- Publication number
- JP3685769B2 JP3685769B2 JP2002112895A JP2002112895A JP3685769B2 JP 3685769 B2 JP3685769 B2 JP 3685769B2 JP 2002112895 A JP2002112895 A JP 2002112895A JP 2002112895 A JP2002112895 A JP 2002112895A JP 3685769 B2 JP3685769 B2 JP 3685769B2
- Authority
- JP
- Japan
- Prior art keywords
- steel sheet
- sheet pile
- joint
- wall portion
- wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
- Load-Engaging Elements For Cranes (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、鋼矢板用吊り具に関し、詳しくは、水や土壌などの仕切り壁を構成する鋼矢板の吊り上げ、引き起こし、運搬などに用いられる、鋼矢板用吊り具に関する。
【0002】
【従来の技術】
従来より、鋼矢板は、港湾、河川、山留、基礎などの各工事分野において、水や土壌の仕切り壁を構成するために用いられている。このような鋼矢板31は、たとえば、図12に示すように、長手方向に延びる板本体32の幅方向両側縁部に鉤状の継手部分33が形成されていることから、このような鋼矢板31を運搬するために、継手部分33を掴む専用の吊り具が、各種提案されている(たとえば、特開平9−194181号公報、特開平10−121499号公報など)。
【0003】
【発明が解決しようとする課題】
しかるに、鋼矢板31の継手部分33は、上記した図12に示すように、鉤状に形成されているため、この鉤状の継手部分33を確実に掴むために、吊り具には、継手部分33における掴む部分に対応した形状が必要とされる。
【0004】
一方、これらの吊り具は、いずれも、クレーンなどによって吊り上げるためのワイヤーロープの取付孔が1箇所しか形成されていないため、鋼矢板31を水平状態で吊り上げる場合と、鉛直状態で吊り上げる場合とでは、吊り具において、鋼矢板31の継手部分33を掴む方向を変更する必要がある。しかし、継手部分33を掴む方向を変更すると、継手部分33における掴む部分が変わってしまい、吊り上げ方法によっては、確実に掴むことができなという不具合がある。
【0005】
本発明は、このような不具合に鑑みなされたものであり、その目的とするところは、簡易な構成によって、鋼矢板の継手部分を確実に掴んだ状態で、種々の吊り上げ方法を実現することのできる、鋼矢板用吊り具を提供することにある。
【0006】
【課題を解決するための手段】
上記の目的を達成するため、請求項1に記載の発明は、鋼矢板の継手部分を掴む掴み部と、吊り部材を取り付けるための取付部とを備える鋼矢板用吊り具において、前記掴み部は、前記継手部分を挟んで対向可能な第1の壁部および第2の壁部と、前記第1の壁部および前記第2の壁部の一方側端部を連結する第3の壁部とを備え、前記取付部は、異なる方向から吊り上げることができるように、前記第1の壁部、前記第2の壁部および前記第3の壁部のうち、少なくとも2つの壁部に設けられ、前記第1の壁部または前記第2の壁部には、前記継手部分を押圧するための第1押圧手段が設けられ、前記第3の壁部には、前記継手部分を押圧するための第2押圧手段が設けられるとともに、前記第1の壁部または前記第2の壁部の他方側端部には、前記継手部分を係止するための係止部が設けられていることを特徴としている。
【0007】
このような構成によると、取付部が、異なる方向から吊り上げることができるように、掴み部における第1の壁部、第2の壁部および第3の壁部のうち、少なくとも2つの壁部に設けられているので、掴み部によって、一定方向から鋼矢板の継手部分を掴んだ状態で、複数の取付部のうちの任意の取付部に吊り部材を取り付けることにより、任意の方向に吊り上げることができる。そのため、継手部分を掴む方向を変更せずとも、種々の方向に吊り上げることができるので、掴み部を、一定方向から継手部分を確実に掴めるように、継手部分の掴む部分に対応する形状に形成して、一定方向からの確実な掴みを確保しつつ、掴み部における第1の壁部、第2の壁部および第3の壁部のうち、少なくとも2つの壁部に設けられた取付部によって、種々の吊り上げ方法に対応した吊り上げを実現することができる。
