Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP13908596A
Other languages
Japanese (ja)
Other versions
JPH09317204A (en
Inventor
親英 佐藤
晋 川口
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Original Assignee
Obayashi Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp filed Critical Obayashi Corp
Priority to JP13908596A priority Critical patent/JP3772394B2/en
Publication of JPH09317204A publication Critical patent/JPH09317204A/en
Application granted granted Critical
Publication of JP3772394B2 publication Critical patent/JP3772394B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、野球場スタジアムなどのような既存の屋外施設に適用され、施設利用を中断することなく移動式屋根を施工することが可能な既存屋外施設の移動式屋根の構造に関する。
【0002】
【従来の技術】
既存の野球場や、サッカースタジアム、その他の競技場施設にあっては、例えば、後楽園球場や福岡ドーム球場のようなものは別として、一般に屋外施設となっており、雨天など天候による試合の開催中止により、施設の利用効率への影響を大きく受けやすい。
【0003】
そこで、このような既存の屋外競技場施設にも、開閉式の屋根構造を持った大規模構造物としてリニューアルすることが提案されている。なお、開閉式とするのは、屋根開放時において、在来の屋外施設固有の利点である開放感が得られるためである。
【0004】
しかしながら、この既存施設に屋根を施工するにあたっては、以下に述べる種々の問題が生ずる。
【0005】
【発明が解決しようとする課題】
まず、屋根を掛ける部分及びその周縁の施設は施工エリアとなり、工事期間中は、施設の利用が不可能となる。また、広大な場所に極めて大規模な屋根を掛けるために、仮設工事もかなり大がかりなものとなる。
【0006】
さらに屋根を可動とするためには、施工の複雑さから工期が延びてしまい、施設の利用への影響が大きくなり、施設の利用がある期間不可能となるため、その原因となる建設工事自体がマイナス要素となる。
【0007】
なお、例えばプロ野球では、一年の間で4〜10月頃までがペナントレースを開催し、11〜3月まではオフシーズンとしているため、このオフシーズン(約5ヶ月間)の間施設利用を一時停止し、その間に急速施工できればよいが、前述のごとく極めて大規模な屋根を掛けるため、現実的ではない。
【0008】
本発明は、以上の問題点に鑑みなされたものであって、その目的は、利用客への安全性、快適性を十分に確保しつつ通年で屋根掛工事を可能とした、既存屋外施設の移動式屋根の構造を提供するものである。
【0009】
【課題を解決するための手段】
以上の目的を達成するため、本発明は、屋外施設の左右両翼の上部を覆った状態で配置されるとともに、両端に設けられた脚部が前記屋外施設の外側に屋外施設を挟んで固定設置される一対の固定屋根と、前記屋外施設の外側に前記屋外施設を挟んで設置される支持躯体及び支持地盤と、前記支持躯体の上部に設置されるガイドレールと、前記支持地盤に設けられた凹部内に設置されるガイドレールと、前記各固定屋根の上部に積層状態で配置されるとともに、上部に屋根膜が張設され、かつ両端に設けられた脚部が前記両ガイドレールに移動可能に支持される可動屋根と、前記支持地盤の凹部の開口縁部に設置され、前記可動屋根の脚部の固定時には前記凹部の開口部を閉塞し、前記可動屋根の脚部の移動時には前記凹部を囲うブリッジとを備えていることを特徴とする。
【0010】
本発明による既存屋外施設の移動式屋根の構造によれば、一旦固定屋根が完成した後は、これを構台として順次その上部に可動屋根工事を実施できるため、架設工事などによる施設の占有がなく、利用客に対する十分な安全を確保した上で工事を持続できる。
また、可動屋根の脚部の固定時においては、ブリッジによって凹部の開口部を閉塞し、可動屋根の脚部の移動時においては、ブリッジによって凹部を囲っているので、屋外施設に出入りする人々の安全性を確保することができる
【0013】
【発明の実施の形態】
以下、本発明の好ましい実施の形態につき、添付図面を参照して詳細に説明する。
【0014】
図1〜図7は、本発明による既存屋外施設の移動式屋根の構造の一実施の形態が示されていて、図1構想を示す説明用姿図、図2は構想を示す説明用平面図、図3は施工手順の一例を示す工程説明図、図4は竣工状態における全開状態の平面図、図5は竣工状態における全閉状態の平面図、図6は全開状態における正面姿図、図7はガイドレール及びその支持構造を示す部分断面図である。
すなわち、この既存屋外施設の移動式屋根の構造は、既存野球場1に適用したものであって、改修工事対象である既存野球場1は、ゲート2を外野側中央に設け、図中矢印に示すごとくゲート2を通過した利用客は、外野席側からなめらかに連続するスロープを歩きながら指定された席まで移動できる構造の建物である。
【0015】
この野球場1の左右両翼にそれぞれ外野側及び内野側にかけて連続し、その両端の一対の脚部3を、野球場1の外側部に固定設置される一対の固定屋根4が配置され、各固定屋根4上にはこれとほぼ同一面積の中段可動屋根5及び上段可動屋根6が積層状態に配置される。
【0016】
そして、各可動屋根5、6の両側の一対の脚部7、8は野球場1外の外野側地表部及び内野側外部に配置された支持躯体11にそれぞれ設けられたガイドレール9、10に沿って扇形に移動可能であり、図1の状態から各可動屋根5、6をガイドレール9、10に沿って野球場1の中央側に向けて移動させ、中央で合致させることによって、図2に破線で示すように、野球場1の上部全体を覆うことができる。
【0017】
なお、全開状態では基本的に固定屋根4の面積分だけ野球場1の左右両翼上部が覆われることになるが、基本的には屋外施設としての開放感を享有している。また全閉状態であっても、矢印に示すように、左右両翼から、外の景色、自然などを十分に見通せることになる。また各屋根4、5、6の脚部の高さは十分にとってあり、野球場1全体が覆われても周囲の見通しを十分に確保できる。
【0018】
図3は、本発明の既存屋外施設の移動式屋根の構造の施工手順の一例を示す工程説明図であり、図の向って左側から順次施工が行われる。
【0019】
この工事スケジュールは、プロ野球スケジュールにリンクして行われ、例えば、1996年から工事が始ると仮定すると、ペナントレース開幕中の後期9,10月中にかけて基礎工事が行われ、野球場1の施設に影響を与えない範囲の工事、各種資材、機材などの準備、工事許認可の取得がなされる。
【0020】
次いで、第一回目シーズンオフ期間である1996年11月〜1997年3月間での5ヶ月の間に固定屋根4を構成する鉄骨屋根建て方工事、可動レール躯体工事が行われる。
【0021】
まず、固定屋根4の支持部を構成する躯体工事と平行して固定屋根部工事のための仮設構台の組立がなされ、これが終ると固定屋根4の鉄骨建方工事が行われ、また、この工事進捗に伴い落下防止養生がなされる。
【0022】
鉄骨建方終了後仮設構台の撤去作業が行われ、落下養生のための中段サポートがセットされる。また、地表部では次工程における可動レール部のための支持地盤工事(外野側)、及び支持躯体11の工事(内野側)が行われる。
【0023】
この第一の工事終了後、1997年4月よりペナントレースが再開され、利用客は、左右両翼に位置する固定屋根4の下で安全にゲームを観戦することができ、フランチャイズ球場としての利用が可能となる。
【0024】
このペナントレース期間中には、可動屋根鉄骨建方工事及び、可動レール及び台車設置工事がなされる。
【0025】
まず固定屋根4を構成する鉄骨組上にはこれを構台として可動屋根5及び6を構成する鉄骨建方が行われる。これと平行して、内外野のレール支持躯体11及び地盤にはレール設置工事が行われる。可動屋根鉄骨が完成する毎にそれぞれのレールに台車がセットされ、サポート盛替えなどが行われる。勿論、この工事スケジュールはゲームスケジュールに合わせて行われ、ゲームのない日、時間帯を選んで工事を進捗させることができ、ペナントレースがほぼ完全に終了する11月の初旬には、可動屋根5,6を構成する鉄骨組は積層されている状態から移動可能な状態となる。
【0026】
ペナントレース終了後の第二回シーズンオフである11月翌年3月にかけてはまず上段の可動屋根鉄骨の上部に屋根膜を張設し、上段可動屋根6が完成すると、これを移動させて、中段可動屋根鉄骨表面を露出させて屋根膜を張設し、中段可動屋根5が完成すると、これを移動させて固定屋根鉄骨表面を露出させて屋根膜を張設して固定屋根4を完成させる。その後は、仕上げ工事及屋根駆動のためのシステム調整、確認を行い、竣工、引渡しを行う。従って4月のペナントレースが開催された時点では新装されたドーム屋根球場による開幕戦を楽しむことができる。
【0027】
図4、5及び図6は完成後の球場の形態変化を示すもので、晴天時などにおいては、図4及び図6に示すように、固定屋根4上に可動屋根5、6を設置したままの状態にすることにより、野球場の縦横前後面は全開状態となり、ゲーム内容を楽しみつつ野外に開放された風景を楽しむこともできる。
【0028】
また、雨天での試合や、ゲーム途中で降雨があった場合には、図5に示すように可動屋根5、6を順次旋回させ、可動屋根6同士を野球場1の上部中心線上に合致させることによって野球場1の全体を覆うことができる。
【0029】
なお、この可動屋根5、6の旋回中においては、外野側の地表に配置された可動屋根移動用レールの配置個所では旋回動作による入場者との思わぬ接触事故などを防止する必要がある。それ故、本発明では、図7に示すように、レール9を地盤E内に予め施工された地下連続壁20の上部であって、地下部に配置し、脚部7、8を移動可能に支持するとともに、固定時においては、地表部に配置された一対のブリッジ21で脚部7、8の周囲を通行できるようにしておき、移動動作時においては、ブリッジ21をはね上げる方式が採用される。このはね上げられたブリッジ21は野球場1に出入りする人々の通行止めとして安全性を十分に確保できる。
