JP3537398B2 - Assembly fencer - Google Patents

Assembly fencer

Info

Publication number
JP3537398B2
JP3537398B2 JP2001016736A JP2001016736A JP3537398B2 JP 3537398 B2 JP3537398 B2 JP 3537398B2 JP 2001016736 A JP2001016736 A JP 2001016736A JP 2001016736 A JP2001016736 A JP 2001016736A JP 3537398 B2 JP3537398 B2 JP 3537398B2
Authority
JP
Japan
Prior art keywords
retaining plate
wall
soil
vegetation
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2001016736A
Other languages
Japanese (ja)
Other versions
JP2001342632A (en
Inventor
英明 斉藤
Original Assignee
株式会社馬渡商会
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社馬渡商会 filed Critical 株式会社馬渡商会
Priority to JP2001016736A priority Critical patent/JP3537398B2/en
Publication of JP2001342632A publication Critical patent/JP2001342632A/en
Application granted granted Critical
Publication of JP3537398B2 publication Critical patent/JP3537398B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
  • Retaining Walls (AREA)
  • Revetment (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、杭体又はU字状枠
体と、土留板を用いて水路や擁壁等の壁面を施工する組
立柵工技術に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an assembly fence technique for constructing a wall such as a waterway or a retaining wall using a pile or a U-shaped frame and a retaining plate.

【0002】[0002]

【従来の技術】従来、例えば、水路や擁壁等の壁面を施
工する組立柵工は、複数本の杭体を、一定間隔で地中に
埋設して立設し、この各杭体の中程背面部に突設された
突出部に土留板の下端部を支持する状態で、土留板を隣
り合う杭体間において杭体の上側部分の間に上下複数段
に横架することにより背面土を支えるように施工され
る。又、水路の壁面を施工する組立柵工は、底面枠部の
両端に支柱枠部が立設されている複数本のU字状枠体
を、水路の内面に沿って一定間隔で設置し、両支柱枠部
の背面両側に形成された切欠部の下端段差部で土留板の
下端部を支持する状態で、土留板を隣り合う支柱枠部の
間に上下複数段に横架することにより背面土を支えるよ
うに施工される。前者の杭体又は後者のU字状枠体のい
ずれを用いた場合も、土留板は上下方向に積み重ねる状
態に架設されることから、施工後の壁面は単なる平面的
な壁に構築されるに過ぎないものになっている。
2. Description of the Related Art Conventionally, for example, an assembly fencer for constructing a wall such as a water channel or a retaining wall has a plurality of piles buried in the ground at regular intervals and stands upright. In the state where the lower end of the retaining plate is supported by the protruding portion protruding from the rear portion, the retaining plate is horizontally laid in a plurality of steps between the upper portions of the piles between the adjacent piles, and It is constructed to support In addition, assembling fences for constructing the wall of the waterway, a plurality of U-shaped frames having support frame portions erected at both ends of the bottom frame portion are installed at regular intervals along the inner surface of the waterway, In the state where the lower end of the retaining plate is supported by the lower end steps of the cutouts formed on both sides of the back surface of both support frame portions, the rear surface is laid horizontally across a plurality of upper and lower stages between the adjacent support frame portions. It is constructed to support the soil. Regardless of whether the former pile body or the latter U-shaped frame body is used, since the earth retaining plate is erected in a vertically stacked state, the wall surface after construction is constructed as a simple planar wall. It's just too much.

【0003】[0003]

【発明が解決しようとする課題】近年、コンクリートに
よる土木構造物の景観向上や環境緑化が重要視されるよ
うになっている。本発明では、この景観向上や環境緑化
の観点に立ち、水路や擁壁等の壁面を施工する組立柵工
についても、植栽による景観向上や環境緑化を図ること
ができるようにした組立柵工技術を提供することを課題
としている。
In recent years, emphasis has been placed on improving the landscape and environmental greening of civil engineering structures using concrete. In the present invention, from the viewpoint of improving the landscape and greening the environment, the assembly fence for constructing the wall surface such as a water channel and a retaining wall is also an assembly fence that is capable of improving the landscape and greening the environment by planting. The task is to provide technology.

【0004】[0004]

【課題を解決するための手段】上記の課題を解決するた
めに、本発明(請求項1)の組立柵工は、水路や擁壁等
の壁面を施工する組立柵工であって、下側部分を地中に
埋設する状態で壁面に沿って立設される複数本の杭体
と、この各杭体の上側部分に取り付けられる板架け部材
と、隣り合う杭体間において板架け部材の間に上下複数
段に横架されて背面土を支える土留板とを備え、前記土
留板を、その上縁側が壁面の前面側に傾斜する状態に横
架させることにより、土留板の内面側に上面が開放した
植生棚部を形成し、この植生棚部内に植生土を充填した
構成にしている。
In order to solve the above-mentioned problems, an assembly fence of the present invention (claim 1) is an assembly fence for constructing a wall such as a waterway or a retaining wall. A plurality of piles erected along the wall surface in a state where the portion is buried in the ground, a plate-mounting member attached to an upper portion of each pile, and a plate-mounting member between adjacent piles. A retaining plate that supports the back soil by being laid horizontally in a plurality of steps, and the retaining plate is laid so that its upper edge side is inclined toward the front side of the wall surface, so that an upper surface is provided on the inner surface side of the retaining plate. Form an open vegetation shelf, and the vegetation shelf is filled with vegetation soil.

