JP3654233B2 - Exterior wall construction structure and exterior wall construction method - Google Patents
Exterior wall construction structure and exterior wall construction method Download PDFInfo
- Publication number
- JP3654233B2 JP3654233B2 JP2001329465A JP2001329465A JP3654233B2 JP 3654233 B2 JP3654233 B2 JP 3654233B2 JP 2001329465 A JP2001329465 A JP 2001329465A JP 2001329465 A JP2001329465 A JP 2001329465A JP 3654233 B2 JP3654233 B2 JP 3654233B2
- Authority
- JP
- Japan
- Prior art keywords
- metal
- runner
- edge
- fixed
- fixing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Finishing Walls (AREA)
Description
【0001】
【技術分野】
本発明は,建築物の構造躯体に固定した金属下地に外壁板を留め付けてなる外壁施工構造,及びその施工方法に関する。
【0002】
【従来技術】
従来より,図30,図31に示すごとく,建築物の構造躯体92に,縦胴縁93等の下地材を介して,外壁板94を固定してなる外壁施工構造9がある。即ち,該外壁施工構造9は,上記構造躯体92に防水紙98を介して固定した縦胴縁93に,留め付け金具95を用いて外壁板94を固定してある。また,該留め付け金具95は,ビス96により上記縦胴縁93及び構造躯体92に固定されている(図31)。
このように,上記外壁施工構造9においては,上記縦胴縁93を,上記構造躯体92における管柱923,間柱924等に,防水紙98を介して固定する。
【0003】
【解決しようとする課題】
しかしながら,上記従来の外壁施工構造9においては,図30に示すごとく,上記縦胴縁93が,その上下にわたり,上記管柱923や間柱924に沿うように配置して固定される必要がある。そして,外壁板94の左右側端部は,縦胴縁93上に配置する必要がある。それ故,上記外壁板94を施工するにあたり,該外壁板94は固定配置とならざるを得ず,施工が困難となる場合がある。
【0004】
また,リフォームする際には,図32に示すごとく,縦胴縁93を,モルタル壁などの既存壁940及びその後方の既存胴縁930を介して構造躯体92に,長いビス960を用いて固定し,この縦胴縁93に,新たな外壁板94を取り付けて外壁施工構造9を得る。
【0005】
この場合,新たに施工した上記縦胴縁93は,その固定力を確保するために,上記既存壁940の後方にある構造躯体92,即ち管柱923,間柱924等の縦柱(図30)に固定される必要がある。
しかし,上記管柱923,間柱924は,上記既存壁940の後方にあるため,上記縦胴縁93を施工する際には,その位置を確認することが困難である。それ故,施工が困難となる。
【0006】
本発明は,かかる従来の問題点に鑑みてなされたもので,施工容易,かつ強度の高い外壁施工構造,及びこれを施工する外壁施工方法を提供しようとするものである。
【0007】
【課題の解決手段】
第1の発明は,建築物の構造躯体に固定した金属下地に横張用の外壁板を留め付けてなる外壁施工構造であって,
上記金属下地は,上記構造躯体に,それぞれ略水平方向に固定された複数の金属ランナーと,該複数の金属ランナーに略鉛直方向に固定された複数の金属胴縁とを有し,
上記外壁板は,上記金属胴縁に配設された留め付け金具又はスタータ金具に,上辺部及び下辺部を係止させることにより,上記金属下地に留め付けられていると共に,上記各外壁板は複数の上記金属胴縁の前方に配置され,
かつ,上記金属ランナーは,構造躯体における土台柱,胴差し,及び桁のいずれか2つ以上に沿ってその前面に固定されており,
上記留め付け金具は,左右の上記外壁板が隣り合う部分に配設されるものと,その他の部分に配設されるものとがあり,前者は左右方向に長い長尺背面板に2個左右に並設された状態で上記金属胴縁に固定され,後者は1個の背面板に1個配設された状態で上記金属胴縁に固定されていることを特徴とする外壁施工構造にある(請求項1)。
【0008】
上記金属胴縁は,上記構造躯体に略水平方向に固定された金属ランナーに固定する。そのため,上記金属胴縁を上記金属ランナーに配設するにあたり,水平方向の位置が多少ずれても,構造躯体の縦材の位置にかかわらず,確実に固定することができる。そのため,上記外壁施工構造は施工容易である。
【0009】
また,上記外壁施工構造は,金属下地を用いているため,強度,耐久性に優れている。
また,上記外壁板は,上記金属胴縁に配設された留め付け金具又はスタータ金具に,上辺部及び下辺部を係止させることにより,上記金属下地に留め付けられている。そのため,上記外壁板を,容易かつ確実に上記金属下地に固定することができる。
【0010】
また,上記外壁施工構造をリフォーム用の外壁施工構造とする場合にも,施工が容易である。即ち,上記金属下地の金属ランナーを,土台柱と胴差し又は桁のように,既存壁の後方にある構造躯体のうち位置の分かりやすい部分に固定すればよいため,施工が容易である。
【0011】
以上のごとく,本発明によれば,施工容易,かつ強度の高い外壁施工構造を提供することができる。
【0012】
第2の発明は,建築物の構造躯体に固定した金属下地に横張用の外壁板を留め付けてなる外壁施工構造を施工する外壁施工方法であって,
該外壁施工方法は,複数の金属ランナーを,上記構造躯体における土台柱,胴差し,及び桁のいずれか2つ以上に沿って,それぞれ略水平方向に固定する第1工程と,
上記複数の金属ランナーに,複数の金属胴縁を略鉛直方向に固定することにより,上記構造躯体に固定された上記金属下地を得る第2工程と,
上記金属胴縁にスタータ金具を固定し,該スタータ金具に最下段の外壁板の下辺部を係止し,更に留め付け金具を上記外壁板の上辺部に係止すると共に上記金属胴縁に固定する第3工程と,
上記留め付け金具に,他の外壁板の下辺部を係止し,更に他の留め付け金具を上記外壁板の上辺部に係止すると共に上記金属胴縁に固定する第4工程とを有し,
該第4工程を順次繰り返すことにより複数の外壁板を上記金属下地に固定する方法であり,
上記第3工程及び第4工程においては,上記各外壁板を複数の上記金属胴縁の前方に配置し,上記留め付け金具は,左右の上記外壁板が隣り合う部分に配設するものと,その他の部分に配設するものとがあり,前者は左右方向に長い長尺背面板に2個左右に並設した状態で上記金属胴縁に固定し,後者は1個の背面板に1個配設した状態で上記金属胴縁に固定することを特徴とする外壁施工方法にある(請求項6)。
【0013】
上記第2工程においては,上記金属胴縁を,上記構造躯体に水平方向に固定された金属ランナーに固定する。そのため,上記金属胴縁を上記金属ランナーに配設するにあたり,水平方向の位置が多少ずれても,構造躯体の縦材の位置にかかわらず,確実に固定することができる。そのため,上記外壁施工構造は施工容易である。
【0014】
また,上記第3工程,第4工程においては,上記外壁板を,上記金属胴縁に配設された留め付け金具又はスタータ金具に,上辺部及び下辺部を係止させることにより,上記金属下地に留め付ける。そのため,上記外壁板を,容易かつ確実に上記金属下地に固定することができる。
また,上記外壁施工構造は,金属下地を用いているため,強度,耐久性に優れている。
【0015】
また,上記外壁施工構造をリフォーム用の外壁施工構造とする場合にも,施工が容易である。即ち,上記金属下地の金属ランナーを,土台柱と胴差し又は桁のように,既存壁の後方にある構造躯体のうち位置の分かりやすい部分に固定すればよいため,施工が容易である。
【0016】
以上のごとく,本発明によれば,強度の高い外壁施工構造を容易に施工することができる外壁施工方法を提供することができる。
【0017】
【発明の実施の形態】
上記第1の発明(請求項1)において,上記金属下地の材質としては,例えば,鉄,アルミ,ステンレス鋼等を用いることができる。また,上記金属ランナー,金属胴縁は,例えば,厚み0.8〜2.3mmの金属板を折り曲げ加工することにより形成される。
また,上記金属ランナーは,構造躯体における土台柱,胴差し,及び桁のいずれかに固定されている。これにより,上記金属ランナーは,特に高い固定力で構造躯体に固定され,その結果,上記金属下地の強度,ひいては外壁施工構造の強度が向上する。
【0018】
また,上記留め付け金具は,例えば,外壁板の裏側面に当接する基板部と,該基板部から前方に立設された支承部と,該支承部から斜め上方へ屈曲した上板係止部と,上記支承部から斜め下方へ屈曲した下板係止部とを有する。また,上記上板係止部及び下板係止部の前方には,前方平板部が形成されていてることが好ましい。また,上記基板部は,その上部において斜め後方に後退した斜面部を有すると共に,下端部において略90°後方に屈曲した下方脚部を有することが好ましい。
【0019】
また,上記スタータ金具は,最下段の外壁板の下辺部を係止するための金具であり,例えば,上記土台柱に固定される固定板部と該固定板部から前方へ屈曲形成された支承部と,該支承部の前端から斜め上方へ屈曲形成された係止部とからなる,水平方向に長尺な金具である。
また,上記外壁施工構造は,新築用の外壁施工構造であっても,リフォーム用の外壁施工構造であってもよい。
【0020】
また,上記金属胴縁は,上記構造躯体に対向する胴縁背板と,該胴縁背板から前方へ略鉛直方向に立設された左右一対の鉛直立設板と,各鉛直立設板の前端から互いに向き合う方向に屈曲された左右一対の胴縁前板とを有し,かつ,上記留め付け金具及びスタータ金具は,その背面に,上記金属胴縁における左右一対の胴縁前板に係合する係合板を有しており,該係合板を上記一対の胴縁前板の背面に係合することにより,上記留め付け金具及びスタータ金具を上記金属胴縁に固定してなることが好ましい(請求項2)。
【0021】
この場合には,上記留め付け金具及びスタータ金具を,上記金属胴縁に沿って上下にスライド移動させて,所望の位置に配置することができる。それ故,上記留め付け金具又はスタータ金具を,容易かつ確実に,上記金属胴縁に固定して,外壁板を金属下地に留め付けることができる。
【0022】
また,上記金属ランナーは,上記構造躯体に固定されるランナー背板と,該ランナー背板から前方へ略水平方向に立設された上下一対の水平立設板とを有し,上記金属胴縁は,上記構造躯体に対向する胴縁背板と,該胴縁背板から前方へ略鉛直方向に立設された左右一対の鉛直立設板とを有し,上記金属ランナーと上記金属胴縁とは,上記金属ランナーの水平立設部に嵌合するランナー固定部と,上記金属胴縁に嵌合する胴縁固定部とを有する固定金具を介して固定されていることが好ましい(請求項3)。
この場合には,上記固定金具を上記金属ランナー及び金属胴縁に嵌合することにより,該金属ランナーと金属胴縁とを固定することができる。それ故,施工が容易であると共に,金属ランナーと金属胴縁とを確実に固定することができる。
【0023】
また,上記固定金具は,上記ランナー固定部及び胴縁固定部に突起部を有し,上記ランナー固定部の突起部は,上記金属ランナーの上記水平立設板に設けられた係合穴に係合し,上記胴縁固定部の突起部は,上記金属胴縁の鉛直立設部に設けられた係合穴に係合していることが好ましい(請求項4)。
これにより,上記固定金具を,上記金属ランナー及び金属胴縁により確実に固定することができる。
【0024】
上記固定金具は,上記ランナー固定部を有するランナー保持体と,上記胴縁固定部を有する胴縁保持体とからなり,上記ランナー保持体と上記胴縁保持体とは,互いの位置関係を前後方向に変化させることができるよう構成してあることが好ましい(請求項5)。
これにより,上記金属下地に固定する外壁板の不陸調整を容易に行うことができる。それ故,一層,施工容易かつ強度の高い外壁施工構造を得ることができる。
【0025】
次に,上記第2の発明(請求項6)において,上記第4工程は1回のみであってもよい。
また,上記第1工程においては,上記金属ランナーを,構造躯体における土台柱,胴差し,及び桁のいずれかに固定することが好ましい。この場合には,上記金属ランナーは,特に高い固定力で構造躯体に固定され,その結果,上記金属下地の強度,ひいては外壁施工構造の強度が向上する。
【0026】
また,上記金属胴縁は,上記構造躯体に対向する胴縁背板と,該胴縁背板から前方へ略鉛直方向に立設された左右一対の鉛直立設板と,各鉛直立設板の前端から互いに向き合う方向に屈曲された左右一対の胴縁前板とを有し,また,上記留め付け金具及びスタータ金具は,その背面に,上記胴縁前板に係合可能な係合板を有しており,上記第3工程又は第4工程において,上記留め付け金具又はスタータ金具を上記金属胴縁に固定するに当っては,上記係合板を上記一対の胴縁前板の背面に係合することが好ましい(請求項7)。
【0027】
この場合には,上記留め付け金具及びスタータ金具を,上記金属胴縁に沿って上下にスライド移動させて,所望の位置に配置することができる。それ故,上記留め付け金具又はスタータ金具を,容易かつ確実に,上記金属胴縁に固定することができる。
【0028】
また,上記金属ランナーは,上記構造躯体に固定されるランナー背板と,該ランナー背板から前方へ略水平方向に立設された上下一対の水平立設板とを有し,上記金属胴縁は,上記構造躯体に対向する胴縁背板と,該胴縁背板から前方へ略鉛直方向に立設された左右一対の鉛直立設板とを有し,上記第2工程において,上記金属胴縁を上記金属ランナーに固定するに当っては,固定金具におけるランナー固定部を上記金属ランナーの水平立設部に嵌合し,上記固定金具の胴縁固定部を上記金属胴縁に嵌合することが好ましい(請求項8)。
この場合には,上記固定金具を上記金属ランナー及び金属胴縁に嵌合することにより,該金属ランナーと金属胴縁とを固定することができる。それ故,施工が容易であると共に,金属ランナーと金属胴縁とを確実に固定することができる。
【0029】
また,上記固定金具は,上記ランナー固定部及び胴縁固定部に突起部を有し,上記ランナー固定部の突起部を,上記金属ランナーの上記水平立設板に設けられた係合穴に係合させ,上記胴縁固定部の突起部は,上記金属胴縁の鉛直立設部に設けられた係合穴に係合させることが好ましい(請求項9)。
これにより,上記固定金具を,上記金属ランナー及び金属胴縁により確実に固定することができる。
【0030】
また,上記固定金具は,上記ランナー固定部を有するランナー保持体と,上記胴縁固定部を有する胴縁保持体とからなり,上記ランナー保持体と上記胴縁保持体との互いの位置関係を前後方向に変化させることにより,上記胴縁金具の不陸調整を行うことが好ましい(請求項10)。
この場合には,一層,施工容易かつ強度の高い外壁施工構造を施工することができる。
【0031】
【実施例】
(実施例1)
本発明の実施例にかかる外壁施工構造及びこれを施工する外壁施工方法につき,図1〜図28を用いて説明する。
本例の外壁施工構造1は,図1,図2に示すごとく,建築物の構造躯体2に固定した金属下地3に外壁板4を留め付けてなる。
【0032】
上記金属下地3は,図1,図2に示すごとく,上記構造躯体2における土台柱21と胴差22とに,それぞれ略水平方向に固定された複数の金属ランナー31と,該複数の金属ランナー31に略鉛直方向に固定された複数の金属胴縁32とを有する。
【0033】
また,上記外壁板4は,図2,図7,図13に示すごとく,上記金属胴縁32に配設された留め付け金具5又はスタータ金具6に,上辺部41及び下辺部42を係止させることにより,上記金属下地3に留め付けられている。
また,上記金属下地3の材質は,例えば,鉄,アルミ,ステンレス鋼等である。
また,上記金属ランナー31,金属胴縁32は,厚み約1.2mmの金属板を折り曲げ加工することにより形成されている(図3,図4)。
【0034】
また,図1に示すごとく,上記土台柱21と上記胴差し22とにそれぞれ固定された2本の金属ランナー31の間には,両者間における複数の管柱23及び間柱24にわたって,水平方向に補強用ランナー310が固定されている。そして,該補強用ランナー310には,上記金属ランナー31と同様に,上記金属胴縁32が固定されている。
【0035】
また,上記金属ランナー31は,図3に示すごとく,上記構造躯体2に固定されるランナー背板311と,該ランナー背板311から前方へ略水平方向に立設された上下一対の水平立設板312とを有する。該水平立設板312には,矩形状の係合穴314(後述する)が形成されている。
また,上記金属ランナー31は,図18に示すごとく,上記ランナー背板311に,所定の間隔をもって,複数のビス穴315が形成されており,図1,図2に示すごとく,該ビス穴315にビス39を挿通すると共に上記構造躯体2にねじ込むことにより,上記金属ランナー31を構造躯体2に固定している。
【0036】
上記金属胴縁32は,図4に示すごとく,上記構造躯体2に対向する胴縁背板321と,該胴縁背板321から前方へ略鉛直方向に立設された左右一対の鉛直立設板322と,各鉛直立設板322の前端から互いに向き合う方向に屈曲された左右一対の胴縁前板323とを有する。鉛直立設板322には,係合穴324(後述する)が形成されている。また,図6〜図10に示すごとく,上記留め付け金具5は,その背面に,上記金属胴縁32における左右一対の胴縁前板323に係合する係合板59を有している。また,図13に示すごとく,スタータ金具6も,同様の係合板69を有している。
なお,上記係合板59,69は,係合ネジ57,67によって,上記留め付け金具5又はスタータ金具6の背面に取り付けられている。
【0037】
図7,図10,図13に示すごとく,上記係合板59,69を上記一対の胴縁前板323の背面に係合することにより,上記留め付け金具5及びスタータ金具6は上記金属胴縁32に固定されている。
上記留め付け金具5は,図5〜図7に示すごとく,外壁板4の裏側面46に当接する基板部51と,該基板部51から前方に立設された支承部52と,該支承部52から斜め上方へ屈曲した上板係止部53と,上記支承部52から斜め下方へ屈曲した下板係止部54とを有する。また,上記上板係止部53及び下板係止部54の前方には,前方平板部534が形成されていてる。また,上記基板部51は,その上部において斜め後方に後退した斜面部511を有すると共に,下端部において略90°後方に屈曲した下方脚部512を有する。
