to the skill level of the person in charge, so that the estimated time required based on the skill level of the person in charge of the survey can be calculated. An appropriate value is set as the rate of change based on past experience and the like.

本発明によると、固定資産の調査を行う担当者のスキルレベルに応じた調査時間を把握することができるため、調査部門において精度の高い綿密な作業スケジュールを立案することができる。   According to the present invention, since the survey time corresponding to the skill level of the person in charge who investigates the fixed assets can be grasped, it is possible to plan a precise work schedule with high accuracy in the survey department.

図8は、本発明の他の実施形態に係わる固定資産管理装置10の内部構成例について説明するためのブロック図で、固定資産DB11には、過去における固定資産の調査結果及びその調査にかかった所要時間実績を調査履歴11cとして部門別に登録して有している。また、所要時間算出手段16によって所要時間見込みを算出した固定資産と同様の状態であった固定資産の調査結果を固定資産DB11から検索し、検索した調査結果の調査時にかかった所要時間実績と、算出した所要時間見込みとを比較することにより当該所要時間見込みの妥当性を判定する妥当性判定手段19を備えている。上記した調査履歴11cには、設置場所や、固定資産の種類、担当者、その時にかかった所要時間実績などの情報が含まれているため、所要時間算出手段16により所要時間見込みを算出した固定資産に対して、同様の設置場所や、種類、担当者だった固定資産の所要時間実績を調査履歴11cから参照することで、上記算出した所要時間見込みが妥当かどうかの判定が可能となる。この際、判定基準としては、例えば、所要時間実績を中心として±β分の範囲内に入ればOK、又は、所要時間実績に対して±γ%の範囲内に入ればOKとするなど、βやγの値を適切に設定する。   FIG. 8 is a block diagram for explaining an example of the internal configuration of the fixed asset management apparatus 10 according to another embodiment of the present invention. The fixed asset DB 11 has a past investigation result of fixed assets and the investigation. The required time record is registered as a survey history 11c for each department. In addition, the fixed asset DB 11 is searched for a fixed asset survey result that is in the same state as the fixed asset for which the estimated required time has been calculated by the required time calculation means 16, and the required time record required when investigating the searched survey result; A validity determination means 19 for determining the validity of the estimated required time by comparing the calculated estimated required time is provided. Since the survey history 11c described above includes information such as the installation location, the type of fixed asset, the person in charge, and the required time record taken at that time, the fixed time for which the required time estimate is calculated by the required time calculation means 16. It is possible to determine whether or not the calculated required time estimate is appropriate by referring to the actual time required for the fixed asset that was the same installation location, type, and person in charge from the survey history 11c. At this time, as a determination criterion, for example, if it falls within the range of ± β minutes centering on the required time result, or OK if it falls within the range of ± γ% with respect to the required time result, β Set the value of γ and γ appropriately.

本発明によると、固定資産調査にかかる所要時間見込み(算出値)の妥当性を、過去の調査履歴における同様な調査結果に基づいて判定することができるため、より精度の高い予測を行うことができる。   According to the present invention, the validity of the estimated time required for the fixed asset survey (calculated value) can be determined based on the similar survey results in the past survey history, so that more accurate prediction can be performed. it can.

図9は、本発明の一実施形態である固定資産管理システムの構成例を示した図で、図中、20は企業等における事業所で、該事業所20は、A部門に設置されている端末装置21,B部門に設置されている端末装置21,・・・を有し、固定資産を統括的に管理する管理部門22には、端末装置23が設置されている。本実施形態の固定資産管理装置10は、各端末装置21,21,23とネットワーク30を介して接続されている。A部門及びB部門は実際に固定資産調査を行う部門であり、管理部門22は、各部門の固定資産調査に際して立会いを行う部門である。尚、管理部門22を含まないシステム構成としてもよい。 FIG. 9 is a diagram showing a configuration example of a fixed asset management system according to an embodiment of the present invention. In the figure, 20 is a business office in a company or the like, and the business office 20 is installed in the A department. the terminal device 21 1, B terminal is installed in sector unit 21 2, it has a ..., a management division 22, which generally manages fixed assets, the terminal device 23 is installed. The fixed asset management apparatus 10 of this embodiment is connected to each terminal device 21 1 , 21 2 , 23 via a network 30. The A department and the B department are departments that actually conduct fixed asset investigations, and the management department 22 is a department that attends the fixed asset investigation of each department. A system configuration that does not include the management department 22 may be adopted.

