JP3297345B2 - Governor rope extension method for construction elevators - Google Patents

Governor rope extension method for construction elevators

Info

Publication number
JP3297345B2
JP3297345B2 JP9254997A JP9254997A JP3297345B2 JP 3297345 B2 JP3297345 B2 JP 3297345B2 JP 9254997 A JP9254997 A JP 9254997A JP 9254997 A JP9254997 A JP 9254997A JP 3297345 B2 JP3297345 B2 JP 3297345B2
Authority
JP
Japan
Prior art keywords
rope
governor rope
machine room
governor
car
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP9254997A
Other languages
Japanese (ja)
Other versions
JPH10279229A (en
Inventor
篤 大黒屋
隆輝 早川
正夫 藤田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Building Systems Co Ltd
Original Assignee
Hitachi Building Systems Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Building Systems Co Ltd filed Critical Hitachi Building Systems Co Ltd
Priority to JP9254997A priority Critical patent/JP3297345B2/en
Publication of JPH10279229A publication Critical patent/JPH10279229A/en
Application granted granted Critical
Publication of JP3297345B2 publication Critical patent/JP3297345B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Types And Forms Of Lifts (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、ビル建築工事の進
行過程に応じて機械室を段階的に吊上げることによりか
ご昇降行程を順次延長するようにした工事用エレベータ
のガバナロープ繰出し方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a construction elevator in which a machine room is lifted stepwise in accordance with the progress of building construction work so as to extend a car elevating process sequentially.
Governor rope feeding method .

【0002】[0002]

【従来の技術】一般に高層ビルなどの建築工事において
は、地上階から高層階まで建設作業者が上ったり建築資
材を昇降させたりするのに多大な時間を要するため、ビ
ル建築工事の効率化を阻害する原因の1つとなってい
る。
2. Description of the Related Art In general, in building construction of a high-rise building or the like, it takes a lot of time for a construction worker to go up and down a building material from a ground floor to a high-rise floor. This is one of the causes of the inhibition.

【0003】そこで従来、例えば特開平8−13363
5号公報に記載されているように、ビル建築工事の進行
過程に応じて機械室を段階的に吊上げることによりかご
昇降行程を順次延長するようにした工事用エレベータが
提案されている。
[0003] Conventionally, for example, Japanese Patent Application Laid-Open No. Hei 8-13363.
As described in Japanese Patent Publication No. 5 (1993), there has been proposed a construction elevator in which a car room is lifted stepwise according to the progress of building construction work so that a car ascending and descending step is sequentially extended.

【0004】この従来の工事用エレベータでは、かごの
昇降行程を延長する際に、機械室が位置する高さ位置ま
でかごを吊上げるとともに、ガバナ装置のガバナロープ
を前記の吊上げた分だけ長いものに交換するようになっ
ていた。
In this conventional construction elevator, when extending a car up and down stroke, the car is lifted to a height position where the machine room is located, and the governor rope of the governor device is extended to the length corresponding to the above-mentioned lifting. Was to be replaced.

【0005】[0005]

【発明が解決しようとする課題】ところで、前述した従
来の工事用エレベータでは、機械室を吊上げた高さに応
じてガバナ装置のガバナロープを長いものに交換して再
び張設する必要があるため、このガバナロープの交換作
業にかなりの手間や時間がかかり作業効率が劣る他コス
トがかかるという問題があった。
By the way, in the above-mentioned conventional construction elevator, it is necessary to replace the governor rope of the governor device with a longer one in accordance with the height at which the machine room is suspended, and to re-stretch the same. The replacement of the governor rope requires considerable labor and time, resulting in poor working efficiency and high cost.

【0006】本発明はこのような従来技術における実情
に鑑みてなされたもので、その第1の目的は、ガバナロ
ープの交換を要せずに、ビル建築工事の進行過程に応じ
て機械室を段階的に吊上げることのできる工事用エレベ
ータを提供することにある。
The present invention has been made in view of such a situation in the prior art, and a first object of the present invention is to step a machine room according to the progress of building construction without changing governor ropes. It is an object of the present invention to provide an elevator for construction that can be lifted.

