JP3682504B2 - Building foundations and construction methods - Google Patents

Building foundations and construction methods Download PDF

Info

Publication number
JP3682504B2
JP3682504B2 JP17928696A JP17928696A JP3682504B2 JP 3682504 B2 JP3682504 B2 JP 3682504B2 JP 17928696 A JP17928696 A JP 17928696A JP 17928696 A JP17928696 A JP 17928696A JP 3682504 B2 JP3682504 B2 JP 3682504B2
Authority
JP
Japan
Prior art keywords
foundation
column base
concrete
pile
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP17928696A
Other languages
Japanese (ja)
Other versions
JPH1025748A (en
Inventor
次郎 福江
賢司 植田
潤二 岡部
ひろし 小川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sekisui House Ltd
Original Assignee
Sekisui House Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sekisui House Ltd filed Critical Sekisui House Ltd
Priority to JP17928696A priority Critical patent/JP3682504B2/en
Publication of JPH1025748A publication Critical patent/JPH1025748A/en
Application granted granted Critical
Publication of JP3682504B2 publication Critical patent/JP3682504B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Foundations (AREA)

Description

【0001】
【発明の属する技術分野】
この発明は、建築物の基礎とその施工方法に関するものである。
【0002】
【従来の技術】
鉄骨構造の基礎は鉄筋コンクリートで構築されるのが一般であり、布基礎或いはべた基礎が用いられている。即ち、基礎コンクリート全体で地震時の水平力を支持させるとともに、建物全体の鉛直荷重をその基礎を通じて地盤に伝えるものである。この場合、鉄骨の3階建住宅においては、建物本体及び基礎からなる全体重量が大きいため、地盤の弱いところでは布基礎やべた基礎を設けただけでは鉛直荷重を支えることが出来ない。このため、このような地域では、通常、地盤に打ち込んだ杭で基礎を補強することが行われる。
【0003】
【発明が解決しようとする課題】
しかしながら、コンクリートの基礎を杭で補強する工法では、基礎自体の重量が大きいため、杭の本数が多くなる欠点がある。また、基礎に沿って地盤を1m程度掘削してコンクリートを打設しなければならず、大量の残土処理の問題を生じ、これらによってコスト高となる欠点がある。しかも、どの程度の本数の杭が必要かは地質調査を行わなければ決定できないから、それだけ見積もりに時間を要するといった問題もある。
【0004】
この発明は、このような従来の欠点を解消して、基礎全体の重量を大幅に軽量化することによって、杭の本数及び残土処理の量を大幅に低減し、これらによって低コストで施工できるようにした基礎とその施工方法を提供することを目的としてなされたものである。
【0005】
【課題を解決するための手段】
上記の課題を解決するため、この発明の基礎は、各柱脚間を連結する鋼製土台梁で水平力を支持させ、且つ、柱脚に対応して設けた杭で柱脚からの鉛直荷重を支持させるとともに、柱脚と杭との間に、その杭上端部周辺を被覆するようにして打設した基礎コンクリートを配置して、柱脚と基礎コンクリートとはアンカーボルトを用いて緊結することなく、柱脚の下端より予め下向きに突出させたアンカーを基礎コンクリートへ埋設して連結してなることを特徴とするものである。
【0008】
同じく、上記の課題を解決するためのこの発明の施工方法は、各柱脚の位置に対応して杭を打設するとともに各柱脚間を鋼製土台梁で連結した後、杭上端と柱脚との間に、その杭上端部周辺を被覆するようにして基礎コンクリートを打設し、柱脚と基礎コンクリートとはアンカーボルトを用いて緊結することなく、柱脚の下端より予め下向きに突出させたアンカーを基礎コンクリートへ埋設して連結することを特徴とするものである。
【0009】
更に、この出願の請求項3の発明では、基礎コンクリートと土間コンクリートをともに一体に打設するものが提供される。
【0010】
【発明の実施の形態】
図1及び2において、(1)は、角形鋼管からなる柱脚であって、この柱脚(1)の下端部分に、H形鋼からなる短尺のブラケット(2)が、それらのフランジ(3)(3)が上下平行となるようにして、一方の端部部分において溶接して固着されている。この場合、柱脚(1)には、その下端面と中間部分に前記のフランジ(3)(3)に対応するプレート(4)(5)が予め固着されており、ブラケット(2)のウェブ(6)を柱脚(1)の側面に溶接し、フランジ(3)(3)をそれらに対応するプレート(4)(5)へ溶接するようにしている。
【0011】
(7)は、前記ブラケット(2)と同断面のH形鋼製の土台梁であって、前記ブラケット(2)の端部へその土台梁(7)端部を突き合わせるとともに、土台梁(7)のウェブ(8)とブラケット(2)のウェブ(6)を垂直接合プレート(9)により、土台梁(7)のフランジ(10)(10)とブラケット(2)のフランジ(3)(3)を、水平接合プレート(11)(11)…によって、それぞれボルト(12)(12)…によって接合されている。柱脚(1)下端面の前記のプレート(5)の下面中央には、垂直下向きに突出するようにして、短尺の1本のアンカー(13)が設けられている。
【0012】
土台梁(7)は、地盤を掘削することなくその地盤面よりも僅かに浮き上がった状態で設置されている。また、図示を省略するが、土台梁(7)に囲まれた内側部分には水平ブレースが設けられる。
【0013】
(14)は基礎杭であって、前記柱脚(1)に対応して地中に打ち込まれており、図1で示すように、その杭(14)上端部周辺を被覆するようにして、その周辺部を掘削した溝(20)内に基礎コンクリート(15)が打設されるとともに、前記のアンカー(13)が、この基礎コンクリート(15)内に埋設されている。
【0014】
(16)は、土台梁(7)の下側部分において、その土台梁(7)に囲まれた地盤面に打設される土間コンクリートであって、前記基礎コンクリート(15)と同時に打設されるものである。更に、土台梁(7)と前記柱脚(1)の外周囲を被覆するようにして化粧コンクリート(17)が設けられており、この化粧コンクリート(17)も、土間コンクリート(16)及び基礎コンクリート(15)と同時に一体に打設されるものである。(10)は、基礎コンクリート(15)内に埋設される鉄筋配筋を示している。
【0015】
次に、上記の構成からなる基礎の構造をその施工順に従って説明すると、まず、柱脚(1)に対応して打設すべき基礎杭(14)の周辺部分の溝(20)を掘削した後、それぞれ基礎杭(14)を打設するか、或いは、基礎杭(14)を打ち込んだ後溝(20)を掘削する。杭の打設方法は、直接地盤に打ち込む方法と予め形成した穴内に挿入して周辺をコンクリートなどで固化させる方法などがある。
【0016】
