JP3554854B2 - Business job execution related diagram display method - Google Patents

Business job execution related diagram display method Download PDF

Info

Publication number
JP3554854B2
JP3554854B2 JP25986597A JP25986597A JP3554854B2 JP 3554854 B2 JP3554854 B2 JP 3554854B2 JP 25986597 A JP25986597 A JP 25986597A JP 25986597 A JP25986597 A JP 25986597A JP 3554854 B2 JP3554854 B2 JP 3554854B2
Authority
JP
Japan
Prior art keywords
business
job
execution
information
business job
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP25986597A
Other languages
Japanese (ja)
Other versions
JPH1196024A (en
Inventor
聡 大谷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Software Engineering Co Ltd
Original Assignee
Hitachi Software Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Software Engineering Co Ltd filed Critical Hitachi Software Engineering Co Ltd
Priority to JP25986597A priority Critical patent/JP3554854B2/en
Publication of JPH1196024A publication Critical patent/JPH1196024A/en
Application granted granted Critical
Publication of JP3554854B2 publication Critical patent/JP3554854B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Debugging And Monitoring (AREA)
  • Digital Computer Display Output (AREA)
  • User Interface Of Digital Computer (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、業務ジョブ実行計算機システム上で実行順序の関連、実行優先順位、予測処理時間、指定開始時刻により実行が制御される業務ジョブの情報、関連を関連図として表示する方法に係わり、特に、複雑あるいは大量の業務ジョブの関連、業務ジョブが実行される計算機の資源の負荷状態等をより見易く表示することで複雑あるいは大量の業務ジョブの関連を容易に把握可能にした業務ジョブ実行関連図表示方法に関するものである。
【0002】
【従来の技術】
従来、業務ジョブの実行順序、実行多重度、実行優先順位、予測処理時間、指定開始時刻の情報から業務ジョブ実行制御を行う計算機システムにおいて、スケジュールされた業務ジョブの実行順序の確認を行うには、実行順序のみから生成された関連図を参照し、また各ジョブの予定開始時刻の確認を行うにはタイムチャート形式で出力されたリストを参照する必要があった。
【0003】
ここで、業務ジョブの実行順序から関連図を自動生成する方法の従来例は、例えば「統合運用管理システムHOPSS3/ASネットフロー解説/操作書、日立製作所マニュアル、APP−T−010」に記載されている。また、タイムチャート形式でリストを出力する方法の従来例は、例えば「統合運用管理システムHOPSS3/AS解説書、日立製作所マニュアル、APP−B−423−30」に記載されている。
【0004】
【発明が解決しようとする課題】
ところが、上記のような従来方法にあっては、実行順序の関連図と予定開始時刻の関連図とが別々に管理されているため、スケジュールされた任意の業務ジョブがなぜ、その開始時刻にスケジュールされたのかを把握し、任意の業務ジョブについてそのスケジュールの妥当性を確認したい場合、実行順序の関連図と予定開始時刻の関連図とを別々に参照する必要がある。このため、スケジュール結果の妥当性を判断するのが極めて面倒で容易でないという問題があった。
【0005】
また、複雑な業務ジョブの実行順序から業務ジョブの配置を関連図上で行い、その関連図を表示しただけでは、非常に見づらく業務ジョブの関連を把握するには不十分であり、特に、業務ジョブの数が大量になると、表示画面に実行関連図の全体を表示することができなくなり、関連図を参照する者にとっては表示領域をずらしながら(スクロールしながら)関連を参照しなくてはならず、業務ジョブ全体の実行関連の把握が難しいという問題があった。
【0006】
また、業務ジョブをスケジュールして実行する計算機システムでは、ある時間帯に計算機の資源に対して負荷が集中すると、資源待ちの業務ジョブが発生し、円滑な業務ジョブの実行が行えなくなる。そこで、スケジュール結果を参照し、計算機の資源に対して過負荷な状態が発生しないかどうかを検討する必要があるが、スケジュール結果から資源の負荷状態を判断するには、タイムチャート形式で出力されたスケジュール結果のリストを参照し、その時間帯に実行される業務ジョブの数から判断するしかなく、負荷が集中する時間帯を見つけるのに手間がかかるという問題があった。
【0007】
また、ある業務ジョブが異常終了した場合、その原因を究明するためには、その業務ジョブの先行となる業務ジョブを辿る必要があるが、そのためにはリストで出力された業務ジョブの間連から辿るしか方法がなく、異常終了の原因究明に手間がかかるという問題があった。同様に、ある業務ジョブが異常終了したことによって実行に影響がでる業務ジョブを確認するためには、異常終了した業務ジョブの後続ジョブを辿る必要があるが、これも先行ジョブと同様にリストで出力された業務ジョブの間連から辿るしか方法がなく、ある業務ジョブの異常終了がどの業務ジョブに波及するかを容易に把握することができないという問題があった。
【0008】
本発明の目的は、多くの業務ジョブ間の複雑な実行順序の関連および予定開始時刻、計算機資源の負荷状態等を容易に把握可能にするための関連図を表示することができる業務ジョブ実行関連図出力方法を提供することにある。
【0009】
【課題を解決するための手段】
上記目的を達成するために本発明は、実行関連図中で表示対象とする業務ジョブの組み合わせを入力装置から指定させ、指定された任意の組み合せの業務ジョブのみを表示するようにしたものである。
【0010】
このようにすることにより、計算機システム上での業務ジョブ運用を管理する担当者が複数存在する場合であっても、各担当者の管理する業務ジョブとそれらの業務ジョブに関連する業務ジョブのみを表示することにより、実行関連図上に表示する業務ジョブの数が減り、実行関連図の把握が容易となる。
【0011】
ここで、業務ジョブの組み合せを選択する際、1つ1つ業務ジョブを指定していくのでは業務ジョブの組み合せの決定に手間がかかる。その為、実行関連図上に入力装置を使用し、範囲を設定することで、その範囲内の業務ジョブを1組の組み合せとする機能を設けることにより、組み合せの作業を容易にすることが可能である。
【0012】
また、業務ジョブの組み合せを決定する方法として、1つの業務ジョブを選択すると、その業務ジョブに関連する業務ジョブを全て自動的に選択する機能、1つの業務ジョブから任意の関連を辿る機能を設けることにより、ある業務ジョブに関連する業務ジョブを容易に組み合せとすることが可能になる。
【0013】
また、実行関連図上で業務ジョブがスケジュールされた結果が妥当であるか否かを判断するため、実行関連図の横軸を時間軸とし、業務ジョブの開始時刻にあわせ業務ジョブ名を実行関連図上に配置する。この時、一定の時間の長さを長くとると画面上に表示可能な業務ジョブ名の数が減ってしまい、業務ジョブの実行順序の関連の把握、スケジュールの妥当性の把握が困難となる。逆に一定時間の長さを短くすると、表示可能な業務ジョブ名の数は増えるが、実行関連図上の業務ジョブ名の配置密度が高くなり、見づらい実行関連図となる。そのため、実行関連図中で実行順序の関連を詳細に知りたい部分のみ一定時間の長さを長くし、その位置から離れるにつれ一定時間の長さを徐々に短くし表示する。このように一定時間の長さを変え表示することにより、実行関連図の一部分は実行関連図上の業務ジョブを比較的大きく表示することができ、詳細な実行順序の関連の把握が容易となる。また、徐々に一定時間の長さを短くしていくことで画面上に表示できる業務ジョブ名の数が増え、実行関連図上の広範囲の領域を参照することにより、全体的な業務ジョブの実行順序の関連、業務ジョブのスケジュール結果の妥当性の確認が容易となる。
【0014】
それに加え、実行関連図の時間軸である横軸に沿って計算機あるいはその任意の資源の負荷状態を表示する領域を設け、負荷の増減を色を変え表示する。これにより、各時間帯の計算機あるいはその資源の負荷状態の判断が容易となり、負荷の多い時間帯の業務ジョブを分散することで円滑な業務ジョブの実行が可能となる。
【0015】
実際に業務ジョブが実行された場合、その状態を実行関連図の業務ジョブの色を変更することで表わしていく。業務ジョブの色が変更されることで、操作者は実行関連図から現在の計算機、業務ジョブの状態を容易に把握することができ、異常があった場合など迅速な対応が可能となる。
【0016】
【発明の実施の形態】
以下、本発明の実施の形態を図面を用いて詳細に説明する。
図1は、本発明の一実施形態を示すシステム構成図である。
【0017】
図1において、1は各種の業務ジョブが実行される業務ジョブ実行計算機システム、2は業務ジョブの実行を実行順序情報に従って制御する業務ジョブ制御プログラム、3は記憶装置5に登録された業務ジョブ実行順序情報、4は業務ジョブ制御プログラム2により業務ジョブがスケジュールされた結果の情報であるスケジュ−ル情報であり、記憶装置5に格納される。6は業務ジョブ関連図を作成する関連図作成計算機システム、7は関連図作成プログラム、8は業務ジョブ情報管理プログラム、9は業務ジョブ実行計算機システム1から業務ジョブ情報管理プログラム6によって取得した業務ジョブ実行順序情報3とスケジュール情報4とを格納する記憶装置、10は業務ジョブ関連図を表示するディスプレイ装置である。11は業務ジョブの組み合せを決定する際、業務ジョブ関連図上に表示させる業務ジョブの選択を行うためのマウス,キーボードなどの入力装置である。
【0018】
12、13は、関連図作成プログラム7が業務ジョブ実行順序情報3およびスケジュール情報4をもとに作成する業務ジョブ情報およびリンク情報、14は実行関連図上に表示する業務ジョブの組合せを定める組み合せ情報であり、これらの業務ジョブ情報およびリンク情報、組合せ情報は記憶装置5に格納されるようになっている。組み合せ情報14は、入力装置11を使用して業務ジョブの管理者あるいは操作者別に任意の組み合せで設定可能になっている。
【0019】
図2は、業務ジョブ情報管理プログラム8が記憶装置5から予め取得して記憶装置9に格納しておいた業務ジョブ実行順序情報3とスケジュール情報4に基づき関連図作成プログラム7が作成し、ディスプレイ装置10に表示する実行関連図の一例を示す図である。図2において、17は実行関連図、18は各業務ジョブの開始時刻を示すための時間軸、19は実行関連図上に配置された各業務ジョブであり、図2においてはA〜Lの業務ジョブ名の業務ジョブがある。20は業務ジョブと業務ジョブの関連を示す線であり、以下ではリンク線と呼ぶ。このリンク線20の右側に配置された業務ジョブは、左側に配置された業務ジョブが終了してから実行されることを意味する。左側に配置される業務ジョブのことを右側に配置されている業務ジョブの先行ジョブと呼ぶ。また、右側に配置される業務ジョブのことを左側に配置されている業務ジョブの後続ジョブと呼ぶ。先行ジョブにつながるリンク線を先行リンク線、後続ジョブにつながるリンク線を後続リンク線と呼ぶ。なお、図中の丸付き数字▲1▼〜▲9▼および(10)はリンク線の番号である。
【0020】
図3(a),(b)は、図2の実行関連図17上に業務ジョブを配置するための構成を表わすものであり、業務ジョブ情報12は、A,B,C等の英文字で記述された業務ジョブ名121、先行の業務ジョブとを結ぶリンク線20の番号で表わされた先行リンク線の識別子122および後続リンク線の識別子123、業務ジョブの開始時刻124、業務ジョブの表示/非表示を表す表示チェック情報125で構成されている。
【0021】
また、リンク情報13は、各リンク線を識別するためのリンク識別子131、各リンクで先に実行される先行ジョブ名132、そのリンクで後に実行される後続ジョブ名133で構成されている。ここで、先行リンク識別子122および後続リンク識別子123は、先行ジョブまたは後続ジョブが存在しない場合は「なし」という情報で表わされる。また、表示チェック情報125は、実行関連図17上に表示するように選択されている時は“1”、選択されていない時は“0”で表される。
【0022】
図4は、実行関連図17上に表示する業務ジョブの数を減らすことにより、実行関連図17自体の見易さを向上させるために、表示する業務ジョブを決定するための業務ジョブの組み合せを示す組み合せ情報14の構成を示すものであり、組み合せのそれぞれの組を識別するための組み合せ識別子141、各組み合せの組に対して操作者が設定する組み合せ名142、各組み合せの組に含まれる業務ジョブを表わす業務ジョブ名143、各組み合せの表示/非表示を表す表示チェック情報144で構成されている。
【0023】
この組み合せ情報14によれば、例えば組合せ名142=「KUMI−A」の表示チェック情報144を操作者が“1”に設定すると、「KUMI−A」の組に含まれる業務ジョブのみの関連が実行関連図17に表示される。逆に、表示チェック情報144を操作者が“0”に設定すると、表示対象から除外される。
【0024】
ここで、組み合せ情報14は、例えば、業務ジョブ実行計算機システム1で業務ジョブの運用を管理する管理者が複数存在する場合、それぞれの管理者が所望の組み合せを選定し、各管理者別に入力装置11を用いて設定される。管理者別に所望の組み合せを設定できるようにしておくことにより、実行関連図17に表示する業務ジョブの数が減少し、実行関連図17が見易くなり、しかも他の管理者が管理する業務ジョブが絡まないために異常終了等の原因究明が容易になる。
【0025】
以上の構成において、実行関連図17に表示する業務ジョブの組み合せが操作者によって指定された時の実行関連図17の表示方法、業務ジョブの組み合せの決定方法を図2の実行関連図17の例を用いて説明する。
【0026】
まず、組み合せ情報14として図4の14のような組み合せが予め設定されているものとし、この中のいずれかの組み合せが指定されたときの実行関連図17の表示方法を図5および図6のフローチャートを用いて説明する。
実行関連図17において操作者が入力装置11を使用し、表示対象の業務ジョブの組み合せを“KUMI−A”と指定したとすると、関連図作成計算機システム6内の関連図作成プログラム7は、組み合せ情報14から操作者が指定した組み合せ名と一致する組み合せ名142の業務ジョブの組み合せを検索し、操作者が指定した組み合せに含まれる業務ジョブ名143を取得する。そして、その業務ジョブ名143により、当該業務ジョブ名143に該当する業務ジョブの表示チェック情報125(図3)に“1”を設定し、また当該業務ジョブ名143に該当しない業務ジョブの表示チェック情報125には“0”を設定する。設定を終えると画面の表示処理を行う。
【0027】
まず、ステップ501で業務ジョブ情報12の先頭の業務ジョブ情報を取得する。続く、ステップ502で業務ジョブ情報12の取得処理が全て終了したか否かを判断し、終了している場合はステップ506の処理に移る。終了していない場合、ステップ503において、取得した業務ジョブ情報12の表示チェック情報125を判断し、“0”の場合はステップ504の業務ジョブ情報表示処理を行わずステップ505に処理を移す。
【0028】
表示チェック情報125が“1”の場合は、その表示チェック情報125が“1”の業務ジョブ情報をディスプレイ装置10に表示する。ステップ505では、業務ジョブ情報12から次の業務ジョブ情報を取得し、ステップ502に戻り、このステップ502からステップ505までの処理を操作者が指定した組み合せの中に存在する全ての業務ジョブ情報12を取得するまで繰り返すことにより、操作者が指定した組み合せに含まれる業務ジョブのみを実行関連図17に表示させる。この時の状態を図7(a)に示す。ここでは、組み合せ「KUMI−A」の中の業務ジョブA,B,C,D,E,Hが表示される。但し、リンク線は未だ表示されていない。
【0029】
次にステップ506からの処理により、リンク情報13で示されるリンク線を表示する。まず、ステップ506で先頭のリンク情報13を取得した後、ステップ507で全てのリンク情報13の取得処理が終了したか否かを判断し、終了している場合は、関連図表示処理を終了する。終了していない場合は、ステップ508で当該リンク情報13の先行ジョブ名132と一致する業務ジョブ情報を業務ジョブ情報12から検索する。続くステップ509において、前記のステップ508で検索した先行ジョブの表示チェック情報125を判断し、その表示チェック情報125が“0”の場合は、当該リンク情報で示されるリンク線の表示処理は行わず、ステップ513に処理を移す。
【0030】
しかし、表示チェック情報125が“1”の場合は、ステップ510で当該リンク情報13の後続ジョブ名133と一致する業務ジョブ情報を業務ジョブ情報12から検索した後、次のステップ511において、前記ステップ510で検索した後続ジョブの表示チェック情報125を判断し、当該表示チェック情報125が“0”の場合は、当該リンク情報13で示されるリンク線の表示処理は行わずステップ513に処理を移す。
【0031】
表示チェック情報125が“1”の場合は、ステップ512で当該リンク情報13で示されるリンク線の表示処理を行った後、次のステップ513でリンク情報13から次のリンク情報を取得し、ステップ507に処理を移す。以降、ステップ507からステップ513の処理を組み合せ名「KUMI−A」の業務ジョブに関連している全てのリンク情報13の取得処理が終了するまで繰り返す。
【0032】
これにより、操作者が指定した組み合せに含まれる業務ジョブのリンク線が実行関連図17に表示され、実行関連図17の表示処理が完了する。図7(b)にリンク線を含む表示処理が完了した実行関連図17を示している。
【0033】
次に、実行関連図17に表示する業務ジョブの組み合せを作成する方法について説明する。
まず、操作者が業務ジョブの関連に関係なく任意の業務ジョブの組み合せを作成し、組み合せ情報14に設定する方法について図8を用いて説明する。
任意の業務ジョブの組み合せを設定する場合、操作者は入力装置11を使用し、予めディスプレイ装置10の表示画面に表示させた実行関連図17上で、組み合せに含ませたい業務ジョブが入るように範囲を設定する。例えば図8に示すように、入力装置11のマウスを用いて破線枠81を入力することにより、任意の組み合せの範囲を設定する。
【0034】
関連図作成プログラム7は、この破線枠81で囲まれた範囲に表示された業務ジョブ名を取得し、組み合せ識別子141を付加して図4に示したような1組の組み合せ情報として組立て、既に設定してある他の組み合せ情報の最後尾に付加する。
【0035】
これによって、図8に示した例では、業務ジョブ名B,C,F,Hが1組の組み合せとして設定される。なお、組み合せ名142は、操作者が指定する方法および関連図作成プログラム7が自動的に付与する方法が考えられるが、いずれであってもよい。
【0036】
次に、1つの業務ジョブを選択することで、その業務ジョブの先行ジョブ、後続ジョブを検索し、該当する先行および後続の業務ジョブの組み合せを作成し、組み合せ情報14として設定する方法について図2の実行関連図17および図9および図10のフローチャートを用いて説明する。
まず、ステップ901で操作者が入力装置11を使用し、設定する組み合せ名142を入力すると、関連図作成プログラム7は、入力された組み合せ名142を組み合せ情報14の組み合せ名142に設定する。続いてステップ902で変数iの初期値に「0」を設定する。次のステップ903で実行順序の関連がある業務ジョブを検索するための業務ジョブ名が入力装置11を使用して指定されると、その指定された業務ジョブ名を変数user_job_nameと変数job_name[i]に取得する。ここでは、図2の業務ジョブ名”D”が指定されたとする。そうすると、現在の変数iは「0」であるためjob_name[0]には”D”が格納される。