図9において、例えば、A部門の調査担当者は、端末装置21から固定資産管理装置10にアクセスし、固定資産管理装置10からA部門に関する最新の固定資産情報に基づいてその調査にかかる所要時間見込みを取得することができる。 9, for example, investigators in A division, accessed from the terminal device 21 1 to the fixed asset management apparatus 10, the required according to the investigation on the basis of a fixed asset management apparatus 10 to the latest fixed asset information on A Division A time estimate can be obtained.

図10は、本発明が適用される固定資産管理方法の一例について説明するためのフロー図である。尚、本例は図2に示した固定資産管理装置10の構成に基づいて説明するものとする。
まず、担当者等は、固定資産管理装置10の固定資産DB11に固定資産情報及び所要時間実績を部門別に登録し(ステップS1)、登録された固定資産情報11aに変更が生じた場合(ステップS2のYESの場合)、担当者等から入力される更新情報に従って、更新手段12が固定資産情報11aを更新する(ステップS3)。また、上記ステップS2において、固定資産情報11aの変更がない場合(ステップS2のNOの場合)、ステップS4に移行する。
FIG. 10 is a flowchart for explaining an example of the fixed asset management method to which the present invention is applied. In addition, this example shall be demonstrated based on the structure of the fixed asset management apparatus 10 shown in FIG.
First, the person in charge or the like registers the fixed asset information and the required time record for each department in the fixed asset DB 11 of the fixed asset management apparatus 10 (step S1), and when the registered fixed asset information 11a is changed (step S2). In the case of YES), the updating means 12 updates the fixed asset information 11a according to the update information input from the person in charge (step S3). In step S2, if there is no change in the fixed asset information 11a (NO in step S2), the process proceeds to step S4.

次に、ステップS4において、固定資産管理装置10は、次回の固定資産調査を実施するまでの間、固定資産情報の更新が生じる度に、上記ステップS2からの処理を繰り返し行う(ステップS4のNOの場合)。また、上記ステップS4において固定資産調査を実施する場合(YESの場合)、固定資産管理装置10において、部門コード入力手段13が部門コードの入力を受け付けて(ステップS5)、固定資産情報抽出手段14が固定資産DB11から該当する部門の固定資産情報を抽出し(ステップS6)、抽出した各固定資産情報について前回調査時点から更新されているかどうか更新判断手段15が判断する(ステップS7)。   Next, in step S4, the fixed asset management apparatus 10 repeats the processing from step S2 every time the fixed asset information is updated until the next fixed asset survey is performed (NO in step S4). in the case of). When the fixed asset survey is performed in the above step S4 (in the case of YES), in the fixed asset management apparatus 10, the department code input means 13 receives the input of the department code (step S5), and the fixed asset information extraction means 14 Extracts the fixed asset information of the corresponding department from the fixed asset DB 11 (step S6), and the update determining means 15 determines whether or not each extracted fixed asset information has been updated since the previous survey (step S7).

上記ステップS7において、前回調査時点から更新されている場合(YESの場合)、更新された固定資産の調査にかかる所要時間見込みを所要時間算出手段16が算出する(ステップS8)。また、上記ステップS7において、前回調査時点から更新されていない場合(NOの場合)、所要時間算出手段16は、前回調査時点の所要時間実績を、所要時間見込みとする(ステップS9)。さらに、所要時間算出手段16は、各固定資産について求めた所要時間見込みの合計値を算出し、通知手段17は、所要時間算出手段16により算出した所要時間見込みの合計値及び対象とする固定資産情報を通知する(ステップS10)。   In step S7, if it has been updated since the previous survey (in the case of YES), the required time calculation means 16 calculates the estimated required time for the survey of the updated fixed asset (step S8). In step S7, if the time has not been updated from the previous survey time (in the case of NO), the required time calculation means 16 sets the required time result at the previous survey time as the required time estimate (step S9). Further, the required time calculation means 16 calculates the total estimated time required for each fixed asset, and the notifying means 17 calculates the estimated required time calculated by the required time calculation means 16 and the target fixed asset. Information is notified (step S10).