【0030】
なお、本発明は、既存の野球場のみでなく、サッカー場、陸上競技場その他スポーツ競技に使用する既存の屋外施設一般に適用できることは勿論である。
【0031】
【発明の効果】
以上の説明により明らかなように、本発明に係る既存屋外施設の移動式屋根の構造にあっては、一旦固定屋根が完成した後は、これを構台として順次その上部に可動屋根工事を実施できるため、仮設工事などによる施設の占有がなく、利用客に対する十分な安全を確保した上で工事を持続できる。また、可動屋根の脚部の固定時においては、ブリッジによって凹部の開口部を閉塞し、可動屋根の脚部の移動時においては、ブリッジによって凹部を囲っているので、屋外施設に出入りする人々の安全性を確保することができる。
【図面の簡単な説明】
【図1】本発明の構想を示す説明用姿図である。
【図2】同平面である。
【図3】本発明の施工手順の一例を示す工程説明図である。
【図4】同竣工状態における全開状態の平面図である。
【図5】同全閉状態の平面図である。
【図6】同全開状態における正面姿図である。
【図7】ガイドレール及びその支持構造を示す部分断面図である。
【符号の説明】
1 既存野球場
3、7、8 脚部
4 固定屋根
5、6 可動屋根
9、10 ガイドレール
[0001]
BACKGROUND OF THE INVENTION
The present invention is applied to an existing outdoor facility such as a baseball field stadium, and relates to a structure of a mobile roof of an existing outdoor facility capable of constructing a mobile roof without interrupting use of the facility.
[0002]
[Prior art]
Existing baseball stadiums, soccer stadiums, and other stadium facilities are generally outdoor facilities apart from things such as Korakuen Stadium and Fukuoka Dome Baseball Stadium. Suspension is likely to be greatly affected by facility utilization efficiency.
[0003]
Therefore, it has been proposed to renew such an existing outdoor stadium facility as a large-scale structure having an openable / closable roof structure. Note that the reason for the opening / closing type is that when the roof is opened, a feeling of opening, which is an advantage unique to a conventional outdoor facility, is obtained.
[0004]
However, in constructing a roof in this existing facility, various problems described below arise.
[0005]
[Problems to be solved by the invention]
First, the part where the roof is hung and the facility around the roof are construction areas, and the facility cannot be used during the construction period. In addition, temporary construction is considerably large because a very large roof is hung on a vast place.
[0006]
Furthermore, in order to make the roof movable, the construction period will be extended due to the complexity of the construction, the impact on the use of the facility will increase, and the use of the facility will be impossible for a period of time, so the construction work itself that causes it Is a negative factor.
[0007]
For example, in professional baseball, the pennant race is held from April to October in one year, and the off-season is from 11 to March, so the facility is used during this off-season (about 5 months). It is only necessary that the vehicle can be temporarily stopped and the work can be performed rapidly in the meantime.
[0008]
The present invention has been made in view of the above problems, and its purpose is to provide an existing outdoor facility capable of roofing construction throughout the year while sufficiently ensuring safety and comfort for users . It provides a mobile roof structure .
[0009]
[Means for Solving the Problems]
In order to achieve the above object, the present invention is arranged in a state of covering the upper parts of the left and right wings of the outdoor facility, and the leg portions provided at both ends are fixedly installed outside the outdoor facility with the outdoor facility sandwiched therebetween. A pair of fixed roofs, a supporting frame and a supporting ground installed on the outside of the outdoor facility with the outdoor facility sandwiched therebetween, a guide rail installed on an upper portion of the supporting frame, and the supporting ground. Guide rails installed in the recesses and laminated on the top of each fixed roof, roof membranes are stretched on the top, and legs provided at both ends can be moved to both guide rails The movable roof supported by the movable roof and the opening edge of the concave portion of the supporting ground, the opening of the concave portion is closed when the leg portion of the movable roof is fixed, and the concave portion is moved when the leg portion of the movable roof is moved. Enclosing bridge and Characterized in that it comprises.
[0010]
According to the structure of the movable roof of the existing outdoor facility according to the present invention, once the fixed roof is completed, the movable roof construction can be carried out sequentially on the upper part of the fixed roof, so there is no occupation of the facility due to the construction work, etc. The construction can be continued with sufficient safety for customers.
In addition, when fixing the leg of the movable roof, the opening of the recess is closed by a bridge, and when moving the leg of the movable roof, the bridge surrounds the recess, so that people entering and exiting outdoor facilities Safety can be ensured .