【0009】
また、鋼矢板の継手部分を、第3の壁部の反対側から、第1の壁部と第2の壁部との間に受け入れて、これら第1の壁部と第2の壁部との間で挟むことにより、掴み部によって掴むことができる。そのため、簡易な構成によって、鋼矢板の継手部分に対応した小型軽量の掴み部を形成することができ、作業性の向上を図ることができる。
【0011】
また、第1の壁部と第2の壁部との間で挟まれた継手部分を、第1押圧手段によって押圧して、掴み部に受け入れられた継手部分を、第1押圧手段が設けられている側と反対側の第1の壁部または第2の壁部に当接させることにより、継手部分を掴み部において固定することができる。さらに、第1の壁部と第2の壁部との間で挟まれた継手部分を、第2押圧手段によって押圧して、掴み部に受け入れられた継手部分を係止部に当接させることによって、継手部分を掴み部における固定位置に位置決めすることができる。そのため、掴み部による継手部分の確実な掴みを達成することができる。
【0014】
また、請求項2に記載の発明は、請求項1に記載の発明において、前記第1押圧手段が、歯付きボルトにより構成されていることを特徴としている。
【0015】
このような構成によると、第1押圧手段が、歯付きボルトにより構成されているので、第1の壁部と第2の壁部との間で挟まれた継手部分を、第1押圧手段によって押圧すれば、より一層強固に、継手部分を掴み部において固定することができる。
【0016】
【発明の実施の形態】
図1は、本発明の鋼矢板用吊り具の一実施形態を示す斜視図、図2は、図1に示す鋼矢板用吊り具の側断面図、図3は、鋼矢板用吊り具の取付状態を示す説明図である。以下、図1ないし図3を参照して、この実施形態の鋼矢板用吊り具1を説明する。なお、以下の説明において、特に言及のない限り、上下方向、内外方向(幅方向)および前後方向(長手方向)は、鋼矢板用吊り具1が継手部分33に取り付けられた状態(図3における取付状態)における鋼矢板31(水平状態)を基準としている。
【0017】
この鋼矢板用吊り具1は、たとえば、図12に示すような鋼矢板31を吊り上げるために用いられる。すなわち、この鋼矢板31は、図3に示すように、長手方向に延びる断面略コ字状(開口方向に広がる断面略コ字状)の板本体32と、その板本体32の幅方向両側縁部に形成される継手部分33とが一体的に形成されている。継手部分33は、略鉤状をなし、板本体32から屈曲形成される平坦部34と、平坦部34から下側に向かって略J字状に屈曲形成される鉤部35とが連続して形成されている。
【0018】
この鋼矢板用吊り具1は、図1および図2に示すように、吊り具本体2と、第1押圧手段としての縦ボルト3と、第2押圧手段としての横ボルト4とを備えている。
【0019】
吊り具本体2は、鋼矢板31の継手部分33を掴む掴み部5と、後述する吊り部材としてのカップリング17を取り付けるための複数の取付部6とが一体的に形成されている。
【0020】
掴み部5は、図2に示すように、断面略コ字状の厚板からなり、平面視略矩形厚板状の第1の壁部としての上壁部7と、底面視略矩形厚板状の第2の壁部としての下壁部8と、背面視略矩形厚板状の第3の壁部としての側壁部9とが一体的に形成されている。上壁部7と下壁部8とは、上下方向に所定の間隔(継手部分33を収容可能な間隔)を隔てて、互いに略平行状に延びるように対向配置されており、それら上壁部7および下壁部8の外側(一方側)端部が、それら上壁部7および下壁部8と略直交する方向に延びる側壁部9によって連結されている。また、下壁部8の内側(他方側)端部には、上側に向かって突出する係止部10が、下壁部8の幅方向(鋼矢板31を基準とする前後方向)すべてにわたって形成されている。また、この係止部10は、図4が参照されるように、重ねて載置される複数の鋼矢板31において、上側の鋼矢板31の継手部分33と下側の鋼矢板31の継手部分33との間の空間に、係止部10を挿入可能な程度の突出長さとして形成されている。
【0021】