次いで、図2及び図3で示すように、これら柱脚(1)と土台梁(7)を前記の接合プレート(9)(11)を用いて一体に接合するとともに、柱脚(1)の下端を前記杭(14)の上方において、その杭(14)から浮かした状態に設置し、更に、土台梁(7)の内側に水平ブレース(図示せず)を設ける。この状態で必要なコンクリート打設用の仮枠を設け、かつ、鉄筋配筋(19)を施して、図4のように、基礎コンクリート(15)部分と土間コンクリート(16)、及び、外周囲の化粧コンクリート(17)を同時に打設するものである。
【0017】
なお、土台梁(7)間には直接大引などを設けて床を取り付ける。また、柱脚(1)は、図のように1メートル程度の高さとし、その上端に躯体側の柱を繋いで躯体工事を行う。
【0018】
【発明の効果】
以上のように、この発明によれば、従来コンクリートよって打設されていた基礎部分が鋼製の土台梁によって構成されているため、コンクリート製の基礎部材に比較して遙かに建物全体の重量を低減することができ、この基礎重量を支持する基礎杭を打設する必要がない。このため、基礎杭は、柱脚を介して伝達される建物本体の重量を支えるだけでよいから、この柱脚部に対応する位置にのみ打ち込めば良く、杭の本数が大幅に低減される。
【0019】
他方、鋼製の土台梁は基礎のように地盤より低くする必要がないため、掘削による残土処理が大幅に削減され、従来の布基礎に比較して1/6〜1/8程度の残土量となり、前記杭本数が低減されることと併せて、従来のべた基礎のみの場合とほとんど変わらないか或いはそれよりも低いコストで施工することが可能となる。加えて、短時間で費用見積もりを顧客に提示できる効果がある。
【0020】
また、通常、杭頭と柱脚との間には基礎コンクリートを打設するが、この基礎コンクリートは柱脚からの鉛直荷重を杭へ伝達するだけであるから、従来のようにアンカーボルトで柱脚を固定する必要はなく、柱脚に溶接した1本のアンカーを基礎コンクリート内に埋設する程度でよく、アンカーボルトと柱脚のボルト穴との位置出しといった厳密な位置精度が不要で、施工が容易となり、この点からもコストを低減できる。
【0021】
加えて、べた基礎と同等のコストでありながら、土間部分の掘削が可能であるから地下収納や地下室も容易に設けることができる。
【図面の簡単な説明】
【図1】この発明の実施形態における柱脚部分の縦断面図である。
【図2】同じく基礎コンクリート打設前の柱脚部分の斜視図である。
【図3】同じく、基礎コンクリート打設前の基礎の全体斜視図である。
【図4】基礎コンクリート打設後の基礎全体の斜視図である。
【符号の説明】
(1) 柱脚
(7) 土台梁
(13) アンカー
(14) 基礎杭
(15) 基礎コンクリート
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a building foundation and its construction method.
[0002]
[Prior art]
The foundation of the steel structure is generally constructed from reinforced concrete, and a cloth foundation or a solid foundation is used. In other words, the entire foundation concrete supports the horizontal force at the time of the earthquake, and transmits the vertical load of the entire building to the ground through the foundation. In this case, in a three-story steel-framed house, the overall weight of the building body and the foundation is large, so that it is impossible to support a vertical load only by providing a cloth foundation or a solid foundation in a weak ground. For this reason, in such an area, the foundation is usually reinforced with a pile driven into the ground.
[0003]
[Problems to be solved by the invention]
However, the method of reinforcing concrete foundations with piles has the disadvantage that the number of piles increases because the foundation itself is heavy. Moreover, the ground has to be excavated along the foundation by about 1 m to place concrete, which causes a problem of a large amount of residual soil treatment, which increases the cost. In addition, since the number of piles required is not determined without a geological survey, there is a problem that it takes time to estimate.
[0004]
The present invention eliminates such conventional drawbacks and significantly reduces the weight of the entire foundation, thereby greatly reducing the number of piles and the amount of residual soil processing, thereby enabling construction at low cost. It was made for the purpose of providing the foundation and its construction method.
[0005]
[Means for Solving the Problems]
In order to solve the above problems, the basis of the present invention is to support a horizontal force with a steel base beam connecting between the column bases, and with a pile provided corresponding to the column bases, a vertical load from the column bases The foundation concrete placed to cover the periphery of the top end of the pile is placed between the column base and the pile, and the column base and the foundation concrete are fastened using anchor bolts. And anchors that are projected downward from the lower ends of the column bases in advance are buried in and connected to the foundation concrete.
[0008]
