JP3359655B2 - Production machine operation schedule management device - Google Patents

Production machine operation schedule management device

Info

Publication number
JP3359655B2
JP3359655B2 JP11690492A JP11690492A JP3359655B2 JP 3359655 B2 JP3359655 B2 JP 3359655B2 JP 11690492 A JP11690492 A JP 11690492A JP 11690492 A JP11690492 A JP 11690492A JP 3359655 B2 JP3359655 B2 JP 3359655B2
Authority
JP
Japan
Prior art keywords
schedule
item
time
date
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP11690492A
Other languages
Japanese (ja)
Other versions
JPH05290056A (en
Inventor
義嗣 森桶
拓郎 飛田
永子 藤本
雄司 嘉瀬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dai Nippon Printing Co Ltd
Original Assignee
Dai Nippon Printing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dai Nippon Printing Co Ltd filed Critical Dai Nippon Printing Co Ltd
Priority to JP11690492A priority Critical patent/JP3359655B2/en
Publication of JPH05290056A publication Critical patent/JPH05290056A/en
Application granted granted Critical
Publication of JP3359655B2 publication Critical patent/JP3359655B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Inking, Control Or Cleaning Of Printing Machines (AREA)
  • Multi-Process Working Machines And Systems (AREA)
  • General Factory Administration (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、生産機械の稼働予定管
理装置、特に、処理対象となる複数の品目を、複数の生
産機械を動作させて順次処理するために、生産機械の稼
働予定を管理する装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a production machine operation schedule management device, and more particularly to a production machine operation schedule for sequentially processing a plurality of items to be processed by operating a plurality of production machines. Related to the device to be managed.

【0002】[0002]

【従来の技術】種々の生産工程では、それぞれ処理能力
が異なった生産機械を複数台同時に用い、いくつもの品
目をそれぞれの生産機械に割り当てて処理することが一
般に行われている。たとえば、印刷物の処理では、種々
の大きさ、種々の色をもった印刷物の印刷が複数の印刷
機で処理される。この場合、最も効率良く印刷機を稼働
させるために、どの印刷機でどの品目をどの順番で処理
するかという予定を立案する必要がある。このような予
定を効率良く立案するための予定立案装置は、たとえ
ば、特開平3−32556号公報に開示されている。こ
の公報に開示された予定立案装置では、予め、各生産機
械固有の処理能力を示す処理能力データを用意してお
き、この処理能力データを、処理対象となる品目の処理
内容と照らし合わせることにより効率の良い予定テーブ
ルが立案される。また、特開平3−256657号公報
には、各生産機械ごとに処理実績を検出し、処理の実際
の進捗状況を、予定テーブルとともに表示する生産機械
の稼働予定管理装置が開示されている。
2. Description of the Related Art In various production processes, it is common practice to use a plurality of production machines having different processing capacities at the same time and to allocate a number of items to the respective production machines for processing. For example, in the processing of printed matter, printing of printed matter having various sizes and colors is processed by a plurality of printing machines. In this case, in order to operate the printing press most efficiently, it is necessary to make a schedule of which printing machine should process which items in which order. A scheduling device for efficiently drafting such a schedule is disclosed in, for example, JP-A-3-32556. In the scheduling apparatus disclosed in this publication, processing capacity data indicating processing capacity specific to each production machine is prepared in advance, and the processing capacity data is compared with the processing content of the item to be processed. An efficient schedule table is created. Japanese Patent Application Laid-Open No. 3-256657 discloses a production machine operation schedule management device that detects the actual processing results of each production machine and displays the actual progress of the process together with a schedule table.

【0003】[0003]

【発明が解決しようとする課題】前述したような生産機
械の稼働予定立案装置によって、最適な予定テーブルが
立案されたとしても、各生産機械を稼働して処理を実行
すると、実際の処理時間は必ずしも立案された予定どお
りにはならない。特に、印刷機械を用いた印刷処理で
は、インキの色合わせなどの準備に時間がかかったり、
印刷不良を除去するための調整に時間がかかったりし
て、実際の処理時間が予定より遅れることがある。ま
た、逆に、作業が予想外に順調に進行したため、実際の
処理時間が予定より早まることもある。予定が遅れれ
ば、以後に処理すべき品目に対する予定が順次繰り下げ
られ、予定が早まれば、逆に以後の予定が順次繰り上げ
られる。
Even if an optimal schedule table is created by the production machine operation schedule planning apparatus as described above, when each production machine is operated and processing is performed, the actual processing time is reduced. It is not always as planned. In particular, in the printing process using a printing machine, it takes time to prepare for color matching of ink, etc.
The actual processing time may be longer than expected due to the time required for adjustment for removing printing defects. On the contrary, the actual processing time may be earlier than expected because the work has progressed smoothly and unexpectedly. If the schedule is delayed, the schedule for the item to be processed thereafter is sequentially reduced, and if the schedule is advanced, the subsequent schedule is sequentially advanced.

【0004】ところが、品目によっては、ある特定の日
(または時)に必ず処理を行わないと、都合の悪いもの
がある。たとえば、印刷処理では、インキの色の確認を
行ったりするために、発注元の顧客が印刷現場に立会っ
た状態で作業を行う場合がある。このような場合、顧客
との間で、立会いの日時を予め約束しておくことになる
ため、立案した予定の日時に必ず処理を行うようにしな
いと、支障を来たすことになる。
[0004] However, depending on the item, it is inconvenient if the processing is not always performed on a specific day (or time). For example, in a printing process, there is a case where an ordering customer works while attending a printing site in order to check the color of ink. In such a case, since the date and time of the attendance must be promised in advance with the customer, unless the processing is always performed at the planned date and time, a problem will occur.