【0007】また、その第2の目的は、機械室を段階的
に吊上げる際にガバナロープの取扱いが容易であり、ガ
バナロープ長さの調整作業を円滑に行なうことのできる
工事用エレベータを提供することにある。
A second object of the present invention is to provide a construction elevator in which the governor rope can be easily handled when the machine room is lifted step by step, and the length of the governor rope can be adjusted smoothly. It is in.

【0008】また、その第3の目的は、機械室を段階的
に吊上げる際にガバナロープのねじれに伴う下部プーリ
の回動を抑制でき、機械室の移設作業を円滑に行なうこ
とのできる工事用エレベータを提供することにある。
[0008] A third object of the present invention is to reduce the rotation of the lower pulley due to the twisting of the governor rope when lifting the machine room step by step, thereby making it possible to smoothly transfer the machine room. To provide an elevator.

【0009】[0009]

【課題を解決するための手段】上記目的を達成するた
め、本発明は、昇降路内に仮設される機械室と、この機
械室に設置され、巻上ロープを駆動する巻上装置と、前
記巻上ロープにより吊上げられ、前記昇降路を昇降する
かごおよびつり合いおもりと、前記機械室に設置される
上部プーリ、および前記昇降路の下部に設置される下部
プーリに巻掛けられ、前記かごの昇降動作と連動するガ
バナロープとを備え、ビル建築工事の進行過程に応じて
前記機械室を段階的に移設する際に前記ガバナロープを
順次繰出すようにした工事用エレベータのガバナロープ
繰出し方法において、前記ガバナロープの長さを、前記
ビルの完成時に必要となる所定長さに設定して、前記ガ
バナロープの一端を前記かごに固定するとともに、前記
ガバナロープの他端側を前記かごに設けたロープリール
装置に繰出し可能に巻き取っておき、前記機械室の移設
時に、この移設距離以上の長さを有する一対のガバナロ
ープにガイドさせて前記下部プーリを上昇させた後、前
記ガバナロープの他端側のロープリール装置からガバナ
ロープを繰出して前記下部プーリを下降させるようにし
構成にしてある。
In order to achieve the above object, the present invention provides a machine room temporarily installed in a hoistway, a hoisting device installed in the machine room and driving a hoisting rope, A car and a counterweight which are lifted by the hoisting rope and move up and down the hoistway, are wound around an upper pulley installed in the machine room, and a lower pulley installed at the lower part of the hoistway, and lift the car A governor rope interlocking with the operation, when the machine room is relocated step by step according to the progress of building construction work, the governor rope
Governor ropes for construction elevators that are sequentially extended
In the feeding method , the length of the governor rope is set to a predetermined length required when the building is completed, and one end of the governor rope is fixed to the car, and the other end of the governor rope is provided on the car. Rope reel
Take it up so that it can be fed out to the device, and transfer the machine room
Sometimes a pair of governors with a length greater than this relocation distance
After lowering the lower pulley by guiding
From the rope reel device on the other end of the governor rope,
Pull out the rope to lower the lower pulley
Were are the configuration.

【0010】上記のように構成した本発明の請求項1に
係る発明では、ガバナロープの中間部が上部プーリおよ
び下部プーリに巻掛けられてループ部が形成されるとと
もに、ガバナロープの他端側がかごに移動可能に取付け
られているので、必要に応じてガバナロープの他端側の
取付状態を解除した後、この他端側の部分を繰出して前
記のループ部の長さを長くする。これによって、ビル建
築工事の進行過程に応じて機械室を段階的に移設する際
に、ガバナロープの交換を要せずに済む。
According to the first aspect of the present invention, the intermediate portion of the governor rope is wound around the upper pulley and the lower pulley to form a loop portion, and the other end of the governor rope is connected to the car. Since it is movably attached, the state of the other end of the governor rope is released if necessary, and then the other end is extended to extend the length of the loop portion. This eliminates the need to replace governor ropes when the machine room is relocated in stages according to the progress of building construction.

