Bolt position free hold down hardware

Info

Publication number
JP3443273B2
JP3443273B2 JP09288097A JP9288097A JP3443273B2 JP 3443273 B2 JP3443273 B2 JP 3443273B2 JP 09288097 A JP09288097 A JP 09288097A JP 9288097 A JP9288097 A JP 9288097A JP 3443273 B2 JP3443273 B2 JP 3443273B2
Authority
JP
Japan
Prior art keywords
bolt
base
hardware
horizontal support
insertion hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP09288097A
Other languages
Japanese (ja)
Other versions
JPH10266349A (en
Inventor
良道 河合
良一 菅野
潤 清水
浩司 杉田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Steel Corp
Original Assignee
Nippon Steel Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Steel Corp filed Critical Nippon Steel Corp
Priority to JP09288097A priority Critical patent/JP3443273B2/en
Publication of JPH10266349A publication Critical patent/JPH10266349A/en
Application granted granted Critical
Publication of JP3443273B2 publication Critical patent/JP3443273B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)
  • Bolts, Nuts, And Washers (AREA)
  • Mutual Connection Of Rods And Tubes (AREA)

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、各種住宅におい
て、土台と柱を押さえて結合するためのホールドダウン
金物に係り、特に、土台に開設のボルト挿入孔とホール
ドダウン金物のボルト挿入孔のセンター位置ずれがあっ
ても、円滑に結合できるボルト位置フリーホールドダウ
ン金物に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a hold-down hardware for pressing and coupling a base and a pillar in various houses, and more particularly to a center of a bolt insertion hole formed in the base and a bolt insertion hole of the hold-down hardware. The present invention relates to a bolt position free hold-down hardware that can be smoothly connected even if there is a positional deviation.

【0002】[0002]

【従来の技術】従来、木造住宅において、土台に対して
柱を立設するには、土台の上面に設けたほぞ穴に、柱下
端のほぞを嵌め合わせたうえ、この嵌合部において、鎹
を土台と柱とに跨って打ちつけることで、当該土台と柱
とを強固に結合していた。
2. Description of the Related Art Conventionally, in a wooden house, in order to erect a pillar on a base, a tenon at the lower end of the pillar is fitted into a mortise hole provided on the upper surface of the base, and then at this fitting portion, a hook is attached. By striking over the base and the pillar, the base and the pillar were firmly connected.

【0003】しかし、先般の阪神淡路大地震に際して、
前記鎹による土台と柱の連結構造が家屋倒壊防止にとっ
て余り役立たなかったことから、阪神大地震以後、鎹に
代わって、急速にホールドダウン金物が使用されるよう
になった。
However, during the recent Hanshin Awaji Earthquake,
Since the connection structure of the foundation and the pillar by the hail was not very useful for preventing the collapse of the house, after the Great Hanshin Earthquake, the haildown hardware was rapidly used instead of the hail.

【0004】従来のホールドダウン金物は図11
(a),(b)、図12(a)に示す構造のものが一般
的である。つまり、図11(a),(b)において、コ
ンクリート基礎1に植設されたアンカーボルト2に土台
3に開設のボルト挿入孔4を嵌合し、土台3の上面にお
いてアンカーボルト2上端のネジ部にナット5を締め付
けることで、土台3がコンクリート基礎1に固定されて
いる。
FIG. 11 shows a conventional holddown hardware.
The structure shown in (a), (b) and FIG. 12 (a) is general. That is, in FIGS. 11A and 11B, the bolt insertion holes 4 formed in the base 3 are fitted into the anchor bolts 2 planted in the concrete foundation 1, and the screw at the upper end of the anchor bolt 2 is mounted on the upper surface of the base 3. The base 3 is fixed to the concrete foundation 1 by tightening the nut 5 on the part.

【0005】土台3には、ほぞ穴6が開設されていて、
このほぞ穴6に柱7の下端のほぞ8が嵌入されている。
さらに、ホールドダウン金物10の垂直板部11が、複
数の釘12打ちによって柱7に固定されている。垂直板
部11の下端には、水平板部13が固定され、かつ垂直
板部11と水平板部13との間に補強板部14が固定さ
れている。
A mortise 6 is formed on the base 3,
The tenon 8 at the lower end of the pillar 7 is fitted into the tenon hole 6.
Further, the vertical plate portion 11 of the hold-down hardware 10 is fixed to the pillar 7 by hammering a plurality of nails 12. The horizontal plate portion 13 is fixed to the lower end of the vertical plate portion 11, and the reinforcing plate portion 14 is fixed between the vertical plate portion 11 and the horizontal plate portion 13.

【0006】そして、土台3の下面にえぐり形成した凹
部15に連結ボルト16のボルト頭部17を位置させ、
さらに、土台3を上下に貫通して設けられたボルト挿入
孔18に前記連結ボルト16を挿入させ、土台3上面か
ら突出したボルト先端部20を前記水平板部13に開設
のボルト挿入孔21に挿入し、水平板部13の上面にお
いて、連結ボルト16のネジ部にナット22を締結する
ことで、ホールドダウン金物10と連結ボルト16を介
して、柱7が土台3に強固に固定される。
Then, the bolt head 17 of the connecting bolt 16 is positioned in the recess 15 formed in the lower surface of the base 3,
Further, the connecting bolt 16 is inserted into a bolt insertion hole 18 provided through the base 3 in the vertical direction, and a bolt tip portion 20 protruding from the upper surface of the base 3 is used as a bolt insertion hole 21 formed in the horizontal plate portion 13. By inserting and fastening the nut 22 to the threaded portion of the connecting bolt 16 on the upper surface of the horizontal plate portion 13, the column 7 is firmly fixed to the base 3 via the hold-down hardware 10 and the connecting bolt 16.

【0007】なお、図12(B)のホールドダウン金物
10aは、図10(A)の金物と若干異なって、垂直板
部23の下端24から所定の高さ位置にボルト挿入孔2
8を有する水平板部26が設けられ、水平板部26とそ
の下側と垂直板部23の間が補強板27で補強されてい
る。
The hold-down hardware 10a shown in FIG. 12B is slightly different from the hardware shown in FIG. 10A, and the bolt insertion hole 2 is located at a predetermined height from the lower end 24 of the vertical plate portion 23.
8 is provided, and the horizontal plate portion 26 and the space between the horizontal plate portion 26 and the vertical plate portion 23 are reinforced by a reinforcing plate 27.

