JP3294829B2 - Floor slab peeler with casters - Google Patents

Floor slab peeler with casters

Info

Publication number
JP3294829B2
JP3294829B2 JP25488199A JP25488199A JP3294829B2 JP 3294829 B2 JP3294829 B2 JP 3294829B2 JP 25488199 A JP25488199 A JP 25488199A JP 25488199 A JP25488199 A JP 25488199A JP 3294829 B2 JP3294829 B2 JP 3294829B2
Authority
JP
Japan
Prior art keywords
floor slab
fulcrum
girder
lever
reaction force
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP25488199A
Other languages
Japanese (ja)
Other versions
JP2001073321A (en
Inventor
忠雄 横山
和明 五日市
直樹 今野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PROTEC CO., LTD.
Original Assignee
PROTEC CO., LTD.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PROTEC CO., LTD. filed Critical PROTEC CO., LTD.
Priority to JP25488199A priority Critical patent/JP3294829B2/en
Publication of JP2001073321A publication Critical patent/JP2001073321A/en
Application granted granted Critical
Publication of JP3294829B2 publication Critical patent/JP3294829B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、橋梁のコンクリー
ト床版を撤去するための装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an apparatus for removing a concrete slab of a bridge.

【0002】[0002]

【従来の技術】老朽化した橋梁のコンクリート床版を改
修する工事では、床版の側方や下方に吊り足場を組み立
て、橋梁の横桁を追加して補強し、既存のコンクリート
床版を撤去し、新たにPCプレキャスト床版を架設して
おり、このようなコンクリート床版の撤去に用いる装置
を図9及び図10に簡略に示す。
2. Description of the Related Art In the repair work of concrete slabs of deteriorated bridges, suspension scaffolds are assembled on the side and below the slabs, cross beams of the bridges are reinforced, and existing concrete slabs are removed. Then, a PC precast slab is newly installed, and an apparatus used for removing such a concrete slab is schematically shown in FIGS. 9 and 10.

【0003】図9において、床版剥離装置50は、台木
54,54を介して撤去対象ブロック40上に配置され
る桁材53と、この桁材53の両端部に固定されたセン
ターホールジャッキ52と、各センターホールジャッキ
52に通されて下端が撤去対象ブロック40に貫通され
た鋼棒51とからなり、鋼棒51の下端は支圧板55を
介してナット等により撤去対象ブロック40に固定され
る。
In FIG. 9, a floor slab peeling device 50 includes a girder 53 disposed on a block 40 to be removed via a stock 54, and a center hole jack fixed to both ends of the girder 53. 52 and a steel rod 51 having a lower end passed through each center hole jack 52 and having a lower end penetrated by the block 40 to be removed. The lower end of the steel rod 51 is fixed to the block 40 to be removed by a nut or the like via a support plate 55. Is done.

【0004】また図10においては、床版剥離装置60
は、撤去対象ブロック40の両側に置かれた台木69,
69間に架設する反力桁66と、この反力桁66の両端
に取付部材61を介して吊り下げられた一対の伸縮ジャ
ッキ62と、各伸縮ジャッキ62に一端が枢着され反力
桁66に支点が設けられた一対のてこ部材63と、撤去
対象ブロック40を吊り上げるため各てこ部材63にそ
れぞれ設けられた鋼棒65とからなり、鋼棒65の下端
は支圧板65を介してナット等により撤去対象ブロック
40に固定される。そして、反力桁66は所定幅のスリ
ットで並設された一対の桁材から成り、このスリットに
各てこ部材63がそれぞれ挿設され、各てこ部材63と
桁材とを貫通するように枢軸64が支点として設けられ
る。
FIG. 10 shows a floor slab peeling device 60.
Are the stocks 69 placed on both sides of the removal target block 40,
69, a pair of telescopic jacks 62 suspended from both ends of the reaction girder 66 via mounting members 61, and one end of each of the telescopic jacks 62 pivotally connected to the reaction girder 66. And a steel bar 65 provided on each of the lever members 63 for lifting the removal target block 40. The lower end of the steel bar 65 is provided with a nut or the like via the support plate 65. Is fixed to the block 40 to be removed. The reaction girder 66 is composed of a pair of girder members arranged side by side with slits having a predetermined width, and the respective lever members 63 are inserted into the slits so that the lever members 63 and the girder members can be pivotally connected. 64 is provided as a fulcrum.

【0005】[0005]

【発明が解決しようとする課題】図9及び図10におけ
る従来装置では、床版の剥離作業後、装置をクレーン等
で吊り上げなければ移動することができず、移動作業に
手間がかかるという欠点がある。
The conventional apparatus shown in FIGS. 9 and 10 cannot be moved unless the apparatus is lifted by a crane or the like after the floor slab is peeled off. is there.

【0006】また、従来装置において、床版を剥離する
ため、センターホールジャッキ52や伸縮ジャッキ62
を稼動させると、床版の撤去対象ブロック40における
鋼棒51又は鋼棒65が貫通した部分に急激に力が作用
し、特に、床版が脆弱な場合には床版全体が剥離するこ
となく、鋼棒の貫通した部分のみが破損してしまうとい
う欠点がある。
In the conventional apparatus, a center hole jack 52 and a telescopic jack 62 are used to separate the floor slab.
When the slab is operated, a force is suddenly applied to the portion where the steel bar 51 or the steel bar 65 has penetrated in the removal target block 40 of the floor slab. Particularly, when the floor slab is fragile, the entire floor slab does not peel off However, there is a disadvantage that only the penetrated portion of the steel bar is damaged.