【0011】また、当初、ガバナロープの一部をロープ
リール装置に巻取っておき、必要に応じてロープリール
装置からガバナロープを繰出すようになっているので、
機械室を段階的に吊上げる際にガバナロープの取扱いが
容易であり、上述したループ部の長さを調整する作業を
円滑に行なえる。
Also , at first , a part of the governor rope is wound on a rope reel device, and the governor rope is fed out from the rope reel device as needed.
It is easy to handle the governor rope when lifting the machine room step by step, and the above-described operation of adjusting the length of the loop portion can be performed smoothly.

【0012】また、機械室の吊上に伴ってガバナロープ
を介して下部プーリが引上げられる際、ガバナロープに
ねじれ力が掛っている場合でも、一対のガイドロープに
より下部プーリがガイドされるため、この下部プーリの
回動を抑制できる。これによって、ガバナロープがねじ
れることがなくて済むので、機械室の移設作業を円滑に
行なえる。
Further, when the lower pulley is pulled up via the governor rope as the machine room is lifted, even if a twisting force is applied to the governor rope, the lower pulley is guided by the pair of guide ropes. The rotation of the pulley can be suppressed. Thus, the governor rope does not need to be twisted, so that the transfer operation of the machine room can be performed smoothly.

【0013】[0013]

【発明の実施の形態】以下、本発明の工事用エレベータ
の実施の形態を図に基づいて説明する。図1は本発明の
一実施形態に係る工事用エレベータの要部構成を示す説
明図、図2は本実施形態の工事用エレベータに備えられ
るガイド部材の正面図、図3はガイド部材の側面図、図
4は本実施形態の工事用エレベータの全体構成を示す縦
断面図である。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of a construction elevator according to the present invention will be described below with reference to the drawings. FIG. 1 is an explanatory view showing a main part configuration of a construction elevator according to an embodiment of the present invention, FIG. 2 is a front view of a guide member provided in the construction elevator of the embodiment, and FIG. 3 is a side view of the guide member. FIG. 4 is a longitudinal sectional view showing the entire configuration of the construction elevator according to the present embodiment.

【0014】一般に工事用エレベータは、図4に示すよ
うに、昇降路1内に仮設される機械室2と、この機械室
2に設置され、巻上ロープ3を駆動する巻上装置4と、
巻上ロープ3により吊上げられ、昇降路1を昇降するか
ご5およびつり合いおもり6と、かご5の昇降動作と連
動するガバナロープ7を有するガバナ装置8とを備えて
いる。機械室2は吊上ロープ2aを介して支持されてお
り、ビル9の建築工事の進行過程に応じて機械室2を段
階的に移設することによりかご5の昇降行程を順次延長
するようになっている。
As shown in FIG. 4, a construction elevator generally includes a machine room 2 temporarily provided in a hoistway 1, a hoisting device 4 installed in the machine room 2 and driving a hoisting rope 3, and
The car 5 includes a car 5 and a counterweight 6 that are lifted by the hoisting rope 3 and move up and down the hoistway 1, and a governor device 8 having a governor rope 7 that works in conjunction with the elevating operation of the car 5. The machine room 2 is supported via a lifting rope 2a, and the elevator room of the car 5 is sequentially extended by gradually relocating the machine room 2 in accordance with the progress of the construction work of the building 9. ing.

【0015】巻上ロープ3は、一端が支持体10を介し
て機械室2の底部に固定され、中間部がつり合いおもり
6の上部のプーリ11と、機械室2のプーリ12および
巻上装置4と、かご5の上部のプーリ13とに順次巻回
されるとともに、他端部が機械室2の巻上ロープリール
14に巻掛けられている。ガバナロープ7は、中間部が
機械室2に設置される上部プーリ15と、昇降路1の下
部に設置される下部プーリ16とに巻掛けられており、
この下部プーリ16は、図1に示すように、昇降路1の
下部に立設されるガイドレール17にブラケット18を
介して取付けられている。
One end of the hoisting rope 3 is fixed to the bottom of the machine room 2 via a support 10, and an intermediate portion is a pulley 11 above the counterweight 6, a pulley 12 of the machine room 2 and a hoisting device 4. And the pulley 13 above the car 5, and the other end is wound around a hoisting rope reel 14 in the machine room 2. The governor rope 7 is wound around an upper pulley 15 whose middle part is installed in the machine room 2 and a lower pulley 16 installed below the hoistway 1.
As shown in FIG. 1, the lower pulley 16 is mounted via a bracket 18 on a guide rail 17 erected below the hoistway 1.

