JP3413549B2 - Material storage box stocker - Google Patents

Material storage box stocker

Info

Publication number
JP3413549B2
JP3413549B2 JP00225999A JP225999A JP3413549B2 JP 3413549 B2 JP3413549 B2 JP 3413549B2 JP 00225999 A JP00225999 A JP 00225999A JP 225999 A JP225999 A JP 225999A JP 3413549 B2 JP3413549 B2 JP 3413549B2
Authority
JP
Japan
Prior art keywords
material storage
box
storage box
stocker
stacked
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP00225999A
Other languages
Japanese (ja)
Other versions
JP2000204900A (en
Inventor
常松 向谷
俊司 羽鳥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tobishima Corp
Original Assignee
Tobishima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tobishima Corp filed Critical Tobishima Corp
Priority to JP00225999A priority Critical patent/JP3413549B2/en
Publication of JP2000204900A publication Critical patent/JP2000204900A/en
Application granted granted Critical
Publication of JP3413549B2 publication Critical patent/JP3413549B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)
  • De-Stacking Of Articles (AREA)

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、シールド工事に使
用するセグメント等の資材を資材収容箱に収容して、そ
れらを立坑内に積み上げて一時的に保管し、また、それ
らを台車に移載する資材収容箱ストッカーに関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention stores materials such as segments used for shield work in a material storage box, stacks them in a vertical shaft for temporary storage, and transfers them to a trolley. Concerning the material storage box stocker .

【0002】[0002]

【従来の技術】従来、立坑内にセグメント等の資材を一
時的に保管するようにしたものとして、たとえば特願平
2−184479号公報に記載されたシールド工事用資
材の貯蔵設備がある。
2. Description of the Related Art Conventionally, as a material for temporarily storing materials such as segments in a vertical shaft, there is a facility for storing materials for shield work described in Japanese Patent Application No. 2-184479.

【0003】その貯蔵設備は、図17に示すように、立
坑1内に、セグメント等の資材2を収納する多数の棚3
a…,3a…をそれぞれ多段に形成してなるストックラ
ック3,3と、これらに対する資材2の収納及び取り出
しを行う移載装置(図示しない)を設けるとともに、上
記ストックラック3,3の前面において昇降する荷台4
を備えた積込み装置5とを有してなるものである。
As shown in FIG. 17, the storage facility has a plurality of shelves 3 for accommodating materials 2 such as segments in a vertical shaft 1.
a, ..., 3a ... are respectively formed in multiple stages, and a transfer device (not shown) for storing and taking out the material 2 from the stock racks 3 and 3 are provided, and at the front of the stock racks 3 and 3. Lifting platform 4
And a loading device 5 provided with.

【0004】[0004]

【発明が解決しようとする課題】しかし、上記の貯蔵設
備では、棚3a…,3a…をそれぞれ多段に形成したス
トックラック3,3に対する資材2の収納及び取り出し
を行う移載装置を設けた荷台4を、ストックラック3,
3の前面において昇降させているために、装置全体の構
造が複雑になって高価なものとなる。
However, in the above-mentioned storage facility, a loading platform provided with a transfer device for storing and taking out the material 2 from / to the stock racks 3 and 3 in which the shelves 3a ... 4 in stock rack 3,
Since it is moved up and down on the front surface of the device 3, the structure of the entire device becomes complicated and expensive.

【0005】また、積込み装置5で、ストックラック
3,3に対する資材2の収納及び取り出しを行うには、
それらストックラック3,3の前面に積込み装置5を配
設しなければならないという構造上の制約があるととも
に、そのために設置面積が増大し、より大きな立坑を掘
削しなければならず工費の高騰を招く。
Further, in order to store and take out the material 2 from the stock racks 3 and 3 by the loading device 5,
There is a structural restriction that the loading device 5 has to be arranged in front of the stock racks 3, 3, and therefore, the installation area increases, and a larger vertical shaft must be excavated, which increases the construction cost. Invite.

【0006】そこで本発明は、シールド工事に使用する
セグメント等の資材を、より狭い設置面積に効率よくス
トックしておくことができるとともに、しかも、それら
の移載を簡易な構成により行うことができる資材収容箱
ストッカーを提供しようとするものである。
Therefore, according to the present invention, the materials such as the segments used for the shield work can be efficiently stocked in a smaller installation area, and at the same time, they can be transferred by a simple structure. Material storage box
It is intended to provide a stocker .

【0007】[0007]

【課題を解決するための手段】本発明に係る資材収容箱
ストッカーは、シールド工事に使用するセグメント15
等の資材を収容した資材収容箱B1〜B8を多段に積み
上げて立坑10内に一時的に保管しておくものであり、
それら資材収納箱B1〜B8のうち、最下段のものの上
段側に積み重ねられている資材収納箱B2〜B8全体を
支持できる箱支持機構D1、および、最下段の資材収容
箱B1を支持する箱支持ユニット35とこれを昇降させ
る昇降用油圧ジャッキ36…とからなり、上記箱支持機
構D1により最下段の資材収容箱B1の上段側に積み重
ねられている資材収容箱B2〜B8全体を支持している
とき、その最下段の資材収納箱B1だけを下降させて、
それを、これの下方に停止している台車43に移載させ
る箱移載機構D2備えた構成のものである。
The material storage box stocker according to the present invention is a segment 15 used for shield construction.
Material storage boxes B1 to B8 that store materials such as are stacked in multiple stages and temporarily stored in the shaft 10.
Of these material storage boxes B1 to B8, a box support mechanism D1 capable of supporting the entire material storage boxes B2 to B8 stacked on the upper side of the lowermost one, and the lowermost material storage
The box support unit 35 that supports the box B1 and moves it up and down.
When the whole material storage boxes B2 to B8 stacked on the upper side of the lowermost material storage box B1 are supported by the box support mechanism D1, Lower only the material storage box B1,
The structure is provided with a box transfer mechanism D2 that transfers it onto the carriage 43 that is stopped below it.

