JP3923807B2 - Reinforcing bar group protective cap and purification device installation method - Google Patents

Reinforcing bar group protective cap and purification device installation method Download PDF

Info

Publication number
JP3923807B2
JP3923807B2 JP2002008953A JP2002008953A JP3923807B2 JP 3923807 B2 JP3923807 B2 JP 3923807B2 JP 2002008953 A JP2002008953 A JP 2002008953A JP 2002008953 A JP2002008953 A JP 2002008953A JP 3923807 B2 JP3923807 B2 JP 3923807B2
Authority
JP
Japan
Prior art keywords
protective cap
reinforcing bar
bar group
tip
purification device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2002008953A
Other languages
Japanese (ja)
Other versions
JP2003213937A (en
Inventor
宏治 庭山
Original Assignee
株式会社たつみ産業
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社たつみ産業 filed Critical 株式会社たつみ産業
Priority to JP2002008953A priority Critical patent/JP3923807B2/en
Publication of JP2003213937A publication Critical patent/JP2003213937A/en
Application granted granted Critical
Publication of JP3923807B2 publication Critical patent/JP3923807B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Description

【0001】
【発明の属する技術分野】
本発明は、一組の鉄筋群の先端部を覆うのに用いられる保護キャップ、及び、浄化装置設置方法に関する。
【0002】
【従来の技術】
コンクリート建造物の建設に当たっては、コンクリート部材に埋設した鉄筋群、例えば縦筋を外部に突出させ、この鉄筋群を、例えば横筋と称される鉄筋の群に接続する工程をとることが多い。これらの縦筋が、最終工程までむき出しの状態であると、極めて危険である。
【0003】
そこで、従来は、地上に剥き出しになっている鉄筋の各先端部を、下向きに曲げたり、先端部に保護キャップを取り付けていた。
【0004】
しかし、鉄筋の各先端部を下向きに曲げても、負傷の危険は依然として存在する。しかも、地上に剥き出しの先端部が多数あるため、折り曲げ作業に長時間を要する。
【0005】
次に、各鉄筋の先端部に保護キャップで覆う工法では、保護キャップで覆う地上に剥き出しの先端部が多数あるため、その作業が煩わしい。しかも、保護キャップが外れ、保護機能が損なわれてしまう。
【0006】
【発明が解決しようとする課題】
本発明の課題は、鉄筋コンクリート部材建設作業に携わる作業者の安全性向上に資する保護キャップを提供することである。
【0007】
本発明のもう一つの課題は、鉄筋群の先端部を、全体として覆うことができる取り扱いの容易な保護キャップを提供することである。
【0008】
【課題を解決するための手段】
上述した課題を解決するため、本発明に係る鉄筋群用保護キャップは、一つの空洞部の一方の側にある閉鎖部と、閉鎖部とは反対側の空洞部のもう一方の側にある開口部とを含んでいる。閉鎖部は閉じられており、開口部は開いている。
【0009】
本発明に係る保護キャップは、コンクリート部材から突出する少なくとも1つの鉄筋群を覆うために用いられる。
【0010】
この場合、本発明に係る保護キャップは、一つの空洞部の一方の側にある閉鎖部と、閉鎖部とは反対側の空洞部のもう一方の側にある開口部とを含んでいるから、保護キャップにより、一組の鉄筋群の先端部を、全体として覆うことができる。鉄筋群の先端部はもはや剥き出しの状態ではないから、作業員の被服または身体が鉄筋の先端部に引っ掛かることがないし、切傷やひっかき傷のような負傷を受けることもない。
【0011】
また、保護キャップは、一本の鉄筋ではなく、一組の鉄筋群の先端部を覆うのであるから、鉄筋群全体を縮めて、保護キャップを被せる等の操作が可能である。このため、保護キャップが簡単にはずれてしまうのを防ぐことができる。従って、本発明の保護キャップによれば、保護キャップの脱落による安全性の低下を防ぐことができる。
【0012】
しかも、本発明によれば、保護キャップは一組の鉄筋群の先端部を、鉄筋具全体として、覆うことができるから、鉄筋の一本毎に保護キャップを付ける場合に比較して、保護キャップを付ける時間が、大幅に削減可能となる。例えば、浄化槽の4隅に3本1組の鉄筋群を配置した場合、従来技術では12個もの保護キャップを付ける必要があるのに比較して、本発明によれば、たった4つの保護キャップを装着するだけでよい。
【0013】
更に、本発明によれば、保護キャップは一組の鉄筋群の先端部を覆うことができるから、工事費用が削減される。先に説明したように、数多くの鉄筋の先端部を覆うのに、少数の保護キャップが必要となるだけなので、工事費用を削減できる。また、同じ保護キャップを何度も繰り返し使うことができるため、工事費用を更に低減し得る。
【0014】
本発明に係る保護キャップは、浄化装置設置方法において、コンクリート部材に備えられた少なくとも1つの鉄筋群を覆うために用いられる。浄化装置の設置方法においては、少なくとも一組の鉄筋群を含むコンクリート部材を、地中に掘削された穴の中に設置する。次に、保護キャップを、鉄筋群の先端部に被せる。保護キャップは上述した本発明に係る保護キャップである。次に、浄化槽を前記穴の中に設置する。前記保護キャップは、少なくとも、前記穴を埋め戻した後に取り外される。
【0015】
上記浄化装置設置方法によれば、その主要な工程である穴への浄化槽の設置から穴の埋め戻しに至るまで、鉄筋群の先端部を、保護キャップで覆うことになるから、浄化槽設置作業に携わる作業員の安全性を確保し得る。また、浄化装置の設置にかかる時間と費用を削減し得る。
【0016】
【発明の実施の形態】
図1は本発明に係る保護キャップの正面図、図2は図1の断面図である。図示された保護キャップは、空洞部90の一方の側にある閉鎖部91と、閉鎖部91とは反対側の空洞部90のもう一方の側にある開口部92とを含む。閉鎖部91は閉じられており、開口部92は開いている。この実施態様では、単なる一例であるが、閉鎖部91は湾曲させてある。保護キャップは、プラスチック、金属またはそれらの組み合わせによって構成できる。
【0017】
また、閉鎖部91は、空洞部90に接続されている。言い換えれば、閉鎖部91と空洞部90は別個の部材で構成され、互いに接続されている。
【0018】
図3は保護キャップの使用状態を示す断面図である。図示されているように、3本の鉄筋群65に含まれる鉄筋の各先端部651が、コンクリート部材60から突き出ている。鉄筋群65の数は、図示されたものより多くても少なくてもよい。
【0019】
本発明に係る保護キャップ100は、コンクリート部材60から突出する少なくとも1つの鉄筋群65の先端部651を覆うために用いられる。
【0020】
この場合、本発明に係る保護キャップ100は、一つの空洞部90の一方の側にある閉鎖部91と、閉鎖部91とは反対側において、空洞部90の他方の側にある開口部92とを含んでいるから、保護キャップ100により、一組の鉄筋群65の先端部651を、全体として覆うことができる。鉄筋群65の先端部651はもはや剥き出しの状態ではないから、作業員の被服または身体が鉄筋の先端部651に引っ掛かることがないし、切傷やひっかき傷のような負傷を受けることもない。
【0021】
また、保護キャップ100は、一本の鉄筋ではなく、一組の鉄筋群65の先端部651を覆うのであるから、保護キャップ100が簡単にはずれてしまうのを防ぐことができる。従って、本発明によれば、脱落の危険性の少ない安全性の高い保護キャップ100を得ることができる。
【0022】
しかも、本発明によれば、保護キャップ100は一組の鉄筋群65の先端部651を、鉄筋群65の全体として、覆うことができるから、鉄筋の一本毎に保護キャップ100を付ける場合に比較して、保護キャップ100を付ける時間が、大幅に削減可能となる。例えば、浄化槽の4隅に3本1組の鉄筋群65を配置した場合、従来技術では12個もの保護キャップ100を付ける必要があるのに比較して、本発明によれば、たった4つの保護キャップ100を付ける必要があるだけである。
【0023】
更に、本発明によれば、保護キャップ100は一組の鉄筋群65の先端部651を覆うことができるから、工事費用が削減される。先に説明したように、数多くの鉄筋群65の先端部651を覆うのに少数の保護キャップ100が必要となるだけなので、工事費用を削減できる。また、同じ保護キャップ100を何度も繰り返し使うことができるため、工事費用を更に低減し得る。