【0037】
次にステップ904において、job_name[i]を組み合せ情報14の業務ジョブ名143に追加する。次にステップ905において、job_name[i]に設定されている業務ジョブ名と一致する業務ジョブ名の業務ジョブ情報を業務ジョブ情報12から検索する。これによって、job_name[0]=“D”の場合、業務ジョブ名Dの業務ジョブ情報が業務ジョブ情報12から取得される。
【0038】
次に、業務ジョブ名Dの業務ジョブが先行および後続の業務ジョブを持っているかを調べるために、ステップ905で当該業務ジョブ名Dの業務ジョブ情報が持つ先行リンク識別子122の先頭の識別子を変数link_idに取得する。業務ジョブ名Dの先頭のリンク識別子は図3では「3」であるためlink_idには「3」が設定される。
【0039】
次に、ステップ907で先行リンク識別子があるかを変数link_idの内容によって判断する。変数link_idとして何等かの数値が設定されている場合は、先行リンク識別子が存在することになるので、次のステップ908で変数link_idと一致するリンク識別子131を持つリンク情報をリンク情報13から検索する。
【0040】
次に、ステップ909で変数iに「1」を加え、変数iを更新する。これにより、変数iは「0」から「1」に更新される。
【0041】
次に、ステップ910で変数job_name[i]にステップ908で検索したリンク情報の先行ジョブ名を取得し、ステップ904に戻る。現在の変数lik_idは「3」であるので、「リンク識別子=3」の先行ジョブ名は図3で”C”となり、また変数iはi=1であるため、job_name[1]の値は”C”となる。
【0042】
以上のステップ904からステップ910までを繰り返すことにより、組み合せ情報14の業務ジョブ名143にはD,C,B,Aが順次設定される。
【0043】
業務ジョブ名Aの設定を終えた場合、その業務ジョブAは先行ジョブを持たないため、ステップ907判断で「先行識別子無し」となり、処理がステップ911に移される。
【0044】
ステップ911では変数iから「1」を減算する。現在の変数iは「3」であるため、減算されて「2」となる。
【0045】
次に、ステップ922で変数iが「0」未満か否かを判定する。現在の変数iは「2」であるため、処理はステップ923に移される。ステップ923では、job_name[i]の次のリンク識別子を変数link_idに取得し、ステップ907に処理を移す。現在の変数iは「2」であり、変数job_name[2]に設定されている業務ジョブ名は“B”である。業務ジョブ名Bの業務ジョブでは、既に検索済みの先行ジョブAの他に先行ジョブを持たないため、ステップ911、922を経てステップ923に処理が移される。
【0046】
次は、業務ジョブ名Cの業務ジョブの2番目の先行リンク識別子がステップ923で変数link_idに設定される。業務ジョブ名Cの業務ジョブの2番目の先行リンク識別子は図3の例では「7」であり、そのリンク識別子=「7」の先行ジョブ名は”H”であるため、ステップ904で業務ジョブ名”H”が業務ジョブ名143に追加される。
【0047】
これらの処理をステップ922で変数iが「0」未満と判断されるまで繰り返すことにより、操作者が指定した業務ジョブDの先行ジョブを辿った結果の業務ジョブ名の組み合せ情報14が設定される。以上と同様の処理を後続ジョブに対してもステップ924で行うことにより、操作者が任意に指定の業務ジョブに関連する業務ジョブの組み合せ情報14が設定される。
【0048】
次に、1つの業務ジョブを操作者が指定し、その業務ジョブに実行順序の関連がある業務ジョブとのリンク線を実行関連図17上で示し、その中から操作者が1組の組み合せに含ませたい業務ジョブへのリンク線を選択していくことにより、業務ジョブの組み合せ情報14を設定する方法について図11および図12を用いて説明する。
【0049】
ここでは、図2の実行関連図17上の業務ジョブFから前につながる業務ジョブA,B,C,Gを1組の組み合せに含ませる業務ジョブとして設定する例を用いる。
【0050】
まず、操作者は入力装置11を使用し、図2の実行関連図17上で業務ジョブFを選択する。選択された業務ジョブFは図11(a)に示すように太枠線111で囲まれ強調表示される。
【0051】
業務ジョブFが選択されると、ます、業務ジョブ情報12およびリンク情報13を検索し、業務ジョブFの先行ジョブである業務ジョブCにつながるリンク線を図11(b)に示すように破線112で実行関連図17内で示し、操作者からの選択を待った状態となる。この状態の時、操作者は破線112で示されているリンク線(リンク線番号▲5▼)を選択するか、選択操作の終了を指示する。
【0052】
ここでは、操作者は業務ジョブCとのリンク線112を選択したものとする。すると、選択されたリンク線112の先行ジョブCが図11(c)に示すように太枠線113で囲まれ強調表示される。次に、業務ジョブCの先行ジョブを検索し、業務ジョブCの先行ジョブである業務ジョブB,Hにつながるリンク線を破線114、115で表示する。
【0053】
操作者は、ここで業務ジョブBにつながるリンク線114を選択する。この処理を先行ジョブがなくなるまで、もしくは操作者が選択操作の終了を指示するまで繰り返す。ここでは、操作者が先行ジョブのない業務ジョブAにつながるリンク線まで選択した状態を図12(a)の実行関連図17に示す。図12(a)においては、業務ジョブF,C,B,,Hが太枠線で強調表示されることを示している。
【0054】
次に、操作者が最初に選択した業務ジョブFの後続ジョブGに対しても同様の処理を行う。後続ジョブの選択処理が、操作者の指示もしくは後続ジョブがない業務ジョブまで終了すると、その終了時点で太枠で囲まれて強調表示されている業務ジョブA,B,C,F,G,Hが1組の組み合せ情報14の業務ジョブ名143に設定される。この終了時点の状態を図12(b)の実行関連図17に示す。
【0055】
ところで、図2に示す実行関連図17に表示されている業務ジョブ数よりさらに業務ジョブの数が増え、ディスプレイ装置10の表示画面に表示できないような場合、実行関連図17上の広範囲の領域を表示した方が実行関連図17の把握が容易となる。そのためには、実行関連図17の横軸である時間軸での目盛り長さを短くしなくてはならない。しかし、目盛り長さを短くすると、表示される業務ジョブ間の間隔がせまくなり、実行順序の関連の把握が困難となる。
【0056】
そこで、本発明の実施形態では、実行順序の関連が見たい時間帯を入力装置11を使用して操作者に指定させ、その指定された時間帯を実行関連図の中心とし、その時間帯から離れていくに従い徐々に時間目盛りの長さを短くして表示するようにしている。このようにすることにより、実行順序の関連を見たい部分の表示を見易くし、かつ、広範囲の業務ジョブを実行関連図上に表示させることができる。
【0057】
また、時間目盛りの長さを短くする割合を操作者が入力装置11を使用して指示した場合、その指示に従って時間目盛りの長さを短くする割合を変えるように制御する。これにより、操作者自身が把握し易い実行関連図17を表示することができ、実行関連図の見易さが大幅に向上する。このようにして表示した実行関連図17の一例を図13に示す。図13では、表示された実行関連図17の画面中央部分aの10分当たりの間隔が広くなって表示され、画面の左右端部になるにつれて10分当たりの間隔が狭くなって表示されている。
【0058】
一方、本発明の実施形態では、表示された実行関連図17上に時間毎の計算機の負荷状態を把握可能なように、時間毎の計算機の負荷状態を表示している。負荷状態の表示は、時間軸である横軸に沿って領域を設け、負荷状態により表示色を変更して表示する。ここでは、あるジョブクラスで同時に実行される業務ジョブの数により色を変えて表示する例を示す。計算機には業務ジョブを実行するジョブクラスが複数存在する。ジョブクラスとは、ジョブの属性によりグループ分けする為に使用される。各ジョブクラスには、業務ジョブの多重度が設定さており、同時に実行することのできる業務ジョブ数は制限される。そのため、ある時間に1つのジョブクラスに対し制限数を超え業務ジョブを実行すると待ち状態の業務ジョブが発生する。
【0059】
この例では、計算機にはジョブクラス01、ジョブクラス02の2つのジョブクラスが用意されており、同時に業務ジョブを実行できる多重度は「2」である。実行関連図17上に表示されている業務ジョブは全てジョブクラス01で実行される。この時に、各ジョブクラスの負荷状態を色を変えて表示した例を図13の実行関連図17に示す。同時に実行される業務ジョブの数が増えると、そのジョブクラスに対する負荷が増大するため、色を濃くして表示する。この例では10時40の部分の色が濃く表示されており、負荷が高いことがわかる。10時40からは3つの業務ジョブが実行されるため、1つの業務ジョブが待ち状態となることが予想される。これを回避するためには、1つの業務ジョブを負荷のないジョブクラス02で実行すればよい。このように知りたい計算機の資源の負荷の状態を色を変更して表示することで、スケジュールの調整の必要な部分を容易に見つけ出すことができる。
【0060】
なお、この例ではジョブクラスの負荷状態を表示する例を示したが、同様にこの他の様々な計算機の資源の負荷状態を表示することでスケジュール結果の妥当性を検証することができる。
【0061】
次に、業務ジョブの実行状態を実行関連図17に反映する例を示す。図14は、図3の業務ジョブ情報12に業務ジョブの現在の状態と異常終了した場合に、その原因を示す終了コードを加えたものである。図1の業務ジョブ情報管理プログラム8が業務ジョブ制御プログラム2より業務ジョブの情報12を取得し、それに対して状態141、終了コード142を設定する。関連図作成プログラム7は、この情報141、142を参照し、実行関連図17上の業務ジョブの色を変更する。業務ジョブの色を変え、実行関連図17を表示した一例を図15に示す。この例では「業務ジョブA」151が正常終了した業務ジョブ、「業務ジョブL」152が実行中の業務ジョブ、「業務ジョブ」153が異常終了した業務ジョブ、「業務ジョブD」154が待ち状態の業務ジョブを表わしている。また、異常終了した業務ジョブを入力装置11を使用し選択することで異常終了の原因を示す終了コード155を表示する。
【0062】
このように業務ジョブをその状態によって色を変更して表示することにより、容易に業務ジョブの状態を知ることができる。もし、業務ジョブが異常終了した場合は、その原因を示す終了コードを表示することで迅速な対応が可能となる。
【0063】
なお、色によって業務ジョブの状態を表示するのに代えて、網掛けまたはハッチングなどの方法によって状態を表示するようにしてもよい。
【0064】
【発明の効果】
以上の説明から明らかなように、本発明においては、実行関連図上に全ての業務ジョブではなく、操作者が入力装置により指定した組み合せ情報に含まれる業務ジョブだけを実行開始時刻と共に実行関連図に表示することにより、実行関連図上に表示される情報が少ない数に絞られる結果、実行関連図の見易さが大幅に向上し、かつ実行開始時刻を同じ画面上で確認することができ、業務ジョブの関連およびスケジュール結果の妥当性を面倒な操作を行なうことなく容易に把握することができる。
【0065】
また、ある業務ジョブに対し実行順序の関連を持つ業務ジョブを自動的に選択し、もしくは実行順序の関連を辿る手段を設けたことにより、表示対象とする業務ジョブの組み合せを容易に作成することができる。
【0066】
さらに、実行関連図の詳細を見たい部分の時間軸の時間目盛りの長さを指定可能にしたことにより、詳しく見たい部分は時間目盛りの長さを長く指定することにより、詳細に各業務ジョブの関連を把握することができる。また、時間目盛りの長さを見たい部分から離れるにつれ徐々に短くしていくことにより、実行関連図上の広い領域を表示できるため、全体の業務ジョブのスケジュール結果の妥当性の判断が容易となる実行関連図を表示することができる。
【0067】
また、計算機やその資源の負荷の状態を色または表示形式を変え表示することにより、スケジュールの調整の必要な部分を容易に把握することができる。
【0068】
さらに、業務ジョブの実行結果を逐次取得し、その情報を実行関連図に反映することにより、業務ジョブの実際の実行結果あるいは実行状態を実行関連図上で把握することが可能になり、異常終了した業務ジョブがあった場合などにおいてその対策を直ちに実施することが可能になるなどの効果が得られる。
【図面の簡単な説明】
【図1】本発明の一実施形態を示すシステム構成図である。
【図2】図1の実施形態で表示する業務ジョブの実行関連図の一例を示す図である。
【図3】図2の実行関連図に業務ジョブを配置するための業務ジョブの情報の構成を表す図である。
【図4】実行関連図上の業務ジョブの組み合せの情報を表わす図である。
【図5】実行関連図の表示処理手順を表わすフローチャートである。
【図6】図5の続きを示すフローチャートである。
【図7】業務ジョブの組み合せを用いて実行関連図を表示していく状態を表わす図である。
【図8】操作者が指定した業務ジョブに実行順序の関連がある業務ジョブを操作者が選択していく状態を表わす図である。
【図9】操作者が指定した業務ジョブに実行順序の関連がある業務ジョブをすべて組み合せに含む表示処理の手順を示すフローチャートである。
【図10】図9の続きを示すフローチャートである。
【図11】操作者が任意の業務ジョブを組み合せとするために範囲を選択した一例を表わす図である。
【図12】図11の続きを示す図である。
【図13】一定時間の長さを徐々に短くし表示し、さらに計算機の負荷状態を色を変え表示した実行関連図の一例を表わす図である。
【図14】実行関連図上に業務ジョブの状態を表示するための業務ジョブ情報の構成を表わす図である。
【図15】実行関連図上に業務ジョブの状態を表示した例を表わす図である。
【符号の説明】
1…業務ジョブ実行計算機システム、2…業務ジョブ制御プログラム、3…業務ジョブ実行順序情報、4…スケジュール結果情報、6…関連図作成計算機システム、7…関連図作成プログラム、8…業務ジョブ情報管理プログラム、10…ディスプレイ装置、11入力装置、12…業務ジョブ情報、13…リンク情報、14…組み合せ情報、17…実行関連図、18…時間軸、19…業務ジョブ、20…リンク線、121…業務ジョブ名、122…先行リンク識別子、123…後続リンク識別子、124…業務ジョブの開始時刻、125…業務ジョブの表示チェック、121…リンク識別子、122…先行ジョブ名、123…後続ジョブ名、141…組み合せ識別子、142…組み合せ名、81…業務ジョブの組み合せを決定するための選択範囲。
[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention relates to a method for displaying, as an association diagram, information on an execution order, execution priority, predicted processing time, information of an operation job whose execution is controlled by a designated start time, and an association on a business job execution computer system, and in particular, Business job execution relation diagram that makes it easy to grasp the relationship between complex or large number of business jobs and the load status of the resources of the computer on which the business job is executed, etc. It relates to a display method.
[0002]
[Prior art]
Conventionally, in a computer system that performs business job execution control from information on the execution order, execution multiplicity, execution priority, predicted processing time, and designated start time of business jobs, to confirm the execution order of scheduled business jobs It is necessary to refer to the related diagram generated only from the execution order, and to refer to the list output in the time chart format in order to confirm the scheduled start time of each job.
[0003]
Here, a conventional example of a method for automatically generating a relation diagram from the execution order of business jobs is described in, for example, “Integrated operation management system HOPSS3 / AS net flow explanation / operation manual, Hitachi, manual, APP-T-010”. ing. A conventional example of a method of outputting a list in a time chart format is described in, for example, "Integrated Operation Management System HOPSS3 / AS Manual, Hitachi, Manual, APP-B-423-30".
[0004]
[Problems to be solved by the invention]
However, in the conventional method as described above, since the related chart of the execution order and the related chart of the scheduled start time are managed separately, the reason why any scheduled business job is If it is desired to grasp whether the job has been performed and to confirm the validity of the schedule of an arbitrary business job, it is necessary to separately refer to the related diagram of the execution order and the related diagram of the scheduled start time. For this reason, there has been a problem that it is extremely troublesome and difficult to judge the validity of the schedule result.
[0005]
Also, arranging business jobs on the related diagram based on the execution order of complex business jobs and displaying the related diagram alone is not enough to grasp the relationship of business jobs that is very difficult to see. When the number of jobs becomes large, it becomes impossible to display the entire execution-related diagram on the display screen, and for those who refer to the related diagram, it is necessary to refer to the relationship while shifting the display area (scrolling). However, there is a problem that it is difficult to grasp the execution relation of the entire business job.