【0008】[0008]

【発明の実施の形態】本発明の実施の形態について図面
を参照して説明する。Aは、図1,2に示すように、1
対の移動用脚6,6の間にガイド桁7を架設してなる脚
体8と、そのガイド桁7に沿って移動可能な横行装置9
とからなる橋形クレーンであり、立坑10の坑口の両側
に互いに平行にして敷設された1対の軌道11,11上
を移動できるようになっている。
BEST MODE FOR CARRYING OUT THE INVENTION Embodiments of the present invention will be described with reference to the drawings. A is 1 as shown in FIGS.
A leg body 8 in which a guide girder 7 is installed between a pair of moving legs 6 and 6, and a traverse device 9 movable along the guide girder 7.
It is a bridge crane consisting of and, and can move on a pair of tracks 11, 11 laid parallel to each other on both sides of the shaft entrance of the shaft 10.

【0009】ガイド桁7は平面長方形の枠体であり、こ
れの一方の端部を、運搬車両12からの資材収容箱Bの
積降ろし作業と、その運搬車両12に対する資材収容箱
Bの積込み作業を行えるように、移動用脚6,6のうち
の一方のものの外方に延出して形成している。また、1
3,13は、横行装置9をガイドする1対のガイドレー
ルである。
The guide girder 7 is a flat rectangular frame, and one end of the guide girder 7 is used to unload the material storage box B from the transport vehicle 12 and to load the material storage box B onto the transport vehicle 12. In order to be able to perform, it is formed so as to extend outside one of the moving legs 6 and 6. Also, 1
Reference numerals 3 and 13 are a pair of guide rails that guide the traverse device 9.

【0010】横行装置9は、上記1対のガイドレール1
3,13上を走行するための走行機構と、昇降ウインチ
(いずれも図示しない)とを筐体9aに内蔵したもので
あり、その昇降ウインチに、資材収容箱Bを把持する箱
持上げユニット14をロープ9bにより吊持している。
The traverse device 9 includes the pair of guide rails 1 described above.
A traveling mechanism for traveling on 3, 3 and a lifting winch (both not shown) are built in a housing 9a, and a box lifting unit 14 for holding the material storage box B is held in the lifting winch. It is suspended by the rope 9b.

【0011】資材収容箱Bは、主に図3〜5に示すよう
に、資材であるたとえばセグメント15を3枚重ね合わ
せて収容できる内容積を備えかつ上面を開口した直方体
形の箱本体16と、これの側壁16a,16b,16
c,16dの上辺縁16eに一致させて上側の保持枠1
7が、また、下辺縁16fには、これよりも所要幅だけ
上方にずらした位置に下側の保持枠18がそれぞれ固着
されている。
As shown mainly in FIGS. 3 to 5, the material storage box B has a box body 16 of a rectangular parallelepiped shape having an internal volume capable of accommodating, for example, three segments 15, which are materials, in an overlapping manner and having an open upper surface. , Side walls 16a, 16b, 16 of this
The upper holding frame 1 in conformity with the upper edges 16e of c and 16d
7, and a lower holding frame 18 is fixed to the lower edge 16f at a position shifted upward by a required width from this.

【0012】保持枠17,18は互いに同形同大の平面
長方形の枠体であり、それらの長辺17a,17a、1
8a,18aの両端寄りに、後述するロック用油圧ジャ
ッキ23のロッド23a等を嵌入する断面円形のロッド
嵌合孔19,19、19,19が貫通形成されている。
また、箱本体16の側壁16a,16cにも、ロッド嵌
合孔19,19、19,19に対向させてそれらと同じ
直径の貫通孔20,20、20,20が形成されてい
る。なお、ロッド嵌合孔19…の外側口縁と、貫通孔2
0…の内側口縁は、ロック用油圧ジャッキ23のロッド
23a等の嵌入を容易にするための面取り加工をしてお
くとよい。
The holding frames 17 and 18 are plane rectangular frame bodies having the same shape and size, and their long sides 17a, 17a, 1
Rod fitting holes 19, 19, 19, 19 having a circular cross-section into which a rod 23a of a locking hydraulic jack 23, which will be described later, is fitted are formed so as to penetrate toward both ends of 8a, 18a.
Further, through holes 20, 20, 20, 20 having the same diameter as those of the rod fitting holes 19, 19, 19, 19 are formed in the side walls 16a, 16c of the box body 16 so as to face the rod fitting holes 19, 19, 19, 19. The outer edge of the rod fitting hole 19 ...
It is preferable that the inner edge of 0 ... Be chamfered for facilitating fitting of the rod 23a and the like of the hydraulic jack 23 for locking.

【0013】下側の保持枠18より下方に所要幅だけ突
出している側壁16a,16b、16c,16d部分に
は、その部分を所要の角度で内側に向けて折曲すること
によって、位置決め片16g,16g′,16g,16
g′が形成されている。
The side walls 16a, 16b, 16c, 16d protruding downward by a required width from the lower holding frame 18 are bent inward at a required angle to form a positioning piece 16g. , 16g ', 16g, 16
g'is formed.

【0014】底壁16hは、側壁16a,16cの中央
部間に横架された補強材21から側壁16bに向けて、
また、その補強片21から側壁16dに向けて、それぞ
れ次第に箱本体16の深さが浅くなるように2枚の鋼板
16i,16iを傾設してなるものである。
The bottom wall 16h extends toward the side wall 16b from the reinforcing member 21 which is horizontally provided between the central portions of the side walls 16a and 16c.
Further, the two steel plates 16i, 16i are inclined from the reinforcing piece 21 toward the side wall 16d so that the depth of the box main body 16 gradually decreases.

【0015】具体的には、2枚の鋼板16i,16i
を、これらの上面がセグメント15…のうち、最も下側
のセグメント15の外周面に当接させるようにして傾設
することにより、それらのセグメント15…を安定させ
ための部材を別に配設する必要がないようにしてい
る。
Specifically, the two steel plates 16i, 16i
Are inclined so that their upper surfaces are brought into contact with the outer peripheral surface of the lowermost segment 15 among the segments 15 ,.
So that it is not necessary to separately dispose the members for that.