【0038】
また,図5に示すごとく,上記留め付け金具5は,上記係合板59を設けた背面板58に,符号Sが示す部分においてスポット溶接することによって固定されている。
また,図11,図24に示すごとく,左右の外壁板4が隣り合う部分に配設される上記留め付け金具5は,左右方向に長い長尺背面板580に,2個左右に並設されている。
【0039】
また,上記スタータ金具6は,図13に示すごとく,最下段の外壁板4の下辺部42を係止するための金具である。そして,図12,図13に示すごとく,上記スタータ金具6は,上記土台柱21に固定される固定板部61と,該固定板部61の下端部611から前方へ屈曲形成された支承部62と,該支承部62の前端から斜め上方へ屈曲形成された係止部63とからなる,水平方向に長尺な金具である。
また,上記固定板部61には,強度を確保するために前方へ屈曲形成された上端突出部612及び中央突出部613が左右方向に設けてある。
【0040】
図21,図22に示すごとく,上記金属ランナー31と上記金属胴縁32とは固定金具7を介して固定されている。該固定金具7は,図14〜図22に示すごとく,上記金属ランナー31の水平立設部312に嵌合するランナー固定部71と,上記金属胴縁32に嵌合する胴縁固定部72とを有する。
【0041】
また,図14〜図16,図19に示すごとく,上記固定金具7は,上記ランナー固定部71及び胴縁固定部72に突起部712,722を有する。図19に示すごとく,上記ランナー固定部71の突起部712は,上記金属ランナー31の上記水平立設板312に設けられた係合穴314に係合している。また,図22に示すごとく,上記胴縁固定部72の突起部722は,上記金属胴縁32の鉛直立設部322に設けられた係合穴324に係合している。
【0042】
上記固定金具7は,図14〜図17に示すごとく,上記ランナー固定部71を有するランナー保持体710と,上記胴縁固定部72を有する胴縁保持体720とからなる。上記ランナー保持体710と上記胴縁保持体720とは,互いの位置関係を前後方向に変化させることができる。
【0043】
即ち,図17に示すごとく,上記ランナー保持体710と上記胴縁保持体720との間には,両者間の隙間を拡縮させる不陸調整ネジ73が配設されている。該不陸調整ネジ73は,上記ランナー保持体710のネジ穴713に螺合するネジ脚部731と,上記胴縁保持体72の中央穴721に遊嵌するネジ頭部732とを有する。そして,上記ネジ脚部731とネジ頭部732との間には,上記胴縁保持体720に後方から当接するネジ鍔部733が設けられている。
これにより,上記不陸調整ネジ73を回転させて,上記ランナー保持体710と胴縁保持体720との位置関係を前後に変化させることができる。
【0044】
また,上記ランナー保持体710と胴縁保持体720とは,上記不陸調整ネジ73の上下において,固定ネジ74によって固定されている。即ち,上記不陸調整ネジ73によって上記ランナー保持体710に対する胴縁保持体720の位置を調整した後,上記固定ネジ74によって,上記ランナー保持体710に胴縁保持体720を固定することができる。
【0045】
また,図21に示すごとく,上記金属胴縁32の胴縁背板321には,上記固定金具7に嵌合されたときに,該固定金具7の上記不陸調整ネジ73,固定ネジ74が配設される部分を開口する開口部325が形成されている。
なお,図14〜図17に示すごとく,上記固定金具7の胴縁保持体720には,補強リブ729が設けてある。
【0046】
次に,上記外壁施工構造1を施工する方法につき説明する。
即ち,本例の外壁施工方法は,下記の第1工程〜第4工程を有する。
第1工程においては,図25,図1,図2に示すごとく,上記構造躯体2における土台柱21と胴差し22とに,複数の金属ランナー31をそれぞれ略水平方向に固定する。
第2工程においては,図27,図1,図2に示すごとく,上記複数の金属ランナー31に,固定金具7を用いて,複数の金属胴縁32を略鉛直方向に固定する。これにより,上記構造躯体2に固定された上記金属下地3を得る。
【0047】
第3工程においては,図28,図1,図2,図13に示すごとく,係合ネジ67を用いて上記金属胴縁32にスタータ金具6を固定し,該スタータ金具6に最下段の外壁板4の下辺部42を係止する。更に,図1,図2,図7に示すごとく,留め付け金具5を上記外壁板4の上辺部41に係止すると共に,係合ネジ57を用いて上記金属胴縁32に固定する。
【0048】
第4工程においては,図1,図2,図7,図23,図24に示すごとく,上記留め付け金具5に,他の外壁板4の下辺部42を係止する。更に他の留め付け金具5を,上記外壁板4の上辺部41に係止すると共に係合ネジ57を用いて上記金属胴縁32に固定する。
そして,該第4工程を順次繰り返すことにより複数の外壁板4を上記金属下地2に固定する。
【0049】
また,上記第1工程においては,図1,図2に示すごとく,上記土台柱21と上記胴差し22との間における複数の管柱23及び間柱24にわたって,水平方向に補強用ランナー310を固定する。
また,上記第2工程において,上記金属胴縁32を上記金属ランナー31に固定するに当っては,まず,図26,図18〜図20に示すごとく,固定金具7におけるランナー固定部71を上記金属ランナー31の水平立設部312に嵌合する。そして,図27,図21,図22に示すごとく,上記固定金具7の胴縁固定部72を上記金属胴縁32に嵌合する。
また,上記金属胴縁32は,上記補強用ランナー310に対しても同様に固定する。
【0050】
このとき,図19に示すごとく,上記ランナー固定部71の突起部712を,上記金属ランナー31の上記水平立設板312に設けられた係合穴314に係合させる。そして,上記胴縁固定部72の突起部722は,上記金属胴縁32の鉛直立設部322に設けられた係合穴324に係合させる。
【0051】
また,上記第2工程において,上記不陸調整ネジ73によって,上記ランナー保持体710と上記胴縁保持体720との互いの位置関係を前後方向に変化させることにより,上記胴縁金具32の不陸調整を行う。
また,上記第3工程又は第4工程において,上記留め付け金具5又はスタータ金具6を上記金属胴縁32に固定するに当っては,図7〜図10,図13に示すごとく,上記係合板59,69を上記一対の胴縁前板323の背面に係合する。
【0052】
即ち,図8に示すごとく,上記係合板59,69を上記一対の胴縁前板323の間から挿入する。次いで,図9,図10に示すごとく,上記係合ネジ57,67を締める方向に回転させることにより上記係合板59,69を回動させると共に前進させ,上記胴縁前板323の背面に係合させる。
【0053】
また,図24に示すごとく,左右の外壁板4が隣り合う部分には,上記長尺背面板580に並設した一対の留め付け金具5を用いる。即ち,これら一対の留め付け金具5のうち,左側の留め付け金具5は左下の外壁板4の上辺部41を係止すると共に左上の外壁板4の下辺部42を支承する。一方,右側の留め付け金具5は右下の外壁板4の上辺部41を係止すると共に右上の外壁板4の下辺部42を支承する。
また,上記長尺背面板580は,その略中央における背面に係合板59を有しており,該係合板59によって上記金属胴縁32に固定される。
【0054】
次に,本例の作用効果につき説明する。
上記金属胴縁32は,上記構造躯体2に水平方向に固定された金属ランナー31に固定する。そのため,上記金属胴縁32を上記金属ランナー31に配設するにあたり,水平方向の位置が多少ずれても,上記構造躯体2の縦材の位置にかかわらず,確実に固定することができる。そのため,上記外壁施工構造1は施工容易である。
【0055】
また,上記外壁施工構造1は,金属下地3を用いているため,強度,耐久性に優れている。
また,図1,図2に示すごとく,上記金属ランナー31は,土台柱21,胴差し22に固定されている。そして,上記土台柱21,胴差し22は,構造躯体2の強度確保に特に重要な部分であるため,特に強度の高い部材が通常使用される。それ故,上記金属ランナー31は,高い固定力で構造躯体2に固定され,その結果,上記金属下地3の強度,ひいては外壁施工構造1の強度が向上する。
【0056】
また,図1,図2,図23,図24に示すごとく,上記外壁板4は,上記金属胴縁31に配設された留め付け金具5又はスタータ金具6に,上辺部41及び下辺部42を係止させることにより,上記金属下地3に留め付けられている。そのため,上記外壁板4を,容易かつ確実に上記金属下地3に固定することができる。
【0057】
また,図7〜図10,図13に示すごとく,上記留め付け金具5及びスタータ金具6に配設した上記係合板59,69を上記一対の胴縁前板323の背面に係合することにより,上記留め付け金具5及びスタータ金具6を上記金属胴縁32に固定する。そのため,上記留め付け金具5及びスタータ金具6を,上記金属胴縁32に沿って上下にスライド移動させて,所望の位置に配置することができる。それ故,上記留め付け金具5又はスタータ金具6を,容易かつ確実に,上記金属胴縁32に固定することができる。
【0058】