【0005】そこで、本発明は、立案した予定と実際の
稼働実績との間に相違が生じた場合にも、予定日時の変
動による支障を避けることができる生産機械の稼働予定
管理装置を提供することを目的とする。
Accordingly, the present invention provides an operation schedule management apparatus for a production machine which can avoid a trouble due to a change in the scheduled date and time even when a difference between a planned schedule and an actual operation result occurs. The purpose is to:

【0006】[0006]

【課題を解決するための手段】(1) 本願第1の発明
は、処理対象となる複数の品目を、複数の生産機械を動
作させて順次処理するために、生産機械の稼働予定を管
理する装置において、各生産機械ごとに、日時順に処理
対象となる品目を並べた予定テーブルを記憶するための
記憶手段と、この記憶手段に記憶された予定テーブルを
表示するための表示手段と、新たな品目について新たな
予定組みを行い、該予定組みの結果を予定テーブルに追
加する予定立案手段と、各生産機械の稼働実績に基づい
て、予定テーブルの各品目を、繰り上げあるいは繰り下
げする修正を行う予定修正手段と、特定の品目につい
て、該特定の品目を処理すべき日時を特定の固定日時に
設定すべきであることを示す固定日時情報を入力し、
固定日時情報を記憶手段に記憶する固定日時設定手段
と、予定修正手段によって、予定テーブルの修正を行う
際に、上記特定の品目についての予定が、上記固定日時
よりも繰り上がってしまう場合と、上記固定日時よりも
繰り下がってしまう場合と、のいずれの場合において
も、表示手段に上記特定の品目についての警告表示を行
う警告手段と、を設けたものである。
Means for Solving the Problems (1) The first invention of the present application manages an operation schedule of a production machine in order to sequentially process a plurality of items to be processed by operating a plurality of production machines. In the apparatus, for each production machine, storage means for storing a schedule table in which items to be processed are arranged in order of date and time; display means for displaying the schedule table stored in the storage means; Schedule planning means for making a new schedule for an item and adding the result of the schedule to the schedule table, and making a correction to move up or down each item in the schedule table based on the operation results of each production machine and correction means for a particular item, enter a fixed time and date information indicating that the date and time to process the particular item should be set to a particular fixed time, the
When the schedule table is corrected by the fixed date and time setting means for storing the fixed date and time information in the storage means and the schedule correction means, the schedule for the specific item is set to the fixed date and time.
And the fixed date and time
In either case
Also, a warning means for displaying a warning on the specific item is provided on the display means.

【0007】(2) 本願第2の発明は、上述の第1の発
明に係る生産機械の稼働予定管理装置において、固定日
時設定手段に、特定の品目についての固定日時情報とと
もに、該特定の品目の処理を固定日時に行うべき要求の
程度を示す固定レベルを入力し、この固定レベルを記憶
手段に記憶する機能を設け、警告手段に、この固定レベ
ルに応じて異なる態様で警告表示を行う機能を設けたも
のである。
(2) In the second aspect of the present invention, in the operation schedule management device for a production machine according to the first aspect, the fixed date and time setting means includes the fixed date and time information for the specific item and the specific item. A function for inputting a fixed level indicating the degree of the request to be performed at a fixed date and time, storing the fixed level in the storage means, and displaying a warning in the warning means in a different manner according to the fixed level. Is provided.

【0008】(3) 本願第3の発明は、上述の第2の発
明に係る生産機械の稼働予定管理装置において、予定修
正手段に、設定された固定日時以外の日程に動いてしま
う品目に対して、固定レベルに基づく優先順位にしたが
って予定組みの変更を行う機能を設け、警告手段に、予
定組みの変更を行っても、なお、設定された固定日時以
外の日程に動いてしまう所定品目がある場合に、該所定
品目についての警告表示を行う機能を設けたものであ
る。
(3) The third invention of the present application is directed to the operation schedule management device for a production machine according to the second invention described above, wherein the schedule correction means is provided for an item which moves on a schedule other than the fixed date and time set. Therefore, a function to change the scheduled set according to the priority order based on the fixed level is provided, and the warning means is provided with a function that, even if the scheduled set is changed, a predetermined item that still moves on a schedule other than the set fixed date and time. In some cases, the prescribed
It is provided with a function to display a warning about an item .

【0009】[0009]

【作 用】(1) 本願第1の発明による生産機械の稼働
予定管理装置では、各生産機械の稼働実績が予定より早
まった場合には予定品目の繰り上げが、逆に遅くなった
場合には予定品目の繰り下げが、予定修正手段によって
行われる。このとき、固定日時の設定が行われている品
目について、繰り上げが行われる場合と繰り下げが行わ
れる場合とのいずれの場合にも、予定テーブルの表示画
面上でその品目についての警告表示がなされるので、作
業者の注意を促すことができ、必要に応じて作業者に予
定の再立案作業を実行させることができる。
[Operation] (1) In the production machine operation schedule management device according to the first invention of the present application, when the operation result of each production machine is earlier than planned, the advance of the planned item is advanced, and when The deferral of the scheduled item is performed by the schedule correcting means. At this time, for items for which a fixed date and time has been set , advancement is performed and
In both cases, a warning is displayed for the item on the display screen of the schedule table, so that the attention of the worker can be urged and the worker can re-plan the schedule as necessary. Can be executed.

【0010】(2) 本願第2の発明による生産機械の稼
働予定管理装置では、固定日時情報とともに固定レベル
が入力され、この固定レベルに応じた警告表示がなされ
る。したがって、作業者は警告表示がなされた品目につ
いての優先順位を把握することができる。
(2) In the operation schedule management device for a production machine according to the second invention of the present application, a fixed level is input together with fixed date and time information, and a warning is displayed according to the fixed level. Therefore, the operator can grasp the priority of the item for which the warning is displayed.