[0006]
Also, in a computer system that schedules and executes business jobs, if the load on the computer resources is concentrated in a certain time zone, a business job waiting for resources occurs, and it becomes impossible to execute the business job smoothly. Therefore, it is necessary to refer to the schedule results to determine whether or not an overload state occurs for the resources of the computer.However, in order to determine the load state of the resources from the schedule results, output is performed in a time chart format. There is no choice but to make a decision from the number of business jobs to be executed in the time zone by referring to the list of the scheduled results, and it takes time to find the time zone in which the load is concentrated.
[0007]
If a business job ends abnormally, it is necessary to trace the business job that precedes the business job in order to investigate the cause. There is no other way but to troubleshoot the cause of the abnormal termination. Similarly, in order to check the business job that is affected by the abnormal termination of a certain business job, it is necessary to follow the succeeding job of the abnormally terminated business job. There is no other way but to trace from a series of output business jobs, and there is a problem that it is not easy to grasp which business job is affected by abnormal termination of a certain business job.
[0008]
SUMMARY OF THE INVENTION An object of the present invention is to provide a business job execution related system capable of displaying a related diagram for easily associating a complicated execution order relationship among many business jobs, a scheduled start time, a load state of computer resources, and the like. It is an object of the present invention to provide a diagram output method.
[0009]
[Means for Solving the Problems]
In order to achieve the above object, the present invention provides A combination of business jobs to be displayed in the execution-related diagram is specified from the input device. Only business jobs of an arbitrary combination are displayed.
[0010]
By doing so, even when there are a plurality of persons in charge of managing job operations on the computer system, only the job managed by each person in charge and the job related to those job are managed. By displaying, the number of business jobs to be displayed on the execution relation diagram is reduced, and it becomes easy to grasp the execution relation diagram.
[0011]
Here, when selecting a combination of business jobs, it is troublesome to determine the combination of business jobs if the business jobs are specified one by one. Therefore, by using an input device on the execution-related diagram and setting a range, a function of combining business jobs within the range into one set is provided, thereby facilitating the combination work. It is.
[0012]
Further, as a method of determining a combination of business jobs, a function of automatically selecting all business jobs related to the business job when one business job is selected, and a function of following an arbitrary relationship from one business job are provided. This makes it possible to easily combine business jobs related to a certain business job.
[0013]
Also, in order to determine whether the result of the scheduled business job on the execution related diagram is appropriate, Run The horizontal axis of the related diagram is the time axis, and the business job name is arranged on the execution related diagram according to the start time of the business job. At this time, if the length of the certain time is increased, the number of business job names that can be displayed on the screen decreases, and it becomes difficult to grasp the relation of the execution order of the business jobs and the validity of the schedule. Conversely, when the length of the fixed time is shortened, the number of business job names that can be displayed increases, but the arrangement density of business job names on the execution-related diagram increases, making it difficult to see. Run It becomes a related figure. Therefore, the length of the fixed time is increased only in a portion of the execution relation diagram in which the relation of the execution order is to be known in detail, and the length of the fixed time is gradually shortened as the position moves away from the position. By changing and displaying the length of the fixed time in this manner, a part of the execution-related diagram can display the business job on the execution-related diagram relatively large, and it is easy to grasp the detailed relationship of the execution order. . Also, by gradually shortening the length of the fixed time, the number of business job names that can be displayed on the screen increases, and by referencing a wide area on the execution-related diagram, It is easy to check the relation of the order and the validity of the business job schedule result.
[0014]
In addition, Run An area for displaying the load status of the computer or any resource thereof is provided along the horizontal axis which is the time axis of the related diagram, and the increase or decrease of the load is displayed in different colors. This makes it easy to determine the load state of the computer or its resources in each time zone, and enables smooth execution of the business job by distributing the business job in the time zone with a heavy load.
[0015]
When a business job is actually executed, Execution It is represented by changing the color of the business job in the series diagram. By changing the color of the business job, the operator can Run The current state of the computer and the business job can be easily grasped from the related diagram, and quick response can be made in case of an abnormality.
[0016]
BEST MODE FOR CARRYING OUT THE INVENTION
Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings.
FIG. 1 is a system configuration diagram showing an embodiment of the present invention.
[0017]
In FIG. 1, 1 is a business job execution computer system for executing various business jobs, 2 is a business job control program for controlling the execution of business jobs according to execution order information, and 3 is a business job execution program registered in the storage device 5. The order information 4 is schedule information, which is information on the result of the business job being scheduled by the business job control program 2, and is stored in the storage device 5. Reference numeral 6 denotes a related diagram creation computer system for creating a business job related diagram, 7 denotes a related diagram creation program, 8 denotes a business job information management program, and 9 denotes a business job acquired from the business job execution computer system 1 by the business job information management program 6. A storage device 10 for storing the execution order information 3 and the schedule information 4 is a display device for displaying a business job related diagram. Reference numeral 11 denotes an input device such as a mouse and a keyboard for selecting a business job to be displayed on the business job relation diagram when determining a combination of business jobs.
[0018]
Reference numerals 12 and 13 denote business job information and link information created by the relation diagram creation program 7 based on the business job execution order information 3 and the schedule information 4; Run Set of business jobs to be displayed on the related diagram Only This is the combination information that determines the combination. Only The matching information is stored in the storage device 5. The combination information 14 can be set using the input device 11 in an arbitrary combination for each business job manager or operator.
[0019]
FIG. 2 is a diagram showing an example in which the business job information management program 8 creates the association diagram creation program 7 based on the business job execution order information 3 and the schedule information 4 previously acquired from the storage device 5 and stored in the storage device 9. FIG. 3 is a diagram illustrating an example of an execution-related diagram displayed on the device 10. In FIG. 2, reference numeral 17 denotes an execution-related diagram, reference numeral 18 denotes a time axis for indicating a start time of each business job, and reference numeral 19 denotes each business job arranged on the execution-related diagram. In FIG. There is a business job with the job name. Reference numeral 20 denotes a line indicating the relationship between business jobs and business jobs, and is hereinafter referred to as a link line. The business job arranged on the right side of the link line 20 means that the business job arranged on the left side is executed after completion. A business job arranged on the left side is called a preceding job of a business job arranged on the right side. A business job arranged on the right side is called a succeeding job of a business job arranged on the left side. A link line leading to a preceding job is called a leading link line, and a link line leading to a succeeding job is called a trailing link line. It should be noted that circled numbers (1) to (9) and (10) in the figure are link line numbers.