【0005】この組立柵工では、土留板の上縁側が壁面
の前面側に傾斜する状態に横架されて、土留板の内面側
に上面が開放した植生棚部が形成されているため、この
植生棚部をいわゆるプランターとして使用することがで
きる。従って、この植生棚部に植生土を充填して、ここ
に植物を植生させれば、壁面に上下複数段のグリーンベ
ルトができあがり、単なるコンクリート壁と異なり、景
観向上や環境緑化を図ることができる。
In this assembling fence, a vegetation shelf having an open upper surface is formed on the inner surface of the earth retaining plate so that the upper edge side of the earth retaining plate is inclined toward the front side of the wall surface. The vegetation shelf can be used as a so-called planter. Therefore, if the vegetation shelf is filled with vegetation soil and vegetation is vegetated here, green belts in upper and lower stages are completed on the wall surface, and unlike a mere concrete wall, landscape improvement and environmental greening can be achieved. .

【0006】この組立柵工において、杭体の中程背面部
に板架け部材の下端面を受け止めて支持する突出部が形
成され、板架け部材には、その前面中央部に杭体に対す
る嵌合溝が形成されると共に、その両側部に張り出し部
が形成され、この張り出し部に土留板の端部を嵌合させ
る傾斜溝が形成されている態様(請求項2)がある。
In this assembling fence, a projecting portion for receiving and supporting the lower end surface of the plate-hanging member is formed in the middle rear portion of the pile body, and the plate-hanging member is fitted to the pile body at the front center portion thereof. There is a mode in which a groove is formed, and projecting portions are formed on both sides thereof, and an inclined groove for fitting an end of the earth retaining plate is formed in the projecting portion (claim 2).

【0007】杭体を用いた組立柵工では、杭体と土留板
が構成部材となるが、本発明では、これに加えて板架け
部材を備えている点に特徴がある。即ち、杭体によって
板架け部材を支持し、この板架け部材によって土留板を
支持する構成になっている。この場合、板架け部材は、
杭体の中程背面部に突設された突出部によって支持され
ると共に、前面中央部に形成された嵌合溝を杭体に嵌合
することにより杭体に支持される。又、板架け部材の両
側部には張り出し部が形成され、この張り出し部に傾斜
溝が形成され、この傾斜溝に土留板の端部を嵌合させる
ことにより、土留板を傾斜状態に横架して土留板の内面
側に植生棚部を形成するようになっている。従って、土
留板は、板架け部材を介して杭体に支持されることにな
るため、杭体及び土留板については、従来の既成品を使
用しながら、板架け部材についてのみ新たな部品として
成形すれば足りる。
In an assembly fence using a pile, a pile and an earth retaining plate are constituent members, but the present invention is characterized in that in addition to this, a plate bridging member is provided. That is, the pile member supports the hanging member, and the retaining member supports the earth retaining plate. In this case, the board member is
The pile body is supported by a protruding portion protruding from a middle rear portion thereof, and is supported by the pile body by fitting a fitting groove formed in a front center portion into the pile body. Also, overhanging portions are formed on both sides of the plate hanging member, and an inclined groove is formed in the overhanging portion. By fitting the end of the earth retaining plate into the inclined groove, the earth retaining plate is horizontally inclined. Then, a vegetation shelf is formed on the inner surface side of the earth retaining plate. Therefore, the earth retaining plate is supported by the pile body via the wooden hanging member. Therefore, the pile body and the earth retaining plate are formed as new parts only for the wooden hanging member while using the existing off-the-shelf products. I suffice.

【0008】又、本発明(請求項3)の組立柵工は、水
路の壁面を施工する組立柵工であって、水路の底面に沿
わせる底面枠部の両端に水路の壁面に沿わせる支柱枠部
が立設されている複数本のU字状枠体と、このU字状枠
体の少なくとも一方の支柱枠部に取り付けられる板架け
部材と、隣り合うU字状枠体間において板架け部材の間
に上下複数段に横架されて背面土を支える土留板とを備
え、前記土留板を、その上縁側が壁面の前面側に傾斜す
る状態に横架させることにより、土留板の内面側に上面
が開放した植生棚部を形成し、この植生棚部内に植生土
を充填した構成にしている。
[0008] Further, the assembly fence of the present invention (claim 3) is an assembly fence for constructing a wall of a waterway, and a strut on both ends of a bottom frame portion along the bottom of the waterway to be along the wall of the waterway. A plurality of U-shaped frames on which the frame portions are erected, a plate-mounting member attached to at least one of the support frame portions of the U-shaped frame, and a plate-mounting member between adjacent U-shaped frames. An earth retaining plate which is horizontally suspended between members in a plurality of stages and supports the rear soil, and the earth retaining plate is laid so that its upper edge side is inclined toward the front side of the wall surface, thereby providing an inner surface of the earth retaining plate. A vegetation shelf with an open upper surface is formed on the side, and the vegetation shelf is filled with vegetation soil.