また,図21,図22に示すごとく,上記金属ランナー31と上記金属胴縁32とは,上記金属ランナー31の水平立設部312に嵌合するランナー固定部71と,上記金属胴縁32に嵌合する胴縁固定部72とを有する固定金具7を介して固定されている。これにより,上記固定金具7を上記金属ランナー31及び金属胴縁32に嵌合して,該金属ランナー31と金属胴縁32とを固定することができる。それ故,施工が容易であると共に,金属ランナー31と金属胴縁32とを確実に固定することができる。
【0059】
また,上記固定金具7は,上記ランナー固定部71の突起部712を,上記金属ランナー31の上記水平立設板312に設けられた係合穴314に係合し,上記胴縁固定部72の突起部722は,上記金属胴縁32の鉛直立設部322に設けられた係合穴324に係合している。これにより,上記固定金具7を,上記金属ランナー31及び金属胴縁32に一層確実に固定することができる。
【0060】
また,図17に示すごとく,上記固定金具7は,上記ランナー保持体710と胴縁保持体720とからなり,両者は互いの位置関係を前後方向に変化させることができる。これにより,上記金属下地3に固定する外壁板4の不陸調整を容易に行うことができる。それ故,一層,施工容易かつ強度の高い外壁施工構造を得ることができる。
【0061】
以上のごとく,本例によれば,施工容易,かつ強度の高い外壁施工構造及び外壁施工方法を提供することができる。
【0062】
(実施例2)
本例は,図29に示すごとく,本発明をリフォーム用の外壁施工構造10とした例である。
該外壁施工構造10を施工するにあたっては,金属下地3の金属ランナー31を,モルタル壁などの既存壁40及び既存胴縁30を介して既存の構造躯体2における土台柱21と胴差し22とに,長尺ビス390を用いて固定する。そして,該金属ランナー31に固定金具7を用いて金属胴縁32を固定する。これにより,上記既存壁40の前面に金属下地3を構築する。
次いで,該金属胴縁32にスタータ金具6及び留め付け金具5を用いて新たな外壁板4を留め付ける。以上により,上記外壁施工構造10を得る。
その他は,実施例1と同様である。
【0063】
この場合には,既存壁40の後方にある構造躯体2のうち,位置の分かりやすい土台柱21,胴差し22に上記金属下地3を固定すればよいため,施工が容易である。
その他,実施例1と同様の作用効果を有する。
【0064】
なお,上記実施例1,2においては,上記金属ランナーを土台柱と胴差しに固定する例を示したが,上記金属ランナーを土台柱と桁とに固定する,或いは,土台柱と胴差しと桁とに固定することもできる。これらの場合にも,同様の作用効果を得ることができる。
また,上記スタータ金具6の代わりに,上記留め付け金具5をスタータ金具として併用することもできる。
【図面の簡単な説明】
【図1】実施例1における,外壁施工構造の正面説明図。
【図2】図1のA−A線矢視断面図。
【図3】実施例1における,金属ランナーの斜視図。
【図4】実施例1における,金属胴縁の斜視図。
【図5】実施例1における,留め付け金具の正面図。
【図6】実施例1における,留め付け金具の背面図。
【図7】実施例1における,留め付け金具周辺の外壁施工構造の縦断面図。
【図8】実施例1における,金属胴縁への留め付け金具の固定方法の説明図。
【図9】図8に続く,留め付け金具の固定方法の説明図。
【図10】図9に続く,留め付け金具の固定方法の説明図。
【図11】実施例1における,長尺背面板に固定された留め付け金具の正面図。
【図12】実施例1における,スタータ金具の斜視図。
【図13】実施例1における,スタータ金具周辺の外壁施工構造の縦断面図。
【図14】実施例1における,固定金具の正面図。
【図15】実施例1における,固定金具の側面図。
【図16】実施例1における,固定金具の上面図。
【図17】図14のB−B線矢視断面図。
【図18】実施例1における,金属ランナーに固定金具を嵌合した状態を示す正面図。
【図19】図18のC矢視図。
【図20】図18のD矢視図。
【図21】実施例1における,固定金具によって金属ランナーと金属胴縁とを固定した状態を示す正面図。
【図22】図21のE矢視図。
【図23】実施例1における,留め付け金具により上下の外壁板を留め付けた状態を示す正面説明図。
【図24】実施例1における,留め付け金具により上下左右の外壁板を留め付けた状態を示す正面説明図。
【図25】実施例1における,外壁施工方法の説明図。
【図26】図25に続く,外壁施工方法の説明図。
【図27】図26に続く,外壁施工方法の説明図。
【図28】図27に続く,外壁施工方法の説明図。
【図29】実施例2における,外壁施工構造の縦断面説明図。
【図30】従来例における,外壁施工構造の正面説明図。
【図31】図30のF−F線矢視断面相当の説明図。
【図32】従来例における,リフォーム用の外壁施工構造の縦断面説明図。
【符号の説明】
1...外壁施工構造,
2...構造躯体,
21...土台柱,
22...胴差し,
3...金属下地,
31...金属ランナー,
32...金属胴縁,
4...外壁板,
5...留め付け金具,
6...スタータ金具,
7...固定金具,[0001]
【Technical field】
The present invention relates to an outer wall construction structure in which an outer wall plate is fastened to a metal base fixed to a structural frame of a building, and a construction method thereof.
[0002]
[Prior art]
Conventionally, as shown in FIGS. 30 and 31, there is an outer wall construction structure 9 in which an
As described above, in the outer wall construction structure 9, the
[0003]
[Problems to be solved]
However, in the above-described conventional outer wall construction structure 9, as shown in FIG. 30, the
[0004]
In addition, when renovating, as shown in FIG. 32, the
[0005]
In this case, the newly constructed
However, since the
[0006]
The present invention has been made in view of such conventional problems, and an object of the present invention is to provide an outer wall construction structure that is easy to construct and has high strength, and an outer wall construction method for constructing the outer wall construction structure.
[0007]
[Means for solving problems]
The first invention is an outer wall construction structure in which a lateral wall plate is fastened to a metal base fixed to a structural frame of a building,
The metal base has a plurality of metal runners fixed to the structural housing in a substantially horizontal direction, and a plurality of metal trunk edges fixed to the metal runners in a substantially vertical direction,
The outer wall plate is fastened to the metal base by locking the upper side portion and the lower side portion to a fastening bracket or starter fitting disposed on the metal body edge, and each outer wall plate is Arranged in front of a plurality of metal barrel edges,
And the said metal runner is being fixed to the front surface along any two or more of the foundation pillar in the structure frame, a trunk, and a girder,
There are two types of fastening brackets, one that is arranged on the side where the left and right outer wall plates are adjacent to each other, and the other that is arranged on the other side. The outer wall construction structure is characterized in that it is fixed to the metal drum edge in a state where it is arranged in parallel, and the latter is fixed to the metal drum edge in a state where one latter is disposed on one back plate. (Claim 1).
[0008]
The metal body edge is fixed to a metal runner fixed to the structural housing in a substantially horizontal direction. Therefore, when the metal barrel edge is disposed on the metal runner, it can be reliably fixed regardless of the position of the vertical member of the structural frame, even if the horizontal position is slightly shifted. Therefore, the outer wall construction structure is easy to construct.
[0009]
The outer wall construction structure is excellent in strength and durability because it uses a metal base.
Further, the outer wall plate is fastened to the metal base by locking the upper side and the lower side to a fastening metal or starter metal provided on the metal body edge. Therefore, the outer wall plate can be easily and reliably fixed to the metal base.
[0010]
Also, when the outer wall construction structure is an outer wall construction structure for renovation, the construction is easy. That is, since the metal runner on the metal base may be fixed to an easily understandable portion of the structural frame at the rear of the existing wall, such as a base column and a trunk or girder, the construction is easy.
[0011]
As described above, according to the present invention, it is possible to provide an outer wall construction structure that is easy to construct and high in strength.
[0012]
The second invention is a external wall construction method of applying an outer wall construction structure in which fastened the external wall plate for YokoCho the metal base fixed to the structural framework of a building,
The outer wall construction method includes a first step of fixing a plurality of metal runners in a substantially horizontal direction along any two or more of a base column, a trunk, and a girder in the structural frame,
A second step of obtaining the metal base fixed to the structural housing by fixing a plurality of metal barrel edges to the plurality of metal runners in a substantially vertical direction;
The starter bracket is fixed to the metal shell edge, the lower side of the lowermost outer wall plate is locked to the starter bracket, and the fastener is further locked to the upper side of the outer wall plate and fixed to the metal barrel edge. A third step to perform,
A fourth step of locking the lower side portion of the other outer wall plate to the fixing bracket, and further locking the other fixing bracket to the upper side portion of the outer wall plate and fixing to the metal barrel edge. ,
A method of fixing a plurality of outer wall plates to the metal base by sequentially repeating the fourth step;
In the third step and the fourth step, the outer wall plates are arranged in front of a plurality of the metal body edges, and the fastening metal fittings are arranged in a portion where the left and right outer wall plates are adjacent to each other; The former is fixed to the metal body edge in a state where two are placed side by side on a long back plate that is long in the left-right direction, and the latter is placed on one back plate. The outer wall construction method is characterized in that the outer wall construction method is characterized in that the outer wall is fixed to the metal body edge in a disposed state .
[0013]
In the second step, the metal body edge is fixed to a metal runner fixed in the horizontal direction to the structural housing. Therefore, when the metal barrel edge is disposed on the metal runner, it can be reliably fixed regardless of the position of the vertical member of the structural frame, even if the horizontal position is slightly shifted. Therefore, the outer wall construction structure is easy to construct.