これによって、掴み部5では、図3に示すように、上壁部7の下面と下壁部8の上面とが平行するように形成され、側壁部9の内側面がこれら上壁部7の下面と下壁部8の上面とから直角方向に形成され、これら上壁部7の下面、下壁部8の上面および側壁部9の内側面によって囲まれる側面視略矩形状の空間が、内側(側壁部9の反対側)が開放される継手部分33の収容空間11とされている。この収容空間11は、上下方向の長さ(上壁部7の下面から下壁部8の上面までの長さ)が、鋼矢板31の継手部分33の上下方向の長さ(継手部分33における平坦面34の上面から鉤部35の先端部までの長さ)よりも少し長く、かつ、内外方向の長さ(側壁部9の内側面から係止部10の内側面までの長さ)が、鋼矢板31の継手部分33の鉤部35の内外方向の長さ(鉤部35の基端部から先端部までの内外方向の長さ)よりも少し長くなるように形成されている。
【0022】
また、上壁部7には、図2に示すように、雌ねじ(図示せず)が形成される大径の上壁螺着孔12が、中央部からやや内側において、厚さ方向(上下方向)を貫通するように形成されている。また、側壁部9には、雌ねじ(図示せず)が形成される上壁螺着孔12よりもやや小径の側壁螺着孔13が、中央部からやや下側において、厚さ方向(内外方向)を貫通するように形成されている。
【0023】
また、下壁部8は、外側端部から内側端部に向かって次第に厚さが薄くなるように、その下面が傾斜(外側端部から内側端部に向かって上向きに傾斜)状に形成されている。なお、上壁部7および側壁部9は、下壁部8よりも厚い略同一の厚みとして形成されている。
【0024】
取付部6は、図1に示すように、上壁部7と下壁部8とにそれぞれ設けられている。上壁部7に設けられる取付部6(以下、第1取付部6aとする。)は、上壁部7の内側端部における幅方向(鋼矢板31を基準とする前後方向)中央部から、斜め内側上方に向かって略環状に膨出するように設けられており、カップリング17を挿通支持するための挿通孔14(第1挿通孔14a)が、第1取付部6aの幅方向(鋼矢板31を基準とする前後方向)を貫通するように形成されている。また、下壁部8に設けられる取付部6(以下、第2取付部6bとする。)は、下壁部8の外側端部における幅方向(鋼矢板31を基準とする前後方向)中央部から、斜め外側下方に向かって略環状に膨出するように設けられており、カップリング17を挿通支持するための挿通孔14(第2挿通孔14b)が、幅方向(鋼矢板31を基準とする前後方向)を貫通するように形成されている。そして、これら第1取付部6aおよび第2取付部6bは、図2に示すように、掴み部5において、上壁部7の内側端部と下壁部8の外側端部とにおいて対角に配置される。
【0025】
縦ボルト3は、図2に示すように、上壁螺着孔12に螺着可能な大径に形成され、その先端部に、縦ボルト3を鋼矢板31に食い込ますための鋭利な歯部15が形成されている歯付きボルトから構成されている。
【0026】
横ボルト4は、側壁螺着孔13に螺着可能な、縦ボルト3よりやや小径に形成されている。そして、縦ボルト3および横ボルト4は、それぞれ上壁螺着孔12および側壁螺着孔13に螺着された状態において、互いに直交する方向から鋼矢板31の継手部分33を押圧することができるように配置されている。
【0027】
そして、この鋼矢板用吊り具1は、たとえば、図3に示すように、鋼矢板1の板本体32の幅方向両側縁部に形成される各継手部分33にそれぞれ取り付けられ、各鋼矢板用吊り具1の第1取付部6aの第1挿通孔14aまたは第2取付部6bの第2挿通孔14bに、後述するチェーン16の一端部に取り付けられるカップリング17を挿通および係止させることにより、鋼矢板31を異なる方向から吊り上げることができる。
【0028】
次に、この鋼矢板用吊り具1を用いて、鋼矢板31を吊り上げる方法について説明する。
【0029】
まず、この鋼矢板用吊り具1を、重ねて載置されている鋼矢板31に取り付ける方法を、図4ないし図6を参照して説明する。
【0030】
鋼矢板用吊り具1を、重ねて載置されている鋼矢板31に取り付けるには、まず、図4に示すように、重ねて載置されている最上位の鋼矢板31の幅方向外側から、鋼矢板用吊り具1を、鋼矢板31の継手部分33に対して、側壁部9の反対側から上壁部7と下壁部8との間の収容空間11内に継手部分33が受け入れられるように挿入する。より具体的には、上壁部7の下面を、平坦部34の上面に対向させながら、係止部10を、最上位の鋼矢板31の継手部分33とその下の鋼矢板31の継手部分33との間の空間に挿入して、継手部分33を収容空間11内に収容した後に、図5に示すように、鉤部35の先端部を下壁部8の上面に当接させる。この時、下壁部8が、外側端部から内側端部に向かって次第に厚さが薄くなるように形成されていることから、係止部10を最上位の鋼矢板31の継手部分33とその下の鋼矢板31の継手部分33との間の空間に円滑に挿入することができる。