Similarly, the construction method of the present invention for solving the above-mentioned problem is that a pile is placed corresponding to the position of each column base and the column base is connected with a steel foundation beam, and then the upper end of the pile and the column Between the legs, foundation concrete is placed so as to cover the periphery of the upper end of the pile, and the column base and the foundation concrete protrude downward downward in advance from the lower end of the column base without being fastened with anchor bolts. It is characterized by burying and connecting the anchors to the foundation concrete.
[0009]
Furthermore, in the invention of claim 3 of this application, there is provided one in which the foundation concrete and the soil concrete are cast together.
[0010]
DETAILED DESCRIPTION OF THE INVENTION
1 and 2, (1) is a column base made of a square steel pipe, and a short bracket (2) made of H-shaped steel is attached to the flange (3) at the lower end portion of the column base (1). ) And (3) are fixed by welding at one end so that they are parallel in the vertical direction. In this case, plates (4) and (5) corresponding to the flanges (3) and (3) are fixed to the column base (1) at the lower end surface and the intermediate portion in advance, and the web of the bracket (2) (6) is welded to the side surface of the column base (1), and the flanges (3) and (3) are welded to the corresponding plates (4) and (5).
[0011]
(7) is a base beam made of H-shaped steel having the same cross section as the bracket (2). The end of the base beam (7) is abutted against the end of the bracket (2), and the base beam ( The web (8) of 7) and the web (6) of the bracket (2) are joined to the flange (10) (10) of the base beam (7) and the flange (3) of the bracket (2) by the vertical joining plate (9). 3) are joined by bolts (12), (12), respectively, by horizontal joining plates (11), (11),. A short anchor (13) is provided at the center of the lower surface of the plate (5) at the lower end surface of the column base (1) so as to protrude vertically downward.
[0012]
The foundation beam (7) is installed in a state slightly raised from the ground surface without excavating the ground. Although not shown, a horizontal brace is provided in the inner part surrounded by the base beam (7).
[0013]
(14) is a foundation pile, which is driven into the ground corresponding to the column base (1), and as shown in FIG. The foundation concrete (15) is placed in the groove (20) excavated in the periphery, and the anchor (13) is embedded in the foundation concrete (15).
[0014]
(16) is interstitial concrete placed on the ground surface surrounded by the foundation beam (7) at the lower part of the foundation beam (7), and is placed at the same time as the foundation concrete (15). Is. Furthermore, decorative concrete (17) is provided so as to cover the outer periphery of the base beam (7) and the column base (1), and this decorative concrete (17) is also made of soil concrete (16) and foundation concrete. (15) At the same time, it will be cast together. (10) shows a reinforcing bar arrangement embedded in the foundation concrete (15).
[0015]
Next, the structure of the foundation constructed as described above will be explained according to the construction sequence. First, the groove (20) in the peripheral portion of the foundation pile (14) to be placed corresponding to the column base (1) is excavated. After that, each foundation pile (14) is driven or the rear groove (20) into which the foundation pile (14) is driven is excavated. Pile driving methods include a method of driving directly into the ground and a method of inserting into a previously formed hole and solidifying the periphery with concrete or the like.
