JP2003306290A - Sling for steel sheet pile - Google Patents

Sling for steel sheet pile

Info

Publication number
JP2003306290A
JP2003306290A JP2002112895A JP2002112895A JP2003306290A JP 2003306290 A JP2003306290 A JP 2003306290A JP 2002112895 A JP2002112895 A JP 2002112895A JP 2002112895 A JP2002112895 A JP 2002112895A JP 2003306290 A JP2003306290 A JP 2003306290A
Authority
JP
Japan
Prior art keywords
steel sheet
sheet pile
wall portion
joint portion
joint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2002112895A
Other languages
Japanese (ja)
Other versions
JP3685769B2 (en
Inventor
Yasuo Wada
保雄 和田
Takaaki Shibamoto
高明 芝本
Shuji Ota
修二 太田
Hajime Doi
元 土井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Elephant Chain Block Co Ltd
Original Assignee
Elephant Chain Block Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Elephant Chain Block Co Ltd filed Critical Elephant Chain Block Co Ltd
Priority to JP2002112895A priority Critical patent/JP3685769B2/en
Publication of JP2003306290A publication Critical patent/JP2003306290A/en
Application granted granted Critical
Publication of JP3685769B2 publication Critical patent/JP3685769B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Load-Engaging Elements For Cranes (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a sling for a steel sheet pile capable of realizing various lifting methods in a state of surely grasping the joint portion of the steel sheet pile by a simple structure. <P>SOLUTION: This sling for a steel sheet pile comprises a sling body 2 formed integrally of upper wall part 7 and a lower wall part 8 extending generally parallel with each other, a grasp part 5 formed in a generally channel shape in cross section from a side wall part 9 connecting the outer end parts thereof, a first mounting part 6a swelled from the upper wall part 7 aslant toward the inner upper side thereof, and a second mounting part 6b swelled from the lower wall part 8 aslant toward the outer lower side thereof. A vertical bolt 3 formed of a toothed bolt is screwed into the upper wall part 7, and a lateral bolt 4 is screwed into the lower wall part 8. Thus, since the grasp part 5 is fixed to a joint portion 33 with the vertical bolt 3 and the lateral bolt 4 and, as necessary, a coupling 17 is locked to the first mounting part 6a or the second mounting part 6b, the sling can be lifted in various directions without changing the direction for grasping the joint portion 33. <P>COPYRIGHT: (C)2004,JPO

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、鋼矢板用吊り具に
関し、詳しくは、水や土壌などの仕切り壁を構成する鋼
矢板の吊り上げ、引き起こし、運搬などに用いられる、
鋼矢板用吊り具に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a steel sheet pile suspender, and more specifically, it is used for lifting, raising, and transporting steel sheet piles constituting a partition wall such as water and soil.
A suspension for steel sheet piles.

【0002】[0002]

【従来の技術】従来より、鋼矢板は、港湾、河川、山
留、基礎などの各工事分野において、水や土壌の仕切り
壁を構成するために用いられている。このような鋼矢板
31は、たとえば、図12に示すように、長手方向に延
びる板本体32の幅方向両側縁部に鉤状の継手部分33
が形成されていることから、このような鋼矢板31を運
搬するために、継手部分33を掴む専用の吊り具が、各
種提案されている(たとえば、特開平9−194181
号公報、特開平10−121499号公報など)。
2. Description of the Related Art Conventionally, steel sheet piles have been used to construct a partition wall for water or soil in each construction field such as a harbor, a river, a mountain retention, and a foundation. Such a steel sheet pile 31, for example, as shown in FIG. 12, has hook-shaped joint portions 33 on both side edges in the width direction of a plate body 32 extending in the longitudinal direction.
Therefore, in order to carry such a steel sheet pile 31, various kinds of dedicated suspending tools for gripping the joint portion 33 have been proposed (for example, JP-A-9-194181).
Japanese Patent Laid-Open No. 10-121499, etc.).

【0003】[0003]

【発明が解決しようとする課題】しかるに、鋼矢板31
の継手部分33は、上記した図12に示すように、鉤状
に形成されているため、この鉤状の継手部分33を確実
に掴むために、吊り具には、継手部分33における掴む
部分に対応した形状が必要とされる。
However, the steel sheet pile 31 is used.
As shown in FIG. 12 above, the joint portion 33 of No. 1 is formed in a hook shape. Therefore, in order to securely grasp this hook-shaped joint portion 33, the suspender is provided with a portion to be grasped in the joint portion 33. Corresponding shapes are required.

【0004】一方、これらの吊り具は、いずれも、クレ
ーンなどによって吊り上げるためのワイヤーロープの取
付孔が1箇所しか形成されていないため、鋼矢板31を
水平状態で吊り上げる場合と、鉛直状態で吊り上げる場
合とでは、吊り具において、鋼矢板31の継手部分33
を掴む方向を変更する必要がある。しかし、継手部分3
3を掴む方向を変更すると、継手部分33における掴む
部分が変わってしまい、吊り上げ方法によっては、確実
に掴むことができなという不具合がある。
On the other hand, in each of these hoists, since only one mounting hole for the wire rope for hoisting by a crane is formed, the steel sheet pile 31 is hoisted horizontally and vertically. In some cases, in the hanger, the joint portion 33 of the steel sheet pile 31 is used.
It is necessary to change the direction to grab. However, joint part 3
If the direction of gripping 3 is changed, the gripped portion of the joint portion 33 changes, and depending on the hoisting method, there is a problem in that it cannot be gripped reliably.

【0005】本発明は、このような不具合に鑑みなされ
たものであり、その目的とするところは、簡易な構成に
よって、鋼矢板の継手部分を確実に掴んだ状態で、種々
の吊り上げ方法を実現することのできる、鋼矢板用吊り
具を提供することにある。
The present invention has been made in view of the above problems, and an object of the present invention is to realize various lifting methods with a simple structure while securely gripping a joint portion of a steel sheet pile. The purpose of the present invention is to provide a hanging tool for steel sheet piles.

【0006】[0006]

【課題を解決するための手段】上記の目的を達成するた
め、請求項1に記載の発明は、鋼矢板の継手部分を掴む
掴み部と、吊り部材を取り付けるための取付部とを備え
る鋼矢板用吊り具において、前記取付部は、異なる方向
から吊り上げることができるように、前記掴み部に複数
設けられていることを特徴としている。
To achieve the above object, the invention as set forth in claim 1 is provided with a steel sheet pile having a grip portion for gripping a joint portion of the steel sheet pile and a mounting portion for mounting a hanging member. The hanging device is characterized in that a plurality of the attaching portions are provided on the gripping portion so that the attaching portion can be lifted from different directions.