以上、本発明の固定資産管理装置及びシステムにおける各機能を中心に各実施形態を説明してきたが、本発明は、固定資産管理装置又はシステムにおける各ステップを実行する方法としても説明したように固定資産管理方法としての形態もとることができる。また、この各機能を有する固定資産管理装置又はシステムと同様に、コンピュータに固定資産管理装置又はシステムとして機能させるためのプログラムとしての形態も、また、そのプログラムを記録した記録媒体としての形態も可能である。   As described above, each embodiment has been described centering on each function in the fixed asset management apparatus and system of the present invention. However, the present invention is fixed as described also as a method for executing each step in the fixed asset management apparatus or system. It can take the form of an asset management method. In addition, similar to the fixed asset management apparatus or system having each of these functions, a form as a program for causing a computer to function as a fixed asset management apparatus or system, or a form as a recording medium storing the program is possible. It is.

本発明による固定資産管理の機能を実現するためのプログラムやデータを記憶した記録媒体の実施形態について説明する。記録媒体としては、具体的には、CD―ROM(―R/―RW)、光磁気ディスク、DVD―ROM、FD、フラッシュメモリ、メモリカードや、メモリスティック及びその他各種ROMやRAM等が想定でき、これら記録媒体に上述した本発明の各実施形態の装置又はシステムとしての機能をコンピュータに実行させ、固定資産管理の機能を実現するためのプログラムを記録して流通させることにより、当該機能の実現を容易にする。そしてコンピュータ等の情報処理装置に上記のごとくの記録媒体を装着して情報処理装置によりプログラムを読み出すか、若しくは情報処理装置が備えている記憶媒体に当該プログラムを記憶させておき、必要に応じて読み出すことにより、本発明に関わる固定資産管理の機能を実行することができる。   An embodiment of a recording medium storing a program and data for realizing the fixed asset management function according to the present invention will be described. Specifically, CD-ROM (-R / -RW), magneto-optical disk, DVD-ROM, FD, flash memory, memory card, memory stick, and other various ROM and RAM can be assumed as the recording medium. The functions of the devices or systems of the embodiments of the present invention described above are executed on these recording media by a computer, and a program for realizing the fixed asset management function is recorded and distributed, thereby realizing the function. To make it easier. Then, the recording medium as described above is mounted on an information processing apparatus such as a computer and the program is read by the information processing apparatus, or the program is stored in a storage medium provided in the information processing apparatus. By reading, the fixed asset management function according to the present invention can be executed.

本発明に係わる情報処理装置の内部構成例を示すブロック図である。It is a block diagram which shows the example of an internal structure of the information processing apparatus concerning this invention. 本発明の一実施形態に係わる固定資産管理装置の内部構成例について説明するためのブロック図である。It is a block diagram for demonstrating the internal structural example of the fixed asset management apparatus concerning one Embodiment of this invention. 固定資産管理装置に登録されている固定資産リストの一例を示す図である。It is a figure which shows an example of the fixed asset list registered into the fixed asset management apparatus. 図3に示した固定資産リストに登録されている各固定資産に関する固定資産情報の一例を示す図である。It is a figure which shows an example of the fixed asset information regarding each fixed asset registered in the fixed asset list shown in FIG. 図4に示した固定資産情報について更新があった場合に更新処理された固定資産情報(更新情報)の一例を示す図である。FIG. 5 is a diagram illustrating an example of fixed asset information (update information) that is updated when the fixed asset information illustrated in FIG. 4 is updated. 本発明の他の実施形態に係わる固定資産管理装置の内部構成例について説明するためのブロック図である。It is a block diagram for demonstrating the internal structural example of the fixed asset management apparatus concerning other embodiment of this invention. 担当者情報DBに登録されている担当者情報の一例を示す図である。It is a figure which shows an example of the person in charge information registered into the person in charge information DB. 本発明の他の実施形態に係わる固定資産管理装置の内部構成例について説明するためのブロック図である。It is a block diagram for demonstrating the internal structural example of the fixed asset management apparatus concerning other embodiment of this invention. 本発明の一実施形態である固定資産管理システムの構成例を示した図である。It is the figure which showed the structural example of the fixed asset management system which is one Embodiment of this invention. 本発明が適用される固定資産管理方法の一例について説明するためのフロー図である。It is a flowchart for demonstrating an example of the fixed asset management method to which this invention is applied.