[0020]
FIGS. 3A and 3B show the arrangement of business jobs on the execution-related diagram 17 of FIG. For The business job information 12 includes a business job name 121 described in English characters such as A, B, and C, and a preceding link represented by a number of a link line 20 connecting the preceding business job. It is composed of a line identifier 122 and a subsequent link line identifier 123, a start time 124 of the business job, and display check information 125 indicating display / non-display of the business job.
[0021]
The link information 13 includes a link identifier 131 for identifying each link line, a preceding job name 132 to be executed first for each link, and a succeeding job name 133 to be executed later for the link. Here, the leading link identifier 122 and the trailing link identifier 123 are represented by information “None” when there is no leading job or trailing job. The display check information 125 is represented by “1” when it is selected to be displayed on the execution-related diagram 17, and is represented by “0” when it is not selected.
[0022]
FIG. 4 shows that by reducing the number of business jobs displayed on the execution-related diagram 17, Run 17 shows the configuration of combination information 14 indicating a combination of business jobs for determining a business job to be displayed in order to improve the visibility of the related diagram 17 itself, and is used to identify each combination of the combinations. Combination identifier 141, combination name 142 set by the operator for each combination set, business job name representing a business job included in each combination set 143 , Display check information 144 indicating display / non-display of each combination.
[0023]
According to the combination information 14, for example, Only When the operator sets the display check information 144 of the matching name 142 = “KUMI-A” to “1”, only the business jobs included in the set of “KUMI-A” are displayed in the execution relation diagram 17. Conversely, when the operator sets the display check information 144 to “0”, the display check information 144 is excluded from display targets.
[0024]
Here, for example, when there are a plurality of managers who manage the operation of a business job in the business job execution computer system 1, each manager selects a desired combination and sets the input device for each manager. 11 is set. By allowing a desired combination to be set for each administrator, the number of business jobs displayed in the execution-related diagram 17 is reduced, and the execution-related diagram 17 is made easier to see. Since no entanglement occurs, it is easy to find the cause of abnormal termination or the like.
[0025]
In the above configuration, the display method of the execution related diagram 17 when the combination of business jobs displayed in the execution related diagram 17 is designated by the operator and the method of determining the combination of business jobs are described in the example of the execution related diagram 17 in FIG. This will be described with reference to FIG.
[0026]
First, it is assumed that a combination such as 14 in FIG. 4 is set in advance as the combination information 14, and the display method of the execution-related FIG. 17 when any one of the combinations is designated is shown in FIGS. This will be described with reference to a flowchart.
Assuming that the operator uses the input device 11 and designates the combination of business jobs to be displayed as “KUMI-A” in the execution relation drawing 17, the relation drawing program 7 in the relation drawing computer system 6 A search is made from the information 14 for a combination of business jobs having a combination name 142 that matches the combination name specified by the operator, and a business job name 143 included in the combination specified by the operator is acquired. Then, based on the business job name 143, the display check information 125 (FIG. 3) of the business job corresponding to the business job name 143 is set to “1”, and the display check of the business job not corresponding to the business job name 143 is set. information 125 Is set to "0". When the setting is completed, screen display processing is performed.
[0027]
First, in step 501, the top job information of the job information 12 is acquired. Subsequently, in step 502, it is determined whether or not all the acquisition processing of the business job information 12 has been completed, and if completed, the process proceeds to step 506. If the processing has not been completed, the display check information 125 of the acquired business job information 12 is determined in step 503. If the processing check information 125 is “0”, the processing moves to step 505 without performing the business job information display processing in step 504.
[0028]
When the display check information 125 is “1”, the business job information whose display check information 125 is “1” is displayed on the display device. 10 To display. In step 505, the next business job information is acquired from the business job information 12, and the process returns to step 502. The processing from step 502 to step 505 is performed for all business job information 12 existing in the combination specified by the operator. Is repeated until only the business job included in the combination specified by the operator is displayed in the execution-related diagram 17. The state at this time is shown in FIG. Here, the business jobs A, B, C, D, E, and H in the combination “KUMI-A” are displayed. However, the link line has not been displayed yet.
[0029]
Next, the link line indicated by the link information 13 is displayed by the processing from step 506. First, after acquiring the leading link information 13 in step 506, it is determined in step 507 whether or not the acquisition processing of all the link information 13 has been completed, and if completed, terminates the related diagram display processing. . If the processing has not been completed, in step 508, business job information that matches the preceding job name 132 of the link information 13 is searched from the business job information 12. In subsequent step 509, the display check information 125 of the preceding job searched in step 508 is determined. If the display check information 125 is "0", the display processing of the link line indicated by the link information is not performed. , To 513.
[0030]
However, if the display check information 125 is “1”, after searching for business job information that matches the succeeding job name 133 of the link information 13 from the business job information 12 in step 510, in the next step 511, The display check information 125 of the succeeding job searched in 510 is determined, and the display check information 125 is determined. 125 Is “0”, the process moves to step 513 without performing the display processing of the link line indicated by the link information 13.
[0031]
If the display check information 125 is “1”, after performing the display processing of the link line indicated by the link information 13 in step 512, the next link information is acquired from the link information 13 in the next step 513, and The processing moves to 507. Thereafter, the processing from step 507 to step 513 is repeated until the processing of acquiring all the link information 13 related to the business job with the combination name “KUMI-A” is completed.
[0032]
Thereby, the link line of the business job included in the combination specified by the operator is displayed in the execution-related diagram 17, and the display process of the execution-related diagram 17 is completed. FIG. 7B shows an execution-related diagram 17 in which the display processing including the link line is completed.
[0033]
Next, a method of creating a combination of business jobs to be displayed in the execution-related diagram 17 will be described.
First, a method in which an operator creates an arbitrary combination of business jobs irrespective of the relation between the business jobs and sets the combination in the combination information 14 will be described with reference to FIG.
When setting an arbitrary combination of business jobs, the operator uses the input device 11 and sets the display device in advance. 10 Displayed on the display screen of Run On the related diagram 17, a range is set so that business jobs to be included in the combination are included. For example, as shown in FIG. 8, an arbitrary combination range is set by inputting a broken line frame 81 using a mouse of the input device 11.
[0034]
The related diagram creation program 7 acquires the business job name displayed in the range surrounded by the broken line frame 81, adds the combination identifier 141, and assembles it as one set of combination information as shown in FIG. It is added to the end of other set combination information.
[0035]