【0007】このような構成によると、取付部が、異な
る方向から吊り上げることができるように掴み部に複数
設けられているので、掴み部によって、一定方向から鋼
矢板の継手部分を掴んだ状態で、複数の取付部のうちの
任意の取付部に吊り部材を取り付けることにより、任意
の方向に吊り上げることができる。そのため、継手部分
を掴む方向を変更せずとも、種々の方向に吊り上げるこ
とができるので、掴み部を、一定方向から継手部分を確
実に掴めるように、継手部分の掴む部分に対応する形状
に形成して、一定方向からの確実な掴みを確保しつつ、
複数の取付部によって、種々の吊り上げ方法に対応した
吊り上げを実現することができる。
According to this structure, since the plurality of mounting portions are provided in the gripping portion so that the mounting portions can be lifted from different directions, the gripping portion can grip the joint portion of the steel sheet pile from a certain direction. It is possible to lift in any direction by attaching the suspending member to any attaching portion of the plurality of attaching portions. Therefore, it is possible to lift in various directions without changing the gripping direction of the joint part, so that the gripping part is formed in a shape corresponding to the gripping part of the joint part so that the joint part can be reliably gripped from a certain direction. And while securing a certain grip from a certain direction,
By using the plurality of mounting portions, it is possible to realize hoisting corresponding to various hoisting methods.

【0008】また、請求項2に記載の発明は、請求項1
に記載の発明において、前記掴み部は、前記継手部分を
挟んで対向可能な第1の壁部および第2の壁部と、前記
第1の壁部および前記第2の壁部の一方側端部を連結す
る第3の壁部とを備え、前記取付部は、前記第1の壁
部、前記第2の壁部および前記第3の壁部のうち、少な
くとも2つの壁部に設けられていることを特徴としてい
る。
The invention described in claim 2 is the same as claim 1.
In the invention according to claim 1, the gripping portion includes a first wall portion and a second wall portion that are opposed to each other with the joint portion interposed therebetween, and one end of the first wall portion and the second wall portion. A third wall part connecting the parts, and the mounting part is provided on at least two wall parts of the first wall part, the second wall part, and the third wall part. It is characterized by being.

【0009】このような構成によると、鋼矢板の継手部
分を、第3の壁部の反対側から、第1の壁部と第2の壁
部との間に受け入れて、これら第1の壁部と第2の壁部
との間で挟むことにより、掴み部によって掴むことがで
きる。そのため、簡易な構成によって、鋼矢板の継手部
分に対応した小型軽量の掴み部を形成することができ、
作業性の向上を図ることができる。
According to this structure, the joint portion of the steel sheet pile is received from the opposite side of the third wall portion between the first wall portion and the second wall portion, and these first wall portions are received. By being sandwiched between the part and the second wall part, it can be gripped by the grip part. Therefore, with a simple configuration, it is possible to form a small and lightweight grip portion corresponding to the joint portion of the steel sheet pile,
Workability can be improved.

【0010】また、請求項3に記載の発明は、請求項2
に記載の発明において、前記第1の壁部または前記第2
の壁部には、前記継手部分を押圧するための第1押圧手
段が設けられていることを特徴としている。
Further, the invention according to claim 3 is the same as claim 2
In the invention described in [1], the first wall portion or the second wall portion.
The wall portion is provided with a first pressing means for pressing the joint portion.

【0011】このような構成によると、第1の壁部と第
2の壁部との間で挟まれた継手部分を、第1押圧手段に
よって押圧して、掴み部に受け入れられた継手部分を、
第1押圧手段が設けられている側と反対側の第1の壁部
または第2の壁部に当接させることにより、継手部分を
掴み部において固定することができる。そのため、掴み
部による継手部分の確実な掴みを達成することができ
る。
According to this structure, the joint portion sandwiched between the first wall portion and the second wall portion is pressed by the first pressing means so that the joint portion received by the grip portion is pressed. ,
The joint portion can be fixed at the grip portion by contacting the first wall portion or the second wall portion on the side opposite to the side on which the first pressing means is provided. Therefore, the reliable gripping of the joint portion by the gripping portion can be achieved.

【0012】また、請求項4に記載の発明は、請求項2
または3に記載の発明において、前記第3の壁部には、
前記継手部分を押圧するための第2押圧手段が設けられ
るとともに、前記第1の壁部または前記第2の壁部の他
方側端部には、前記継手部分を係止するための係止部が
設けられていることを特徴としている。
The invention according to claim 4 is the same as that of claim 2
Alternatively, in the invention described in 3, the third wall portion includes:
Second pressing means for pressing the joint portion is provided, and a locking portion for locking the joint portion is provided at the other end of the first wall portion or the second wall portion. Is provided.

【0013】このような構成によると、第1の壁部と第
2の壁部との間で挟まれた継手部分を、第2押圧手段に
よって押圧して、掴み部に受け入れられた継手部分を係
止部に当接させることによって、継手部分を掴み部にお
ける固定位置に位置決めすることができる。そのため、
掴み部による継手部分のより確実な掴みを達成すること
ができる。
According to this structure, the joint portion sandwiched between the first wall portion and the second wall portion is pressed by the second pressing means, and the joint portion received by the grip portion is pressed. By abutting on the locking portion, the joint portion can be positioned at the fixed position in the grip portion. for that reason,
A more reliable grip of the joint portion by the grip can be achieved.

【0014】また、請求項5に記載の発明は、請求項3
または4に記載の発明において、前記第1押圧手段が、
歯付きボルトにより構成されていることを特徴としてい
る。
The invention described in claim 5 is the same as claim 3
Alternatively, in the invention described in 4, the first pressing means is
It is characterized by being composed of toothed bolts.

【0015】このような構成によると、第1押圧手段
が、歯付きボルトにより構成されているので、第1の壁
部と第2の壁部との間で挟まれた継手部分を、第1押圧
手段によって押圧すれば、より一層強固に、継手部分を
掴み部において固定することができる。
According to this structure, since the first pressing means is composed of the toothed bolt, the joint portion sandwiched between the first wall portion and the second wall portion is By pressing with the pressing means, the joint portion can be more firmly fixed at the grip portion.

【0016】[0016]

【発明の実施の形態】図1は、本発明の鋼矢板用吊り具
の一実施形態を示す斜視図、図2は、図1に示す鋼矢板
用吊り具の側断面図、図3は、鋼矢板用吊り具の取付状
態を示す説明図である。以下、図1ないし図3を参照し
て、この実施形態の鋼矢板用吊り具1を説明する。な
お、以下の説明において、特に言及のない限り、上下方
向、内外方向(幅方向)および前後方向(長手方向)
は、鋼矢板用吊り具1が継手部分33に取り付けられた
状態(図3における取付状態)における鋼矢板31(水
平状態)を基準としている。
1 is a perspective view showing an embodiment of a steel sheet pile hanger of the present invention, FIG. 2 is a side sectional view of the steel sheet pile hanger shown in FIG. 1, and FIG. It is explanatory drawing which shows the attachment state of the hanging tool for steel sheet piles. The steel sheet pile hanger 1 of this embodiment will be described below with reference to FIGS. 1 to 3. In the following description, unless otherwise specified, the vertical direction, the inner / outer direction (width direction), and the front-back direction (longitudinal direction).
Is based on the steel sheet pile 31 (horizontal state) when the steel sheet pile hanger 1 is attached to the joint portion 33 (attached state in FIG. 3).