【0009】この組立柵工においても、土留板の内面側
に上面が開放した植生棚部が形成されているため、この
植生棚部に植生土を充填して、ここに植物を植生させれ
ば、壁面に上下複数段のグリーンベルトができあがり、
単なるコンクリート壁と異なり、景観向上や環境緑化を
図ることができる。この場合、隣り合うU字状枠体間に
おいて一方の支柱枠部間には、従来通りに土留板を上下
方向に積み重ねる状態に架設することで、水路を形成す
る一方の壁面を単なる平面的な壁に形成させてもよい
し、又、隣り合うU字状枠体間において両方の支柱枠部
間に土留板を傾斜する状態に横架して、水路を形成する
両方の壁面に、共に植生棚部を形成させるようにしても
よい。
[0009] Also in this assembly fence, a vegetation shelf having an open upper surface is formed on the inner side of the earth retaining plate, so that the vegetation shelf is filled with vegetation soil and plants are vegetated here. , A green belt with multiple levels up and down on the wall is completed,
Unlike a mere concrete wall, it can improve the landscape and green the environment. In this case, between the adjacent U-shaped frames, between one of the support frames, the earth retaining plates are vertically stacked in a state of being stacked in a conventional manner, so that one wall surface forming the water channel is merely planar. It may be formed on a wall, or between the U-shaped frames adjacent to each other, the earth retaining plate may be laid between both support frame portions in an inclined state, and both vegetation may be formed on both wall surfaces forming a waterway. A shelf may be formed.

【0010】この組立柵工において、支柱枠部の背面両
側に上端から下部にかけて切欠部が形成され、この切欠
部の下端に板架け部材の下端面を受け止めて支持する下
端段差部が形成され、板架け部材には、その前面中央部
に支柱枠部に対する嵌合溝が形成されると共に、その両
側部に張り出し部が形成され、この張り出し部に土留板
の端部を嵌合させる傾斜溝が形成されている態様(請求
項4)がある。
In this assembling fence, a notch is formed from the upper end to the lower side on both sides of the back of the support frame, and a lower end step is formed at the lower end of the notch to receive and support the lower end surface of the board member. A fitting groove for the support frame portion is formed in the center of the front surface of the board-hanging member, and overhangs are formed on both sides thereof, and an inclined groove for fitting an end of the earth retaining plate is fitted to the overhang. There is an aspect (claim 4) that is formed.

【0011】このようにU字状枠体を用いた組立柵工に
おいても、土留板は、板架け部材を介して支柱枠部に支
持されることになるため、U字状枠体及び土留板につい
ては、従来の既成品を使用しながら、板架け部材につい
てのみ新たな部品として成形すれば足りる。
[0011] Even in the assembly fence using the U-shaped frame as described above, the retaining plate is supported by the support frame portion via the plate-mounting member, so that the U-shaped frame and the retaining plate are provided. With regard to the above, it is sufficient to form only a new member as a new member while using a conventional off-the-shelf product.

【0012】[0012]

【発明の実施の形態】以下、本発明の実施の形態を図面
により詳述する。図1は本発明の実施の第1形態である
組立柵工の断面図、図2はその正面図、図3はその平面
図、図4はこの組立柵工に用いた板架け部材の斜視図で
ある。
Embodiments of the present invention will be described below in detail with reference to the drawings. FIG. 1 is a cross-sectional view of an assembly fencer according to a first embodiment of the present invention, FIG. 2 is a front view thereof, FIG. 3 is a plan view thereof, and FIG. 4 is a perspective view of a plate bridging member used in the assembly fencer. It is.

【0013】 この組立柵工は、水路Wの壁面を施工する
ものであって、杭体1と、板架け部材2と、土留板3と
を備えている。
[0013] The assembly Sakuko is for applying a wall of the channel W, and includes a Kuitai 1, a plate hung member 2, and earth retaining plate 3.

【0014】 前記杭体1は、鉄筋コンクリートにより角
柱状に形成され、中程背面部に突出部10が形成された
既成品が用いられている。そして、壁面に沿って複数本
の杭体1を一定間隔で立設させるもので、この場合、突
出部10が背面になるように各杭体1の下側部分を地中
Gに打ち込んで埋設する。
The pile body 1 is made of reinforced concrete in the shape of a prism and is made of a ready-made product in which a protruding portion 10 is formed in the middle rear surface. Then, a plurality of piles 1 are erected at regular intervals along the wall surface. In this case, the lower portion of each pile 1 is driven into the underground G so that the protruding portion 10 is on the back side, and buried. I do.