[0016]
Next, as shown in FIGS. 2 and 3, the column base (1) and the base beam (7) are joined together using the joining plates (9) and (11), and the column base (1) A lower end is installed above the pile (14) in a state of floating from the pile (14), and further, a horizontal brace (not shown) is provided inside the foundation beam (7). In this state, the necessary temporary frames for placing concrete are provided, and reinforcing bar reinforcement (19) is applied. As shown in Fig. 4, the foundation concrete (15) part and soil concrete (16), and the outer periphery Of decorative concrete (17).
[0017]
In addition, the floor is attached by providing a direct draw between the base beams (7). Moreover, the column base (1) is about 1 meter high as shown in the figure, and the column work on the column side is connected to the upper end of the column base (1).
[0018]
【The invention's effect】
As described above, according to the present invention, since the foundation portion that has been conventionally cast by concrete is constituted by a steel base beam, the weight of the entire building is much longer than that of a concrete foundation member. It is not necessary to drive foundation piles that support this foundation weight. For this reason, since the foundation pile only needs to support the weight of the building main body transmitted via the column base, it is only necessary to drive it into a position corresponding to this column base portion, and the number of piles is greatly reduced.
[0019]
On the other hand, the foundation beam made of steel does not need to be lower than the ground like the foundation, so the residual soil treatment by excavation is greatly reduced, and the amount of residual soil is about 1/6 to 1/8 compared to the conventional fabric foundation Thus, in conjunction with the reduction in the number of piles, construction can be performed at a cost that is almost the same as or lower than that of the conventional solid foundation alone. In addition, the cost estimate can be presented to the customer in a short time.
[0020]
Normally, foundation concrete is placed between the pile head and the column base, but this foundation concrete only transmits the vertical load from the column base to the pile. It is not necessary to fix the legs, it is only necessary to embed one anchor welded to the column base in the foundation concrete, and it does not require strict positional accuracy such as positioning of the anchor bolt and the bolt hole of the column base. In this respect, the cost can be reduced.
[0021]
In addition, since it is possible to excavate the soil part, the underground storage and the basement can be easily provided at a cost equivalent to that of the solid foundation.
[Brief description of the drawings]
FIG. 1 is a longitudinal sectional view of a column base portion in an embodiment of the present invention.
FIG. 2 is a perspective view of a column base portion before foundation concrete is similarly placed.
FIG. 3 is an overall perspective view of the foundation before foundation concrete is similarly placed.
FIG. 4 is a perspective view of the entire foundation after foundation concrete placement.
[Explanation of symbols]
(1) Column base
(7) Foundation beam
(13) Anchor
(14) Foundation pile
(15) Foundation concrete