【0016】上述した資材収容箱Bは、図1に示すよう
に、それらを多段に直接積み上げて使用するものであ
り、それら資材収容箱B…のうち、隣接する上下2つの
資材収容箱B,Bについてみると、上段のものの下側の
保持枠18が、下段のものの上側の保持枠17に当接す
ることにより、それら両資材収容箱B,Bが安定した状
態で垂直に積み上げられるようになっている。
As shown in FIG. 1, the above-mentioned material storage boxes B are used by directly stacking them in multiple stages. Of these material storage boxes B, two adjacent upper and lower material storage boxes B, As for B, the lower holding frame 18 of the upper one comes into contact with the upper holding frame 17 of the lower one so that the two material storage boxes B, B can be vertically stacked in a stable state. ing.

【0017】また、それら2つの資材収容箱B,Bを積
み上げるときには、上段の資材収容箱Bの位置決め片1
6g,16g′が、下段の資材収容箱Bの上辺縁16e
に内接することにより、それらの位置合わせがなされる
ようになっている。
When the two material storage boxes B, B are stacked, the positioning piece 1 of the upper material storage box B is placed.
6g and 16g 'are the upper edge 16e of the lower material storage box B
By inscribed in, the alignment of them is made.

【0018】箱持上げユニット14は、図6,7に示す
ように、上記資材収容箱Bの保持枠17,18と同形同
大の平面長方形の持上げ用枠22と、4つのロック用油
圧ジャッキ23…と、その持上げ用枠22に載置した油
圧装置24とからなる。なお、22a…は把持枠22の
長枠材22b,22bの両端寄りの上面に突設した吊り
具である。
As shown in FIGS. 6 and 7, the box lifting unit 14 includes a lifting frame 22 having a flat rectangular shape having the same shape and size as the holding frames 17 and 18 of the material storage box B, and four locking hydraulic jacks. 23, and a hydraulic device 24 mounted on the lifting frame 22. Numerals 22a, ... Are hanging members projectingly provided on the upper surfaces of the long frame members 22b, 22b of the holding frame 22 near both ends.

【0019】持上げ用枠22の下面には、上記箱本体1
6の位置決め片16g,16g′,16g,16g′と
同様の位置決め片22c,22c′、22c,22c′
が内側に所要の角度で折曲形成されている。また、それ
らのうちの位置決め片22c,22cには、資材収容箱
Bの保持枠17のロッド嵌合孔19…に対向することに
なる位置に、上記各ロック用油圧ジャッキ23…を配設
している。
On the lower surface of the lifting frame 22, the box body 1 is attached.
Positioning pieces 22c, 22c ', 22c, 22c' similar to the positioning pieces 16g, 16g ', 16g, 16g' in FIG.
Is bent inside at a required angle. In addition, among the positioning pieces 22c, 22c, the lock hydraulic jacks 23 are arranged at positions facing the rod fitting holes 19 of the holding frame 17 of the material storage box B. ing.

【0020】ロック用油圧ジャッキ23は、箱本体16
の貫通孔20及び保持枠17のロッド嵌合孔19に嵌入
するロッド23aを外側に向けた状態にして、ジャッキ
本体23bが位置決め片22cに固定されている。
The hydraulic jack 23 for locking is the box body 16
The jack body 23b is fixed to the positioning piece 22c with the rod 23a fitted into the through hole 20 and the rod fitting hole 19 of the holding frame 17 facing outward.

【0021】箱持上げユニット14により、資材収容箱
Bを持ち上げるときには、その箱持上げユニット14を
その資材収容箱Bに載せて、それの持上げ用枠22の下
面を資材収容箱Bの保持枠17の上面に当接させる。こ
のとき、箱持上げユニット14と資材収容箱Bとが位置
ずれしているときには、持上げ用枠22の位置決め片2
2c,22c′,22c,22c′が資材収容箱Bの上
辺縁16eに内接し、これにより、それらの位置合わせ
がなされる。
When the material holding box B is lifted by the box lifting unit 14, the box lifting unit 14 is placed on the material holding box B and the lower surface of the lifting frame 22 of the box holding unit 17 of the material holding box B. Contact the top surface. At this time, when the box lifting unit 14 and the material storage box B are displaced, the positioning piece 2 of the lifting frame 22 is moved.
2c, 22c ', 22c, 22c' are inscribed in the upper edge 16e of the material storage box B, and their alignment is achieved.

【0022】また、持上げ用枠22の下面が資材収容箱
Bの保持枠17の上面に当接したときに、各ロック用油
圧ジャッキ23のロッド23aが、資材収容箱Bの各貫
通孔20に対向する。従って、箱持上げユニット14を
資材収容箱Bに載せて、ロッド23aを伸出させるだけ
で、そのロッド23aを貫通孔20及びロッド嵌合孔1
9に嵌入させことができ、これにより、資材収容箱B
をロックすることができるようになる。また、ロッド2
3aを縮退させるだけで資材収容箱Bのロック状態を解
除できる。
When the lower surface of the lifting frame 22 contacts the upper surface of the holding frame 17 of the material storage box B, the rods 23a of the lock hydraulic jacks 23 are inserted into the through holes 20 of the material storage box B. opposite. Therefore, by only placing the box lifting unit 14 on the material storage box B and extending the rod 23a, the rod 23a is inserted into the through hole 20 and the rod fitting hole 1.
Can Ru is fitted to 9, whereby the material accommodating box B
Will be able to lock. Also, rod 2
The locked state of the material storage box B can be released only by retracting 3a.

【0023】C1,C2は、図1,2に示すように、互
いに同じ構造からなる資材収容箱ストッカーであり、こ
れらのうち資材収容箱ストッカーC1は、セグメント1
5…を収容した資材収容箱B…を一時的に保管するため
のもの、また、資材収容箱ストッカーC2は、セグメン
ト15…を取り出した後の空の資材収容箱B…を一時的
に保管しておくためのものであり、それらを、立坑10
内の側壁10aに近接した状態で並設している。なお、
ここでは資材収容箱ストッカーC1の構成について説明
し、資材収容箱ストッカーC2の構成については説明を
省略する。
As shown in FIGS. 1 and 2, C1 and C2 are material storage box stockers having the same structure. Of these, the material storage box stocker C1 is the segment 1
5 for accommodating the material storage box B ..., and the material storage box stocker C2 temporarily stores the empty material storage box B ... To keep them,
They are juxtaposed in a state of being close to the inner side wall 10a. In addition,
Here, the configuration of the material storage box stocker C1 will be described, and the configuration of the material storage box stocker C2 will be omitted.