【0011】(3) 本願第3の発明による生産機械の稼
働予定管理装置では、予定修正手段に、予定組みの変更
を行う機能を設けたため、固定日時を維持するような予
定組みが自動的に行われるようになる。しかも、この予
定組みは、固定レベルに基づく優先順位にしたがってな
されるので、より重要な品目についての固定日時維持が
優先され、固定日時が維持されなかった品目については
警告表示がなされるため、作業者の注意を促すことがで
きる。
(3) In the operation schedule management device for the production machine according to the third invention of the present application, the schedule correcting means is provided with a function of changing the schedule set, so that the schedule set that maintains the fixed date and time is automatically generated. Will be done. In addition, since this schedule is made in accordance with the priority based on the fixed level, priority is given to maintaining the fixed date and time for more important items, and a warning is displayed for the items for which the fixed date and time have not been maintained. Can draw the attention of the elderly.

【0012】[0012]

【実施例】以下、本発明を図示する実施例に基づいて説
明する。図1は、本発明に係る生産機械の稼働予定管理
装置の基本構成を示すブロック図である。この管理装置
の主たる構成要素は、記憶手段10、表示手段20、予
定立案手段30、予定修正手段40、固定日時設定手段
50、警告手段60、であり、この実施例では、3台の
生産機械1〜3を動作させて複数の品目を順次処理させ
るための稼働予定を管理する機能を有する。記憶手段1
0内には、予定テーブル11、固定日時情報12、固定
レベル13が記憶される。予定テーブル11は、各生産
機械1〜3ごとに、日時順に処理対象となる品目を並べ
たテーブルであり、この予定テーブル11は表示手段2
0の画面に表示される。生産機械1〜3を稼働させる作
業者は、この予定テーブル11に示された順に各品目に
対する処理を行うことになる。予定立案手段30は、新
たな品目について新たな予定組みを行い、これを予定テ
ーブル11に追加する機能を有する。すなわち、新たな
受注により、新たな品目についての処理が必要になった
ときには、この予定立案手段30によって新たな予定組
みを行い、これが予定テーブル11に追加されることに
なる。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention will be described below with reference to the illustrated embodiments. FIG. 1 is a block diagram showing a basic configuration of a production machine operation schedule management device according to the present invention. The main components of the management device are a storage unit 10, a display unit 20, a schedule planning unit 30, a schedule correction unit 40, a fixed date and time setting unit 50, and a warning unit 60. In this embodiment, three production machines are used. It has a function of managing an operation schedule for operating a plurality of items to sequentially process a plurality of items. Storage means 1
In 0, a schedule table 11, fixed date and time information 12, and a fixed level 13 are stored. The schedule table 11 is a table in which items to be processed are arranged in order of date and time for each of the production machines 1 to 3.
0 is displayed on the screen. An operator who operates the production machines 1 to 3 performs processing on each item in the order shown in the schedule table 11. The scheduling unit 30 has a function of creating a new schedule for a new item and adding the new schedule to the schedule table 11. That is, when processing for a new item is required due to a new order, a new schedule is created by the schedule planning means 30 and added to the schedule table 11.

【0013】生産機械1〜3の稼働実績は、予定修正手
段40に入力される(図に破線で示す)。たとえば、生
産機械1〜3がそれぞれ印刷機の場合には、印刷枚数が
予定修正手段40に入力されることになる。この稼働実
績の入力操作は、各生産機械を稼働させる作業者による
報告という形式を採ってもよいし、各生産機械からの信
号による自動入力という形式を採ってもよい。たとえ
ば、印刷機の場合には、印刷枚数をカウントする実績集
計装置を設けておけば、印刷枚数を信号によって自動入
力することが可能になる。この稼働実績は、必ずしも立
案された予定のとおりにはならない。予定修正手段40
は、入力された稼働実績に基づいて、予定テーブルを修
正する機能を有する。すなわち、処理が早まっている生
産機械についての予定については、各品目を順次繰り上
げる修正を行い、処理が遅れている生産機械についての
予定については、各品目を順次繰り下げる修正を行う。
The operation results of the production machines 1 to 3 are input to the schedule correcting means 40 (shown by broken lines in the figure). For example, when each of the production machines 1 to 3 is a printing machine, the number of prints is input to the schedule correction unit 40. The operation of inputting the operation results may take the form of a report by an operator who operates each production machine, or may take the form of automatic input by a signal from each production machine. For example, in the case of a printing machine, if a result totaling device that counts the number of printed sheets is provided, the number of printed sheets can be automatically input by a signal. This operation result is not always as planned. Schedule modification means 40
Has a function of correcting the schedule table based on the input operation results. That is, for a schedule for a production machine whose processing is advanced, a correction is made to advance each item sequentially, and for a schedule for a production machine whose processing is delayed, a correction is made to sequentially decrement each item.

【0014】一方、固定日時設定手段50は、特定の品
目について、この品目を処理すべき日時を特定の固定日
時に設定すべきであることを示す固定日時情報12と、
その品目の処理を固定日時に行うべき要求の程度を示す
固定レベル13とを入力し、これを記憶手段10に記憶
する機能を有する。また、警告手段60は、予定修正手
段40によって、予定テーブル11の修正を行う際に、
固定日時が設定された品目についての予定が、設定され
た固定日時以外の日程に動いてしまう場合に、その品目
について警告表示を行う機能を有する。この警告表示
は、表示手段20に対して行われ、それぞれ設定された
固定レベルに応じて異なる態様で表示がなされる。この
固定日時設定手段50および警告手段60の動作は、本
発明の重要な機能に関わる部分であるので、具体的な実
施例を参照しながら後に詳述する。
On the other hand, the fixed date and time setting means 50 includes, for a specific item, fixed date and time information 12 indicating that the date and time when this item should be processed should be set to a specific fixed date and time;
The storage unit 10 has a function of inputting a fixed level 13 indicating the degree of a request to process the item at a fixed date and time, and storing this in the storage unit 10. Further, the warning unit 60 performs the correction of the schedule table 11 by the schedule correction unit 40,
When a schedule for an item for which a fixed date and time is set moves on a schedule other than the set fixed date and time, a function is provided for displaying a warning for the item. This warning display is performed on the display means 20, and is displayed in different modes according to the fixed levels set respectively. The operations of the fixed date and time setting means 50 and the warning means 60 are related to important functions of the present invention, and will be described later in detail with reference to specific examples.