【0017】この鋼矢板用吊り具1は、たとえば、図1
2に示すような鋼矢板31を吊り上げるために用いられ
る。すなわち、この鋼矢板31は、図3に示すように、
長手方向に延びる断面略コ字状(開口方向に広がる断面
略コ字状)の板本体32と、その板本体32の幅方向両
側縁部に形成される継手部分33とが一体的に形成され
ている。継手部分33は、略鉤状をなし、板本体32か
ら屈曲形成される平坦部34と、平坦部34から下側に
向かって略J字状に屈曲形成される鉤部35とが連続し
て形成されている。
This steel sheet pile hanger 1 is shown in FIG.
It is used to lift up the steel sheet pile 31 as shown in FIG. That is, the steel sheet pile 31, as shown in FIG.
A plate main body 32 having a substantially U-shaped cross section extending in the longitudinal direction (a substantially U-shaped cross section extending in the opening direction) and joint portions 33 formed at both side edges of the plate main body 32 in the width direction are integrally formed. ing. The joint portion 33 has a substantially hook shape, and a flat portion 34 that is bent and formed from the plate body 32 and a hook portion 35 that is bent and formed in a substantially J shape downward from the flat portion 34 are continuous. Has been formed.

【0018】この鋼矢板用吊り具1は、図1および図2
に示すように、吊り具本体2と、第1押圧手段としての
縦ボルト3と、第2押圧手段としての横ボルト4とを備
えている。
This steel sheet pile hanger 1 is shown in FIGS.
As shown in FIG. 3, the hanging tool main body 2, the vertical bolt 3 as the first pressing means, and the horizontal bolt 4 as the second pressing means are provided.

【0019】吊り具本体2は、鋼矢板31の継手部分3
3を掴む掴み部5と、後述する吊り部材としてのカップ
リング17を取り付けるための複数の取付部6とが一体
的に形成されている。
The suspender body 2 includes a joint portion 3 of the steel sheet pile 31.
A grip portion 5 for gripping 3 and a plurality of mounting portions 6 for mounting a coupling 17 as a suspending member, which will be described later, are integrally formed.

【0020】掴み部5は、図2に示すように、断面略コ
字状の厚板からなり、平面視略矩形厚板状の第1の壁部
としての上壁部7と、底面視略矩形厚板状の第2の壁部
としての下壁部8と、背面視略矩形厚板状の第3の壁部
としての側壁部9とが一体的に形成されている。上壁部
7と下壁部8とは、上下方向に所定の間隔(継手部分3
3を収容可能な間隔)を隔てて、互いに略平行状に延び
るように対向配置されており、それら上壁部7および下
壁部8の外側(一方側)端部が、それら上壁部7および
下壁部8と略直交する方向に延びる側壁部9によって連
結されている。また、下壁部8の内側(他方側)端部に
は、上側に向かって突出する係止部10が、下壁部8の
幅方向(鋼矢板31を基準とする前後方向)すべてにわ
たって形成されている。また、この係止部10は、図4
が参照されるように、重ねて載置される複数の鋼矢板3
1において、上側の鋼矢板31の継手部分33と下側の
鋼矢板31の継手部分33との間の空間に、係止部10
を挿入可能な程度の突出長さとして形成されている。
As shown in FIG. 2, the grip portion 5 is composed of a thick plate having a substantially U-shaped cross section, and has an upper wall portion 7 as a first wall portion having a substantially rectangular thick plate shape in a plan view and a bottom plate substantially in a bottom view. A lower wall portion 8 as a second wall portion having a rectangular thick plate shape and a side wall portion 9 as a third wall portion having a substantially rectangular thick plate shape in rear view are integrally formed. The upper wall portion 7 and the lower wall portion 8 have a predetermined gap in the vertical direction (the joint portion 3
3 are arranged facing each other so as to extend substantially in parallel with each other at an interval capable of accommodating 3), and the outer (one side) end portions of the upper wall portion 7 and the lower wall portion 8 are located at the upper wall portion 7 Also, they are connected by a side wall portion 9 extending in a direction substantially orthogonal to the lower wall portion 8. Further, at the inner (other side) end of the lower wall portion 8, a locking portion 10 protruding upward is formed over the entire width direction of the lower wall portion 8 (the front-back direction with the steel sheet pile 31 as a reference). Has been done. Further, this locking portion 10 is shown in FIG.
, A plurality of steel sheet piles 3 to be placed on top of each other are referred to.
1, the locking portion 10 is provided in the space between the joint portion 33 of the upper steel sheet pile 31 and the joint portion 33 of the lower steel sheet pile 31.
Is formed so as to allow insertion of

【0021】これによって、掴み部5では、図3に示す
ように、上壁部7の下面と下壁部8の上面とが平行する
ように形成され、側壁部9の内側面がこれら上壁部7の
下面と下壁部8の上面とから直角方向に形成され、これ
ら上壁部7の下面、下壁部8の上面および側壁部9の内
側面によって囲まれる側面視略矩形状の空間が、内側
(側壁部9の反対側)が開放される継手部分33の収容
空間11とされている。この収容空間11は、上下方向
の長さ(上壁部7の下面から下壁部8の上面までの長
さ)が、鋼矢板31の継手部分33の上下方向の長さ
(継手部分33における平坦面34の上面から鉤部35
の先端部までの長さ)よりも少し長く、かつ、内外方向
の長さ(側壁部9の内側面から係止部10の内側面まで
の長さ)が、鋼矢板31の継手部分33の鉤部35の内
外方向の長さ(鉤部35の基端部から先端部までの内外
方向の長さ)よりも少し長くなるように形成されてい
る。
As a result, in the grip portion 5, as shown in FIG. 3, the lower surface of the upper wall portion 7 and the upper surface of the lower wall portion 8 are formed so as to be parallel to each other, and the inner surface of the side wall portion 9 is formed on these upper walls. A space formed in a right angle direction from the lower surface of the portion 7 and the upper surface of the lower wall portion 8 and surrounded by the lower surface of the upper wall portion 7, the upper surface of the lower wall portion 8 and the inner side surface of the side wall portion 9 and having a substantially rectangular shape in a side view. Is the accommodation space 11 of the joint portion 33 whose inside (opposite side wall 9) is open. The accommodation space 11 has a vertical length (a length from the lower surface of the upper wall portion 7 to the upper surface of the lower wall portion 8) that is the vertical length of the joint portion 33 of the steel sheet pile 31 (in the joint portion 33. From the upper surface of the flat surface 34 to the hook 35
Of the joint portion 33 of the steel sheet pile 31 is a little longer than the length of the joint portion 33 of the steel sheet pile 31 and a length in the inner and outer directions (the length from the inner side surface of the side wall portion 9 to the inner side surface of the locking portion 10). It is formed to be slightly longer than the length of the hook portion 35 in the inward / outward direction (the length in the inward / outward direction from the base end portion to the tip portion of the hook portion 35).