【0007】さらに、図10の装置は床版の撤去対象ブ
ロックの長さに比べて、装置の長さが大きいため、様々
な工事機械が設置される煩雑な施工現場には不向きであ
る。また、図10の装置における伸縮ジャッキ62は、
床版の剥離作業毎にホースを介して油圧ポンプが着脱さ
れるので、ホースにゴミや埃が詰まりやすく、装置が故
障しやすいという欠点がある。
Further, the apparatus shown in FIG. 10 is not suitable for a complicated construction site where various construction machines are installed because the length of the apparatus is longer than the length of the block to be removed from the floor slab. Also, the telescopic jack 62 in the device of FIG.
Since the hydraulic pump is attached and detached via the hose every time the floor slab is peeled off, there is a drawback that the hose is liable to be clogged with dirt and dust, and the device is easily broken.

【0008】したがって、本発明は、上記従来装置の問
題点を解決せんとしたものであり、その課題は、装置を
容易に移動させることできる床版撤去のための装置を提
供することにある。
Accordingly, the present invention has been made to solve the above-mentioned problems of the conventional apparatus, and an object of the present invention is to provide an apparatus for removing a slab which can easily move the apparatus.

【0009】また別の課題は、床版の撤去対象ブロック
における鋼棒の貫通部分が、床版剥離前に破損すること
のないように、貫通部分への急激な力の作用を防止する
ことができる床版剥離装置を提供することにある。
Another object is to prevent a sudden force from acting on the penetrating portion so that the penetrating portion of the steel bar in the block to be removed from the slab is not damaged before the slab is peeled off. It is an object of the present invention to provide a floor slab peeling device which can be used.

【0010】[0010]

【課題を解決するための手段】本発明では、橋梁のコン
クリート床版を切断し、この切断した床版ブロックを橋
梁桁から剥離させるための装置であって、前記床版ブロ
ックの両側に接地可能な接地脚部を備えた反力桁と、該
反力桁のほぼ中央に設けられた少なくとも一対の反力ジ
ャッキと、該反力桁の上に各別に支点が設けられて各反
力ジャッキに一端が枢着された一対のてこ部材と、前記
床版ブロックを吊り上げるために該一対のてこ部材にそ
れぞれ連結された吊り棒と、各てこ部材から床版に向け
て延設されたキャスターとを備え、該キャスターは、前
記てこ部材と前記反力ジャッキとの枢着部から支点を隔
てた逆側に配置されると共に、前記反力ジャッキの収縮
時には前記接地脚部よりも下方に位置するように構成さ
れたことを特徴とする床版剥離装置が提供される。
SUMMARY OF THE INVENTION According to the present invention, there is provided an apparatus for cutting a concrete slab of a bridge and separating the cut slab block from a bridge girder. Reaction girder having a strong grounding leg, at least a pair of reaction force jacks provided substantially at the center of the reaction girder, and a fulcrum separately provided on the reaction girder to each reaction force jack. A pair of lever members having one end pivotally connected thereto, suspension bars respectively connected to the pair of lever members for lifting the floor slab block, and casters extending from each lever member toward the floor slab. The caster is disposed on the opposite side of the pivot between the lever member and the reaction force jack with a fulcrum separated from the pivot, and is located below the ground leg when the reaction force jack is contracted. It is characterized by being comprised in That slab peeling device is provided.

【0011】本発明の床版剥離装置では、キャスター
が、てこ部材と反力ジャッキとの枢着部から支点を隔て
た逆側に配置されると共に、反力ジャッキの収縮時には
接地脚部よりも下方に位置し、反力ジャッキの伸張時に
は接地脚部よりも上方に位置するように構成されたの
で、反力ジャッキが収縮して各てこ部材がほぼ水平状態
に保たれたときには、キャスターが床版上に接地し、接
地脚部は床版よりも上方に浮き上がるので、床版剥離装
置はキャスターによる転がり移動が可能になり、特別な
揚重機を用いること無く、容易に移動させることができ
る。一方、反力ジャッキが伸張して各てこ部材の一端が
押し下げられた場合には、キャスターはてこ部材の他端
と共に上昇して床版上から離れ、接地脚部が床版上に接
地して、床版を剥離させるための反力が接地脚部を介し
て反力桁から得られる。
In the floor slab peeling apparatus of the present invention, the caster is disposed on the opposite side of the pivot point between the lever member and the reaction force jack, with the fulcrum separated from the pivot point. When the reaction jack is extended and the levers are kept almost horizontal when the reaction jack is contracted and the levers are almost level, the caster is placed on the floor. Since the ground contact leg is lifted above the floor slab, the floor slab peeling device can be rolled by a caster, and can be easily moved without using a special lifting machine. On the other hand, when the reaction force jack is extended and one end of each lever member is pushed down, the caster rises with the other end of the lever member and separates from the floor slab, and the grounding leg is grounded on the floor slab. Then, a reaction force for peeling the floor slab is obtained from the reaction force girder through the contact leg.