[0013]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings.
[0014]
1 to 7 show an embodiment of a movable roof structure of an existing outdoor facility according to the present invention . FIG. 1 is an explanatory view showing the concept of FIG. 1, and FIG. 2 is an explanatory plan view showing the concept. 3 is a process explanatory diagram showing an example of the construction procedure, FIG. 4 is a plan view of the fully opened state in the completed state, FIG. 5 is a plan view of the fully closed state in the completed state, and FIG. 6 is a front view in the fully opened state. 7 is a partial cross-sectional view showing the guide rail and its supporting structure.
That is, the structure of the mobile roof of the existing outdoor facilities, there is applied to an existing baseball field 1, the existing baseball field 1 is a renovation object is provided with a gate 2 to outfield center, in arrows As shown, the passenger who has passed through the gate 2 is a building that can move from the outfield seat side to the designated seat while walking along the slope that continues smoothly.
[0015]
A pair of fixed roofs 4 are arranged on the left and right wings of the baseball field 1 so as to extend to the outer field side and the inner field side, and a pair of leg parts 3 at both ends thereof are fixedly installed on the outer side part of the baseball field 1. On the roof 4, a middle movable roof 5 and an upper movable roof 6 having substantially the same area are arranged in a stacked state.
[0016]
And a pair of leg parts 7 and 8 of both sides of each movable roof 5 and 6 are on the guide rails 9 and 10 respectively provided in the support frame 11 arrange | positioned in the outer field side surface part outside the baseball field 1, and the inner field side outside. 1 by moving the movable roofs 5 and 6 along the guide rails 9 and 10 toward the center of the baseball field 1 from the state shown in FIG. As shown by a broken line, the entire upper part of the baseball field 1 can be covered.
[0017]
In the fully opened state, the upper part of the left and right wings of the baseball field 1 is basically covered by the area of the fixed roof 4, but basically enjoys a feeling of openness as an outdoor facility. Even in the fully closed state, as shown by the arrows, the outside scenery and nature can be fully seen from both the left and right wings. Moreover, the height of the leg part of each roof 4,5,6 is enough, and even if the whole baseball field 1 is covered, the surrounding prospects can be sufficiently secured.
[0018]
FIG. 3 is a process explanatory diagram showing an example of a construction procedure of the structure of the movable roof of the existing outdoor facility according to the present invention, and construction is sequentially performed from the left side as viewed in the figure.
[0019]
This construction schedule is linked to the professional baseball schedule. For example, assuming that construction starts in 1996, foundation work will be carried out during the second half of September and October during the opening of the Pennant Race. Construction that does not affect the facilities, preparation of various materials and equipment, and acquisition of construction permits.
[0020]
Next, during the first season off period, from November 1996 to March 1997, a steel roof construction method and a movable rail frame construction that constitute the fixed roof 4 are performed.
[0021]
First of all, a temporary gantry for the fixed roof part construction is assembled in parallel with the frame construction that constitutes the support part of the fixed roof 4, and then the steel frame construction work of the fixed roof 4 is performed. As the progress progresses, the fall prevention curing is made.
[0022]
After the construction of the steel frame is completed, the temporary gantry is removed, and the middle support for the drop curing is set. Further, in the ground part, support ground work (outer field side) for the movable rail part in the next process and construction of the support frame 11 (infield side) are performed.
[0023]
After the completion of this first construction, the Pennant race was resumed in April 1997, and users can safely watch the game under the fixed roof 4 located on the left and right wings, and can be used as a franchise stadium. It becomes possible.
[0024]
During this pennant race period, movable roof steel frame construction work and movable rail and cart installation work are performed.