【0022】また、上壁部7には、図2に示すように、
雌ねじ(図示せず)が形成される大径の上壁螺着孔12
が、中央部からやや内側において、厚さ方向(上下方
向)を貫通するように形成されている。また、側壁部9
には、雌ねじ(図示せず)が形成される上壁螺着孔12
よりもやや小径の側壁螺着孔13が、中央部からやや下
側において、厚さ方向(内外方向)を貫通するように形
成されている。
Further, as shown in FIG.
Large-diameter upper wall screw hole 12 in which a female screw (not shown) is formed
Is formed so as to penetrate in the thickness direction (vertical direction) slightly inside from the central portion. Also, the side wall portion 9
Has a female screw (not shown) formed in the upper wall screw hole 12
A side wall screw hole 13 having a diameter slightly smaller than that of the side wall is formed so as to penetrate in the thickness direction (inward / outward direction) from the center to slightly lower side.

【0023】また、下壁部8は、外側端部から内側端部
に向かって次第に厚さが薄くなるように、その下面が傾
斜(外側端部から内側端部に向かって上向きに傾斜)状
に形成されている。なお、上壁部7および側壁部9は、
下壁部8よりも厚い略同一の厚みとして形成されてい
る。
Further, the lower wall portion 8 has an inclined lower surface (inclined upward from the outer end portion to the inner end portion) so that the thickness gradually decreases from the outer end portion to the inner end portion. Is formed in. The upper wall portion 7 and the side wall portion 9 are
The lower wall portion 8 is formed to have substantially the same thickness as the lower wall portion 8.

【0024】取付部6は、図1に示すように、上壁部7
と下壁部8とにそれぞれ設けられている。上壁部7に設
けられる取付部6(以下、第1取付部6aとする。)
は、上壁部7の内側端部における幅方向(鋼矢板31を
基準とする前後方向)中央部から、斜め内側上方に向か
って略環状に膨出するように設けられており、カップリ
ング17を挿通支持するための挿通孔14(第1挿通孔
14a)が、第1取付部6aの幅方向(鋼矢板31を基
準とする前後方向)を貫通するように形成されている。
また、下壁部8に設けられる取付部6(以下、第2取付
部6bとする。)は、下壁部8の外側端部における幅方
向(鋼矢板31を基準とする前後方向)中央部から、斜
め外側下方に向かって略環状に膨出するように設けられ
ており、カップリング17を挿通支持するための挿通孔
14(第2挿通孔14b)が、幅方向(鋼矢板31を基
準とする前後方向)を貫通するように形成されている。
そして、これら第1取付部6aおよび第2取付部6b
は、図2に示すように、掴み部5において、上壁部7の
内側端部と下壁部8の外側端部とにおいて対角に配置さ
れる。
The mounting portion 6 has an upper wall portion 7 as shown in FIG.
And the lower wall portion 8 are provided respectively. The attachment portion 6 provided on the upper wall portion 7 (hereinafter referred to as the first attachment portion 6a).
Is provided so as to bulge in a substantially annular shape obliquely inward and upward from the center portion in the width direction (the front-rear direction with respect to the steel sheet pile 31) at the inner end portion of the upper wall portion 7. An insertion hole 14 (first insertion hole 14a) for inserting and supporting the is formed so as to penetrate in the width direction of the first mounting portion 6a (the front-back direction with respect to the steel sheet pile 31).
Further, the mounting portion 6 (hereinafter, referred to as the second mounting portion 6b) provided on the lower wall portion 8 is a central portion in the width direction (the front-back direction with respect to the steel sheet pile 31) at the outer end portion of the lower wall portion 8. From the above, the insertion hole 14 (second insertion hole 14b), which is provided so as to bulge obliquely outwardly in a substantially annular shape and through which the coupling 17 is inserted and supported, is arranged in the width direction (steel sheet pile 31 as a reference). And the front-back direction).
And these 1st attachment part 6a and 2nd attachment part 6b
As shown in FIG. 2, in the grip portion 5, the inner end portion of the upper wall portion 7 and the outer end portion of the lower wall portion 8 are diagonally arranged.

【0025】縦ボルト3は、図2に示すように、上壁螺
着孔12に螺着可能な大径に形成され、その先端部に、
縦ボルト3を鋼矢板31に食い込ますための鋭利な歯部
15が形成されている歯付きボルトから構成されてい
る。
As shown in FIG. 2, the vertical bolt 3 is formed to have a large diameter so that it can be screwed into the upper wall screwing hole 12, and at its tip end,
The vertical bolt 3 is composed of a toothed bolt having sharp tooth portions 15 for biting the steel sheet pile 31.

【0026】横ボルト4は、側壁螺着孔13に螺着可能
な、縦ボルト3よりやや小径に形成されている。そし
て、縦ボルト3および横ボルト4は、それぞれ上壁螺着
孔12および側壁螺着孔13に螺着された状態におい
て、互いに直交する方向から鋼矢板31の継手部分33
を押圧することができるように配置されている。
The horizontal bolt 4 is formed in a diameter slightly smaller than that of the vertical bolt 3, which can be screwed into the side wall screw hole 13. Then, the vertical bolts 3 and the horizontal bolts 4 in the state of being screwed into the upper wall screw holes 12 and the side wall screw holes 13 respectively, from the directions orthogonal to each other, the joint portion 33 of the steel sheet pile 31.
Are arranged so that they can be pressed.

【0027】そして、この鋼矢板用吊り具1は、たとえ
ば、図3に示すように、鋼矢板1の板本体32の幅方向
両側縁部に形成される各継手部分33にそれぞれ取り付
けられ、各鋼矢板用吊り具1の第1取付部6aの第1挿
通孔14aまたは第2取付部6bの第2挿通孔14b
に、後述するチェーン16の一端部に取り付けられるカ
ップリング17を挿通および係止させることにより、鋼
矢板31を異なる方向から吊り上げることができる。
The steel sheet pile hanger 1 is attached to each joint portion 33 formed on both side edges of the plate body 32 of the steel sheet pile 1 in the width direction, as shown in FIG. The first insertion hole 14a of the first attachment portion 6a of the steel sheet pile hanger 1 or the second insertion hole 14b of the second attachment portion 6b.
The steel sheet pile 31 can be lifted from different directions by inserting and locking the coupling 17 attached to one end of the chain 16 described later.

【0028】次に、この鋼矢板用吊り具1を用いて、鋼
矢板31を吊り上げる方法について説明する。
Next, a method of hoisting the steel sheet pile 31 using the steel sheet pile suspending tool 1 will be described.

【0029】まず、この鋼矢板用吊り具1を、重ねて載
置されている鋼矢板31に取り付ける方法を、図4ない
し図6を参照して説明する。
First, a method for attaching the steel sheet pile suspending tool 1 to the steel sheet piles 31 which are placed in an overlapping manner will be described with reference to FIGS. 4 to 6.