【0015】 前記板架け部材2は、鉄筋コンクリートに
より成形されたもので、前記杭体の断面角形状に対応す
る嵌合溝20が前面中央部に上下方向に全長に亘って延
長して形成され、その左右には張り出し部21,21が
形成されている。この張り出し部21には、板架け部材
2の側面及び前面に開口し、前面から背面方向に下り傾
斜した(実施の形態では垂直に対して約35度)傾斜溝
22が上下複数段(3段)に形成されている。そして、
この板架け部材2は、前記嵌合溝20を杭体の背面側か
ら杭体1の上側部分に嵌合させると共に、その下端面を
前記突出部10によって受け止めることで、杭体1に支
持されている。
The plate hanging member 2 is formed of reinforced concrete, and a fitting groove 20 corresponding to the cross-sectional square shape of the pile body is formed in the center of the front surface to extend vertically over the entire length. Overhangs 21 and 21 are formed on the left and right sides. The overhanging portion 21 has a plurality of upper and lower (three-step) inclined grooves 22 which are opened on the side and front surfaces of the plate hanging member 2 and are inclined downward from the front surface to the rear direction (in the embodiment, about 35 degrees with respect to the vertical). ). And
The board hanging member 2 is supported by the pile body 1 by fitting the fitting groove 20 from the back side of the pile body to the upper portion of the pile body 1 and receiving the lower end surface by the projection 10. ing.

【0016】 前記土留板3は、鉄筋コンクリートにより
平板状に形成された既成品が用いられている。そして、
この土留板3の両端部を隣り合う杭体1,1間において
板架け部材2,2の傾斜溝22,22に嵌合させて、板
架け部材2,2間に土留板3を横架させることにより、
この土留板3によって背面土Bを支えた組立柵工が構成
される。この場合、土留板3の上縁側が壁面の前面側に
傾斜する状態に横架されることにより、土留板3の内面
側に上面が開放した植生棚部Pが形成され、この植生棚
部P内に植生土Qを充填して(背面土Bをそのまま充填
してもよいし、腐葉土等を充填してもよい)、ここに植
物を植生させるようになっている。
As the earth retaining plate 3, an existing product formed in a flat plate shape from reinforced concrete is used. And
Both ends of the retaining plate 3 are fitted between the adjacent piles 1 and 1 into the inclined grooves 22 and 22 of the paneling members 2 and 2, and the retaining plate 3 is horizontally suspended between the paneling members 2 and 2. By
The earth retaining plate 3 constitutes an assembly fence supporting the back soil B. In this case, a vegetation shelf P having an open upper surface is formed on the inner surface side of the sill plate 3 by being laid so that the upper edge side of the sill plate 3 is inclined to the front side of the wall surface. The inside is filled with vegetation soil Q (the back soil B may be filled as it is, or mulch or the like may be filled), and plants are vegetated here.

【0017】 このように構成した組立柵工では、土留板
3の上縁側が壁面の前面側に傾斜する状態に横架され
て、土留板3の内面側に上面が開放した植生棚部Pが形
成されているため、この植生棚部Pをいわゆるプランタ
ーとして使用することができる。従って、この植生棚部
Pに植生土Qを充填して、ここに植物を植生させれば、
壁面に上下複数段のグリーンベルトができあがり、単な
るコンクリート壁と異なり、景観向上や環境緑化を図る
ことができる。又、植生棚部Pに充填した植生土Qと背
面土Bが連続するため、背面土Bから植生土Qへの雨水
の浸透が得られ、単なる鉢やプランタによる植栽と異な
り、地山からの水分補給が得られる。
In the assembled fence constructed as described above, the vegetation shelf P having an upper surface open on the inner surface side of the earth retaining plate 3 is laid so that the upper edge side of the earth retaining plate 3 is inclined to the front side of the wall surface. Because it is formed, this vegetation shelf P can be used as a so-called planter. Therefore, if the vegetation shelf P is filled with vegetation soil Q and plants are vegetated there,
The upper and lower green belts are formed on the wall surface, and unlike a mere concrete wall, it can improve the landscape and green the environment. In addition, since the vegetation soil Q filled in the vegetation shelf P and the back soil B are continuous, rainwater infiltration from the back soil B to the vegetation soil Q can be obtained. Hydration is obtained.