【0008】このホールドダウン金物10aでは、その
垂直板部23が柱に固定され、かつ、土台3の上端面か
ら大きく突出した長尺の連結ボルトを水平板部26のボ
ルト挿入孔28に通す。つまり、土台3から比較的上方
に離れて位置する水平板部26のボルト挿入孔28から
上方に突出する長尺連結ボルトのネジ部にナットをネジ
込むことで、ホールドダウン金物10aを土台3に固定
し、このホールドダウン金物10aを介して柱を土台3
に固定するものである。
In this hold-down hardware 10a, the vertical plate portion 23 is fixed to the column, and a long connecting bolt that largely projects from the upper end surface of the base 3 is passed through the bolt insertion hole 28 of the horizontal plate portion 26. In other words, by screwing the nut into the threaded portion of the long connecting bolt projecting upward from the bolt insertion hole 28 of the horizontal plate portion 26 located relatively far away from the base 3, the hold-down hardware 10a is attached to the base 3. Fix and mount the pillar through this holddown hardware 10a 3
It is fixed to.

【0009】[0009]

【発明が解決しようとする課題】従来のホールドダウン
金物の取付け構造では、当該ホールドダウン金物10,
10aの水平板部13,26に開設のボルト挿入孔2
1,28の孔径は、連結ボルト16が若干の余裕をもっ
て挿入できる程度の大きさである。そのため、土台3に
開設するボルト挿入孔21,28が、設計上の位置、つ
まり土台3の幅方向中央からずれていたり、長手方向に
所定の位置からずれていた場合は、この土台3のボルト
挿入孔18に挿入する連結ボルト16の位置と、柱7に
予め固定されているホールドダウン金物10の水平板部
13のボルト挿入孔21の位置が合致せず、このためホ
ールドダウン金物10を固定できないという不具合が生
じた。そしてこの場合は、土台3の正しい位置にボルト
挿入孔18を開設し直さなければならないという不具合
が生じた。
In the conventional attachment structure of the hold-down hardware, the hold-down hardware 10,
Bolt insertion hole 2 formed in horizontal plate portions 13 and 26 of 10a
The hole diameters of 1 and 28 are such that the connecting bolt 16 can be inserted with a slight margin. Therefore, when the bolt insertion holes 21 and 28 formed in the base 3 are displaced from the designed position, that is, from the center of the base 3 in the width direction or from the predetermined position in the longitudinal direction, the bolt of the base 3 is The position of the connecting bolt 16 to be inserted into the insertion hole 18 and the position of the bolt insertion hole 21 of the horizontal plate portion 13 of the hold-down hardware 10 that is previously fixed to the column 7 do not match, so that the hold-down hardware 10 is fixed. There was a problem that it could not be done. In this case, there is a problem that the bolt insertion hole 18 has to be opened again at the correct position on the base 3.

【0010】また、前述の不具合を解消するため、ホー
ルドダウン金物10の水平板部13のボルト挿入孔21
の孔径を連結ボルト16の径よりも相当程度大きくし
て、前記大径のボルト挿入孔内で連結ボルト16の位置
を自由に変位させることで、連結ボルト16とホールド
ダウン金物10との位置合わせを行なうことが考えられ
る。しかし、前述の構造では、大径ボルト挿入孔内での
連結ボルト16が不安定となり、かつボルト挿入孔が大
径であるが故に、連結ボルト16とホールドダウン金物
10との連結が不確実となり、ホールドダウン金物10
が土台3と柱7とを確実に固定できないという不具合が
生じるという問題があった。
Further, in order to eliminate the above-mentioned problems, the bolt insertion hole 21 of the horizontal plate portion 13 of the hold-down hardware 10 is inserted.
The diameter of the connecting bolt 16 is made considerably larger than the diameter of the connecting bolt 16, and the position of the connecting bolt 16 is freely displaced in the large-diameter bolt insertion hole, thereby aligning the connecting bolt 16 and the hold-down hardware 10. It is possible to do However, in the above-described structure, the connecting bolt 16 in the large-diameter bolt insertion hole becomes unstable, and since the bolt insertion hole has a large diameter, the connection between the connecting bolt 16 and the hold-down hardware 10 becomes uncertain. , Holddown hardware 10
However, there was a problem that the base 3 and the pillar 7 could not be securely fixed to each other.

【0011】さらに、従来は、連結ボルト16のナット
締めを行なう際、両側の補強板14が邪魔となり、スパ
ナが回わしにくく、ナット締結が困難であった。
Further, in the past, when tightening the nut of the connecting bolt 16, the reinforcing plates 14 on both sides interfered with each other and the spanner was difficult to rotate, and it was difficult to tighten the nut.

【0012】本発明は、前記の問題点を解決したボルト
位置フリーホールドダウン金物を的することを目的とす
る。
An object of the present invention is to provide a bolt position free hold down metal object which solves the above problems.

【0013】[0013]