符号の説明Explanation of symbols

1…CPU、2…RAM、3…ROM、4…記憶装置、5…入力装置、6…表示装置、7…通信装置、8…出力装置、9…システムバス、10…固定資産管理装置、11…固定資産DB、11a…固定資産情報、11a′…固定資産情報(更新情報)、11b…所要時間実績、11c…調査履歴、12…更新手段、13…部門コード入力手段、14…固定資産情報抽出手段、15…更新判断手段、16…所要時間算出手段、17…通知手段、18…担当者情報DB、18a…担当者情報、18b…所要時間実績、19…妥当性判定手段、20…事業所、21,21,23…端末装置、22…管理部門、30…ネットワーク。 DESCRIPTION OF SYMBOLS 1 ... CPU, 2 ... RAM, 3 ... ROM, 4 ... Storage device, 5 ... Input device, 6 ... Display device, 7 ... Communication device, 8 ... Output device, 9 ... System bus, 10 ... Fixed asset management device, 11 ... fixed asset DB, 11a ... fixed asset information, 11a '... fixed asset information (update information), 11b ... required time record, 11c ... survey history, 12 ... update means, 13 ... department code input means, 14 ... fixed asset information Extraction means, 15 ... update determination means, 16 ... required time calculation means, 17 ... notification means, 18 ... responsible person information DB, 18a ... responsible person information, 18b ... required time results, 19 ... validity determination means, 20 ... business , 21 1 , 21 2 , 23 ... terminal device, 22 ... management department, 30 ... network.

Claims (19)

固定資産の管理を行うための固定資産管理装置において、該固定資産管理装置は、固定資産の種別,数量,設置場所,設置状態のいずれか1又は複数を含む固定資産情報とその固定資産の調査にかかった所要時間実績とを関連付けて部門別に登録した固定資産データベースと、前回の調査時点から固定資産情報の変更があった場合に前記固定資産データベースの固定資産情報を更新する更新手段と、部門を識別するための部門コードの入力を受け付ける部門コード入力手段と、該受け付けた部門コードに応じて前記固定資産データベースから該当する部門の固定資産情報を抽出する固定資産情報抽出手段と、該抽出した各固定資産情報について前記更新手段により更新されているかどうかを判断する更新判断手段と、該更新判断手段によって更新されていると判断された場合、該更新された固定資産の調査にかかる所要時間見込みを、前記前回調査時における固定資産情報とその所要時間実績との関係に基づいて算出する所要時間算出手段とを有することを特徴とする固定資産管理装置。   In the fixed asset management apparatus for managing fixed assets, the fixed asset management apparatus investigates fixed asset information including one or more of the type, quantity, installation location, and installation status of the fixed asset and the fixed asset. A fixed asset database that is registered for each department by associating with the required time results, update means for updating the fixed asset information in the fixed asset database when the fixed asset information has changed since the previous survey, A department code input means for receiving an input of a department code for identifying the fixed asset information, a fixed asset information extraction means for extracting the fixed asset information of the corresponding department from the fixed asset database according to the received department code, and the extracted Update determination means for determining whether or not each fixed asset information has been updated by the update means, and the update determination means Time required calculation means for calculating the estimated time required for investigating the updated fixed asset based on the relationship between the fixed asset information and the actual time required at the time of the previous investigation when it is determined that the property is new. And a fixed asset management device. 請求項1に記載の固定資産管理装置において、前記所要時間算出手段は、前記更新判断手段によって固定資産情報が更新されていないと判断された固定資産に対して、該固定資産の調査にかかる所要時間見込みを、前記前回調査時における所要時間実績とすることを特徴とする固定資産管理装置。   The fixed asset management apparatus according to claim 1, wherein the required time calculation unit is a requirement for investigating the fixed asset for the fixed asset for which it is determined that the fixed asset information has not been updated by the update determination unit. A fixed asset management apparatus characterized in that a time estimate is a required time record at the time of the previous survey. 請求項1又は2に記載の固定資産管理装置において、前記所要時間算出手段は、前記各固定資産情報について求めた所要時間見込みに基づいて前記部門の固定資産調査にかかる所要時間見込みの合計値を算出することを特徴とする固定資産管理装置。   3. The fixed asset management apparatus according to claim 1, wherein the required time calculation means calculates a total estimated time required for the fixed asset survey of the department based on the estimated required time obtained for each fixed asset information. A fixed asset management device characterized by calculating. 請求項3に記載の固定資産管理装置において、該固定資産管理装置は、前記所要時間算出手段によって算出された前記部門の固定資産調査にかかる所要時間見込みの合計値及び対象となる固定資産情報を併せて電子メールによって通知する通知手段を有することを特徴とする固定資産管理装置。   4. The fixed asset management apparatus according to claim 3, wherein the fixed asset management apparatus obtains a total estimated time required for the fixed asset survey of the department calculated by the required time calculation means and target fixed asset information. A fixed asset management apparatus characterized by further comprising notification means for notifying by e-mail. 請求項1に記載の固定資産管理装置において、前記所要時間算出手段は、固定資産の数量に基づく所要時間見込みを、前記前回調査時の固定資産情報に含まれる固定資産の数量と、その数量に対する所要時間実績との関係に基づいて算出することを特徴とする固定資産管理装置。   2. The fixed asset management apparatus according to claim 1, wherein the required time calculation means calculates the estimated required time based on the quantity of fixed assets with respect to the quantity of fixed assets included in the fixed asset information at the previous survey and the quantity. A fixed asset management device characterized in that it is calculated based on a relationship with a required time record. 請求項1又は5に記載の固定資産管理装置において、前記所要時間算出手段は、固定資産の設置場所に基づく所要時間見込みを、前記前回調査時の固定資産情報に含まれる固定資産の設置場所と、その設置場所に対する所要時間実績との関係に基づいて算出することを特徴とする固定資産管理装置。   6. The fixed asset management apparatus according to claim 1, wherein the required time calculation means calculates an estimated required time based on a fixed asset installation location and a fixed asset installation location included in the fixed asset information at the previous survey. The fixed asset management device, which is calculated based on a relationship with an actual time required for the installation location. 請求項1,5,6のいずれか1に記載の固定資産管理装置において、前記所要時間算出手段は、固定資産の設置状態に基づく所要時間見込みを、前記前回調査時の固定資産情報に含まれる固定資産の設置状態と、その設置状態に対する所要時間実績との関係に基づいて算出することを特徴とする固定資産管理装置。   7. The fixed asset management device according to claim 1, wherein the required time calculation means includes a required time estimate based on a fixed asset installation state in the fixed asset information at the time of the previous survey. A fixed asset management apparatus that calculates based on a relationship between an installation state of a fixed asset and an actual time required for the installation state. 請求項1乃至7のいずれか1に記載の固定資産管理装置において、該固定資産管理装置は、固定資産の調査に係わる調査担当者のスキルレベルを少なくとも含む担当者情報を固定資産情報に関連付けて部門別に登録した担当者情報データベースを有し、前記所要時間算出手段は、調査担当者のスキルレベルに基づく所要時間見込みを、前記前回調査時に担当した調査担当者のスキルレベルと、その調査担当者のスキルレベルに対する所要時間実績との関係に基づいて算出することを特徴とする固定資産管理装置。   The fixed asset management apparatus according to any one of claims 1 to 7, wherein the fixed asset management apparatus associates person-in-charge information including at least a skill level of a person in charge of investigating fixed assets with the fixed asset information. It has a person-in-charge information database registered for each department, and the required time calculation means calculates the required time based on the skill level of the person in charge of the investigation, the skill level of the person in charge of the person in charge who was in charge of the previous investigation, and the person in charge of the investigation A fixed asset management device, wherein the fixed asset management device calculates the relationship based on the relationship with the required time record for each skill level. 請求項1乃至8のいずれか1に記載の固定資産管理装置において、前記固定資産データベースは、過去における固定資産の調査結果及びその調査時にかかった所要時間実績を調査履歴として部門別に登録して有し、前記固定資産管理装置は、前記所要時間算出手段によって所要時間見込みを算出した固定資産と同様の状態であった固定資産の調査結果を前記固定資産データベースから検索し、該検索した調査結果の調査時にかかった所要時間実績と、前記所要時間見込みとを比較することにより該所要時間見込みの妥当性を判定する妥当性判定手段を有することを特徴とする固定資産管理装置。   9. The fixed asset management apparatus according to any one of claims 1 to 8, wherein the fixed asset database stores past fixed asset survey results and actual time required for the survey as a survey history. The fixed asset management apparatus searches the fixed asset database for a fixed asset survey result that is in the same state as the fixed asset for which the required time estimate has been calculated by the required time calculation means, and A fixed asset management apparatus, comprising: validity determination means for determining the validity of the required time estimate by comparing the required time record taken at the time of the survey and the estimated required time. 固定資産の管理を行うための固定資産管理装置を有する固定資産管理システムにおいて、該固定資産管理装置は、固定資産の種別,数量,設置場所,設置状態のいずれか1又は複数を含む固定資産情報とその固定資産の調査にかかった所要時間実績とを関連付けて部門別に登録した固定資産データベースと、前回の調査時点から固定資産情報の変更があった場合に前記固定資産データベースの固定資産情報を更新する更新手段と、部門を識別するための部門コードの入力を受け付ける部門コード入力手段と、該受け付けた部門コードに応じて前記固定資産データベースから該当する部門の固定資産情報を抽出する固定資産情報抽出手段と、該抽出した各固定資産情報について前記更新手段により更新されているかどうかを判断する更新判断手段と、該更新判断手段によって更新されていると判断された場合、該更新された固定資産の調査にかかる所要時間見込みを、前記前回調査時における固定資産情報とその所要時間実績との関係に基づいて算出する所要時間算出手段とを有することを特徴とする固定資産管理システム。   In a fixed asset management system having a fixed asset management device for managing fixed assets, the fixed asset management device includes fixed asset information including one or more of the type, quantity, installation location, and installation status of fixed assets. The fixed asset database registered by department by associating the time required for investigating the fixed asset and the fixed asset information, and updating the fixed asset information in the fixed asset database when the fixed asset information has changed since the previous survey Updating means, department code input means for receiving input of a department code for identifying the department, and fixed asset information extraction for extracting the fixed asset information of the corresponding department from the fixed asset database according to the received department code And an update judging means for judging whether or not each of the extracted fixed asset information has been updated by the updating means. And when it is determined by the update determination means that the estimated required time for the updated fixed asset survey is based on the relationship between the fixed asset information and the actual required time at the previous survey. A fixed asset management system comprising: a required time calculation means for calculating 請求項10に記載の固定資産管理システムにおいて、前記所要時間算出手段は、前記更新判断手段によって固定資産情報が更新されていないと判断された固定資産に対して、該固定資産の調査にかかる所要時間見込みを、前記前回調査時における所要時間実績とすることを特徴とする固定資産管理システム。   The fixed asset management system according to claim 10, wherein the required time calculating means is a requirement for investigating the fixed assets for fixed assets for which the fixed asset information is determined not to be updated by the update determining means. A fixed asset management system characterized in that a time estimate is a required time record at the time of the previous survey. 請求項10又は11に記載の固定資産管理システムにおいて、前記所要時間算出手段は、前記各固定資産情報について求めた所要時間見込みに基づいて前記部門の固定資産調査にかかる所要時間見込みの合計値を算出することを特徴とする固定資産管理システム。   12. The fixed asset management system according to claim 10 or 11, wherein the required time calculation means calculates a total estimated time required for the fixed asset survey of the department based on the estimated required time obtained for each fixed asset information. A fixed asset management system characterized by calculating. 請求項12に記載の固定資産管理システムにおいて、該固定資産管理装置は、固定資産の調査に係わる調査担当者が使用する端末装置とネットワークを介して接続可能とし、前記所要時間算出手段によって算出された前記部門の固定資産調査にかかる所要時間見込みの合計値及び対象となる固定資産情報を併せて電子メールによって前記端末装置に通知する通知手段を有することを特徴とする固定資産管理システム。   13. The fixed asset management system according to claim 12, wherein the fixed asset management device is connectable via a network to a terminal device used by a person in charge of investigating fixed assets, and is calculated by the required time calculation means. The fixed asset management system further comprising a notification means for notifying the terminal device by e-mail of the total estimated time required for the fixed asset survey of the department and the target fixed asset information. 請求項1乃至9のいずれか1に記載の固定資産管理装置を用いて固定資産管理を行うための固定資産管理方法において、固定資産の種別,数量,設置場所,設置状態のいずれか1又は複数を含む固定資産情報とその固定資産の調査にかかった所要時間実績とを関連付けて部門別に固定資産データベースに登録する登録ステップと、前回の調査時点から固定資産情報の変更があった場合に前記固定資産データベースの固定資産情報を更新する更新ステップと、部門を識別するための部門コードの入力を受け付ける部門コード入力ステップと、該受け付けた部門コードに応じて前記固定資産データベースから該当する部門の固定資産情報を抽出する固定資産情報抽出ステップと、該抽出した各固定資産情報について前記更新ステップにより更新されているかどうかを判断する更新判断ステップと、該更新判断ステップにおいて更新されていると判断された場合、該更新された固定資産の調査にかかる所要時間見込みを、前記前回調査時における固定資産情報とその所要時間実績との関係に基づいて算出する所要時間算出ステップとを有することを特徴とする固定資産管理方法。   A fixed asset management method for performing fixed asset management using the fixed asset management apparatus according to any one of claims 1 to 9, wherein any one or more of the type, quantity, installation location, and installation state of fixed assets A registration step for associating fixed asset information including the actual time required for investigating the fixed asset and registering it in the fixed asset database for each department, and the fixed asset information when the fixed asset information has changed since the previous survey An update step for updating the fixed asset information in the asset database, a department code input step for receiving an input of a department code for identifying the department, and a fixed asset of the corresponding department from the fixed asset database according to the received department code A fixed asset information extraction step for extracting information, and the extracted fixed asset information is updated by the update step. An update determination step for determining whether or not the updated asset is updated in the update determination step, the estimated time required for investigating the updated fixed asset and the fixed asset information at the time of the previous survey A fixed asset management method comprising: a required time calculation step for calculating based on a relationship with the required time record. 請求項14に記載の固定資産管理方法において、前記所要時間算出ステップにおいて、前記更新判断ステップにて固定資産情報が更新されていないと判断された固定資産に対して、該固定資産の調査にかかる所要時間見込みを、前記前回調査時における所要時間実績とすることを特徴とする固定資産管理方法。   15. The fixed asset management method according to claim 14, wherein in the required time calculation step, the fixed asset for which it is determined that the fixed asset information has not been updated in the update determination step is to investigate the fixed asset. A method for managing fixed assets, characterized in that the estimated time required is an actual time required in the previous survey. 請求項14又は15に記載の固定資産管理方法において、前記所要時間算出ステップにおいて、前記各固定資産情報について求めた所要時間見込みに基づいて前記部門の固定資産調査にかかる所要時間見込みの合計値を算出することを特徴とする固定資産管理方法。   The fixed asset management method according to claim 14 or 15, wherein, in the required time calculation step, a total required time estimate for the fixed asset survey of the department is calculated based on the required time estimate obtained for each fixed asset information. A fixed asset management method characterized by calculating. 請求項16に記載の固定資産管理方法において、前記固定資産管理装置と、固定資産の調査に係わる調査担当者が使用する端末装置とがネットワークを介して接続され、前記所要時間算出ステップにて算出された前記部門の固定資産調査にかかる所要時間見込みの合計値及び対象となる固定資産情報を併せて電子メールによって前記端末装置に通知する通知ステップを有することを特徴とする固定資産管理方法。   17. The fixed asset management method according to claim 16, wherein the fixed asset management device and a terminal device used by a person in charge of investigating fixed assets are connected via a network and calculated in the required time calculation step. And a notification step of notifying the terminal device by e-mail of the total estimated time required for the fixed asset survey of the department and the target fixed asset information. 請求項1乃至9のいずれか1に記載の固定資産管理装置としての機能を実現するためのプログラム。   The program for implement | achieving the function as a fixed asset management apparatus of any one of Claims 1 thru | or 9. 請求項18に記載のプログラムを記録したコンピュータ読み取り可能な記録媒体。   The computer-readable recording medium which recorded the program of Claim 18.
JP2003300240A 2003-08-25 2003-08-25 Fixed asset management apparatus, fixed asset management system, method, program, and recording medium Expired - Fee Related JP4198012B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2003300240A JP4198012B2 (en) 2003-08-25 2003-08-25 Fixed asset management apparatus, fixed asset management system, method, program, and recording medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2003300240A JP4198012B2 (en) 2003-08-25 2003-08-25 Fixed asset management apparatus, fixed asset management system, method, program, and recording medium

Publications (2)

Publication Number Publication Date
JP2005071094A JP2005071094A (en) 2005-03-17
JP4198012B2 true JP4198012B2 (en) 2008-12-17

Family

ID=34405229

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2003300240A Expired - Fee Related JP4198012B2 (en) 2003-08-25 2003-08-25 Fixed asset management apparatus, fixed asset management system, method, program, and recording medium

Country Status (1)

Country Link
JP (1) JP4198012B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114819652B (en) * 2022-04-25 2023-04-18 佛山职业技术学院 Intelligent fixed asset management method and system based on block chain

Also Published As

Publication number Publication date
JP2005071094A (en) 2005-03-17

Similar Documents

Publication Publication Date Title
US7974870B2 (en) Sales activity management system, server device, recording medium and computer data signal
US8566182B2 (en) Enterprise asset management
CN107615313A (en) The business activity servicing unit and business activity householder method predicted using contract cancellation
US20200168067A1 (en) Article management system
US20120271775A1 (en) Systems, methods, apparatus and graphical user interfaces for improved candidate search and selection and recruitment management
US9229670B1 (en) Flexible attribute tracking and report generation for a workflow
US8123129B2 (en) Information provision intermediation apparatus
US20040039587A1 (en) Method and system for managing recycling of a product
JP4198012B2 (en) Fixed asset management apparatus, fixed asset management system, method, program, and recording medium
US8032417B2 (en) Method, apparatus, and computer program product for tracking inventory values within a plant
JP2020154962A (en) Information processing device and program
EP2985726A1 (en) Information processing apparatus and method for updating point by the same
JP2015079373A (en) Asset management device, asset management method and program
JP4329896B2 (en) Fixed asset management device, fixed asset management system, program, and recording medium
JP4289950B2 (en) Fixed asset management device, program, and recording medium
JP5146947B2 (en) Export control system, export control method and export control program
CN111145880A (en) Asset inventory system and method for PDA devices
JP2010157067A (en) Device, method and program for managing document
JP2019125107A (en) Withholding tax related business support device, withholding tax related business supporting method, and withholding tax related business supporting program
US20230351325A1 (en) Parts procurement support device, parts procurement support system, and parts procurement support method
JP2019105869A (en) Name identification support apparatus, name identification support method and program
JP6983647B2 (en) Personnel cost management device, personnel cost management method, and labor cost management program
JP7280931B2 (en) Information processing device, information processing method, and information processing program
JP5427700B2 (en) Evaluation support system, evaluation support method, and evaluation support program for property value during transportation
JP2008140219A (en) Sales information processing device, sales information processing method, and program

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20060419

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20080930

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20080930

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111010

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121010

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131010

Year of fee payment: 5

LAPS Cancellation because of no payment of annual fees