【0015】以上の基本構成要素は、具体的にはコンピ
ュータおよびその周辺機器を用いて実現される。すなわ
ち、予定立案手段30、予定修正手段40、固定日時設
定手段50、警告手段60は、いずれも、コンピュータ
本体およびこれを動作させるためのソフトウエアによっ
て実現されるものであり、記憶手段10は、このコンピ
ュータ用のメモリあるいは磁気ディスクなどの記憶装置
によって実現されるものであり、表示手段20は、この
コンピュータ用のディスプレイ装置によって実現される
ものである。
The above basic components are specifically realized using a computer and its peripheral devices. That is, the schedule planning unit 30, the schedule correction unit 40, the fixed date and time setting unit 50, and the warning unit 60 are all realized by a computer main body and software for operating the computer unit. This is realized by a storage device such as a computer memory or a magnetic disk, and the display means 20 is realized by a display device for the computer.

【0016】続いて、この装置の具体的な動作を具体例
に基づいて説明する。いま、図2に示すような予定テー
ブル11が記憶手段10内に用意されているものとす
る。この予定テーブルには、3台の生産機械1〜3につ
いての予定が示されている。すなわち、4月1日(月)
から4月2日(火)にかけて、生産機械1は品目A,
D,Gの順に処理を行い、生産機械2は品目B,E,H
の順に処理を行い、生産機械3は品目C,F,Iの順に
処理を行うべきである予定が示されている。一般に、各
品目についての処理時間はそれぞれ異なる。たとえば、
印刷機を用いた印刷処理を考えると、印刷に用いる色数
や印刷枚数によって当然、各品目についての印刷時間が
異なるわけである。このような予定テーブルは、予定立
案手段30によって作成される。予定テーブルを作成す
るには、各生産機械の処理能力を考慮して、各品目を効
率良く割り当てる必要がある。たとえば、4色印刷を行
うべき品目は、4色刷りを行う能力をもった印刷機に割
り当てる必要がある。逆に、4色刷りを行う能力をもっ
た印刷機には、2色印刷を行うべき品目も、4色印刷を
行うべき品目も、両方割り当てることができるが、どち
らの品目を割り当てたら効率的であるかは、処理対象と
なる個々の品目を考慮して決定する必要がある。また、
納期が決められた品目は、この納期に合わせた処理が必
要になる。予定立案手段30は、このようなことを考慮
しながら、最適な品目割り当てを行い、予定テーブルの
作成を行う機能をもっている。なお、このような予定立
案手段30の構成や、予定立案のためのアルゴリズム
は、たとえば、特開平3−32556号公報に開示され
ている公知技術であるため、本明細書では詳しい説明は
省略する。
Subsequently, a specific operation of the apparatus will be described based on a specific example. Now, it is assumed that the schedule table 11 as shown in FIG. In this schedule table, schedules for three production machines 1 to 3 are shown. That is, April 1 (Monday)
From April to Tuesday, April 2, production machine 1
Processing is performed in the order of D and G, and the production machine 2
, And the production machine 3 should process in the order of items C, F, and I. Generally, the processing time for each item is different. For example,
Considering the printing process using a printing machine, the printing time for each item naturally differs depending on the number of colors used for printing and the number of prints. Such a schedule table is created by the schedule planning means 30. In order to create a schedule table, it is necessary to efficiently assign each item in consideration of the processing capacity of each production machine. For example, an item to be printed in four colors must be assigned to a printing machine capable of printing in four colors. Conversely, a printing machine capable of four-color printing can be assigned both an item to be subjected to two-color printing and an item to be subjected to four-color printing. It is necessary to determine whether or not there is an individual item to be processed. Also,
Items for which delivery dates have been determined require processing in accordance with the delivery dates. The schedule planning means 30 has a function of allocating an optimum item and creating a schedule table in consideration of the above. The configuration of the scheduling unit 30 and the algorithm for the scheduling are known technologies disclosed in, for example, Japanese Patent Application Laid-Open No. 3-32556, and therefore, detailed description thereof is omitted in this specification. .

【0017】さて、ここで、顧客から新たな品目J〜O
についての受注があった場合を考える。オペレータが、
予定立案手段30に対して、この新たな品目J〜Oにつ
いての詳細な情報(たとえば、4色刷り:A4判:印刷
枚数1000枚といった情報)を入力すると、予定立案
手段30は、これらの品目を所定のアルゴリズムに従っ
て、3台の生産機械1〜3に割り当てる予定組みを行
い、その結果を予定テーブル11に追加する。ここで
は、その結果、予定テーブルが図3に示すようになった
ものとする。新規受注した品目J〜Oは、4月2日
(火)から4月3日(水)にかけて割り当てられてい
る。表示手段20には、このような予定テーブルが画面
上に表示される。生産機械1〜3を操作する作業者は、
この予定テーブルに基づいて処理を進めることになる。
具体的には、図3に示す予定テーブルに従うと、4月1
日(月)の午前零時から、生産機械1は品目Aの処理に
とりかかり、生産機械2は品目Bの処理にとりかかり、
生産機械3は品目Cの処理にとりかかることになる。
Now, a new item J to O is received from the customer.
Suppose there is an order for. The operator
When detailed information (for example, information such as four-color printing: A4 size: 1000 printed sheets) on the new items J to O is input to the scheduling unit 30, the scheduling unit 30 enters these items. According to a predetermined algorithm, a schedule set to be assigned to the three production machines 1 to 3 is made, and the result is added to the schedule table 11. Here, as a result, it is assumed that the schedule table is as shown in FIG. Newly ordered items J to O are allocated from April 2 (Tuesday) to April 3 (Wednesday). The display means 20 displays such a schedule table on a screen. The operators who operate the production machines 1 to 3,
The process will proceed based on this schedule table.
Specifically, according to the schedule table shown in FIG.
From midnight on the day (Monday), the production machine 1 starts processing the item A, the production machine 2 starts processing the item B,
The production machine 3 starts to process the item C.