【0024】資材収容箱ストッカーC1は、図8〜10
に示すように、立坑10の底壁10bに設置された収容
箱支持移載部Dと、それの上部に立設された収容箱保管
部Eとからなる。
The material storage box stocker C1 is shown in FIGS.
As shown in FIG. 3, the storage box support transfer section D is installed on the bottom wall 10b of the vertical shaft 10, and the storage box storage section E is installed upright on the storage box support transfer section D.

【0025】収容箱支持移載部Dは、平面長方形の頂点
に対応する位置に立設された4本のガイド支柱25〜2
8のうち、ガイド支柱25と26、ガイド支柱27と2
8間に上側横桁29,29を横設するとともに、それら
の下端間に下側横桁30,30、31,31を横設する
ことにより、それらを上下3段にして横設してなる基台
32と、この基台32の上端面に固設した箱支持機構D
1と、これの下方、すなわち、基台32内に配設した箱
移載機構D2とからなる。
The storage box support transfer section D has four guide struts 25 to 2 which are erected at positions corresponding to the vertices of a plane rectangle.
Of the eight, guide columns 25 and 26, guide columns 27 and 2
The upper lateral girders 29, 29 are provided horizontally between the eight, and the lower lateral girders 30, 30, 31, 31 are provided horizontally between the lower ends thereof so that they are vertically arranged in three stages. Base 32 and box support mechanism D fixed to the upper end surface of the base 32
1 and a box transfer mechanism D2 disposed below this, that is, in the base 32.

【0026】箱支持機構D1は、基台32の上端面に載
置された平面長方形の固定枠33の、資材収容箱Bの上
側の保持枠17のロッド嵌合孔19…に対向することに
なる位置に、それぞれ箱支持用油圧ジャッキ34…を配
設したものである。
The box support mechanism D1 faces the rod fitting holes 19 of the holding frame 17 on the upper side of the material storage box B of the flat rectangular fixed frame 33 placed on the upper end surface of the base 32. The box-supporting hydraulic jacks 34 ... Are arranged at respective positions.

【0027】箱支持用油圧ジャッキ34は、ロッド嵌合
孔19に嵌入するロッド34aを内側に向けた状態で、
ジャッキ本体34bを固定枠33の長枠材33a,33
aの外側面に固定されている。
The box-supporting hydraulic jack 34 has a rod 34a fitted in the rod fitting hole 19 facing inward.
The jack body 34b is attached to the long frame members 33a, 33 of the fixed frame 33.
It is fixed to the outer surface of a.

【0028】箱移載機構D2は、ガイド支柱25〜28
に沿って昇降自在な箱支持ユニット35と、この箱支持
ユニット35を昇降させる4本の昇降用油圧ジャッキ3
6…とからなる。
The box transfer mechanism D2 includes guide columns 25 to 28.
A box support unit 35 that can be moved up and down along with four hydraulic jacks 3 for raising and lowering the box support unit 35.
It consists of 6 ...

【0029】箱支持ユニット35は、資材収容箱Bの下
側の保持枠18を囲繞できる大きさにした長方形の枠3
7に、資材収容箱Bの下側の保持枠18のロッド嵌合孔
19…に対向することになる位置に4つの箱支持用油圧
ジャッキ38…を配設したものである。
The box support unit 35 is a rectangular frame 3 having a size capable of surrounding the holding frame 18 on the lower side of the material storage box B.
7, four box-supporting hydraulic jacks 38 ... Are arranged at positions facing the rod fitting holes 19 ... of the holding frame 18 on the lower side of the material storage box B.

【0030】上記枠37の長枠材37a,37a(一方
は図示しない)の両端には、ガイド支柱25〜28の内
部に形成されたガイド溝25a、26a、27a及び2
8aに沿って摺動するスライダー39…が配置されてい
る。すなわち、枠37は、スライダー39…によって支
持された状態でガイド支柱25〜28に沿って昇降でき
るようになっている。
Guide grooves 25a, 26a, 27a and 2 formed inside the guide columns 25 to 28 are provided at both ends of the long frame members 37a, 37a (one is not shown) of the frame 37.
Sliders 39 ... Which slide along 8a are arranged. That is, the frame 37 can be moved up and down along the guide columns 25 to 28 while being supported by the slider 39.

【0031】各昇降用油圧ジャッキ36は、ロッド36
aを枠37の四隅下面に連結できるように、それのジャ
ッキ本体36bを、立坑10の底壁10bに立設してい
る。
Each lifting hydraulic jack 36 includes a rod 36
The jack main body 36b of the frame 37 is erected on the bottom wall 10b of the vertical shaft 10 so that a can be connected to the lower surfaces of the four corners of the frame 37.

【0032】箱支持ユニット35は、昇降用油圧ジャッ
キ36のロッド36aを伸縮駆動するのに従って、箱支
持機構D1によって支持している資材収容箱Bを支持す
る支持位置(イ)と、その支持した資材収容箱Bを、そ
の箱支持ユニット35の垂直下方に停止している台車4
3に移載する移載位置(ロ)との間で往復移動されるよ
うになっている。
The box support unit 35 supports the material storage box B supported by the box support mechanism D1 as the rod 36a of the lifting hydraulic jack 36 expands and contracts, and the supporting position (a). The dolly 4 that stops the material storage box B vertically below the box support unit 35.
3 is reciprocated between the transfer position (3) and the transfer position (2).

【0033】収容箱保管部Eは、資材収容箱Bを囲繞す
る長方形の頂点にそれぞれ支柱40,40を1組として
立設するとともに、それら各1組の支柱40,40毎
に、資材収容箱Bをガイドするスペーサー41を図9に
示すように配設したものである。
In the storage box storage section E, columns 40, 40 are set up at the apexes of the rectangle surrounding the material storage box B as a set, and the storage box E is provided for each set of columns 40, 40. A spacer 41 for guiding B is arranged as shown in FIG.