[0014]
In the third step and the fourth step, the outer wall plate is fixed to the metal base by locking the upper side portion and the lower side portion with the fastening metal or starter metal provided on the metal body edge. Fasten to. Therefore, the outer wall plate can be easily and reliably fixed to the metal base.
The outer wall construction structure is excellent in strength and durability because it uses a metal base.
[0015]
Also, when the outer wall construction structure is an outer wall construction structure for renovation, the construction is easy. That is, since the metal runner on the metal base may be fixed to an easily understandable portion of the structural frame at the rear of the existing wall, such as a base column and a trunk or girder, the construction is easy.
[0016]
As described above, according to the present invention, it is possible to provide an outer wall construction method capable of easily constructing a strong outer wall construction structure.
[0017]
DETAILED DESCRIPTION OF THE INVENTION
In the first invention (invention 1), as the material of the metal substrate, for example, iron, aluminum, stainless steel, or the like can be used. Moreover, the said metal runner and a metal trunk edge are formed by bending the metal plate of thickness 0.8-2.3 mm, for example.
Further, the metal runner, foundation pillars in the structure building frame, that is fixed to one barrel feeding, and digits. As a result , the metal runner is fixed to the structural frame with a particularly high fixing force, and as a result, the strength of the metal base and thus the strength of the outer wall construction structure are improved.
[0018]
In addition, the fastening bracket includes, for example, a substrate portion that abuts on the back side surface of the outer wall plate, a support portion that is erected forward from the substrate portion, and an upper plate engagement portion that is bent obliquely upward from the support portion. And a lower plate locking portion bent obliquely downward from the support portion. Further, it is preferable that a front flat plate portion is formed in front of the upper plate locking portion and the lower plate locking portion. In addition, the substrate portion preferably has a slope portion that recedes obliquely rearward at the upper portion thereof and a lower leg portion that is bent substantially 90 ° rearward at the lower end portion.
[0019]
The starter bracket is a bracket for locking the lower side portion of the lowermost outer wall plate, for example, a fixed plate portion fixed to the base pillar and a support bent and formed forward from the fixed plate portion. This is a metal fitting that is long in the horizontal direction, and includes a locking portion that is bent obliquely upward from the front end of the support portion.
The outer wall construction structure may be a new construction outer wall construction structure or a renovation outer wall construction structure.
[0020]
In addition, the metal trunk edge includes a trunk edge back plate facing the structural housing, a pair of left and right vertical standing boards standing in a substantially vertical direction forward from the trunk edge back plate, and each vertical standing board. A pair of left and right body edge front plates bent in a direction facing each other from the front end of the metal, and the fastening bracket and the starter metal fitting are provided on the rear surface of the pair of left and right body edge front plates on the metal body edge. An engaging plate that engages, and the fastening plate and the starter fitting are fixed to the metal barrel edge by engaging the engagement plate with the back of the pair of barrel edge front plates. Preferred (claim 2).
[0021]
In this case, the fastening metal fitting and the starter metal fitting can be slid up and down along the metal body edge and arranged at a desired position. Therefore, the outer metal plate can be fastened to the metal base by easily and reliably fixing the fastening metal or the starter metal to the metal body edge.
[0022]
The metal runner has a runner back plate fixed to the structural housing and a pair of upper and lower horizontal upright plates standing in a substantially horizontal direction forward from the runner back plate. Has a trunk back plate facing the structural frame and a pair of left and right vertical plates standing in a substantially vertical direction forward from the trunk back plate, and the metal runner and the metal trunk edge Is preferably fixed via a fixing bracket having a runner fixing portion that fits to the horizontal standing portion of the metal runner and a trunk edge fixing portion that fits to the metal trunk edge. 3).
In this case, the metal runner and the metal trunk edge can be fixed by fitting the fixing metal fitting to the metal runner and the metal trunk edge. Therefore, the construction is easy and the metal runner and the metal trunk edge can be securely fixed.
[0023]
The fixing bracket has protrusions on the runner fixing portion and the trunk edge fixing portion, and the protrusion of the runner fixing portion is engaged with an engagement hole provided in the horizontal standing plate of the metal runner. In addition, it is preferable that the protrusion of the trunk edge fixing portion is engaged with an engagement hole provided in a vertical standing portion of the metal trunk edge.
Thereby, the said fixing metal fitting can be reliably fixed by the said metal runner and a metal trunk | rim.
[0024]
The fixing bracket includes a runner holding body having the runner fixing portion and a trunk edge holding body having the trunk edge fixing portion, and the runner holding body and the trunk edge holding body have a positional relationship with each other. It is preferable that the direction can be changed.
Thereby, the unevenness adjustment of the outer wall board fixed to the said metal base | substrate can be performed easily. Therefore, it is possible to obtain an outer wall construction structure that is easier to construct and higher in strength.
[0025]
Next, in the second invention (invention 6), the fourth step may be performed only once.
Moreover, in the first step, it is preferable that the metal runner is fixed to any one of a base pillar, a trunk, and a girder in the structural frame. In this case, the metal runner is fixed to the structural frame with a particularly high fixing force, and as a result, the strength of the metal base and the strength of the outer wall construction structure are improved.
[0026]
In addition, the metal trunk edge includes a trunk edge back plate facing the structural housing, a pair of left and right vertical standing boards standing in a substantially vertical direction forward from the trunk edge back plate, and each vertical standing board. A pair of left and right trunk edge front plates bent in a direction facing each other from the front end of the front plate, and the fastening bracket and the starter bracket are provided with an engagement plate on the back side thereof that can be engaged with the trunk edge front plate. In the third step or the fourth step, the fastening plate or the starter bracket is fixed to the metal barrel edge, and the engagement plate is engaged with the rear surfaces of the pair of barrel edge front plates. (Claim 7).
[0027]
In this case, the fastening metal fitting and the starter metal fitting can be slid up and down along the metal body edge and arranged at a desired position. Therefore, the fastening metal fitting or the starter metal fitting can be fixed to the metal barrel edge easily and reliably.
[0028]
The metal runner has a runner back plate fixed to the structural housing and a pair of upper and lower horizontal upright plates standing in a substantially horizontal direction forward from the runner back plate. Has a trunk-back plate opposed to the structural frame and a pair of left and right vertical plates standing in a substantially vertical direction forward from the trunk-rim back plate, and in the second step, the metal When fixing the trunk edge to the metal runner, fit the runner fixing part of the fixing bracket to the horizontal standing part of the metal runner, and fit the trunk edge fixing part of the fixing bracket to the metal trunk edge. (Claim 8).
In this case, the metal runner and the metal trunk edge can be fixed by fitting the fixing metal fitting to the metal runner and the metal trunk edge. Therefore, the construction is easy and the metal runner and the metal trunk edge can be securely fixed.
[0029]
The fixing bracket has protrusions on the runner fixing portion and the trunk edge fixing portion, and the protrusion of the runner fixing portion is engaged with an engagement hole provided in the horizontal standing plate of the metal runner. It is preferable that the protrusion portion of the trunk edge fixing portion is engaged with an engagement hole provided in a vertical standing portion of the metal trunk edge.
Thereby, the said fixing metal fitting can be reliably fixed by the said metal runner and a metal trunk | rim.
[0030]
The fixing bracket includes a runner holding body having the runner fixing portion and a trunk edge holding body having the trunk edge fixing portion, and the positional relationship between the runner holding body and the trunk edge holding body is determined. It is preferable to adjust the unevenness of the body rim metal by changing in the front-rear direction (claim 10).