Thus, in the example shown in FIG. 8, the business job names B, C, F, and H are set as one set. The combination name 142 may be specified by the operator or automatically given by the related diagram creation program 7, but may be any one.
[0036]
Next, by selecting one business job, the preceding job and the succeeding job of the business job are searched, and the combination of the corresponding preceding and succeeding business jobs is searched. Matching Create and combine Matching A method of setting the information 14 will be described with reference to the execution-related diagram 17 of FIG. 2 and the flowcharts of FIGS. 9 and 10.
First, in step 901, when the operator uses the input device 11 to input the combination name 142 to be set, the relation diagram creation program 7 sets the input combination name 142 as the combination name 142 of the combination information 14. Subsequently, in step 902, “0” is set as the initial value of the variable i. In step 903, when a business job name for searching for a business job related to the execution order is specified using the input device 11, the specified business job name is changed to variables user_job_name and variable job_name [i]. To get. Here, it is assumed that the business job name “D” in FIG. 2 has been designated. Then, since the current variable i is “0”, “D” is stored in job_name [0].
[0037]
Next, in step 904, job_name [i] is added to the business job name 143 of the combination information 14. Next, in step 905, the business job information 12 is searched for business job information having a business job name that matches the business job name set in job_name [i]. Thus, when job_name [0] = "D", the business job information of the business job name D is acquired from the business job information 12.
[0038]
Next, in order to check whether the business job having the business job name D has preceding and succeeding business jobs, in step 905, the leading identifier of the leading link identifier 122 included in the business job information having the business job name D is set as a variable. link_id. Since the head link identifier of the business job name D is “3” in FIG. 3, “3” is set in link_id.
[0039]
Next, in step 907, it is determined whether there is a preceding link identifier based on the contents of the variable link_id. If any numerical value is set as the variable link_id, there is a preceding link identifier. Therefore, in the next step 908, link information having the link identifier 131 matching the variable link_id is searched from the link information 13. .
[0040]
Next, in step 909, “1” is added to the variable i to update the variable i. As a result, the variable i is updated from “0” to “1”.
[0041]
Next, in step 910, the preceding job name of the link information searched in step 908 is acquired for the variable job_name [i], and the process returns to step 904. Current variable li n Since k_id is “3”, the preceding job name of “link identifier = 3” is “C” in FIG. 3, and since the variable i is i = 1, the value of job_name [1] is “C”. Become.
[0042]
By repeating the above steps 904 to 910, D, C, B, and A are sequentially set in the business job name 143 of the combination information 14.
[0043]
When the setting of the business job name A is completed, the business job A does not have the preceding job, so that the result of the judgment in step 907 is “no preceding identifier”, and the process proceeds to step 911.
[0044]
In step 911, “1” is subtracted from the variable i. Since the current variable i is “3”, it is subtracted to “2”.
[0045]
Next, in step 922, it is determined whether or not the variable i is less than “0”. Since the current variable i is “2”, the process proceeds to step 923. In step 923, the link identifier next to job_name [i] is obtained as a variable link_id, and the process proceeds to step 907. The current variable i is “2”, and the business job name set in the variable job_name [2] is “B”. Since the business job with the business job name B has no preceding job other than the previously searched preceding job A, the process moves to step 923 via steps 911 and 922.
[0046]
Next, the second preceding link identifier of the business job with the business job name C is set in the variable link_id in step 923. The second preceding link identifier of the business job having the business job name C is “7” in the example of FIG. 3, and the preceding job name of the link identifier = “7” is “H”. Name "H" is the business job name 143 Is added to
[0047]
By repeating these processes until the variable i is determined to be less than “0” in step 922, a set of business job names resulting from tracing the preceding job of business job D specified by the operator Matching Information 14 is set. By performing the same processing as described above on the subsequent job in step 924, the operator can arbitrarily specify a set of business jobs related to the specified business job. Matching Information 14 is set.
[0048]
Next, the operator specifies one business job, and creates a link line with the business job whose execution order is related to the business job. Run FIG. 17 shows an example in which the operator selects one set. Matching By selecting the link line to the business job that you want to include in the Matching A method for setting the information 14 will be described with reference to FIGS.
[0049]
Here, an example is used in which the business jobs A, B, C, and G that are connected to the business job F on the execution related diagram 17 in FIG. 2 are set as business jobs to be included in one combination.
[0050]
First, the operator uses the input device 11 to select the business job F on the execution relation diagram 17 of FIG. The selected job job F is highlighted by being surrounded by a thick frame line 111 as shown in FIG.
[0051]
When the business job F is selected, the business job information 12 and the link information 13 are searched, and the link line leading to the business job C which is the preceding job of the business job F is changed to a dashed line 112 as shown in FIG. 17 and is in a state of waiting for a selection from the operator. In this state, the operator selects the link line (link line number {circle around (5)}) indicated by the broken line 112 or instructs the end of the selection operation.
[0052]
Here, it is assumed that the operator has selected the link line 112 with the business job C. Then, the preceding job C of the selected link line 112 is highlighted by being surrounded by the thick frame line 113 as shown in FIG. Next, the preceding job of the business job C is searched, and link lines leading to the business jobs B and H, which are the preceding jobs of the business job C, are displayed by broken lines 114 and 115.
[0053]
Here, the operator selects the link line 114 connected to the business job B. This process is repeated until there is no preceding job or until the operator instructs to end the selection operation. Here, a state in which the operator has selected up to the link line leading to the business job A having no preceding job is shown in the execution-related diagram 17 of FIG. In FIG. 12A, business jobs F, C, B, A , H are indicated by bold lines.
[0054]
Next, the same processing is performed on the succeeding job G of the business job F selected first by the operator. When the selection process of the succeeding job is completed up to the instruction of the operator or the business job having no succeeding job, the business jobs A, B, C, F, G, and H that are highlighted in a bold frame at the end of the process. Is set as the business job name 143 of the set of combination information 14. The state at the time of this termination is shown in the execution-related diagram 17 of FIG.
[0055]
By the way, when the number of business jobs is further increased than the number of business jobs displayed in the execution-related diagram 17 shown in FIG. 2 and cannot be displayed on the display screen of the display device 10, Run Displaying a wide area on the related figure 17 is better Run The related figure 17 can be easily grasped. for that purpose, Run The scale length on the time axis, which is the horizontal axis in the related drawing 17, must be shortened. However, when the scale length is shortened, the intervals between the displayed business jobs become narrow, and it becomes difficult to grasp the relation of the execution order.
[0056]
Therefore, in the embodiment of the present invention, the operator uses the input device 11 to specify a time zone in which the user wants to see the relation of the execution order, and specifies the specified time zone. Run At the center of the related diagram, the length of the time scale is gradually shortened and displayed as the distance from the time zone increases. By doing so, it is easy to see the display of the part that the user wants to see the relation of the execution order, and a wide range of business jobs can be Run It can be displayed on the related diagram.
[0057]