【0031】
次いで、図5に示すように、横ボルト4を螺進させて、鉤部35の基端部を横ボルト4の先端部で押圧して、図6に示すように、鉤部35の先端部を係止部10に当接させ、固定位置を位置決めする。その後、縦ボルト3を螺進させて、平坦部34を縦ボルト3の先端部で押圧して、鉤部35の先端部を下壁部8の上面に圧接させる。これによって、収容空間11に収容された継手部分33を、横ボルト4および縦ボルト3によって、掴み部5において確実に固定することができる。とりわけ、縦ボルト3が歯付きボルトによって構成されていることから、縦ボルト3の螺進により、歯部15が平坦部34にしっかりと食い込んで、継手部分33を掴み部5において強固に固定することができる。
【0032】
そして、たとえば、図7に示すように、鋼矢板31の板本体32の幅方向両側縁部に形成される各継手部分33における長手方向両端部に、このような方法により、2つの鋼矢板用吊り具1をそれぞれ対角状に取り付けて、各鋼矢板用吊り具1において、第1取付部6aの第1挿通孔14aにカップリング17を係止させ、そのカップリング17を、その他端部がリング部材18を介して吊り上げ装置(クレーンやチェーンブロックなど)のフック20に係止されるマスターリンク19に取り付けられているチェーン16の一端部に取り付けることにより、2つの鋼矢板用吊り具1によって、鋼矢板31を水平状態で吊り上げる、水平2点吊りを達成することができる。
【0033】
なお、同様に、たとえば、図8に示すように、鋼矢板31の各継手部分33における長手方向両端部に、4つの鋼矢板用吊り具1を、鋼矢板31の幅方向において各鋼矢板用吊り具1が対向するようにそれぞれ取り付けることにより、4つの鋼矢板用吊り具1によって、鋼矢板31を水平状態で吊り上げる、水平4点吊りを達成することができる。
【0034】
また、たとえば、図9に示すように、鋼矢板31の一方の継手部分33における長手方向両端部に、2つの鋼矢板用吊り具1を取り付けて、各鋼矢板用吊り具1において、第2取付部6bの第2挿通孔14bにカップリング17を係止させ、そのカップリング17に、上記と同様に、チェーン16を取り付けることにより、2つの鋼矢板用吊り具1によって、鋼矢板31を鉛直状態で吊り上げる、鉛直2点吊りを達成することができる。
【0035】
さらに、たとえば、図10に示すように、鋼矢板31の各継手部分33における長手方向一端部に、2つの鋼矢板用吊り具1を取り付けて、各鋼矢板用吊り具1において、第1取付部6aの第1挿通孔14aにカップリング17を係止させ、そのカップリング17に、上記と同様に、チェーン16を取り付けることにより、2つの鋼矢板用吊り具1によって、鋼矢板31の引き起しを達成することができる。
【0036】
このように、この鋼矢板用吊り具1では、異なる方向から吊り上げることができるように、掴み部5に2つの第1取付部6aおよび第2取付部6bが設けられているので、掴み部5の収容空間11を、上記したように、常に一定方向から鋼矢板31の継手部分33に挿入して、横ボルト4および縦ボルト3によって確実に固定した状態で、吊り上げ方法に応じて、適宜、第1取付部6aおよび第2取付部6bに、カップリング17を係止させて、任意の方向に吊り上げることができる。そのため、継手部分33を掴む方向を変更せずとも、種々の方向に吊り上げることができるので、掴み部5を、常に一定方向から継手部分33を確実に掴めるように、継手部分33の掴む部分に対応する最適の形状に形成して、一定方向からの挿入と、縦ボルト3および横ボルト4の締め付けによる簡易な取付作業のみによって、確実な掴みを確保しつつ、第1取付部6aおよび第2取付部6bによって、たとえば、上記したような、水平吊り、鉛直吊り、引き起しなどの種々の吊り上げ方法に対応した吊り上げを実現することができる。
【0037】
また、掴み部本体2が、断面略コ字状の掴み部5および2つの取付部6から小型軽量に形成されているので、作業性の向上を図ることができる。
【0038】
なお、上記の実施形態において、縦ボルト3を、たとえば、図11に示すように、雄ねじが形成されるボルトの先端部に、基端部に向かって窪む側断面矩形状の凹部21を形成するとともに、その凹部21に、歯部材25を、ピン22を介して周方向に回転可能に取り付けてもよい。より具体的には、歯部材25は、先端部に鋭利な歯部23と、基端部に膨出状の頭部24とが形成されるととも、その軸方向途中にピン22を受け入れるくびれ部分が形成されており、凹部21に受け入れられた状態で、くびれ部分にピン22が挿入されることにより、縦ボルト3の先端部に、周方向に回転可能に取り付けられている。これによって、横ボルト3を螺進させても、歯部材25を供回りさせずに、歯部23を継手部分33の平坦部34に確実に食い込ますことができる。なお、ピン22に代えて、剛球を用い、凹部21に剛球を介して歯部材25を周方向に回転可能に取り付けてもよい。
【0039】
なお、上記の実施形態では、吊り上げ作業において、各取付部6にカップリング17を係止させたが、本発明の吊り部材としては、これに限定されず、たとえば、シャックルなどの公知の吊り部材を係止させることができ、また、吊り部材としてチェーン16を直接係止させてもよく、さらには、チェーン16に代えてワイヤーロープや繊維ロープを用いて、これらワイヤーロープや繊維ロープを直接係止させてもよい。
【0040】
また、上記の実施形態においては、鋼矢板31の鉤状の継手部分33に対応させて、掴み部5を、断面略コ字状に形成したが、掴み部5は、鋼矢板31の継手部分33の形状に対応させて形成すれば、特に断面略コ字状に限定されることはなく、適宜の形状および構造(たとえば、挟持状に揺動させるなど)を採用することができる。
【0041】
また、複数の取付部6を、上壁部7、下壁部8および側壁部9のどの部分に設けるかも、その目的および用途によって適宜決定することができ、また、2つ以上であれば、たとえば、3つあるいは4つ設けてもよい。
【0042】
また、縦ボルト3を下壁部8に螺着させ、上壁部7に係止部10を形成してもよく、また、横ボルト4も、縦ボルト3と同様に歯付きボルトから構成してもよい。
【0043】
【発明の効果】
以上述べたように、請求項1に記載の発明によれば、掴み部における一定方向からの確実な掴みを確保しつつ、複数の取付部によって、種々の吊り上げ方法に対応した吊り上げを実現することができる。
【0044】
また、簡易な構成によって、鋼矢板の継手部分に対応した小型軽量の掴み部を形成することができ、作業性の向上を図ることができる。
【0045】
また、掴み部による継手部分の確実な掴みを達成することができる。
【0047】
請求項2に記載の発明によれば、より一層強固に、継手部分を掴み部において固定することができる。
【図面の簡単な説明】
【図1】本発明の鋼矢板用吊り具の一実施形態を示す斜視図である。
【図2】図1に示す鋼矢板用吊り具の側断面図である。
【図3】鋼矢板用吊り具の取付状態を示す説明図である。
【図4】図1に示す鋼矢板用吊り具の取付状態(鋼矢板用吊り具を継手部分に挿入する状態)を示す説明図である。
【図5】図1に示す鋼矢板用吊り具の取付状態(鋼矢板用吊り具を継手部分に固定する動作状態)を示す説明図である。
【図6】図1に示す鋼矢板用吊り具の取付状態(鋼矢板用吊り具を継手部分に固定した状態)を示す説明図である。
【図7】図1に示す鋼矢板用吊り具によって鋼矢板を吊り上げる状態(水平2点吊り)を示す説明図である。
【図8】図1に示す鋼矢板用吊り具によって鋼矢板を吊り上げる状態(水平4点吊り)を示す説明図である。
【図9】図1に示す鋼矢板用吊り具によって鋼矢板を吊り上げる状態(鉛直2点吊り)を示す説明図である。
【図10】図1に示す鋼矢板用吊り具によって鋼矢板を吊り上げる状態(引き起し)を示す説明図である。
【図11】縦ボルトの他の実施形態を示す部分断面図である。
【図12】施工された鋼矢板を示す斜視図である。
【符号の説明】
1 鋼矢板用吊り具
3 縦ボルト
4 横ボルト
5 掴み部
6 取付部
7 上壁部
8 下壁部
9 側壁部
10 係止部
31 鋼矢板
33 継手部分[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a steel sheet pile hanger, and more particularly to a steel sheet pile hanger used for lifting, raising, transporting, and the like of steel sheet piles that constitute partition walls such as water and soil.
[0002]
[Prior art]
Conventionally, steel sheet piles have been used to form partition walls for water and soil in construction fields such as harbors, rivers, mountains, and foundations. For example, as shown in FIG. 12, the
[0003]
[Problems to be solved by the invention]
However, since the
[0004]
On the other hand, since all of these lifting implements have only one wire rope attachment hole for lifting by a crane or the like, in the case of lifting the
[0005]
The present invention has been made in view of such problems, and the object of the present invention is to realize various lifting methods with a simple configuration while securely grasping the joint portion of the steel sheet pile. It is possible to provide a steel sheet pile suspension.
[0006]
[Means for Solving the Problems]
To achieve the above object, the invention according to
[0007]
According to such a configuration , at least two of the first wall portion, the second wall portion, and the third wall portion of the grip portion are attached to the attachment portion so that the attachment portion can be lifted from different directions. Since it is provided, it can be lifted in any direction by attaching a suspension member to any attachment part of the plurality of attachment parts in a state where the joint part of the steel sheet pile is grasped from a certain direction by the grasping part. it can. Therefore, it can be lifted in various directions without changing the direction of gripping the joint part, so the gripping part is formed in a shape corresponding to the part of the joint part so that the joint part can be securely gripped from a certain direction. Then, while securing a reliable grip from a certain direction , the mounting portion provided on at least two of the first wall portion, the second wall portion, and the third wall portion in the grip portion. Thus, lifting corresponding to various lifting methods can be realized.
[0009]
Moreover , the joint part of a steel sheet pile is received between the 1st wall part and the 2nd wall part from the other side of a 3rd wall part, These 1st wall part and 2nd wall part, Can be gripped by the gripping part. Therefore, with a simple configuration, a small and lightweight grip portion corresponding to the joint portion of the steel sheet pile can be formed, and workability can be improved.
[0011]
Further , the joint portion sandwiched between the first wall portion and the second wall portion is pressed by the first pressing means, and the joint portion received by the grip portion is provided with the first pressing means. The joint portion can be fixed at the grip portion by contacting the first wall portion or the second wall portion on the opposite side to the side being provided. Furthermore, the joint portion sandwiched between the first wall portion and the second wall portion is pressed by the second pressing means, and the joint portion received by the grip portion is brought into contact with the locking portion. Thus, the joint portion can be positioned at a fixed position in the grip portion. Therefore, it is possible to achieve a reliable gripping of the joint portion by the gripping portion.
[0014]
The invention described in
[0015]
According to such a structure, since the 1st press means is comprised by the toothed bolt, the joint part pinched | interposed between the 1st wall part and the 2nd wall part is used by the 1st press means. If pressed, the joint portion can be more firmly fixed at the grip portion.