【0018】 この組立柵工では、杭体1によって板架け
部材2を支持し、この板架け部材2によって土留板3を
支持する構成になっている。即ち、板架け部材2は、杭
体1の中程背面部に突設された突出部10によって支持
されると共に、前面中央部に形成された嵌合溝20を杭
体1に嵌合することにより杭体1に支持されている。
又、土留板3は、板架け部材2の張り出し部21に形成
された傾斜溝22に端部を嵌合させることにより横架さ
れている。従って、土留板3は、板架け部材2を介して
杭体1に支持されることになるため、杭体1及び土留板
3については、従来の既成品を使用しながら、板架け部
材2についてのみ新たな部品として成形すれば足りるこ
とになり、成形コストの負担を軽減することができる。
In this assembling fence construction, a pile member 1 supports a board member 2, and the board member 2 supports an earth retaining plate 3. That is, the board member 2 is supported by the protrusion 10 protruding from the middle part of the back of the pile 1, and the fitting groove 20 formed in the center of the front face is fitted to the pile 1. Is supported by the pile 1.
The earth retaining plate 3 is laterally suspended by fitting an end of the retaining plate 3 into an inclined groove 22 formed in the overhanging portion 21 of the plate hanging member 2. Therefore, since the retaining plate 3 is supported by the pile 1 via the paneling member 2, the pile 1 and the retaining plate 3 are used for the paneling member 2 while using a conventional off-the-shelf product. Only new parts need to be molded, and the burden of molding costs can be reduced.

【0019】 次に、図5は本発明の実施の第2形態であ
る組立柵工の断面図、図6は図5のA−A断面図、図7
はこの組立柵工に用いた板架け部材の斜視図である。
Next, FIG. 5 is a sectional view of an assembled fence Engineering is a second embodiment of the present invention, FIG. 6 is a sectional view taken along A-A of FIG. 5, FIG. 7
FIG. 3 is a perspective view of a board-hanging member used for this assembly fence.

【0020】 この組立柵工は、水路Wの両壁面を施工す
るものであって、U字状枠体5と、板架け部材6と、土
留板7とを備えている。
[0020] The assembly Sakuko is for construction of both walls of the channel W, and includes a U-shaped frame 5, a plate hung member 6, and earth retaining plate 7.

【0021】 前記U字状枠体5は、鉄筋コンクリートに
より、水路Wの底面に沿わせる底面枠部50の両端に水
路Wの壁面に沿わせる支柱枠部51,51が一体に立設
された略U字形状に形成されている。そして、支柱枠部
51の背面両側に上端から下部にかけて切欠部52,5
2が形成されて、この支柱枠部51が断面凸字形状に形
成され、前記切欠部52,52の下端に板架け部材6の
下端面を受け止めて支持する下端段差部53,53が形
成された既成品が用いられている。そして、水路Wの内
面に沿って複数体のU字状枠体5を一定間隔で設置させ
るもので、この場合、底面枠部50が水路Wの幅方向に
延在するように設置する。
The U-shaped frame 5 is made of reinforced concrete, and has a bottom frame 50 along the bottom of the water channel W, and column frames 51, 51 extending along the wall of the water channel W at both ends thereof. It is formed in a U-shape. The notches 52, 5 are formed on both sides of the back of the support frame 51 from the upper end to the lower part.
2 are formed, the support frame 51 is formed in a convex shape in cross section, and lower end steps 53, 53 for receiving and supporting the lower end surface of the plate bridging member 6 are formed at the lower ends of the notches 52, 52. Ready-made products are used. Then, a plurality of U-shaped frames 5 are installed at regular intervals along the inner surface of the water channel W. In this case, the bottom frame 50 is installed so as to extend in the width direction of the water channel W.

【0022】 前記板架け部材6は、鉄筋コンクリートに
より成形されたもので、前記支柱枠部51の断面凸字形
状に対応する嵌合溝60が前面中央部に上下方向に全長
に亘って延長して形成され、その左右には張り出し部6
1,61が形成されている。この張り出し部61には、
板架け部材6の側面及び前面に開口し、前面から背面方
向に下り傾斜した(実施の形態では垂直に対して約45
度)傾斜溝62が上下複数段(3段)に形成されてい
る。そして、この板架け部材6は、前記嵌合溝60を支
柱枠部51に背面側から嵌合させると共に、その下端面
を前記下端段差部53によって受け止めることで、支柱
枠部51に支持されている。
The plate bridging member 6 is formed of reinforced concrete, and a fitting groove 60 corresponding to the convex shape of the cross section of the support frame 51 extends vertically over the entire length in the center of the front surface. Formed on its left and right
1, 61 are formed. In this overhang portion 61,
It is open at the side and the front of the plate hanging member 6, and is inclined downward from the front to the rear (in the embodiment, about 45 to the vertical).
Degree) The inclined grooves 62 are formed in a plurality of upper and lower stages (three stages). Then, the plate bridging member 6 is supported by the support frame 51 by fitting the fitting groove 60 into the support frame 51 from the rear side and receiving the lower end surface by the lower step 53. I have.