In addition, when the operator instructs the rate of shortening the length of the time scale using the input device 11, control is performed so as to change the rate of shortening the length of the time scale in accordance with the instruction. As a result, it is possible to display the execution-related diagram 17 which is easy for the operator to grasp. Run The legibility of related figures is greatly improved. FIG. 13 shows an example of the execution-related diagram 17 displayed in this manner. In FIG. 13, the interval per 10 minutes in the center part a of the screen in the displayed execution-related diagram 17 is displayed to be wider, and the interval per 10 minutes becomes narrower toward the left and right ends of the screen. .
[0058]
On the other hand, in the embodiment of the present invention, the load status of the computer at each time is displayed on the displayed execution relation diagram 17 so that the load status of the computer at each time can be grasped. In the display of the load state, an area is provided along the horizontal axis which is a time axis, and the display color is changed according to the load state and displayed. Here, an example is shown in which the color is changed according to the number of business jobs executed simultaneously in a certain job class. The computer has a plurality of job classes for executing business jobs. The job class is used for grouping according to job attributes. Each job class is set with a multiplicity of business jobs, and the number of business jobs that can be executed simultaneously is limited. For this reason, when a job class exceeds the limit for one job class at a certain time and the job job is executed, a job job in a waiting state occurs.
[0059]
In this example, the computer has two job classes, job class 01 and job class 02, and the multiplicity at which a job can be executed at the same time is "2". Run All business jobs displayed on the related diagram 17 are executed in the job class 01. At this time, an example in which the load status of each job class is displayed in different colors is shown in FIG. Run This is shown in FIG. When the number of business jobs executed at the same time increases, the load on the job class increases. In this example, the color of the portion at 10:40 is displayed dark, indicating that the load is high. From 10:40, since three business jobs are executed, it is expected that one business job will be in a waiting state. In order to avoid this, one business job may be executed in the job class 02 having no load. By changing the color and displaying the state of the resource load of the computer that the user wants to know, it is possible to easily find the part that needs to be adjusted in the schedule.
[0060]
Note that, in this example, an example in which the load status of the job class is displayed is shown. Similarly, the validity of the schedule result can be verified by displaying the load status of various other computer resources.
[0061]
Next, the execution status of the business job Run An example reflected in the related FIG. 17 is shown. FIG. 14 shows the business job information 12 shown in FIG. 3 in which the current status of the business job and the end code indicating the cause of the abnormal termination are added. The business job information management program 8 in FIG. 1 acquires the business job information 12 from the business job control program 2 and sets the status 141 and the end code 142 for it. The related diagram creation program 7 refers to the information 141 and 142, Run The color of the business job on the related diagram 17 is changed. Change the color of business jobs, Run FIG. 15 shows an example in which the related diagram 17 is displayed. In this example, a “business job A” 151 has completed normally, a “business job L” 152 has a running business job, and a “business job C "153" indicates an abnormally terminated business job, and "business job D" 154 indicates a business job in a waiting state. Further, by selecting a business job that has ended abnormally using the input device 11, an end code 155 indicating the cause of the abnormal end is displayed.
[0062]
In this way, by displaying the business job in a different color depending on its status, the status of the business job can be easily known. If a business job ends abnormally, prompt display of an end code indicating the cause enables quick response.
[0063]
Note that, instead of displaying the status of the business job by color, the status may be displayed by a method such as hatching or hatching.
[0064]
【The invention's effect】
As is clear from the above description, according to the present invention, not all business jobs but an operator Business job included in the combination information specified by Is displayed in the execution-related diagram together with the execution start time, the information displayed on the execution-related diagram is reduced to a small number. As a result, the visibility of the execution-related diagram is greatly improved, and the execution start time is reduced. It is possible to confirm on the same screen, and it is possible to easily grasp the relation of the business job and the validity of the schedule result without performing a troublesome operation.
[0065]
Also, by automatically selecting a business job having an execution order relationship with a certain business job or providing a means for following the execution order relationship, a combination of business jobs to be displayed can be easily created. Can be.
[0066]
further, Run By enabling the length of the time scale on the time axis of the part where you want to see the details of the related diagram, you can specify the length of the time scale for the part you want to see in detail, so that the relationship between each business job can be specified in detail. I can figure it out. In addition, by gradually shortening the length of the time scale as you move away from the part you want to see, a large area on the execution-related diagram can be displayed, making it easy to judge the validity of the schedule results of the entire business job. Can be displayed.
[0067]
Further, by displaying the state of the load of the computer and its resources by changing the color or the display format, it is possible to easily grasp the portion that requires the schedule adjustment.
[0068]
Furthermore, by sequentially acquiring the execution results of business jobs and reflecting the information in the execution-related diagrams, it becomes possible to grasp the actual execution results or execution states of the business jobs on the execution-related diagrams, and to terminate abnormally. For example, when there is a business job that has been performed, it is possible to take an effect such that the countermeasure can be immediately implemented.
[Brief description of the drawings]
FIG. 1 is a system configuration diagram showing an embodiment of the present invention.
FIG. 2 is a diagram showing an example of a business job execution related diagram displayed in the embodiment of FIG. 1;
FIG. 3 is a diagram showing a configuration of business job information for arranging business jobs in the execution relation diagram of FIG. 2;
FIG. 4 is a set of business jobs on an execution relation diagram. Matching FIG.
FIG. 5 is a flowchart illustrating a procedure of displaying an execution-related diagram.
FIG. 6 is a flowchart showing a continuation of FIG. 5;
FIG. 7 using a combination of business jobs Run Display the related diagram Show FIG.
FIG. 8 is a diagram illustrating a state in which the operator selects a business job whose execution order is related to the business job specified by the operator.
FIG. 9 shows a set of all business jobs related to the execution order to the business job specified by the operator. Matching 9 is a flowchart showing a procedure of a display process included in FIG.
FIG. 10 is a flowchart showing a continuation of FIG. 9;
FIG. 11 is a diagram showing an example in which an operator sets an arbitrary job Matching FIG. 13 is a diagram illustrating an example in which a range is selected to be set.
FIG. 12 is a view showing a continuation of FIG. 11;
FIG. 13 shows the length of a certain time gradually shortened, and furthermore, the load state of the computer is displayed in different colors. Run It is a figure showing an example of a related figure.
FIG. 14 Run FIG. 11 is a diagram illustrating a configuration of business job information for displaying a status of the business job on the related diagram.
FIG. Run FIG. 14 is a diagram illustrating an example in which the status of a business job is displayed on a related diagram.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 ... Business job execution computer system, 2 ... Business job control program, 3 ... Business job execution order information, 4 ... Schedule result information, 6 ... Related diagram creation computer system, 7 ... Related diagram creation program, 8 ... Business job information management Program 10 display device 11 input device 12 business job information 13 link information 14 combination information 17 execution related diagram 18 time axis 19 business job 20 link line 121 Business job name, 122: preceding link identifier, 123: subsequent link identifier, 124: start time of business job, 125: display check of business job, 121: link identifier, 122: preceding job name, 123: succeeding job name, 141 ... combination identifier, 142 ... combination name, 81 ... business job combination Matching Selection range to determine.

Claims (4)

業務ジョブと業務ジョブの間での実行順序の関連、実行多重度、実行優先順位、予測処理時間、指定開始時刻に関する情報により業務ジョブを実行する業務ジョブ実行計算機システムから、実行される業務ジョブの情報とそれに関連する実行順序の情報を取得し、横軸を時間軸とし、業務ジョブの開始時刻、業務ジョブ間の実行順序の関連にしたがって業務ジョブ名を配置した実行関連図を関連図作成計算機で作成し、表示装置に出力する業務ジョブ実行関連図表示方法であって、
実行関連図中で表示対象とする業務ジョブについて、関連付けて表示する複数の業務ジョブを入力装置により指定させ、指定された複数の業務ジョブについての業務ジョブ名の組み合せを組み合せ情報として1ないし複数組保存しておき、実行関連図の出力に際して、前記入力装置により表示対象とする組を指定させ、指定された組の組み合せ情報に含まれる業務ジョブ名のみを配置した実行関連図を作成し、開始時刻の情報と共に表示することを特徴とする業務ジョブ実行関連図表示方法。
The execution of the business job from the business job execution computer system that executes the business job based on the information on the execution order relationship, execution multiplicity, execution priority, predicted processing time, and specified start time between business jobs Acquires information and related execution order information, sets the horizontal axis to the time axis, arranges business job names in accordance with the relation between the start time of business jobs and the execution order between business jobs, and creates an execution relation diagram related computer Business job execution related diagram display method created in and output to a display device,
For the business job to be displayed in the execution relation diagram, a plurality of business jobs to be displayed in association with each other are designated by an input device, and one or a plurality of combinations of business job names of the plurality of designated business jobs are used as combination information. When the execution relation diagram is output, the set to be displayed is designated by the input device, and the execution relation diagram in which only the business job names included in the combination information of the specified group are arranged is created. A business job execution related diagram display method characterized by displaying the information together with time information.
前記表示装置に出力された実行関連図に対して、入力装置により範囲を指定させ、指定範囲に含まれる複数の業務ジョブの業務ジョブ名を前記1組の組み合せ情報として保存することを特徴とする請求項1記載の業務ジョブ実行関連図作成方法。  A range is specified by an input device with respect to the execution-related diagram output to the display device, and business job names of a plurality of business jobs included in the specified range are stored as the set of combination information. The business job execution related diagram creation method according to claim 1. 前記業務ジョブ実行計算機から取得した業務ジョブの情報に基づき、前記入力装置から指定された特定の業務ジョブに関連する全ての業務ジョブを検索し、その検索結果の業務ジョブの一部または全部を前記特定の業務ジョブに関連する1組の組み合せ情報として保存することを特徴とする請求項1記載の業務ジョブの実行関連図作成方法。Based on the information of the business job acquired from the business job execution computer, search for all business jobs related to the specific business job specified from the input device, and part or all of the business job of the search result is 2. The method according to claim 1, wherein the information is stored as a set of combination information related to a specific business job. 前記実行関連図の全部又は一部について、前記時間軸の時間目盛りの長さを入力装置からの指定に応じて可変し、指定された組の業務ジョブ名を当該時間軸方向に配置して表示することを特徴とする請求項1〜3のいずれかに記載の業務ジョブ実行関連図作成方法。 For all or a part of the execution-related diagram, the length of the time scale on the time axis is changed according to the specification from the input device, and the specified set of business job names are arranged and displayed in the time axis direction. The method for creating a business job execution-related diagram according to any one of claims 1 to 3, wherein:
JP25986597A 1997-09-25 1997-09-25 Business job execution related diagram display method Expired - Fee Related JP3554854B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP25986597A JP3554854B2 (en) 1997-09-25 1997-09-25 Business job execution related diagram display method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP25986597A JP3554854B2 (en) 1997-09-25 1997-09-25 Business job execution related diagram display method

Publications (2)

Publication Number Publication Date
JPH1196024A JPH1196024A (en) 1999-04-09
JP3554854B2 true JP3554854B2 (en) 2004-08-18

Family

ID=17340043

Family Applications (1)

Application Number Title Priority Date Filing Date
JP25986597A Expired - Fee Related JP3554854B2 (en) 1997-09-25 1997-09-25 Business job execution related diagram display method

Country Status (1)

Country Link
JP (1) JP3554854B2 (en)

Families Citing this family (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2008143237A1 (en) * 2007-05-21 2008-11-27 Wise Solutions Inc. Project information display apparatus, project information display method, project information display program, and electronic medical chart information display apparatus
JP5229223B2 (en) * 2007-06-11 2013-07-03 富士通株式会社 Workflow definition change program and workflow definition change method
WO2008152687A1 (en) * 2007-06-11 2008-12-18 Fujitsu Limited Workflow definition changing program, workflow definition changing method, and workflow definition changing device
JP5464970B2 (en) * 2009-10-21 2014-04-09 富士通エフ・アイ・ピー株式会社 Information processing program, information processing apparatus, and information processing method
US8516301B2 (en) * 2011-04-08 2013-08-20 Ca, Inc. Visualizing transaction traces as flows through a map of logical subsystems
US8438427B2 (en) * 2011-04-08 2013-05-07 Ca, Inc. Visualizing relationships between a transaction trace graph and a map of logical subsystems
JP5497210B1 (en) * 2013-01-23 2014-05-21 中国電力株式会社 Job re-execution support system
JP6209862B2 (en) 2013-05-24 2017-10-11 富士通株式会社 Program, job monitoring support method, information processing apparatus and system
JP6097666B2 (en) * 2013-09-25 2017-03-15 株式会社日立ソリューションズ Job management system
JP6258159B2 (en) * 2014-08-26 2018-01-10 株式会社東芝 Program information generation system, method, and program
US9684546B2 (en) * 2014-12-16 2017-06-20 Microsoft Technology Licensing, Llc Job scheduling and monitoring in a distributed computing environment
JP6920235B2 (en) * 2018-02-28 2021-08-18 株式会社日立製作所 Failure impact investigation device and failure impact investigation method
JP7176243B2 (en) * 2018-06-15 2022-11-22 富士フイルムビジネスイノベーション株式会社 Information processing device and program

Also Published As

Publication number Publication date
JPH1196024A (en) 1999-04-09

Similar Documents

Publication Publication Date Title
US5479599A (en) Computer console with group ICON control
JP3554854B2 (en) Business job execution related diagram display method
JP3634323B2 (en) Graphic editing system
US6239800B1 (en) Method and apparatus for leading a user through a software installation procedure via interaction with displayed graphs
US5005119A (en) User interactive control of computer programs and corresponding versions of input/output data flow
US6232968B1 (en) Data processor controlled display system with a plurality of switchable customized basic function interfaces for the control of varying types of operations
US7788631B2 (en) Process automation system
JPH0786819B2 (en) Tree structure display method
JP2001524710A (en) How to access object parameters in a simulation model
US7689990B2 (en) Method, system and program for managing executable tasks
JPH02130663A (en) User's interface
JP3668041B2 (en) Data search device and computer-readable recording medium storing data search program
US6002850A (en) Operation sequence user adaptive system and method
US6671566B2 (en) Process control system and process control program storage medium
US6212674B1 (en) Graphic control process for controlling operations in a network management system
US7900155B2 (en) System and method for providing information about an operation's applicability to an item
JPH08314679A (en) Application management control method
JPH10177596A (en) Product development project management system and method
JP3239292B2 (en) Figure specification control method for figure editing system
US7343557B2 (en) Guided data entry using indicator and interactive step symbols
JP2650101B2 (en) User adaptive system and adaptive method
JPH09114572A (en) Record data input device
JP2827874B2 (en) Menu display control method
JPH0916368A (en) Object editing system
JPH06208445A (en) Data processor for executing converged display

Legal Events

Date Code Title Description
TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20040420

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20040421

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100521

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130521

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20160521

Year of fee payment: 12

LAPS Cancellation because of no payment of annual fees