JP4023409B2 - Electricity trading plan creation method and apparatus - Google Patents

Electricity trading plan creation method and apparatus Download PDF

Info

Publication number
JP4023409B2
JP4023409B2 JP2003204215A JP2003204215A JP4023409B2 JP 4023409 B2 JP4023409 B2 JP 4023409B2 JP 2003204215 A JP2003204215 A JP 2003204215A JP 2003204215 A JP2003204215 A JP 2003204215A JP 4023409 B2 JP4023409 B2 JP 4023409B2
Authority
JP
Japan
Prior art keywords
plan
power
exchange
information
bid
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2003204215A
Other languages
Japanese (ja)
Other versions
JP2005051866A (en
Inventor
康生 佐藤
泰志 原田
敏之 澤
満男 鶴貝
滋 田村
昭夫 竹居
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Priority to JP2003204215A priority Critical patent/JP4023409B2/en
Publication of JP2005051866A publication Critical patent/JP2005051866A/en
Application granted granted Critical
Publication of JP4023409B2 publication Critical patent/JP4023409B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S50/00Market activities related to the operation of systems integrating technologies related to power network operation or related to communication or information technologies
    • Y04S50/10Energy trading, including energy flowing from end-user application to grid

Description

【0001】
【発明の属する技術分野】
本発明は、電力事業者の電力取引所に対する入札計画案を策定する電力売買計画作成方法および装置に関わるものである。
【0002】
【従来の技術】
市場原理が導入される前の電力系統では、基本的にコストを最小化する計画作成方式が取られてきた。この理由としては、顧客に販売する電力量や、その売電の料金体系が固定化されている体制を確立していることや、顧客損失などの危険性がないなど、リスクが最小化されていたことが考えられる。つまり、実績をベースに予測される需要に対して発電量を確保すれば、収益が保証されることになる。例えば、特開2001−211548号(以下、特許文献1と呼ぶ。)に記載の発電計画作成装置では、発電機の起動停止問題および発電機の最適出力の配分を行う際に、発電費用を最小化となる方法を説明している。この公知例は、実績をベースに予測される需要に対して、コスト最小化の運転計画を作成する方法である。
【0003】
一方で、市場原理が導入された後の電力系統における運転計画方法ついて着目した場合、予想される収益とリスクの関係を管理しようとする運転計画を作成するような技術が知られている。例えば、特開2002−281665号(以下、特許文献2と呼ぶ。)では、発電に関わるリスクを定式化して、発電変動が生じた際でも比較的安定した事業収益を得られるような運転計画方法を説明している。
【0004】
【特許文献1】
特開2001−211548号
【特許文献2】
特開2002−281665号
【0005】
【発明が解決しようとする課題】
電力市場に競争原理が導入された場合、特に、翌日電力などの直近のスポット電力量を扱う取引所取引が導入された場合、取引結果によって供給する需要量や電力売買単価が、実発電目前で変動することになる。取引所参加者は、このような取引所取引の不確実性を考慮した入札計画と、発電計画を立案する必要がある。このような計画立案手段を支援するシステムが必要となる。
【0006】
また、業務における責任分担上の観点から考えると、取引所に参加する企業において、不確実な取引所取引に参加する前の段階で、供給が確定している電力需要に対する運転計画を一旦策定し、その上で、取引所取引に対する運転計画を調整する業務を行うことが想定される。例えば、運用部門が前日段階での需要予測などに基づいて取引前の運転計画が策定する業務を担当し、その上で、取引部門が前記運転計画を修正して取引所収益の管理を行う業務を担当する業務体制が考えられる。このように、取引所収益を独立して管理することが望まれる場合も想定される。
【0007】
本発明の目的は、電力取引において、取引所参加者が、取引所取引の不確実性を考慮した入札計画と、発電計画を作成することができるような電力売買計画作成方法および装置を提供することにある。
【0008】
【課題を解決するための手段】
供給が確定している電力需要に対して策定された運転計画を受信する手段、および、受信した計画をベースとして取引所への複数の入札計画を策定する手段を設ける。この際、取引所決済における電力単価の不確定について条件指定してもらうことで、入札結果としてもたらされる取引量および収益変動について予測計算を行うことを可能とする。また、収益と取引量の予測について条件指定してもらうことで、複数の入札計画から、操作者が求める入札計画をスクリーニングする手段を備える。
【0009】
操作者は、取引所取引前の運転計画をベースとして、想定される取引所決済価格の範囲で、適切な入札計画を得ることが出来る。ここでいう適切であるという条件は、見込まれる収益と取引量に関する最低最大・期待値およびそのブレ幅である。たとえば、一定以上の収益を確保しつつ、収益のブレが小さく、かつ、一定量以上の売電量を実現できる入札計画が立案できるようになる。
【0010】
本発明により、電力取引所参加者は、自社収益に影響する取引所の不確定要因を考慮して、取引所への入札計画を作成することが可能となる。
【0011】
【発明の実施の形態】
(実施例)
図1に、本発明を用いた発電計画・電力売買計画作成装置の機能構成を示す。
本装置0101は、幾つかの機能ブロックで構成されている。まず、全体における機能間の連携について概略を説明する。
【0012】
発電計画受信手段0102では、給電指令所などの運用部門から送達される電力取引所取引前の発電計画を受信する。想定取引所価格受信手段0103では、電力取引を担当する操作者が操作する顧客端末から入力される取引所の決済価格に関する想定範囲の情報を受信する。同様に、入札条件受信手段0104によって、操作者が要求する入札計画の収益や売買量に関する指定条件の情報を受信する。これらの情報をもとにして、最適入札計画作成手段0105によって、操作者が要求する入札計画を作成した上で、入札計画送信手段0106によって、操作者にその入札計画の内容について連絡する構成となっている。また、その入札結果について、実際に操作者が入札を行った場合、約定結果受信手段0107によって、約定結果を受信して、発電計画修正送信手段0108によって、上記発電計画受信手段0102が受信した発電計画からの変更点について、給電指令所などの運用部門に送達する構成となっている。
【0013】
以下、図1に示した発電計画・電力売買計画作成装置の運用方法および内部処理について、詳細な説明を補足する。なお、本実施例では、一日前時点における発電計画・電力売買計画の策定を想定しており、また、電力取引所では、翌日における30分おきのスポット電力を板寄せ方式にて取り扱っているものとする。
【0014】
まず、図2に、本発明を用いた発電計画・電力売買計画作成装置の利用体系を説明する。前述した通り、電力取引所取引を行う前の発電計画、つまり、どの発電機をいつ起動停止するかという起動停止計画(ユニットコミットメント)、および、どれだけ出力させるかという負荷配分計画は、中央給電指令所0201に設置されている中央給電指令所サーバ0202で作成されている。前日段階での翌日気象予報、たとえば最高気温予報を用いて、既にkW契約を締結している電力需要について、実際のkWhがどのようになるのか需要予測を行った上で、それを満たすために十分な発電計画が作成されている。ここを取り扱う運用部門の責務として、予備力などのアンシラリーサービスを提供することが義務付けられている場合、単純にkWhを充たすような発電計画を作成するのでなく、変化速度制約などの発電上の制約を考慮した上で、瞬動予備力などの各種予備力などのアンシラリーサービス提供を実現する発電計画が組まれている。
【0015】
このような性質を持つ取引所取引前の発電計画が、中央給電指令所0201から、取引部署0203内に設置された電力取引所取引支援端末0204に送達される。本発明が適用されている取引支援端末0204では、上記の如く、取引担当者が満足する入札計画を提示する機能を備えている。その支援内容そのもの、もしくは、それを手動で一部修正した入札計画が、電力取引所取引入札端末0205を介して、電力取引所サーバ0206に注文として伝達される。この注文に対する約定結果は、電力取引所取引入札端末0205を介して、電力取引所取引支援端末0204にフィードバックされる。取引支援端末0204では、その約定結果に相当する発電計画の修正要求を、中央給電指令所サーバ0202に発信する構成となっている。
【0016】
上記利用体系をもって、図3のような利用目的を実現することができる。取引前事前の業務群0301は、運用部門の業務管轄となる。まず、予備力など信頼性制約や出力変動範囲などの機械的制約などを考慮して、各発電機の起動停止有無および起動停止時間に関する計画、つまり取引所取引前発電計画0302が作成される。仮に取引所取引が実施されない場合でも、発電計画0302によって、支障なく供給できるものである。その上で、この発電計画0302の中には、各発電機について、計画変更の可否について情報が補足されている。たとえば、前日段階にて供給を実施することが確定している需要に対する供給契約需要予測0303を行った上で、この予測需要量を満足する発電機起動停止計画を組んだ場合を想定する。この前日段階での起動停止計画の中には、計画が変更できる計画変更可能発電機と、そうでない計画変更不能発電機が含まれている。たとえば、石炭を用いる火力発電機など起動に時間を有するため取引所取引約定後では追加起動が難しいという場合や、人員配置の制約のため起動停止時間の変更が不能な場合などが考えられる。逆に、このような計画変更が可能な発電機については、計画変更が可能な範囲、つまり、起動停止時間の範囲や上下限の範囲を指定する。ここまでが運用部門の業務管轄となり、これら情報を取引部門による業務群0304に引き渡す。取引部門では、上記の如く、操作者が指定する条件下で最も適切な電力取引所への入札を実現するような、取引後発電計画立案0305を行うことが最大の業務目的となっている。この取引後発電計画立案0305は、取引前発電計画立案0302と比較すると、前記計画変更可能発電機のうち0個以上の発電機について、起動停止有無もしくは起動停止時間が変更されている。取引前後において供給契約需要予測0303は不変であり、取引後発電計画立案0305によって、同時に、取引所入札計画立案0306が達成されている。
【0017】
以上のように、運用部門の主たる業務目的は、取引所取引前の段階で各種信頼性制約や機械的制約などを満足する発電計画を立案することである。一方、取引部門の主たる業務目的は、運用部門が立案した発電計画を調整することで、取引所取引での収益を上げたり、一定以上の電力売買を実行したりすることにある。本発明のシステムは、上記のような業務フローにおいて利用されることが一般的なものである。
【0018】
以下、本発明を用いた発電計画・電力売買計画作成装置の動作内容について、図を用いながら説明する。
【0019】
図4に、給電指令所から受信する取引前の発電計画データの一例を示す。図1の発電計画受信手段0102が受信するデータである。横軸方向に発電機ごとの設定について、縦軸方向に電力取引所で扱う時間帯ごとのスポット電力商品の設定について、それぞれ、計画値・上限・下限が登録されている。計画値とは、取引前発電計画立案0302における該発電機の該時間帯での出力計画値を意味して、上限・下限は、取引後発電計画立案0305による計画調整において、前記出力計画値を変更できる範囲を示している。
【0020】
データ0401のように、計画値が0より大きい一定値が割り振られていて、かつ、上下限のいずれかに計画値と異なる数値が指定されている場合には、取引前発電計画において起動が予定されているが計画変更が可能なことを意味する。逆に、計画値と上下限が一致する場合は、その発電機は計画変更不能ということを意味する。特に、データ0403のように、計画値と上下限が0の場合には、取引前発電計画において停止が予定されていて、かつ、計画変更不能ということになる。データ0402のように、計画値が0であるが、上下限に0でない値が設定されている場合は、取引前発電計画において停止が予定されているが、計画変更して起動することが可能であることを意味する。
【0021】
このような発電計画データを、発電計画受信手段0102にて受信した上で、本発明を用いた発電計画・電力売買計画作成装置は処理を行う。図5を用いて、本発明の処理フローを説明する。
【0022】
運用部門による発電計画立案が終了する時間に定刻起動0501を行って、受信処理0502によって、図4に一例を示したような取引前発電計画立案0302の結果を受信する。次に、閲覧画面処理0503によって、前記で受信した取引前発電計画について操作者に内容を閲覧可能な画面を提示して内容の確認を行う。この取引前の発電計画閲覧画面の一例を、図6に示す。
【0023】
ウインドウ0601で構成される画面となっている。ウインドウ0601下部には、発電機毎に取引前発電計画の内容を可視化したものが表示されている。たとえば、エリア0602は取引前発電計画において計画変更不能な出力割当を示し、エリア0603は計画変更が可能な出力範囲を示している。エリア0604は起動停止の計画を変更する際に、下限として強制的に割り当てられる出力範囲を示しており、図6の例では、GenCは、取引前発電計画では停止が予定されているが、9時以降ならば起動に変更可能であり、また、起動する場合には一定以上の出力を持たないといけないことを表現している画面である。ウインドウ0601上部には、各発電機出力を合計した値0605および各発電機容量を合計した値0606がグラフ表示されていて、操作者の理解を促す情報を与えている。これら情報を閲覧した操作者が内容を確認したときは、ボタン0607押下を行うようになっている。
【0024】
以上のような図6の閲覧画面によって、受信した取引前発電計画(計画変更可能発電機の情報も含む)のデータについて、操作者が妥当性を確認した後、入札計画の立案処理に移行する。
【0025】
まず、図5の処理フロー内の処理0504において、想定取引所価格の設定を行う。この処理では、操作者に翌日の電力取引所で扱われるスポット電力の相場観を入力してもらう。図7に、入力画面の一例を示す。
【0026】
ウインドウ0701内の左部分には、表形式の入力部分が存在する。縦軸方向0702に電力取引所で扱う時間帯ごとのスポット電力商品の設定について、横方向に低め値0703,中心値0704,高め値0705の設定について、入力欄が設けられている。中心値0704には、予想される取引所価格の期待値を入力し、低め値0703と高め値0705には、相場観として想定される上下限範囲を入力するようになっている。この低め値0703と高め値0705は一定の確率、たとえば95%の確度で期待できる上下限を入力してもらう仕様となっていて、操作者はその仕様を理解した上で、この入力操作を実施するものとする。この表形式の入力欄で入れた値は、グラフエリア0706において3本の折れ線グラフ(中心値,低め・高め)として視覚的に確認できるようになっている。全てのスポット電力商品について入力を完了したらならば、ボタン0707を押下して設定を確定する。
【0027】
スポット電力の相場観においては、全てを手動で入力する必要は必ずしもない。過去の統計を推定される値を自動設定したり、もしくは、その値を手動で修正したものを設定したりすることが考えられる。このような操作を行う場合には、ボタン0708を押下して、別画面を呼び出す構成となっている。
【0028】
図8は、図7ボタン0708から呼び出される相場観のヒストリカルデータ取り込み画面の一例である。ウインドウ0801内には、一覧表が表示されていて、縦方向0802に取り込みデータがリストアップされている。たとえば、データ0803のように、直近の一日のデータを参照にしたり、データ0804のように、過去の一定期間の平均値を用いたりしている。これらのデータのなかから、いずれかを選択して、ボタン0805を押下することによって、そのパラメータが図7で設定している表形式入力欄に転送される仕掛けとなっている。また、ラジオボタン0806をチェックした場合、翌日の最高気温予測値に応じて、選択したデータの内容を補正する機能も備えている。補正率はプログラム内部に保持する最高気温と最大需要の相関関数から求められる比率を乗算することで実現させている。
【0029】
以上の図7および図8のような入力画面を用いて、処理0504の想定取引所価格の設定が完了する。ここまでで最小限の入力作業を終えて、以下、入札計画の作成計算に移行する。まず、処理0505によって起動停止組合せ候補作成を行う。この処理においては、解の候補として、与えられた入力の範囲で考えられる発電機起動停止パターンを全て作成する。具体的には、取引前発電計画をベースとして、計画変更可能発電機の個々について、起動停止有無および時間について有り得るパターンを全て組み合わせていく処理を実施する。一般に起動停止の調整ができる発電機は高々数台であり、この組合せ数は数十から数百万のオーダーの組合せ数となっていく。本処理フローにおいては、作成した個々の組合せについて、データテーブルに保管する。
【0030】
図9に、処理0505によって作成された組合せ候補作成結果として、データベース内のテーブルに保管される内容の一例を示す。テーブルには、縦方向0901に、組合せ候補の個々について、情報がエントリされている。組合せ候補の各々については、各発電機の起動時間情報0902および停止時間情報0903が設定されている。任意の組合せ候補は、自身以外の組合せと比較すると、必ず一台以上の発電機について起動時間もしくは停止時間の設定が異なるものになっている。例えば、組合せ候補2では、データ0904のように、GenCの起動時間が、他の組合せ候補とずれたものになっている。
【0031】
以上のように、処理0505では、計画変更可能発電機のあり得る範囲で複数の組合せ候補が作成される。組合せ候補が作成された後は、個々の組合せ候補について、最適な売買量の決定と、それがもたらす収益の計算を実施する。この処理は、図5の処理フローにおいて、ループ処理0506による反復処理に該当する。
【0032】
個々の組合せ候補の収益性を検討するためには、処理0504にて設定した想定価格範囲について、評価を行う必要がある。そこで、本処理では、想定価格範囲の幾つかの代表点について、収益性を評価する方式を採用している。具体的には、図7にて設定した想定取引所価格の中心・高め・低めの3点について、評価計算を実行する。この処理は、図5の処理フローにおいて、ループ処理0507に該当する。
【0033】
上記の二重ループ処理内で、組合せ候補と想定価格が特定された状態において、その条件における収益性を評価するためには、全時間断面について、および、全発電機について、収益性を評価して合算する方式を採用している。図5の処理フローにおいて、ループ処理0508およびループ処理0509がこれに該当する。
【0034】
次に、処理0510によって、各発電機の最適売買量を計算する処理を実施する。上記のような四重の反復処理によって、この処理を実行する時点では、計算対象の発電機と、想定取引所価格が特定された状態となっている。これを前提とした計算内容を以下に説明する。
【0035】
まず、計算に用いるパラメータをデータベース0511より入手する。このパラメータは、(数1)のように、出力量Pに対するコストを示す発電機特性の計算式を構成する係数群a,b,cである。取引所価格をMとして、目的関数は
(数2)のように構成される。取引所からの収入とコストの差分を最大にすればよい。この目的を達成する最適出力点は(数3)をもって一意に決定することができる。基本的に(M−b)/2aを算出するが、図4にて指定された上限ULと下限LLの範囲に限定する条件が付加される。このように最適出力点が決定できれば、(数4)のように、取引前発電計画における計画量をP0として、最適出力点とP0の差分を最適売買量として算出できる。
【0036】
【数1】