【課題を解決するための手段】前記課題を解決するため
に、本発明におけるボルト位置フリーホールドダウン金
物は、薄鋼板を加工成形してなる溝形鋼で形成される
物本体の水平支持部と垂直支持部を、土台と、土台に立
設の柱に連結ボルト、釘等の固定手段を介して固定する
ホールドダウン金物であって、前記水平支持部には、前
記土台を貫通する連結ボルトが可動できる大径のボルト
挿通孔を開設し、また、前記水平支持部には、前記土台
の長手方向と直角方向に長いボルト挿入用長孔を有し、
かつ土台長手方向にスライド可能なボルト位置合わせ金
物を載置し、前記ボルト位置合わせ金物は、薄鋼板を加
工成形してなる溝形鋼で形成され、前記ボルト挿入用長
孔は、当該ボルト位置合わせ金物のウェブに開設され、
かつボルト位置合わせ金物のフランジは、当該位置合わ
せ金物のスライド方向と直角方向に形成され、前記金物
本体の水平支持部の下面部には、連結ボルト貫通部の周
辺における前記水平支持部の撓みを防止するベース補強
金物を配設するとよい。前記金物本体の前記水平支持部
は、前記土台から離れて所定高さ位置に設けられ、前記
連結ボルトは、前記水平支持部におけるボルト挿入孔に
届く長尺連結ボルトで構成するとよい。
In order to solve the above-mentioned problems, a bolt position free hold-down hardware according to the present invention is a metal body formed of a channel steel formed by forming a thin steel plate. A horizontal support part and a vertical support part of the base, and a hold-down hardware for fixing to a pillar standing on the base through connecting means such as connecting bolts and nails, wherein the base is mounted on the horizontal support part. A large-diameter bolt insertion hole through which the connecting bolt passing therethrough can be opened, and the horizontal support portion has a long bolt insertion long hole in a direction perpendicular to the longitudinal direction of the base,
Also, place a bolt alignment tool that is slidable in the longitudinal direction of the base , and add a thin steel plate to the bolt alignment tool.
The bolt insertion length is made of channel steel formed by working
A hole is opened in the web of the bolt alignment hardware,
And the flange of the bolt alignment hardware is
Formed in a direction perpendicular to the sliding direction of the metal object,
On the lower surface of the horizontal support of the main unit,
Reinforcement of the base to prevent bending of the horizontal support portion at the side
It is good to install hardware. The horizontal support portion of the metal body may be provided at a predetermined height apart from the base, and the connecting bolt may be a long connecting bolt that reaches a bolt insertion hole in the horizontal support portion.

【0014】本発明によると、土台を貫通して立上る連
結ボルトが設計上の位置からずれていても、そのずれは
ホールドダウン金物の水平支持部に開設の大径のボルト
挿入孔が存在すること、土台長手方向と直角の方向に長
いボルト挿入用長孔を有するボルト位置合わせ金物を、
土台長手方向にスライドさせることで、前記変位したボ
ルトとホールドダウン金物との配置関係を適正に調整保
持できる。
According to the present invention, even if the connecting bolt which penetrates through the base and rises is displaced from the designed position, the displacement is caused by a large-diameter bolt insertion hole formed in the horizontal support portion of the hold-down hardware. That is, a bolt alignment hardware having a long hole for inserting a bolt that is long in the direction perpendicular to the base longitudinal direction,
By sliding in the longitudinal direction of the base, the positional relationship between the displaced bolt and the holddown hardware can be properly adjusted and maintained.

【0015】[0015]

【発明の実施の形態】以下、本発明を図を参照して説明
する。図1〜図6は本発明の第1の実施形態を示し、図
5と図6には図1〜図4と異なる使用例が示されてい
る。
DETAILED DESCRIPTION OF THE INVENTION The present invention will be described below with reference to the drawings. 1 to 6 show a first embodiment of the present invention, and FIGS. 5 and 6 show examples of use different from those in FIGS. 1 to 4.

【0016】図1〜図4において、コンクリート基礎1
にアンカーボルト(図示せず)を用いて木材の土台3が
載置固定され、土台3に穿設されたほぞ穴6に柱7の下
端のほぞ8を嵌込むことで、柱7が土台3に立設されて
おり、柱7と土台3とはホールドダウン金物30で固定
されている。
1 to 4, the concrete foundation 1
The timber base 3 is placed and fixed to the base using an anchor bolt (not shown), and the tenon 8 at the lower end of the pillar 7 is fitted into the mortise hole 6 formed in the base 3, so that the pillar 7 is fixed to the base 3. The pillar 7 and the base 3 are fixed by a hold-down hardware 30.

【0017】本発明において、ホールドダウン金物30
は、金物本体31と、ボルト位置合わせ金物32と、ベ
ース補強金物33とから構成される。
In the present invention, the hold-down hardware 30
Is composed of a hardware main body 31, a bolt positioning hardware 32, and a base reinforcing hardware 33.

【0018】金物本体31は、例えば厚さ0.7mm〜
4.5mm程度の長尺の一枚の薄鋼板を、その強度を増
強すべく、ロールフォーミングにより溝形(コ字形)に
曲げ加工して形成されたもの、又は、圧延溝型鋼を所定
の長さに切断したうえ、さらにそれを所定の位置で曲げ
加工することにより水平支持部34と、水平支持部34
の後端から立上がる垂直支持部35とを形成してなり、
かつ、水平支持部34と、垂直支持部35とは、いずれ
もウエブ37,37aと、その両端を上方又は、前方に
折り曲げてなるフランジ38,38aをそれぞれ有して
おり、水平支持部34におけるウエブ37に円形で、か
つ通常のボルト穴径より大径のボルト挿入穴39が開設
されている。
The metal body 31 has a thickness of, for example, 0.7 mm to
A long thin steel sheet of about 4.5 mm, which is formed by bending into a groove shape (U-shape) by roll forming in order to enhance its strength, or a rolled groove steel having a predetermined length. After being cut into pieces, it is further bent at a predetermined position to form a horizontal support portion 34 and a horizontal support portion 34.
And a vertical support portion 35 rising from the rear end of the
Further, the horizontal support portion 34 and the vertical support portion 35 each have webs 37 and 37a and flanges 38 and 38a formed by bending both ends thereof upward or forward, respectively. A circular bolt insertion hole 39 having a diameter larger than a normal bolt hole diameter is formed in the web 37.

【0019】ボルト位置合わせ金物32は、金物本体3
1の材料と同じ薄鋼板をロールフォーミングしてなる溝
形鋼、又は、圧延溝型鋼を所定の寸法Lに切断して形成
され、ウエブ(以下上面板という)40と、フランジ
(以下両側板という)41を有し、かつ上面板40に
は、その長手方向が両側板41と平行なボルト挿入用長
穴43が形成されている。
The bolt positioning hardware 32 is a hardware body 3
A channel steel formed by roll forming the same thin steel plate as the material of No. 1 or rolled channel steel is cut into a predetermined dimension L, and is formed by a web (hereinafter referred to as an upper plate) 40 and a flange (hereinafter referred to as both side plates). ) 41, and the upper surface plate 40 is formed with a long hole 43 for inserting a bolt whose longitudinal direction is parallel to both side plates 41.