【0023】 前記土留板7は、鉄筋コンクリートにより
平板状に形成された既成品が用いられている。そして、
実施の第1形態と同様に、この土留板7の両端部を隣り
合うU字状枠体5,5間において板架け部材6,6の傾
斜溝62,62に嵌合させて、板架け部材62,62間
に土留板7を横架させることにより、この土留板7によ
って背面土Bを支えた組立柵工が構成される。これによ
り、土留板7の内面側に上面が開放した植生棚部Pが形
成され、この植生棚部P内に植生土Qを充填して、ここ
に植物を植生させるようになっている。従って、植生棚
部Pをいわゆるプランターとして使用することができ、
単なるコンクリート壁と異なり、景観向上や環境緑化を
図ることができる。
As the earth retaining plate 7, an existing product formed in a flat plate shape from reinforced concrete is used. And
Similarly to the first embodiment, both ends of the earth retaining plate 7 are fitted into the inclined grooves 62, 62 of the bridge members 6, 6 between the adjacent U-shaped frames 5, 5, thereby forming the bridge member. By suspending the earth retaining plate 7 between 62, 62, an assembling fence supporting the rear soil B is constituted by the earth retaining plate 7. As a result, a vegetation shelf P having an open upper surface is formed on the inner side of the earth retaining plate 7, and the vegetation shelf P is filled with the vegetation soil Q, where plants are vegetated. Therefore, the vegetation shelf P can be used as a so-called planter,
Unlike a mere concrete wall, it can improve the landscape and green the environment.

【0024】 この組立柵工では、板架け部材6は、支柱
枠部51に形成された切欠部52,52の下端段差部5
3,53によって支持されると共に、前面中央部に形成
された嵌合溝60を支柱枠部51に嵌合することにより
支柱枠部51に支持されている。又、土留板7は、板架
け部材6の張り出し部61に形成された傾斜溝62に端
部を嵌合させることにより横架されている。従って、土
留板7は、板架け部材6を介してU字状枠体5の支柱枠
部51に支持されることになるため、U字状枠体5及び
土留板7については、従来の既成品を使用しながら、板
架け部材6についてのみ新たな部品として成形すれば足
りる。
In this assembling fence, the plate bridging member 6 is formed by cutting the lower end steps 5 of the notches 52, 52 formed in the support frame 51.
The support frame 3 supports the support frame 51 by fitting a fitting groove 60 formed in the center of the front surface into the support frame 51. The earth retaining plate 7 is laterally suspended by fitting an end portion thereof to an inclined groove 62 formed in an overhanging portion 61 of the suspension member 6. Therefore, since the retaining plate 7 is supported by the support frame 51 of the U-shaped frame 5 via the plate bridging member 6, the U-shaped frame 5 and the retaining plate 7 are the same as those of the conventional existing. It is sufficient to mold only the boarding member 6 as a new part while using the product.

【0025】 以上、本発明の実施の形態を図面により説
明したが、具体的な構成はこれに限定されることはな
い。例えば、杭体を用いた組立柵工については、これを
用いて水路の壁面を構築するほか、擁壁の壁面を構築す
ることができる。又、杭体の立設間隔やU字状枠体の設
置間隔、土留板の段数や傾斜角度等は、現場条件等に合
わせて適宜に設計することができる。又、土留板の材質
についても、鉄筋コンクリートのほか、プラスチック、
金属、木材、ポーラスコンクリート等を使用できるし、
その表面にデザインや塗装を施すことは任意である。
Although the embodiment of the present invention has been described with reference to the drawings, the specific configuration is not limited to this. For example, in the case of an assembly fence using a pile body, it can be used to construct a wall surface of a waterway and also a wall surface of a retaining wall. Further, the standing interval of the piles, the installing interval of the U-shaped frame, the number of steps of the earth retaining plate, the inclination angle, and the like can be appropriately designed according to site conditions and the like. As for the material of the earth retaining plate, in addition to reinforced concrete, plastic,
Metal, wood, porous concrete, etc. can be used,
It is optional to design or paint the surface.

【0026】[0026]

【発明の効果】以上説明してきたように、本発明の組立
柵工(請求項1又は3)にあっては、景観向上や環境緑
化の観点に立ち、水路や擁壁等の壁面を施工する組立柵
工について、植栽による景観向上や環境緑化を図ること
ができる。
As described above, in the assembly fence of the present invention (Claim 1 or 3), wall surfaces such as waterways and retaining walls are constructed from the viewpoint of improving the landscape and greening the environment. About assembling fence construction, we can plan scenery improvement and environmental greening by planting.

【0027】 また、本発明の組立柵工(請求項2又は
4)にあっては、杭体又はU字状枠体、及び土留板につ
いては、従来の既成品を使用しながら、板架け部材につ
いてのみ新たな部品として成形すれば足りることにな
り、成形コストの負担を軽減することができる。
[0027] In the assembly fence of the present invention (claim 2 or 4), the pile member or the U-shaped frame and the earth retaining plate are formed by using a conventional off-the-shelf member. It is sufficient to mold only a new part as a part, and the burden of molding cost can be reduced.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の実施の第1形態である組立柵工の断面
図である。
FIG. 1 is a sectional view of an assembly fence according to a first embodiment of the present invention.