【0034】上記資材収容箱ストッカーC1,C2は、
それらの収容箱保管部E,Eの壁側の2組の支柱40,
40、40,40に、これの所定間隔毎に配設した壁繋
ぎ部材40a…によって、立坑10の側壁10aに固定
されている。
The material storage box stockers C1 and C2 are
Two sets of columns 40 on the wall side of the storage box storage sections E, E,
40, 40, 40 are fixed to the side wall 10a of the vertical shaft 10 by wall connecting members 40a disposed at predetermined intervals.

【0035】42は、図1,2,8,10に示すよう
に、台車43及びバッテリーロコ44を走行させる作業
床F上に敷設された軌条であり、資材収容箱ストッカー
C1及びC2の下方から横坑45内のシールド機46の
近傍にまで延設されている。なお、図2に示す42aは
わたり線である。
As shown in FIGS. 1, 2, 8 and 10, reference numeral 42 denotes a rail laid on a work floor F on which a carriage 43 and a battery locomotive 44 travel, and from below the material storage box stockers C1 and C2. It is extended to the vicinity of the shield machine 46 in the side shaft 45. In addition, 42a shown in FIG. 2 is a crossover line.

【0036】次に、上記の構成からなる資材収容箱スト
ッカーC1,C2により、立坑10内に複数個の資材収
容箱B…を多段に積み上げて一時的に保管するととも
に、それらの資材収容箱B…を台車43に移載する動作
について説明する。なお、ここでは、多段に積み上げた
複数個の資材収容箱B…のうち、最下段のものをB1、
これの上段側に積み上げられている資材収容箱を下から
順にB2,B3…のように示す。
Next, a plurality of material storage boxes B ... Are stacked in the vertical shaft 10 in a multi-stage manner by the material storage box stockers C1 and C2 having the above-mentioned structure and temporarily stored, and the material storage boxes B are also stored. The operation of transferring the ... To the carriage 43 will be described. In addition, here, of the plurality of material storage boxes B ...
The material storage boxes stacked on the upper side of this are shown as B2, B3 ... In order from the bottom.

【0037】<資材収容箱の積上げ動作> まず、資材収容箱ストッカーC1に資材収容箱B1を供
給するには、前述した橋形クレーンAにより、これの側
方に停車させた運搬車両12に搭載されている資材収容
箱B1を吊り上げ、これを、立坑10内の資材収容箱ス
トッカーC1の上方に移動した後、その内部に吊り下ろ
す。
<Stacking Operation of Material Storage Box> First, in order to supply the material storage box B1 to the material storage box stocker C1, it is mounted on the transportation vehicle 12 parked to the side by the bridge crane A described above. The stored material storage box B1 is lifted up, moved above the material storage box stocker C1 in the vertical shaft 10 and then hung down inside the stocker storage box C1.

【0038】吊り下ろされた資材収容箱B1は、収容箱
保管部E内に吊り下ろされる際、スペーサー41…にガ
イドされながら下降した後、図11に示すように、支持
位置(イ)に移動されている箱支持ユニット35によっ
て支持されるとともに、箱支持機構D1によっても支持
された状態になる。
When the suspended material storage box B1 is suspended in the storage box storage section E, it descends while being guided by the spacers 41, and then moved to the support position (a) as shown in FIG. While being supported by the box supporting unit 35, the box supporting unit 35 is also supported by the box supporting mechanism D1.

【0039】すなわち、資材収容箱B1は、これの上側
の保持枠17のロッド嵌合孔19…に、箱支持機構D1
の箱支持用油圧ジャッキ34…のロッド34a…が嵌合
され、また、下側の保持枠18のロッド嵌合孔19…
に、箱支持ユニット35の箱支持用油圧ジャッキ38…
のロッド38a…が嵌合された状態で支持される。
That is, the material storage box B1 has a box support mechanism D1 in the rod fitting holes 19 of the holding frame 17 on the upper side thereof.
The rods a of the box supporting hydraulic jacks 34 ... Are fitted, and the rod fitting holes 19 of the lower holding frame 18 are fitted.
The box support hydraulic jack 38 of the box support unit 35 ...
Are supported in a fitted state.

【0040】上記資材収容箱B1を箱支持ユニット3
5、箱支持機構D1によって支持した後、橋形クレーン
A及び箱持上げユニット14により、図12に示すよう
に、次の資材収容箱B2を資材収容箱ストッカーC1内
に吊り下ろして、先の資材収容箱B1に直接積み上げ
る。
The material storage box B1 is attached to the box support unit 3
5, after being supported by the box support mechanism D1, the bridge-type crane A and the box lifting unit 14 suspend the next material storage box B2 in the material storage box stocker C1 as shown in FIG. It is stacked directly on the storage box B1.

【0041】その積上げ動作を必要なだけ繰り返して、
図13に示すように、収容箱保管部E内に資材収容箱B
1〜B8を多段に積み上げた状態にする。
The stacking operation is repeated as many times as necessary,
As shown in FIG. 13, the material storage box B is stored in the storage box storage unit E.
1 to B8 are stacked in multiple stages.

【0042】<資材収容箱の移載動作> 資材収容箱B1を台車43に移載するには、図13に示
すように、箱支持機構D1による最下段の資材収容箱B
1の支持状態を解除した後、図14に示すように、箱支
持ユニット35を、資材収容箱B2の上側の保持枠17
が、箱支持機構D1の箱支持用油圧ジャッキ34…に対
向するように下降させる。
<Material Storage Box Transfer Operation> To transfer the material storage box B1 onto the carriage 43, as shown in FIG. 13, the lowermost material storage box B by the box support mechanism D1 is transferred.
After releasing the supporting state of No. 1, as shown in FIG. 14, the box supporting unit 35 is attached to the holding frame 17 on the upper side of the material storage box B2.
Is lowered so as to face the box supporting hydraulic jacks 34 of the box supporting mechanism D1.