【0020】さらに、ボルト位置合わせ金物32は、そ
の両側板41が図1に示されるように、金物本体31の
水平支持部34のフランジ38と90°の配置となるよ
うにして、当該水平支持部34のウエブ37上に載置さ
れ、前後方向(つまり、図1の矢印方向)にスライド自
在に配置される。また、ボルト位置合わせ金物32のボ
ルト挿入用長孔43の長径は、水平支持部34の大径ボ
ルト挿入孔39の孔径と略同寸法に設けてある。ベース
補強金物33は、所定の厚みと強度を有する金属板から
なり、ボルト挿入孔44を有している。このベース補強
金物33は、金物本体31の水平支持部34と土台3と
の間に配置されるものである。
Further, as shown in FIG. 1, the both side plates 41 of the bolt alignment hardware 32 are arranged at 90 ° with the flange 38 of the horizontal support portion 34 of the hardware main body 31 so as to support the horizontal support. It is placed on the web 37 of the portion 34 and arranged so as to be slidable in the front-back direction (that is, the arrow direction in FIG. 1). Further, the long diameter of the bolt insertion long hole 43 of the bolt positioning hardware 32 is provided to be substantially the same as the large diameter bolt insertion hole 39 of the horizontal support portion 34. The base reinforcing metal member 33 is made of a metal plate having a predetermined thickness and strength and has a bolt insertion hole 44. The base reinforcing hardware 33 is arranged between the horizontal support portion 34 of the hardware main body 31 and the base 3.

【0021】前記ホールドダウン金物30の使用状態を
説明する。金物本体31は、その垂直支持部35のウエ
ブ37aを貫通する複数の釘12を、柱7の側面に打ち
つけることで、この柱7の側面に固定されている。
The usage state of the hold-down hardware 30 will be described. The metal body 31 is fixed to the side surface of the pillar 7 by driving a plurality of nails 12 penetrating the web 37 a of the vertical support portion 35 into the side surface of the pillar 7.

【0022】次に、図3、図4に示されるように、土台
3に開設のボルト挿入孔18に挿入してあり、上部が土
台上面から突出した連結ボルト36にベース補強金物3
3のボルト挿入孔44を挿入することで、ベース補強金
物33を土台3上面に載置する。
Next, as shown in FIGS. 3 and 4, the base reinforcing metal member 3 is attached to the connecting bolt 36 which is inserted into the bolt insertion hole 18 formed in the base 3 and whose upper portion projects from the upper surface of the base.
By inserting the bolt insertion holes 44 of No. 3, the base reinforcing metal member 33 is placed on the upper surface of the base 3.

【0023】次に、釘12で予め柱7に固定されている
ホールドダウン金物本体31の水平支持部34をベース
補強金物33の上面に載置し、ウエブ37に開設の大径
ボルト挿入孔39に前記連結ボルト36の上部を挿入す
る。
Next, the horizontal support portion 34 of the hold-down hardware main body 31 which is previously fixed to the pillar 7 with the nail 12 is placed on the upper surface of the base reinforcing metal fitting 33, and the large-diameter bolt insertion hole 39 opened in the web 37. Then, the upper portion of the connecting bolt 36 is inserted.

【0024】連結ボルト36の上部は、さらに水平支持
部34に前後方向スライド可能に載置のボルト位置合わ
せ金物32のボルト挿入用長孔43に挿入する。その
後、ボルト位置合わせ金物32の上面において、連結ボ
ルト36のネジ部にナット42を締結することで、ホー
ルドダウン金物本体31が連結ボルト36を介して土台
3に固定される。
The upper portion of the connecting bolt 36 is further inserted into the bolt insertion long hole 43 of the bolt positioning hardware 32 which is mounted on the horizontal support portion 34 so as to be slidable in the front-rear direction. After that, the hold-down hardware main body 31 is fixed to the base 3 via the connection bolt 36 by fastening the nut 42 to the thread portion of the connection bolt 36 on the upper surface of the bolt alignment hardware 32.

【0025】前記において、土台3に開設のボルト挿入
孔18が所定位置からずれて孔明けされ、その結果、こ
のボルト挿入孔18と、ホールドダウン金物30のボル
ト挿入孔センターとの位置ずれが多発し、この場合、従
来は大工手間をかけて土台3のボルト挿入孔18の穴く
り直しをしていた。
In the above description, the bolt insertion hole 18 formed in the base 3 is drilled by being displaced from a predetermined position, and as a result, the positional deviation between the bolt insertion hole 18 and the center of the bolt insertion hole of the hold-down hardware 30 frequently occurs. However, in this case, conventionally, it took a lot of time and labor to re-assemble the bolt insertion holes 18 of the base 3.

【0026】本発明では、前記の場合、ホールドダウン
金物30の大径ボルト挿入孔39の存在により、その大
径孔内での連結ボルト36の相対的変位が許容されてい
ることにより、この土台3の偏心したボルト挿入孔18
から突出する連結ボルト36に対し、前記大径ボルト挿
入孔39を介して、ホールドダウン金物30を土台3上
部において、その長手方向と幅方向に適宜相対移動さ
せ、土台3の上面における設計上の位置に移動調整でき
る。
According to the present invention, in the above case, the presence of the large-diameter bolt insertion hole 39 of the hold-down hardware 30 allows the relative displacement of the connecting bolt 36 within the large-diameter hole, so that this base is provided. 3 eccentric bolt insertion hole 18
The hold-down hardware 30 is appropriately moved in the longitudinal direction and the width direction at the upper part of the base 3 through the large-diameter bolt insertion hole 39 with respect to the connecting bolt 36 protruding from the top surface of the base 3. Can be moved and adjusted to the position.