【0030】鋼矢板用吊り具1を、重ねて載置されてい
る鋼矢板31に取り付けるには、まず、図4に示すよう
に、重ねて載置されている最上位の鋼矢板31の幅方向
外側から、鋼矢板用吊り具1を、鋼矢板31の継手部分
33に対して、側壁部9の反対側から上壁部7と下壁部
8との間の収容空間11内に継手部分33が受け入れら
れるように挿入する。より具体的には、上壁部7の下面
を、平坦部34の上面に対向させながら、係止部10
を、最上位の鋼矢板31の継手部分33とその下の鋼矢
板31の継手部分33との間の空間に挿入して、継手部
分33を収容空間11内に収容した後に、図5に示すよ
うに、鉤部35の先端部を下壁部8の上面に当接させ
る。この時、下壁部8が、外側端部から内側端部に向か
って次第に厚さが薄くなるように形成されていることか
ら、係止部10を最上位の鋼矢板31の継手部分33と
その下の鋼矢板31の継手部分33との間の空間に円滑
に挿入することができる。
In order to attach the steel sheet pile hanger 1 to the steel sheet piles 31 which are stacked, first, as shown in FIG. 4, the width of the uppermost steel sheet pile 31 which is stacked is placed. From the outside in the direction, the steel sheet pile hanger 1 is joined to the joint portion 33 of the steel sheet pile 31 in the accommodation space 11 between the upper wall portion 7 and the lower wall portion 8 from the side opposite to the side wall portion 9. Insert so that 33 is accepted. More specifically, while the lower surface of the upper wall portion 7 faces the upper surface of the flat portion 34, the locking portion 10
5 is inserted into the space between the joint portion 33 of the uppermost steel sheet pile 31 and the joint portion 33 of the steel sheet pile 31 therebelow, and the joint portion 33 is housed in the housing space 11 and then shown in FIG. As described above, the tip of the hook portion 35 is brought into contact with the upper surface of the lower wall portion 8. At this time, since the lower wall portion 8 is formed so that the thickness thereof gradually decreases from the outer end portion to the inner end portion, the locking portion 10 is connected to the joint portion 33 of the uppermost steel sheet pile 31. It can be smoothly inserted into the space between the steel sheet pile 31 below and the joint portion 33.

【0031】次いで、図5に示すように、横ボルト4を
螺進させて、鉤部35の基端部を横ボルト4の先端部で
押圧して、図6に示すように、鉤部35の先端部を係止
部10に当接させ、固定位置を位置決めする。その後、
縦ボルト3を螺進させて、平坦部34を縦ボルト3の先
端部で押圧して、鉤部35の先端部を下壁部8の上面に
圧接させる。これによって、収容空間11に収容された
継手部分33を、横ボルト4および縦ボルト3によっ
て、掴み部5において確実に固定することができる。と
りわけ、縦ボルト3が歯付きボルトによって構成されて
いることから、縦ボルト3の螺進により、歯部15が平
坦部34にしっかりと食い込んで、継手部分33を掴み
部5において強固に固定することができる。
Next, as shown in FIG. 5, the horizontal bolt 4 is screwed to push the base end of the hook portion 35 with the tip of the horizontal bolt 4, and as shown in FIG. The tip end of the is brought into contact with the locking portion 10 to position the fixed position. afterwards,
The vertical bolt 3 is screwed, and the flat portion 34 is pressed by the tip portion of the vertical bolt 3 so that the tip portion of the hook portion 35 is brought into pressure contact with the upper surface of the lower wall portion 8. As a result, the joint portion 33 accommodated in the accommodation space 11 can be reliably fixed at the grip portion 5 by the horizontal bolt 4 and the vertical bolt 3. In particular, since the vertical bolt 3 is constituted by a toothed bolt, the tooth portion 15 firmly bites into the flat portion 34 by the screwing of the vertical bolt 3, and the joint portion 33 is firmly fixed at the grip portion 5. be able to.

【0032】そして、たとえば、図7に示すように、鋼
矢板31の板本体32の幅方向両側縁部に形成される各
継手部分33における長手方向両端部に、このような方
法により、2つの鋼矢板用吊り具1をそれぞれ対角状に
取り付けて、各鋼矢板用吊り具1において、第1取付部
6aの第1挿通孔14aにカップリング17を係止さ
せ、そのカップリング17を、その他端部がリング部材
18を介して吊り上げ装置(クレーンやチェーンブロッ
クなど)のフック20に係止されるマスターリンク19
に取り付けられているチェーン16の一端部に取り付け
ることにより、2つの鋼矢板用吊り具1によって、鋼矢
板31を水平状態で吊り上げる、水平2点吊りを達成す
ることができる。
Then, for example, as shown in FIG. 7, two end portions in the longitudinal direction of each joint portion 33 formed on both side edges in the width direction of the sheet body 32 of the steel sheet pile 31 are provided with two pieces by such a method. The steel sheet pile hanger 1 is diagonally attached, and in each steel sheet pile hanger 1, the coupling 17 is locked in the first insertion hole 14a of the first attachment portion 6a, and the coupling 17 is The other end has a master link 19 whose end is locked to a hook 20 of a lifting device (crane, chain block, etc.) via a ring member 18.
By attaching it to one end of the chain 16 attached to, the steel sheet pile 31 can be horizontally suspended by the two steel sheet pile suspenders 1 to achieve horizontal two-point suspension.

【0033】なお、同様に、たとえば、図8に示すよう
に、鋼矢板31の各継手部分33における長手方向両端
部に、4つの鋼矢板用吊り具1を、鋼矢板31の幅方向
において各鋼矢板用吊り具1が対向するようにそれぞれ
取り付けることにより、4つの鋼矢板用吊り具1によっ
て、鋼矢板31を水平状態で吊り上げる、水平4点吊り
を達成することができる。
Similarly, for example, as shown in FIG. 8, four steel sheet pile suspenders 1 are provided at both longitudinal ends of each joint portion 33 of the steel sheet pile 31 in the width direction of the steel sheet pile 31. By attaching the steel sheet pile suspenders 1 so as to face each other, the four steel sheet pile suspenders 1 can achieve horizontal four-point suspension in which the steel sheet pile 31 is suspended in a horizontal state.

【0034】また、たとえば、図9に示すように、鋼矢
板31の一方の継手部分33における長手方向両端部
に、2つの鋼矢板用吊り具1を取り付けて、各鋼矢板用
吊り具1において、第2取付部6bの第2挿通孔14b
にカップリング17を係止させ、そのカップリング17
に、上記と同様に、チェーン16を取り付けることによ
り、2つの鋼矢板用吊り具1によって、鋼矢板31を鉛
直状態で吊り上げる、鉛直2点吊りを達成することがで
きる。
Further, for example, as shown in FIG. 9, two steel sheet pile suspenders 1 are attached to both longitudinal ends of one joint portion 33 of the steel sheet pile 31, and each steel sheet pile suspender 1 is attached. , The second insertion hole 14b of the second mounting portion 6b
Lock the coupling 17 to the
Further, similarly to the above, by attaching the chain 16, it is possible to achieve the vertical two-point suspension in which the steel sheet pile 31 is vertically suspended by the two steel sheet pile suspenders 1.

【0035】さらに、たとえば、図10に示すように、
鋼矢板31の各継手部分33における長手方向一端部
に、2つの鋼矢板用吊り具1を取り付けて、各鋼矢板用
吊り具1において、第1取付部6aの第1挿通孔14a
にカップリング17を係止させ、そのカップリング17
に、上記と同様に、チェーン16を取り付けることによ
り、2つの鋼矢板用吊り具1によって、鋼矢板31の引
き起しを達成することができる。
Further, for example, as shown in FIG.
Two steel sheet pile suspenders 1 are attached to one longitudinal end of each joint portion 33 of the steel sheet pile 31, and in each steel sheet pile suspender 1, the first insertion hole 14a of the first attachment portion 6a is attached.
Lock the coupling 17 to the
Further, similarly to the above, by attaching the chain 16, the pulling-up of the steel sheet pile 31 can be achieved by the two steel sheet pile suspenders 1.

【0036】このように、この鋼矢板用吊り具1では、
異なる方向から吊り上げることができるように、掴み部
5に2つの第1取付部6aおよび第2取付部6bが設け
られているので、掴み部5の収容空間11を、上記した
ように、常に一定方向から鋼矢板31の継手部分33に
挿入して、横ボルト4および縦ボルト3によって確実に
固定した状態で、吊り上げ方法に応じて、適宜、第1取
付部6aおよび第2取付部6bに、カップリング17を
係止させて、任意の方向に吊り上げることができる。そ
のため、継手部分33を掴む方向を変更せずとも、種々
の方向に吊り上げることができるので、掴み部5を、常
に一定方向から継手部分33を確実に掴めるように、継
手部分33の掴む部分に対応する最適の形状に形成し
て、一定方向からの挿入と、縦ボルト3および横ボルト
4の締め付けによる簡易な取付作業のみによって、確実
な掴みを確保しつつ、第1取付部6aおよび第2取付部
6bによって、たとえば、上記したような、水平吊り、
鉛直吊り、引き起しなどの種々の吊り上げ方法に対応し
た吊り上げを実現することができる。
Thus, in this steel sheet pile suspender 1,
Since the first holding portion 5 is provided with the two first mounting portions 6a and the second mounting portion 6b so that the holding portion 5 can be lifted from different directions, the accommodation space 11 of the holding portion 5 is always constant as described above. From the direction into the joint portion 33 of the steel sheet pile 31 and securely fixed by the horizontal bolts 4 and the vertical bolts 3, depending on the hoisting method, to the first attachment portion 6a and the second attachment portion 6b, as appropriate. The coupling 17 can be locked and lifted in any direction. Therefore, the joint portion 33 can be lifted in various directions without changing the gripping direction, so that the grip portion 5 can be fixed to the grip portion of the joint portion 33 so that the joint portion 33 can always be reliably gripped from a fixed direction. The first attachment portion 6a and the second attachment portion 6a and the second attachment portion 6a and the second attachment portion 6a and the second attachment portion 6a and the second attachment portion 6a are formed to have a corresponding optimum shape, and only by a simple attachment work by inserting from a certain direction and tightening the vertical bolt 3 and the horizontal bolt 4. With the attachment portion 6b, for example, as described above, horizontal suspension,
It is possible to realize hoisting corresponding to various hoisting methods such as vertical hoisting and pulling up.

【0037】また、掴み部本体2が、断面略コ字状の掴
み部5および2つの取付部6から小型軽量に形成されて
いるので、作業性の向上を図ることができる。
Further, since the grip portion main body 2 is formed to be small and lightweight from the grip portion 5 having the substantially U-shaped cross section and the two mounting portions 6, the workability can be improved.

【0038】なお、上記の実施形態において、縦ボルト
3を、たとえば、図11に示すように、雄ねじが形成さ
れるボルトの先端部に、基端部に向かって窪む側断面矩
形状の凹部21を形成するとともに、その凹部21に、
歯部材25を、ピン22を介して周方向に回転可能に取
り付けてもよい。より具体的には、歯部材25は、先端
部に鋭利な歯部23と、基端部に膨出状の頭部24とが
形成されるととも、その軸方向途中にピン22を受け入
れるくびれ部分が形成されており、凹部21に受け入れ
られた状態で、くびれ部分にピン22が挿入されること
により、縦ボルト3の先端部に、周方向に回転可能に取
り付けられている。これによって、横ボルト3を螺進さ
せても、歯部材25を供回りさせずに、歯部23を継手
部分33の平坦部24に確実に食い込ますことができ
る。なお、ピン22に代えて、剛球を用い、凹部21に
剛球を介して歯部材25を周方向に回転可能に取り付け
てもよい。
In the above-described embodiment, the vertical bolt 3 is, for example, as shown in FIG. 11, a concave portion having a rectangular side cross section which is recessed toward the base end portion at the tip portion of the bolt on which the male screw is formed. 21 is formed, and in the concave portion 21,
The tooth member 25 may be attached via the pin 22 so as to be rotatable in the circumferential direction. More specifically, the tooth member 25 has a sharp tooth portion 23 at the tip end and a bulging head portion 24 at the base end, and also has a constriction for receiving the pin 22 in the axial middle thereof. A portion is formed, and the pin 22 is inserted into the constricted portion in a state of being received in the concave portion 21, so that the vertical bolt 3 is mounted rotatably in the circumferential direction. Thereby, even if the lateral bolt 3 is screwed, the tooth portion 23 can be surely bited into the flat portion 24 of the joint portion 33 without rotating the tooth member 25. Instead of the pin 22, a hard sphere may be used, and the tooth member 25 may be attached to the recess 21 via the hard sphere so as to be rotatable in the circumferential direction.

【0039】なお、上記の実施形態では、吊り上げ作業
において、各取付部6にカップリング17を係止させた
が、本発明の吊り部材としては、これに限定されず、た
とえば、シャックルなどの公知の吊り部材を係止させる
ことができ、また、吊り部材としてチェーン16を直接
係止させてもよく、さらには、チェーン16に代えてワ
イヤーロープや繊維ロープを用いて、これらワイヤーロ
ープや繊維ロープを直接係止させてもよい。
In the above embodiment, the coupling 17 is locked to each mounting portion 6 in the lifting work, but the hanging member of the present invention is not limited to this, and for example, a known shackle or the like is known. The hanging member can be locked, and the chain 16 may be directly locked as the hanging member. Further, instead of the chain 16, a wire rope or a fiber rope is used. May be directly locked.

【0040】また、上記の実施形態においては、鋼矢板
31の鉤状の継手部分33に対応させて、掴み部5を、
断面略コ字状に形成したが、掴み部5は、鋼矢板31の
継手部分33の形状に対応させて形成すれば、特に断面
略コ字状に限定されることはなく、適宜の形状および構
造(たとえば、挟持状に揺動させるなど)を採用するこ
とができる。
Further, in the above embodiment, the grip portion 5 is made to correspond to the hook-shaped joint portion 33 of the steel sheet pile 31.
Although the grip portion 5 is formed to have a substantially U-shaped cross section, the grip portion 5 is not particularly limited to the substantially U-shaped cross section as long as it is formed so as to correspond to the shape of the joint portion 33 of the steel sheet pile 31. A structure (for example, rocking in a pinching manner) can be adopted.

【0041】また、複数の取付部6を、上壁部7、下壁
部8および側壁部9のどの部分に設けるかも、その目的
および用途によって適宜決定することができ、また、2
つ以上であれば、たとえば、3つあるいは4つ設けても
よい。
Further, which part of the upper wall portion 7, the lower wall portion 8 and the side wall portion 9 where the plurality of mounting portions 6 are provided can be appropriately determined according to the purpose and application, and 2
If it is one or more, for example, three or four may be provided.

【0042】また、縦ボルト3を下壁部8に螺着させ、
上壁部7に係止部10を形成してもよく、また、横ボル
ト4も、縦ボルト3と同様に歯付きボルトから構成して
もよい。
Further, the vertical bolt 3 is screwed onto the lower wall portion 8,
The locking portion 10 may be formed on the upper wall portion 7, and the horizontal bolt 4 may be formed of a toothed bolt, like the vertical bolt 3.

【0043】[0043]

【発明の効果】以上述べたように、請求項1に記載の発
明によれば、掴み部における一定方向からの確実な掴み
を確保しつつ、複数の取付部によって、種々の吊り上げ
方法に対応した吊り上げを実現することができる。
As described above, according to the invention as set forth in claim 1, various gripping methods are supported by a plurality of mounting parts while ensuring a reliable gripping of the gripping part from a certain direction. Lifting can be realized.

【0044】請求項2に記載の発明によれば、簡易な構
成によって、鋼矢板の継手部分に対応した小型軽量の掴
み部を形成することができ、作業性の向上を図ることが
できる。
According to the second aspect of the invention, it is possible to form a small and lightweight grip portion corresponding to the joint portion of the steel sheet pile with a simple structure, and it is possible to improve workability.

【0045】請求項3に記載の発明によれば、掴み部に
よる継手部分の確実な掴みを達成することができる。
According to the third aspect of the invention, it is possible to achieve reliable gripping of the joint portion by the gripping portion.

【0046】請求項4に記載の発明によれば、掴み部に
よる継手部分のより確実な掴みを達成することができ
る。
According to the invention described in claim 4, it is possible to achieve more reliable gripping of the joint portion by the gripping portion.

【0047】請求項5に記載の発明によれば、より一層
強固に、継手部分を掴み部において固定することができ
る。
According to the fifth aspect of the present invention, the joint portion can be more firmly fixed at the grip portion.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の鋼矢板用吊り具の一実施形態を示す斜
視図である。
FIG. 1 is a perspective view showing an embodiment of a steel sheet pile hanger of the present invention.

【図2】図1に示す鋼矢板用吊り具の側断面図である。FIG. 2 is a side sectional view of the steel sheet pile hanger shown in FIG.

【図3】鋼矢板用吊り具の取付状態を示す説明図であ
る。
FIG. 3 is an explanatory view showing a mounting state of a steel sheet pile hanger.

【図4】図1に示す鋼矢板用吊り具の取付状態(鋼矢板
用吊り具を継手部分に挿入する状態)を示す説明図であ
る。
FIG. 4 is an explanatory view showing a mounting state of the steel sheet pile suspending tool shown in FIG. 1 (a state in which the steel sheet pile suspending tool is inserted into a joint portion).

【図5】図1に示す鋼矢板用吊り具の取付状態(鋼矢板
用吊り具を継手部分に固定する動作状態)を示す説明図
である。
FIG. 5 is an explanatory view showing a mounting state of the steel sheet pile suspending tool shown in FIG. 1 (an operating state of fixing the steel sheet pile suspending tool to the joint portion).

【図6】図1に示す鋼矢板用吊り具の取付状態(鋼矢板
用吊り具を継手部分に固定した状態)を示す説明図であ
る。
FIG. 6 is an explanatory view showing a mounting state of the steel sheet pile suspending tool shown in FIG. 1 (a state in which the steel sheet pile suspending tool is fixed to a joint portion).

【図7】図1に示す鋼矢板用吊り具によって鋼矢板を吊
り上げる状態(水平2点吊り)を示す説明図である。
FIG. 7 is an explanatory view showing a state (horizontal two-point suspension) of lifting the steel sheet pile by the steel sheet pile suspending tool shown in FIG. 1.

【図8】図1に示す鋼矢板用吊り具によって鋼矢板を吊
り上げる状態(水平4点吊り)を示す説明図である。
8 is an explanatory diagram showing a state (horizontal 4-point suspension) of lifting the steel sheet pile by the steel sheet pile suspending tool shown in FIG. 1. FIG.

【図9】図1に示す鋼矢板用吊り具によって鋼矢板を吊
り上げる状態(鉛直2点吊り)を示す説明図である。
FIG. 9 is an explanatory view showing a state in which the steel sheet pile is hoisted by the steel sheet pile suspending tool shown in FIG. 1 (vertical two-point suspension).

【図10】図1に示す鋼矢板用吊り具によって鋼矢板を
吊り上げる状態(引き起し)を示す説明図である。
FIG. 10 is an explanatory view showing a state where the steel sheet pile is hoisted (raised) by the steel sheet pile suspending tool shown in FIG. 1.

【図11】縦ボルトの他の実施形態を示す部分断面図で
ある。
FIG. 11 is a partial cross-sectional view showing another embodiment of the vertical bolt.

【図12】施工された鋼矢板を示す斜視図である。FIG. 12 is a perspective view showing a constructed steel sheet pile.

【符号の説明】[Explanation of symbols]

1 鋼矢板用吊り具 3 縦ボルト 4 横ボルト 5 掴み部 6 取付部 7 上壁部 8 下壁部 9 側壁部 10 係止部 31 鋼矢板 33 継手部分 1 Steel sheet pile suspenders 3 vertical bolts 4 horizontal bolts 5 grip 6 Mounting part 7 Upper wall 8 Lower wall 9 Side wall 10 Locking part 31 steel sheet pile 33 Joint part

───────────────────────────────────────────────────── フロントページの続き (72)発明者 太田 修二 大阪府大阪狭山市岩室2丁目180番地 象 印チェンブロック株式会社内 (72)発明者 土井 元 大阪府大阪狭山市岩室2丁目180番地 象 印チェンブロック株式会社内 Fターム(参考) 2D050 AA12 EE03 3F004 AA08 EA03 ZZ00    ─────────────────────────────────────────────────── ─── Continued front page    (72) Inventor Shuji Ota             2-180 Iwamuro, Sayama City, Osaka Prefecture, Osaka Prefecture             In Chen Block Co., Ltd. (72) Inventor Gen Doi             2-180 Iwamuro, Sayama City, Osaka Prefecture, Osaka Prefecture             In Chen Block Co., Ltd. F-term (reference) 2D050 AA12 EE03                 3F004 AA08 EA03 ZZ00

Claims (5)

【特許請求の範囲】[Claims] 【請求項1】 鋼矢板の継手部分を掴む掴み部と、吊り
部材を取り付けるための取付部とを備える鋼矢板用吊り
具において、 前記取付部は、異なる方向から吊り上げることができる
ように、前記掴み部に複数設けられていることを特徴と
する、鋼矢板用吊り具。
1. A steel sheet pile hanger having a gripping portion for gripping a joint portion of a steel sheet pile and a mounting portion for mounting a suspension member, wherein the mounting portion can be lifted from different directions. A suspender for steel sheet piles, characterized in that a plurality of grips are provided on the grip.
【請求項2】 前記掴み部は、前記継手部分を挟んで対
向可能な第1の壁部および第2の壁部と、前記第1の壁
部および前記第2の壁部の一方側端部を連結する第3の
壁部とを備え、 前記取付部は、前記第1の壁部、前記第2の壁部および
前記第3の壁部のうち、少なくとも2つの壁部に設けら
れていることを特徴とする、請求項1に記載の鋼矢板用
吊り具。
2. The grip portion includes a first wall portion and a second wall portion that can face each other with the joint portion interposed therebetween, and one end portion of one side of the first wall portion and the second wall portion. And a third wall portion that connects the first wall portion, the second wall portion, and the third wall portion, and the mounting portion is provided on at least two wall portions of the first wall portion, the second wall portion, and the third wall portion. The hanging tool for steel sheet piles according to claim 1, characterized in that.
【請求項3】 前記第1の壁部または前記第2の壁部に
は、前記継手部分を押圧するための第1押圧手段が設け
られていることを特徴とする、請求項2に記載の鋼矢板
用吊り具。
3. The first pressing means for pressing the joint portion is provided on the first wall portion or the second wall portion, as claimed in claim 2. Hanging equipment for steel sheet pile.
【請求項4】 前記第3の壁部には、前記継手部分を押
圧するための第2押圧手段が設けられるとともに、前記
第1の壁部または前記第2の壁部の他方側端部には、前
記継手部分を係止するための係止部が設けられているこ
とを特徴とする、請求項2または3に記載の鋼矢板用吊
り具。
4. The third wall portion is provided with a second pressing means for pressing the joint portion, and at the other end portion of the first wall portion or the second wall portion. Is provided with a locking portion for locking the joint portion, The steel sheet pile hanger according to claim 2 or 3, wherein.
【請求項5】 前記第1押圧手段が、歯付きボルトによ
り構成されていることを特徴とする、請求項3または4
に記載の鋼矢板用吊り具。
5. The method according to claim 3, wherein the first pressing means is a toothed bolt.
The hanger for steel sheet pile described in.
JP2002112895A 2002-04-16 2002-04-16 Steel sheet pile suspension Expired - Fee Related JP3685769B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002112895A JP3685769B2 (en) 2002-04-16 2002-04-16 Steel sheet pile suspension

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002112895A JP3685769B2 (en) 2002-04-16 2002-04-16 Steel sheet pile suspension

Publications (2)

Publication Number Publication Date
JP2003306290A true JP2003306290A (en) 2003-10-28
JP3685769B2 JP3685769B2 (en) 2005-08-24

Family

ID=29395231

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002112895A Expired - Fee Related JP3685769B2 (en) 2002-04-16 2002-04-16 Steel sheet pile suspension

Country Status (1)

Country Link
JP (1) JP3685769B2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110778129A (en) * 2019-09-25 2020-02-11 中国二十冶集团有限公司 H-shaped steel clamping and hoisting device and H-shaped steel hoisting method
JP2020105740A (en) * 2018-12-26 2020-07-09 大和ハウス工業株式会社 Fitting hanger and mounting method for fitting
CN114559079A (en) * 2022-04-29 2022-05-31 山东莱钢磁浮列车轨道工程有限公司 Surface machining equipment and method for 9Ni steel cast blank for floor boring
JP7084668B1 (en) 2022-01-12 2022-06-15 株式会社小澤土木 Construction processing method of steel sheet pile

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020105740A (en) * 2018-12-26 2020-07-09 大和ハウス工業株式会社 Fitting hanger and mounting method for fitting
JP7278071B2 (en) 2018-12-26 2023-05-19 大和ハウス工業株式会社 Fittings hanger and fitting method
CN110778129A (en) * 2019-09-25 2020-02-11 中国二十冶集团有限公司 H-shaped steel clamping and hoisting device and H-shaped steel hoisting method
JP7084668B1 (en) 2022-01-12 2022-06-15 株式会社小澤土木 Construction processing method of steel sheet pile
JP2023102427A (en) * 2022-01-12 2023-07-25 株式会社小澤土木 Handling method for steel sheet pile
CN114559079A (en) * 2022-04-29 2022-05-31 山东莱钢磁浮列车轨道工程有限公司 Surface machining equipment and method for 9Ni steel cast blank for floor boring
CN114559079B (en) * 2022-04-29 2022-07-26 山东磁浮列车轨道工程有限公司 Surface machining equipment and method for 9Ni steel cast blank for floor boring

Also Published As

Publication number Publication date
JP3685769B2 (en) 2005-08-24

Similar Documents

Publication Publication Date Title
JP3990731B2 (en) Chain engagement tool
JP2003306290A (en) Sling for steel sheet pile
GB2379478A (en) Coupling self-locking hook
JP3704333B2 (en) Board suspension
AU1217097A (en) Hoisting link device
JPH0344783Y2 (en)
JP3109069U (en) Steel hanger
CN107700723B (en) Curtain wall hoisting device
JP3114464U (en) Steel sheet pile gripper
JP2004269255A (en) Hoisting tool and take up apparatus
JP3118799U (en) Block hanger
JP2514314Y2 (en) Suspension equipment for mountain retaining materials
CN213738180U (en) Stator core hoist can overturn
BRPI1000340A2 (en) method and hook adapter for submarine transfer
CN213475145U (en) Ring forging hoist
CN218879135U (en) Special tool for hoisting top cover of hydroelectric generating set
JP3026787B2 (en) Pile suspension equipment
CN210286454U (en) Safety sling fixing device for equipment compartment
CN215626152U (en) Assembled building wallboard hoist device
JP2003176092A (en) Hoisting accessory for plate material
EP0678472B1 (en) Universal hooking system for the lifting of concrete products
CN220056026U (en) Telegraph pole production hoisting mechanism
CN219730279U (en) Slender steel pipe pile lifting device
JP2003254317A (en) Shackle
JPH0120378Y2 (en)

Legal Events

Date Code Title Description
A977 Report on retrieval

Effective date: 20050120

Free format text: JAPANESE INTERMEDIATE CODE: A971007

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20050201

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20050329

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20050517

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20050531

R150 Certificate of patent (=grant) or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080610

Year of fee payment: 3

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090610

Year of fee payment: 4

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 4

Free format text: PAYMENT UNTIL: 20090610

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100610

Year of fee payment: 5

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100610

Year of fee payment: 5

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 6

Free format text: PAYMENT UNTIL: 20110610

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 6

Free format text: PAYMENT UNTIL: 20110610

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 7

Free format text: PAYMENT UNTIL: 20120610

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120610

Year of fee payment: 7

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130610

Year of fee payment: 8

LAPS Cancellation because of no payment of annual fees