[0025]
First, on the steel frame that constitutes the fixed roof 4, the steel frame construction that constitutes the movable roofs 5 and 6 is performed using this as a gantry. In parallel with this, rail installation work is performed on the rail support frame 11 and the ground in the inner and outer fields. Every time a movable roof steel frame is completed, a carriage is set on each rail, and support replacement is performed. Of course, this construction schedule is performed in accordance with the game schedule, and it is possible to select the day and time when there is no game and to proceed with the construction. At the beginning of November when the pennant race is almost complete, the movable roof 5 , 6 are movable from the stacked state.
[0026]
From the end of the second season after the end of the pennant race to November the following March, first, the roof membrane is stretched over the upper movable roof steel frame, and when the upper movable roof 6 is completed, it is moved to the middle When the movable roof steel frame surface is exposed and the roof membrane is stretched and the middle movable roof 5 is completed, the movable roof steel frame 5 is moved to expose the fixed roof steel frame surface and the roof membrane is stretched to complete the fixed roof 4. After that, the system will be adjusted and confirmed for finishing work and driving the roof, and completed and delivered. Therefore, when the Penang race in April is held, you can enjoy the opening game with the newly renovated dome roof stadium.
[0027]
4, 5 and 6 show changes in the shape of the stadium after completion. In a fine weather, the movable roofs 5 and 6 remain installed on the fixed roof 4 as shown in FIGS. 4 and 6. In this state, the vertical and horizontal front and back surfaces of the baseball field are fully opened, and the game can be enjoyed while enjoying the contents open to the outdoors.
[0028]
Also, in the event of a rainy game or rain during the game, the movable roofs 5 and 6 are sequentially turned as shown in FIG. 5 so that the movable roofs 6 coincide with each other on the upper center line of the baseball field 1. Thus, the entire baseball field 1 can be covered.
[0029]
While the movable roofs 5 and 6 are turning, it is necessary to prevent unexpected contact accidents with the visitors due to the turning operation at the place where the movable roof moving rails are arranged on the ground surface on the outfield side. Therefore, in this invention, as shown in FIG. 7, the rail 9 is the upper part of the underground continuous wall 20 previously constructed in the ground E, and it arrange | positions in an underground part, The leg parts 7 and 8 can be moved. In addition to supporting, when fixed, a pair of bridges 21 arranged on the ground surface can be passed around the legs 7 and 8, and when moving, the bridge 21 is lifted up. Is done. This raised bridge 21 can sufficiently secure safety as a closed road for people entering and leaving the baseball field 1.
[0030]
Of course, the present invention can be applied not only to existing baseball fields, but also to general outdoor facilities used for soccer fields, athletic fields, and other sports competitions.
[0031]
【The invention's effect】
As is clear from the above description, in the structure of the movable roof of the existing outdoor facility according to the present invention, once the fixed roof is completed, the movable roof construction can be sequentially performed on the upper part of the fixed roof. Therefore, there is no occupancy of facilities due to temporary construction, etc., and construction can be continued with sufficient safety for users. In addition, when fixing the leg of the movable roof, the opening of the recess is closed by a bridge, and when moving the leg of the movable roof, the bridge surrounds the recess, so that people entering and exiting outdoor facilities Safety can be ensured.
[Brief description of the drawings]
FIG. 1 is an explanatory view showing a concept of the present invention.
FIG. 2 is the same plane.
FIG. 3 is a process explanatory view showing an example of a construction procedure of the present invention.
FIG. 4 is a plan view of the fully opened state in the completed state.
FIG. 5 is a plan view of the fully closed state.
FIG. 6 is a front view in the fully opened state.
FIG. 7 is a partial cross-sectional view showing a guide rail and its support structure.
[Explanation of symbols]
1 Existing baseball field 3, 7, 8 Leg 4 Fixed roof 5, 6 Movable roof 9, 10 Guide rail