【0024】
図4〜図6は、本発明に係る保護キャップの他の実施態様を示したものである。図4に図示された保護キャップでは、閉鎖部91は、空洞部90と一体形成されている。
【0025】
図5に図示された保護キャップでは、閉鎖部91の形は平らである。閉鎖部91と空洞部90は別個の部材であり、接着剤等によって、互いに接続されている図6に図示された保護キャップにおいて、閉鎖部91の形は、平らであり、閉鎖部91は空洞部90と一体形成されている。
【0026】
図7〜図13は本発明に係る浄化槽設置方法を示す図である。まず、図7に示すように、地中に掘削された穴50の底部にコンクリート基板63を設置する。コンクリート基板63には、必要な組数の鉄筋群65が植設されている。コンクリート基板63のサイズ及び形は、浄化装置の一部である浄化槽を支えるのに十分な大きさでなければならない。
【0027】
鉄筋群65は、任意数、例えば3本の鉄筋を含み、先端部651〜653が、コンクリート基板63の一面上から、地表面GLの方向に延び、地表面GLから突出している。
【0028】
鉄筋群65は、例えばヒューム管等のコンクリート部材60によって覆われており、その先端部651がコンクリート部材60から外部に突出している。突出量は、後で付設される横筋との接続のため、例えば40cm以上の長さとなるように選定される。コンクリート部材60は、筒状として形成されても、壁として形成されてもよい。鉄筋群65は、縦方向に間隔を隔てて結合されたループ筋66によって拘束されている。
【0029】
次に、図8に示すように、鉄筋群65の組の先端部651に、これを覆うように、保護キャップ100を被せる。保護キャップ100は図1〜図4を参照して説明されたものであり、従って、ここでは、更なる説明は省略する。
【0030】
次に、図9に示すように、穴50の中に浄化槽10を設置されている。更に詳しく言えば、浄化槽10はコンクリート基板63上に載置される。浄化槽10の蓋81は地表面GLとほぼ同じ高さである。また、図示されてはいないが、浄化槽10は、コンクリート基板63に固定されてもよい。図示された浄化槽10は、現在知られており、将来提案されることのある何れのものであってもよい。
【0031】
次に、図10に示すように、浄化槽10の蓋81が地表面GLにあるように、浄化槽10の周りを埋め戻す。そして、更に、保護キャップ100を一時的に除去し、ロート状注入部材45を用いて、生コンクリート30を、ヒューム管等でなるコンクリート部材60に注入する。コンクリート部材60が生コンクリート30でスラブ下場まで一杯になった後、保護キャップ100は再び鉄筋群65の組の先端部651に被せられる。
【0032】
次に、図11、図12に示すように、鉄筋群65の組の先端部651を曲げ、浄化槽10の上に備えられた横筋200に接続する。
【0033】
この後、図13に示すように、浄化槽10の蓋81、82、83の周囲に生コンクリート30を打設し、上部コンクリートスラブ300を形成する。これにより、浄化装置の上に車が駐車しても、浄化装置を、車荷重から保護することができるようになる。
上述した浄化装置設置方法によれば、その主要な工程である穴50への浄化槽10の設置から穴50の埋め戻しに至るまでの全工程を通して、鉄筋群65の先端部651を、保護キャップ100で覆うことになるから、浄化槽設置作業に携わる作業員の安全性を確保し得る。また、浄化装置設置にかかる時間と費用を削減し得る。
【0034】
【発明の効果】
以上述べたように、本発明によれば、次のような効果を得ることができる。
(a)鉄筋コンクリート部材建設作業に携わる作業者の安全性向上に資する保護キャップを提供することができる。
(b)鉄筋群の先端部を、全体として覆うことができる取り扱いの容易な保護キャップを提供することができる。
【図面の簡単な説明】
【図1】本発明に係る保護キャップの正面図である。
【図2】図1の断面図である。
【図3】本発明に係る保護キャップの使用状態を示す断面図である。
【図4】本発明に係る保護キャップの別の実施態様を示す断面図である。
【図5】本発明に係る保護キャップのさらに別の実施態様を示す断面図である。
【図6】本発明に係る保護キャップのさらに別の実施態様を示す断面図である。
【図7】本発明に係る浄化装置を設置するための方法に含まれる一つの工程を示す断面図である。
【図8】図7に示した工程の後の工程を示す断面図である。
【図9】図8に示した工程の後の工程を示す断面図である。
【図10】図9に示した工程の後の工程を示す断面図である。
【図11】図10に示した工程の後の工程を示す断面図である。
【図12】図11に示した工程の後の工程を示す断面図である。
【図13】図12に示した工程の平面図である。
【符号の説明】
100 保護キャップ
90 空洞部
91 閉鎖部
92 開口部
63 コンクリート基板
10 浄化槽
60 コンクリート部材
65 鉄筋
651 鉄筋の先端部
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a protective cap used to cover the tip of a set of reinforcing bars, and a purification device installation method.
[0002]
[Prior art]
In constructing a concrete building, a reinforcing bar group embedded in a concrete member, for example, a vertical bar protrudes to the outside, and the reinforcing bar group is often connected to a group of reinforcing bars called horizontal bars, for example. It is extremely dangerous if these vertical stripes are exposed until the final process.
[0003]
Therefore, conventionally, each tip of the reinforcing bar exposed on the ground is bent downward or a protective cap is attached to the tip.
[0004]
However, there is still a risk of injury even if each rebar tip is bent downward. In addition, since there are many exposed tips on the ground, the bending work takes a long time.
[0005]
Next, in the construction method in which the tip portion of each reinforcing bar is covered with a protective cap, there are many exposed tip portions on the ground covered with the protective cap, so that the operation is troublesome. In addition, the protective cap is removed, and the protective function is impaired.
[0006]
[Problems to be solved by the invention]
The subject of this invention is providing the protective cap which contributes to the safety | security improvement of the worker engaged in a reinforced concrete member construction work.
[0007]
Another object of the present invention is to provide an easy-to-handle protective cap that can cover the tip of a reinforcing bar group as a whole.
[0008]
[Means for Solving the Problems]
In order to solve the above-described problem, a protective cap for reinforcing steel bars according to the present invention includes a closing part on one side of one cavity part and an opening on the other side of the cavity part opposite to the closing part. Part. The closure is closed and the opening is open.
[0009]