【0027】前記ホールドダウン金物本体31の調整移
動に対応して、ボルト位置合わせ金物32を、相対的に
水平支持部34の溝部に沿って前後方向(土台長手方
向)にスライドさせる。このとき、ボルト位置合わせ金
物32のボルト挿入用長孔43はその長手方向と直角の
方向に移動するので、このボルト挿入用長孔43を挿通
する連結ボルト36の図1における前後方向の位置ずれ
に対応して、ボルト位置合わせ金物32のホールドダウ
ン金物本体31に対する位置調整ができる。
Corresponding to the adjustment movement of the hold-down hardware body 31, the bolt positioning hardware 32 is relatively slid along the groove of the horizontal support portion 34 in the front-rear direction (longitudinal direction of the base). At this time, the long hole 43 for bolt insertion of the bolt alignment fitting 32 moves in a direction perpendicular to the longitudinal direction thereof, so that the displacement of the connecting bolt 36 inserted through the long hole 43 for bolt insertion in the front-back direction in FIG. Accordingly, it is possible to adjust the position of the bolt alignment hardware 32 with respect to the hold-down hardware body 31.

【0028】連結ボルト36の図1における左右方向の
位置ずれに対しては、金物本体31の水平支持部34の
大径ボルト挿入孔39が大径であることと、ボルト位置
合わせ金物32のボルト挿入用長孔43の長径が左右方
向に伸びていることにより、ホールドダウン金物30を
位置調整しつつ、土台3に対して適正位置に調節固定で
きる。
With respect to the positional displacement of the connecting bolt 36 in the left-right direction in FIG. 1, the large-diameter bolt insertion hole 39 of the horizontal support portion 34 of the metal body 31 has a large diameter, and the bolt for the bolt alignment hardware 32 is large. Since the long diameter of the insertion long hole 43 extends in the left-right direction, it is possible to adjust and fix the hold-down hardware 30 at a proper position with respect to the base 3 while adjusting the position.

【0029】第1の実施形態において、ボルト位置合わ
せ金物32の両側板41は、ガイドとなる水平支持部3
4のフランジ38と90°の角度をなす配置とされてい
るので、前記両側板38が水平支持部34のウエブ37
を押さえ、このウエブ37の撓みを防止することができ
る。
In the first embodiment, the both side plates 41 of the bolt alignment hardware 32 are the horizontal support portions 3 serving as guides.
4 and the flange 38 of FIG.
Thus, the bending of the web 37 can be prevented.

【0030】図5、図6には、第1実施形態の他の使用
例が示されている。この例では図1〜図4に示したホー
ルドダウン金物30が木材の土台ではなく、コンクリー
ト基礎1に設置の、溝鋼板製の溝形鋼からなる下部横枠
45内に設置された例が示されている。なお、この例の
場合、ベース補強金物33は省略することができる。ま
た、この例では、ホールドダウン金物30の垂直支持部
35のウエブ37aに、下部横枠45と同じ薄鋼板製の
溝形鋼からなる垂直枠46のウエブ46aを当てがい、
両ウエブ37a,46a間をドリリングタッピングねじ
12aにより連結固定する。他の構成は図1〜図4の例
と同じである。
5 and 6 show another example of use of the first embodiment. In this example, the holddown hardware 30 shown in FIGS. 1 to 4 is installed in the lower horizontal frame 45 made of grooved steel made of grooved steel plate, which is installed in the concrete foundation 1 instead of the base of wood. Has been done. In this example, the base reinforcing metal member 33 can be omitted. Further, in this example, the web 37a of the vertical support portion 35 of the hold-down hardware 30 is applied with the web 46a of the vertical frame 46 made of the channel steel made of the same thin steel plate as the lower horizontal frame 45,
The webs 37a and 46a are connected and fixed by a drilling tapping screw 12a. Other configurations are the same as the examples of FIGS.

【0031】図7、図8には本発明の第2の実施形態が
示されている。この例では、ホールドダウン金物本体3
1aの垂直支持部35aの構造及び、水平支持台49の
位置、つまり長尺連結ボルト36aをナット締めする位
置が土台3の上面から大きく上方に離れている点が第1
の実施形態と相異する。
A second embodiment of the present invention is shown in FIGS. In this example, the holddown hardware body 3
The first point is that the structure of the vertical support portion 35a of 1a and the position of the horizontal support base 49, that is, the position where the long connecting bolt 36a is tightened with the nut are largely apart from the upper surface of the base 3 upward.
Different from the embodiment.

【0032】この第2実施形態では所定の厚みと強度を
有する金属板により垂直支持部35aと、垂直支持部3
5aのほぼ中間部の高さに設けられた水平支持台49
と、水平支持台49の両側縁と、垂直支持部35aの下
端両側縁との間にわたって設けられた側面逆3角形状の
補強支持板47が設けられ、前記水平支持台49には、
ボルト挿入孔48が開設されている。
In the second embodiment, the vertical support portion 35a and the vertical support portion 3 are made of a metal plate having a predetermined thickness and strength.
Horizontal support 49 provided at a height approximately in the middle of 5a
A side-reverse triangular triangular reinforcing support plate 47 provided between both side edges of the horizontal support base 49 and both lower end sides of the vertical support portion 35a.
A bolt insertion hole 48 is opened.

【0033】前記水平支持台49の上面には、第1実施
形態に示した水平支持部34と同じ構造の水平支持部3
4aが載置され固定されている。この水平支持部34a
内には、第1実施形態のそれと同じ構造のボルト位置合
わせ金物32が図7において前後方向にスライド自在に
配設されている。
On the upper surface of the horizontal support base 49, the horizontal support portion 3 having the same structure as the horizontal support portion 34 shown in the first embodiment.
4a is placed and fixed. This horizontal support portion 34a
Inside, a bolt positioning hardware 32 having the same structure as that of the first embodiment is slidably arranged in the front-rear direction in FIG. 7.