In this case, it is possible to construct an outer wall construction structure that is easier to construct and stronger.
[0031]
【Example】
(Example 1)
An outer wall construction structure according to an embodiment of the present invention and an outer wall construction method for constructing the same will be described with reference to FIGS.
As shown in FIGS. 1 and 2, the outer
[0032]
As shown in FIGS. 1 and 2, the
[0033]
Further, as shown in FIGS. 2, 7, and 13, the
The material of the
The
[0034]
Further, as shown in FIG. 1, between the two
[0035]
Further, as shown in FIG. 3, the
Further, as shown in FIG. 18, the
[0036]
As shown in FIG. 4, the
The
[0037]
As shown in FIGS. 7, 10, and 13, by engaging the
As shown in FIG. 5 to FIG. 7, the
[0038]
Further, as shown in FIG. 5, the
Further, as shown in FIGS. 11 and 24, the two
[0039]
Further, the starter fitting 6 is a fitting for locking the
Further, the fixed
[0040]
As shown in FIGS. 21 and 22, the
[0041]
Further, as shown in FIGS. 14 to 16 and 19, the fixing
[0042]
As shown in FIGS. 14 to 17, the fixing
[0043]
That is, as shown in FIG. 17, a
Accordingly, the positional adjustment between the
[0044]
The
[0045]
Further, as shown in FIG. 21, the shell back
As shown in FIGS. 14 to 17, a reinforcing
[0046]
Next, a method for constructing the outer
That is, the outer wall construction method of the present example has the following first to fourth steps.
In the first step, as shown in FIGS. 25, 1, and 2, a plurality of
In the second step, as shown in FIGS. 27, 1, and 2, the plurality of metal barrel edges 32 are fixed to the plurality of
[0047]
In the third step, as shown in FIGS. 28, 1, 2, and 13, the starter fitting 6 is fixed to the
[0048]
In the fourth step, as shown in FIGS. 1, 2, 7, 23, and 24, the
Then, the plurality of
[0049]
In the first step, as shown in FIGS. 1 and 2, the reinforcing
In the second step, when the
The
[0050]
At this time, as shown in FIG. 19, the
[0051]
Further, in the second step, the
Further, in the third step or the fourth step, the
[0052]
That is, as shown in FIG. 8, the
[0053]
Further, as shown in FIG. 24, a pair of
The
[0054]
Next, the effect of this example will be described.
The
[0055]
Moreover, since the said outer
In addition, as shown in FIGS. 1 and 2, the
[0056]
As shown in FIGS. 1, 2, 23, and 24, the
[0057]
Further, as shown in FIG. 7 to FIG. 10 and FIG. 13, by engaging the
[0058]
Further, as shown in FIGS. 21 and 22, the
[0059]
Further, the fixing
[0060]
Moreover, as shown in FIG. 17, the said fixing
[0061]
As described above, according to this example, it is possible to provide an outer wall construction structure and an outer wall construction method that are easy to construct and have high strength.
[0062]
(Example 2)
In this example, as shown in FIG. 29, the present invention is an outer
In constructing the outer
Next, a new
Others are the same as in the first embodiment.
[0063]
In this case, the construction is easy because the
In addition, the same effects as those of the first embodiment are obtained.
[0064]
In Examples 1 and 2, the metal runner is fixed to the base column and the girder. However, the metal runner is fixed to the base column and the girder, or It can also be fixed to the digit. In these cases, similar effects can be obtained.
Further, instead of the
[Brief description of the drawings]
FIG. 1 is an explanatory front view of an outer wall construction structure in
2 is a cross-sectional view taken along line AA in FIG.
FIG. 3 is a perspective view of a metal runner according to the first embodiment.
4 is a perspective view of a metal trunk edge in
FIG. 5 is a front view of a fastener according to the first embodiment.
FIG. 6 is a rear view of the fastener in the first embodiment.
FIG. 7 is a longitudinal sectional view of an outer wall construction structure around a fastener in the first embodiment.
FIG. 8 is an explanatory diagram of a method for fixing a fastener to a metal barrel edge in the first embodiment.
FIG. 9 is an explanatory view of the fixing method of the fasteners, following FIG. 8;
FIG. 10 is an explanatory diagram of a method for fixing a fastening metal fitting, following FIG. 9;
FIG. 11 is a front view of a fastening bracket fixed to a long back plate in
12 is a perspective view of a starter metal fitting in
13 is a longitudinal sectional view of the outer wall construction structure around the starter fitting in
14 is a front view of a fixing metal fitting in
15 is a side view of a fixing metal fitting in
FIG. 16 is a top view of the fixing bracket in the first embodiment.
17 is a cross-sectional view taken along line BB in FIG.
18 is a front view showing a state in which a metal fitting is fitted to a metal runner in
19 is a view as seen from the direction of arrow C in FIG.
20 is a view as seen from the direction of arrow D in FIG.
FIG. 21 is a front view showing a state in which the metal runner and the metal trunk edge are fixed by the fixing bracket in the first embodiment.
22 is a view on arrow E in FIG. 21. FIG.
FIG. 23 is a front explanatory view showing a state where the upper and lower outer wall plates are fastened by the fastening metal fittings in the first embodiment.
FIG. 24 is a front explanatory view showing a state in which the upper, lower, left and right outer wall plates are fastened by the fastening metal fittings in the first embodiment.
25 is an explanatory diagram of an outer wall construction method in
26 is an explanatory diagram of the outer wall construction method following FIG. 25. FIG.
FIG. 27 is an explanatory view of the outer wall construction method following FIG.
28 is an explanatory diagram of the outer wall construction method following FIG. 27. FIG.
29 is a longitudinal cross-sectional explanatory view of an outer wall construction structure in
FIG. 30 is a front explanatory view of an outer wall construction structure in a conventional example.
31 is an explanatory view corresponding to a cross section taken along line FF in FIG. 30. FIG.
FIG. 32 is a longitudinal sectional explanatory view of an outer wall construction structure for renovation in a conventional example.
[Explanation of symbols]
1. . . Outer wall construction structure,
2. . . Structural enclosure,
21. . . Foundation pillar,
22. . . Torso,
3. . . Metal substrate,
31. . . Metal runner,
32. . . Metal waist,
4). . . Outer wall board,
5. . . Fasteners,
6). . . Starter bracket,
7. . . securing bracket,
Claims (10)
上記金属下地は,上記構造躯体に,それぞれ略水平方向に固定された複数の金属ランナーと,該複数の金属ランナーに略鉛直方向に固定された複数の金属胴縁とを有し,
上記外壁板は,上記金属胴縁に配設された留め付け金具又はスタータ金具に,上辺部及び下辺部を係止させることにより,上記金属下地に留め付けられていると共に,上記各外壁板は複数の上記金属胴縁の前方に配置され,
かつ,上記金属ランナーは,構造躯体における土台柱,胴差し,及び桁のいずれか2つ以上に沿ってそれぞれその前面に固定されており,
上記留め付け金具は,左右の上記外壁板が隣り合う部分に配設されるものと,その他の部分に配設されるものとがあり,前者は左右方向に長い長尺背面板に2個左右に並設された状態で上記金属胴縁に固定され,後者は1個の背面板に1個配設された状態で上記金属胴縁に固定されていることを特徴とする外壁施工構造。 An outer wall construction structure in which a lateral wall plate is fastened to a metal base fixed to a structural frame of a building,
The metal base has a plurality of metal runners fixed to the structural housing in a substantially horizontal direction, and a plurality of metal trunk edges fixed to the metal runners in a substantially vertical direction,
The outer wall plate is fastened to the metal base by locking the upper side portion and the lower side portion to a fastening bracket or starter fitting disposed on the metal body edge, and each outer wall plate is Arranged in front of a plurality of metal barrel edges,
And the said metal runner is being fixed to the front surface respectively along any two or more of the foundation pillar in the structure frame, a trunk, and a girder,
There are two types of fastening brackets, one that is arranged on the side where the left and right outer wall plates are adjacent to each other, and the other that is arranged on the other side. The outer wall construction structure is fixed to the metal barrel edge in a state of being arranged side by side, and the latter is fixed to the metal barrel edge in a state of being arranged on one back plate .