【0012】本発明の床版剥離装置では、前記各てこ部
材に連設部材を載置し、この連設部材に前記吊り棒の上
端部を揺動可能に取り付けて、連設部材における、てこ
部材との当接面に、例えば、ゴム、布ヤスリ又は砂の吹
付け等の滑り止め材を取り付ければ、ボルトや溶接等の
機械的な手段によるてこ部材への固定が為されなくて
も、床版剥離作業時に、てこ部材の傾きで連設部材が位
置ずれするのを防止できる。したがって、連設部材のて
こ部材における配置の変更は容易に行なうことができ
る。
In the floor slab peeling apparatus of the present invention, a continuous member is placed on each of the lever members, and the upper end of the hanging bar is swingably attached to the continuous member. If a non-slip material such as rubber, cloth file or sand is attached to the contact surface with the member, even if it is not fixed to the lever member by mechanical means such as bolts or welding, At the time of the floor slab peeling operation, it is possible to prevent the displacement of the continuous member due to the inclination of the lever member. Therefore, the arrangement of the connecting member on the lever member can be easily changed.

【0013】また本発明の床版剥離装置において、前記
各てこ部材は、所定幅のスリットを形成するように並設
された一対の長尺部材から形成しても良い。この態様に
おいて、前記吊り棒はそれぞれ該長尺部材のスリットに
挿通して設けられ、前記連設部材は前記各てこ部材に載
置されて、ここに吊り棒の上端部が揺動可能に固定され
る。
[0013] In the floor slab peeling apparatus of the present invention, each of the lever members may be formed of a pair of long members arranged side by side so as to form a slit having a predetermined width. In this aspect, each of the hanging bars is provided so as to pass through the slit of the long member, and the continuous member is placed on each of the lever members, and the upper end portion of the hanging bar is swingably fixed thereto. Is done.

【0014】さらに本発明の床版剥離装置では、前記て
こ部材の支点と、前記てこ部材と前記反力ジャッキとの
枢着部と、前記てこ部材における吊り棒の取り付け部分
との三箇所を結ぶ線が三角形を為し、かつ、前記支点と
前記枢着部との水平離隔長さが、前記吊り棒の取り付け
部分と前記支点との水平離隔長さよりも長くなるよう
に、前記支点と前記枢着部と前記吊り棒の取り付け部と
を配置することができて、さらに好ましくは、前記支点
と前記枢着部との水平離隔長さを、前記吊り棒の取り付
け部分と前記支点との水平離隔長さの約1〜2倍程度に
する。
Further, in the floor slab peeling device of the present invention, three points are connected: a fulcrum of the lever member, a pivotal connection portion between the lever member and the reaction force jack, and an attachment portion of the lever member to which a hanging bar is attached. The fulcrum and the pivot are so arranged that the line forms a triangle, and that the horizontal divergence between the fulcrum and the pivot is longer than the horizontal divergence between the hanging rod mounting portion and the fulcrum. A mounting portion and a mounting portion of the hanging bar can be arranged, and more preferably, a horizontal separation length between the fulcrum and the pivot mounting portion is a horizontal separation between a mounting portion of the hanging bar and the fulcrum. Approximately 1-2 times the length.

【0015】これにより、反力ジャッキの伸張動作で、
てこ部材と反力ジャッキの枢着部(力点)が押し下げら
れた垂直長さ(下降長さ)が、てこ部材における吊り棒
の取り付け部分(作用点)の押し上げられた垂直長さ
(上昇長さ)よりも短くなり、しかも、作用点の上昇長
さが徐々に増加するため、床版の撤去対象ブロックにお
ける鋼棒の貫通部分への急激な力の作用を防止すること
ができて、貫通部分が、床版剥離前に破損することを防
止できる。
[0015] Thereby, the extension operation of the reaction force jack,
The vertical length (downward length) of the lever member and the reaction force jack at the pivot point (point of force) is lowered, and the vertical length (upward length) of the lifting portion of the lever member at which the hanging bar is attached (action point) is raised. ), And the rising length of the action point gradually increases, so that it is possible to prevent a sudden force from acting on the penetrating portion of the steel bar in the removal target block of the floor slab, and However, it can be prevented from being broken before the floor slab is peeled off.

【0016】また本発明の床版剥離装置において、前記
反力桁は所定幅のスリットを形成するように一対の桁材
を並設して形成しても良く、この反力桁の態様におい
て、スリットに各てこ部材をそれぞれ挿設し、該一対の
桁材に設けられた前記支点としての枢軸により各てこ部
材を枢着することができる。この態様では、一対のてこ
部材が反力桁のスリットに挿設されるので、搬送時には
嵩ばらず、また設置時には取り扱いが簡単になった。ま
た前記てこ部材は反力桁のスリットに挿設され、反力桁
に枢着されるので、装置全体の高さが抑制されて重心が
低くなり、床版ブロックが剥離する際に衝撃が生じて
も、装置は転倒することなく、安全に作業を行うことが
できる。
Further, in the floor slab peeling device of the present invention, the reaction girder may be formed by arranging a pair of girder members side by side so as to form a slit having a predetermined width. Each lever member can be inserted into the slit, and each lever member can be pivotally connected by the pivot as the fulcrum provided on the pair of beam members. In this embodiment, the pair of lever members are inserted into the slits of the reaction force girder, so that they are not bulky at the time of transportation and are easy to handle at the time of installation. In addition, since the lever member is inserted into the slit of the reaction girder and is pivotally attached to the reaction girder, the height of the entire apparatus is suppressed, the center of gravity is lowered, and an impact occurs when the floor slab block peels off. However, the device can safely work without falling down.