[0016]
DETAILED DESCRIPTION OF THE INVENTION
1 is a perspective view showing an embodiment of a steel sheet pile hanger according to the present invention, FIG. 2 is a side sectional view of the steel sheet pile hanger shown in FIG. 1, and FIG. 3 is an attachment of a steel sheet pile hanger. It is explanatory drawing which shows a state. Hereinafter, with reference to FIG. 1 thru | or FIG. 3, the
[0017]
This steel
[0018]
As shown in FIGS. 1 and 2, the steel
[0019]
In the
[0020]
As shown in FIG. 2, the
[0021]
As a result, the
[0022]
Further, as shown in FIG. 2, the
[0023]
Further, the
[0024]
As shown in FIG. 1, the
[0025]
As shown in FIG. 2, the
[0026]
The horizontal bolt 4 is formed in a slightly smaller diameter than the
[0027]
And this steel sheet
[0028]
Next, a method for lifting the
[0029]
First, a method of attaching the steel
[0030]
In order to attach the steel
[0031]
Next, as shown in FIG. 5, the horizontal bolt 4 is screwed and the proximal end portion of the
[0032]
And for example, as shown in FIG. 7, it is for two steel sheet piles by such a method in the longitudinal direction both ends in each
[0033]
Similarly, for example, as shown in FIG. 8, four steel
[0034]
Moreover, for example, as shown in FIG. 9, two steel
[0035]
Furthermore, for example, as shown in FIG. 10, two steel
[0036]
Thus, in this steel
[0037]
Moreover, since the grip part
[0038]
In the above-described embodiment, for example, as shown in FIG. 11, the
[0039]
In the above embodiment, the
[0040]
Moreover, in said embodiment, although the
[0041]
Further, which part of the
[0042]
Further, the
[0043]
【The invention's effect】
As described above, according to the invention described in
[0044]
In addition , with a simple configuration, a small and lightweight grip portion corresponding to the joint portion of the steel sheet pile can be formed, and workability can be improved.
[0045]
In addition , it is possible to achieve a reliable gripping of the joint portion by the gripping portion.
[0047]
According to invention of
[Brief description of the drawings]
FIG. 1 is a perspective view showing an embodiment of a steel sheet pile suspension according to the present invention.
FIG. 2 is a side sectional view of the steel sheet pile hanger shown in FIG.
FIG. 3 is an explanatory view showing a mounting state of a steel sheet pile hanger.
4 is an explanatory view showing a mounting state of the steel sheet pile suspension shown in FIG. 1 (state in which the steel sheet pile suspension is inserted into the joint portion). FIG.
FIG. 5 is an explanatory view showing an attachment state of the steel sheet pile suspension shown in FIG. 1 (an operation state in which the steel sheet pile suspension is fixed to the joint portion).
6 is an explanatory view showing an attachment state of the steel sheet pile suspension shown in FIG. 1 (a state where the steel sheet pile suspension is fixed to a joint portion). FIG.
FIG. 7 is an explanatory view showing a state in which the steel sheet pile is lifted by the steel sheet pile suspension shown in FIG. 1 (horizontal two-point suspension).
FIG. 8 is an explanatory view showing a state in which the steel sheet pile is suspended by the steel sheet pile suspension shown in FIG. 1 (horizontal four-point suspension).
FIG. 9 is an explanatory view showing a state in which the steel sheet pile is lifted by the steel sheet pile lifting tool shown in FIG. 1 (vertical two-point suspension).
10 is an explanatory view showing a state (lifting) of a steel sheet pile suspended by the steel sheet pile suspension shown in FIG.
FIG. 11 is a partial cross-sectional view showing another embodiment of a vertical bolt.
FIG. 12 is a perspective view showing a constructed steel sheet pile.