【0043】次に、箱支持機構D1の各箱支持用油圧ジ
ャッキ34…を伸出駆動して、図15に示すように、そ
れらのロッド34a…を資材収容箱B2の上側の保持枠
17のロッド嵌合孔19…に嵌入する。これにより、最
下段の資材収容箱B1を除く資材収容箱B2〜B8全体
が、箱支持機構D1によって支えられた状態になる。
Next, the box supporting hydraulic jacks 34 ... Of the box supporting mechanism D1 are extended and driven to move the rods 34a ... of the holding frame 17 above the material storage box B2 as shown in FIG. Fit into the rod fitting hole 19 ... As a result, the entire material storage boxes B2 to B8 excluding the lowermost material storage box B1 are in a state of being supported by the box support mechanism D1.

【0044】箱支持用油圧ジャッキ38…のロッド38
aを、資材収容箱B1の下側の支持枠18のロッド嵌合
孔19…に嵌入させた状態で、箱支持ユニット35を支
持位置(イ)から移載位置(ロ)に下降移動し、図16
に示すように、その資材収容箱B1を台車43に移載す
る。その後、箱支持用油圧ジャッキ38…を縮退駆動し
て、保持枠18のロッド嵌合孔19…からロッド38a
…を抜き出し、資材収容箱B1の支持状態を解除する。
Rod 38 of the hydraulic jack 38 for supporting the box
a is fitted in the rod fitting hole 19 of the support frame 18 below the material storage box B1, the box support unit 35 is moved downward from the support position (a) to the transfer position (b), FIG.
The material storage box B1 is transferred to the carriage 43 as shown in FIG. After that, the box supporting hydraulic jacks 38 ... Are driven to retract, and the rod fitting holes 19 ...
... is pulled out, and the support state of the material storage box B1 is released.

【0045】資材収容箱B1を搭載した台車43は、バ
ッテリーロコ44によって牽引されて横坑45内を走行
してシールド機46近傍で停車され、そこで資材収容箱
B1内に収容していたセグメント15…が取り出され
る。
The trolley 43 carrying the material storage box B1 is pulled by the battery locomotive 44, travels in the shaft 45, and is stopped near the shield machine 46, where the segment 15 stored in the material storage box B1 is located. ... is taken out.

【0046】セグメント15…を取り出した後の空の資
材収容箱B1は、台車43によって資材収容箱ストッカ
ーC2に運ばれた後、上述した資材収容箱Bの移載動作
と逆の動作によって、資材収容箱ストッカーC2側の収
容箱保管部E内に積み上げられて一時的に保管されるよ
うになる。従って、夜間に作業を継続して行い、これに
より搬出すべき空の資材収容箱B…がある場合にも、そ
れらを資材収容箱ストッカーC2内に積み上げて一時的
に保管しておけるため、それら空の資材収容箱B…の夜
間における搬出を行わなくてもよい。
The empty material storage box B1 from which the segments 15 have been taken out is carried by the carriage 43 to the material storage box stocker C2, and then the material storage box B is transferred by the reverse operation of the material storage box B described above. It is piled up in the storage box storage unit E on the storage box stocker C2 side and temporarily stored. Therefore, even if there is an empty material storage box B to be carried out by continuing the work at night, it is possible to stack them in the material storage box stocker C2 and temporarily store them. It is not necessary to carry out the empty material storage box B ... at night.

【0047】なお、本発明は次のような変形実施が可能
である。上記においては、資材収容箱ストッカーC1と
C2とを1つずつ立坑の壁面に沿って並設した構成のも
のについて説明したが、資材収容箱ストッカーC1と資
材収容箱ストッカーC2とをそれぞれ2つ以上ずつ並設
した構成にしてよい。
The present invention can be modified as follows. Although the material storage box stockers C1 and C2 are arranged side by side along the wall surface of the shaft in the above description, two or more material storage box stockers C1 and two material storage box stockers C2 are provided. They may be arranged side by side.

【0048】また、たとえば1つの資材収容箱ストッカ
ーC1に対して2つの資材収容箱ストッカーC2を対応
配設した構成にしてもよい。
Further, for example, two material storage box stockers C2 may be arranged corresponding to one material storage box stocker C1.

【0049】上記においては、セグメントを資材の一例
として説明したが、資材としてはたとえば工事に使用す
る鋼材等や工具等であってもよい。また、資材を取り出
した後の空の資材収容箱内に、切羽で発生した掘削土砂
を充填して排出するようにしてもよい。
Although the segment has been described as an example of the material in the above, the material may be, for example, a steel material or a tool used for construction. Further, the excavated earth and sand generated by the face may be filled and discharged in the empty material storage box after the material is taken out.

【0050】この場合、搬出した掘削土砂を資材収容箱
に充填したまま、運搬車で他の土捨て場に搬送すること
ができるので、掘削土砂の積替え作業を行う必要がな
く、コストの低減を図ることもできる。
In this case, since the excavated earth and sand carried out can be transported to another earth dump site by the carrier while the material storage box is filled, it is not necessary to transship the excavated earth and sand, thus reducing the cost. It can also be planned.

【0051】さらに、掘削土砂を充填した資材収容箱
を、資材収容箱ストッカー内に多段に積み上げた状態で
保管しておけるので、夜間における掘削土砂の搬出を行
う必要がなく、夜間における騒音を防止できる。
Further, since the material storage box filled with the excavated earth and sand can be stored in the material storage box stocker in a stacked state in multiple stages, it is not necessary to carry out the excavated earth and sand at night, and noise at night is prevented. it can.

【0052】[0052]

【発明の効果】本発明によれば、次の効果を得ることが
できる。複数個の資材収容箱を直接多段に積み上げて立
坑内に保管しておくことができるので、セグメント等の
資材をそのまま棚等に収容しておく場合に比較して、よ
り小さな空間に多くの資材を収容することができるとと
もに、設置面積をも小さくすることができる。
According to the present invention, the following effects can be obtained. Since multiple material storage boxes can be directly stacked in multiple stages and stored in the shaft, more materials can be stored in a smaller space than when storing materials such as segments as they are on shelves. Can be accommodated and the installation area can be reduced.

【0053】多段に積み上げた資材収容箱のうち、最下
段のものを順次下降させることにより、これを台車に移
できるようにしているので、その移載のための装置
を、多段に積み上げた資材収容箱の下方に配置できるよ
うになり、設置面積をさらに小さくすることができる。
従って、設置面積を小さくできる分だけ小さな立坑を掘
削すればよく、立坑掘削のための工費を低減することが
できる。
Among the material storage boxes stacked in multiple stages, the lowest one can be transferred to the trolley by sequentially lowering it. Therefore, the transfer device can be stacked in multiple stages. Since it can be placed below the material storage box, the installation area can be further reduced.
Therefore, it is only necessary to excavate a small vertical shaft as much as the installation area can be reduced, and the construction cost for vertical shaft excavation can be reduced.

【0054】最下段のものを順次下降させるという単純
な動作だけで、資材収容箱を台車に移載することができ
ようにしているので、その移載に係る構成を簡易にす
ることができる。
Since the material storage box can be transferred to the dolly by a simple operation of sequentially lowering the lowermost one, the structure relating to the transfer can be simplified.

【0055】資材を資材収容箱内に収容できるように
ているので、たとえばそれらを立坑を設けた発進基地内
に数段ずつ積み上げて置いておくこともできる。これに
より、そのためのストックヤードを小さくすることがで
き、発進基地内を有効に使用することができる。
Since the materials can be accommodated in the material accommodating box, it is possible to stack them in several steps in a starting base provided with a shaft. As a result, the stockyard for that purpose can be reduced, and the inside of the starting base can be effectively used.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明に係る資材収容箱ストッカーと、これを
設置した立坑及び横坑の縦断面図である。
FIG. 1 is a longitudinal sectional view of a material storage box stocker according to the present invention, and a vertical shaft and a horizontal shaft in which the stocker is installed.

【図2】その横断面図である。FIG. 2 is a cross sectional view thereof.

【図3】資材収容箱の平面図である。FIG. 3 is a plan view of a material storage box.

【図4】その正面図である。FIG. 4 is a front view thereof.

【図5】その側面図である。FIG. 5 is a side view thereof.

【図6】箱持上げユニットの平面図である。FIG. 6 is a plan view of a box lifting unit.

【図7】その正面図である。FIG. 7 is a front view thereof.

【図8】資材収容箱ストッカーの主要部を示す部分正面
図である。
FIG. 8 is a partial front view showing a main part of the material storage box stocker.

【図9】その資材収容箱ストッカーの平面図である。FIG. 9 is a plan view of the material storage box stocker.

【図10】その資材収容箱ストッカーの主要部の部分側
面図である。
FIG. 10 is a partial side view of a main part of the material storage box stocker.

【図11】その資材収容箱ストッカー内に資材収容箱を
積み上げる様子を示すもので、最下段の資材収容箱を箱
移載機構により支持した正面図である。
FIG. 11 is a front view showing a state in which the material storage boxes are stacked in the material storage box stocker and the lowermost material storage box is supported by the box transfer mechanism.

【図12】その資材収容箱ストッカー内で支持されてい
る最下段の資材収容箱に、次段の資材収容箱を積み上げ
る状態を示す正面図である。
FIG. 12 is a front view showing a state where the next-stage material storage box is stacked on the lowest-stage material storage box supported in the material storage box stocker.

【図13】その資材収容箱ストッカー内に8個の資材収
容箱を積み上げた状態を示す正面図である。
FIG. 13 is a front view showing a state where eight material storage boxes are stacked in the material storage box stocker.

【図14】資材収容箱ストッカー内に積み上げられてい
る8個の資材収容箱全体を、箱移載機構により下降させ
た状態を示す正面図である。
FIG. 14 is a front view showing a state where the entire eight material storage boxes stacked in the material storage box stocker are lowered by the box transfer mechanism.

【図15】下から2段目の資材収容箱を箱支持機構によ
り支持した様子を示す正面図である。
FIG. 15 is a front view showing a state in which a second-stage material storage box from the bottom is supported by a box support mechanism.

【図16】最下段の資材収容箱を台車に移載した様子を
示す正面図である。
FIG. 16 is a front view showing a state in which the lowermost material storage box is transferred to a trolley.

【図17】従来のシールド工事用資材の貯蔵設備を示す
正面図である。
FIG. 17 is a front view showing a conventional storage facility for shield work materials.

【符号の説明】[Explanation of symbols]

15 資材の一例であるセ
グメント 16 箱本体 16a,16b,16c,16d 側壁 16e 上辺縁 16f 下辺縁 17,18 保持枠 19 ロッド嵌合孔 34 箱支持用油圧ジャッ
キ 35 箱支持ユニット 36 昇降用油圧ジャッキ 37 枠 38 箱支持用油圧ジャッ
キ 38a ロッド 43 台車 A 橋形クレーン B,B1,B2,B8 資材収容箱 C1,C2 資材収容箱ストッカ
ー D1 箱支持機構 D2 箱移載機構
15 Segment 16 as an example of material Box body 16a, 16b, 16c, 16d Side wall 16e Upper edge 16f Lower edge 17, 18 Holding frame 19 Rod fitting hole 34 Box supporting hydraulic jack 35 Box supporting unit 36 Lifting hydraulic jack 37 Frame 38 Box-supporting hydraulic jack 38a Rod 43 Cart A Bridge cranes B, B1, B2, B8 Material storage boxes C1, C2 Material storage box stocker D1 Box support mechanism D2 Box transfer mechanism

───────────────────────────────────────────────────── フロントページの続き (56)参考文献 特開 昭56−37929(JP,A) 特開 平10−266800(JP,A) 特開 平10−331599(JP,A) 実開 昭62−132015(JP,U) 実開 平3−65800(JP,U) (58)調査した分野(Int.Cl.7,DB名) E21F 13/00 - 13/06 E21D 11/40 B65G 59/06 ─────────────────────────────────────────────────── ─── Continuation of the front page (56) Reference JP-A-56-37929 (JP, A) JP-A-10-266800 (JP, A) JP-A-10-331599 (JP, A) Actual development Sho-62- 132015 (JP, U) Actual Kaihei 3-65800 (JP, U) (58) Fields investigated (Int.Cl. 7 , DB name) E21F 13/00-13/06 E21D 11/40 B65G 59/06

Claims (3)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】シールド工事に使用するセグメント等の資
材を収容する資材収容箱を多段に積み上げて立坑内に一
時的に保管しておく資材収容箱ストッカーであって、上
記多段に積み上げた資材収納箱のうち、最下段のものに
積み上げられている資材収納箱全体を支持できる箱支持
機構、および、最下段の資材収容箱を支持する箱支持ユ
ニットとこれを昇降させる昇降用油圧ジャッキとからな
り、上記箱支持機構により最下段の資材収容箱に積み上
げられている資材収容箱全体を支持しているとき、その
最下段の資材収納箱だけを下降させて、それを、これの
下方に停止している台車に移載する箱移載機構備えて
いることを特徴とする資材収容箱ストッカー。
1. A material storage box stocker in which material storage boxes for storing materials such as segments used for shield construction are stacked in multiple stages and temporarily stored in a shaft, and the material storage boxes are stacked in multiple stages. Of the boxes, a box support mechanism that can support the entire material storage box stacked in the lowermost one , and a box support unit that supports the lowermost material storage box.
It consists of a knit and a hydraulic jack for raising and lowering it.
When the above-mentioned box support mechanism supports the entire material storage box stacked in the lowermost material storage box, only the lowermost material storage box is lowered and stopped below it. A material storage box stocker, which is equipped with a box transfer mechanism for transferring to a trolley.
【請求項2】箱支持ユニットは、資材収容箱を内包する
大きさの枠に、複数の箱支持用油圧ジャッキを配設して
なる請求項記載の資材収容箱ストッカー。
2. A box support unit, the size of the frame containing the material containing box, according to claim 1 Material containing box stocker according formed by arranging a plurality of boxes supporting hydraulic jack.
【請求項3】資材収容箱は、複数の資材を収容できる内
容積を備えかつ上面を開口した直方体形の箱本体と、こ
れの側壁の上辺縁と下辺縁とに、箱支持用油圧ジャッキ
のロッドを嵌入するロッド嵌合孔を形成した保持枠を固
着してなるものである請求項記載の資材収容箱ストッ
カー。
3. A material storage box has a rectangular parallelepiped box body having an internal volume capable of storing a plurality of materials and an open top surface, and a side wall of the box main body having upper and lower side edges of the box supporting hydraulic jack. The material storage box stocker according to claim 2 , wherein a holding frame having a rod fitting hole into which the rod is fitted is fixed.
JP00225999A 1999-01-07 1999-01-07 Material storage box stocker Expired - Fee Related JP3413549B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP00225999A JP3413549B2 (en) 1999-01-07 1999-01-07 Material storage box stocker

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP00225999A JP3413549B2 (en) 1999-01-07 1999-01-07 Material storage box stocker

Publications (2)

Publication Number Publication Date
JP2000204900A JP2000204900A (en) 2000-07-25
JP3413549B2 true JP3413549B2 (en) 2003-06-03

Family

ID=11524378

Family Applications (1)

Application Number Title Priority Date Filing Date
JP00225999A Expired - Fee Related JP3413549B2 (en) 1999-01-07 1999-01-07 Material storage box stocker

Country Status (1)

Country Link
JP (1) JP3413549B2 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5325351B1 (en) * 2013-03-29 2013-10-23 伊藤忠建機株式会社 Excavation Sediment / Equipment Import / Removal System and Excavation Sediment / Equipment Import / Export Method
JP5325352B1 (en) * 2013-03-29 2013-10-23 伊藤忠建機株式会社 Excavation Sediment / Equipment Import / Removal System and Excavation Sediment / Equipment Import / Export Method
DE202014100905U1 (en) 2014-02-27 2015-05-28 Autefa Solutions Germany Gmbh stacker
CN104612738B (en) * 2015-03-04 2016-11-02 山东良庄矿业有限公司 A kind of fully-mechanized mining working surface hydraulic support quickly remove transportation method
JP7128052B2 (en) * 2018-08-01 2022-08-30 株式会社フジタ segment carrier
CN115367492A (en) * 2022-08-03 2022-11-22 范德兰德物流自动化系统(上海)有限公司 Framing device, security inspection system, framing dismantling method, and computer-readable storage medium

Also Published As

Publication number Publication date
JP2000204900A (en) 2000-07-25

Similar Documents

Publication Publication Date Title
JP3959034B2 (en) Cargo storage system
US20100189534A1 (en) Method and apparatus for storaging and transferring containers
TW201532928A (en) Method and apparatus for storing and retrieving or shifting containers in high-bay warehouses
US3933257A (en) Warehouse shelving system
JP3413549B2 (en) Material storage box stocker
JP2709047B2 (en) Transfer crane and its operation method
JP3139698B2 (en) Container hangar
JPH10218311A (en) Automatic warehouse
JP3892976B2 (en) Transport system for lining materials for tunnel construction
JPS63272704A (en) Three-dimensional storage warehouse
JPH0818648B2 (en) Temporary storage / import facility for tunnel segment
JPH0248311A (en) Three-dimensional article accommodating equipment
JP2925976B2 (en) Dolly type multi-stage storage device
JP2004075342A (en) Carrying in/out device of automatic high-rise warehouse
JP2645705B2 (en) Storage facility for container chassis
JPS6286272A (en) Fork type delivery apparatus in three-dimensional housing tower
JPS6145805A (en) Crane with storing shelves
JP2001199512A (en) Storage system of container and holder device for container
JP3581005B2 (en) Material stock apparatus and material transport method
JP3602623B2 (en) Transport equipment
JP4670314B2 (en) Three-dimensional storage
JPS59149235A (en) Material treating device and its method
JPH07215410A (en) Automatic high-rise warehouse for steel
JP2001193400A (en) Retrieving device for multi-tier automatic warehouse
JPH03172207A (en) Stacker crane

Legal Events

Date Code Title Description
FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100404

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110404

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130404

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140404

Year of fee payment: 11

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

LAPS Cancellation because of no payment of annual fees