【図2】その組立柵工の正面図である。FIG. 2 is a front view of the assembled fence.

【図3】その組立柵工の平面図である。FIG. 3 is a plan view of the assembly fence.

【図4】この組立柵工に用いた板架け部材の斜視図であ
る。
FIG. 4 is a perspective view of a board member used in the assembly fence.

【図5】本発明の実施の第2形態である組立柵工の断面
図である。
FIG. 5 is a sectional view of an assembly fence according to a second embodiment of the present invention.

【図6】図5のA−A断面図である。FIG. 6 is a sectional view taken along line AA of FIG. 5;

【図7】この組立柵工に用いた板架け部材の斜視図であ
る。
FIG. 7 is a perspective view of a board member used in the assembly fence.

【符号の説明】[Explanation of symbols]

1 杭体 10 突出部 2 板架け部材 20 嵌合溝 21 張り出し部 22 傾斜溝 3 土留板 B 背面土 G 地中 P 植生棚部 Q 植生土 W 水路 5 U字状枠体 50 底面枠部 51 支柱枠部 52 切欠部 53 下端段差部 6 板架け部材 60 嵌合溝 61 張り出し部 62 傾斜溝 7 土留板 1 pile body 10 Projection 2 Board members 20 mating groove 21 Overhang 22 Inclined groove 3 earth retaining plate B back soil G Underground P Vegetation shelf Q vegetation soil W waterway 5 U-shaped frame 50 Bottom frame 51 Support frame 52 Notch 53 Lower step 6 Board members 60 mating groove 61 Overhang 62 Inclined groove 7 earth retaining plate

フロントページの続き (51)Int.Cl.7 識別記号 FI E02D 29/02 311 E02D 29/02 311 Continued on the front page (51) Int.Cl. 7 Identification code FI E02D 29/02 311 E02D 29/02 311

Claims (4)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 水路や擁壁等の壁面を施工する組立柵工
であって、 下側部分を地中に埋設する状態で壁面に沿って立設され
る複数本の杭体と、この各杭体の上側部分に取り付けら
れる板架け部材と、隣り合う杭体間において板架け部材
の間に上下複数段に横架されて背面土を支える土留板と
を備え、 前記土留板を、その上縁側が壁面の前面側に傾斜する状
態に横架させることにより、土留板の内面側に上面が開
放した植生棚部を形成し、この植生棚部内に植生土を充
填したことを特徴とした組立柵工。
1. An assembling fence for constructing a wall such as a waterway or a retaining wall, wherein a plurality of piles are erected along the wall with a lower portion buried in the ground. A boarding member attached to the upper portion of the pile body, and a retaining plate that supports the back soil by being laid horizontally in a plurality of stages between the boarding members between adjacent pile bodies, and further comprising: An assembly characterized by forming a vegetation shelf with an open upper surface on the inner surface side of the earth retaining plate by bridging the edge side in a state inclined to the front side of the wall surface, and filling the vegetation shelf with vegetation soil. Fencer.
【請求項2】 請求項1記載の組立柵工において、杭体
の中程背面部に板架け部材の下端面を受け止めて支持す
る突出部が形成され、板架け部材には、その前面中央部
に杭体に対する嵌合溝が形成されると共に、その両側部
に張り出し部が形成され、この張り出し部に土留板の端
部を嵌合させる傾斜溝が形成されている組立柵工。
2. The assembling fence according to claim 1, wherein a projecting portion for receiving and supporting a lower end surface of the boarding member is formed in a middle rear portion of the pile body, and the boarding member has a front center portion thereof. An assembling fence in which a fitting groove for the pile body is formed, and overhang portions are formed on both sides thereof, and an inclined groove for fitting an end of the earth retaining plate is formed in the overhang portion.
【請求項3】 水路の壁面を施工する組立柵工であっ
て、 水路の底面に沿わせる底面枠部の両端に水路の壁面に沿
わせる支柱枠部が立設されている複数本のU字状枠体
と、このU字状枠体の少なくとも一方の支柱枠部に取り
付けられる板架け部材と、隣り合うU字状枠体間におい
て板架け部材の間に上下複数段に横架されて背面土を支
える土留板とを備え、 前記土留板を、その上縁側が壁面の前面側に傾斜する状
態に横架させることにより、土留板の内面側に上面が開
放した植生棚部を形成し、この植生棚部内に植生土を充
填したことを特徴とした組立柵工。
3. A plurality of U-shaped assembling fences for constructing a wall of a water channel, wherein a plurality of U-shaped pillar frames are provided at both ends of a bottom frame portion along the bottom of the water channel at both ends thereof. A frame member, a board member attached to at least one support frame portion of the U-shaped frame member, and a back surface which is horizontally laid in a plurality of upper and lower stages between the board members between adjacent U-shaped frame members. A soil retaining plate for supporting soil, by forming the soil retaining plate laterally in a state in which the upper edge side is inclined toward the front side of the wall surface, to form a vegetation shelf with an open upper surface on the inner surface side of the soil retaining plate, An assembling fence characterized by filling the vegetation shelf with vegetation soil.
【請求項4】 請求項3記載の組立柵工において、支柱
枠部の背面両側に上端から下部にかけて切欠部が形成さ
れ、この切欠部の下端に板架け部材の下端面を受け止め
て支持する下端段差部が形成され、板架け部材には、そ
の前面中央部に支柱枠部に対する嵌合溝が形成されると
共に、その両側部に張り出し部が形成され、この張り出
し部に土留板の端部を嵌合させる傾斜溝が形成されてい
る組立柵工。
4. The assembly fence according to claim 3, wherein a notch is formed from the upper end to the lower side on both sides on the back side of the support frame portion, and the lower end of the notch receives and supports the lower end surface of the plate bridging member. A stepped portion is formed, a fitting groove for the support frame portion is formed in the center of the front surface of the plate-hanging member, and overhang portions are formed on both sides thereof, and the end of the earth retaining plate is formed at the overhang portion. Assembling fence with inclined grooves to be fitted.
JP2001016736A 2000-03-28 2001-01-25 Assembly fencer Expired - Fee Related JP3537398B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001016736A JP3537398B2 (en) 2000-03-28 2001-01-25 Assembly fencer

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP2000088110 2000-03-28
JP2000-88110 2000-03-28
JP2001016736A JP3537398B2 (en) 2000-03-28 2001-01-25 Assembly fencer

Related Child Applications (1)

Application Number Title Priority Date Filing Date
JP2003426472A Division JP3774459B2 (en) 2000-03-28 2003-12-24 Assembly fence

Publications (2)

Publication Number Publication Date
JP2001342632A JP2001342632A (en) 2001-12-14
JP3537398B2 true JP3537398B2 (en) 2004-06-14

Family

ID=26588529

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001016736A Expired - Fee Related JP3537398B2 (en) 2000-03-28 2001-01-25 Assembly fencer

Country Status (1)

Country Link
JP (1) JP3537398B2 (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100493655B1 (en) * 2002-11-01 2005-06-28 주식회사 에스디알앤디 Assembly earth retaining structures to improve a activity of the vegetation
CN107503341B (en) * 2017-06-30 2018-04-24 中铁二院昆明勘察设计研究院有限责任公司 Oblique cutting board positioning method based on friction pile embankment operating mode
CN107288124B (en) * 2017-06-30 2018-03-27 中铁二院昆明勘察设计研究院有限责任公司 Oblique cutting board positioning method based on friction pile excavation operating mode
CN108867668B (en) * 2018-02-08 2023-12-22 韦随庆 Ecological retaining plate structure
CN113944141B (en) * 2021-10-27 2022-11-25 山东省水利科学研究院 Fence plate for bank protection and construction method

Also Published As

Publication number Publication date
JP2001342632A (en) 2001-12-14

Similar Documents

Publication Publication Date Title
US5399050A (en) Plastic concrete form for footers
US6557818B2 (en) Form for manufacturing concrete retaining wall blocks
US20080317557A1 (en) Building Element For Making Walls Using Filling Material, Particularly Earth Or The Like
KR102095581B1 (en) Rainwater storage block, rainwater storage structure using the block and its construction method
JP3537398B2 (en) Assembly fencer
JP4227356B2 (en) Long block for construction
JP2004137892A (en) Built-up fence
US20090110491A1 (en) Securable retaining wall block and system
JPH032422A (en) Construction of foundation sill
KR100660989B1 (en) Revetment structure
JP2000073331A (en) Ecological conservation block and its stacking method
KR100593181B1 (en) A terrace-revetment unit and a process of construction unsing the same
KR102371639B1 (en) Retaining wall block with improved cohesion
JP3816067B2 (en) Residual formwork method in concrete structures
KR100938829B1 (en) Breast wall assembly
JPS632512Y2 (en)
AU667458B2 (en) Retaining wall
KR200361092Y1 (en) Tiered concrete retaining wall structure for tree-planting road slope
JP3074421B2 (en) Construction method for the soil on the slope
KR200380091Y1 (en) Revetment structure
KR20000051610A (en) A method for stabilizing the slope surface
KR101070304B1 (en) Block for revetment construction
JPS6029487Y2 (en) Block for retaining wall
JPS6011169Y2 (en) Earth retaining wall structure for slopes
JP2581377Y2 (en) Retaining wall

Legal Events

Date Code Title Description
A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20031224

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20040217

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20040316

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080326

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090326

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090326

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100326

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100326

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110326

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120326

Year of fee payment: 8

LAPS Cancellation because of no payment of annual fees