The protective cap according to the present invention is used to cover at least one reinforcing bar group protruding from the concrete member.
[0010]
In this case, the protective cap according to the present invention includes a closing part on one side of one cavity part and an opening part on the other side of the cavity part opposite to the closing part, With the protective cap, the tip of the set of reinforcing bars can be covered as a whole. Since the tip of the reinforcing bar group is no longer exposed, the clothes or body of the worker will not be caught by the tip of the reinforcing bar, and will not be injured such as a cut or a scratch.
[0011]
In addition, since the protective cap covers not the single reinforcing bar but the tip of the set of reinforcing bars, the entire reinforcing bar group can be contracted and covered with a protective cap. For this reason, it can prevent that a protective cap slip | deviates easily. Therefore, according to the protective cap of the present invention, it is possible to prevent a decrease in safety due to the falling off of the protective cap.
[0012]
In addition, according to the present invention, the protective cap can cover the tip of a set of reinforcing bars as a whole reinforcing bar, so that the protective cap is compared with a case where a protective cap is attached to each reinforcing bar. The time for attaching can be greatly reduced. For example, when a set of three reinforcing bars is arranged at the four corners of the septic tank, according to the present invention, only four protective caps are provided, as compared with the conventional technology that requires as many as twelve protective caps. Just wear it.
[0013]
Furthermore, according to the present invention, since the protective cap can cover the tip of the set of reinforcing bars, the construction cost is reduced. As described above, since only a small number of protective caps are required to cover the tips of many reinforcing bars, the construction cost can be reduced. Moreover, since the same protective cap can be used over and over again, the construction cost can be further reduced.
[0014]
The protective cap which concerns on this invention is used in order to cover the at least 1 reinforcing bar group with which the concrete member was equipped in the purification apparatus installation method. In the installation method of the purification apparatus, a concrete member including at least one set of reinforcing bars is installed in a hole excavated in the ground. Next, a protective cap is put on the tip of the reinforcing bar group. The protective cap is the protective cap according to the present invention described above. Next, a septic tank is installed in the hole. The protective cap is removed at least after the hole is backfilled.
[0015]
According to the above purification device installation method, the tip of the reinforcing bar group is covered with the protective cap from the installation of the purification tank to the hole, which is the main process, to the backfilling of the hole. The safety of workers involved can be ensured. In addition, the time and cost required for installing the purification device can be reduced.
[0016]
DETAILED DESCRIPTION OF THE INVENTION
FIG. 1 is a front view of a protective cap according to the present invention, and FIG. 2 is a cross-sectional view of FIG. The illustrated protective cap includes a closure 91 on one side of the cavity 90 and an opening 92 on the other side of the cavity 90 opposite the closure 91. The closing part 91 is closed and the opening 92 is open. In this embodiment, the closing portion 91 is curved, which is merely an example. The protective cap can be made of plastic, metal, or a combination thereof.
[0017]
Further, the closing portion 91 is connected to the hollow portion 90. In other words, the closing portion 91 and the hollow portion 90 are formed of separate members and are connected to each other.
[0018]
FIG. 3 is a cross-sectional view showing a use state of the protective cap. As shown in the drawing, the respective leading ends 651 of the reinforcing bars included in the three reinforcing bar groups 65 protrude from the concrete member 60. The number of reinforcing bar groups 65 may be more or less than that illustrated.