[Explanation of symbols]
DESCRIPTION OF
Claims (2)
前記掴み部は、前記継手部分を挟んで対向可能な第1の壁部および第2の壁部と、前記第1の壁部および前記第2の壁部の一方側端部を連結する第3の壁部とを備え、
前記取付部は、異なる方向から吊り上げることができるように、前記第1の壁部、前記第2の壁部および前記第3の壁部のうち、少なくとも2つの壁部に設けられ、
前記第1の壁部または前記第2の壁部には、前記継手部分を押圧するための第1押圧手段が設けられ、
前記第3の壁部には、前記継手部分を押圧するための第2押圧手段が設けられるとともに、前記第1の壁部または前記第2の壁部の他方側端部には、前記継手部分を係止するための係止部が設けられていることを特徴とする、鋼矢板用吊り具。In a steel sheet pile suspension comprising a grip portion for gripping a joint portion of a steel sheet pile and an attachment portion for attaching a suspension member,
The grip portion connects a first wall portion and a second wall portion that can be opposed to each other with the joint portion interposed therebetween, and a third end portion that connects one end portion of the first wall portion and the second wall portion. The wall and
The attachment portion is provided on at least two wall portions of the first wall portion, the second wall portion, and the third wall portion so that the attachment portion can be lifted from different directions ,
The first wall part or the second wall part is provided with a first pressing means for pressing the joint part,
The third wall portion is provided with a second pressing means for pressing the joint portion, and the joint portion is provided at the other end portion of the first wall portion or the second wall portion. A steel sheet pile hanger characterized in that a locking portion for locking the steel sheet pile is provided .
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2002112895A JP3685769B2 (en) | 2002-04-16 | 2002-04-16 | Steel sheet pile suspension |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2002112895A JP3685769B2 (en) | 2002-04-16 | 2002-04-16 | Steel sheet pile suspension |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2003306290A JP2003306290A (en) | 2003-10-28 |
JP3685769B2 true JP3685769B2 (en) | 2005-08-24 |
Family
ID=29395231
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2002112895A Expired - Fee Related JP3685769B2 (en) | 2002-04-16 | 2002-04-16 | Steel sheet pile suspension |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP3685769B2 (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP7278071B2 (en) * | 2018-12-26 | 2023-05-19 | 大和ハウス工業株式会社 | Fittings hanger and fitting method |
CN110778129A (en) * | 2019-09-25 | 2020-02-11 | 中国二十冶集团有限公司 | H-shaped steel clamping and hoisting device and H-shaped steel hoisting method |
JP7084668B1 (en) | 2022-01-12 | 2022-06-15 | 株式会社小澤土木 | Construction processing method of steel sheet pile |
CN114559079B (en) * | 2022-04-29 | 2022-07-26 | 山东磁浮列车轨道工程有限公司 | Surface machining equipment and method for 9Ni steel cast blank for floor boring |
-
2002
- 2002-04-16 JP JP2002112895A patent/JP3685769B2/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
JP2003306290A (en) | 2003-10-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US5245730A (en) | Rope connector having quick engaging and releasing means | |
JP3685769B2 (en) | Steel sheet pile suspension | |
JP4274991B2 (en) | Hanging jig | |
CN213233970U (en) | Suspended ceiling | |
AU1217097A (en) | Hoisting link device | |
GB2379478A (en) | Coupling self-locking hook | |
JPH0120378Y2 (en) | ||
JP3118799U (en) | Block hanger | |
JPH0344783Y2 (en) | ||
JP2004269255A (en) | Hoisting tool and take up apparatus | |
JP5716952B2 (en) | Tie fastener | |
BRPI1000340A2 (en) | method and hook adapter for submarine transfer | |
JP7373812B2 (en) | sling | |
JP3722585B2 (en) | Wire socket | |
JPS6342230Y2 (en) | ||
JP2569534Y2 (en) | Pinch hanger | |
JP3001773U (en) | Cable connection | |
JP2002265166A (en) | Adjustment jig for elevator main rope end | |
JPH0215909Y2 (en) | ||
JPH0734757Y2 (en) | Hangaiya locking device | |
JP3016045U (en) | Connector | |
JP2002013184A (en) | Hoisting accessory for u-shaped block | |
JP2007170055A (en) | Connector for concrete block | |
KR200248343Y1 (en) | clamp | |
JPH0723779U (en) | U-shaped block hanging |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20050120 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20050201 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20050329 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20050517 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20050531 |
|
R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080610 Year of fee payment: 3 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090610 Year of fee payment: 4 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090610 Year of fee payment: 4 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100610 Year of fee payment: 5 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100610 Year of fee payment: 5 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110610 Year of fee payment: 6 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110610 Year of fee payment: 6 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120610 Year of fee payment: 7 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120610 Year of fee payment: 7 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130610 Year of fee payment: 8 |
|
LAPS | Cancellation because of no payment of annual fees |