Figure 0004023409
【0037】
【数2】
Figure 0004023409
【0038】
【数3】
Figure 0004023409
【0039】
【数4】
Figure 0004023409
【0040】
以上(数1)〜(数4)の計算をループ処理0508およびループ処理0509について反復すれば、組合せ候補と想定価格が特定されたひとつの状態について、最適売買量の算出が終了する。そこで、ループ処理0508およびループ処理0509の終了時に、処理0512によって、収益計算を実施する。この計算内容は(数5)で示される。各時間帯および各発電機について、最適売買量から得られる取引所収益と、それに必要な発電コストの差分を算出する。
【0041】
【数5】
Figure 0004023409
【0042】
以上で、組合せ候補と想定価格が特定されたひとつの状態について、収益を算出することができた。本発電計画・電力売買計画作成装置では、これらの結果を集計した画面を操作者に示して、組合せ候補を取捨できる選択手段を提供する。処理0513にて、収益分布評価できる入札計画表示画面を操作者に提示する。図10に、入札計画表示画面の一例を示す。
【0043】
ウインドウ1001は、組合せ候補を取捨するための条件を入力する表形式入力部1002、および、上記の処理フローで計算した組合せ候補ごとの収益性などを可視化しているグラフ部1003と、前記組合せ候補のいずれかについて詳細情報を補足的に表示する表形式出力部1004で構成される。
【0044】
まず、グラフ部1003に表示される入札計画表示内容について、図11を用いて説明する。前記グラフは、縦軸1102に売買電力量をとり、横軸1101に収益の見通しをとったものである。この平面上に、それぞれの組合せ候補について、想定した電力価格範囲の幾つかの場合について、収益評価をプロットしていく。本実施例の場合、図7で入力した3つの想定電力価格(高め,中心値,低め)の場合について、(数1)〜(数5)の一連の処理によって求まる最適売買量および取引所収益の関係を3点(高めの場合1103,中心値の場合1104,低めの場合1105)をプロットして、それらを直線で連結した表示をしている。このような直線が組合せ候補に一つずつ描画されるので、グラフエリアには多数の有限長の折れ線が描画されている。組合せ候補の中には、同じ起動発電機の構成であるが起動停止時間が多少ずれているような関係が近い組合せ候補のものと、起動発電機構成が異なる関係が遠い組合せ候補が存在する。前記グラフエリアの場合、1006から1008のように、関係が近い組合せ候補同士は、近接した描画が行われている。起動停止時間が多少ずれているものも組合せ候補として多数表示されるため、これら多数候補の中から取捨選択、つまり絞り込みの処理を行う必要がある。
【0045】
そのために、図10の表形式入力部1002においては、組合せ候補のそれぞれに対する条件として、収益に関する制約条件、および、売買量に関する制約条件を入力できるようになっている。収益に関する制約条件としては、最低収益が取り得る下限値,期待収益が取り得る下限値および上限値,最高収益が取り得る上限値などが設定できる。同様に、売電量・買電量についても同様に設定が可能になっている。以上のような制約条件を入れた後、ボタン1005の押下によって、組合せ候補の絞込みが行える。これは、前記グラフエリア1003上でも動作が確認できるようになっている。
【0046】
この動作を説明すると、図12のようになる。最低収益の下限値の入力は、範囲指定1201のように、前記線分の垂直方向において下端が取り得る範囲を制限することになる。同様に、最高収益の上限値の入力は、範囲指定1202のように、前記線分の上端が取り得る範囲の制限を意味する。また、収益の幅について制限を入力した場合、線分の上下方向への長さを指定することになる。売買量に対する制約条件に関しても、グラフエリア1003上の水平方向に対する範囲指定および長さ指定として整理される。図12のように、期待売電量の下限値に対する範囲指定1203や、最高売電量の上限範囲指定1204のようになる。このような範囲指定および長さ指定に対して、条件を満足しない線分は、色調を変えることで操作者に認識できるようにする。候補全体の中から、前記範囲指定1201〜1204から逸脱する線分や、線分1205のように線分長を違反する線分を除外して、条件を満足するもののみを残した表示を得ることが出来る。
【0047】
表形式入力部1002への数値入力、および、ボタン1005の押下を繰り返すことにより、グラフエリア1003の表示は逐次更新される。これにより、操作者は組合せ候補の絞込みが行うことができる。このとき、表形式出力部1004を用いて、絞込みの対象となっている組合せ候補の詳細情報を獲得することができる。組合せ候補の絞込んだ後には、カーソル1006のように、選択候補とした組合せ候補について選択操作を行うことで、前記出力部1004に詳細情報を補完的に参照できるようになる。表示される数値としては、最大収益,期待収益および最小収益とは、図11の説明の通り、3つの想定電力価格(高め,中心値,低め)に対応する取引所収益の3点である。また収益幅は、最大収益と最小収益の差異を示す。同様に、取引量についても、最大・期待・最小のケースについて合計売買量が表示されている。このような数値の表示に加えて、取引前発電計画に対して計画変更(起動停止の切り換え・起動停止時間変更)を行った発電機の固体名称について、略号をリストアップした表示を行っている。これによって、操作者は、どのような発電計画の変更であるか大よその認識ができるようになる。これら前記出力部1004を参考指標として、組合せ候補の絞り込み作業を行っていく。
【0048】
最終的に組合せ候補を一つに絞り込んだ場合には、カーソル1006のように選択操作を行った上で、ボタン1007の押下によって、その組合せ候補を採用した場合の個別入札案の提示を得ることができる。
【0049】
図13に、個別入札案の提示画面の一例を示す。ウインドウ1301には、入札条件を表示する表形式出力部1302と、入札が約定した場合の収益内容を表示する表形式出力部1303が配置されている。表形式出力部1302は、縦方向1304について取引所で扱う時間帯ごとの電力量商品がリストアップされていて、また、横方向1305には、左右に買い方向と売り方向について複数の入札条件の入力欄が設けられている。個別の入札条件は、価格の指定欄1306と量の指定欄1307が配置される。ここに表示する入札価格と入札量の数値については、前記(数1)〜(数5)の算出過程を参照して、(数6)のように求められる。つまり、取引前発電計画における出力点と新しく算出した最適出力点との差分が入札量であり、また、その出力差分に応じるコストの変化を入札量あたりの単価にしたものが入札価格となる。
【0050】
【数6】
Figure 0004023409
【0051】
本実施例では、図13のような書式を採用しているが、使用する取引所取引端末の画面書式に合わせた配置を採用することにより、操作者の理解を促すように配慮することができる。表形式出力部1303には、前記の個別入札条件が約定成立した場合に発生する収益および発電計画修正に関する情報が表示される。表形式出力部1302における上記1306および1307が配置される位置に相当する場所として、収益値の表示欄1308と、発電計画修正内容の表示欄1309が配置されている。収益値の表示欄1308に表示される数値は、表形数1302で対応する位置に配置される個別入札が約定した場合に得られる収益値を表示されている。この値は、取引所の取引価格がどのようになるかに依存するため、その価格の想定をラジオボタン1310から1311の何れかをチェックしてもらう。チェック位置に応じて、想定価格の中心値,低め値・高め値の何れかを採用して、その取引価格に対する収益を計算して、これを表示欄1308に示すようになっている。想定価格と入札価格の関係から約定が見込めない個別入札条件については、表示欄1308および1309が空欄となることで、操作者の理解を促す仕掛けとなっている。表示欄1309には、前記の個別入札条件が約定成立した場合に発生する収益および発電計画修正に関する情報が表示される。また、発電計画修正内容の表示欄1308に表示される文字列は、取引前発電計画に対して計画変更(起動停止の切り換え・起動停止時間変更)を行った発電機の固体名称について、略号をリストアップした表示を行っている。この略号に対して、マウス操作1310のようにカーソルを充てると、ポップアップウインドウによって、計画変更前後の出力量の差分を詳細表示する仕掛けとなっている。このように、図10の操作によって絞り込んだ一つの組合せ候補について、具体的な個別入札案の内容を参照することが可能な画面となっている。
【0052】
図13にて選択した入札案を採用する場合には、ボタン1311の押下によって、前記入札条件(入札量と入札価格の集合)を外部システムにデータ書き出しすることが可能となっている。この機能は、電力取引所へのオンライン取引が可能な取引端末とリンクしており、ここでの条件をそのまま流し込む、つまりプログラム自動発注する機能と連携することも可能となっている。ただ、一般的には、ここでの提示案は支援情報の位置付けとして扱って、取引端末では本システム提示の内容を受信した上で、図13の表形式出力部のような注文画面に反映することだけに留める実装が多い。その後、取引端末装置上の作業において、人間系によって多少の量・価格の調整を行ったのちに、実際に発注確認作業を行う。何れの機能連携方式によっても、本システムの操作者は、取引所端末の入札画面に対して、どのような量と価格を入力すればよいのか、入札画面と同様のフォーマットにて具体的推奨案を参照することができる。
【0053】
また、このような入札方法に関する詳細情報だけでなく、入札後の影響を受けた発電計画についても詳細情報を参照できる補足画面を設けている。最終的に絞り込んだ組合せ候補をカーソル1006で選択操作を行った上で、ボタン1008を押下することにより、取引所取引後の発電計画について、詳細画面が表示される。
【0054】
図14に、取引後の発電計画閲覧画面の一例を示す。基本的構成は図6に近いものとなっている。ウインドウ1401には、発電全体としての計画修正内容を視覚的に表示するグラフ出力部1402と、発電機個別ごとの計画修正内容を表示するグラフ出力部1403が配置されている。グラフ出力部1402は、横軸に一日における時間をとっていて、縦方向には、2つの情報がプロットされている。ひとつは、発電機の容量[kW]に関する情報として、取引前の発電容量合計を示す折れ線1404と、取引後の発電容量合計を示す折れ線1405がプロットされている。もう一つとして、発電機の出力[kWh]に関する情報として、取引前の発電出力合計を示す折れ線1406と、取引前後の出力差分を示す折れ線1407がプロットされている。ここでも、出力の大きさは、取引所の価格に依存するため、その価格の想定をラジオボタン1408から1410の何れかをチェックしてもらう。チェック位置に応じて、想定価格の中心値,低め値・高め値の何れかを採用して、その取引価格に対する各発電機の出力を計算して、その合計値を折れ線1407に反映するようになっている。
【0055】
このようなグラフによって、発電機全体の大枠として、どのような入札条件を採用したのか、発電計画全体イメージで理解できる構成となっている。
【0056】
また、グラフ出力部1403では、縦方向1411について、発電機個別ごとの計画修正内容がグラフ表示されている。個別のグラフ表示において、横軸方向には、前記グラフ出力部1403の横軸と同じスケールで一日における時間をとっていて、縦軸には各発電機の出力[kWh]に関する情報が表示されている。取引計画前の発電計画による出力は、エリア1412のように描画されて、また、取引所取引による発電計画の変更分は、エリア1413のように描画される。この出力は、前記グラフ出力部1402で説明したように、想定価格のラジオボタンのチェックに対応した表示が成されるようになっている。
【0057】
以上のようにして、絞込み,選択、そして採用された入札計画について、図5の処理フロー内の処理0514において入札計画を送信する。図1の入札計画送信手段0106の出力がこれに相当する。この入札結果の約定結果を約定結果受信手段0107によって入手できる場合には、それに対応する発電機出力調整量を以上の計算結果のなかから抜粋して、発電計画修正送信手段0108によって送信することも可能となっている。
【0058】
実務を想定した場合、取引所における価格上下変動の制限幅や、取引量の上限が設けられることが考えられる。また、取引参加する事業体の内部においても取引戦略として、価格の上下限や取引量の上下限が設定される可能性がある。このような場合においても、上記実施例の装置も用いれば、取引所における価格の規制は、図7の想定価格設定によって、量に関する自主規制は、図10における組合せの取捨条件によって反映できる。このように実務実態に合わせて、入出力の出所を調整することによって、種々の制約を反映することが可能にもなっている。
【0059】
本発明の発電計画・電力売買計画作成方法により、操作者は、取引所取引前の運転計画をベースとして、想定される取引所決済価格の範囲で、適切な入札計画を得ることが出来る。ここでいう適切であるという条件は、見込まれる収益と取引量に関する最低最大・期待値およびそのブレ幅である。たとえば、一定以上の収益を確保しつつ、収益のブレが小さく、かつ、一定量以上の売電量を実現できる入札計画が立案できるようになる。電力取引所参加者は、自社収益に影響する取引所の不確定要因を考慮して、取引所への入札計画を作成することが可能となる。
【0060】
【発明の効果】
本発明の目的によれば、電力取引において、取引所参加者が、取引所取引の不確実性を考慮した入札計画と、発電計画を作成することができるような電力売買計画作成方法および装置を提供することができる。
【図面の簡単な説明】
【図1】本発明の実施例の機能構成。
【図2】本発明の実施例の利用体系。
【図3】本発明の実施例の利用目的。
【図4】本発明の実施例の給電指令所から受信する取引前の発電計画データの一例。
【図5】本発明の実施例の処理フロー。
【図6】取引前の発電計画閲覧画面の一例。
【図7】本発明の実施例の相場観の入力画面。
【図8】本発明の実施例の相場観のヒストリカルデータ取り込み画面。
【図9】組合せ候補作成結果の一例。
【図10】入札計画表示画面の一例。
【図11】入札計画表示内容の説明の例(その1)。
【図12】入札計画表示内容の説明の例(その2)。
【図13】個別入札案の提示画面の一例。
【図14】取引後の発電計画閲覧画面の一例。
【符号の説明】
0101…本装置、0102…発電計画受信手段、0103…想定取引所価格受信手段、0104…入札条件受信手段、0105…最適入札計画作成手段、
0106…入札計画送信手段、0107…約定結果受信手段。[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a power trading plan creation method and apparatus for formulating a bid plan for a power exchange of a power company.
[0002]
[Prior art]
In the power system before the market principle was introduced, a planning method for minimizing the cost has been basically taken. This is because the amount of power sold to customers and the system for fixing the electricity sales fee system has been established, and there is no risk of customer loss and other risks. It is possible that In other words, if the amount of power generation is secured for the demand predicted based on the actual results, the profit is guaranteed. For example, in the power generation plan creation device described in Japanese Patent Application Laid-Open No. 2001-212548 (hereinafter referred to as Patent Document 1), the power generation cost is minimized when the start / stop problem of the generator and the optimal output of the generator are allocated. Explains how to make it. This publicly known example is a method of creating an operation plan for minimizing the cost for the demand predicted based on the actual results.
[0003]
On the other hand, when attention is paid to the operation planning method in the electric power system after the introduction of the market principle, a technique is known that creates an operation plan for managing the relationship between the expected profit and the risk. For example, in Japanese Patent Laid-Open No. 2002-281665 (hereinafter referred to as Patent Document 2), a risk relating to power generation is formulated, and an operation planning method capable of obtaining relatively stable business profit even when power generation fluctuation occurs. Is explained.
[0004]
[Patent Document 1]
Japanese Patent Laid-Open No. 2001-2111548
[Patent Document 2]
JP 2002-281665 A
[0005]
[Problems to be solved by the invention]
When the principle of competition is introduced into the electricity market, especially when exchange trading that deals with the most recent spot electricity, such as electricity the next day, is introduced, the amount of demand to be supplied and the unit price of electricity sales will be Will fluctuate. Exchange participants need to develop a bidding plan and a power generation plan that take into account the uncertainty of such exchange transactions. A system that supports such planning means is required.
[0006]
Also, from the perspective of sharing responsibilities in business, companies that participate in exchanges once formulate an operation plan for power demand that has been determined to supply before participating in uncertain exchange transactions. In addition, it is assumed that the business of adjusting the operation plan for the exchange transaction is performed. For example, the operation department is in charge of the work that the operation plan before the transaction is formulated based on the demand forecast at the previous day, etc., and the transaction department corrects the operation plan and manages the exchange revenue A business structure in charge of In this way, it may be assumed that it is desired to manage the exchange revenue independently.
[0007]
An object of the present invention is to provide a power trading plan creation method and apparatus that enables a participant in an exchange to create a bid plan and a power generation plan in consideration of the uncertainty of exchange transactions. There is.
[0008]
[Means for Solving the Problems]
Means are provided for receiving an operation plan formulated for a power demand whose supply is fixed, and means for formulating a plurality of bid plans for an exchange based on the received plan. At this time, it is possible to make a prediction calculation for the transaction amount and the profit fluctuation resulting from the bidding by specifying the condition for the uncertainty of the power unit price in the exchange settlement. In addition, there is provided a means for screening a bid plan requested by an operator from a plurality of bid plans by specifying conditions for prediction of profit and transaction volume.
[0009]
The operator can obtain an appropriate bid plan within the range of the assumed exchange settlement price based on the operation plan before the exchange transaction. The appropriate condition here is the minimum / maximum expected value and the fluctuation range for the expected revenue and transaction volume. For example, it is possible to create a bidding plan that can achieve a certain amount of power sales while ensuring a certain amount of revenue while minimizing revenue fluctuations.
[0010]
According to the present invention, a power exchange participant can create a bidding plan for an exchange in consideration of an uncertain factor of the exchange that affects the company's earnings.
[0011]
DETAILED DESCRIPTION OF THE INVENTION
(Example)
FIG. 1 shows a functional configuration of a power generation plan / power trading plan creation device using the present invention.
This apparatus 0101 is composed of several functional blocks. First, an outline of cooperation between functions in the whole will be described.
[0012]
The power generation plan receiving unit 0102 receives a power generation plan before a power exchange transaction delivered from an operation department such as a power supply command station. The assumed exchange price receiving unit 0103 receives information on an assumed range relating to the settlement price of the exchange, which is input from a customer terminal operated by an operator in charge of power trading. Similarly, the bid condition receiving means 0104 receives information on the specified conditions related to the profit of the bid plan and the trading volume requested by the operator. Based on such information, the optimum bid plan creation means 0105 creates a bid plan requested by the operator, and the bid plan transmission means 0106 informs the operator of the contents of the bid plan. It has become. When the operator actually bids for the bid result, the contract result receiving unit 0107 receives the contract result, and the power generation plan correction transmitting unit 0108 receives the power generation plan received by the power generation plan receiving unit 0102. Changes from the plan are delivered to operation departments such as the power supply command center.
[0013]
Hereinafter, a detailed description will be supplemented regarding the operation method and internal processing of the power generation plan / power trading plan creation device shown in FIG. In this example, it is assumed that a power generation plan and a power trading plan will be formulated as of the day before, and the power exchange handles spot power every 30 minutes on the next day in a plate-by-line method. And
[0014]
First, FIG. 2 illustrates a utilization system of a power generation plan / power trading plan creation device using the present invention. As described above, the power generation plan before the power exchange transaction, that is, the start / stop plan (unit commitment) of which generator is to be started and stopped, and the load distribution plan of how much power is output are the central power supply. It is created by the central power supply command station server 0202 installed in the command station 0201. In order to meet the demand forecast of the actual kWh for the electricity demand that has already signed a kW contract using the next day weather forecast in the previous day, for example, the maximum temperature forecast A sufficient power generation plan has been created. If it is obliged to provide ancillary services such as reserve capacity as the responsibility of the operation department that handles this, rather than simply creating a power generation plan that satisfies kWh, A power generation plan that provides ancillary services such as various reserves such as a quick reserve is taken into consideration.
[0015]
The power generation plan before the exchange transaction having such a property is delivered from the central power supply command station 0201 to the power exchange transaction support terminal 0204 installed in the transaction department 0203. As described above, the transaction support terminal 0204 to which the present invention is applied has a function of presenting a bid plan that satisfies a transaction person. The support content itself or a bid plan in which the content is partially corrected manually is transmitted as an order to the power exchange server 0206 via the power exchange transaction bidding terminal 0205. The contract result for this order is fed back to the power exchange transaction support terminal 0204 via the power exchange transaction bidding terminal 0205. The transaction support terminal 0204 is configured to transmit a power generation plan correction request corresponding to the contract result to the central power supply command station server 0202.
[0016]
With the above usage system, the usage purpose as shown in FIG. 3 can be realized. The business group 0301 before the transaction is the business jurisdiction of the operation department. First, in consideration of reliability constraints such as reserve power and mechanical constraints such as output fluctuation range, a plan relating to whether or not each generator is activated and stopped, and the activation and deactivation time, that is, a power generation plan 0302 before exchange transaction is created. Even if the exchange transaction is not executed, the power generation plan 0302 can be supplied without any trouble. In addition, this power generation plan 0302 is supplemented with information on whether or not the plan can be changed for each generator. For example, a case is assumed in which a supply contract demand prediction 0303 is performed for a demand that is determined to be supplied at the previous day, and then a generator start / stop plan that satisfies this predicted demand amount is established. The start / stop plan at the previous day stage includes a plan changeable generator that can change the plan and a generator that cannot change the plan. For example, there are cases where additional start-up is difficult after an exchange transaction is contracted, such as a thermal power generator using coal, or when start-up stop time cannot be changed due to personnel allocation restrictions. On the other hand, for a generator capable of such a plan change, a range in which the plan can be changed, that is, a start / stop time range and an upper and lower limit range are specified. Up to this point, the operation department has jurisdiction, and the information is transferred to the business group 0304 by the transaction department. In the trading department, as described above, the greatest business purpose is to perform post-transaction power generation planning 0305 that realizes bidding on the most appropriate power exchange under the conditions specified by the operator. In this post-transaction power generation plan 0305, when compared with the pre-transaction power generation plan 0302, the start / stop time or the start / stop time is changed for zero or more generators among the generators capable of changing the plan. The supply contract demand forecast 0303 is unchanged before and after the transaction, and the exchange bid plan planning 0306 is simultaneously achieved by the post-transaction power generation planning 0305.
[0017]
As described above, the main business purpose of the operation department is to formulate a power generation plan that satisfies various reliability constraints and mechanical constraints before the exchange transaction. On the other hand, the main business purpose of the trading department is to adjust the power generation plan drafted by the operation department to increase profits in exchange transactions and to execute a certain amount of power trading. The system of the present invention is generally used in the business flow as described above.
[0018]
Hereinafter, the operation content of the power generation plan / power trading plan creation device using the present invention will be described with reference to the drawings.
[0019]
FIG. 4 shows an example of power generation plan data before the transaction received from the power supply command station. Data received by the power generation plan receiving unit 0102 in FIG. Plan values, upper limits, and lower limits are registered for the setting for each generator in the horizontal axis direction and for the setting of spot power products for each time zone handled by the power exchange in the vertical axis direction. The planned value means the output plan value of the generator in the time zone in the pre-transaction power plan 0302, and the upper and lower limits are the output plan values in the plan adjustment by the post-transaction power plan 0305. The range that can be changed is shown.
[0020]
When a fixed value greater than 0 is allocated as shown in data 0401, and a numerical value different from the planned value is specified for any of the upper and lower limits, activation is scheduled in the pre-trade power generation plan This means that the plan can be changed. On the other hand, if the planned value matches the upper and lower limits, it means that the generator cannot be changed. In particular, when the planned value and the upper and lower limits are 0 as in the data 0403, the stop is scheduled in the pre-transaction power generation plan, and the plan cannot be changed. When the planned value is 0 as in data 0402, but the upper and lower limits are set to a value other than 0, a stop is scheduled in the power generation plan before the transaction, but it is possible to start by changing the plan It means that.
[0021]
After such power generation plan data is received by the power generation plan receiving means 0102, the power generation plan / power trading plan creation device using the present invention performs processing. The processing flow of the present invention will be described with reference to FIG.
[0022]
On-time activation 0501 is performed at the time when the power generation planning by the operation department ends, and the result of the pre-transaction power generation planning 0302 as shown in FIG. Next, the browsing screen process 0503 presents a screen that allows the operator to browse the contents of the pre-transaction power generation plan received above and confirms the contents. An example of the power generation plan browsing screen before this transaction is shown in FIG.
[0023]
The screen is composed of a window 0601. In the lower part of the window 0601, a visualization of the contents of the pre-transaction power generation plan is displayed for each generator. For example, area 0602 indicates output allocation that cannot be changed in the power generation plan before transaction, and area 0603 indicates an output range in which the plan can be changed. Area 0604 shows the output range that is forcibly assigned as the lower limit when changing the start / stop plan. In the example of FIG. 6, GenC is scheduled to stop in the pre-transaction power generation plan. It is a screen expressing that it can be changed to activation after the time, and that it must have a certain output when it is activated. In the upper part of the window 0601, a value 0605 obtained by summing up the generator outputs and a value 0606 obtained by summing up the generator capacities are displayed in a graph, which gives information that facilitates the understanding of the operator. When the operator who has browsed the information confirms the contents, the button 0607 is pressed.
[0024]
After the operator confirms the validity of the received pre-transaction power generation plan (including information on the plan changeable generator) by the browsing screen of FIG. 6 as described above, the process proceeds to a bid plan planning process. .
[0025]
First, in process 0504 in the process flow of FIG. 5, an assumed exchange price is set. In this process, the operator is asked to input a spot power market view that is handled at the power exchange on the next day. FIG. 7 shows an example of the input screen.
[0026]
The left part of the window 0701 has a tabular input part. An input field is provided for setting a low value 0703, a center value 0704, and a high value 0705 in the horizontal direction for the setting of spot power products for each time zone handled in the power exchange in the vertical axis direction 0702. The expected value of the expected exchange price is input to the center value 0704, and the upper and lower limit ranges assumed as market views are input to the lower value 0703 and the higher value 0705. The lower value 0703 and the higher value 0705 have specifications that allow you to input the upper and lower limits that can be expected with a certain probability, for example, 95% accuracy, and the operator should perform this input operation after understanding the specifications. It shall be. The values entered in the tabular input field can be visually confirmed as three line graphs (center value, lower / higher) in the graph area 0706. When input is completed for all spot power products, the button 0707 is pressed to confirm the setting.
[0027]
In the spot power market view, it is not always necessary to manually input everything. It is conceivable to automatically set a value for estimating past statistics, or to set a value obtained by manually correcting the value. When such an operation is performed, the button 0708 is pressed to call another screen.
[0028]
FIG. 8 shows an example of the historical data capturing screen for the market view called from the button 0708 in FIG. A list is displayed in the window 0801, and the captured data is listed in the vertical direction 0802. For example, data of the most recent day is referred to as data 0803, or an average value of a past fixed period is used as data 0804 is used. By selecting any one of these data and pressing a button 0805, the parameters are transferred to the table format input field set in FIG. In addition, when the radio button 0806 is checked, a function of correcting the content of the selected data according to the maximum temperature predicted value on the next day is also provided. The correction factor is realized by multiplying the ratio obtained from the correlation function between the maximum temperature held in the program and the maximum demand.
[0029]
The setting of the assumed exchange price in the process 0504 is completed using the input screens as shown in FIGS. At this point, the minimum input work has been completed, and the following shifts to the bidding plan creation calculation. First, in step 0505, a start / stop combination candidate is created. In this process, all generator start / stop patterns that can be considered within a given input range are created as solution candidates. Specifically, on the basis of the pre-transaction power generation plan, a process of combining all possible patterns for the start / stop status and time for each generator capable of changing the plan is performed. In general, there are at most several generators that can be adjusted for starting and stopping, and the number of combinations becomes the number of combinations on the order of several tens to several millions. In this processing flow, each created combination is stored in a data table.
[0030]
FIG. 9 shows an example of contents stored in a table in the database as a combination candidate creation result created by processing 0505. In the table, information is entered for each combination candidate in the vertical direction 0901. For each combination candidate, start time information 0902 and stop time information 0903 of each generator are set. Arbitrary combination candidates always have different start time or stop time settings for one or more generators as compared to combinations other than themselves. For example, in combination candidate 2, the activation time of GenC is different from other combination candidates as in data 0904.
[0031]
As described above, in the process 0505, a plurality of combination candidates are created within a possible range of the generator whose plan can be changed. After the combination candidates are created, the optimal trading volume is determined for each individual combination candidate, and the revenue generated by the determination is calculated. This processing corresponds to the iterative processing by the loop processing 0506 in the processing flow of FIG.
[0032]
In order to examine the profitability of individual combination candidates, it is necessary to evaluate the assumed price range set in process 0504. Therefore, in this process, a method of evaluating profitability is adopted for some representative points in the assumed price range. Specifically, the evaluation calculation is performed for the three points of the center exchange price set in FIG. This processing corresponds to loop processing 0507 in the processing flow of FIG.
[0033]
In order to evaluate profitability under the conditions where the combination candidate and the assumed price are specified within the above double loop process, evaluate the profitability for all time sections and all generators. Is used. In the processing flow of FIG. 5, loop processing 0508 and loop processing 0509 correspond to this.
[0034]
Next, in process 0510, a process for calculating the optimal trading volume of each generator is performed. At the time when this process is executed by the above-described quadruple repeated process, the generator to be calculated and the assumed exchange price are specified. The calculation contents based on this will be described below.
[0035]
First, parameters used for calculation are obtained from the database 0511. This parameter is a group of coefficients a, b, and c constituting a generator characteristic calculation formula indicating the cost with respect to the output amount P, as in (Equation 1). If the exchange price is M, the objective function is
(Equation 2) The difference between the revenue from the exchange and the cost should be maximized. The optimum output point that achieves this purpose can be uniquely determined by (Equation 3). Basically, (M−b) / 2a is calculated, but a condition limited to the range between the upper limit UL and the lower limit LL specified in FIG. 4 is added. If the optimum output point can be determined in this way, as shown in (Equation 4), the planned amount in the power generation plan before transaction can be set as P0, and the difference between the optimum output point and P0 can be calculated as the optimum sale amount.
[0036]
[Expression 1]
Figure 0004023409
[0037]
[Expression 2]
Figure 0004023409
[0038]
[Equation 3]
Figure 0004023409
[0039]
[Expression 4]
Figure 0004023409
[0040]
If the calculations of (Equation 1) to (Equation 4) are repeated for the loop process 0508 and the loop process 0509, the calculation of the optimal trading amount is completed for one state in which the combination candidate and the assumed price are specified. Therefore, at the end of the loop process 0508 and the loop process 0509, the profit is calculated by the process 0512. The contents of this calculation are shown in (Formula 5). For each time zone and each generator, the difference between the exchange revenue obtained from the optimal trading volume and the power generation cost required for it is calculated.
[0041]
[Equation 5]
Figure 0004023409
[0042]
As described above, the profit can be calculated for one state in which the combination candidate and the assumed price are specified. In this power generation plan / power trading plan creation device, a screen that summarizes these results is shown to the operator, and a selection means that can discard the combination candidates is provided. In process 0513, a bid plan display screen for evaluating the profit distribution is presented to the operator. FIG. 10 shows an example of the bid plan display screen.
[0043]
The window 1001 includes a tabular input unit 1002 that inputs conditions for discarding combination candidates, a graph unit 1003 that visualizes profitability for each combination candidate calculated in the above processing flow, and the combination candidates The table format output unit 1004 displays supplementary detailed information about any of the above.
[0044]
First, the bid plan display content displayed on the graph part 1003 will be described with reference to FIG. In the graph, the vertical axis 1102 represents the amount of electric power purchased and sold, and the horizontal axis 1101 represents the earnings outlook. On this plane, for each combination candidate, the profit evaluation is plotted for several cases in the assumed power price range. In the case of the present embodiment, for the case of the three assumed power prices (high, center value, low) input in FIG. 7, the optimal trading volume and exchange revenue obtained by a series of processing of (Formula 1) to (Formula 5) 3 points are plotted (1103 for the higher value, 1104 for the center value, and 1105 for the lower value), and these are connected by a straight line. Since such a straight line is drawn for each combination candidate, a large number of finite-length broken lines are drawn in the graph area. Among the combination candidates, there are a combination candidate having the same start-up generator configuration but having a close relationship such that the start / stop time is slightly shifted, and a combination candidate having a distant relationship with a different start-up generator configuration. In the case of the graph area, combination candidates having close relationships such as 1006 to 1008 are drawn close to each other. Since a large number of combinations whose start and stop times are slightly different are displayed as combination candidates, it is necessary to perform selection, that is, a narrowing-down process, from among these many candidates.
[0045]
Therefore, in the tabular input unit 1002 in FIG. 10, as a condition for each combination candidate, a constraint condition related to revenue and a constraint condition related to trading volume can be input. As a constraint condition related to profit, a lower limit value that can be obtained by the minimum profit, a lower limit value and an upper limit value that can be obtained by the expected profit, an upper limit value that can be obtained by the maximum profit, and the like can be set. Similarly, it is possible to set the amount of power sold and purchased in the same manner. After entering the constraint conditions as described above, combination candidates can be narrowed down by pressing a button 1005. The operation can be confirmed on the graph area 1003 as well.
[0046]
This operation is illustrated in FIG. The input of the lower limit value of the minimum profit limits the range that the lower end can take in the vertical direction of the line segment as in the range specification 1201. Similarly, the input of the upper limit value of the maximum profit means the limitation of the range that the upper end of the line segment can take, as in the range specification 1202. In addition, when a limit is input for the profit range, the length in the vertical direction of the line segment is designated. The restrictions on the trading volume are also organized as a range designation and length designation in the horizontal direction on the graph area 1003. As shown in FIG. 12, a range specification 1203 for the lower limit value of the expected power sale amount and an upper limit range specification 1204 for the maximum power sale amount are obtained. For such a range designation and length designation, a line segment that does not satisfy the condition can be recognized by the operator by changing the color tone. From all candidates, a line segment that deviates from the range designation 1201 to 1204 or a line segment that violates the line segment length such as the line segment 1205 is excluded, and a display that leaves only those that satisfy the condition is obtained. I can do it.
[0047]
By repeatedly inputting numerical values into the tabular input unit 1002 and pressing the button 1005, the display of the graph area 1003 is sequentially updated. Thereby, the operator can narrow down combination candidates. At this time, using the tabular output unit 1004, it is possible to acquire detailed information of combination candidates that are targeted for narrowing down. After the combination candidates are narrowed down, detailed information can be referred to the output unit 1004 in a complementary manner by performing a selection operation on the combination candidate as a selection candidate like the cursor 1006. As the numerical values to be displayed, the maximum revenue, the expected revenue, and the minimum revenue are the three points of the exchange revenue corresponding to the three assumed power prices (high, central value, low) as described in FIG. The profit margin indicates the difference between the maximum profit and the minimum profit. Similarly, regarding the transaction volume, the total trading volume is displayed for the maximum, expected, and minimum cases. In addition to these numerical displays, the abbreviations are listed for the individual names of generators that have undergone a plan change (start / stop switching / start / stop time change) to the pre-transaction power generation plan. . As a result, the operator can roughly recognize what kind of power generation plan changes. Using the output unit 1004 as a reference index, the combination candidates are narrowed down.
[0048]
When the combination candidates are finally narrowed down to one, the selection operation is performed like the cursor 1006, and then the individual bid proposal when the combination candidate is adopted is obtained by pressing the button 1007. Can do.
[0049]
FIG. 13 shows an example of an individual bid proposal presentation screen. In the window 1301, a tabular output unit 1302 for displaying bid conditions and a tabular output unit 1303 for displaying profit contents when a bid is executed are arranged. The tabular output unit 1302 lists power products for each time zone handled by the exchange in the vertical direction 1304. In the horizontal direction 1305, there are a plurality of bid conditions for the buying direction and the selling direction on the left and right. An input field is provided. As individual bid conditions, a price designation column 1306 and an amount designation column 1307 are arranged. The numerical values of the bid price and the bid amount displayed here are obtained as shown in (Expression 6) with reference to the calculation processes of (Expression 1) to (Expression 5). That is, the difference between the output point in the pre-transaction power generation plan and the newly calculated optimum output point is the bid amount, and the bid price is obtained by changing the cost change according to the output difference to the unit price per bid amount.
[0050]
[Formula 6]
Figure 0004023409
[0051]
In this embodiment, the format as shown in FIG. 13 is adopted. However, by adopting an arrangement according to the screen format of the exchange trading terminal to be used, consideration can be given to promote the understanding of the operator. . The tabular output unit 1303 displays information on revenue generated when the individual bidding conditions are executed and the power generation plan correction. As a place corresponding to the position where the above-mentioned 1306 and 1307 are arranged in the tabular output unit 1302, a display column 1308 for profit value and a display column 1309 for details of power generation plan correction are arranged. The numerical value displayed in the profit value display field 1308 displays the profit value obtained when the individual bid placed at the corresponding position is executed in the tabular number 1302. Since this value depends on what the transaction price of the exchange will be, ask the radio buttons 1310 to 1311 to check the price assumption. Depending on the check position, either the center value, the lower value or the higher value of the assumed price is adopted, the profit for the transaction price is calculated, and this is shown in the display column 1308. The individual bid conditions for which a contract cannot be expected due to the relationship between the assumed price and the bid price are a mechanism for prompting the operator to understand by the display columns 1308 and 1309 being blank. The display field 1309 displays information relating to the revenue generated when the individual bidding conditions are executed and the power generation plan correction. The character string displayed in the power generation plan correction display column 1308 is an abbreviation for the solid name of the generator that has made a plan change (start / stop switching / start / stop time change) to the pre-transaction power generation plan The list is displayed. When the cursor is filled with this abbreviation as in mouse operation 1310, a pop-up window is used to display in detail the difference in output amount before and after the plan change. In this way, the screen is a screen on which the content of a specific individual bid proposal can be referred to for one combination candidate narrowed down by the operation of FIG.
[0052]
When the bid plan selected in FIG. 13 is adopted, the bid condition (a set of bid amounts and bid prices) can be written to an external system by pressing a button 1311. This function is linked to a trading terminal capable of online trading to the power exchange, and it is possible to link the conditions here as they are, that is, to cooperate with a function for automatically ordering a program. However, generally, the proposal here is treated as the positioning of the support information, and the transaction terminal receives the contents of the present system presentation and reflects them on the order screen such as the tabular output unit of FIG. There are many implementations that just keep things. Thereafter, in the work on the transaction terminal device, after some amount and price adjustment is performed by the human system, the order confirmation work is actually performed. Regardless of which function linkage method is used, the operator of this system should specify what amount and price should be entered on the bidding screen of the exchange terminal in a format similar to the bidding screen. Can be referred to.
[0053]
Moreover, not only the detailed information regarding such a bidding method but also a supplementary screen for referring to the detailed information regarding the power generation plan influenced after the bidding is provided. When a combination candidate finally selected is selected with the cursor 1006 and a button 1008 is pressed, a detailed screen is displayed for the power generation plan after the exchange transaction.
[0054]
FIG. 14 shows an example of the power generation plan browsing screen after the transaction. The basic configuration is similar to FIG. The window 1401 is provided with a graph output unit 1402 for visually displaying the plan correction contents for the entire power generation and a graph output unit 1403 for displaying the plan correction contents for each generator. The graph output unit 1402 takes time in one day on the horizontal axis, and two pieces of information are plotted in the vertical direction. One is plotted as a line 1404 indicating the total power generation capacity before the transaction and a line 1405 indicating the total power generation capacity after the transaction as information on the capacity [kW] of the generator. As another information, a line 1406 indicating the total power output before the transaction and a line 1407 indicating the output difference before and after the transaction are plotted as information on the output [kWh] of the generator. Again, since the magnitude of the output depends on the price of the exchange, the user is asked to check one of the radio buttons 1408 to 1410 for the price assumption. Depending on the check position, either the central value, lower value or higher value of the assumed price is adopted, the output of each generator for the transaction price is calculated, and the total value is reflected in the broken line 1407 It has become.
[0055]
With such a graph, it is possible to understand from the overall power generation plan what kind of bid conditions have been adopted as a framework for the entire generator.
[0056]
In the graph output unit 1403, the plan correction contents for each generator are displayed in a graph in the vertical direction 1411. In the individual graph display, in the horizontal axis direction, the time in the day is taken on the same scale as the horizontal axis of the graph output unit 1403, and information on the output [kWh] of each generator is displayed on the vertical axis. ing. The output from the power generation plan before the transaction plan is drawn as in area 1412, and the change in the power generation plan due to the exchange transaction is drawn as in area 1413. As described in the graph output unit 1402, this output is displayed in accordance with the check of the assumed price radio button.
[0057]
As described above, the bid plan is transmitted in the process 0514 in the process flow of FIG. 5 for the narrowed down, selected, and adopted bid plans. The output of the bid plan transmission means 0106 in FIG. 1 corresponds to this. When the contract result of the bid result can be obtained by the contract result receiving unit 0107, the generator output adjustment amount corresponding to the bid result can be extracted from the above calculation results and transmitted by the power generation plan correction transmitting unit 0108. It is possible.
[0058]
Assuming practical business, it is conceivable that there is a limit range for price fluctuations at the exchange and an upper limit for the transaction volume. In addition, there is a possibility that the upper and lower limits of the price and the upper and lower limits of the transaction volume may be set as a trading strategy even within the entity that participates in the trading. Even in such a case, if the apparatus of the above embodiment is also used, the price regulation at the exchange can be reflected by the assumed price setting in FIG. 7, and the voluntary regulation regarding the quantity can be reflected by the combination rounding condition in FIG. As described above, various restrictions can be reflected by adjusting the source of input / output according to the actual business situation.
[0059]
With the power generation plan / power trading plan creation method of the present invention, the operator can obtain an appropriate bid plan within the range of the expected exchange settlement price based on the operation plan before the exchange transaction. The appropriate condition here is the minimum / maximum expected value and the fluctuation range for the expected revenue and transaction volume. For example, it is possible to create a bidding plan that can achieve a certain amount of power sales while ensuring a certain amount of revenue while minimizing revenue fluctuations. Participants in the power exchange can create a bidding plan for the exchange in consideration of the uncertainties of the exchange that affect their earnings.
[0060]
【The invention's effect】
According to the object of the present invention, there is provided a power trading plan creation method and apparatus that enables a participant in an exchange to create a bidding plan that takes into account the uncertainty of exchange transactions and a power generation plan. Can be provided.
[Brief description of the drawings]
FIG. 1 is a functional configuration of an embodiment of the present invention.
FIG. 2 is a utilization system of an embodiment of the present invention.
FIG. 3 shows the purpose of use of an embodiment of the present invention.
FIG. 4 is an example of power generation plan data before a transaction received from a power supply command station according to an embodiment of the present invention.
FIG. 5 is a processing flow of an embodiment of the present invention.
FIG. 6 shows an example of a power generation plan browsing screen before a transaction.
FIG. 7 is an input screen for market view according to the embodiment of the present invention.
FIG. 8 is a historical data capturing screen of market view according to an embodiment of the present invention.
FIG. 9 shows an example of a combination candidate creation result.
FIG. 10 shows an example of a bid plan display screen.
FIG. 11 is an example of description of bid plan display contents (part 1);
FIG. 12 is an example of explanation of bid plan display contents (part 2);
FIG. 13 shows an example of an individual bid proposal presentation screen.
FIG. 14 shows an example of a power generation plan browsing screen after trading.
[Explanation of symbols]
0101 ... This device, 0102 ... Power generation plan receiving means, 0103 ... Assumed exchange price receiving means, 0104 ... Bid condition receiving means, 0105 ... Optimal bid plan creating means,
0106 ... bid plan transmission means, 0107 ... contract result reception means.

Claims (13)

地域電力系統の安定運用及び電力供給に関する義務を有する電気事業者のために、電力売買契約の仲介を行う電力取引所に対する入札計画を作成する電力売買計画作成装置において、
前記電力取引所における取引前の前記義務を満足した発電計画情報を受信する受信手段と、
前記電力取引所における決済価格の想定価格情報を受信する受信手段とを備え、
前記発電計画情報、及び前記想定価格情報に基づいて入札計画案を作成する作成手段を有することを特徴とする電力売買計画作成装置。
In an electricity trading plan creation device that creates a bid plan for an electric power exchange that mediates an electric power sales contract for an electric power company that has an obligation regarding stable operation of the local power system and electric power supply ,
Receiving means for receiving power generation plan information that satisfies the obligations before the transaction at the power exchange;
Receiving means for receiving estimated price information of a settlement price at the power exchange,
A power trading plan creation device comprising creation means for creating a bid plan based on the power generation plan information and the estimated price information.
地域電力系統の安定運用及び電力供給に関する義務を有する電気事業者のために、電力売買契約の仲介を行う電力取引所に対する入札計画を作成する電力売買計画作成装置において、
前記電力取引所における取引前の前記義務を満足した発電計画情報を受信する受信手段と、
前記電力取引所での取引による収益又は取引量に関わる条件を指定する入札条件情報を受信する手段と、
前記電力取引所における決済価格の想定価格情報を受信する受信手段とを備え、
前記発電計画情報,前記入札条件情報および前記想定価格情報に基づいて入札計画案を作成する作成手段を有することを特徴とする電力売買計画作成装置。
In an electricity trading plan creation device that creates a bid plan for an electric power exchange that mediates an electric power sales contract for an electric power company that has an obligation regarding stable operation of the local power system and electric power supply ,
Receiving means for receiving power generation plan information that satisfies the obligations before the transaction at the power exchange;
Means for receiving bid condition information for specifying conditions relating to revenue or transaction volume from transactions on the power exchange;
Receiving means for receiving estimated price information of a settlement price at the power exchange,
A power trading plan creation device comprising creation means for creating a bid plan based on the power generation plan information, the bid condition information, and the estimated price information.
請求項2において、前記作成手段によって作成された入札計画案を前記想定価格情報に応じて表示する表示手段を備えることを特徴とする電力売買計画作成装置。  3. The power trading plan creation device according to claim 2, further comprising display means for displaying the bid plan created by the creation means in accordance with the assumed price information. 請求項2又は3において、
前記発電計画情報は、気象予報情報に基づいて予測される電力需要量に基づいて作成されたものであることを特徴とする電力売買計画作成装置。
In claim 2 or 3,
The power generation plan creation device, wherein the power generation plan information is created based on a power demand amount predicted based on weather forecast information.
請求項2から4のいずれかにおいて、
前記取引所取引前の発電計画情報は、複数台の発電機を起動停止の起動の有無,起動停止時間の情報及び起動停止実行および起動停止時間を変更できる発電機の指定情報を受信することを特徴とする電力売買計画作成装置。
In any one of Claim 2 to 4,
The power generation plan information before the exchange transaction is to receive whether or not to start or stop a plurality of generators, information about start and stop times, and generator designation information that can change start and stop execution and start and stop times. A power trading plan creation device.
請求項2から5のいずれかにおいて、
前記想定価格情報として、想定される価格範囲を確率分布として表現する情報を用いることを特徴とする電力売買計画作成装置。
In any of claims 2 to 5,
Information that expresses an assumed price range as a probability distribution is used as the assumed price information.
請求項2から6のいずれかにおいて、
前記想定価格情報として、電力の売買契約の仲介を行う取引所によって取り扱われる所定時間帯ごとの電力量商品の各々について、想定される価格範囲の中心値,上限値及び下限値に関する情報を用いることを特徴とする電力売買計画作成装置。
In any one of Claim 2 to 6,
As the assumed price information, information on the center value, the upper limit value, and the lower limit value of the assumed price range is used for each of the electricity amount products for each predetermined time period handled by the exchange that mediates the power sales contract. Electricity trading plan creation device characterized by.
請求項2から7のいずれかにおいて、
前記入札条件情報は前記取引所での取引による収益の確率分布,取引所での取引量の確率分布に関する条件を指定する情報であることを特徴とする電力売買計画作成装置。
In any of claims 2 to 7,
The power bid plan creation apparatus, wherein the bid condition information is information for specifying a condition relating to a probability distribution of profits from transactions at the exchange and a probability distribution of transaction amounts at the exchange.
請求項2から8のいずれかにおいて、
前記入札条件情報は前記取引所での取引による収益の期待値,上限値及び下限値を指定する入札条件情報を受信する受信手段を備えることを特徴とする電力売買計画作成装置。
In any of claims 2 to 8,
The power purchase plan creation device, wherein the bid condition information comprises receiving means for receiving bid condition information for designating an expected value, an upper limit value, and a lower limit value of profits from transactions at the exchange.
請求項6において、
前記取引所での取引による収益及び取引所での取引量の関係を二次元グラフに表示する表示手段と、
前記作成した複数の入札計画案の各々について、収益変動幅および取引量変動幅を線分にて表示する表示手段とを備え、
指示手段によって線分を特定することによって、入札計画案の取捨が実行できることを特徴とする電力売買計画作成装置。
In claim 6,
Display means for displaying, in a two-dimensional graph, the relationship between the revenue from the transaction at the exchange and the transaction volume at the exchange;
For each of the created plurality of bid plans, a display means for displaying a profit fluctuation range and a transaction amount fluctuation range by a line segment,
A power trading plan creation device characterized in that a bid plan can be discarded by specifying a line segment by an instruction means.
請求項9において、
前記グラフにおいて、グラフ内の描画範囲を指定すること、または線分の縦方向長さと横方向長さの制約を指定することによって、入札計画案の取捨が実行できることを特徴とする電力売買計画作成装置。
In claim 9,
In the graph, it is possible to execute a bid plan draft by specifying a drawing range in the graph or by specifying constraints on the vertical length and horizontal length of the line segment. apparatus.
請求項11において、
入札計画案の取捨が実行によって、取引所取引前の発電計画情報における状態から変更を受ける発電機名称が出力されることを特徴とする電力売買計画作成装置。
In claim 11,
A power trading plan creation device characterized in that the name of a generator that receives a change from the state in the power generation plan information before the exchange transaction is output by executing the bid plan draft.
地域電力系統の安定運用及び電力供給に関する義務を有する電気事業者のために、電力売買契約の仲介を行う電力取引所に対する入札計画を作成する電力売買計画方法において、
受信手段により前記電力取引所における取引前の前記義務を満足した発電計画情報を受信するステップと、
前記電力取引所における決済価格の想定価格情報を受信するステップと、
前記発電計画情報、及び前記想定価格情報に基づいて入札計画案を作成するステップとを有することを特徴とする電力売買計画作成方法。
In an electric power trading plan method for creating a bid plan for an electric power exchange that acts as an intermediary for an electric power sales contract for an electric power company having an obligation regarding stable operation of the local power system and electric power supply ,
Receiving power generation plan information satisfying the obligation before trading at the power exchange by a receiving means;
Receiving assumed price information of a settlement price at the power exchange;
And a step of creating a bid plan based on the power generation plan information and the assumed price information.
JP2003204215A 2003-07-31 2003-07-31 Electricity trading plan creation method and apparatus Expired - Lifetime JP4023409B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2003204215A JP4023409B2 (en) 2003-07-31 2003-07-31 Electricity trading plan creation method and apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2003204215A JP4023409B2 (en) 2003-07-31 2003-07-31 Electricity trading plan creation method and apparatus

Publications (2)

Publication Number Publication Date
JP2005051866A JP2005051866A (en) 2005-02-24
JP4023409B2 true JP4023409B2 (en) 2007-12-19

Family

ID=34263281

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2003204215A Expired - Lifetime JP4023409B2 (en) 2003-07-31 2003-07-31 Electricity trading plan creation method and apparatus

Country Status (1)

Country Link
JP (1) JP4023409B2 (en)

Families Citing this family (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4405415B2 (en) * 2005-03-16 2010-01-27 中部電力株式会社 Power transaction evaluation support system and method, program, server, and terminal
JP4607632B2 (en) * 2005-03-16 2011-01-05 株式会社東芝 Power transaction evaluation support system, method, and program
JP2006260431A (en) * 2005-03-18 2006-09-28 Chugoku Electric Power Co Inc:The Power bid price decision support system
JP4660281B2 (en) * 2005-05-27 2011-03-30 株式会社東芝 Power trading support system and method, and program
JP2007004646A (en) * 2005-06-27 2007-01-11 Hitachi Ltd Power transaction support system and power transaction support program
JP4734059B2 (en) * 2005-08-04 2011-07-27 株式会社東芝 Power transaction bidding support system and method, and program
JP5072307B2 (en) * 2006-09-28 2012-11-14 中国電力株式会社 Power transaction risk management apparatus and power transaction risk management method
JP2008108085A (en) * 2006-10-26 2008-05-08 Hitachi Ltd Spot price prediction system, spot transaction support system and spot price prediction and transaction support system
JP5042342B2 (en) * 2010-06-08 2012-10-03 中国電力株式会社 Electric power demand plan adjustment apparatus, electric power demand plan adjustment method, and program
JP5042341B2 (en) 2010-06-08 2012-10-03 中国電力株式会社 Hydroelectric power generation plan adjusting device, hydroelectric power generation plan adjusting method, and program
JP6342131B2 (en) * 2013-09-13 2018-06-13 株式会社東芝 Received energy reduction information calculation device, received energy reduction information calculation method, and program
KR102094137B1 (en) * 2014-11-21 2020-03-27 한국전력공사 Method for relaying electric power trading
KR101553985B1 (en) * 2014-12-17 2015-09-18 한국전력거래소 Power bidding system based on weather report
KR101676436B1 (en) * 2014-12-17 2016-11-16 한국전력거래소 Power bidding verification system
KR101676427B1 (en) * 2014-12-17 2016-11-16 한국전력거래소 Power bidding profile system
JP7024256B2 (en) * 2017-08-28 2022-02-24 三菱電機株式会社 Electric power transaction formulation device
JP7183754B2 (en) * 2018-12-12 2022-12-06 富士電機株式会社 Production allocation determination device, production allocation determination system, and production allocation determination method
CN111582609B (en) * 2019-11-20 2023-04-25 国网吉林省电力有限公司吉林供电公司 Coal-to-electricity project optimization method and optimization system considering regional characteristics
CN110866842A (en) * 2019-11-22 2020-03-06 四川电力交易中心有限公司 Electric power transaction settlement method based on electric power transformation degree

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11224297A (en) * 1998-02-06 1999-08-17 Hitachi Ltd Price predicting and article dealing method for market-price article transaction
JP3961727B2 (en) * 1999-09-17 2007-08-22 三菱電機株式会社 Method and apparatus for calculating optimum operation plan of power generation facility
JP2001331691A (en) * 2000-05-24 2001-11-30 Mitsubishi Electric Corp Bidding system using internet, market price prediction system, optimum bit quantity and price laying system, strategy laying system, and bidding system with risk management
JP2002074071A (en) * 2000-08-25 2002-03-12 Dynadixt Systema Co Ltd Optimum market price determining system by auction and record medium
JP3787761B2 (en) * 2001-09-27 2006-06-21 株式会社日立製作所 Power generation facility operation planning system and power selling system
WO2003032463A1 (en) * 2001-09-28 2003-04-17 Mitsubishi Denki Kabushiki Kaisha Method for assisting in planning of power supply schedule

Also Published As

Publication number Publication date
JP2005051866A (en) 2005-02-24

Similar Documents

Publication Publication Date Title
JP4023409B2 (en) Electricity trading plan creation method and apparatus
US8775309B2 (en) Method and apparatus for pricing calculation
US7249085B1 (en) Method and system for conducting electronic auctions with multi-parameter price equalization bidding
KR101887347B1 (en) Method for virtual electric power trading between microgrids based on bidding way and agent apparatus for the same
US7917404B2 (en) System for commodity sales
KR102094137B1 (en) Method for relaying electric power trading
CN101159046A (en) Electric power trading support system
US20110106648A1 (en) Reverse auction method
US20040030646A1 (en) Tariff generation, invoicing and contract management
JP2007058760A (en) Energy transaction support system and energy transaction support program
JP7024256B2 (en) Electric power transaction formulation device
KR20110064495A (en) Business method to product and sale of design
KR101448290B1 (en) Bid consulting system for using distribution chart of expert's successful bid prediction and method thereof
JP2006099432A (en) Power trading system, method, and program
KR102196464B1 (en) Trouble solution system through professional experts and the method using it
JP2005284420A (en) Power resource transaction system and power resource transaction management server
CN108805473A (en) Optimize the system and method for price fixing and stock control using advanced price/fulfilment date matcher
JP2004192473A (en) System and server for trading electric power resources
WO2020136910A1 (en) Electronic value management system, electronic value management method, and program
US7634439B1 (en) Method and apparatus to perform buy versus leasing transformational bidding
JP2006285351A (en) Power transaction support system, method and program
US20210134447A1 (en) Decision support engine for medical equipment
KR20200068064A (en) Differential fee payment system through professional experts
JP4329644B2 (en) Market analyzer
KR102394361B1 (en) Shopping mall operating system with advertising content collaboration model

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20050616

RD01 Notification of change of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7421

Effective date: 20060420

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20070112

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20070123

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20070605

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20070704

A911 Transfer to examiner for re-examination before appeal (zenchi)

Free format text: JAPANESE INTERMEDIATE CODE: A911

Effective date: 20070809

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20070911

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20070924

R151 Written notification of patent or utility model registration

Ref document number: 4023409

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R151

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101012

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111012

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121012

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121012

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131012

Year of fee payment: 6

EXPY Cancellation because of completion of term