[0019]
The protective cap 100 according to the present invention is used to cover the distal end portion 651 of at least one reinforcing bar group 65 protruding from the concrete member 60.
[0020]
In this case, the protective cap 100 according to the present invention includes a closing portion 91 on one side of one cavity portion 90, and an opening 92 on the other side of the cavity portion 90 on the side opposite to the closing portion 91. Therefore, the protective cap 100 can cover the tip end portion 651 of the set of reinforcing bar groups 65 as a whole. Since the distal end portion 651 of the reinforcing bar group 65 is no longer exposed, the clothes or body of the worker is not caught by the distal end portion 651 of the reinforcing bar and is not injured such as a cut or a scratch.
[0021]
Moreover, since the protective cap 100 covers not the single reinforcing bar but the tip 651 of the set of reinforcing bars 65, it is possible to prevent the protective cap 100 from being easily displaced. Therefore, according to the present invention, it is possible to obtain the protective cap 100 with high safety with less risk of dropping off.
[0022]
In addition, according to the present invention, the protective cap 100 can cover the tip 651 of the pair of reinforcing bar groups 65 as the entire reinforcing bar group 65. Therefore, when the protective cap 100 is attached to each reinforcing bar. In comparison, the time for attaching the protective cap 100 can be greatly reduced. For example, when a group of three reinforcing bars 65 are arranged at the four corners of the septic tank, according to the present invention, only four protections are required, as compared with the conventional technique where as many as twelve protective caps 100 are required. It is only necessary to attach the cap 100.
[0023]
Furthermore, according to the present invention, since the protective cap 100 can cover the front end portion 651 of the set of reinforcing bars 65, the construction cost is reduced. As described above, the construction cost can be reduced because only a small number of protective caps 100 are required to cover the tip portions 651 of the numerous reinforcing bar groups 65. Moreover, since the same protective cap 100 can be used repeatedly over and over, construction costs can be further reduced.
[0024]
4 to 6 show other embodiments of the protective cap according to the present invention. In the protective cap illustrated in FIG. 4, the closing portion 91 is formed integrally with the cavity portion 90.
[0025]
In the protective cap illustrated in FIG. 5, the shape of the closure 91 is flat. In the protective cap shown in FIG. 6 in which the closing portion 91 and the hollow portion 90 are separate members and are connected to each other by an adhesive or the like, the shape of the closing portion 91 is flat, and the closing portion 91 is hollow. The unit 90 is integrally formed.
[0026]
7-13 is a figure which shows the septic tank installation method based on this invention. First, as shown in FIG. 7, a concrete substrate 63 is installed at the bottom of a hole 50 excavated in the ground. The concrete board 63 is provided with a necessary number of reinforcing bar groups 65. The size and shape of the concrete substrate 63 must be large enough to support the septic tank that is part of the septic device.
[0027]
The reinforcing bar group 65 includes an arbitrary number, for example, three reinforcing bars, and tip portions 651 to 653 extend from one surface of the concrete substrate 63 in the direction of the ground surface GL and protrude from the ground surface GL.
[0028]
The reinforcing bar group 65 is covered with a concrete member 60 such as a fume pipe, for example, and a tip end portion 651 protrudes from the concrete member 60 to the outside. The protrusion amount is selected so as to be, for example, a length of 40 cm or more in order to connect with a transverse line to be attached later. The concrete member 60 may be formed as a cylinder or a wall. The reinforcing bar group 65 is constrained by loop bars 66 that are coupled to each other in the vertical direction.