該外壁施工方法は,複数の金属ランナーを,上記構造躯体における土台柱,胴差し,及び桁のいずれか2つ以上に沿って,それぞれ略水平方向に固定する第1工程と,
上記複数の金属ランナーに,複数の金属胴縁を略鉛直方向に固定することにより,上記構造躯体に固定された上記金属下地を得る第2工程と,
上記金属胴縁にスタータ金具を固定し,該スタータ金具に最下段の外壁板の下辺部を係止し,更に留め付け金具を上記外壁板の上辺部に係止すると共に上記金属胴縁に固定する第3工程と,
上記留め付け金具に,他の外壁板の下辺部を係止し,更に他の留め付け金具を上記外壁板の上辺部に係止すると共に上記金属胴縁に固定する第4工程とを有し,
該第4工程を順次繰り返すことにより複数の外壁板を上記金属下地に固定する方法であり,
上記第3工程及び第4工程においては,上記各外壁板を複数の上記金属胴縁の前方に配 置し,上記留め付け金具は,左右の上記外壁板が隣り合う部分に配設するものと,その他の部分に配設するものとがあり,前者は左右方向に長い長尺背面板に2個左右に並設した状態で上記金属胴縁に固定し,後者は1個の背面板に1個配設した状態で上記金属胴縁に固定することを特徴とする外壁施工方法。 A outer wall construction method of applying an outer wall construction structure in which fastened the external wall plate for YokoCho the fixed metal base to the structural framework of a building,
The outer wall construction method includes a first step of fixing a plurality of metal runners in a substantially horizontal direction along any two or more of a base column, a trunk, and a girder in the structural frame,
A second step of obtaining the metal base fixed to the structural housing by fixing a plurality of metal barrel edges to the plurality of metal runners in a substantially vertical direction;
The starter bracket is fixed to the metal shell edge, the lower side of the lowermost outer wall plate is locked to the starter bracket, and the fastener is further locked to the upper side of the outer wall plate and fixed to the metal barrel edge. A third step to perform,
A fourth step of locking the lower side portion of the other outer wall plate to the fixing bracket, and further locking the other fixing bracket to the upper side portion of the outer wall plate and fixing to the metal barrel edge. ,
A method of fixing a plurality of outer wall plates to the metal base by sequentially repeating the fourth step;
In the third step and the fourth step, the respective wall panels and placed in front of a plurality of the metal furring strip, said fastening member is to those arranged in a portion right above the external wall plate adjacent The former is fixed to the metal body edge in a state where two are arranged side by side on a long back plate that is long in the left-right direction, and the latter is 1 on one back plate. A method for constructing an outer wall, characterized in that the outer wall is fixed to the metal barrel edge in a state of being arranged individually .
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2001329465A JP3654233B2 (en) | 2001-10-26 | 2001-10-26 | Exterior wall construction structure and exterior wall construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2001329465A JP3654233B2 (en) | 2001-10-26 | 2001-10-26 | Exterior wall construction structure and exterior wall construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2003129638A JP2003129638A (en) | 2003-05-08 |
JP3654233B2 true JP3654233B2 (en) | 2005-06-02 |
Family
ID=19145364
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2001329465A Expired - Fee Related JP3654233B2 (en) | 2001-10-26 | 2001-10-26 | Exterior wall construction structure and exterior wall construction method |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP3654233B2 (en) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3767596B2 (en) * | 2003-10-23 | 2006-04-19 | ニチハ株式会社 | Fastening unit and outer wall construction structure |
JP3804656B2 (en) * | 2003-11-27 | 2006-08-02 | ニチハ株式会社 | Exterior wall construction structure |
CN1330836C (en) * | 2004-01-22 | 2007-08-08 | 日吉华株式会社 | Metal sustrate assembly and wall constructing structure |
JP5796225B2 (en) * | 2012-02-10 | 2015-10-21 | パナソニックIpマネジメント株式会社 | Panel connecting device |
JP7053206B2 (en) | 2017-09-29 | 2022-04-12 | ニチハ株式会社 | Fixtures and building wall structures |
JP2020117963A (en) * | 2019-01-25 | 2020-08-06 | ケイミュー株式会社 | Wall plate support and wall structure |
-
2001
- 2001-10-26 JP JP2001329465A patent/JP3654233B2/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
JP2003129638A (en) | 2003-05-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP3654233B2 (en) | Exterior wall construction structure and exterior wall construction method | |
JP3636139B2 (en) | Exterior wall construction structure and exterior wall construction method | |
JP2021161739A (en) | Jig for wall connection and outer wall panel member provided with the jig | |
JPH06346568A (en) | Mounting piece for plate member | |
JP2020165091A (en) | Temporary enclosure and construction method thereof | |
KR100663996B1 (en) | Cladding panel installation structure using section shape steel bar and installing method thereof | |
JPS60105747A (en) | Suspended ceiling structure utilizing tile panel structure | |
JP2000273933A (en) | Mounting structure of wall surface setting instrument | |
JPH0247461A (en) | Execution of tiled wall | |
JP3671937B2 (en) | Fastening unit | |
JP3637401B2 (en) | Heavy panel mounting structure and method | |
JP2774404B2 (en) | Wall mounting fixture and wall mounting structure | |
JP2018062836A (en) | Support structure of temporary frame constituting reinforced-concrete building and ceiling panel temporary frame | |
JP5317457B2 (en) | Planar joining method of steel plate panel and tile panel | |
JPH0127212B2 (en) | ||
JP3791507B2 (en) | Fastening unit | |
JP4516534B2 (en) | Exterior material mounting structure | |
JP2007284908A (en) | Brick wall surface using external facing substrate, and its construction method | |
JP5301122B2 (en) | Permanent formwork for walls | |
KR101336669B1 (en) | Construction type pannel for the surface of a wallcarrying out of a building | |
JP2018178582A (en) | Exterior wall repair structure | |
JP4760501B2 (en) | Attached structure mounting structure | |
JPH11131748A (en) | Execution structure of tiled lined siding panel | |
JPS6343293Y2 (en) | ||
JP3566534B2 (en) | Building units and unit buildings |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20040316 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20040511 |
|
A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20041109 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20050106 |
|
A911 | Transfer of reconsideration by examiner before appeal (zenchi) |
Free format text: JAPANESE INTERMEDIATE CODE: A911 Effective date: 20050117 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20050208 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20050221 |
|
R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090311 Year of fee payment: 4 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100311 Year of fee payment: 5 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110311 Year of fee payment: 6 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120311 Year of fee payment: 7 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130311 Year of fee payment: 8 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130311 Year of fee payment: 8 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20140311 Year of fee payment: 9 |
|
LAPS | Cancellation because of no payment of annual fees |