【0016】そして、本実施形態の工事用エレベータで
は、従来のものと比べて、ガバナロープ7の長さをビル
9の完成時に必要となる所定長さに設定したことと、昇
降路1の下部に下部プーリ16をガイドするガイド部材
19を設けたことと、かご5の上部にロープリール装置
20を設置したこととが主として異なっており、その他
の構成は基本的には同様である。
In the construction elevator according to this embodiment, the length of the governor rope 7 is set to a predetermined length required when the building 9 is completed. The main difference is that a guide member 19 for guiding the lower pulley 16 is provided, and that a rope reel device 20 is provided on the upper part of the car 5, and other configurations are basically the same.

【0017】上述したガバナロープ7の一端は、図1に
示すように、かご5にロープ端支持部21を介して固定
され、ガバナロープ7の中間部は、上部プーリ15およ
び下部プーリ16に巻掛けられ、これらの上部プーリ1
5および下部プーリ16間でループ部7aが形成されて
いる。また、ガバナロープ7の他端側は、かご5にロー
プ端支持部21を介して移動可能に取付けられており、
この他端側の部分7bはロープリール装置20により巻
取られている。
As shown in FIG. 1, one end of the governor rope 7 is fixed to the car 5 via a rope end supporting portion 21, and an intermediate portion of the governor rope 7 is wound around an upper pulley 15 and a lower pulley 16. , These upper pulleys 1
A loop portion 7a is formed between the lower pulley 5 and the lower pulley 16. Further, the other end of the governor rope 7 is movably attached to the car 5 via a rope end support portion 21.
The other end portion 7b is wound by the rope reel device 20.

【0018】上述したガイド部材19は、図2に示すよ
うに、ガバナロープ7のループ部7aと略平行となるよ
う鉛直方向に張設される一対のガイドロープ22と、こ
の一対のガイドロープ22の各端部がボルト23を介し
て固定されるブラケット24a、24bとからなってい
る。これらのブラケット24a、24bは、昇降路1の
下部に立設されるガイドレール17に取付けられ、機械
室2の1回当りの移設距離Lより少し大きな間隔を置い
て設けられている。また、下部プーリ16には、一対の
ガイドロープ22と係合する係合部、例えばシャックル
25が設けられている。
As shown in FIG. 2, the guide member 19 includes a pair of guide ropes 22 extending in a vertical direction so as to be substantially parallel to the loop portion 7a of the governor rope 7, and a pair of the guide ropes 22. Each end is composed of brackets 24a and 24b fixed via bolts 23. These brackets 24a, 24b are mounted on guide rails 17 erected below the hoistway 1, and are provided at intervals slightly larger than the transfer distance L per machine room 2 per operation. Further, the lower pulley 16 is provided with an engaging portion that engages with the pair of guide ropes 22, for example, a shackle 25.

【0019】この実施形態にあっては、まず下部プーリ
16をガイドレール17に取付けた状態を解除した後、
機械室2を所定距離L吊上げることにより、ガバナロー
プ7のループ部7aを介して下部プーリ16が一対のガ
イドロープ22に沿って鉛直方向に引上げられる。次い
で、前記の所定距離Lに応じて巻上ロープリール14か
ら巻上ロープ3を繰出すとともに、ガバナロープ7の他
端側の部分7bをロープ端支持部21に取付ける2個の
Uクリップ26をそれぞれ緩めた後、ロープリール装置
20からガバナロープ7の他端側の部分7bを繰出して
ループ部7aの長さを長くして、2個のUクリップ26
をそれぞれ締込むことによりガバナロープ7の他端側の
部分7bを再びロープ端支持部21に取付ける。そし
て、昇降路1の全長にわたって上記の手順を繰返すこと
により機械室2を段階的に移設し、かご5の昇降行程を
順次延長するようになっている。
In this embodiment, after the state where the lower pulley 16 is attached to the guide rail 17 is released,
By lifting the machine room 2 for a predetermined distance L, the lower pulley 16 is pulled up vertically along the pair of guide ropes 22 via the loop portion 7a of the governor rope 7. Next, the hoisting rope 3 is fed out from the hoisting rope reel 14 in accordance with the predetermined distance L, and two U clips 26 for attaching the other end portion 7b of the governor rope 7 to the rope end supporting portion 21 are respectively attached. After loosening, the portion 7b on the other end side of the governor rope 7 is extended from the rope reel device 20 to increase the length of the loop portion 7a, and the two U clips 26
Respectively, the portion 7b on the other end side of the governor rope 7 is attached to the rope end support portion 21 again. By repeating the above procedure over the entire length of the hoistway 1, the machine room 2 is relocated stepwise, and the hoisting stroke of the car 5 is sequentially extended.

【0020】このように構成した実施形態では、ビル9
の建築工事の進行過程に応じて機械室2を段階的に移設
する際、ガバナロープ7のループ部7aの長さを調整す
ることができるので、ガバナロープ7の交換を要せずに
済む。
In the embodiment configured as described above, the building 9
When the machine room 2 is relocated stepwise according to the progress of the construction work, the length of the loop portion 7a of the governor rope 7 can be adjusted, so that the governor rope 7 does not need to be replaced.

【0021】また、本実施形態では、当初、ガバナロー
プ7の他端側の部分7bをロープリール装置20に巻取
っておき、必要に応じてロープリール装置20から前記
の部分7bを繰出すようになっているので、その際のガ
バナロープ7の取扱いが容易であり、上述したループ部
7aの長さを調整する作業を円滑に行なえる。
In the present embodiment, the portion 7b at the other end of the governor rope 7 is first wound around the rope reel device 20, and the portion 7b is unwound from the rope reel device 20 as needed. Therefore, the governor rope 7 can be easily handled at that time, and the operation of adjusting the length of the loop portion 7a can be performed smoothly.

【0022】また、本実施形態では、機械室2の吊上に
伴ってガバナロープ7を介して下部プーリ16が引上げ
られるとき、ガバナロープ7にねじれ力が掛っている場
合でも、一対のガイドロープ22により下部プーリ16
がガイドされているため、この下部プーリ16の回動を
抑制できる。さらに、ガイド部材19のガイドロープ2
2は、機械室2を吊上げる1回当りの所定距離Lより少
し長いので、ガイド部材19を一度設置すれば、このガ
イド部材19の移動を要せずに、機械室2の移設作業を
繰返して行なうことができる。
Further, in the present embodiment, when the lower pulley 16 is pulled up via the governor rope 7 as the machine room 2 is lifted, even if a twisting force is applied to the governor rope 7, a pair of guide ropes 22 are used. Lower pulley 16
, The rotation of the lower pulley 16 can be suppressed. Further, the guide rope 2 of the guide member 19
2 is slightly longer than the predetermined distance L per one time of lifting the machine room 2, so once the guide member 19 is installed, the transfer operation of the machine room 2 is repeated without moving the guide member 19. Can be done.

【0023】[0023]

【発明の効果】以上のように構成したので、本発明
、ガバナロープの交換を要せずに、ビル建築工事の進
行過程に応じて機械室を段階的に移設することができ、
したがって、ガバナロープの交換を要する従来の場合と
比べて、かご昇降行程を延長する作業を効率的に行なえ
るという効果がある。
According to the present invention having the above-described structure ,
It is, without requiring the replacement of the governor rope, can be transferred in stages the machine room in accordance with the progress process of building construction work,
Therefore, there is an effect that the operation of extending the car up-and-down stroke can be performed efficiently compared to the conventional case that requires replacement of the governor rope.

【0024】また、機械室を段階的に移設する際にガバ
ナロープの取扱いが容易であり、ガバナロープの長さを
調整する作業を円滑に行なえる。したがって、比較的長
いガバナロープであってもその取扱いが容易であるた
め、高層ビルにも適用可能な工事用エレベータが得られ
るという効果がある。
Further, the governor rope can be easily handled when the machine room is relocated step by step, and the operation of adjusting the length of the governor rope can be performed smoothly. Therefore, even a relatively long governor rope can be easily handled, so that there is an effect that a construction elevator applicable to a high-rise building can be obtained.

【0025】また、機械室の吊上時にガバナロープのね
じれに伴う下部プーリの回動を抑制できるため、機械室
の移設を円滑に行なうことができ、したがって、この点
からもかご昇降行程を延長する作業を効率的に行なえる
という効果がある。
In addition , since the rotation of the lower pulley due to the twisting of the governor rope during the lifting of the machine room can be suppressed, the transfer of the machine room can be performed smoothly, so that the car ascending and descending stroke is extended from this point. There is an effect that work can be performed efficiently.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の一実施形態に係る工事用エレベータの
要部構成を示す説明図である。
FIG. 1 is an explanatory diagram showing a main configuration of a construction elevator according to an embodiment of the present invention.

【図2】本実施形態の工事用エレベータに備えられるガ
イド部材の正面図である。
FIG. 2 is a front view of a guide member provided in the construction elevator according to the embodiment.

【図3】ガイド部材の側面図である。FIG. 3 is a side view of a guide member.

【図4】本実施形態の工事用エレベータの全体構成を示
す縦断面図である。
FIG. 4 is a longitudinal sectional view showing the entire configuration of the construction elevator according to the embodiment.

【符号の説明】[Explanation of symbols]

1 昇降路 2 機械室 3 巻上ロープ 4 巻上装置 5 かご 6 つり合いおもり 7 ガバナロープ 7a ループ部 7b 他端側の部分 9 ビル 15 上部プーリ 16 下部プーリ 19 ガイド部材 20 ロープリール装置 22 ガイドロープ 24a、24b ブラケット 25 シャックル(係合部) Reference Signs List 1 hoistway 2 machine room 3 hoisting rope 4 hoisting device 5 car 6 counterweight 7 governor rope 7a loop portion 7b other end portion 9 building 15 upper pulley 16 lower pulley 19 guide member 20 rope reel device 22 guide rope 24a, 24b Bracket 25 Shackle (engagement part)

───────────────────────────────────────────────────── フロントページの続き (56)参考文献 特開 昭49−42039(JP,A) 特開 平9−86827(JP,A) 特開 平3−36182(JP,A) 実開 昭51−91476(JP,U) 実開 昭58−41782(JP,U) 実開 平2−66578(JP,U) (58)調査した分野(Int.Cl.7,DB名) B66B 1/00 - 31/02 ──────────────────────────────────────────────────続 き Continuation of the front page (56) References JP-A-49-42039 (JP, A) JP-A-9-86827 (JP, A) JP-A-3-36182 (JP, A) Japanese Utility Model Showa 51- 91476 (JP, U) Japanese Utility Model Showa 58-41782 (JP, U) Japanese Utility Model Application Hei 2-66578 (JP, U) (58) Field surveyed (Int. Cl. 7 , DB name) B66B 1/00-31 / 02

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 昇降路内に仮設される機械室と、この機
械室に設置され、巻上ロープを駆動する巻上装置と、前
記巻上ロープにより吊上げられ、前記昇降路を昇降する
かごおよびつり合いおもりと、前記機械室に設置される
上部プーリ、および前記昇降路の下部に設置される下部
プーリに巻掛けられ、前記かごの昇降動作と連動するガ
バナロープとを備え、ビル建築工事の進行過程に応じて
前記機械室を段階的に移設する際に前記ガバナロープを
順次繰出すようにした工事用エレベータのガバナロープ
繰出し方法において、 前記ガバナロープの長さを、前記ビルの完成時に必要と
なる所定長さに設定して、前記ガバナロープの一端を前
記かごに固定するとともに、前記ガバナロープの他端側
を前記かごに設けたロープリール装置に繰出し可能に巻
き取っておき、前記機械室の移設時に、この移設距離以
上の長さを有する一対のガバナロープにガイドさせて前
記下部プーリを上昇させた後、前記ガバナロープの他端
側のロープリール装置からガバナロープを繰出して前記
下部プーリを下降させるようにしたことを特徴とする工
事用エレベータのガバナロープ繰出し方法
1. A machine room temporarily installed in a hoistway, a hoisting device installed in the machine room and driving a hoisting rope, a car lifted up and down the hoistway by the hoisting rope, and A balance weight, an upper pulley installed in the machine room, and a governor rope wound around a lower pulley installed below the hoistway and interlocking with the elevator operation of the car, and a building construction process in progress When moving the machine room step by step according to
Governor ropes for construction elevators that are sequentially extended
In the feeding method , the length of the governor rope is set to a predetermined length required when the building is completed, and one end of the governor rope is fixed to the car, and the other end of the governor rope is provided on the car. Rollable reel reel device
When moving the machine room, remove it
Guided by a pair of governor ropes with upper length
After raising the lower pulley, the other end of the governor rope
The governor rope from the rope reel device on the side
A method of feeding a governor rope of a construction elevator, wherein a lower pulley is lowered .
JP9254997A 1997-04-10 1997-04-10 Governor rope extension method for construction elevators Expired - Fee Related JP3297345B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP9254997A JP3297345B2 (en) 1997-04-10 1997-04-10 Governor rope extension method for construction elevators

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP9254997A JP3297345B2 (en) 1997-04-10 1997-04-10 Governor rope extension method for construction elevators

Publications (2)

Publication Number Publication Date
JPH10279229A JPH10279229A (en) 1998-10-20
JP3297345B2 true JP3297345B2 (en) 2002-07-02

Family

ID=14057490

Family Applications (1)

Application Number Title Priority Date Filing Date
JP9254997A Expired - Fee Related JP3297345B2 (en) 1997-04-10 1997-04-10 Governor rope extension method for construction elevators

Country Status (1)

Country Link
JP (1) JP3297345B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4443171B2 (en) * 2003-09-04 2010-03-31 三菱電機株式会社 Elevator rope feeding device for construction

Also Published As

Publication number Publication date
JPH10279229A (en) 1998-10-20

Similar Documents

Publication Publication Date Title
US8028393B2 (en) Elevator arrangement
JP5095401B2 (en) Elevator installation method and elevator
US20020066622A1 (en) Procedure and apparatus for the installation of an elevator
JP2007099515A (en) Method for mounting support means of lift cage to lift cage and lift shaft
JP6813123B2 (en) How to apply elevator lift extension technology
JP2003020175A (en) Installation frame for installation of shaft device, installation lift therewith, and method of installing shaft device
JPH1160117A (en) Elevator
JP3297345B2 (en) Governor rope extension method for construction elevators
CN112744665B (en) Method for roping an elevator
JPH09278325A (en) Construction work elevator lifting method and construction work elevator device
JP2000335847A (en) Elevator installation device
JP2877593B2 (en) Elevator installation method
JP3519009B2 (en) Elevator installation method
JPH082850A (en) Work method in elevator shaft
US20240017964A1 (en) Construction elevator arrangement and a method for producing the same
WO2022230140A1 (en) Elevator and lifting/lowering path extension method
JP2003073052A (en) Rope installing method of elevator and rope guide device
JP4454744B2 (en) Temporary elevator device
JP2001122405A (en) Hoist gear of stacker crane
JP2930911B2 (en) Elevator installation method
JP2502323Y2 (en) Construction elevator
JPH05262475A (en) Installation method of elevator
JP2654409B2 (en) Elevator main cable replacement method
JPH05201648A (en) Installation of elevator
JPS60167875A (en) Elevator