Claims (1)

屋外施設の左右両翼の上部を覆った状態で配置されるとともに、両端に設けられた脚部が前記屋外施設の外側に屋外施設を挟んで固定設置される一対の固定屋根と、
前記屋外施設の外側に前記屋外施設を挟んで設置される支持躯体及び支持地盤と、
前記支持躯体の上部に設置されるガイドレールと、前記支持地盤に設けられた凹部内に設置されるガイドレールと、
前記各固定屋根の上部に積層状態で配置されるとともに、上部に屋根膜が張設され、かつ両端に設けられた脚部が前記両ガイドレールに移動可能に支持される可動屋根と、
前記支持地盤の凹部の開口縁部に設置され、前記可動屋根の脚部の固定時には前記凹部の開口部を閉塞し、前記可動屋根の脚部の移動時には前記凹部を囲うブリッジとを備えていることを特徴とする既存屋外施設の移動式屋根の構造
A pair of fixed roofs that are arranged in a state of covering the upper parts of the left and right wings of the outdoor facility, and the leg portions provided at both ends are fixedly installed outside the outdoor facility with the outdoor facility sandwiched therebetween,
A support housing and a support ground installed across the outdoor facility outside the outdoor facility;
A guide rail installed at the top of the support housing, a guide rail installed in a recess provided in the support ground,
A movable roof that is arranged in a laminated state on each of the fixed roofs, has a roof membrane stretched on the upper part, and leg portions provided at both ends are supported movably on the both guide rails,
It is installed at the opening edge of the recess of the supporting ground, and includes a bridge that closes the opening of the recess when the leg of the movable roof is fixed and surrounds the recess when the leg of the movable roof moves. The structure of the movable roof of an existing outdoor facility characterized by that .
JP13908596A 1996-05-31 1996-05-31 Mobile roof structure of existing outdoor facilities Expired - Fee Related JP3772394B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP13908596A JP3772394B2 (en) 1996-05-31 1996-05-31 Mobile roof structure of existing outdoor facilities

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP13908596A JP3772394B2 (en) 1996-05-31 1996-05-31 Mobile roof structure of existing outdoor facilities

Publications (2)

Publication Number Publication Date
JPH09317204A JPH09317204A (en) 1997-12-09
JP3772394B2 true JP3772394B2 (en) 2006-05-10

Family

ID=15237145

Family Applications (1)

Application Number Title Priority Date Filing Date
JP13908596A Expired - Fee Related JP3772394B2 (en) 1996-05-31 1996-05-31 Mobile roof structure of existing outdoor facilities

Country Status (1)

Country Link
JP (1) JP3772394B2 (en)

Also Published As

Publication number Publication date
JPH09317204A (en) 1997-12-09

Similar Documents

Publication Publication Date Title
JPH04339945A (en) Openable roof structure
US6832452B1 (en) Mega pyramid stadium complex
JP3772394B2 (en) Mobile roof structure of existing outdoor facilities
RU122107U1 (en) MULTIFUNCTIONAL SPORTS COMPLEX FOR BEACH SPORTS ON HEATED SAND
JPH04323446A (en) Opening and closing type roof
JPH0285438A (en) Movable roof
JPH09228483A (en) Installation method of roof on structure and the structure
Gu Urban greenway landscape design research
JPH0327180Y2 (en)
JPH01146060A (en) Temporary roof for curing
JP3767045B2 (en) Crossing passage of support track on movable roof
Miller Structural roof systems for athletic stadia
Frazer Design considerations for retractable-roof stadia
JPH0814166B2 (en) Open / close roof stadium
JP2702553B2 (en) Retractable roof structure
JP2860376B2 (en) Retractable roof
JPH0788693B2 (en) Retractable roof
JP3377621B2 (en) Openable roof structure
JPS645143B2 (en)
JPH0640141U (en) Stadium with moving roof
JP2755264B2 (en) Roof structure
JPH0415852Y2 (en)
JP2934572B2 (en) Movable stand
JPH01223237A (en) Freely extensible roof structure
JP3085868B2 (en) Stadium

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20050819

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20050823

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20051013

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20060124

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20060206

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100224

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100224

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110224

Year of fee payment: 5

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110224

Year of fee payment: 5

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120224

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130224

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130224

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140224

Year of fee payment: 8

LAPS Cancellation because of no payment of annual fees