[0029]
Next, as shown in FIG. 8, the protective cap 100 is put on the tip portion 651 of the set of the reinforcing bar group 65 so as to cover it. The protective cap 100 has been described with reference to FIGS. 1 to 4 and, therefore, further description is omitted here.
[0030]
Next, as shown in FIG. 9, the septic tank 10 is installed in the hole 50. More specifically, the septic tank 10 is placed on the concrete substrate 63. The lid 81 of the septic tank 10 is almost the same height as the ground surface GL. Further, although not shown, the septic tank 10 may be fixed to the concrete substrate 63. The illustrated septic tank 10 may be any currently known and proposed in the future.
[0031]
Next, as shown in FIG. 10, the periphery of the septic tank 10 is backfilled so that the lid 81 of the septic tank 10 is on the ground surface GL. Further, the protective cap 100 is temporarily removed, and the ready-mixed concrete 30 is injected into the concrete member 60 made of a fume pipe or the like using the funnel-shaped injection member 45. After the concrete member 60 is filled with the ready-mixed concrete 30 until the slab is released, the protective cap 100 is again put on the front end portion 651 of the reinforcing bar group 65.
[0032]
Next, as shown in FIGS. 11 and 12, the distal end portion 651 of the set of the reinforcing bar group 65 is bent and connected to the transverse bar 200 provided on the septic tank 10.
[0033]
Thereafter, as shown in FIG. 13, the ready-mixed concrete 30 is placed around the lids 81, 82 and 83 of the septic tank 10 to form an upper concrete slab 300. Thereby, even if the vehicle is parked on the purification device, the purification device can be protected from the vehicle load.
According to the purification device installation method described above, the tip portion 651 of the reinforcing bar group 65 is attached to the protective cap 100 through all the steps from the installation of the purification tank 10 to the hole 50, which is the main process, to the backfilling of the hole 50. Therefore, the safety of workers engaged in the septic tank installation work can be ensured. Further, the time and cost required for installing the purification device can be reduced.
[0034]
【The invention's effect】
As described above, according to the present invention, the following effects can be obtained.
(A) It is possible to provide a protective cap that contributes to improving the safety of workers engaged in reinforced concrete member construction work.
(B) It is possible to provide an easy-to-handle protective cap that can cover the tip of the reinforcing bar group as a whole.
[Brief description of the drawings]
FIG. 1 is a front view of a protective cap according to the present invention.
FIG. 2 is a cross-sectional view of FIG.
FIG. 3 is a cross-sectional view showing a use state of the protective cap according to the present invention.
FIG. 4 is a cross-sectional view showing another embodiment of the protective cap according to the present invention.
FIG. 5 is a sectional view showing still another embodiment of the protective cap according to the present invention.
FIG. 6 is a cross-sectional view showing still another embodiment of the protective cap according to the present invention.
FIG. 7 is a cross-sectional view showing one process included in the method for installing the purification apparatus according to the present invention.
8 is a cross-sectional view showing a step that follows the step shown in FIG. 7. FIG.
9 is a cross-sectional view showing a step that follows the step shown in FIG. 8. FIG.
10 is a cross-sectional view showing a step that follows the step shown in FIG. 9. FIG.
11 is a cross-sectional view showing a step that follows the step shown in FIG. 10. FIG.
12 is a cross-sectional view showing a step that follows the step shown in FIG. 11. FIG.
13 is a plan view of the process shown in FIG. 12. FIG.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 100 Protective cap 90 Cavity 91 Closure 92 Opening 63 Concrete substrate 10 Septic tank 60 Concrete member 65 Reinforcement 651 Reinforcing bar tip

Claims (1)

浄化装置の設置方法であって、
少なくとも一組の鉄筋群を含むコンクリート部材を、地中に掘削された穴の中に設置し、
次に、保護キャップを、前記鉄筋群の先端部に被せ、
次に、浄化槽を前記穴の中に設置し、
次に、前記穴を埋め戻した後、前記保護キャップを取り外す工程を含み、
前記保護キャップは、空洞部と、閉鎖部と、開口部とを含み、コンクリート部材から突出する一組の鉄筋群の先端部を覆うのに用いられるものであり、前記閉鎖部は、前記空洞部の一方の側にあって閉じられており、
前記開口部は、前記閉鎖部とは反対側の前記空洞部の他方の側にあって開口している、
浄化装置の設置方法。
A method of installing a purification device,
Install a concrete member containing at least one set of reinforcing bars in a hole excavated in the ground,
Next, a protective cap is put on the tip of the reinforcing bar group,
Next, install a septic tank in the hole,
Next, after refilling the hole , including the step of removing the protective cap ,
The protective cap includes a hollow portion, a closing portion, and an opening portion, and is used to cover a distal end portion of a set of reinforcing bars that protrude from a concrete member, and the closing portion includes the hollow portion. Is closed on one side of the
The opening is open on the other side of the cavity opposite to the closure;
How to install the purification device.
JP2002008953A 2002-01-17 2002-01-17 Reinforcing bar group protective cap and purification device installation method Expired - Fee Related JP3923807B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002008953A JP3923807B2 (en) 2002-01-17 2002-01-17 Reinforcing bar group protective cap and purification device installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002008953A JP3923807B2 (en) 2002-01-17 2002-01-17 Reinforcing bar group protective cap and purification device installation method

