JP3334075B2 - Method for producing composite yarn and composite yarn thereof - Google Patents

Method for producing composite yarn and composite yarn thereof

Info

Publication number
JP3334075B2
JP3334075B2 JP24849698A JP24849698A JP3334075B2 JP 3334075 B2 JP3334075 B2 JP 3334075B2 JP 24849698 A JP24849698 A JP 24849698A JP 24849698 A JP24849698 A JP 24849698A JP 3334075 B2 JP3334075 B2 JP 3334075B2
Authority
JP
Japan
Prior art keywords
yarn
fiber bundle
spun yarn
filament
fluctuation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP24849698A
Other languages
Japanese (ja)
Other versions
JP2000080527A (en
Inventor
利光 武者
由樹 丹羽
幸広 中村
重男 堀越
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nisshinbo Holdings Inc
Original Assignee
Nisshinbo Holdings Inc
Nisshinbo Industries Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nisshinbo Holdings Inc, Nisshinbo Industries Inc filed Critical Nisshinbo Holdings Inc
Priority to JP24849698A priority Critical patent/JP3334075B2/en
Publication of JP2000080527A publication Critical patent/JP2000080527A/en
Application granted granted Critical
Publication of JP3334075B2 publication Critical patent/JP3334075B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Yarns And Mechanical Finishing Of Yarns Or Ropes (AREA)
  • Spinning Or Twisting Of Yarns (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、衣料用の複合糸に関す
るものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a composite yarn for clothing.

【0002】[0002]

【従来の技術】衣料用の糸としては、近年、消費ニーズ
の多様化にともない、新しい審美性あるいは感性を有す
る糸が求められている。その一つに杢調糸がある。その
製造方法としては、混紡による杢調、撚糸による杢調、
エアー交絡による杢調などがあるが、いずれも規則的或
いは全くのランダムであり、自然な手作り状態のものが
得られなかった。
2. Description of the Related Art In recent years, with the diversification of consumption needs, yarns having a new aesthetic or sensibility have been demanded as clothing yarns. One of them is heather tone. As the manufacturing method, heather by blending, heather by twisting yarn,
Although there are heathers and the like caused by air confounding, they are all regular or completely random, and natural handmade ones cannot be obtained.

【0003】[0003]

【本発明の目的】本発明は、自然な杢調感をもった糸を
提供することにある。
SUMMARY OF THE INVENTION It is an object of the present invention to provide a yarn having a natural feeling of heather.

【0004】[0004]

【問題点を解決するための手段】本発明は、精紡機を用
いて短繊維からなる繊維束をドラフトして紡績糸とする
精紡工程において、フィラメント糸或いは紡績糸をフロ
ントローラの前又は後で該繊維束の中心付近に供給する
際に、該フィラメント糸或いは紡績糸の該繊維束への供
給量を1/fゆらぎに従って変化させ、その後、撚掛け
することを特徴とする、複合糸の製造方法、又は、精紡
機を用いて短繊維からなる繊維束をドラフトして紡績糸
とする精紡工程において、フィラメント糸或いは紡績糸
をフロントローラの前又は後で該繊維束の中心付近に供
給する際、該フィラメント糸或いは紡績糸の供給量を大
小の2段階に分け、一方の段階の供給量の時間を1/f
ゆらぎに従って変化させ、該フィラメント糸或いは紡績
糸を2段階の供給量で交互に該繊維束へ供給し、その
後、撚掛けすることを特徴とする、複合糸の製造方法、
又は、紡機を用いて短繊維からなる繊維束をドラフトし
て紡績糸とする精紡工程において、フィラメント糸或い
は紡績糸をフロントローラの前又は後で該繊維束に供給
する際、該フィラメント糸或いは紡績糸の該繊維束への
供給位置を該繊維束の幅方向の中央位置を中心として、
幅方向に1/fゆらぎに従って変化させ、その後、撚掛
けすることを特徴とする、複合糸の製造方法、又は、精紡
機を用いて短繊維からなる繊維束をドラフトして紡績糸
とする精紡工程において、フィラメント糸或いは紡績糸
をフロントローラの前又は後で該繊維束に供給する際、
該フィラメント糸或いは紡績糸の該繊維束への供給位置
を中央付近と外側付近の2種類に分け、一方の種類の供
給時間を1/fゆらぎで変化させ、該フィラメント糸或
いは紡績糸を2種類の位置で交互に該繊維束へ供給し、
その後、撚掛することを特徴とする、複合糸の製造方
法、又は、フィラメント糸或いは紡績糸が配置された複
合糸において、複合糸の外周に該フィラメント糸或いは
紡績糸の存在する箇所と存在しない個所が交互に現れ、
存在する箇所の長さ又は存在しない箇所の長さが1/f
ゆらぎに従って変化していることを特徴とする、複合糸
にある。
SUMMARY OF THE INVENTION The present invention relates to a spinning process in which a fiber bundle made of short fibers is drafted into a spun yarn by using a spinning machine. The supply of the filament yarn or the spun yarn to the fiber bundle is changed in accordance with 1 / f fluctuation when the fiber yarn is supplied to the vicinity of the center of the fiber bundle. In a manufacturing method or in a spinning process in which a fiber bundle composed of short fibers is drafted into a spun yarn by using a spinning machine, a filament yarn or a spun yarn is supplied to the vicinity of the center of the fiber bundle before or after a front roller. In this case, the supply amount of the filament yarn or the spun yarn is divided into two stages, large and small, and the time of the supply amount in one stage is 1 / f
A method for producing a composite yarn, characterized in that the filament yarn or the spun yarn is alternately supplied to the fiber bundle in two-stage supply amounts, and then twisted.
Alternatively, in a spinning process in which a fiber bundle made of short fibers is drafted into a spun yarn by using a spinning machine, when the filament yarn or the spun yarn is supplied to the fiber bundle before or after a front roller, the filament yarn or The supply position of the spun yarn to the fiber bundle is centered on the center position in the width direction of the fiber bundle,
A method for producing a composite yarn, characterized by changing the width in the width direction according to 1 / f fluctuation and then twisting, or using a spinning machine to draft a fiber bundle made of short fibers into a spun yarn. In the spinning process, when supplying the filament yarn or spun yarn to the fiber bundle before or after the front roller,
The supply position of the filament yarn or spun yarn to the fiber bundle is divided into two types, near the center and near the outside, and the supply time of one type is changed by 1 / f fluctuation, and two types of the filament yarn or the spun yarn are used. At the position of alternately to the fiber bundle,
Thereafter, in a method for producing a composite yarn, or in a composite yarn in which a filament yarn or a spun yarn is arranged, twisting is performed, and a portion where the filament yarn or the spun yarn is present does not exist on the outer periphery of the composite yarn. Places appear alternately,
Length of existing part or length of non-existing part is 1 / f
A composite yarn characterized by being changed according to fluctuation.

【0005】[0005]

【発明の実施の形態】以下、図面を用いて本発明の実施
例を説明する。
Embodiments of the present invention will be described below with reference to the drawings.

【0006】<イ>複合糸の製造装置 複合糸の製造装置は、フィラメント糸或いは紡績糸と粗
糸の2本の糸から複合糸を製造するものである。例え
ば、図1や図3のように、ドラフト部1で粗糸31をド
ラフトすると共に、フロントローラ13の前又は後でフ
ィラメント糸或いは紡績糸32を粗糸31の繊維束に供
給し、その後、スピンドル部4により複合糸33を撚
り、管糸34に巻き取るものである。ドラフト部1は、
バックローラ11、エプロン12、及びフロントローラ
13を備えている。
<A> Composite yarn manufacturing apparatus A composite yarn manufacturing apparatus is for manufacturing a composite yarn from a filament yarn or a spun yarn and a roving yarn. For example, as shown in FIGS. 1 and 3, the roving yarn 31 is drafted in the drafting section 1, and the filament yarn or the spun yarn 32 is supplied to the fiber bundle of the roving yarn 31 before or after the front roller 13. The composite yarn 33 is twisted by the spindle unit 4 and wound around a tube yarn 34. Draft part 1
The vehicle includes a back roller 11, an apron 12, and a front roller 13.

【0007】<ロ>粗糸、及びフィラメント糸或いは紡
績糸 粗糸の繊維は、木綿、麻、絹、羊毛などの天然繊維、レ
ーヨン、キュプラ、高強度再生セルロース繊維(例え
ば、商品名テンセル)などの再生繊維、ナイロン、ポリ
エステルなどの合成繊維などの短繊維が使用できる。
<B> Roving yarn and filament yarn or spun yarn Roving fiber includes natural fibers such as cotton, hemp, silk, and wool, rayon, cupra, and high-strength regenerated cellulose fiber (for example, trade name: Tencel). Short fibers such as recycled fibers and synthetic fibers such as nylon and polyester can be used.

【0008】フィラメント糸或いは紡績糸は、上記粗糸
の各種の繊維のフィラメントや紡績糸が使用できる。
As the filament yarn or spun yarn, filaments or spun yarns of various types of the above-described roving yarns can be used.

【0009】<ハ>フィラメント糸或いは紡績糸の供給 フィラメント糸或いは紡績糸32をフロントローラ13
の前又は後で粗糸31の繊維束に供給する際、供給量や
供給位置を1/fゆらぎに従って変化させる。
<C> Supply of Filament Yarn or Spun Yarn
Before or after the supply, the supply amount and the supply position are changed according to the 1 / f fluctuation.

【0010】図1及び図2のように、フィラメント糸或
いは紡績糸32をフロントローラ13の後に供給すると
き、ガイドバー29の位置は、供給するフィラメント糸
或いは紡績糸32の太さ、最終的な複合糸33の太さ、
及びフィラメント糸或いは紡績糸32と繊維束との比率
による。最終的な複合糸が5s〜100s、供給するフィ
ラメント糸或いは紡績糸8s〜160s、フィラメント糸
或いは紡績糸と繊維束の比率が65:35〜40:60
のとき、フロントローラのニップ点から3〜7mm程度
前方にガイドバー29を置き、そこで、フィラメント糸
或いは紡績糸32と繊維束を合流させる。
As shown in FIGS. 1 and 2, when the filament or spun yarn 32 is supplied after the front roller 13, the position of the guide bar 29 depends on the thickness of the supplied filament or spun yarn 32 and the final size. The thickness of the composite yarn 33,
And the ratio between the filament yarn or spun yarn 32 and the fiber bundle. The final composite yarn is 5 s to 100 s , the supplied filament yarn or spun yarn is 8 s to 160 s , and the ratio of the filament yarn or spun yarn to the fiber bundle is 65:35 to 40:60.
At this time, the guide bar 29 is placed about 3 to 7 mm forward from the nip point of the front roller, where the filament yarn or spun yarn 32 and the fiber bundle are merged.

【0011】ニップ点から3mm以下では、作業性が悪
くなり、7mm以上では、糸切れと不良部分の増加があ
る。
When the distance is less than 3 mm from the nip point, the workability deteriorates, and when the distance is more than 7 mm, yarn breakage and defective parts increase.

【0012】なお、図1及び図2では、フィラメント糸
或いは紡績糸32をフロントローラ13の後のガイドバ
ー29の前に供給しているが、ガイドバー29を用いな
いで、フロントローラ13の前に供給しても良い。その
場合、供給量の増減により張力がかかり、材質によって
は伸びの弾性範囲をオーバーする可能性があり、糸切れ
が生じることがあり、フィラメント糸或いは紡績糸32
をフロントローラ13の後のガイドバー29の前に供給
するほうがより好ましい。
In FIGS. 1 and 2, the filament yarn or the spun yarn 32 is supplied to the front of the front roller 13 before the guide bar 29. May be supplied. In this case, tension is applied due to an increase or decrease in the supply amount, and depending on the material, there is a possibility that the elasticity of elongation may be exceeded.
Is more preferably supplied before the guide bar 29 after the front roller 13.

【0013】供給量を変化させ方法は、1/fゆらぎ信
号21が入力されたコントローラ22でフィードモータ
23を制御し、フィードローラ24の回転速度を制御
し、フィラメント糸或いは紡績糸32の供給量を1/f
ゆらぎに従って変えることができる。
The method of changing the supply amount is as follows. The controller 22 to which the 1 / f fluctuation signal 21 is input controls the feed motor 23, controls the rotation speed of the feed roller 24, and controls the supply amount of the filament yarn or the spun yarn 32. Is 1 / f
It can be changed according to the fluctuation.

【0014】フィラメント糸或いは紡績糸32の供給位
置を変える方法は、例えば図3のように、1/fゆらぎ
信号が入力されたコントローラ22で電磁弁26を制御
し、エア25によってエアシリンダ27とガイド28を
動作し、フィラメント糸或いは紡績糸32の供給位置を
1/fゆらぎに従って変化させることができる。
A method of changing the supply position of the filament yarn or the spun yarn 32 is, for example, as shown in FIG. 3, by controlling the electromagnetic valve 26 by the controller 22 to which the 1 / f fluctuation signal is inputted, and by the air 25 to the air cylinder 27. By operating the guide 28, the supply position of the filament yarn or the spun yarn 32 can be changed according to the 1 / f fluctuation.

【0015】なお、図3では、フィラメント糸或いは紡
績糸32をフロントローラ13の前に供給しているが、
フロントローラ13の後のガイドバー29の前に供給し
ても良い。フロントローラ13の後に供給すると、繊維
束が細くなり、糸の供給位置のコントロールが難しくな
り、フロントローラ13の前に供給するほうが好まし
い。
In FIG. 3, the filament yarn or the spun yarn 32 is supplied before the front roller 13.
It may be supplied before the guide bar 29 after the front roller 13. When the fiber bundle is supplied after the front roller 13, the fiber bundle becomes thin, and it becomes difficult to control the supply position of the yarn. Therefore, it is preferable to supply the yarn before the front roller 13.

【0016】<ニ>1/fゆらぎ信号 1/fゆらぎ信号は、時系列の信号のパワースペクトル
を分析すると、その周波数(f)の強度が周波数にほぼ
逆比例(1/fに比例)するものであり、これは、人体
の基本的なリズムの変動と関係し、自然な杢調感や手作
りのむら感を与えることができる。これを別の見方をす
ると、人間は同じ刺激を継続的に受けると飽きがくるこ
と、これとは逆にあまり変化の激しい刺激はかえって不
快感を伴うもので、この両者を適当にあわせもつゆらぎ
が1/fゆらぎである(例えば、特開平7−24313
7号公報参照)。
<D> 1 / f fluctuation signal When the power spectrum of a 1 / f fluctuation signal is analyzed, the intensity of the frequency (f) is substantially inversely proportional to the frequency (proportional to 1 / f). This is related to the fluctuation of the basic rhythm of the human body, and can give a natural feeling of heather and a sense of handmade unevenness. From another perspective, humans become tired of receiving the same stimulus continuously, and on the contrary, a stimulus that changes too much is accompanied by discomfort, and the fluctuation that combines these two appropriately Is 1 / f fluctuation (for example, see JP-A-7-24313).
No. 7).

【0017】1/fゆらぎ信号は、乱数列に所定の個数
の係数を演算して作った数値列より求めることができ、
コンピュータなどを用いて、公知の方法で作成すること
ができる(例えば、前述の特開平7−243137号公
報参照)。
The 1 / f fluctuation signal can be obtained from a numerical sequence formed by calculating a predetermined number of coefficients on a random number sequence.
It can be prepared by a known method using a computer or the like (for example, see the above-mentioned Japanese Patent Application Laid-Open No. 7-243137).

【0018】なお、1/fゆらぎとは、周波数成分fを
持つパワースペクトルが1/fkに比例するもので、k
が1付近の値を持つもの、及びこれに類似したスペクト
ルを持つものをいう。
The 1 / f fluctuation means that a power spectrum having a frequency component f is proportional to 1 / f k ,
Has a value close to 1 and has a spectrum similar to this.

【0019】[0019]

【実施例】以下に本発明の実施例を説明する。Embodiments of the present invention will be described below.

【0020】<イ>フィラメント糸或いは紡績糸の供給
量の1/fゆらぎのピッチ変化 フィラメント糸或いは紡績糸32を図1及び図2のよう
に供給する際、フィラメント糸或いは紡績糸32をフロ
ントローラ13の後のガイドバー29の前の繊維束の中
心付近に供給する。
<A> Pitch change of 1 / f fluctuation of supply amount of filament yarn or spun yarn When supplying filament yarn or spun yarn 32 as shown in FIG. 1 and FIG. The fiber is supplied near the center of the fiber bundle before the guide bar 29 after 13.

【0021】フィラメント糸或いは紡績糸32の供給量
を1/fゆらぎに従って変化させる。この変化例とし
て、フロントローラ13の表面速度1に対して、フィー
ドローラ24の表面速度を1.15と0.85の2段階
で変化させ、一方の段階の供給時間を1/fゆらぎのピ
ッチで変える。
The supply amount of the filament yarn or the spun yarn 32 is changed according to the 1 / f fluctuation. As an example of this change, the surface speed of the feed roller 24 is changed in two stages of 1.15 and 0.85 with respect to the surface speed 1 of the front roller 13, and the supply time in one stage is set to a pitch of 1 / f fluctuation. Change with.

【0022】フィードローラ24の表面速度が1.15
の場合、繊維束に対してフィラメント糸或いは紡績糸3
2の供給量が多くなり、製造された複合糸33の外周に
フィラメント糸或いは紡績糸32が巻き付いて露出す
る。それに対して、フィードローラ24の表面速度が
0.85の場合、フィラメント糸或いは紡績糸32の供
給量が少なくなり、フィラメント糸或いは紡績糸32が
複合糸の中心付近に配置され、外周には露出しない。
The surface speed of the feed roller 24 is 1.15.
In the case of, the filament yarn or the spun yarn 3
2, the filament yarn or the spun yarn 32 is wound around the outer periphery of the manufactured composite yarn 33 and exposed. On the other hand, when the surface speed of the feed roller 24 is 0.85, the supply amount of the filament yarn or the spun yarn 32 decreases, and the filament yarn or the spun yarn 32 is arranged near the center of the composite yarn and exposed on the outer periphery. do not do.

【0023】このようにして製造された複合糸33のパ
ターンを図4及図5に示す。図4のパターンにおいて、
フィラメント或いは紡績糸が外周に露出した部分331
の長さが、20mm程度になるようにフロントローラ1
3の回転を制御した場合で、しかも、フロントローラ1
3の表面速度0.85の段階における供給時間を1/f
ゆらぎ(t1、t2、t3、・・・)のピッチで変化さ
せたものである。図5のパターンは、繊維束のみ露出し
た部分332の長さが、20mm程度になるようにフロ
ントローラ13の回転を制御した場合で、しかも、フロ
ントローラ13の表面速度1.15の段階における供給
時間を1/fゆらぎ(t1、t2、t3、・・・)のピ
ッチで変化させたものである。
FIGS. 4 and 5 show patterns of the composite yarn 33 thus manufactured. In the pattern of FIG.
The portion 331 where the filament or spun yarn is exposed on the outer periphery
So that the length of the front roller 1 is about 20 mm.
3 when the rotation of the front roller 1 is controlled.
3 is 1 / f.
This is changed at a pitch of fluctuation (t1, t2, t3,...). The pattern in FIG. 5 shows the case where the rotation of the front roller 13 is controlled so that the length of the portion 332 where only the fiber bundle is exposed is about 20 mm, and the supply of the front roller 13 at the surface speed of 1.15. The time is changed at a pitch of 1 / f fluctuation (t1, t2, t3,...).

【0024】このように、フィラメント糸或いは紡績糸
32と繊維束のパターンは、1/fゆらぎ変化が生じて
おり、自然な杢調感を有している。
As described above, the pattern of the filament yarn or the spun yarn 32 and the fiber bundle has a 1 / f fluctuation change, and has a natural feeling of heather.

【0025】フロントローラ13の表面速度1に対し
て、フィードローラの表面速度を1.15と0.85の
2段階の割合としてあるが、0.85より小さくする
と、糸切れなどのトラブルが生じ、また1.15と0.
85の間隔を狭くしすぎるとパターンが明確でなくなる
問題がある。2段階の範囲を1.15と0.85付近に
すると、安定した明確な杢を出すことができた。
The surface speed of the feed roller is set to two steps of 1.15 and 0.85 with respect to the surface speed 1 of the front roller 13, but if it is smaller than 0.85, troubles such as thread breakage may occur. , And 1.15 and 0.
If the interval of 85 is too narrow, there is a problem that the pattern is not clear. When the range of the two steps was set to around 1.15 and 0.85, a stable and clear heather could be obtained.

【0026】<ロ>フィラメント糸或いは紡績糸の供給
位置の1/fゆらぎのピッチ変化 フィラメント糸或いは紡績糸32を図3のように供給す
る際、フィラメント糸或いは紡績糸32をフロントロー
ラ13の前で繊維束の幅方向の中央位置を中心にして、
幅方向に1/fゆらぎに従って変化させる。例えば、フィ
ラメント糸或いは紡績糸32を繊維束の幅方向の中心に
配置される位置(図6(A)参照)と外周に巻き付く位
置(図6(B)参照)の2種類の位置で供給する。フィ
ラメント糸或いは紡績糸32は、エアシリンダ27で操
作されるガイド28で支持され、エアシリンダ27の1
/fゆらぎに基づく制御によって、ガイド28を移動制
御し、2種類の位置に供給される。
<B> Pitch Change of 1 / f Fluctuation of Filament or Spun Yarn Supply Position When the filament or spun yarn 32 is supplied as shown in FIG. With the center of the fiber bundle in the width direction center,
It is changed according to 1 / f fluctuation in the width direction. For example, the filament yarn or the spun yarn 32 is supplied at two positions: a position arranged at the center of the fiber bundle in the width direction (see FIG. 6A) and a position wound around the outer periphery (see FIG. 6B). I do. The filament yarn or spun yarn 32 is supported by a guide 28 operated by an air cylinder 27,
The movement of the guide 28 is controlled by the control based on the / f fluctuation, and the guide 28 is supplied to two types of positions.

【0027】1/fゆらぎは、例えば、フィラメント糸
或いは紡績糸32が中心位置(図6(A)参照)に現わ
れるピッチを1/fゆらぎで変化させ、外周に巻き付く
位置(図6(B)参照)をある一定時間とし、残りを中
心位置とする。図7はこのようにして得られた複合糸3
3であり、フィラメント或いは紡績糸32が外周に露出
した部分の長さが、20mm程度と一定であり、フィラ
メント或いは紡績糸32が外周に露出した部分331と
繊維束のみ露出した部分332の全体の長さが1/fゆ
らぎ(t1、t2、t3、・・・)のピッチで変化して
いる。
The 1 / f fluctuation is obtained, for example, by changing the pitch at which the filament yarn or spun yarn 32 appears at the center position (see FIG. 6 (A)) by 1 / f fluctuation, and winding it around the outer periphery (FIG. 6 (B)). )) Is a certain time, and the rest is the center position. FIG. 7 shows the composite yarn 3 thus obtained.
3, the length of the portion where the filament or the spun yarn 32 is exposed to the outer periphery is constant at about 20 mm, and the whole of the portion 331 where the filament or the spun yarn 32 is exposed to the outer periphery and the portion 332 where only the fiber bundle is exposed The length changes at a pitch of 1 / f fluctuation (t1, t2, t3,...).

【0028】複合糸の素材の番手にも依存するが、例え
ば、フロントローラ13の幅Wmm(例:25mm)の
場合、幅の中央を中心として、0〜1/4Wの範囲で、
望ましくは1/5W程度で供給位置を制御する。
For example, when the width of the front roller 13 is Wmm (for example, 25 mm), the width of the front roller 13 ranges from 0 to 1/4 W,
Preferably, the supply position is controlled at about 1/5 W.

【0029】この変化幅は、0〜1/3Wの範囲で可能
であるが、0に近いとフィラメント糸或いは紡績糸の露
出部分が不明確であり、1/3W(約8mm)以上にな
ると、明確になるが、糸切れなどのトラブルが発生す
る。そのため、1/5W(約5mm)程度が望ましい。
This variation width is possible in the range of 0 to 1/3 W. However, when the variation width is close to 0, the exposed portion of the filament yarn or the spun yarn is unclear, and when it becomes 1/3 W (about 8 mm) or more, Clearly, troubles such as thread breakage occur. Therefore, about 1/5 W (about 5 mm) is desirable.

【0030】<ハ>木綿の粗糸に対するポリエステルマ
ルチフィラメント糸の供給量の1/fゆらぎのピッチ変
化 木綿からなる粗糸とポリエステルマルチフィラメント糸
(50d/24f)とを使用し、フィラメントオーバーフ
ィード15%(フィード=1.15)を20mmとし
(フィラメント糸が外側)、出現のピッチを1/fゆら
ぎ信号を基に、3cm〜18cmの範囲内で変化させ
て、トータル50番手(撚数:31T/インチ)の複合
糸を得た。フィラメントが中心にあるところは、アンダ
ーフィード15%(フィールド=0.85)である。こ
の複合糸は図7と同様のパターンが得られる。
<C> Pitch change of 1 / f fluctuation of the supply amount of polyester multifilament yarn to cotton roving Yarn of cotton roving and polyester multifilament yarn (50 d / 24 f ) are used. The feed 15% (feed = 1.15) is set to 20 mm (the filament yarn is on the outside), and the appearance pitch is changed within the range of 3 cm to 18 cm based on the 1 / f fluctuation signal, and a total of 50 counts (number of twists) : 31 T / inch). At the center of the filament is underfeed 15% (field = 0.85). This composite yarn has a pattern similar to that shown in FIG.

【0031】ここで使用した1/fゆらぎ信号の数値列
の一部を以下に示す。この数値列Aを利用して、式(A
+20)×(150/100)×(1/10)で計算し
て、出現のピッチを3cm〜18cmの範囲内とし、コ
ントローラに入力した。
A part of the numerical sequence of the 1 / f fluctuation signal used here is shown below. Using this numerical sequence A, the formula (A
+20) × (150/100) × (1/10), and the appearance pitch was in the range of 3 cm to 18 cm, which was input to the controller.

【0032】得られた複合糸は、フィラメント糸が外周
に位置した部分の現われ方が1/fゆらぎのピッチで配
置されており、規則的でもなく、またランダムでもない
自然な杢調を有する複合糸が得られた。
In the obtained composite yarn, the appearance of the portion where the filament yarn is located on the outer periphery is arranged at a pitch of 1 / f fluctuation, and the composite yarn has a natural heath tone that is neither regular nor random. A yarn was obtained.

【0033】1/fゆらぎの数値列:・・・・・・5
2.38、39.22、46.96、54.37、6
0.21、52.58、32.31、54.61、5
7.17、66.55、73.81、61.03、4
2.08、63.42、47.59、38.32、4
3.67、45.27、60.70、59.82、6
2.16、51.64、63.81、51.54、6
8.24、68.31、75.31、67.37、7
6.81、69.42、46.71、66.39、6
0.38、42.66、・・・・・・
Numerical sequence of 1 / f fluctuation: 5
2.38, 39.22, 46.96, 54.37, 6
0.21, 52.58, 32.31, 54.61, 5
7.17, 66.55, 73.81, 61.03, 4
2.08, 63.42, 47.59, 38.32, 4
3.67, 45.27, 60.70, 59.82, 6
2.16, 51.64, 63.81, 51.54, 6
8.24, 68.31, 75.31, 67.37, 7
6.81, 69.42, 46.71, 66.39, 6
0.38, 42.66, ...

【0034】[0034]

【発明の効果】本発明は、次のような効果を得ることが
できる。 <イ>自然な杢調感をもった複合糸を得ることができ
る。 <ロ>本発明の複合糸を使用すると、規則的でもなく、
ランダムでもない、自然な杢調を有する織編物を得るこ
とができる。
According to the present invention, the following effects can be obtained. <A> A composite yarn having a natural heather tone can be obtained. <B> When the composite yarn of the present invention is used, it is not regular,
A woven or knitted material having a natural heather tone that is not random can be obtained.

【図面の簡単な説明】[Brief description of the drawings]

【図1】1/fゆらぎの複合糸を製造する精紡機の説明
FIG. 1 is an explanatory view of a spinning machine for producing a composite yarn having a 1 / f fluctuation.

【図2】ガイドバーの側面の説明図FIG. 2 is an explanatory view of a side surface of a guide bar.

【図3】1/fゆらぎの複合糸を製造する他の精紡機の
説明図
FIG. 3 is an explanatory view of another spinning machine for producing a composite yarn having a 1 / f fluctuation.

【図4】フィラメント或いは紡績糸が外周に露出した複
合糸の説明図
FIG. 4 is an explanatory view of a composite yarn in which a filament or a spun yarn is exposed on the outer periphery.

【図5】フィラメント或いは紡績糸が外周に露出した他
の複合糸の説明図
FIG. 5 is an explanatory view of another composite yarn in which a filament or a spun yarn is exposed on the outer periphery.

【図6】フィラメント或いは紡績糸の供給位置を示す図FIG. 6 is a view showing a supply position of a filament or a spun yarn.

【図7】フィラメント或いは紡績糸が外周に露出した他
の複合糸の説明図
FIG. 7 is an explanatory view of another composite yarn in which a filament or a spun yarn is exposed on the outer periphery.

【符号の説明】[Explanation of symbols]

1・・・ドラフト部 11・・バックローラ 12・・エプロン 13・・フロントローラ 21・・1/fゆらぎ信号 22・・コントローラ 23・・フィードモータ 24・・フィードローラ 25・・エアー 26・・電磁弁 27・・エアシリンダ 28・・ガイド 29・・ガイドバー 31・・粗糸 32・・フィラメント或いは紡績糸 33・・複合糸 331・フィラメント或いは紡績糸が外周に露出した部
分 332・繊維束のみ露出した部分 34・・管糸 4・・・スピンドル部
1 Draft part 11 Back roller 12 Apron 13 Front roller 21 1 / f fluctuation signal 22 Controller 23 Feed motor 24 Feed roller 25 Air 26 Electromagnetic Valve 27 Air cylinder 28 Guide 29 Guide bar 31 Filament or spun yarn 33 Composite yarn 331 Part where filament or spun yarn is exposed on the outer periphery 332 Only fiber bundle is exposed Part 34 ··· tube yarn 4 ··· spindle part

───────────────────────────────────────────────────── フロントページの続き (72)発明者 堀越 重男 愛知県岡崎市美合町字入込45 日清紡績 株式会社 美合工場内 審査官 吉澤 秀明 (56)参考文献 特許2860455(JP,B2) 特許2964061(JP,B2) 特許2860443(JP,B2) 特許2917094(JP,B2) (58)調査した分野(Int.Cl.7,DB名) D01H 7/02 D01H 5/32 D02G 3/26 D02G 3/34 ────────────────────────────────────────────────── ─── Continued on the front page (72) Inventor Shigeo Horikoshi 45 characters in Miai-cho, Okazaki City, Aichi Pref. Inspector in Niibo Spinning Co., Ltd. Miai Factory Hideaki Yoshizawa JP, B2) Patent 2860443 (JP, B2) Patent 2917094 (JP, B2) (58) Fields investigated (Int. Cl. 7 , DB name) D01H 7/02 D01H 5/32 D02G 3/26 D02G 3/34

Claims (5)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】精紡機を用いて短繊維からなる繊維束をド
ラフトして紡績糸とする精紡工程において、フィラメン
ト糸或いは紡績糸をフロントローラの前又は後で該繊維
束の中心付近に供給する際に、該フィラメント糸或いは
紡績糸の該繊維束への供給量を1/fゆらぎに従って変
化させ、その後、撚掛けすることを特徴とする、 複合糸の製造方法。
In a spinning process in which a fiber bundle composed of short fibers is drafted into a spun yarn by using a spinning machine, a filament yarn or a spun yarn is supplied to the vicinity of the center of the fiber bundle before or after a front roller. A process of changing the supply amount of the filament yarn or the spun yarn to the fiber bundle in accordance with 1 / f fluctuation, and then twisting.
【請求項2】精紡機を用いて短繊維からなる繊維束をド
ラフトして紡績糸とする精紡工程において、フィラメン
ト糸或いは紡績糸をフロントローラの前又は後で該繊維
束の中心付近に供給する際、該フィラメント糸或いは紡
績糸の供給量を大小の2段階に分け、一方の段階の供給
量の時間を1/fゆらぎに従って変化させ、該フィラメ
ント糸或いは紡績糸を2段階の供給量で交互に該繊維束
へ供給し、その後、撚掛けすることを特徴とする、 複合糸の製造方法。
2. In a spinning process in which a fiber bundle composed of short fibers is drafted into a spun yarn using a spinning machine, a filament yarn or a spun yarn is supplied to the vicinity of the center of the fiber bundle before or after a front roller. At this time, the supply amount of the filament yarn or the spun yarn is divided into two stages, large and small, and the time of the supply amount in one stage is changed according to 1 / f fluctuation, and the filament yarn or the spun yarn is supplied in two stages. A method for producing a composite yarn, comprising alternately supplying the fiber bundle, and then twisting.
【請求項3】精紡機を用いて短繊維からなる繊維束をド
ラフトして紡績糸とする精紡工程において、フィラメン
ト糸或いは紡績糸をフロントローラの前又は後で該繊維
束に供給する際、該フィラメント糸或いは紡績糸の該繊
維束への供給位置を該繊維束の幅方向の中央位置を中心
として、幅方向に1/fゆらぎに従って変化させ、その
後、撚掛けすることを特徴とする、 複合糸の製造方法。
3. In a spinning process in which a fiber bundle made of short fibers is drafted into a spun yarn by using a spinning machine, a filament yarn or a spun yarn is supplied to the fiber bundle before or after a front roller. The supply position of the filament yarn or spun yarn to the fiber bundle is changed around the center position in the width direction of the fiber bundle in accordance with 1 / f fluctuation in the width direction, and thereafter, twisting is performed. A method for producing a composite yarn.
【請求項4】精紡機を用いて短繊維からなる繊維束をド
ラフトして紡績糸とする精紡工程において、フィラメン
ト糸或いは紡績糸をフロントローラの前又は後で該繊維
束に供給する際、該フィラメント糸或いは紡績糸の該繊
維束への供給位置を中央付近と外側付近の2種類に分
け、一方の種類の供給時間を1/fゆらぎで変化させ、
該フィラメント糸或いは紡績糸を2種類の位置で交互に
該繊維束へ供給し、その後、撚掛することを特徴とす
る、 複合糸の製造方法。
4. In a spinning process in which a fiber bundle composed of short fibers is drafted into a spun yarn by using a spinning machine, a filament yarn or a spun yarn is supplied to the fiber bundle before or after a front roller. The supply position of the filament yarn or spun yarn to the fiber bundle is divided into two types, near the center and near the outside, and the supply time of one type is changed by 1 / f fluctuation,
A method for producing a composite yarn, comprising supplying the filament yarn or the spun yarn to the fiber bundle alternately at two types of positions, and thereafter twisting.
【請求項5】フィラメント糸或いは紡績糸が配置された
複合糸において、複合糸の外周に該フィラメント糸或い
は紡績糸の存在する箇所と存在しない個所が交互に現
れ、存在する箇所の長さ又は存在しない箇所の長さが1
/fゆらぎに従って変化していることを特徴とする、 複合糸。
5. A composite yarn on which a filament yarn or a spun yarn is disposed, where the filament yarn or the spun yarn and the non-existent portion alternately appear on the outer periphery of the composite yarn, and the length or the length of the existing portion is present. The length of the part that does not
A composite yarn characterized by changing according to / f fluctuation.
JP24849698A 1998-09-02 1998-09-02 Method for producing composite yarn and composite yarn thereof Expired - Fee Related JP3334075B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP24849698A JP3334075B2 (en) 1998-09-02 1998-09-02 Method for producing composite yarn and composite yarn thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP24849698A JP3334075B2 (en) 1998-09-02 1998-09-02 Method for producing composite yarn and composite yarn thereof

Publications (2)

Publication Number Publication Date
JP2000080527A JP2000080527A (en) 2000-03-21
JP3334075B2 true JP3334075B2 (en) 2002-10-15

Family

ID=17179045

Family Applications (1)

Application Number Title Priority Date Filing Date
JP24849698A Expired - Fee Related JP3334075B2 (en) 1998-09-02 1998-09-02 Method for producing composite yarn and composite yarn thereof

Country Status (1)

Country Link
JP (1) JP3334075B2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105040194A (en) * 2015-08-21 2015-11-11 江南大学 Four-cotton-sliver asynchronous inputting and three-level carding rotor spinning method and device
CN105063821A (en) * 2015-08-21 2015-11-18 江南大学 Rotor spinning method and device adopting three-cotton-sliver asynchronous input and multi-stage carding
CN108468115A (en) * 2018-05-04 2018-08-31 江南大学 Six component independence feed-type drawing frames
CN108570731A (en) * 2018-05-04 2018-09-25 江南大学 Eight component independence feed-type drawing frames

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5701275B2 (en) * 2012-11-26 2015-04-15 日本毛織株式会社 Long / short composite spun yarn, method for producing the same, fabric using the same, and textile product for clothing
CN103835033B (en) * 2014-03-13 2016-02-24 武汉纺织大学 A kind of forward type ring ingot compound spinning method
CN105113066B (en) * 2015-08-21 2018-02-16 江南大学 The asynchronous input of five slivers and the revolving cup spinning method and device of three fractions comb
CN105040193B (en) * 2015-08-21 2018-02-16 江南大学 A kind of asynchronous input of double slivers and the revolving cup spinning method and device of three fractions comb
KR101978184B1 (en) * 2016-08-04 2019-05-14 태광산업주식회사 Manufactirung method of sirofil yarn
TR201701808A2 (en) * 2017-02-07 2018-08-27 Sanko Tekstil Isletmeleri Sanayi Ve Ticaret Anonim Sirketi

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105040194A (en) * 2015-08-21 2015-11-11 江南大学 Four-cotton-sliver asynchronous inputting and three-level carding rotor spinning method and device
CN105063821A (en) * 2015-08-21 2015-11-18 江南大学 Rotor spinning method and device adopting three-cotton-sliver asynchronous input and multi-stage carding
CN105040194B (en) * 2015-08-21 2018-01-16 江南大学 The asynchronous input of four slivers and the revolving cup spinning method and device of three fractions comb
CN105063821B (en) * 2015-08-21 2018-01-19 江南大学 The asynchronous input of three slivers and the revolving cup spinning method and device of more fractions comb
CN108468115A (en) * 2018-05-04 2018-08-31 江南大学 Six component independence feed-type drawing frames
CN108570731A (en) * 2018-05-04 2018-09-25 江南大学 Eight component independence feed-type drawing frames

Also Published As

Publication number Publication date
JP2000080527A (en) 2000-03-21

Similar Documents

Publication Publication Date Title
JP3334075B2 (en) Method for producing composite yarn and composite yarn thereof
US3945189A (en) Method of producing knop yarn
KR100876078B1 (en) Method and apparatus for manufacturing single-sided spun yarn in ring spinning machine
JP3334081B2 (en) Method for producing composite yarn and composite yarn thereof
US20020152738A1 (en) Composite yarn and method of manufacturing it
KR20030018387A (en) Slub type core yarn, manufacturing method thereof, and manufacturing device thereof
JP2006225827A (en) Core yarn and textile
JP3507410B2 (en) String-like yarn and method for producing the same
JP3400755B2 (en) String-like yarn composed of composite elastic yarn and method for producing the same
JPH093742A (en) Long and short composite yarn and its production
KR0175690B1 (en) Method of manufacturing long and short composite yarn
JPH04352820A (en) Production of core yarn
JPH07157934A (en) Special spun yarn and its production
JP3170042B2 (en) Composite yarn and method for producing the same
JP2000017532A (en) Production of compound yarn, compound yarn produced thereby and woven or knit fabric made of the yarn
JPH08199439A (en) Production of designed yarn
JPH01213429A (en) Linen/rayon/polyester blended yarn by air false twist method
JPS5927406B2 (en) Method for producing plied yarn containing wool fibers
JPH0364546A (en) Fluff yarn and its production
JPH1181072A (en) Composite spun yarn and production thereof
JPS6141328A (en) Production of special twisted union spun yarn
JPS5847483B2 (en) Manufacturing method of slub yarn
JPH11172543A (en) Slub yarn and its production
JP2001348748A (en) Method for producing false-twist covered elastic yarn
JPH01213425A (en) Rayon/polyester blended yarn by air false twist method

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees