JP4008842B2 - Bath water heater - Google Patents

Bath water heater Download PDF

Info

Publication number
JP4008842B2
JP4008842B2 JP2003087108A JP2003087108A JP4008842B2 JP 4008842 B2 JP4008842 B2 JP 4008842B2 JP 2003087108 A JP2003087108 A JP 2003087108A JP 2003087108 A JP2003087108 A JP 2003087108A JP 4008842 B2 JP4008842 B2 JP 4008842B2
Authority
JP
Japan
Prior art keywords
hot water
heating
time
bathroom
bath
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2003087108A
Other languages
Japanese (ja)
Other versions
JP2004293925A (en
Inventor
雅 石本
好孝 中村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tokyo Gas Co Ltd
Original Assignee
Tokyo Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokyo Gas Co Ltd filed Critical Tokyo Gas Co Ltd
Priority to JP2003087108A priority Critical patent/JP4008842B2/en
Publication of JP2004293925A publication Critical patent/JP2004293925A/en
Application granted granted Critical
Publication of JP4008842B2 publication Critical patent/JP4008842B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Control For Baths (AREA)
  • Central Heating Systems (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、浴槽への湯張りと浴室の暖房とを連動させることができる風呂給湯暖房装置に関する。
【0002】
【従来の技術】
特許文献1には、浴槽に対する自動湯張り機能と浴室に対する暖房機能を備え、入浴準備が完了した旨を報知するようにした風呂給湯暖房装置であって、浴槽の湯張り運転開始と同時、若しくは湯張り運転中に浴室の暖房運転を開始する場合には、湯張り運転が完了し且つ暖房運転において予め定めた一定の条件を満たした時点で、入浴準備の完了の旨を報知するようにした風呂給湯暖房装置が記載されている。
【0003】
また、特許文献1には、風呂の自動湯張り運転と浴室暖房運転の運転開始タイミングを自動的に得て、それら両運転を自動的に行う方法として、次のことが記載されている。先ず初回は風呂自動湯張り運転と浴室暖房運転を同時に、または所定時間遅らせて浴室暖房を開始するようにし、このとき浴室暖房に要した時間と自動湯張りに要した時間とをコントローラで演算してその時間差を記憶させておき、2回目以降は前回の運転において記憶している時間差だけ何れかの運転を遅らせるようにして自動運転を行う。
【0004】
特許文献2には、浴室暖房機に対して暖房運転の開始を指示する暖房指示手段と、給湯配管を介して浴槽に所定量の湯を供給する湯張り指示手段を有する給湯機と、給湯機に対して湯張り運転の開始を指示する自動スイッチを備えた浴室リモコンと、台所リモコンとを備えた浴室給湯装置において、浴室リモコンに、使用者の操作に応じて湯張り運転と暖房運転とを連動させる連動設定状態と、湯張り運転と暖房運転とを連動させずに湯張り運転のみを実行する非連動設定状態とを切換える暖房自動スイッチを設けるようにした浴室給湯装置が記載されている。
【0005】
【特許文献1】
特開2002−71212号公報
【特許文献2】
特開2002−221355号公報
【0006】
【発明が解決しようとする課題】
浴室暖房運転によって浴室内の室温を適温(例えば18℃)にするまでの暖房時間は、暖房開始時の室温によって異なる。また、浴槽に所定温度の湯を張るまでの湯張り時間は、入水温度によって異なることがある。このため前回の運転において記憶している浴室暖房に要した時間と自動湯張りに要した時間とに基づいて今回の運転開始タイミングを設定するようにした場合、前回の運転における暖房開始時の室温や入水温度と今回の運転における暖房開始時の室温や入水温度が異なっているときには、湯張り運転の終了タイミングと室温が適温に暖房されるタイミングとが一致しないことがある。湯張り時間が暖房時間よりも長くなり、湯張りが終了するまで暖房運転を継続させた場合には、その継続させた分だけ暖房費用が無駄となる。
【0007】
また、湯張運転と暖房運転とを連動させる連動設定状態と、湯張運転と暖房運転とを連動させずに湯張運転のみを実行する非連動設定状態とを切換える暖房自動スイッチを設けるようにした場合には、リモコン装置の操作スイッチの数が増加するとともに、連動または非連動の設定操作が必要である。上記暖房自動スイッチ等を設けることなく、気温の変化に応じて寒い時は暖房運転が自動的に連動されれば便利である。
【0008】
本発明はこのような課題を解決するためになされたもので、暖房に要する時間および湯張り等の風呂運転に要する時間を的確に予測して、風呂運転の終了時点に浴室を適温に暖房できるようにした風呂給湯暖房装置を提供することを目的とする。
【0009】
また、本発明は、浴室の室温が所定温度以下の場合には風呂運転と暖房運転とを自動的に連動させることのできる風呂給湯暖房装置を提供することを目的とする。
【0010】
さらに、本発明は、暖房に要する時間と風呂運転に要する時間とを比較し、風呂運転能力または暖房運転能力を高く設定することで、連動運転に要する時間(入浴準備時間)を短縮できるようにした風呂給湯暖房装置を提供することを目的とする。
【0011】
【課題を解決するための手段】
前記課題を解決するため本発明に係る風呂給湯暖房装置は、室温センサによって検出された浴室の室温に基づいて浴室を所定の室温に暖房するまでに要する暖房時間を予測する暖房時間予測部と、入水温度センサによって検出された入水温度に基づいて浴槽に所定湯温の湯を張るまでに要する湯張時間を求める湯張時間予測部と、予測した暖房時間と予測した湯張時間とに基づいて暖房運転の終了タイミングと湯張運転の終了タイミングとが略一致するように湯張運転の開始タイミングおよび暖房運転の開始タイミングを設定する連動運転制御部とを備える。
【0012】
本発明に係る風呂給湯暖房装置は、気温によって室温や入水温度が変動しても、湯張り終了時点には浴室を適温に暖房することができる。よって、快適な入浴が可能になる。また、風呂運転および暖房運転にかかるコストを低減することができる。
【0013】
なお、浴室の室温が予め設定した暖房運転判定しきい値温度以下である場合に、湯張運転と暖房運転とを連動させるようにすることで、気温が低いときは風呂運転と暖房運転とを自動的に連動させることができる。
【0014】
浴室の温度と浴室暖房機の暖房能力とに基づいて浴室を所定の室温に暖房するまでに要する時間を予測してもよい。また、暖房運転開始時の室温と暖房に要した時間とを対応付けて記憶しておき、過去の暖房時間を参照して今回の暖房時間を求めてもよい。
【0015】
入水温度と給湯機の給湯能力とに基づいて浴槽に所定量の湯を張るまでの時間を予測してもよい。また、入水温度と湯張りに要した時間とを対応付けて記憶しておき、過去の湯張時間を参照して今回の湯張時間を求めるようにしてもよい。
【0016】
また、所定の給湯能力で湯張りした際の湯張時間と所定の暖房能力で浴室を暖房した際の暖房時間とを比較し、湯張時間が前記暖房時間よりも長い場合には給湯能力を高く設定し、暖房時間が湯張時間よりも長い場合には暖房能力を高く設定するようにしてもよい。これにより、入浴準備時間を短縮できる。
【0017】
さらに、給湯能力を高く設定しまたは暖房能力を高く設定した状態で、湯張りが終了するタイミングと浴室が適温になるタイミングとが一致するように湯張運転と暖房運転の各運転開始タイミングを制御することで、入浴準備時間を短縮するとともに、湯張り終了時点には浴室を適温に暖房することができる。
【0018】
【発明の実施の形態】
本発明の第1の実施の形態による風呂給湯暖房装置について図1乃至図4を用いて説明する。まず、本実施の形態による風呂給湯暖房装置の概略の構成を図1を用いて説明する。風呂給湯暖房装置1は、屋外等に設置された熱源機10と、浴室2の天井や壁面等に設置された浴室暖房機20と、熱源機10から浴室暖房機20へ暖房用温水を供給するための暖房用温水循環路30と、浴槽3内の浴槽水を循環させて追焚するための追焚循環路40と、浴室2に設置された浴室リモコン(風呂リモコン)50とを有している。暖房用温水循環路30は、暖房往き管31と暖房戻り管32とを有している。追焚循環路40は、追焚往き管41と追焚戻り管42とを有している。
【0019】
熱源機10と浴室暖房機20とは暖房用温水循環路30で接続されている。また、熱源機10と浴室暖房機20とは通信線11で接続されており、熱源機10と浴室暖房機20との間で双方向のデータ通信が可能な構成となっている。
【0020】
熱源機10と浴槽3とは追焚循環路40で接続されている。熱源機10と浴室リモコン50とは浴室リモコン線12で接続されており、熱源機10側から浴室リモコン50へ電源を供給するとともに、熱源機10と浴室リモコン50と間で双方向のデータ通信が可能な構成となっている。浴室リモコン50を操作することで、風呂の運転および浴室の暖房運転を制御することができ、また、浴室リモコン50に運転状態等が表示される。さらに、浴室リモコン50によって各種の設定が可能である。
【0021】
風呂給湯暖房装置1は、台所等に設置された台所リモコン60をさらに備える構成であってもよい。熱源機10と台所リモコン60とは台所リモコン線13で接続されており、熱源機10側から台所リモコン60へ電源を供給するとともに、熱源機10と台所リモコン60と間で双方向のデータ通信が可能な構成となっている。台所リモコン60を設置することで、台所等でも風呂運転や浴室暖房運転の操作ができ、また、運転状態を確認することができる。
【0022】
さらに、熱源機10から給湯配管4および浴室への分岐配管5を介して浴室2に設置された給湯栓やシャワー等の給湯器具6へ給湯ができたり、台所等への分岐配管7を介して台所等に設置された給湯栓8へ給湯ができたりする構成としてもよい。この場合、浴室2に設置された給湯栓やシャワー等の給湯器具6からの出湯温度を浴室リモコン50によって設定できるようにしている。また、台所等に設置された給湯栓8からの出湯温度を台所リモコン60によって設定できるようにしている。
【0023】
本実施の形態に係る熱源機10はガスを熱源とするもので、この熱源機10にはガス、水道、商用電源が供給される。また、浴室暖房機20には商用電源が供給される。なお、熱源機10側から電源ケーブルを介して浴室暖房機20へ電力を供給する構成としてもよい。なお、ガスを熱源とする熱源機10に代えて、電気や灯油等をエネルギー源としてももちろんよい。例えば、湯張り用の熱源機はガス給湯器や灯油式給湯器を用い、暖房用の熱源機は電気式ヒートポンプを用いるようにしてももちろんよく、湯張り及び暖房の双方に電気式温水器を熱源機として用いるようにしてももちろんよい。
【0024】
図2は熱源機の一具体例を示すブロック構成図である。熱源機10は、給湯部110と追焚部120と湯張部130と温水部140と制御部(コントローラ)150と電源部160とガスの燃焼に必要な空気を供給するための送風機構(不図示)および排気機構(不図示)等から構成されている。制御部150は、給湯制御部151と、追焚制御部152と、湯張制御部153と、温水制御部154と、入出力インタフェース部155と、通信インタフェース部156と、連動運転制御部157と、運転時間予測部158と、風呂運転モード設定部159とを備える。
【0025】
給湯部110は、不図示の給湯用燃焼室内に給湯用熱交換器111と給湯用の複数のバーナ112,112,112と不図示の点火機構等を備えるとともに、入水温度センサ113、出湯温度センサ114、流量センサ(または水流センサ)115、出湯流量を調整する流量調整弁116、各バーナ112に対するガスの供給・停止を制御するガス電磁弁117,117,117およびガス流量を調整可能なガス流量調整弁118,118,118を備える。
【0026】
制御部150内の給湯制御部151は、流量センサ115の出力に基づいて給湯が開始されたことを検知すると、ガス電磁弁117を開弁駆動させてバーナ112を燃焼させる。これにより、給湯用熱交換器111を介して温水が生成され出湯される。制御部150は、出湯温度センサ114の出力に基づいて所定の出湯温度となるように燃焼させるバーナの個数およびガス供給量ならびに出湯流量を制御する。制御部150は、流量センサ115の出力に基づいて給湯が停止されたことを検知すると、バーナ112へのガスの供給を停止させる。
【0027】
追焚部120は、不図示の追焚用燃焼室内に追焚用熱交換器121と追焚用バーナ122と点火機構(不図示)等を備えるとともに、追焚戻り管42の戻り湯の温度を検出する戻り湯温度センサ123、追焚往き管の温度を検出する追焚出湯温度センサ124、追焚戻り管に介設された追焚用循環ポンプ125、圧力センサ等を用いて構成され浴槽水の水位を検出する水位センサ126、追焚循環路の流量を検出する追焚流量センサ(または追焚水流センサ)127、追焚用バーナ122へのガスの供給を制御する追焚用ガス電磁弁128および追焚用ガス流量調整弁129を備える。水位センサ126は、追焚往き管41側に設けられている。
【0028】
制御部150内の追焚制御部152は、追焚運転を行うに際して、水位センサ126の出力に基づいて予め設定した追焚許容水位以上の浴槽水が浴槽に張られていることを確認した後に、追焚用循環ポンプ125を運転させる。追焚制御部152は、追焚用循環ポンプ125の運転によって浴槽水が循環されていることを追焚流量センサ(または追焚水流センサ)127の出力に基づいて確認すると、追焚用ガス電磁弁128を開弁駆動して追焚用バーナ122を燃焼させる。追焚制御部152は、追焚出湯温度センサ124を監視し、追焚出湯温度が予め設定した追焚出湯温度となるようにガス供給量を調整する。追焚制御部152は、戻り湯温度センサ123の検出出力に基づいて戻り湯の温度を監視し、所定の追焚湯温に達すると追焚用ガス電磁弁128を閉弁駆動して追焚用バーナ122へのガスの供給を停止する。制御部は、追焚用バーナ122の燃焼を停止させた時点から所定時間経過した時点で追焚用循環ポンプ125の運転を停止させる。
【0029】
湯張部130は、給湯部110の出湯側と追焚循環路40との間に介設されており、湯張用電磁弁131と一方向弁(逆止弁)132と必要に応じて設けられる大気開放弁133等を有している。
【0030】
制御部150内の湯張制御部153は、浴槽への湯張りおよび足し湯を行う際には、湯張用電磁弁131を開弁させる。これにより、給湯部110から追焚循環路40を介して浴槽への給湯がなされる。湯張制御部153は、給湯用熱交換器111の出湯側に設けた流量センサ115の出力に基づいて給湯が開始されたことを検知すると、ガス電磁弁117を開弁駆動させて給湯用のバーナ112を燃焼させる。湯張制御部153は、出湯温度センサ114の出力を監視しており、所定の湯張り温度または足し湯温度の湯が供給されるように、燃焼させるバーナの個数およびガス燃焼量ならびに出湯流量を制御する。湯張制御部153は、水位センサ126の出力を監視しており、所定の湯張り水位に達した時点で湯張用電磁弁131を閉弁させるとともに、給湯用のバーナ112へのガスの供給を停止させる。
【0031】
温水部140は、不図示の温水用燃焼室内に温水用熱交換器141と温水用バーナ142と点火機構(不図示)等を備えるとともに、温水戻り管32の温水温度を検出する温水戻り湯温度センサ143、温水往き管31の温水温度を検出する温水往き湯温度センサ、温水戻り管32に介設された温水用循環ポンプ145、温水循環路の流量を検出する温水流量センサ(または温水水流センサ)146、温水用バーナ141へのガスの供給を制御する温水用ガス電磁弁147およびガス供給量を調整する温水用ガス流量調整弁148等を備える。
【0032】
制御部150内の温水制御部154は、浴室暖房機20によって浴室暖房を行う場合には、温水用循環ポンプ145を運転させ、温水流量センサ(または温水水流センサ)146によって温水循環路内の温水が循環されたことを確認すると、温水用バーナ142を燃焼させる。温水制御部154は、温水往き湯温度センサ144の検出出力を監視し、標準の温水湯温(例えば60℃)となるようにガス燃焼量を制御する。温水制御部154は、浴室暖房運転能力を「強」に設定する場合は、「強」用の温水湯温(例えば80℃)となるようにガス燃焼量を制御する。なお、湯水温度を変更せずに、温水の循環流量を増加させることで浴室暖房運転能力を大きくするようにしてもよい。
【0033】
電源部160は、商用電源から電力の供給を受けて、各部に必要な直流電源等を生成して供給する。
【0034】
制御部150は、マイクロコンピュータシステムを用いて構成しており、ROM等に格納された制御プログラムとその制御プログラムを実行するCPUとRAMおよびタイマ等によって、給湯制御部151、追焚制御部152、湯張制御部153、温水制御部154、連動運転制御部175、運転時間予測部158および風呂運転モード設定部159を構成している。
【0035】
入出力インタフェース部155は、各種センサや各種流量センサの検出出力をデジタルデータへ変換するA/D変換器を備えるとともに、D/A変換器や各種弁を駆動するための駆動回路等を備える。通信インタフェース部156は、浴室リモコン50および台所リモコン60に対して電源を供給するとともに、熱源機10と各リモコン50,60との間で双方向データ通信を行うための回路部を備える。また、通信インタフェース部156は、熱源機10と浴室暖房機20との間で双方向データ通信を行うための回路部を備える。
【0036】
浴室暖房機20は、熱源機10から供給される温水を熱源として空気を加熱する暖房用熱交換器(不図示)と、この熱交換器で加熱された空気を浴室内に送出する循環ファン(不図示)と、浴室内の空気を屋外に排出する換気ファン(不図示)と、浴室内の温度を検出する浴室温度センサ21と、熱源機10と双方向データ通信を行う通信部(不図示)と、熱源機10とデータ通信を行うとともに浴室暖房機の動作を制御する暖房制御部(不図示)とを備える。暖房制御部は、浴室温度センサ21によって検出された浴室温度データを熱源機10側へ供給する。暖房制御部は、熱源機10側から供給される各種運転指令に基づいて循環ファンおよび換気ファンの運転を制御する。暖房制御部は、熱源機10側から供給される暖房能力指令に基づいて循環ファンの回転数を制御する。
【0037】
浴室リモコン50は、操作部と可視表示部と可聴表示部と通信部と制御部と人体センサとを備える。浴室リモコンによって風呂の運転モード、湯張水位、湯張温度、カランやシャワー等の給湯器具6からの出湯温度等を設定することができる。浴室リモコン50によって設定された内容は、熱源機10側へ供給される。人体センサは、浴室内の人の存在を検出するもので、例えば人体から放射される赤外線を検出する焦電型センサ等を用いて構成している。浴室内に人が存在するか否かの情報は熱源機10側へ供給される。浴室リモコン50は、熱源機10側から供給される表示指令に基づいて運転状況等を表示する。
【0038】
台所リモコン60は、操作部と可視表示部と可聴表示部と通信部と制御部とを備える。台所リモコン60によって風呂の運転モードを設定することができる。台所リモコン60によって台所に設けられた給湯栓8からの出湯温度を設定することができる。台所リモコン60は、熱源機10側から供給される表示指令に基づいて運転状況等を表示する。
【0039】
熱源機10の制御部150は、浴室リモコン50側から浴室に人がいることを示す情報が供給された場合には、浴室リモコン50によって設定された出湯温度を有効なものとして扱う。熱源機10の制御部150は、浴室に人がいない場合にのみ台所リモコン60によって設定された出湯温度を有効なものとして扱う。熱源機10の制御部150は、浴槽3への湯張り運転および足し湯運転を行っている場合には、湯張り温度を有効なものとして扱う。
【0040】
図3は運転時間予測部158のブロック構成図である。熱源機10の制御部150内の運転時間予測部158は、運転実績管理部171と、運転実績データ記憶部172と、暖房時間予測部173と、湯張時間予測部174と、追焚時間予測部175と、足し湯時間予測部(足し湯・追焚時間予測部)176とを備えている。運転実績データ記憶部172は、書き換え可能な不揮発性メモリ等を用いて構成されている。運転実績管理部171は、風呂運転および暖房運転がなされると運転時間を計時し、運転が終了すると、運転条件および運転時間を運転実績データ記憶部172に記憶させる。
【0041】
運転実績管理部171は、湯張運転が実行された場合には、入水温度と湯張り温度と燃焼に用いたバーナおよびガス供給量と湯張りに要した時間とを対応付けて運転実績データ記憶部172に記憶させる。運転実績管理部171は、同一の運転状態で湯張り運転が実行された場合には、前回の湯張り時間(記憶されている湯張り時間)と今回の湯張り時間の平均値を求め、求めた平均値を記憶させる。なお、平均値を求めずに、最新の湯張り時間に更新してもよい。
【0042】
運転実績管理部171は、追焚運転が実行された場合には、浴槽の水位と浴槽水の温度と追焚終了時点での浴槽水の温度と追焚時間(追焚に要した時間)とを対応付けて運転実績データ記憶部172に記憶させる。運転実績管理部171は、同一の運転状態での運転実績データが既に存在する場合には、記憶されている追焚時間と今回の追焚時間との平均値を求め、求めた平均値を記憶させる。なお、平均値を求めずに今回の追焚時間を記憶させるようにしてもよい。
【0043】
運転実績管理部171は、足し湯運転(足し湯とそれに続く追焚運転)が実行された場合には、足し湯運転開始時の浴槽の水位と浴槽水の温度と足し湯に要した時間と追焚時間とを対応付けて運転実績データ記憶部172に記憶させる。運転実績管理部171は、同一の運転状態での運転実績データが既に存在する場合には、記憶されている各時間と今回の各時間との平均値をそれぞれ求め、求めた各平均値を記憶させる。なお、今回の各時間を記憶させるようにしてもよい。
【0044】
運転実績管理部171は、暖房運転が実行された場合には、暖房運転開始時の浴室の室温と暖房設定温度と暖房運転時の暖房能力と暖房設定温度に達するまでの暖房時間とを対応付けて運転実績データ記憶部172に記憶させる。運転実績管理部171は、同一の運転状態での運転実績データが既に存在する場合には、記憶されている暖房時間と今回の暖房時間との平均値を求め、求めた平均値を記憶させる。なお、今回の暖房時間を記憶させるようにしてもよい。
【0045】
図2に示した熱源機10の制御部150内の風呂運転モード設定部159は、浴室リモコン50または台所リモコン60から風呂自動運転指令が供給されると、水位センサ126の検出出力に基づいて浴槽水の水位を検出し、浴槽水の水位に応じて風呂運転モードを設定する。制御部は浴槽水が無いことを認識すると、湯張り運転モードを設定する。風呂運転モード設定部159は、追焚可能水位を越える浴槽水があるが湯張り完了水位に達していない場合は、足し湯運転モード(足し湯・追焚運転モード)を設定する。風呂運転モード設定部159は、湯張り完了水位またはそれを越える水位の浴槽水がある場合には、追焚運転モードを設定する。風呂運転モード設定部159は、浴槽水がない場合および追焚可能水位未満である場合には、湯張運転モードを設定する。なお、風呂運転モード設定部159は、浴室リモコン50または台所リモコン60によって風呂の運転モード(湯張運転、追焚運転、足し湯運転のいずれか)が指定された場合には、指定された風呂運転モードを設定する。
【0046】
連動運転制御部157は、浴室の室温に基づいて暖房運転が必要でるか否かを判断する。連動運転制御部157は、浴室の室温が予め設定した暖房運転判定しきい値温度(例えば15℃)以下である場合には、風呂運転と暖房運転とを連動させる連動運転モードを設定する。なお、暖房運転判定しきい値温度は、浴室リモコン50または台所リモコン60によって設定できるようにしている。
【0047】
運転時間予測部158は、連動運転モードが設定された場合には、風呂運転に要する時間と暖房運転に要する時間をそれぞれ予測する。運転時間予測部158は、風呂単独運転モードが設定された場合には、風呂運転に要する時間を予測する。これにより、風呂単独運転モードにおいても、風呂運転終了時刻または風呂運転の残り時間を浴室リモコン50または台所リモコン60の可視表示部に表示させることができる。運転時間予測部158は、暖房単独運転モードが設定された場合には、暖房運転に要する時間を予測する。これにより暖房単独運転モードにおいても、暖房終了時刻(適温に暖房される時刻)または暖房運転の残り時間を浴室リモコン50または台所リモコン60の可視表示部に表示させることができる。
【0048】
湯張時間予測部174は、湯張り運転モードが設定されている場合、運転実績データ記憶部172に格納されている湯張運転の実績データを参照して、現在の入水温度に対応した湯張り時間を求める。湯張時間予測部174は、現在の入水温度に対応した運転実績データが格納されていない場合には、現在の入水温度に近い入水温度の1または複数のデータに基づいて、現在の入水温度に対応した湯張時間を算出する。なお、湯張時間予測部174は、入水温度と給湯能力(単位時間当りの出湯量)と湯張り量とに基づいて湯張時間を算出するようにしてもよい。なお、湯張り量は湯張り運転の際に流量センサ115の出力を積算して求めるようにしてもよい。
【0049】
追焚時間予測部175は、追焚運転モードが設定されている場合、運転実績データ記憶部172に格納されている追焚運転の実績データを参照して、現在の浴槽水の温度に対応した追焚時間を求める。追焚時間予測部175は、現在の浴槽水温度に対応した運転実績データが格納されていない場合には、現在の浴槽水温度に近い1または複数のデータに基づいて、現在の浴槽水温度に対応した追焚時間を算出する。
【0050】
足し湯時間予測部176は、足し湯運転モード(足し湯・追焚運転モード)が設定されている場合、運転実績データ記憶部172に格納されている足し湯運転の実績データを参照して、現在の状態(入水温度、浴槽水温度、浴槽水位)に対応した足し湯・追焚運転時間を求める。足し湯時間予測部176は、現在の状態(入水温度、浴槽水温度、浴槽水位)に対応した運転実績データが格納されていない場合には、現在の状態に近い1または複数のデータに基づいて、現在の状態に対応した足し湯・追焚時間を算出する。
【0051】
暖房時間予測部173は、連動運転モードおよび暖房単独運転モードが設定された場合、運転実績データ記憶部172に格納されている暖房運転の実績データを参照して、現在の浴室の室温に対応した暖房時間を求める。暖房時間予測部173は、現在の浴室の室温に対応した運転実績データが格納されていない場合には、現在の浴室の室温に近い1または複数のデータに基づいて、現在の浴室の室温に対応した暖房時間を算出する。
【0052】
なお、暖房時間予測部173は、浴室の室温と浴室暖房機20の暖房能力と予め登録した浴室の容積とに基づいて暖房時間を演算によって求めるようにしてもよい。また、暖房運転実績データとして、浴室の室温と所定温度(例えば2℃)上昇させるに要した時間を浴室暖房機20の暖房運転能力(例えば「強」、「普通」、「弱」等)との対応を付けて記憶させておき、暖房時間予測部173は、浴室の室温と所定温度(例えば2℃)上昇させるに要した時間に基づいて、暖房開始前の室温を設定された室温にまで暖房するのに必要な時間を演算するようにしてもよい。
【0053】
連動運転制御部157は、連動運転モードを設定した場合には、暖房時間予測部173によって予測された暖房時間と各予測部174〜176によって予測された風呂運転時間(湯張時間、追焚時間、足し湯・追焚時間のいずれか1つ)とを比較する。連動運転制御部157は、暖房時間と風呂運転時間が略等しい場合には、暖房運転と風呂運転とを同時に開始させる。
【0054】
連動運転制御部157は、暖房時間が風呂運転時間よりも長い場合には、予測された暖房時間が暖房能力を最大にした状態であるものか否かをチェックし、暖房能力が最大である場合には、暖房運転を開始させた後に、暖房時間と風呂運転時間との時間差分が経過した時点で風呂運転を開始させる。これにより、暖房運転の終了タイミングと風呂運転の終了タイミングとを一致させることができる。
【0055】
連動運転制御部157は、予測された暖房時間が暖房能力を最大にした状態ではない場合、暖房時間予測部173を介して暖房能力を最大にしたときの暖房時間を求める。そして、連動運転制御部157は、暖房能力を最大にしたときの暖房時間と風呂運転時間とを比較し、暖房運転の終了タイミングと風呂運転の終了タイミングとが一致するように、暖房運転の開始タイミングと風呂運転の開始タイミングとを制御する。連動運転制御部157は、温水制御部154に暖房運転能力を増加させる旨の指令を供給し、暖房運転能力を増加させた状態で温水部140を運転させる。さらに、連動運転制御部157は、浴室暖房機20に対して暖房能力を「強」に設定する指令を供給して、浴室暖房機20を暖房能力「強」の状態で運転させる。
【0056】
連動運転制御部157は、予測された風呂運転時間が予測された暖房時間よりも長い場合には、風呂運転モードをチェックする。連動運転制御部157は、予測された風呂運転時間が予測された暖房時間よりも長い場合であって、且つ湯張り運転モードである場合には、予測された湯張り時間が給湯能力を最大にした状態でのものか否かチェックする。連動運転制御部157は、予測された湯張り時間が給湯能力を最大にした状態でのものである場合には、湯張り運転を開始させ、予測された湯張り時間と予測された暖房時間との時間差分の時間が経過した時点で暖房運転を開始させる。
【0057】
連動運転制御部157は、予測された湯張り時間が給湯能力を最大にした状態でのものでない場合には、燃焼させるガスバーナ数を増加させたりガス供給量を増加させたりすることで給湯能力を増加させたときの湯張り時間を湯張時間予測部174を介して求める。そして、連動運転制御部157は、給湯能力を増加したときの給湯時間と暖房時間とを比較し、湯張り運転の終了タイミングと暖房運転の終了タイミングとが一致するように、湯張り運転開始タイミングおよび暖房運転の開始タイミングと制御する。これにより、湯張り終了時点で浴室を所定温度に暖房させることができる。なお、連動運転制御部157は、給湯制御部151を介して給湯部110に給湯能力を増加させた状態で給湯を行わせる。給湯能力を増加させることで、入浴準備時間を短縮できる。
【0058】
連動運転制御部157は、予測された風呂運転時間が予測された暖房時間よりも長い場合であって、且つ、追焚運転モードまたは足し湯・追焚運転モードである場合には、追焚運転または足し湯・追焚運転を開始させ、予測された風呂運転時間と予測された暖房時間との時間差分の時間が経過した時点で暖房運転を開始させる。これにより、追焚運転の終了タイミングまたは足し湯・追焚運転の終了タイミングと暖房運転の終了タイミングとを一致させることができる。なお、追焚能力を増加可能な場合には、追焚能力を増加した場合の風呂運転時間を予測し、追焚能力を増加したときの風呂運転時間と暖房時間とを比較する。そして、風呂運転の終了タイミングと暖房運転の終了タイミングとが一致するように、風呂運転の開始タイミングおよび暖房運転の開始タイミングと制御する。追焚能力を増加することで、入浴準備時間を短縮できる。
【0059】
図4は本実施の形態に係る風呂給湯暖房装置の動作を示すフローチャートである。浴室リモコン50または台所リモコン60によって風呂自動運転の操作がなされると、ステップS1で、風呂設定モード設定部159によって風呂運転モードの設定がなされる。風呂設定モード設定部159は、浴槽水の水位に基づいて湯張運転モード、追焚運転モード、足し湯・追焚運転モードのいずれかを設定する。
【0060】
ステップS2で、連動運転制御部157によって暖房運転が必要か否かが判断される。連動運転制御部157は、浴室の室温が所定温度よりも低い場合は、風呂運転と暖房運転とを連動させる連動運転モードを設定する。
【0061】
連動運転モードが設定されると、運転時間予測部158によって風呂運転時間および暖房時間が予測され(ステップS3)、連動運転制御部157によって風呂運転時間と暖房時間とが比較される(ステップS4)。
【0062】
暖房時間が風呂運転時間よりも長い場合、ステップS5で、連動運転制御部157は、暖房能力を増加可能か否か判断する。暖房能力を増加できる場合には、増加した場合の暖房時間を予測する(ステップS6)。
【0063】
風呂運転時間が暖房時間よりも長い場合、ステップS7で、連動運転制御部157は、風呂運転能力を増加可能か否か判断する。風呂運転能力を増加できる場合には、風呂運転能力を増加した場合の風呂運転時間を予測する(ステップS8)。
【0064】
そして、ステップS9で、予測された風呂運転時間と予測された暖房時間とに基づいて、風呂運転の終了タイミングと暖房運転の終了タイミングとが略一致するように、風呂運転の開始タイミングと暖房運転の開始タイミングが設定され、風呂運転と暖房運転との連動運転が開始される。
【0065】
ステップS2で、浴室の室温が所定温度よりも高く暖房運転が必要ないと判断された場合には(風呂単独運転モード)、ステップS11で風呂運転時間が予測され、風呂運転が開始される。
【0066】
連動運転または風呂単独運転が開始されると、熱源機10の制御部150は、運転終了時刻または運転残り時間を浴室リモコン50および台所リモコン60の可視表示部に表示させる(ステップS12)。そして、連動運転または風呂単独運転が終了すると(ステップS13)、熱源機10の制御部150は、浴室リモコン50および台所リモコン60の可聴表示部を介してチャイム音を鳴動させたり音声メッセージを出力したりして、入浴準備が完了したことを報知させる(ステップS14)。
【0067】
以下、具体的に実施例を用いて説明する。
[実施例]
浴槽への湯張りと浴室内の暖房とを連動制御して、湯張り終了時に浴室内が適温となるよう制御し、また、これにより必要以上に浴室を暖め過ぎない制御による省エネ効果を確認した。本実施の形態の風呂給湯暖房装置1を用いて浴槽への湯張りと浴室内の暖房とを連動制御させた試験(以下、試験(1)とする)と、従来の湯張りシステムと浴室暖房システムを用いて、浴槽への湯張りと浴室内の暖房とを同時に運転開始させる試験(以下、試験(2)とする)を行い、湯張り終了時の室温及びランニングコストを比較した。
【0068】
試験条件は、試験(1)、(2)とも以下のとおりである。
(i)湯張り開始時の浴室内温度:9℃;
(ii)目標浴室内温度:30℃;
(iii)湯張り温度:42℃;
(iv)外気温度:5℃。
なお、浴槽蓋は閉鎖した状態であり、また、熱源機及び浴室暖房機の能力は同一である。
【0069】
【表1】

Figure 0004008842
【0070】
表1は試験結果を示している。試験(1)においては、湯張り開始10分後に浴室暖房が開始された。湯張り終了時の浴室内温度は30.2℃であった。また、湯張り開始から湯張り終了までの熱源機でのガス使用量は1.033m3であった。
【0071】
一方、試験(2)においては、湯張り開始とほぼ同時に浴室暖房が開始された。湯張り終了時の浴室内温度は32.8℃であった。また、湯張り開始から湯張り終了までの熱源機でのガス使用量は1.067m3であった。
【0072】
このように、試験(2)では、浴槽の湯張りと浴室暖房がほぼ同時に開始されるため、浴室内室温は30℃を超え32.8℃まで上昇する。浴室内の適温が30℃とすると、2.8℃分温度が上がり過ぎていることとなる。一方、本実施の形態による風呂給湯暖房装置1を用いた試験(1)では、湯張り終了時に浴室内が適温になるように浴室暖房がずれて開始されるため、湯張り終了時に30.2℃とほぼ適温が得られている。
【0073】
また、湯張り開始から湯張り終了までの熱源機でのガス使用量は、試験(1)の方が試験(2)に比べて約3%低減している。これは、試験(1)の方が、暖房運転時間が短く必要以上に浴室を暖めないため、ランニングコストを低く抑え、省エネルギー効果を導くことができることを示している。
【0074】
以上のことから、本実施例により、湯張りと浴室暖房を連動制御することにより、浴室暖房の運転開始時間を調整することで、湯張り終了時に浴室内が適温となるよう浴室暖房を制御することができることが確認された。さらに必要以上に浴室を暖めない制御を行うことで、省エネ効果が得られることを確認できた。
【0075】
図5は本発明の第2の実施の形態に係る風呂給湯暖房装置の全体構成図である。図5に示す風呂給湯暖房装置200は、熱源機210に熱源機側連動運転制御部211と湯張時間予測部212を設け、浴室暖房機220に暖房機側連動運転制御部221と暖房時間予測部222を設けている。
【0076】
湯張時間予測部212は、過去の湯張運転における湯張時間を入水温度との対応を付けて記憶しており、記憶されている湯張時間を参照して現在の入水温度に対応した湯張時間を予測する。
【0077】
熱源機側連動運転制御部211は、連動運転モードが設定された場合には、湯張時間予測部212によって予測された湯張時間を浴室暖房機220へ通知する。
【0078】
暖房時間予測部222は、過去の暖房運転における暖房時間を暖房開始前の室温との対応を付けて記憶しており、記憶されている暖房時間を参照して現在の暖房開始前の室温を適温に暖房するまでに要する暖房時間を予測する。
【0079】
暖房機側連動運転制御部221は、熱源機210側から湯張時間が通知されると、暖房時間予測部222によって予測された暖房時間と熱源機210側から通知された湯張時間とを比較する。暖房機側連動運転制御部221は、湯張時間が暖房時間よりも長い場合には、熱源機210に対して湯張運転の開始を指示する。これにより、湯張運転が開始される。そして、暖房機側連動運転制御部221は、湯張終了時点で浴室が適温に暖房できるように暖房開始タイミングおよび暖房能力を設定し、浴室暖房機220の運転を制御する。
【0080】
暖房機側連動運転制御部221は、暖房時間が湯張時間よりも長い場合には、暖房運転開始要求を熱源機210側へ供給して、熱源機210に暖房用温水の生成・供給を開始させて暖房運転を開始させるとともに、暖房時間を熱源機210側に通知する。熱源機側連動運転制御部211は、暖房運転の終了とほぼ同時に湯張運転が終了するように湯張運転の開始タイミングおよび給湯能力を設定し、湯張運転を実行させる。
【0081】
なお、図5では第2の実施の形態に係る風呂給湯暖房装置200として、湯張運転と暖房運転とを連動させる場合を例示したが、熱源機210側に湯張時間だけでなく追焚時間および足し湯時間を予測する風呂運転時間予測部を備えることで、湯張運転だけでなく追焚運転および足し湯・追焚運転においても、風呂運転の終了タイミングと暖房運転の終了タイミングとを略一致させることができる。
【0082】
【発明の効果】
以上説明したように本発明に係る風呂給湯暖房装置は、気温によって室温や入水温度が変動しても、湯張り終了時点には浴室を適温に暖房することができる。よって、快適な入浴が常に可能になる。また、本発明に係る風呂給湯暖房装置は、浴室の室温が所定温度以下の場合には風呂運転と暖房運転とを自動的に連動させることができる。さらに、本発明に係る風呂給湯暖房装置は、暖房に要する時間と風呂運転に要する時間とを比較し、風呂運転能力または暖房運転能力を高く設定することができるので、連動運転に要する時間(入浴準備時間)を短縮できる。
【図面の簡単な説明】
【図1】本発明の第1の実施の形態に係る風呂給湯暖房装置の全体構成図である。
【図2】本発明の第1の実施の形態に係る風呂給湯暖房装置の熱源機の一具体例を示すブロック構成図である。
【図3】本発明の第1の実施の形態に係る風呂給湯暖房装置の熱源機内の運転時間予測部のブロック構成図である。
【図4】本発明の第1の実施の形態に係る風呂給湯暖房装置の動作を示すフローチャートである。
【図5】本発明の第2の実施の形態に係る風呂給湯暖房装置の全体構成図である。
【符号の説明】
1,200 風呂給湯暖房装置
2 浴室
3 浴槽
4,5,7 給湯配管
6 給湯器具(浴室)
8 給湯栓(台所)
10,210 熱源機
11 通信線
12 浴室リモコン線
13 台所リモコン線
20,220 浴室暖房機
21 温度(室温)センサ
110 給湯部
113 入水温度センサ
120 追焚部
130 湯張部
140 温水部
150 制御部
151 給湯制御部
152 追焚制御部
153 湯張制御部
154 温水制御部
155 入出力インタフェース部
156 通信インタフェース部
157 連動運転制御部
158 運転時間予測部
159 風呂運転モード設定部
160 電源部
171 運転実績管理部
172 運転実績データ記憶部
173,222 暖房時間予測部
174 湯張時間予測部
175 追焚時間予測部
176 足し湯時間予測部
211 連動運転制御部(熱源機側)
212 湯張時間予測部
221 連動運転制御部(暖房機側)
222 暖房時間予測部[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a bath water heater / heater capable of interlocking hot water filling to a bathtub and heating of a bathroom.
[0002]
[Prior art]
Patent Document 1 is a bath water heater / heater that has an automatic hot water filling function for a bathtub and a heating function for a bathroom, and that informs that the preparation for bathing has been completed, When starting the heating operation of the bathroom during the hot water filling operation, the fact that the preparation for bathing is completed is notified when the hot water filling operation is completed and a predetermined condition is satisfied in the heating operation. A bath water heater is described.
[0003]
Further, Patent Document 1 describes the following as a method for automatically obtaining the operation start timings of the automatic bath filling operation and the bathroom heating operation and automatically performing both the operations. First of all, the automatic bath filling operation and the bathroom heating operation are started at the same time or delayed for a predetermined time, and the bathroom heating is started at this time, and the controller calculates the time required for bathroom heating and the time required for automatic filling. Then, the time difference is stored, and from the second time, automatic operation is performed by delaying any operation by the time difference stored in the previous operation.
[0004]
Patent Document 2 discloses a water heater having a heating instruction means for instructing a bathroom heater to start a heating operation, a hot water filling instruction means for supplying a predetermined amount of hot water to a bathtub through a hot water supply pipe, and a water heater. In a bathroom hot water supply device with an automatic switch for instructing the start of hot water filling operation and a kitchen remote control, the hot water filling operation and heating operation are performed on the bathroom remote control according to the user's operation. There is described a bathroom hot water supply apparatus provided with a heating automatic switch that switches between an interlocking setting state to be interlocked and a non-interlocking setting state in which only the hot water operation is performed without interlocking the hot water operation and the heating operation.
[0005]
[Patent Document 1]
JP 2002-71212 A
[Patent Document 2]
JP 2002-221355 A
[0006]
[Problems to be solved by the invention]
The heating time until the room temperature in the bathroom is set to an appropriate temperature (for example, 18 ° C.) by the bathroom heating operation varies depending on the room temperature at the start of heating. Moreover, the hot water filling time until hot water of a predetermined temperature is filled in the bathtub may differ depending on the incoming water temperature. Therefore, if the current operation start timing is set based on the time required for bathroom heating and the time required for automatic hot water filling stored in the previous operation, the room temperature at the start of heating in the previous operation is set. When the temperature of the incoming water and the room temperature or the incoming water temperature at the start of heating in the current operation are different, the end timing of the hot water filling operation may not match the timing at which the room temperature is heated to an appropriate temperature. When the hot water filling time becomes longer than the heating time, and the heating operation is continued until the hot water filling is finished, the heating cost is wasted by the continued amount.
[0007]
In addition, an automatic heating switch is provided that switches between a linked setting state in which the hot water operation and the heating operation are linked and a non-linked setting state in which only the hot water operation is performed without linking the hot water operation and the heating operation. In this case, the number of operation switches of the remote control device is increased, and linked or unlinked setting operations are required. It is convenient if the heating operation is automatically interlocked when it is cold according to the temperature change without providing the heating automatic switch or the like.
[0008]
The present invention has been made to solve such problems, and can accurately predict the time required for heating and the time required for bath operation such as hot water filling, and can heat the bathroom to an appropriate temperature at the end of the bath operation. An object of the present invention is to provide a bath water heater / heater as described above.
[0009]
Another object of the present invention is to provide a bath water heater / heater that can automatically link a bath operation and a heating operation when the room temperature of the bathroom is equal to or lower than a predetermined temperature.
[0010]
Furthermore, the present invention compares the time required for heating with the time required for bath operation, and sets the bath operation capability or heating operation capability high so that the time required for linked operation (bathing preparation time) can be shortened. An object of the present invention is to provide a bath water heater / heater.
[0011]
[Means for Solving the Problems]
In order to solve the above problems, a bath water heater / heater according to the present invention predicts a heating time required to heat a bathroom to a predetermined room temperature based on the room temperature of the bathroom detected by a room temperature sensor; and Based on the hot water time prediction unit that calculates the hot water time required to fill the bathtub with hot water of a predetermined hot water temperature based on the incoming water temperature detected by the incoming water temperature sensor, and based on the predicted heating time and the predicted hot water time An interlocking operation control unit configured to set the start timing of the hot water operation and the start timing of the heating operation so that the end timing of the heating operation and the end timing of the hot water operation are approximately the same.
[0012]
The bath water heater / heater according to the present invention can heat the bathroom to an appropriate temperature at the end of hot water filling even if the room temperature or the incoming water temperature fluctuates depending on the temperature. Therefore, comfortable bathing becomes possible. Moreover, the cost concerning bath operation and heating operation can be reduced.
[0013]
In addition, when the room temperature of the bathroom is equal to or lower than the preset heating operation determination threshold temperature, the bath operation and the heating operation are performed when the temperature is low by linking the hot water operation and the heating operation. Can be linked automatically.
[0014]
The time required to heat the bathroom to a predetermined room temperature may be predicted based on the temperature of the bathroom and the heating capacity of the bathroom heater. Alternatively, the room temperature at the start of the heating operation and the time required for heating may be stored in association with each other, and the current heating time may be obtained by referring to the past heating time.
[0015]
Based on the incoming water temperature and the hot water supply capacity of the water heater, the time required to fill a predetermined amount of hot water in the bathtub may be predicted. Alternatively, the incoming water temperature and the time required for the hot water filling may be stored in association with each other, and the current hot water filling time may be obtained by referring to the past hot water filling time.
[0016]
In addition, the hot water filling time when the hot water is filled with a predetermined hot water supply capacity is compared with the heating time when the bathroom is heated with the predetermined heating capacity. If the heating time is longer than the hot water charging time, the heating capacity may be set higher. Thereby, bath preparation time can be shortened.
[0017]
In addition, when the hot water supply capacity is set high or the heating capacity is set high, the start timing of the hot water operation and the heating operation are controlled so that the timing when the hot water filling ends and the timing when the bathroom reaches an appropriate temperature are matched. By doing so, the bath preparation time can be shortened and the bathroom can be heated to an appropriate temperature at the end of the hot water filling.
[0018]
DETAILED DESCRIPTION OF THE INVENTION
The bath hot water heater according to the first embodiment of the present invention will be described with reference to FIGS. First, a schematic configuration of the bath hot water heater according to the present embodiment will be described with reference to FIG. The bath water heater / heater 1 supplies a heat source unit 10 installed outdoors, a bathroom heater 20 installed on a ceiling, a wall surface, and the like of the bathroom 2, and hot water for heating from the heat source unit 10 to the bathroom heater 20. A hot water circulation path 30 for heating, a memorial circulation path 40 for circulating and bathing the bathtub water in the bathtub 3, and a bathroom remote control (bath remote control) 50 installed in the bathroom 2 Yes. The heating hot water circuit 30 includes a heating forward pipe 31 and a heating return pipe 32. The memorial circuit 40 has a memorial delivery pipe 41 and a memorial return pipe 42.
[0019]
The heat source device 10 and the bathroom heater 20 are connected by a hot water circulation path 30 for heating. Moreover, the heat source device 10 and the bathroom heater 20 are connected by a communication line 11, and bidirectional data communication is possible between the heat source device 10 and the bathroom heater 20.
[0020]
The heat source device 10 and the bathtub 3 are connected by a memorial circuit 40. The heat source device 10 and the bathroom remote control 50 are connected by a bathroom remote control line 12 to supply power to the bathroom remote control 50 from the heat source device 10 side and to perform two-way data communication between the heat source device 10 and the bathroom remote control 50. It has a possible configuration. By operating the bathroom remote controller 50, the operation of the bath and the heating operation of the bathroom can be controlled, and the operation state and the like are displayed on the bathroom remote controller 50. Furthermore, various settings can be made by the bathroom remote controller 50.
[0021]
The bath hot water heater 1 may be configured to further include a kitchen remote controller 60 installed in a kitchen or the like. The heat source unit 10 and the kitchen remote control 60 are connected by the kitchen remote control line 13, and power is supplied from the heat source unit 10 to the kitchen remote control 60, and bidirectional data communication is performed between the heat source unit 10 and the kitchen remote control 60. It has a possible configuration. By installing the kitchen remote controller 60, it is possible to perform a bath operation or a bathroom heating operation even in a kitchen or the like, and it is possible to check the operation state.
[0022]
Further, hot water can be supplied from the heat source device 10 to the hot water supply equipment 6 such as a hot water tap and a shower installed in the bathroom 2 through the hot water supply pipe 4 and the branch pipe 5 to the bathroom, or through the branch pipe 7 to the kitchen or the like. It is good also as a structure which can supply hot water to the hot-water tap 8 installed in the kitchen etc. In this case, the temperature of the hot water supply from the hot water supply appliance 6 such as a hot water tap or a shower installed in the bathroom 2 can be set by the bathroom remote controller 50. In addition, the temperature of the hot water discharged from the hot water tap 8 installed in the kitchen or the like can be set by the kitchen remote controller 60.
[0023]
The heat source device 10 according to the present embodiment uses gas as a heat source, and the heat source device 10 is supplied with gas, water, and commercial power. The bathroom heater 20 is supplied with commercial power. In addition, it is good also as a structure which supplies electric power to the bathroom heater 20 via a power cable from the heat-source equipment 10 side. Of course, electricity, kerosene, or the like may be used as an energy source instead of the heat source device 10 using gas as a heat source. For example, a gas water heater or a kerosene type water heater may be used as a heat source for hot water filling, and an electric heat pump may be used as a heat source for heating, and electric water heaters may be used for both hot water filling and heating. Of course, it may be used as a heat source machine.
[0024]
FIG. 2 is a block diagram showing a specific example of the heat source device. The heat source unit 10 includes a hot water supply unit 110, a memorial unit 120, a hot water filling unit 130, a hot water unit 140, a control unit (controller) 150, a power source unit 160, and a blower mechanism for supplying air necessary for gas combustion. And an exhaust mechanism (not shown). The control unit 150 includes a hot water supply control unit 151, a chasing control unit 152, a hot water control unit 153, a hot water control unit 154, an input / output interface unit 155, a communication interface unit 156, and a linked operation control unit 157. The operation time prediction unit 158 and the bath operation mode setting unit 159 are provided.
[0025]
The hot water supply unit 110 includes a hot water supply heat exchanger 111, a plurality of hot water supply burners 112, 112, and 112, an unillustrated ignition mechanism, and the like, an incoming water temperature sensor 113, and a hot water temperature sensor. 114, a flow rate sensor (or water flow sensor) 115, a flow rate adjustment valve 116 for adjusting the hot water flow rate, gas solenoid valves 117, 117, 117 for controlling supply / stop of gas to each burner 112, and a gas flow rate capable of adjusting the gas flow rate Regulating valves 118, 118, 118 are provided.
[0026]
When detecting that hot water supply is started based on the output of the flow sensor 115, the hot water supply control unit 151 in the control unit 150 drives the gas electromagnetic valve 117 to open and burns the burner 112. Thereby, warm water is produced | generated and discharged using the heat exchanger 111 for hot water supply. The control unit 150 controls the number of burners, the amount of gas supplied, and the flow rate of the hot water based on the output of the hot water temperature sensor 114 so as to reach a predetermined hot water temperature. When the controller 150 detects that hot water supply has been stopped based on the output of the flow sensor 115, the controller 150 stops the supply of gas to the burner 112.
[0027]
The remedy section 120 includes a remedy heat exchanger 121, a remedy burner 122, an ignition mechanism (not shown), and the like in a remedy combustion chamber (not shown), and the temperature of return hot water in the remedy return pipe 42. The hot water temperature sensor 123 for detecting the temperature, the hot water temperature sensor 124 for detecting the temperature of the remedy return pipe, the circulation pump 125 for remedy provided in the remedy return pipe, the pressure sensor, etc. A water level sensor 126 for detecting the water level of the water, a remedy flow sensor (or a remedy water flow sensor) 127 for detecting the flow rate of the remedy circuit, and a remedy gas electromagnetic for controlling the supply of gas to the remedy burner 122. A valve 128 and a gas flow adjustment valve 129 for remedy are provided. The water level sensor 126 is provided on the tracking tube 41 side.
[0028]
After performing the chasing operation, the chasing control unit 152 in the control unit 150 confirms that bath water having a temperature exceeding the chasing allowable water level set in advance based on the output of the water level sensor 126 is stretched in the bathtub. Then, the memorial circulation pump 125 is operated. When the chasing control unit 152 confirms that the bath water is circulated by the operation of the chasing circulation pump 125 based on the output of the chasing flow sensor (or chasing water flow sensor) 127, the chasing gas electromagnetic The valve 128 is driven to open, and the remedy burner 122 is combusted. The remedy control unit 152 monitors the remedy hot water temperature sensor 124 and adjusts the gas supply amount so that the remedy hot water temperature becomes a preset remedy hot water temperature. The remedy control unit 152 monitors the temperature of the return hot water based on the detection output of the return hot water temperature sensor 123, and when it reaches a predetermined temperature of the remedy hot water, the remedy gas electromagnetic valve 128 is driven to be closed. The gas supply to the burner 122 is stopped. The control unit stops the operation of the circulation pump for tracking 125 when a predetermined time has elapsed since the combustion of the combustion burner 122 was stopped.
[0029]
The hot water filling section 130 is interposed between the hot water supply side of the hot water supply section 110 and the recirculation circuit 40, and is provided with a hot water filling electromagnetic valve 131 and a one-way valve (check valve) 132 as necessary. And an air release valve 133 and the like.
[0030]
The hot water controller 153 in the controller 150 opens the hot water solenoid valve 131 when performing hot water filling and adding hot water to the bathtub. Thus, hot water is supplied from the hot water supply unit 110 to the bathtub via the memorial circuit 40. Upon detecting that hot water supply has started based on the output of the flow sensor 115 provided on the outlet side of the hot water supply heat exchanger 111, the hot water controller 153 opens the gas electromagnetic valve 117 to open the hot water supply. Burner 112 is burned. The hot water controller 153 monitors the output of the hot water temperature sensor 114, and controls the number of burners, the amount of gas burned, and the hot water flow rate so that hot water having a predetermined hot water temperature or additional hot water temperature is supplied. Control. The hot water controller 153 monitors the output of the water level sensor 126, closes the hot water electromagnetic valve 131 when the predetermined hot water level is reached, and supplies gas to the hot water supply burner 112. Stop.
[0031]
The hot water unit 140 includes a hot water heat exchanger 141, a hot water burner 142, an ignition mechanism (not shown) and the like in a hot water combustion chamber (not shown), and detects the hot water temperature of the hot water return pipe 32. A sensor 143, a hot water going hot water temperature sensor for detecting the hot water temperature of the hot water going pipe 31, a hot water circulation pump 145 provided in the hot water return pipe 32, a hot water flow sensor (or a hot water flow sensor for detecting the flow rate of the hot water circulation path). 146, a hot water gas electromagnetic valve 147 for controlling the supply of gas to the hot water burner 141, a hot water gas flow rate adjusting valve 148 for adjusting the gas supply amount, and the like.
[0032]
The hot water control unit 154 in the control unit 150 operates the hot water circulation pump 145 when the bathroom heater 20 performs bathroom heating, and the hot water flow sensor (or hot water flow sensor) 146 performs hot water in the hot water circulation path. Is confirmed to circulate, the hot water burner 142 is burned. The hot water control unit 154 monitors the detection output of the warm water hot water temperature sensor 144 and controls the amount of gas combustion so that the standard hot water temperature (for example, 60 ° C.) is reached. When the bathroom heating operation capacity is set to “strong”, the hot water control unit 154 controls the amount of gas combustion so that the hot water temperature (for example, 80 ° C.) for “strong” is obtained. In addition, you may make it enlarge bathroom heating operation capability by increasing the circulation flow rate of warm water, without changing hot water temperature.
[0033]
The power supply unit 160 receives supply of power from a commercial power supply, and generates and supplies necessary DC power and the like to each unit.
[0034]
The control unit 150 is configured using a microcomputer system, and includes a hot water supply control unit 151, a memorial control unit 152, a control program stored in a ROM and the like, a CPU and a RAM that execute the control program, a timer, and the like. A hot water control unit 153, a hot water control unit 154, an interlock operation control unit 175, an operation time prediction unit 158, and a bath operation mode setting unit 159 are configured.
[0035]
The input / output interface unit 155 includes an A / D converter that converts detection outputs of various sensors and various flow rate sensors into digital data, and includes a drive circuit for driving the D / A converter and various valves. The communication interface unit 156 includes a circuit unit that supplies power to the bathroom remote controller 50 and the kitchen remote controller 60 and performs bidirectional data communication between the heat source device 10 and the remote controllers 50 and 60. In addition, the communication interface unit 156 includes a circuit unit for performing bidirectional data communication between the heat source device 10 and the bathroom heater 20.
[0036]
The bathroom heater 20 is a heating heat exchanger (not shown) that heats air using hot water supplied from the heat source apparatus 10 as a heat source, and a circulation fan (not shown) that sends air heated by the heat exchanger into the bathroom. (Not shown), a ventilation fan (not shown) that discharges the air in the bathroom to the outdoors, a bathroom temperature sensor 21 that detects the temperature in the bathroom, and a communication unit (not shown) that performs bidirectional data communication with the heat source device 10. ), And a heating control unit (not shown) that performs data communication with the heat source device 10 and controls the operation of the bathroom heater. The heating control unit supplies bathroom temperature data detected by the bathroom temperature sensor 21 to the heat source device 10 side. The heating control unit controls the operation of the circulation fan and the ventilation fan based on various operation commands supplied from the heat source unit 10 side. A heating control part controls the rotation speed of a circulation fan based on the heating capability instruction | command supplied from the heat-source equipment 10 side.
[0037]
The bathroom remote controller 50 includes an operation unit, a visible display unit, an audible display unit, a communication unit, a control unit, and a human body sensor. A bath operation mode, a hot water level, a hot water temperature, a hot water temperature from a hot water supply device 6 such as a currant or a shower, and the like can be set by the bathroom remote controller. The content set by the bathroom remote controller 50 is supplied to the heat source device 10 side. The human body sensor detects the presence of a person in the bathroom and is configured using, for example, a pyroelectric sensor that detects infrared rays emitted from the human body. Information on whether or not there is a person in the bathroom is supplied to the heat source unit 10 side. The bathroom remote controller 50 displays an operation status or the like based on a display command supplied from the heat source device 10 side.
[0038]
The kitchen remote control 60 includes an operation unit, a visible display unit, an audible display unit, a communication unit, and a control unit. The operation mode of the bath can be set by the kitchen remote controller 60. The hot water temperature from the hot water tap 8 provided in the kitchen can be set by the kitchen remote controller 60. The kitchen remote controller 60 displays the operation status and the like based on a display command supplied from the heat source device 10 side.
[0039]
When information indicating that there is a person in the bathroom is supplied from the bathroom remote controller 50 side, the control unit 150 of the heat source apparatus 10 treats the hot water temperature set by the bathroom remote controller 50 as effective. The controller 150 of the heat source apparatus 10 treats the hot water temperature set by the kitchen remote controller 60 as effective only when there is no person in the bathroom. The control unit 150 of the heat source device 10 treats the hot water temperature as effective when the hot water operation to the bathtub 3 and the hot water operation are performed.
[0040]
FIG. 3 is a block diagram of the operation time prediction unit 158. The operation time prediction unit 158 in the control unit 150 of the heat source device 10 includes an operation result management unit 171, an operation result data storage unit 172, a heating time prediction unit 173, a hot water time prediction unit 174, and a memorial time prediction. Unit 175 and an added hot water time predicting unit (added hot water / memorial time predicting unit) 176. The operation result data storage unit 172 is configured using a rewritable nonvolatile memory or the like. The operation result management unit 171 measures the operation time when the bath operation and the heating operation are performed, and stores the operation condition and the operation time in the operation result data storage unit 172 when the operation is completed.
[0041]
When the hot water operation is executed, the operation result management unit 171 stores the operation result data by associating the incoming water temperature, the hot water temperature, the burner used for combustion, the gas supply amount, and the time required for the hot water filling. Store in the unit 172. When the hot water filling operation is executed in the same operation state, the operation result management unit 171 obtains the average value of the previous hot water filling time (stored hot water filling time) and the current hot water filling time. Memorize the average value. In addition, you may update to the newest hot water filling time, without calculating | requiring an average value.
[0042]
When the memorial operation is executed, the operation result management unit 171 performs the bath water level, the bath water temperature, the bath water temperature and the memorial time (time required for memorialization) Are associated and stored in the driving performance data storage unit 172. If the operation result data in the same operation state already exists, the operation result management unit 171 obtains the average value of the stored remedy time and the current remedy time, and stores the obtained average value. Let The memorial time of this time may be stored without obtaining the average value.
[0043]
When the additional hot water operation (addition hot water and subsequent memorial operation) is executed, the operation result management unit 171 includes the water level of the bathtub, the temperature of the bathtub water, and the time required for the additional hot water. The driving time data storage unit 172 stores the memorized time in association with each other. When actual operation data in the same operation state already exists, the actual operation management unit 171 obtains an average value of each stored time and each current time, and stores each obtained average value. Let In addition, you may make it memorize | store each time of this time.
[0044]
When the heating operation is executed, the operation result management unit 171 associates the room temperature of the bathroom at the start of the heating operation, the heating set temperature, the heating capacity at the time of the heating operation, and the heating time until the heating set temperature is reached. And stored in the operation result data storage unit 172. When the operation result data in the same operation state already exists, the operation result management unit 171 obtains the average value of the stored heating time and the current heating time, and stores the obtained average value. In addition, you may make it memorize | store this heating time.
[0045]
The bath operation mode setting unit 159 in the control unit 150 of the heat source apparatus 10 illustrated in FIG. 2 receives a bath automatic operation command from the bathroom remote controller 50 or the kitchen remote controller 60, and is based on the detection output of the water level sensor 126. Detect the water level and set the bath operation mode according to the water level of the bathtub water. When the control unit recognizes that there is no bathtub water, it sets the hot water operation mode. The bath operation mode setting unit 159 sets the additional hot water operation mode (addition hot water / memorial operation mode) when there is bathtub water exceeding the water level that can be memorized but has not reached the water filling completion water level. The bath operation mode setting unit 159 sets a memorial operation mode when there is bathtub water at a water filling completion water level or above. The bath operation mode setting unit 159 sets the hot water operation mode when there is no bathtub water and when the bath water level is lower than the memorable water level. The bath operation mode setting unit 159, when the bath operation mode (any one of the hot water operation, the memorial operation, and the additional hot water operation) is designated by the bathroom remote controller 50 or the kitchen remote controller 60, the designated bath. Set the operation mode.
[0046]
The linked operation control unit 157 determines whether heating operation is necessary based on the room temperature of the bathroom. When the room temperature of the bathroom is equal to or lower than a preset heating operation determination threshold temperature (for example, 15 ° C.), the interlock operation control unit 157 sets an interlock operation mode for interlocking the bath operation and the heating operation. The heating operation determination threshold temperature can be set by the bathroom remote controller 50 or the kitchen remote controller 60.
[0047]
When the linked operation mode is set, the operation time prediction unit 158 predicts the time required for the bath operation and the time required for the heating operation, respectively. The operation time prediction unit 158 predicts the time required for the bath operation when the bath single operation mode is set. Thereby, even in the bath single operation mode, the bath operation end time or the remaining time of the bath operation can be displayed on the visible display portion of the bathroom remote controller 50 or the kitchen remote controller 60. The operation time prediction unit 158 predicts the time required for the heating operation when the heating single operation mode is set. Thereby, also in heating independent operation mode, the heating end time (time heated to appropriate temperature) or the remaining time of heating operation can be displayed on the visible display part of the bathroom remote control 50 or the kitchen remote control 60.
[0048]
Hot water time prediction part 174 When the hot water filling operation mode is set, the hot water filling time corresponding to the current incoming water temperature is obtained by referring to the hot water filling operation result data stored in the operation result data storage unit 172. Hot water time prediction part 174 If the operation result data corresponding to the current incoming water temperature is not stored, the hot water filling time corresponding to the current incoming water temperature is calculated based on one or more data of the incoming water temperature close to the current incoming water temperature. calculate. Yubari time prediction unit 174 The hot water filling time may be calculated based on the incoming water temperature, the hot water supply capacity (the amount of hot water discharged per unit time) and the hot water filling amount. Note that the amount of filling may be obtained by integrating the output of the flow sensor 115 during the filling operation.
[0049]
When the memorial operation mode is set, the memorial time predicting unit 175 refers to the memorial operation result data stored in the operation result data storage unit 172 and corresponds to the current temperature of the bath water. Seek memorial time. When the operation result data corresponding to the current bath water temperature is not stored, the memorial time prediction unit 175 sets the current bath water temperature based on one or more data close to the current bath water temperature. The corresponding memorial time is calculated.
[0050]
When the additional hot water operation mode (addition hot water / remembrance operation mode) is set, the additional hot water time prediction unit 176 refers to the actual performance data of the additional hot water operation stored in the operation performance data storage unit 172. Obtain additional hot water / memorial operation time corresponding to the current state (inlet water temperature, bath water temperature, bath water level). When the operation result data corresponding to the current state (inlet water temperature, bath water temperature, bath water level) is not stored, the additional hot water time prediction unit 176 is based on one or a plurality of data close to the current state. Then, add water / memorial time corresponding to the current state is calculated.
[0051]
When the linked operation mode and the heating independent operation mode are set, the heating time prediction unit 173 corresponds to the current room temperature of the bathroom by referring to the heating operation result data stored in the operation result data storage unit 172. Ask for heating time. When the operation result data corresponding to the current room temperature of the bathroom is not stored, the heating time prediction unit 173 corresponds to the current room temperature of the bathroom based on one or more data close to the room temperature of the current bathroom. Calculate the heating time.
[0052]
The heating time prediction unit 173 may calculate the heating time based on the room temperature of the bathroom, the heating capacity of the bathroom heater 20 and the volume of the bathroom registered in advance. Further, as the heating operation result data, the room temperature of the bathroom and the time required to increase the predetermined temperature (for example, 2 ° C.) are set as the heating operation capacity (for example, “strong”, “normal”, “weak”, etc.) of the bathroom heater 20. And the heating time predicting unit 173 sets the room temperature before starting the heating to the set room temperature based on the room temperature of the bathroom and the time required to increase the predetermined temperature (for example, 2 ° C.). The time required for heating may be calculated.
[0053]
When the linked operation mode is set, the linked operation control unit 157 sets the heating time predicted by the heating time prediction unit 173 and the bath operation time predicted by each of the prediction units 174 to 176 (hot water time, memorial time). , Any one of Addi-yu and Remembrance time). When the heating time and the bath operation time are substantially equal, the interlocking operation control unit 157 starts the heating operation and the bath operation at the same time.
[0054]
When the heating time is longer than the bath operation time, the linked operation control unit 157 checks whether or not the predicted heating time is a state where the heating capacity is maximized, and the heating capacity is maximum In this case, after the heating operation is started, the bath operation is started when the time difference between the heating time and the bath operation time elapses. Thereby, the end timing of heating operation and the end timing of bath operation can be made to correspond.
[0055]
When the predicted heating time is not the state where the heating capacity is maximized, the interlocking operation control unit 157 obtains the heating time when the heating capacity is maximized via the heating time prediction unit 173. Then, the linked operation control unit 157 compares the heating time when the heating capacity is maximized with the bath operation time, and starts the heating operation so that the end timing of the heating operation matches the end timing of the bath operation. Control timing and start timing of bath operation. The linked operation control unit 157 supplies a command to the warm water control unit 154 to increase the heating operation capability, and causes the warm water unit 140 to operate with the heating operation capability increased. Further, the linked operation control unit 157 supplies a command for setting the heating capacity to “strong” to the bathroom heater 20 so that the bathroom heater 20 is operated in a state where the heating capacity is “strong”.
[0056]
The linked operation control unit 157 checks the bath operation mode when the predicted bath operation time is longer than the predicted heating time. When the predicted bath operation time is longer than the predicted heating time and in the hot water operation mode, the linked operation control unit 157 maximizes the hot water supply capacity when the predicted hot water time is in the hot water operation mode. Check whether it is in the state that has been done. When the predicted hot water filling time is in a state where the hot water supply capacity is maximized, the linked operation control unit 157 starts the hot water filling operation, and the predicted hot water filling time and the predicted heating time The heating operation is started at the time when the time difference of lapses.
[0057]
When the predicted hot water filling time is not in a state where the hot water supply capacity is maximized, the interlock operation control unit 157 increases the hot water supply capacity by increasing the number of gas burners to be burned or increasing the gas supply amount. The hot water filling time when increased is obtained through the hot water filling time prediction unit 174. Then, the linked operation control unit 157 compares the hot water supply time when the hot water supply capacity is increased with the heating time, and the hot water operation start timing is matched with the hot water operation end timing and the heating operation end timing. And control with the start timing of heating operation. Thereby, the bathroom can be heated to a predetermined temperature at the end of the hot water filling. The linked operation control unit 157 causes the hot water supply unit 110 to perform hot water supply with increased hot water supply capacity via the hot water supply control unit 151. The bath preparation time can be shortened by increasing the hot water supply capacity.
[0058]
When the predicted bath operation time is longer than the predicted heating time and in the memorial operation mode or the additional hot water / memorial operation mode, the linked operation control unit 157 performs the memorial operation. Alternatively, additional hot water / remembrance operation is started, and heating operation is started when the time difference between the predicted bath operation time and the predicted heating time has elapsed. As a result, the end timing of the chasing operation or the end timing of the additional hot water / memoriing operation can be matched with the end timing of the heating operation. When the memorial capability can be increased, the bath operation time when the memorial capability is increased is predicted, and the bath operation time and the heating time when the memorial capability is increased are compared. Then, the start timing of the bath operation and the start timing of the heating operation are controlled so that the end timing of the bath operation coincides with the end timing of the heating operation. The bath preparation time can be shortened by increasing the memorial ability.
[0059]
FIG. 4 is a flowchart showing the operation of the bath hot water heater according to the present embodiment. When the automatic bath operation is performed by the bathroom remote controller 50 or the kitchen remote controller 60, the bath setting mode setting unit 159 sets the bath operation mode in step S1. The bath setting mode setting unit 159 sets one of a hot water operation mode, a memorial operation mode, and an additional hot water / memorial operation mode based on the water level of the bathtub water.
[0060]
In step S2, the linked operation control unit 157 determines whether heating operation is necessary. When the room temperature of the bathroom is lower than the predetermined temperature, the linked operation control unit 157 sets a linked operation mode that links the bath operation and the heating operation.
[0061]
When the linked operation mode is set, the bath time and the heating time are predicted by the operation time predicting unit 158 (step S3), and the bath operation time and the heating time are compared by the linked operation control unit 157 (step S4). .
[0062]
If the heating time is longer than the bath operation time, in step S5, the linked operation control unit 157 determines whether the heating capacity can be increased. When the heating capacity can be increased, the heating time when the heating capacity is increased is predicted (step S6).
[0063]
When the bath operation time is longer than the heating time, in step S7, the interlock operation control unit 157 determines whether or not the bath operation capability can be increased. If the bath driving capability can be increased, the bath operating time when the bath driving capability is increased is predicted (step S8).
[0064]
Then, in step S9, based on the predicted bath operation time and the predicted heating time, the bath operation start timing and the heating operation are set so that the bath operation end timing and the heating operation end timing substantially coincide with each other. The start timing is set, and the linked operation of the bath operation and the heating operation is started.
[0065]
If it is determined in step S2 that the room temperature in the bathroom is higher than the predetermined temperature and heating operation is not required (bath single operation mode), the bath operation time is predicted in step S11, and the bath operation is started.
[0066]
When the linked operation or the bath single operation is started, the control unit 150 of the heat source apparatus 10 displays the operation end time or the remaining operation time on the visible display units of the bathroom remote controller 50 and the kitchen remote controller 60 (step S12). When the linked operation or the bath single operation ends (step S13), the control unit 150 of the heat source apparatus 10 sounds a chime sound or outputs a voice message via the audible display unit of the bathroom remote controller 50 and the kitchen remote controller 60. To notify that the preparation for bathing is completed (step S14).
[0067]
Hereinafter, specific examples will be described.
[Example]
We controlled the hot water filling in the bathtub and the heating in the bathroom to control the temperature in the bathroom at the end of the hot water filling, and confirmed the energy-saving effect by the control not to overheat the bathroom more than necessary. . A test (hereinafter referred to as test (1)) in which the hot water filling in the bathtub and the heating in the bathroom are controlled in conjunction using the bath hot water heater 1 according to the present embodiment, and the conventional hot water filling system and the bathroom heating. Using the system, a test (hereinafter referred to as test (2)) of simultaneously starting hot water filling in a bathtub and heating in a bathroom was performed, and the room temperature and running cost at the end of hot water filling were compared.
[0068]
The test conditions are as follows for both tests (1) and (2).
(I) Bathroom temperature at the start of hot water filling: 9 ° C;
(Ii) Target bathroom temperature: 30 ° C;
(Iii) Hot water filling temperature: 42 ° C .;
(Iv) Outside temperature: 5 ° C.
In addition, the bathtub lid is in a closed state, and the capabilities of the heat source machine and the bathroom heater are the same.
[0069]
[Table 1]
Figure 0004008842
[0070]
Table 1 shows the test results. In test (1), bathroom heating was started 10 minutes after the start of hot water filling. The temperature in the bathroom at the end of the hot water filling was 30.2 ° C. In addition, the amount of gas used in the heat source machine from the start of hot water filling to the end of hot water filling is 1.033 m Three Met.
[0071]
On the other hand, in the test (2), bathroom heating was started almost simultaneously with the start of hot water filling. The temperature in the bathroom at the end of the hot water filling was 32.8 ° C. In addition, the amount of gas used in the heat source machine from the start of hot water filling to the end of hot water filling is 1.067 m Three Met.
[0072]
Thus, in the test (2), bath filling and bathroom heating are started almost simultaneously, so that the room temperature in the bathroom exceeds 30 ° C. and rises to 32.8 ° C. If the appropriate temperature in the bathroom is 30 ° C., the temperature has increased too much by 2.8 ° C. On the other hand, in the test (1) using the bath / hot water heater 1 according to the present embodiment, the bathroom heating starts to deviate so that the inside of the bathroom becomes an appropriate temperature at the end of the hot water filling. ℃ and almost appropriate temperature is obtained.
[0073]
In addition, the amount of gas used in the heat source machine from the start of the hot water filling to the end of the hot water filling is reduced by about 3% in the test (1) compared to the test (2). This shows that the test (1) has a shorter heating operation time and does not heat the bathroom more than necessary, so that the running cost can be reduced and an energy saving effect can be obtained.
[0074]
From the above, according to the present embodiment, by controlling the hot water filling and bathroom heating in conjunction with each other, by adjusting the operation start time of the bathroom heating, the bathroom heating is controlled so that the temperature in the bathroom becomes appropriate at the end of the hot water filling. It was confirmed that it was possible. Furthermore, it was confirmed that an energy saving effect could be obtained by performing control that did not heat the bathroom more than necessary.
[0075]
FIG. 5 is an overall configuration diagram of a bath / hot water heater according to the second embodiment of the present invention. A bath water heater / heating apparatus 200 shown in FIG. 5 includes a heat source device-side linked operation control unit 211 and a hot water time predicting unit 212 in a heat source device 210, and a heater-side linked operation control unit 221 and a heating time prediction in a bathroom heater 220. A portion 222 is provided.
[0076]
The hot water time predicting unit 212 stores the hot water time in the past hot water operation in association with the incoming water temperature, and refers to the stored hot water time for hot water corresponding to the current incoming water temperature. Predict the hang time.
[0077]
When the linked operation mode is set, the heat source device side linked operation control unit 211 notifies the bathroom heater 220 of the hot water time predicted by the hot water time predicting unit 212.
[0078]
The heating time prediction unit 222 stores the heating time in the past heating operation in association with the room temperature before the heating start, and refers to the stored heating time to determine the current room temperature before the heating start to an appropriate temperature. Estimate the heating time required for heating.
[0079]
When the hot water filling time is notified from the heat source device 210 side, the heater side linked operation control unit 221 compares the heating time predicted by the heating time prediction unit 222 with the hot water time notified from the heat source device 210 side. To do. When the hot water filling time is longer than the heating time, the heater side linked operation control unit 221 instructs the heat source device 210 to start the hot water filling operation. Thereby, hot water operation is started. Then, the heater-side linked operation control unit 221 sets the heating start timing and the heating capacity so that the bathroom can be heated to an appropriate temperature at the end of hot water filling, and controls the operation of the bathroom heater 220.
[0080]
When the heating time is longer than the hot water filling time, the heater-side linked operation control unit 221 supplies a heating operation start request to the heat source unit 210 and starts generating / supplying the heating hot water to the heat source unit 210. The heating operation is started, and the heating time is notified to the heat source unit 210 side. The heat source apparatus side linked operation control unit 211 sets the start timing and the hot water supply capacity of the hot water operation so that the hot water operation is completed almost simultaneously with the end of the heating operation, and causes the hot water operation to be executed.
[0081]
In addition, although the case where the hot water operation and the heating operation are interlocked is illustrated as the bath hot water supply and heating device 200 according to the second embodiment in FIG. 5, not only the hot water time but also the memorial time on the heat source device 210 side. In addition to the hot water operation, the bath operation time prediction unit that predicts the additional hot water time, the bath operation end timing and the heating operation end timing can be omitted not only in the hot water operation but also in the memorial operation and the addition hot water / memorial operation. Can be matched.
[0082]
【The invention's effect】
As described above, the bath water heater / heater according to the present invention can heat the bathroom to an appropriate temperature at the end of hot water filling even when the room temperature or the incoming water temperature varies depending on the temperature. Therefore, comfortable bathing is always possible. Moreover, the bath hot-water heater according to the present invention can automatically link the bath operation and the heating operation when the room temperature of the bathroom is equal to or lower than a predetermined temperature. Furthermore, the bath water heater / heater according to the present invention can compare the time required for heating with the time required for bath operation, and can set the bath operation capacity or the heating operation capacity high. Preparation time).
[Brief description of the drawings]
FIG. 1 is an overall configuration diagram of a bath / hot water heating / air-heating device according to a first embodiment of the present invention.
FIG. 2 is a block configuration diagram showing a specific example of a heat source unit of the hot water supply / room heating device according to the first embodiment of the present invention.
FIG. 3 is a block configuration diagram of an operation time prediction unit in the heat source unit of the hot water supply / room heating device according to the first embodiment of the present invention.
FIG. 4 is a flowchart showing an operation of the bath / hot water heater according to the first embodiment of the present invention.
FIG. 5 is an overall configuration diagram of a bath water heater / heater according to a second embodiment of the present invention.
[Explanation of symbols]
1,200 bath water heater
2 Bathroom
3 Bathtub
4, 5, 7 Hot water supply piping
6 Water heater (bathroom)
8 Hot water tap (kitchen)
10,210 heat source machine
11 Communication line
12 Bathroom remote control line
13 Kitchen remote control line
20,220 Bathroom heater
21 Temperature (room temperature) sensor
110 Hot water supply section
113 Water temperature sensor
120 Memorial
130 Yubari
140 Hot water section
150 Control unit
151 Hot water supply control unit
152 Memorial Control Unit
153 Hot water controller
154 Hot water control unit
155 I / O interface part
156 Communication interface unit
157 Linked operation controller
158 Operating time prediction unit
159 Bath operation mode setting section
160 Power supply
171 Operation Results Management Department
172 Operation result data storage
173,222 Heating time prediction part
174 Hot water time prediction part
175 Memorial time prediction part
176 Addition time prediction part
211 Interlocking operation controller (heat source unit side)
212 Hot water time prediction part
221 Interlocking operation control unit (on the heater side)
222 Heating time prediction unit

Claims (2)

浴槽への湯張運転と浴室の暖房運転とを連動させることのできる風呂給湯暖房装置であって、
室温センサによって検出された浴室の室温に基づいて浴室を所定の室温に暖房するまでに要する暖房時間を予測する暖房時間予測部と、
入水温度センサによって検出された入水温度に基づいて浴槽に所定湯温の湯を張るまでに要する湯張時間を求める湯張時間予測部と、
所定の給湯能力で湯張りした際の予測した前記湯張時間と所定の暖房能力で浴室を暖房した際の予測した前記暖房時間とを比較し、前記湯張時間が前記暖房時間よりも長い場合には給湯能力を高く設定し、前記暖房時間が前記湯張り時間よりも長い場合には暖房能力を高く設定する連動運転制御部を備えたこと
を特徴とする風呂給湯暖房装置。
A bath water heater / heater that can link hot water operation to a bathtub and heating operation of a bathroom,
A heating time prediction unit that predicts a heating time required to heat the bathroom to a predetermined room temperature based on the room temperature of the bathroom detected by the room temperature sensor;
A hot water filling time prediction unit for obtaining a hot water filling time required to fill the bathtub with hot water of a predetermined hot water temperature based on the incoming water temperature detected by the incoming water temperature sensor;
When the hot water filling time predicted when the hot water is filled with a predetermined hot water supply capacity is compared with the predicted heating time when the bathroom is heated with a predetermined heating capacity, and the hot water filling time is longer than the heating time The hot water supply / heater apparatus is provided with an interlocking operation control unit that sets the hot water supply capacity high and sets the heating capacity high when the heating time is longer than the hot water filling time.
請求項1記載の風呂給湯暖房装置であって、
前記連動運転制御部は、湯張りが終了するタイミングと浴室が適温になるタイミングとが一致するように湯張運転と暖房運転の各運転開始タイミングを制御すること
を特徴とする風呂給湯暖房装置。
The bath hot water heater according to claim 1 ,
The interlocking operation control unit controls each operation start timing of the hot water operation and the heating operation so that the timing when the hot water filling ends and the timing when the bathroom reaches an appropriate temperature are matched.
JP2003087108A 2003-03-27 2003-03-27 Bath water heater Expired - Fee Related JP4008842B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2003087108A JP4008842B2 (en) 2003-03-27 2003-03-27 Bath water heater