Publications (2)

Publication Number Publication Date
JP2003213937A JP2003213937A (en) 2003-07-30
JP3923807B2 true JP3923807B2 (en) 2007-06-06

Family

ID=27647078

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002008953A Expired - Fee Related JP3923807B2 (en) 2002-01-17 2002-01-17 Reinforcing bar group protective cap and purification device installation method

Country Status (1)

Country Link
JP (1) JP3923807B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5000771B2 (en) * 2011-01-31 2012-08-15 株式会社カンケン Septic tank installation structure
KR102054491B1 (en) * 2019-08-22 2019-12-10 정윤희 A Safety cover for vertical rebar

Also Published As

Publication number Publication date
JP2003213937A (en) 2003-07-30

Similar Documents

Publication Publication Date Title
US20030140575A1 (en) Hook facility for concrete structure
US5456051A (en) Compression spacer for bar reinforcement
JP3923807B2 (en) Reinforcing bar group protective cap and purification device installation method
KR200437883Y1 (en) Tie bar for openig cover
KR200406601Y1 (en) An apparatus for fixing a rope for hanging the duster of building
CN106284402A (en) Lower margin sleeve bolt installation tool and the pre-embedded construction method of lower margin sleeve bolt
KR100492469B1 (en) Storage tank structure and constructing method thereof
KR101897247B1 (en) Expansion joint of bridge
KR101002828B1 (en) Side gutter for ridge of a mountain channel and integrated construction method thereof
KR19990041358U (en) Fence holding formwork
KR200379650Y1 (en) Link fixed on the wall for Rope
JPH0213097B2 (en)
KR200369895Y1 (en) Manhole support block and manhole structure of use it
JP4037201B2 (en) Concrete block formwork
KR200385488Y1 (en) Form for Cast-in-Site Plant Pavement
KR20030023036A (en) Mending method of concret underdrain using corrugated matter plate and structure thereof
JP2002302902A (en) Road widening block and its fixing structure
KR200293483Y1 (en) Storage tank structure
KR102146635B1 (en) Apparatus for protecting road gutter and installation method of road gutter using the same
JP2000204511A (en) Outer frame for curb block
KR100491404B1 (en) Construction member for covering hollowness of a pier and construction method thereof
JP2796694B2 (en) Formwork for sub pipe protection concrete construction
JPH0771032A (en) Prefabricated pile and installation method thereof
JPS584628Y2 (en) septic tank
KR100579711B1 (en) Steel plate floor supporting method for water proofing on the floor in open-cut method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20041210

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20061129

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20070122

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20070214

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20070222

R150 Certificate of patent or registration of utility model

Ref document number: 3923807

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100302

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110302

Year of fee payment: 4

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120302

Year of fee payment: 5

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130302

Year of fee payment: 6

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140302

Year of fee payment: 7

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees