JP3683090B2 - 発破による地盤振動の予測方法および発破方法 - Google Patents
発破による地盤振動の予測方法および発破方法 Download PDFInfo
- Publication number
- JP3683090B2 JP3683090B2 JP35481697A JP35481697A JP3683090B2 JP 3683090 B2 JP3683090 B2 JP 3683090B2 JP 35481697 A JP35481697 A JP 35481697A JP 35481697 A JP35481697 A JP 35481697A JP 3683090 B2 JP3683090 B2 JP 3683090B2
- Authority
- JP
- Japan
- Prior art keywords
- blasting
- ground vibration
- test
- blast
- vibration
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000005422 blasting Methods 0.000 title claims description 151
- 238000000034 method Methods 0.000 title claims description 42
- 238000012360 testing method Methods 0.000 claims description 72
- 238000012937 correction Methods 0.000 claims description 20
- 238000005259 measurement Methods 0.000 claims description 19
- 239000002360 explosive Substances 0.000 description 8
- 238000011156 evaluation Methods 0.000 description 4
- 230000000052 comparative effect Effects 0.000 description 3
- 230000003111 delayed effect Effects 0.000 description 3
- 230000002194 synthesizing effect Effects 0.000 description 3
- 238000005056 compaction Methods 0.000 description 2
- 230000002238 attenuated effect Effects 0.000 description 1
- 239000002131 composite material Substances 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000002035 prolonged effect Effects 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 230000002123 temporal effect Effects 0.000 description 1
Images
Landscapes
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
- Geophysics And Detection Of Objects (AREA)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP35481697A JP3683090B2 (ja) | 1997-12-24 | 1997-12-24 | 発破による地盤振動の予測方法および発破方法 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP35481697A JP3683090B2 (ja) | 1997-12-24 | 1997-12-24 | 発破による地盤振動の予測方法および発破方法 |
Publications (3)
| Publication Number | Publication Date |
|---|---|
| JPH11181753A JPH11181753A (ja) | 1999-07-06 |
| JPH11181753A5 JPH11181753A5 (enExample) | 2003-04-09 |
| JP3683090B2 true JP3683090B2 (ja) | 2005-08-17 |
Family
ID=18440098
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP35481697A Expired - Fee Related JP3683090B2 (ja) | 1997-12-24 | 1997-12-24 | 発破による地盤振動の予測方法および発破方法 |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3683090B2 (enExample) |
Families Citing this family (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR100551764B1 (ko) * | 2003-12-30 | 2006-02-13 | 석철기 | 시차별 발파진동을 상호간섭시켜 진동소음을 저감시키는발파방법 |
| KR100665878B1 (ko) * | 2005-10-27 | 2007-01-09 | 에스케이건설 주식회사 | 전자뇌관의 최적 지연초시 결정을 통한 저진동저소음발파패턴 설계방법 |
| JP6484089B2 (ja) * | 2015-04-03 | 2019-03-13 | 鹿島建設株式会社 | 振動予測方法 |
| JP6461022B2 (ja) * | 2016-01-12 | 2019-01-30 | 株式会社村上工業 | 地中杭破砕方法 |
| JP6603774B1 (ja) * | 2018-10-04 | 2019-11-06 | 株式会社村上工業 | 地中杭破砕方法 |
| CN113238281A (zh) * | 2021-05-13 | 2021-08-10 | 中国科学院武汉岩土力学研究所 | 一种基于波组分的爆破振动衰减规律分析方法 |
-
1997
- 1997-12-24 JP JP35481697A patent/JP3683090B2/ja not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JPH11181753A (ja) | 1999-07-06 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| Agrawal et al. | Modified scaled distance regression analysis approach for prediction of blast-induced ground vibration in multi-hole blasting | |
| Kahriman | Analysis of parameters of ground vibration produced from bench blasting at a limestone quarry | |
| CN109115061A (zh) | 一种降低爆破振动的起爆控制方法 | |
| JP7908934B2 (ja) | 破壊密度モデル化システム、方法、及び装置 | |
| US4725991A (en) | Method for controlling blasting operations | |
| JP6484089B2 (ja) | 振動予測方法 | |
| JP6998014B2 (ja) | 発破工法 | |
| Blair | Blast vibration control in the presence of delay scatter and random fluctuations between blastholes | |
| CN119885822B (zh) | 一种考虑抵抗线值的台阶爆破振动波形预测方法 | |
| KR100883832B1 (ko) | 단일공 파형 중첩모델링 자료에 의한 발파진동의 예측 방법 | |
| Singh et al. | Frequency channeling: a concept to increase the frequency and control the PPV of blast-induced ground vibration waves in multi-hole blast in a surface mine | |
| JP2001021300A (ja) | 発破による低振動破砕工法 | |
| Agrawal et al. | Seismic energy prediction to optimize rock fragmentation: a modified approach | |
| JP2001021298A (ja) | 発破による低振動破砕工法 | |
| CN109752085A (zh) | 一种数码电子雷管逐孔起爆振动预测方法 | |
| JPH11181753A (ja) | 発破による地盤振動の予測方法および発破方法 | |
| JP2001289599A (ja) | 振動低減発破工法ならびに遅延起爆秒時間隔決定方法 | |
| Mansouri et al. | Blast vibration modeling using linear superposition method | |
| Battison et al. | Reducing crest loss at Barrick Cowal gold mine | |
| KR100673552B1 (ko) | 대상지반의 주파수해석을 통한 발파진동 저감 지연시차설계방법 | |
| JP2019109168A (ja) | 岩盤評価方法 | |
| Sabatier et al. | Investigation of possibility of damage from the acoustically coupled seismic waveform from blast and artillery | |
| Gasmi et al. | Combined blast and vibratory machines effect on in-service structures | |
| JPH11326529A (ja) | 地質探査方法、弾性波発生方法、及び弾性波発生装置 | |
| Müller et al. | Comparison of different methods of measuring and calculating blast vibrations in rock masses |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20041026 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20041029 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20041227 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20050218 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20050413 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20050520 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20050524 |
|
| R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080603 Year of fee payment: 3 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090603 Year of fee payment: 4 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100603 Year of fee payment: 5 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100603 Year of fee payment: 5 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110603 Year of fee payment: 6 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120603 Year of fee payment: 7 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120603 Year of fee payment: 7 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130603 Year of fee payment: 8 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130603 Year of fee payment: 8 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20140603 Year of fee payment: 9 |
|
| LAPS | Cancellation because of no payment of annual fees |