【0018】さて、実際に生産機械を使ってそれぞれの
処理を実施した場合、各品目の処理時間が必ずしも予定
テーブルのとおりに終了するとは限らない。印刷機械な
どでは、インキの色合わせなどの準備に時間がかかった
り、印刷不良を除去するまでの調整に時間がかかったり
して、予定が大幅に遅れることもある。逆に、予定テー
ブルで見積もっていた準備時間や調整時間が実際には短
くてすみ、予定が早まることもある。ここでは、4月1
日(月)の午後12時(4月2日(火)の午前零時)の
時点において、図4に斜線を施した処理が完了していた
場合について、以下の説明を続けることにする。すなわ
ち、生産機械1では、品目Aの処理に手間取り、4月1
日(月)にまる1日作業を行ったにもかかわらず、品目
Aについての処理の半分程しか作業が進行していない。
逆に、生産機械2では、作業が予想外にはかどり、品目
B,E,Hまでの処理が完了している。また、生産機械
3では、全く予定テーブルどおりの進捗状況となってお
り、品目C,Fまでの処理が完了している。このような
処理実績が、予定修正手段40に入力されると、予定修
正手段40は、図4に示す予定テーブルを図5に示すよ
うに修正する。修正後の予定テーブルは、4月2日
(火)以降の予定を示すものであり、予定に遅延が生じ
た生産機械1については、遅れた分だけすべての予定を
繰り下げる修正がなされ、予定が早まった生産機械2に
ついては、早まった分だけすべての予定を繰り上げる修
正がなされている。生産機械3についての予定はもとの
ままである。このように予定テーブルの修正を行うこと
により、各生産機械の作業者は、引き続きこの予定テー
ブルに基づいて作業を続けることができる。
When each processing is actually performed using a production machine, the processing time of each item does not always end according to the schedule table. In a printing machine or the like, it takes a long time to prepare for color matching of ink or the like, and it takes a long time to adjust until a printing defect is removed, so that the schedule may be greatly delayed. Conversely, the preparation time and the adjustment time estimated in the schedule table may actually be shorter, and the schedule may be earlier. Here, April 1
At the time of 12:00 pm on the day (Monday) (midnight on Tuesday, April 2), the following description will be continued on the case where the processing indicated by hatching in FIG. 4 has been completed. That is, in the production machine 1, it takes time to process the item A.
Despite having performed the entire day on the day (Monday), only about half of the processing for the item A has progressed.
Conversely, in the production machine 2, the operation is unexpectedly performed, and the processing up to the items B, E, and H is completed. In the production machine 3, the progress status is exactly as scheduled, and the processes up to the items C and F have been completed. When such a processing result is input to the schedule correcting means 40, the schedule correcting means 40 corrects the schedule table shown in FIG. 4 as shown in FIG. The revised schedule table shows the schedule after April 2 (Tuesday). For the production machine 1 whose schedule has been delayed, the schedule has been revised so that all schedules are moved forward by the delayed amount. With respect to the production machine 2 which has been advanced, a correction has been made in which all schedules are advanced by an amount corresponding to the advance. The plan for the production machine 3 remains unchanged. By correcting the schedule table in this way, the operator of each production machine can continue working based on the schedule table.

【0019】ところが、品目によっては、処理日程が別
な日時に動いてしまっては問題がある場合がある。たと
えば、印刷処理において、発注元の顧客がインキの色合
わせに立ち会うことになっており、立ち会いの日程を予
め約束しているような場合は、処理日程をむやみに変更
することはできない。このような場合には、固定日時設
定手段50によって、固定日時の設定を行っておく。た
とえば、図3に示すような予定テーブルを作成した時点
で、品目Jは4月2日(火)に処理し、品目NおよびO
は4月3日(水)に処理しなければならない事情があっ
たとすると、これらの日付を固定日として設定する入力
を行えばよい。固定日時設定手段50は、この設定入力
を、固定日時情報12として記憶手段10に記憶させ
る。具体的には、たとえば、「J:4/2,N:4/
3,O:4/3」のようなデータを書き込むようにすれ
ばよい。この実施例の装置では、このような固定日時の
設定が行われた品目については、表示手段20の画面
上、太枠表示するようにしている。上述の例の場合、図
6に示すような予定テーブルが表示画面に得られること
になり、固定日が設定されている品目が一目瞭然とな
る。
However, depending on the item, there may be a problem if the processing schedule moves to another date and time. For example, in the printing process, the ordering customer is to attend the color matching of the ink, and if the attendance schedule is promised in advance, the processing schedule cannot be changed unnecessarily. In such a case, the fixed date and time setting unit 50 sets the fixed date and time. For example, when the schedule table as shown in FIG. 3 is created, the item J is processed on Tuesday, April 2, and the items N and O are processed.
If there is a situation that needs to be processed on April 3 (Wednesday), an input may be made to set these dates as fixed dates. The fixed date and time setting unit 50 causes the storage unit 10 to store the setting input as fixed date and time information 12. Specifically, for example, “J: 4/2, N: 4 /
Data such as "3, O: 4/3" may be written. In the apparatus of this embodiment, the items for which the fixed date and time have been set are displayed in a bold frame on the screen of the display unit 20. In the case of the above example, the schedule table as shown in FIG. 6 is obtained on the display screen, and the item for which the fixed date is set can be seen at a glance.

【0020】さて、このような固定日時の設定が行われ
ていると、予定修正手段40によって予定テーブルの修
正が行われたあとの表示は、図5の代わりに図7に示す
ようになる。ここで、品目J,N,Oについて太枠表示
がなされているのは、前述のように、これらの品目につ
いて固定日時の設定がなされていることを示すものであ
る。また、品目Jにはバー表示61が、品目Nにはバー
表示62が、それぞれなされているが、これらのバー表
示は警告手段60によってなされたものである。すなわ
ち、予定修正手段40によって、予定テーブルの修正が
実行されると、警告手段60は、修正後の予定テーブル
11について固定日時情報12をチェックする。そし
て、設定された固定日とは異なる日程に割り当てられた
品目については、このようなバー表示による警告を行う
のである。このようなバー表示により、オペレータは、
その品目が固定日から動いたことを直ちに認識すること
ができる。必要に応じて、どのように動いたのかを知ら
しめる表示を行うようにしてもよい。たとえば、 品目J : 4月2日(火) → 4月3日(水) 品目N : 4月3日(水) → 4月2日(火) のような表示をさせれば、もとの固定日がいつであった
かが容易に認識できる。また、必要に応じて、このよう
な情報をプリンタによって紙面上に出力させてもよい。
いずれにしても、このバー表示により、オペレータの注
意を喚起することができる。オペレータは、このように
固定日が動いてしまった個々の品目に対して、どのよう
な処置をすべきかを判断し、これに対処するための処理
を行う。たとえば、顧客の立ち会い日程を動かすことが
できるのであれば、固定日時設定手段50に対して、固
定日の設定を変更する処理を行えばよい。日程変更が困
難な場合には、オペレータが手作業で予定組みの変更を
行い、予定テーブルの修正を行う処理を行えばよい。
When the fixed date and time are set, the display after the schedule table is corrected by the schedule correction means 40 is as shown in FIG. 7 instead of FIG. Here, the bold frame display of the items J, N, and O indicates that the fixed date and time are set for these items as described above. Further, a bar display 61 is provided for the item J, and a bar display 62 is provided for the item N. These bar displays are provided by the warning unit 60. That is, when the schedule table is corrected by the schedule correction unit 40, the warning unit 60 checks the fixed date and time information 12 with respect to the corrected schedule table 11. For items assigned to a schedule different from the set fixed date, such a bar display warning is issued. With such a bar display, the operator can
You can immediately recognize that the item has moved since the fixed date. If necessary, a display may be displayed to inform the user how the movement has been performed. For example, item J: April 2 (Tue) → April 3 (Wed) Item N: April 3 (Wed) → April 2 (Tue) It is easy to recognize when the fixed date was. If necessary, such information may be output on paper by a printer.
In any case, this bar display can call the operator's attention. The operator determines what kind of treatment should be performed on each item whose fixed date has moved in this way, and performs a process for coping with this. For example, if the attendance schedule of the customer can be changed, the fixed date and time setting means 50 may be subjected to a process of changing the setting of the fixed date. If it is difficult to change the schedule, the operator may manually change the schedule set and perform a process of correcting the schedule table.

【0021】なお、この装置では、固定日の設定を行う
ときに、合わせて固定ランクの設定も行うようにしてい
る。この固定ランクは、その品目の処理を固定日に行う
べき要求の程度を示す指標であり、たとえば、この実施
例では、 ランク1:絶対に固定日を動かせない品目 ランク2:できるだけ固定日を動かさないようにする品
目 ランク3:場合によっては固定日を動かしてもかまわな
い品目 の3つのランクを定義し、固定日の設定時に、ランク1
〜3のいずれかを入力するようにしている。入力した固
定レベルは、固定日時情報と同様に記憶手段10内に記
憶される。このような固定ランクが設定されている場合
には、警告手段60は、ランクによって異なる態様で警
告表示を行うことができる。この実施例では、バー表示
の色を変えることにより態様を変えている。具体的に
は、ランク1の固定日が動いてしまった場合には赤色に
より、ランク2の固定日が動いてしまった場合には黄色
により、ランク3の固定日が動いてしまった場合には緑
色により、それぞれバー表示を行うようにしている。オ
ペレータは、表示手段20の画面上で、このように色別
のバー表示を見ることができるので、各固定ランクに適
した処置を直ちに採ることができる。
In this apparatus, when a fixed date is set, a fixed rank is also set. The fixed rank is an index indicating the degree of the requirement that the processing of the item should be performed on the fixed day. For example, in this embodiment, rank 1: an item whose fixed date cannot be moved absolutely Rank 2: move the fixed date as much as possible Items to be eliminated Rank 3: In some cases, three ranks of items that can be moved on a fixed date are defined, and when the fixed date is set, rank 1 is set.
To 3 are input. The input fixed level is stored in the storage unit 10 like the fixed date and time information. When such a fixed rank is set, the warning unit 60 can perform a warning display in a different manner depending on the rank. In this embodiment, the mode is changed by changing the color of the bar display. Specifically, if the fixed day of rank 1 has moved, it will be red, if the fixed day of rank 2 has moved, it will be yellow, and if the fixed day of rank 3 has moved, Each bar is displayed in green. Since the operator can see the bar display for each color on the screen of the display means 20 in this manner, the operator can immediately take a treatment suitable for each fixed rank.

【0022】本願発明の装置の別な実施例として、固定
日が動いてしまった品目については、もとの固定日に日
程をもどすような予定テーブルの修正を自動的に行う機
能を付加することも可能である。すなわち、予定修正手
段40に、上述のような予定テーブルの修正アルゴリズ
ムを用意しておき、自動修正を行うようにするのであ
る。たとえば、図7に示すような予定テーブルでは、品
目J,Nに対して修正が必要である。修正を行うための
アルゴリズムのひとつは、予定テーブルの同一欄内で調
整を行う方法である。たとえば、品目Jに対する修正
は、品目Jを上下に移動させることにより行うことがで
きる。すなわち、図8に示すように、品目Jを品目A−
D間に挿入するような修正を行えば、固定日は動かさな
いですむことになる。修正を行うための別なアルゴリズ
ムは、予定テーブルの異なる欄間で調整を行う方法であ
る。たとえば、品目Nに対する修正を行うために、図9
に示すように、品目Mを生産機械2に割り当て直し、品
目K−N間に挿入するような修正を行えば、固定日は動
かさないですむことになる。このように、予定修正手段
40内に、所定の修正アルゴリズムを用意しておいて自
動修正を行い、この自動修正を行っても固定日が動いて
しまうような品目については、警告手段60による警告
表示を行うようにすれば、オペレータが行うべき処理負
担が軽減される。なお、固定レベルの設定がなされてい
るときには、固定レベルの優先順に従って自動修正を行
うようにする。
As another embodiment of the apparatus of the present invention, for an item whose fixed date has been moved, a function of automatically modifying the schedule table to return the schedule to the original fixed date is added. Is also possible. In other words, the above-described schedule table correction algorithm is prepared in the schedule correction means 40, and automatic correction is performed. For example, in the schedule table as shown in FIG. 7, items J and N need to be corrected. One of the algorithms for making the correction is to make adjustments in the same column of the schedule table. For example, the modification to the item J can be performed by moving the item J up and down. That is, as shown in FIG.
If you make a correction to be inserted between D, you will not have to move on a fixed day. Another algorithm for making the correction is to make adjustments between different columns of the schedule table. For example, to make a correction to item N, FIG.
As shown in (2), if the item M is reassigned to the production machine 2 and a correction is made to insert it between the items K and N, the fixed date does not have to be moved. As described above, a predetermined correction algorithm is prepared in the schedule correction means 40 and automatic correction is performed. For items for which the fixed date moves even if the automatic correction is performed, a warning by the warning means 60 is issued. If the display is performed, the processing load to be performed by the operator is reduced. When the fixed level is set, the automatic correction is performed in accordance with the priority order of the fixed level.

【0023】以上、本発明を図示する実施例に基づいて
説明したが、本発明はこの実施例のみに限定されるもの
ではなく、この他にも種々の態様で実施可能である。特
に、上述の具体例では、固定日の設定を行う例について
述べたが、固定日時設定手段は、日だけでなく時刻の設
定を行うことも可能であり、たとえば、ある特定の日付
の午前中に固定するというような設定を行ってもよい
(この場合、同一日付でも午後に予定が動いてしまった
場合には、警告表示がなされる)。あるいは、更に厳密
に、時刻の設定までも行い、その時刻が所定時間以上ず
れた場合に警告表示を行うようにしてもよい。また、警
告表示の一態様として、前述の実施例では、その品目の
欄にバー表示をする例を示したが、これはどのような態
様の表示であってもかまわない。
Although the present invention has been described based on the illustrated embodiment, the present invention is not limited to this embodiment, but can be implemented in various other modes. In particular, in the specific example described above, an example in which the fixed date is set has been described. However, the fixed date and time setting unit can set not only the date but also the time, for example, in the morning of a specific date. (In this case, if the schedule moves in the afternoon even on the same date, a warning is displayed). Alternatively, the setting of the time may be performed more strictly, and a warning may be displayed when the time is shifted by a predetermined time or more. Further, as an example of the warning display, in the above-described embodiment, an example in which a bar is displayed in the column of the item has been described, but this may be displayed in any manner.

【0024】[0024]

【発明の効果】以上のとおり本発明による生産機械の稼
働予定管理装置では、予定テーブルの修正が行われた場
合であっても、固定日時の設定が行われている品目につ
いての繰り上げや繰り下げが行われる場合には、予定テ
ーブルの表示画面上でその品目についての警告表示がな
されるので、作業者の注意を促すことができ、予定日時
の変動による支障を避けることができる。
As described above, in the operation schedule management device for production machines according to the present invention, even if the schedule table is corrected, it is possible to move up or down the items for which the fixed date and time are set. When this is performed, a warning is displayed for the item on the display screen of the schedule table, so that the worker can be alerted and trouble due to a change in the scheduled date and time can be avoided.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明に係る生産機械の稼働予定管理装置の基
本構成を示すブロック図である。
FIG. 1 is a block diagram showing a basic configuration of an operation schedule management device for a production machine according to the present invention.

【図2】図1に示す装置における予定テーブルの一例を
示す図である。
FIG. 2 is a diagram showing an example of a schedule table in the device shown in FIG.

【図3】図2に示す予定テーブルに、更に新たな品目に
ついての予定を追加した状態を示す図である。
FIG. 3 is a diagram showing a state where a schedule for a new item is further added to the schedule table shown in FIG. 2;

【図4】図3に示す予定テーブルについて、実際の処理
の進捗状況を斜線で示す図である。
FIG. 4 is a diagram showing the progress of actual processing in the schedule table shown in FIG. 3 by oblique lines;

【図5】図4に示す予定テーブルについて、予定の繰り
上げおよび繰り下げ修正を行った状態を示す図である。
FIG. 5 is a diagram showing a state in which a scheduled carry-up and carry-down correction has been performed on the schedule table shown in FIG. 4;

【図6】図3に示す予定テーブルについて、固定日設定
を行った状態を示す図である。
FIG. 6 is a diagram showing a state in which fixed dates are set for the schedule table shown in FIG. 3;

【図7】図6に示す予定テーブルについて、予定の繰り
上げおよび繰り下げ修正を行った状態を示す図である。
FIG. 7 is a diagram showing a state in which a scheduled carry-up and carry-down correction has been performed on the schedule table shown in FIG. 6;

【図8】図7に示す予定テーブルについて、品目Jの予
定修正を行った状態を示す図である。
FIG. 8 is a diagram showing a state in which the schedule of the item J has been corrected in the schedule table shown in FIG. 7;

【図9】図8に示す予定テーブルについて、品目Nの予
定修正を行った状態を示す図である。
9 is a diagram showing a state in which the schedule of the item N has been corrected in the schedule table shown in FIG. 8;

【符号の説明】[Explanation of symbols]

1,2,3…生産機械 10…記憶手段 11…予定テーブル 12…固定日時情報 13…固定レベル 20…表示手段(ディスプレイ装置) 30…予定立案手段 40…予定修正手段 50…固定日時設定手段 60…警告手段 61,62…バー表示 1, 2, 3 ... production machine 10 ... storage means 11 ... schedule table 12 ... fixed date and time information 13 ... fixed level 20 ... display means (display device) 30 ... schedule planning means 40 ... schedule correction means 50 ... fixed date and time setting means 60 ... Warning means 61, 62 ... Bar display

───────────────────────────────────────────────────── フロントページの続き (72)発明者 嘉瀬 雄司 東京都新宿区市谷加賀町1丁目1番1号 大日本印刷株式会社内 (56)参考文献 特開 平3−32556(JP,A) 特開 平2−311250(JP,A) 特開 平3−58169(JP,A) 特開 昭63−237165(JP,A) 特開 平2−127765(JP,A) (58)調査した分野(Int.Cl.7,DB名) G05B 19/418 B23Q 41/08 G06F 17/60 ──────────────────────────────────────────────────続 き Continuation of front page (72) Inventor Yuji Kase 1-1-1, Ichigaya-Kaga-cho, Shinjuku-ku, Tokyo Dai Nippon Printing Co., Ltd. (56) References JP-A-3-32556 (JP, A) JP-A-2-311250 (JP, A) JP-A-3-58169 (JP, A) JP-A-63-237165 (JP, A) JP-A-2-127765 (JP, A) (58) Int.Cl. 7 , DB name) G05B 19/418 B23Q 41/08 G06F 17/60

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 処理対象となる複数の品目を、複数の生
産機械を動作させて順次処理するために、生産機械の稼
働予定を管理する装置であって、 各生産機械ごとに、日時順に処理対象となる品目を並べ
た予定テーブルを記憶するための記憶手段と、 該記憶手段に記憶された予定テーブルを表示するための
表示手段と、 新たな品目について新たな予定組みを行い、該予定組み
の結果を前記予定テーブルに追加する予定立案手段と、 各生産機械の稼働実績に基づいて、前記予定テーブルの
各品目を、繰り上げあるいは繰り下げする修正を行う予
定修正手段と、 特定の品目について、該特定の品目を処理すべき日時を
特定の固定日時に設定すべきであることを示す固定日時
情報を入力し、該固定日時情報を前記記憶手段に記憶す
る固定日時設定手段と、 前記予定修正手段によって、予定テーブルの修正を行う
際に、前記特定の品目についての予定が、前記特定の固
定日時よりも繰り上がってしまう場合と、前記特定の固
定日時よりも繰り下がってしまう場合と、のいずれの場
合においても、前記表示手段に前記特定の品目について
の警告表示を行う警告手段と、 を備えることを特徴とする生産機械の稼働予定管理装
置。
An apparatus for managing an operation schedule of a production machine in order to sequentially process a plurality of items to be processed by operating a plurality of production machines. Storage means for storing a schedule table in which target items are arranged; display means for displaying the schedule table stored in the storage means; performing a new schedule set for a new item; Schedule planning means for adding the result of the above to the schedule table; schedule correction means for carrying out a correction for raising or lowering each item of the schedule table based on the operation results of each production machine; and Fixed date and time information indicating that the date and time at which a specific item should be processed should be set to a specific fixed date and time, and storing the fixed date and time information in the storage means. When, by the schedule modifying means, when correcting the schedule table, the plan for a particular item, the particular solid
The case where it moves up beyond the fixed date and time,
Either the case of going down from the scheduled date and time,
And a warning unit for displaying a warning on the specific item on the display unit.
JP11690492A 1992-04-09 1992-04-09 Production machine operation schedule management device Expired - Lifetime JP3359655B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP11690492A JP3359655B2 (en) 1992-04-09 1992-04-09 Production machine operation schedule management device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP11690492A JP3359655B2 (en) 1992-04-09 1992-04-09 Production machine operation schedule management device

Publications (2)

Publication Number Publication Date
JPH05290056A JPH05290056A (en) 1993-11-05
JP3359655B2 true JP3359655B2 (en) 2002-12-24

Family

ID=14698522

Family Applications (1)

Application Number Title Priority Date Filing Date
JP11690492A Expired - Lifetime JP3359655B2 (en) 1992-04-09 1992-04-09 Production machine operation schedule management device

Country Status (1)

Country Link
JP (1) JP3359655B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4697908B2 (en) * 2000-05-12 2011-06-08 大日本印刷株式会社 Scheduled printing method and system

Also Published As

Publication number Publication date
JPH05290056A (en) 1993-11-05

Similar Documents

Publication Publication Date Title
US6380953B1 (en) Method of display scrolling along a timebase and an apparatus for performing the method
JP3359655B2 (en) Production machine operation schedule management device
JPH10118896A (en) Schedule preparation support system
JPH05143613A (en) Production planning system
JP3031943B2 (en) Production machine operation schedule management device
JP3075357B2 (en) Production machine operation schedule planning device
JP2908076B2 (en) Scheduling system
JPS62224561A (en) Work load display system
JPH06187354A (en) Production schedule preparing system for printed product
JP2004145436A (en) Method and device for creating production plan
JP2019159511A (en) Production support device and production support method
JPH07210606A (en) Scheduling system
JPH0710486B2 (en) Multi-product production schedule creation device
JPH01264751A (en) Preparation for production process planning table
JP2005202831A (en) Machine tool maintenance system
JP2008276412A (en) Process progress management system and process progress management method
JPH05229105A (en) Planning device for operation schedule of printing press
JPH0253553A (en) Production planning method
JP3637070B2 (en) Schedule reservation device and schedule reservation method
JP3242067B2 (en) Schedule converter
JPH05298324A (en) Operation schedule planning device for production machine
JP2873869B2 (en) Operation planning equipment for production machines
JP3305437B2 (en) Production machine operation schedule planning system
JPH03117543A (en) Production instruction method
JPH09254363A (en) Operation program making apparatus of distribution printing press

Legal Events

Date Code Title Description
FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081011

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091011

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091011

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101011

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111011

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121011

Year of fee payment: 10

EXPY Cancellation because of completion of term
FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121011

Year of fee payment: 10