【0034】この第2の実施形態においては、垂直支持
部35aの下端部50は土台3の上面近くまで伸び、か
つ垂直支持部35aへの釘12打ちにより、柱7の側面
に固定する。また長尺連結ボルト36aが第1実施形態
における連結ボルト36よりも長尺のものが使用され、
土台3のボルト挿入孔18を挿通して土台上面から高く
立上がるこの長尺連結ボルト36aは、さらに、水平支
持台49のボルト挿入孔48と、水平支持部34aのウ
エブ37の大径ボルト挿入孔39と、ボルト位置合わせ
金物32のボルト挿入用長孔43を挿通して、このボル
ト位置合わせ金物32の上面において、長尺連結ボルト
36aのネジ部にナット42を締結する。これにより、
第1実施形態の場合と同様、土台3に開設のボルト挿入
孔18の設計上での穿孔位置誤差による長尺連結ボルト
36aの変位配設に対応して、土台3に対する金物本体
31aの位置調整を行ないつつ、長尺連結ボルト36a
を介してホールドダウン金物30を土台3に固定でき、
かつホールドダウン金物30を介して柱7を土台3に強
固に固定できる。
In the second embodiment, the lower end portion 50 of the vertical support portion 35a extends close to the upper surface of the base 3 and is fixed to the side surface of the column 7 by driving the nail 12 into the vertical support portion 35a. Further, the long connecting bolt 36a is longer than the connecting bolt 36 in the first embodiment,
The long connecting bolt 36a which is inserted through the bolt insertion hole 18 of the base 3 and rises high from the upper surface of the base further includes the bolt insertion hole 48 of the horizontal support base 49 and the large diameter bolt insertion of the web 37 of the horizontal support portion 34a. The hole 39 and the long hole 43 for bolt insertion of the bolt positioning metal fitting 32 are inserted, and the nut 42 is fastened to the threaded portion of the long connecting bolt 36a on the upper surface of the bolt positioning metal fitting 32. This allows
Similar to the case of the first embodiment, the position adjustment of the hardware main body 31a with respect to the base 3 is performed corresponding to the displacement arrangement of the long connecting bolt 36a due to the hole position error in the design of the bolt insertion hole 18 formed in the base 3. Long connecting bolt 36a
Hold down hardware 30 can be fixed to base 3 via
Moreover, the pillar 7 can be firmly fixed to the base 3 via the hold-down hardware 30.

【0035】図9、図10には、本発明の第3実施形態
が示されている。この第3実施形態では、あたかも図1
の第1実施形態におけるボルト位置合わせ金物32の両
側板41の丈を高くした形状に相当する丈高ボルト位置
合わせ金物32aが使用されている。つまり、丈高ボル
ト位置合わせ金物32aは、丈高両側板41aと、上面
板40aと、ボルト挿入用長孔43を有している。
9 and 10 show a third embodiment of the present invention. In the third embodiment, as if in FIG.
In the first embodiment, the high-bolt positioning metal fitting 32a corresponding to the shape in which the both side plates 41 of the bolt positioning metal fitting 32 are increased in height is used. That is, the tall bolt alignment tool 32a has the tall both side plates 41a, the upper plate 40a, and the bolt insertion long hole 43.

【0036】また、第1実施形態の水平支持部34にお
けるウエブ37とフランジ38に相当する構成として、
この第3実施形態では、上下に長い垂直支持部35bの
下部に底板37bが設けられ、この底板37bの両側縁
から垂直支持部35bの中間高さにかけて側面3角形状
で下方側が拡大している平行ガイド板38bを有してお
り、これらで、ホールドダウン金物30の水平支持部3
4bを形成している。そして、前記ボルト挿入用長孔4
3を有する丈高ボルト位置合わせ金物32aは底板37
b上に載置され、平行ガイド板38bにガイドされて前
後移動自在に支持される。
Further, as the structure corresponding to the web 37 and the flange 38 in the horizontal support portion 34 of the first embodiment,
In the third embodiment, a bottom plate 37b is provided below the vertically long vertical support portion 35b, and the lower side is enlarged in a side surface triangle shape from both side edges of the bottom plate 37b to the intermediate height of the vertical support portion 35b. It has a parallel guide plate 38b, by which the horizontal support portion 3 of the hold-down hardware 30 is provided.
4b is formed. Then, the long hole 4 for inserting the bolt
3 has a bottom plate 37
It is placed on b and is supported by the parallel guide plate 38b so as to be movable back and forth.

【0037】第3実施形態においても、土台3のボルト
挿入孔18を挿通して土台上面から高く立上がる長尺連
結ボルト36aは、さらに、底板37bの大径ボルト挿
入孔39と、丈高ボルト位置合わせ金物32aのボルト
挿入用長孔43を挿通して、このボルト位置合わせ金物
32aの上面において、長尺連結ボルト36aのネジ部
にナット42を締結することにより、第1実施形態の場
合と同様、土台3に開設のボルト挿入孔18の設計上か
らの穿孔位置誤差による長尺連結ボルト36aの変位配
設に対応して土台3に対する金物本体31の位置調整を
行ないつつ、長尺連結ボルト36aとホールドダウン金
物30を介して柱7を土台3に強固に固定できる。
Also in the third embodiment, the long connecting bolt 36a which is inserted through the bolt insertion hole 18 of the base 3 and rises higher from the upper surface of the base further includes the large-diameter bolt insertion hole 39 of the bottom plate 37b and the high-strength bolt. By inserting the bolt insertion long hole 43 of the alignment fitting 32a and fastening the nut 42 to the threaded portion of the long connecting bolt 36a on the upper surface of the bolt alignment fitting 32a, the case of the first embodiment is different from that of the first embodiment. Similarly, while adjusting the position of the metal main body 31 with respect to the base 3 in correspondence with the displacement arrangement of the long connecting bolt 36a due to the hole position error from the design of the bolt insertion hole 18 formed in the base 3, the long connecting bolt 36a is adjusted. The pillar 7 can be firmly fixed to the base 3 through the 36a and the hold-down hardware 30.

【0038】[0038]

【発明の効果】以上説明したように、本発明によると、
土台に穿設のボルト挿入孔に位置ずれがあり、その結
果、このボルト挿入孔を貫通して立上がる連結ボルトが
設計上の位置からのずれが生じても、そのずれはホール
ドダウン金物の水平支持部に開設の大径のボルト挿入孔
が存在すること、及び土台長手方向と直角方向に長いボ
ルト挿入用長孔を有するボルト位置合わせ金物を、土台
長手方向にスライドさせることで、前記配置誤差のある
ボルトと、ホールドダウン金物との配置関係を適正に調
整保持できるので、従来のように、土台のボルト挿入孔
の位置とホールドダウン金物のボルト挿入孔のセンター
位置ずれがあっても、大工手間をかけて穴くり直しをす
ることなく、適正に連結ボルトがセットされた状態でホ
ールドダウン金物を固定できるというすぐれた効果があ
る。
As described above, according to the present invention,
Even if the connecting bolt that rises through the bolt insertion hole is displaced from the design position as a result of the displacement of the bolt insertion hole on the base, the displacement is horizontal. The presence of a large-diameter bolt insertion hole that is opened in the support portion, and the bolt alignment hardware having a long hole for inserting a bolt that is long in the direction perpendicular to the longitudinal direction of the base slides in the longitudinal direction of the base. Since it is possible to properly adjust and hold the positional relationship between the bolt with the hold-down hardware and the hold-down hardware, even if there is a misalignment between the position of the base bolt insertion hole and the center of the hold-down hardware bolt insertion hole, carpentry There is an excellent effect that the hold-down hardware can be fixed with the connecting bolt properly set without re-working the holes.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の第1実施形態における第1使用例を示
すホールドダウン金物の斜視図である。
FIG. 1 is a perspective view of a holddown hardware showing a first usage example according to the first embodiment of the present invention.

【図2】図1におけるボルト位置合わせ金物の斜視図で
ある。
FIG. 2 is a perspective view of a bolt positioning metal piece in FIG.

【図3】図1の正面断面図である。FIG. 3 is a front sectional view of FIG.

【図4】図1の側面断面図である。FIG. 4 is a side sectional view of FIG.

【図5】第1実施形態における第2使用例を示すホール
ドダウン金物の斜視図である。
FIG. 5 is a perspective view of a holddown hardware showing a second usage example according to the first embodiment.

【図6】図5におけるボルト位置合わせ金物の斜視図で
ある。
FIG. 6 is a perspective view of the bolt alignment hardware in FIG.

【図7】(A)は第2実施形態に係るホールドダウン金
物の使用状態の斜視図、(B)は図7(A)におけるボ
ルト位置合わせ金物の斜視図である。
FIG. 7A is a perspective view of a use state of the hold-down hardware according to the second embodiment, and FIG. 7B is a perspective view of the bolt alignment hardware of FIG. 7A.

【図8】図7(A)の正面断面図である。8 is a front sectional view of FIG. 7 (A).

【図9】第3実施形態に係るホールドダウン金物の使用
状態の斜視図である。
FIG. 9 is a perspective view of a use state of a holddown hardware according to a third embodiment.

【図10】図9の側面断面図である。FIG. 10 is a side sectional view of FIG.

【図11】(A)は第1従来例のホールドダウン金物の
使用状態の正面図、(B)は図(A)の側面図である。
FIG. 11A is a front view of a first conventional example of a holddown hardware in use, and FIG. 11B is a side view of FIG.

【図12】(A)は図11のホールドダウン金物の斜視
図、(B)は第2従来例のホールドダウン金物の斜視図
である。
12A is a perspective view of the hold-down hardware of FIG. 11, and FIG. 12B is a perspective view of the hold-down hardware of the second conventional example.

【符号の説明】[Explanation of symbols]

1 コンクリート基礎 2 アンカーボルト 3 土台 4 ボルト挿入孔 5 ナット 6 ほぞ穴 7 柱 8 ほぞ 10 ホールドダウン金物 11 垂直板部 12 釘 13 水平板部 14 補強板部 15 凹部 16 連結ボルト 17 ボルト頭部 18 ボルト挿入孔 20 ボルト先端 21 ボルト挿入孔 22 ナット 23 垂直板部 24 下端 26 水平板部 27 補強板 28 ボルト挿入孔 30 ホールドダウン金物 31 金物本体 32 ボルト位置合わせ金物 33 ベース補強金物 34 水平支持部 35 垂直支持部 36 連結ボルト 37 ウエブ 38 フランジ 39 大径ボルト挿入孔 40 上面板 41 両側板 42 ナット 43 ボルト挿入用長孔 44 ボルト挿入孔 45 下部横枠 46 垂直枠 47 補強支持板 48 ボルト挿入孔 49 水平支持台 50 下端部 1 concrete foundation 2 Anchor bolt 3 foundation 4 bolt insertion hole 5 nuts 6 mortise 7 pillars 8 Mortice 10 Holddown hardware 11 Vertical plate part 12 nails 13 Horizontal plate part 14 Reinforcement plate part 15 recess 16 connecting bolt 17 bolt head 18 bolt insertion hole 20 bolt tip 21 Bolt insertion hole 22 nuts 23 Vertical plate 24 bottom 26 Horizontal plate 27 Reinforcement plate 28 Bolt insertion hole 30 Holddown hardware 31 Hardware 32 bolt alignment hardware 33 Base reinforcement hardware 34 Horizontal support 35 Vertical support 36 Connection bolt 37 Web 38 Flange 39 Large diameter bolt insertion hole 40 Top plate 41 both sides 42 nuts 43 Bolt insertion slot 44 Bolt insertion hole 45 Lower horizontal frame 46 vertical frame 47 Reinforcement support plate 48 bolt insertion hole 49 Horizontal support 50 Lower end

───────────────────────────────────────────────────── フロントページの続き (72)発明者 杉田 浩司 東京都千代田区大手町二丁目6番3号 新日本製鐵株式会社内 (56)参考文献 特開 平8−326156(JP,A) 特開 平3−235840(JP,A) 特開 平8−260567(JP,A) 特開 平10−219826(JP,A) 実開 平5−40403(JP,U) 登録実用新案3002207(JP,U) (58)調査した分野(Int.Cl.7,DB名) E04B 1/24 - 1/26 E04B 1/38 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Koji Sugita 2-6-3 Otemachi, Chiyoda-ku, Tokyo Within Nippon Steel Corporation (56) Reference JP-A-8-326156 (JP, A) Kaihei 3-235840 (JP, A) JP 8-260567 (JP, A) JP 10-219826 (JP, A) Actual Kai 5-40403 (JP, U) Registered utility model 3002207 (JP, U) (58) Fields investigated (Int.Cl. 7 , DB name) E04B 1/24-1/26 E04B 1/38