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2003087108A JP4008842B2 (en) 2003-03-27 2003-03-27 Bath water heater

Publications (2)

Publication Number Publication Date
JP2004293925A JP2004293925A (en) 2004-10-21
JP4008842B2 true JP4008842B2 (en) 2007-11-14

Family

ID=33401555

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2003087108A Expired - Fee Related JP4008842B2 (en) 2003-03-27 2003-03-27 Bath water heater

Country Status (1)

Country Link
JP (1) JP4008842B2 (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008151376A (en) * 2006-12-15 2008-07-03 Matsushita Electric Ind Co Ltd Hot water storage type water heater
JP4998025B2 (en) * 2007-03-14 2012-08-15 マックス株式会社 Humidification air conditioning system
JP5438350B2 (en) * 2009-03-30 2014-03-12 大阪瓦斯株式会社 Mist sauna equipment
JP5922966B2 (en) * 2012-03-29 2016-05-24 大阪瓦斯株式会社 Bathroom heating dryer
JP2018063084A (en) * 2016-10-14 2018-04-19 東京瓦斯株式会社 Information processing device, information processing method, and program
WO2018109942A1 (en) * 2016-12-16 2018-06-21 三菱電機株式会社 Control apparatus, air conditioning system, air conditioning control method and program
JP6988344B2 (en) * 2017-09-29 2022-01-05 マックス株式会社 Bathroom heating system
JP7112045B2 (en) * 2018-05-09 2022-08-03 三菱電機株式会社 hot water system

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61147051A (en) * 1984-12-19 1986-07-04 Matsushita Electric Ind Co Ltd Automatic hot water bath furnace
JPH03110345A (en) * 1989-09-22 1991-05-10 Rinnai Corp Automatic hot water feeder
JP2507850B2 (en) * 1992-07-24 1996-06-19 ミサワホーム株式会社 Heat pump heating system
JPH0666443A (en) * 1992-08-19 1994-03-08 Fujitsu General Ltd Air conditioner
JP3773297B2 (en) * 1996-04-05 2006-05-10 株式会社ハーマンプロ Bath facilities
JP2002071212A (en) * 2000-08-30 2002-03-08 Noritz Corp Hot-water supplying and space heating equipment for bathroom

Also Published As

Publication number Publication date
JP2004293925A (en) 2004-10-21

Similar Documents

Publication Publication Date Title
JP4008842B2 (en) Bath water heater
JP6732672B2 (en) Hot water heating system
JP5068145B2 (en) Mist sauna device and mist sauna system using the same
JP4763442B2 (en) Combustion system and remote control device applied to the combustion system
JP5411732B2 (en) Bath water heater
JP2010169271A (en) Storage type water heater
JP5818585B2 (en) Memorial device
JP2005273958A (en) Hot-water supply and heating apparatus
JP2019100593A (en) Bath device
JP5358010B2 (en) Mist sauna device and mist sauna system using the same
JP2010230289A (en) Hot water storage type water heater
JP6192474B2 (en) Bath memorial system
JP3849692B2 (en) Water heater
JP2643865B2 (en) Automatic bath equipment
JP3611372B2 (en) Water heater
JP7066564B2 (en) Bath water heater
JP2019045053A (en) Heating system
JP3703596B2 (en) Temperature controller for combined hot water heating system
JP2682553B2 (en) Hot water heating system
JP2023071457A (en) heating system
JPH09264576A (en) Bathroom ventilation device
JP6415923B2 (en) Bath equipment
JPH01277137A (en) Temperature control device in hot water-circulating heater
JP3777001B2 (en) One can two water channel combustion system
JP2022024755A (en) Bathing system

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20051214

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20061228

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20070116

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20070308

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20070508

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20070620

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20070828

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20070830

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100907

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100907

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110907

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120907

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130907

Year of fee payment: 6

LAPS Cancellation because of no payment of annual fees