Claims (3)

各柱脚間を連結する鋼製土台梁で水平力を支持させ、且つ、柱脚に対応して設けた杭で柱脚からの鉛直荷重を支持させるとともに、柱脚と杭との間に、その杭上端部周辺を被覆するようにして打設した基礎コンクリートを配置して、柱脚と基礎コンクリートとはアンカーボルトを用いて緊結することなく、柱脚の下端より予め下向きに突出させたアンカーを基礎コンクリートへ埋設して連結してなることを特徴とする建築物の基礎。While supporting the horizontal force with the steel base beam connecting each column base, and supporting the vertical load from the column base with the pile provided corresponding to the column base, between the column base and the pile, An anchor that has been placed to cover the periphery of the upper end of the pile and anchored in advance downward from the lower end of the column base, without anchoring the column base and the basic concrete using anchor bolts. A building foundation characterized by being embedded in and connected to foundation concrete. 各柱脚の位置に対応して杭を打設するとともに各柱脚間を鋼製土台梁で連結した後、杭上端と柱脚との間に、その杭上端部周辺を被覆するようにして基礎コンクリートを打設し、柱脚と基礎コンクリートとはアンカーボルトを用いて緊結することなく、柱脚の下端より予め下向きに突出させたアンカーを基礎コンクリートへ埋設して連結することを特徴とする基礎の施工方法。After placing the piles corresponding to the position of each column base and connecting each column base with a steel base beam, cover the periphery of the pile upper end between the pile upper end and the column base. The foundation concrete is cast and the column base and the foundation concrete are connected to each other by burying the anchor that protrudes downward in advance from the lower end of the column base into the foundation concrete without using an anchor bolt. Foundation construction method. 基礎コンクリートを土間コンクリートとともに一体に打設することを特徴とする請求項2記載の基礎の施工方法。  The foundation construction method according to claim 2, wherein the foundation concrete is cast together with the soil concrete.
JP17928696A 1996-07-09 1996-07-09 Building foundations and construction methods Expired - Fee Related JP3682504B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP17928696A JP3682504B2 (en) 1996-07-09 1996-07-09 Building foundations and construction methods

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP17928696A JP3682504B2 (en) 1996-07-09 1996-07-09 Building foundations and construction methods

Publications (2)

Publication Number Publication Date
JPH1025748A JPH1025748A (en) 1998-01-27
JP3682504B2 true JP3682504B2 (en) 2005-08-10

Family

ID=16063183

Family Applications (1)

Application Number Title Priority Date Filing Date
JP17928696A Expired - Fee Related JP3682504B2 (en) 1996-07-09 1996-07-09 Building foundations and construction methods

Country Status (1)

Country Link
JP (1) JP3682504B2 (en)

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04289329A (en) * 1991-03-16 1992-10-14 Takatoshi Fujimoto Concrete base structure for building and formation of thereof
JPH07268883A (en) * 1994-03-30 1995-10-17 Tokyu Koken Kk Method of construction of footing section using precast footing beam
JP3611876B2 (en) * 1994-03-31 2005-01-19 大和ハウス工業株式会社 Column base and foundation beam structure
JPH07279184A (en) * 1994-04-11 1995-10-24 Daiwa House Ind Co Ltd Floating underground beam foundation for building

Also Published As

Publication number Publication date
JPH1025748A (en) 1998-01-27

Similar Documents

Publication Publication Date Title
JP4069509B2 (en) Construction method of reverse struts in the outer periphery of underground excavation space
JP2831909B2 (en) Connection structure of steel columns, piles and foundation beams
JP3799036B2 (en) Building basic structure and construction method
JP2006274746A (en) Reinforcing method and reinforcing structure for building foundation
JPH06116942A (en) Construction method of critical sheathing wall
JP3107716B2 (en) Soil retaining wall
JP3129676B2 (en) Piling columns in building structures using piles as pillars
JP3682504B2 (en) Building foundations and construction methods
JP3150987B2 (en) Basic structure of building
JP3612600B2 (en) Unit anchor and structural steel foundation beam
JP4612422B2 (en) Construction method of structure and foundation structure used for it
JP3690495B2 (en) Building construction method and building
JP2979117B2 (en) Building foundation method
JP3742637B2 (en) Building structure
JP3135495B2 (en) Construction method of avalanche and rock fall protection fence and avalanche and rock fall protection fence
JP2858997B2 (en) Temporary support column used for reverse driving method
JP3322259B2 (en) Earthquake countermeasures during construction during seismic isolation construction
JP2523234B2 (en) Anchor retaining wall
JP4373899B2 (en) Attached foundation and construction method of attached foundation
JP2819008B2 (en) Existing building seismic isolation method
KR102523155B1 (en) Connecting structure of middle girder and construction method thereof
JPH1130053A (en) Construction method of base isolation building
JPH0959925A (en) Existing foundation structure reinforcing method
JP2900840B2 (en) How to build underground structures
JP2959436B2 (en) How to build underground structures

Legal Events

Date Code Title Description
A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20040824

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20041025

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20041124

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20050124

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20050322

A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A711

Effective date: 20050420

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20050420

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20050420

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110603

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140603

Year of fee payment: 9

LAPS Cancellation because of no payment of annual fees