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 薄鋼板を加工成形してなる溝形鋼で形成
される金物本体の水平支持部と垂直支持部を、土台と、
土台に立設の柱に連結ボルト、釘等の固定手段を介して
固定するホールドダウン金物であって、前記水平支持部
には、前記土台を貫通する連結ボルトが可動できる大径
のボルト挿通孔を開設し、また、前記水平支持部には、
前記土台の長手方向と直角方向に長いボルト挿入用長孔
を有し、かつ土台長手方向にスライド可能なボルト位置
合わせ金物を載置し、前記ボルト位置合わせ金物は、薄
鋼板を加工成形してなる溝形鋼で形成され、前記ボルト
挿入用長孔は、当該ボルト位置合わせ金物のウェブに開
設され、かつボルト位置合わせ金物のフランジは、当該
位置合わせ金物のスライド方向と直角方向に形成され、
前記金物本体の水平支持部の下面部には、連結ボルト貫
通部の周辺における前記水平支持部の撓みを防止するベ
ース補強金物を配設することを特徴とするボルト位置合
わせフリーホールドダウン金物。
1. A channel steel formed by processing a thin steel plate.
The horizontal support of the hardware main body and the vertical support is a base,
A hold-down hardware for fixing to a pillar standing on the base via a fixing means such as a connecting bolt and a nail, and a large-diameter bolt insertion hole through which the connecting bolt penetrating the base can be moved in the horizontal support portion. And the horizontal support is
A bolt positioning metal fitting having a long hole for inserting a bolt long in a direction perpendicular to the longitudinal direction of the base and slidable in the longitudinal direction of the base is mounted, and the bolt positioning metal fitting is thin.
The bolt is formed by channel steel formed by processing and shaping a steel plate.
The slot for insertion is opened in the web of the bolt alignment hardware.
And the flange of the bolt alignment hardware is
It is formed in the direction perpendicular to the sliding direction of the alignment hardware,
On the lower surface of the horizontal support part of the hardware body, a connecting bolt
A plate for preventing the horizontal support part from bending around the through part.
A bolt-positioning free hold-down hardware that is equipped with a base reinforcement hardware.
【請求項2】 前記金物本体の前記水平支持部は、前記
土台から離れて所定高さ位置に設けられ、前記連結ボル
トは、前記水平支持部におけるボルト挿入孔に届く長尺
連結ボルトである請求項1に記載のボルト位置合わせフ
リーホールドダウン金物。
2. The horizontal support portion of the metal body is provided at a predetermined height apart from the base, and the connecting bolt is a long connecting bolt reaching a bolt insertion hole in the horizontal support portion. Item 1. A bolt position free holding down hardware according to Item 1.
JP09288097A 1997-03-28 1997-03-28 Bolt position free hold down hardware Expired - Fee Related JP3443273B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP09288097A JP3443273B2 (en) 1997-03-28 1997-03-28 Bolt position free hold down hardware

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP09288097A JP3443273B2 (en) 1997-03-28 1997-03-28 Bolt position free hold down hardware

Publications (2)

Publication Number Publication Date
JPH10266349A JPH10266349A (en) 1998-10-06
JP3443273B2 true JP3443273B2 (en) 2003-09-02

Family

ID=14066772

Family Applications (1)

Application Number Title Priority Date Filing Date
JP09288097A Expired - Fee Related JP3443273B2 (en) 1997-03-28 1997-03-28 Bolt position free hold down hardware

Country Status (1)

Country Link
JP (1) JP3443273B2 (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4717239B2 (en) * 2001-03-29 2011-07-06 株式会社カナイ Withdrawal hardware
JP2006132120A (en) * 2004-11-04 2006-05-25 Jutaku Kozo Kenkyusho:Kk Building hardware
US20130114994A1 (en) 2011-11-04 2013-05-09 Robert Erik Grip Truss end pad fitting
CN105402239A (en) * 2015-12-16 2016-03-16 苏州市皓东金属压延五金厂 Fixing cushion block
CN105345507A (en) * 2015-12-16 2016-02-24 苏州市皓东金属压延五金厂 End fixing block

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3002207U (en) 1994-02-24 1994-09-20 信夫 松崎 Metal plate with adjustable mounting core and its mounting device

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3002207U (en) 1994-02-24 1994-09-20 信夫 松崎 Metal plate with adjustable mounting core and its mounting device

Also Published As

Publication number Publication date
JPH10266349A (en) 1998-10-06

Similar Documents

Publication Publication Date Title
US8978339B2 (en) Adjustable joist hanger
JP3443273B2 (en) Bolt position free hold down hardware
AU2007200753A1 (en) A Panel Attachment Clip
JP2007218043A (en) Joint securing structure of wooden building, fitting for joint securing structure, column base structure, fitting for column base structure, column-beam joint structure, and fitting for column-beam joint structure
JP4276126B2 (en) Support device for anchor bolt for foundation
JP2566470Y2 (en) Anchor bolt fixing device for construction
JP3314055B2 (en) Building hardware
JP2681620B2 (en) Joining structure of wooden building horizontal members and its tools
JP3347937B2 (en) Method of assembling concrete formwork, formwork fixing tool used for this method, and positioning tool for level adjustment material
JP2002322753A (en) Support structure of curtain wall
JP2609971B2 (en) Fixed frame for pier in concrete formwork panel
JP2004011214A (en) High-strength holddown metallic material for building material composed of thin- and light-weight shape steel
JP2004308259A (en) Metal fixture of extrusion molding cement plate and mounting method
JP3033041U (en) Hole down hardware for true wall of wooden structure
JPH11193572A (en) Joint fixing for wooden building
JP3049439U (en) Bracing fixture
JP2001336216A (en) Joining hardware for wooden building
JP2022058194A (en) Inner wall installation method and inner wall installation structure
JP5015110B2 (en) Withdrawal hardware
JP3106211U (en) Wooden remaining formwork
JPH10266435A (en) Fitting method and jig for pc curtain wall to building skeleton section
JP3406969B2 (en) Seismic reinforcement structure and its construction method
JPH0427991Y2 (en)
JPH0313606Y2 (en)
JP3328221B2 (en) Fastening method and fastening materials for ceramic building boards and fastening hardware

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20030603

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080620

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090620

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090620

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100620

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100620

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110620

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110620

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120620

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130620

Year of fee payment: 10

LAPS Cancellation because of no payment of annual fees