【0017】さらに本発明の床版剥離装置では、前記反
力ジャッキに圧力を供給するための油圧供給ユニットを
前記反力桁に取り付けて、油圧供給ユニットと反力ジャ
ッキとをホースで接続し、油圧供給ユニットはコードを
介して接続した操作装置で制御するか、あるいは無線に
より操作装置で制御することができる。このように、油
圧供給ユニット、接続ホース及び操作装置等からなる油
圧供給手段を、床版剥離装置に一体に設ければ、従来装
置の欠点、すなわち、ホースや油圧供給ユニットにゴミ
や埃が詰まって故障しやすいという欠点は克服すること
ができる。
Further, in the floor slab peeling device of the present invention, a hydraulic supply unit for supplying pressure to the reaction force jack is attached to the reaction force girder, and the hydraulic supply unit and the reaction force jack are connected by a hose. The hydraulic supply unit can be controlled by an operating device connected via a cord, or can be wirelessly controlled by the operating device. As described above, if the hydraulic supply unit including the hydraulic supply unit, the connection hose, and the operating device is provided integrally with the floor slab peeling device, the drawback of the conventional device, that is, the hose and the hydraulic supply unit are clogged with dirt and dust. The drawback that it is easy to break down can be overcome.

【0018】[0018]

【実施例】以下、実施例により更に詳細に説明するが、
本発明はこれらに限定されるものではない。図1は本発
明の一実施例に係る床版剥離装置の平面図であり、図2
は図1の床版剥離装置における長手方向の側面図であ
り、図3は図1の床版剥離装置における端部の側面図で
ある。また図4(a)(b)は床版剥離装置における摺
動ブラケットを示すそれぞれ断面図及び側面図であり、
図5は図1の床版剥離装置の縦断面図である。
The present invention will be described in more detail with reference to the following examples.
The present invention is not limited to these. FIG. 1 is a plan view of a floor slab peeling apparatus according to one embodiment of the present invention, and FIG.
Is a longitudinal side view of the floor slab peeling apparatus of FIG. 1, and FIG. 3 is a side view of an end of the floor slab peeling apparatus of FIG. FIGS. 4A and 4B are a cross-sectional view and a side view, respectively, showing a sliding bracket in the floor slab peeling device.
FIG. 5 is a longitudinal sectional view of the floor slab peeling device of FIG.

【0019】床版剥離装置10は、反力桁11と、この
反力桁11に支点ブラケット15,15を介してそれぞ
れ固定された支点軸材16,16と、この支点軸材1
6,16によりそれぞれ枢着された一対のてこ部材1
4,14と、反力桁11のほぼ中央に配置されたジャッ
キ支持部材13により支持された一対の反力ジャッキ3
4,34と、一対のてこ部材15,15にそれぞれ設け
られた吊り棒20,20とからなる。
The floor slab peeling device 10 comprises a reaction girder 11, fulcrum shafts 16 and 16 fixed to the reaction girder 11 via fulcrum brackets 15 and 15, respectively.
A pair of lever members 1 respectively pivotally connected by
4, 14 and a pair of reaction force jacks 3 supported by a jack support member 13 arranged substantially at the center of the reaction force girder 11.
4 and 34, and hanging rods 20 and 20 provided on the pair of lever members 15 and 15, respectively.

【0020】ここで、前記反力桁11は、一対の桁材1
1a,11aが所定間隔で平行に配置されることによ
り、桁材11a,11a間にスリット11bが形成さ
れ、これら桁材11a,11aの両端が連結プレート等
で連結される。また反力桁11の両端下側には接地脚部
32が突設される。さらに、反力桁11には、図1に示
したように反力ジャッキ34に圧力を供給するための油
圧供給ユニット12が両側に固定され、油圧供給ユニッ
ト12と反力ジャッキ34とをホース(図示せず)で接
続し、油圧供給ユニット12を制御するための操作装置
(図示せず)がコード(図示せず)で接続される。
Here, the reaction force girder 11 comprises a pair of girder members 1.
The slits 11b are formed between the beam members 11a, 11a by arranging the beam members 1a, 11a in parallel at predetermined intervals, and both ends of the beam members 11a, 11a are connected by a connection plate or the like. At the lower end of both ends of the reaction force girder 11, ground contact legs 32 are protruded. Further, a hydraulic supply unit 12 for supplying pressure to the reaction force jack 34 is fixed to both sides of the reaction force girder 11 as shown in FIG. 1, and the hydraulic supply unit 12 and the reaction force jack 34 are connected to a hose ( (Not shown), and an operating device (not shown) for controlling the hydraulic supply unit 12 is connected by a cord (not shown).

【0021】このように本発明の床版剥離装置10で
は、油圧供給ユニット12等が一体化されているので、
これらの装置を同時に移動することができて、図9や図
10の従来装置と比較すると、格段に作業時間の短縮化
が図られる。すなわち、図9の従来例では装置を移動す
るたびに、センターホールジャッキ52と桁材53と油
圧供給ユニットとが別々に運ばれて組立てられるため、
作業量が多く煩雑になり、また図10の従来例でも、装
置と油圧供給ユニットとは別々に運ばれるため同様な煩
雑さがあった。多くの場合、床版の剥離作業は夜間に行
われており、時間的な制約が大きく、作業時間の短縮が
強く求められているが、本発明の床版剥離装置10で
は、油圧供給ユニット12等の一体化により移動や設置
が効率良く行われるので、上記課題が解決される。
As described above, in the floor slab separating apparatus 10 of the present invention, since the hydraulic supply unit 12 and the like are integrated,
Since these devices can be moved at the same time, the working time can be remarkably reduced as compared with the conventional devices shown in FIGS. That is, in the conventional example of FIG. 9, each time the apparatus is moved, the center hole jack 52, the beam member 53, and the hydraulic supply unit are separately transported and assembled.
The amount of work is large and complicated, and also in the conventional example of FIG. 10, the apparatus and the hydraulic supply unit are carried separately, and therefore have the same complexity. In many cases, the floor slab peeling operation is performed at night, and time constraints are large, and a reduction in working time is strongly required. However, in the floor slab peeling device 10 of the present invention, the hydraulic supply unit 12 Since the movement and installation are efficiently performed by the integration of the above, the above-mentioned problem is solved.

【0022】反力桁11のほぼ中央に配置したジャッキ
支持部材13は、図5に示したように、桁材11aのう
えに支持柱13aが立設され、支持柱13aの間に支持
梁13bが架設されてなる。そして、支持梁13bには
ヒンジ37により反力ジャッキ34の上端が固定され、
この反力ジャッキ34の下端にはヒンジ36により、て
こ部材14の先端に連設された連結材35に枢着され
る。さらに、桁材11a,11aの上には、二箇所の対
向位置に支点ブラケット15,15が固定される。
As shown in FIG. 5, a jack support member 13 arranged substantially at the center of the reaction girder 11 has a support column 13a erected on a girder member 11a, and a support beam 13b is provided between the support columns 13a. Is constructed. The upper end of the reaction force jack 34 is fixed to the support beam 13b by a hinge 37,
The lower end of the reaction force jack 34 is hinged to a connecting member 35 connected to the tip of the lever member 14 by a hinge 36. Further, fulcrum brackets 15, 15 are fixed on the beam members 11a, 11a at two opposing positions.

【0023】前記各てこ部材14は、スリット14bを
形成するように一対の軸材14a,14aが所定間隔で
並設されてなり、この軸材14a,14aの上面には支
点軸材16を挿着するブラケット14c,14cが対向
配置で設けられ、先端には連結材35が連設されて、こ
の連結材35には反力ジャッキ34の下端がヒンジ36
により枢着される。ここで、連結材35の形状や配置
は、ヒンジ36が支点軸材16や後述の吊り棒受材18
よりも下方に位置し、且つ、ヒンジ36と支点軸材16
と吊り棒受材18との三箇所が三角形の頂点を為すよう
に定める。
In each of the lever members 14, a pair of shaft members 14a, 14a are juxtaposed at a predetermined interval so as to form a slit 14b, and a fulcrum shaft member 16 is inserted into the upper surface of the shaft members 14a, 14a. Brackets 14c, 14c to be attached are provided to face each other, and a connecting member 35 is continuously provided at the tip, and a lower end of a reaction force jack 34 is attached to the connecting member 35 by a hinge 36.
Pivoted by Here, the shape and arrangement of the connecting member 35 are such that the hinge 36 is connected to the fulcrum shaft member 16 or the hanging rod receiving member 18 described later.
And the hinge 36 and the fulcrum shaft 16
And the hanging rod receiving member 18 are determined so as to form a vertex of a triangle.

【0024】また、各てこ部材14の後端にはほぼ直交
するように、キャスター支持梁30が固定される。この
固定のために、てこ部材14の後端とキャスター支持梁
30とには連通する貫通孔がそれぞれ二箇所に形成さ
れ、各貫通孔にボルト26が通されて下端はナット27
bでてこ部材14に固定され、上端にはスプリング28
が嵌挿されて、その上から二本のボルト26を連結する
連結プレート25が設けられ、連結プレート25のうえ
からナット27aで固定される。
A caster support beam 30 is fixed to the rear end of each lever member 14 so as to be substantially orthogonal. For this fixation, through holes are respectively formed at two places communicating with the rear end of the lever member 14 and the caster support beam 30, and a bolt 26 is passed through each through hole, and a lower end is provided with a nut 27.
b is fixed to the lever member 14, and a spring 28
Is provided, and a connection plate 25 for connecting the two bolts 26 from above is provided. The connection plate 25 is fixed on the connection plate 25 with a nut 27a.

【0025】前記キャスター支持梁30の両端には、床
版に向けて延びる支柱38が固定され、この支柱38の
下端にはキャスター39が固定される。支柱38は、図
3において符号29で示す固定調整ボルトによってキャ
スター支持梁30に固定されるので、この固定調整ボル
トをレンチ等で回転することにより、キャスター39の
高さを調整することができる。キャスター39は、図5
に示すように、てこ部材14がほぼ水平状態にあると
き、接地脚部32よりも下方に位置して床版42上に接
地するように、前述の高さ調整手段29で調整される。
At both ends of the caster support beam 30, a column 38 extending toward the floor slab is fixed, and at the lower end of the column 38, a caster 39 is fixed. Since the support column 38 is fixed to the caster support beam 30 by a fixing adjustment bolt indicated by reference numeral 29 in FIG. 3, the height of the caster 39 can be adjusted by rotating the fixing adjustment bolt with a wrench or the like. The casters 39 are shown in FIG.
As shown in FIG. 7, when the lever member 14 is in a substantially horizontal state, the height is adjusted by the above-described height adjusting means 29 so that the lever member 14 is located below the grounding leg 32 and grounds on the floor slab 42.

【0026】前記吊り棒20は、各てこ部材14のスリ
ット14bに挿通されて、摺動ブラケット17と吊り棒
受材18により、摺動可能かつ揺動可能に各てこ部材1
4に取り付けられる。すなわち、前記吊り棒受材18に
は、吊り棒20を挿通させるための貫通孔18bが上下
方向に設けられ、左右両側には揺動軸18aが突設され
る。一方、前記摺動ブラケット17には、てこ部材14
のスリット14bに連通する穴17bが底面に形成さ
れ、吊り棒受材18の揺動軸18aを挿設する貫通孔1
7aが左右両側に設けられ、底面には滑り止め材17c
としてのゴムシートが貼り付けられる。上記摺動ブラケ
ット17は、左右の貫通孔17aに吊り棒受材18の揺
動軸18aが挿入された後に溶接で組み立てられる。摺
動ブラケット17は、ボルトや溶接等の機械的な手段に
よるてこ部材14への固定が為されず、ただ単に、てこ
部材14の上面に載置されて、滑り止め材17cにより
位置ずれが防止され、したがって、摺動ブラケット17
は図5の位置から図6の位置まで適宜移動することが可
能である。
The hanging bar 20 is inserted into the slit 14 b of each lever member 14, and is slidably and swingably moved by the sliding bracket 17 and the hanging bar receiving member 18.
4 attached. That is, the suspension rod receiving member 18 is provided with a through hole 18b for inserting the suspension rod 20 in a vertical direction, and a swing shaft 18a protrudes on both left and right sides. On the other hand, the sliding bracket 17 is provided with a lever member 14.
A hole 17b communicating with the slit 14b is formed in the bottom surface, and the through hole 1 for inserting the swing shaft 18a of the hanging rod receiving member 18 is provided.
7a are provided on both left and right sides, and a non-slip material 17c is provided on the bottom surface.
A rubber sheet is pasted. The sliding bracket 17 is assembled by welding after the swing shaft 18a of the hanging rod receiving member 18 is inserted into the left and right through holes 17a. The sliding bracket 17 is not fixed to the lever member 14 by a mechanical means such as a bolt or welding, but is simply placed on the upper surface of the lever member 14 and prevented from being displaced by the non-slip member 17c. And therefore the sliding bracket 17
Can be appropriately moved from the position in FIG. 5 to the position in FIG.

【0027】吊り棒20は、図4(a)に示すように、
吊り棒受材18の貫通孔18bに挿通されて、上端が支
圧板19を介してナット21で固定される。したがっ
て、床版剥離作業時には吊り棒20を介して回転力が作
用すると、吊り棒受材18の揺動軸18aが、摺動ブラ
ケット17の貫通孔17aを中心に回動して、吊り棒2
0に曲げ応力が生じるのを防止する。
The hanging bar 20 is, as shown in FIG.
It is inserted into the through hole 18 b of the hanging rod receiving member 18, and the upper end is fixed by the nut 21 via the support plate 19. Therefore, when a rotational force is applied via the suspension bar 20 during the floor slab peeling operation, the swing shaft 18a of the suspension bar receiving member 18 rotates about the through hole 17a of the slide bracket 17, and the suspension rod 2
0 prevents bending stress from occurring.

【0028】次に、吊り棒20のてこ部材14における
配置、すなわち、吊り棒20が固定される吊り棒受材1
8のてこ部材14における配置について説明する。本実
施例の床版剥離装置10において、反力ジャッキ34の
力が作用するヒンジ36が力点であり、支点軸材16が
支点であり、さらに、吊り棒受材18が作用点であり、
これらの作用点、支点および力点の三点が三角形の頂点
を為し、図8に示したように、支点と力点の水平離隔長
さL2は、作用点と支点の水平離隔長さL1の約1〜2
倍程度にすることが好ましい。
Next, the arrangement of the suspension rod 20 on the lever member 14, that is, the suspension rod receiving member 1 to which the suspension rod 20 is fixed
The arrangement of the eight lever members 14 will be described. In the floor slab peeling device 10 of the present embodiment, the hinge 36 on which the force of the reaction force jack 34 acts is the point of force, the fulcrum shaft 16 is the fulcrum, and the hanging rod receiving member 18 is the point of action,
The three points of the action point, the fulcrum and the force point form the vertices of a triangle. As shown in FIG. 8, the horizontal separation length L2 between the fulcrum and the force point is about the horizontal separation length L1 between the action point and the fulcrum. 1-2
Preferably, it is about twice.

【0029】このような三点の配置により、反力ジャッ
キ34を伸張して力点を下方に押し下げた場合、作用点
の垂直方向の上昇長さM1は、力点の垂直方向の下降長
さM2よりも短くなり、しかも、図7に示したように、
作用点の区間移動量は上昇するにしたがって徐々に増加
するので、床版ブロック40における吊り棒20の貫通
部分への力も徐々に増加して、急激な力の作用を防止す
ると共に、床版剥離前に貫通部分のみが破損することは
防止される。
With such a three-point arrangement, when the reaction force jack 34 is extended and the power point is pushed downward, the vertical rising length M1 of the application point is larger than the vertical falling length M2 of the power point. Is also shortened, and as shown in FIG.
Since the section movement amount of the action point gradually increases as it rises, the force on the penetrating portion of the hanging bar 20 in the floor slab block 40 also gradually increases, preventing the action of the sudden force and peeling the floor slab. It is prevented that only the penetrating part is broken before.

【0030】次に、図6は床版剥離装置10により床版
を剥離する様子を示した縦断面図である。この図6と図
5とを参照して、床版剥離装置10の作用について説明
する。なお、図5及び図6において、摺動ブラケット1
7及び吊り棒受材18の配置が異なるが、これは、上述
の如く、摺動ブラケット17の可動範囲を示しただけで
あり、床版剥離作業中に摺動ブラケット17の位置を移
動するものではない。
Next, FIG. 6 is a longitudinal sectional view showing a state where the floor slab is peeled off by the floor slab peeling device 10. The operation of the floor slab peeling device 10 will be described with reference to FIGS. 6 and 5. 5 and 6, the sliding bracket 1
7 and the arrangement of the hanging rod receiving members 18 are different, but this only shows the movable range of the sliding bracket 17, as described above, and moves the position of the sliding bracket 17 during the floor slab peeling operation. is not.

【0031】床版剥離装置10は、図5に示す如く、初
期状態において反力ジャッキ34が収縮し、てこ部材1
4はほぼ水平に保持され、キャスター39が床版42の
うえに接地する一方で、反力桁11の接地脚部32は床
版42から浮き上がっている。したがって、床版剥離装
置10はキャスター39による転がり移動が可能にな
り、特別な揚重機を必要としないで、車両等により床版
剥離装置10を牽引すれば容易に移動させることができ
る。
As shown in FIG. 5, in the floor slab peeling device 10, the reaction force jack 34 contracts in the initial state,
4 is held substantially horizontally, and the casters 39 touch the ground on the floor slab 42, while the grounding leg 32 of the reaction force girder 11 rises from the floor slab 42. Therefore, the floor slab peeling device 10 can be rolled and moved by the casters 39, and can be easily moved by pulling the floor slab peeling device 10 by a vehicle or the like without requiring a special lifting machine.

【0032】一方、床版ブロック40を剥離する際には
反力ジャッキ34を伸張し、ヒンジ36を介して各てこ
部材14の先端を下方に押し下げる。これにより、支点
軸材16を中心に各てこ部材14の後端は押し上げられ
て、床版ブロック40には吊り棒20を介して上方に引
き上げる力として伝達し、この床版ブロック40を上方
へ引き上げる力が所定以上になると、橋梁桁と床版ブロ
ック40との定着は破壊され、床版ブロック40は撤去
可能な状態になる。また、各てこ部材14の後端が押し
上げられるとき、キャスター39はてこ部材14と共に
上昇して床版42の上から離れ、接地脚部32が床版4
2の上に接地して、床版ブロック40を剥離させるため
の反力が接地脚部32を介して反力桁11から得られ
る。
On the other hand, when the floor slab block 40 is peeled, the reaction force jack 34 is extended, and the tip of each lever member 14 is pushed down via the hinge 36. As a result, the rear end of each lever member 14 is pushed up about the fulcrum shaft member 16, and transmitted to the floor slab block 40 as a force for lifting the floor slab through the hanging bar 20, and the floor slab block 40 is moved upward. If the lifting force exceeds a predetermined value, the fixing between the bridge girder and the floor slab block 40 is broken, and the floor slab block 40 is ready to be removed. Also, when the rear end of each lever member 14 is pushed up, the casters 39 move up together with the lever member 14 and separate from the floor slab 42, and the grounding leg 32
The reaction force for contacting the floor 2 and peeling the floor slab block 40 is obtained from the reaction force beam 11 via the contact leg 32.

【0033】定着が破壊された床版ブロック40は、適
宜、クレーンで吊り上げて搬送車両に積載して撤去され
る。
The floor block 40 whose fixing has been destroyed is appropriately lifted by a crane, loaded on a transport vehicle, and removed.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の一実施例に係る床版剥離装置の平面図
である。
FIG. 1 is a plan view of a floor slab peeling apparatus according to one embodiment of the present invention.

【図2】図1の床版剥離装置における長手方向の側面図
である。
FIG. 2 is a longitudinal side view of the floor slab peeling device of FIG.

【図3】図1の床版剥離装置における端部の側面図であ
る。
FIG. 3 is a side view of an end of the floor slab peeling device of FIG. 1;

【図4】(a)(b)は床版剥離装置における摺動ブラ
ケットを示す、それぞれ断面図及び側面図である。
FIGS. 4A and 4B are a cross-sectional view and a side view, respectively, showing a sliding bracket in the floor slab peeling device.

【図5】図1の床版剥離装置の縦断面図である。FIG. 5 is a longitudinal sectional view of the floor slab peeling device of FIG. 1;

【図6】床版剥離装置により床版を剥離する様子を示し
た縦断面図である。
FIG. 6 is a longitudinal sectional view showing a state where the floor slab is peeled off by the floor slab peeling device.

【図7】床版剥離装置における力点と作用点の挙動につ
いての説明図である。
FIG. 7 is an explanatory diagram of behaviors of a power point and an action point in the floor slab peeling device.

【図8】床版剥離装置における力点、支点及び作用点の
配置関係の説明図である。
FIG. 8 is an explanatory diagram of an arrangement relationship of a power point, a fulcrum, and an action point in the floor slab peeling device.

【図9】従来の床版剥離装置を説明するために示した簡
略図である。
FIG. 9 is a simplified diagram shown to explain a conventional floor slab peeling apparatus.

【図10】従来の床版剥離装置を説明するために示した
簡略図である。
FIG. 10 is a simplified diagram shown for explaining a conventional floor slab peeling apparatus.

【符号の説明】[Explanation of symbols]

10 床版剥離装置 11 反力桁 14 てこ部材 15 支点ブラケット(支点) 16 支点軸材(支点) 17 摺動ブラケット(枢着部) 18 吊り棒受材(枢着部) 20 吊り棒 32 接地脚部 34 反力ジャッキ 39 キャスター 40 床版ブロック REFERENCE SIGNS LIST 10 floor slab peeling device 11 reaction girder 14 lever member 15 fulcrum bracket (fulcrum) 16 fulcrum shaft (fulcrum) 17 sliding bracket (pivot part) 18 hanging bar receiving material (pivot part) 20 suspension rod 32 grounding leg Part 34 reaction force jack 39 caster 40 floor slab block

フロントページの続き (72)発明者 今野 直樹 東京都中野区中央1−42−5 株式会社 プロテック内 (56)参考文献 特開 平9−67809(JP,A) 特開 平9−41325(JP,A) 特開 平6−136722(JP,A) 特開 平4−238905(JP,A) (58)調査した分野(Int.Cl.7,DB名) E01D 21/00 E01D 19/12 Continuation of the front page (72) Inventor Naoki Konno 1-42-5 Chuo, Nakano-ku, Tokyo Inside Protec Co., Ltd. (56) References JP-A-9-67809 (JP, A) JP-A-9-41325 (JP) JP-A-6-136722 (JP, A) JP-A-4-238905 (JP, A) (58) Fields investigated (Int. Cl. 7 , DB name) E01D 21/00 E01D 19/12

Claims (3)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 橋梁のコンクリート床版を切断し、この
切断した床版ブロックを橋梁桁から剥離させるための装
置であって、前記床版ブロックの両側に接地可能な接地
脚部を備えた反力桁と、該反力桁のほぼ中央に設けられ
た少なくとも一対の反力ジャッキと、該反力桁の上に各
別に支点が設けられて各反力ジャッキに一端が枢着され
た一対のてこ部材と、前記床版ブロックを吊り上げるた
めに該一対のてこ部材にそれぞれ設けられた吊り棒と、
各てこ部材から床版に向けて延設されたキャスターとを
備え、該キャスターは、前記てこ部材と前記反力ジャッ
キとの枢着部から支点を隔てた逆側に配置されると共
に、前記反力ジャッキの収縮時に前記接地脚部よりも下
方に位置するように構成されたことを特徴とする床版剥
離装置。
An apparatus for cutting a concrete floor slab of a bridge and peeling the cut floor slab from a bridge girder, wherein the floor slab is provided with grounding legs provided on both sides of the floor slab. A power girder, at least a pair of reaction force jacks provided substantially at the center of the reaction girder, and a pair of fulcrums provided separately on the reaction girder and having one end pivotally attached to each reaction girder. Lever members, and hanging bars respectively provided on the pair of lever members to lift the floor slab block,
A caster extending from each lever member toward the floor slab, wherein the caster is disposed on a side opposite to a fulcrum from a pivot portion between the lever member and the reaction force jack, and The floor slab peeling device is configured to be located below the ground contact leg when the force jack is contracted.
【請求項2】 下面に滑り止め部材を備えた連設部材が
前記各てこ部材のうえに載置され、該連設部材により前
記吊り棒の上端部が前記各てこ部材に揺動可能に連設さ
れたことを特徴とする請求項1記載の床版剥離装置。
2. A connecting member having a non-slip member on its lower surface is mounted on each of the lever members, and the connecting member swingably connects the upper end of the hanging bar to each of the lever members. The floor slab peeling device according to claim 1, wherein the slab is provided.
【請求項3】 前記てこ部材の支点と、前記てこ部材と
前記反力ジャッキとの枢着部と、前記てこ部材における
吊り棒の取り付け部分との三箇所を結ぶ線が三角形を為
し、かつ、前記支点と前記枢着部との水平離隔長さが、
前記吊り棒の取り付け部分と前記支点との水平離隔長さ
よりも長くなるように、前記支点と前記枢着部と前記吊
り棒の取り付け部とを配置したことを特徴とする請求項
1記載の床版剥離装置。
3. A line connecting three points of a fulcrum of the lever member, a pivotal connection portion between the lever member and the reaction force jack, and a mounting portion of a hanging bar in the lever member forms a triangle, and , The horizontal separation length between the fulcrum and the pivot portion,
2. The floor according to claim 1, wherein the fulcrum, the pivot portion, and the attachment portion of the suspension bar are arranged so as to be longer than a horizontal separation length between the attachment portion of the suspension bar and the fulcrum. 3. Plate peeling device.
JP25488199A 1999-09-08 1999-09-08 Floor slab peeler with casters Expired - Fee Related JP3294829B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP25488199A JP3294829B2 (en) 1999-09-08 1999-09-08 Floor slab peeler with casters

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP25488199A JP3294829B2 (en) 1999-09-08 1999-09-08 Floor slab peeler with casters

Publications (2)

Publication Number Publication Date
JP2001073321A JP2001073321A (en) 2001-03-21
JP3294829B2 true JP3294829B2 (en) 2002-06-24

Family

ID=17271139

Family Applications (1)

Application Number Title Priority Date Filing Date
JP25488199A Expired - Fee Related JP3294829B2 (en) 1999-09-08 1999-09-08 Floor slab peeler with casters

Country Status (1)

Country Link
JP (1) JP3294829B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4690764B2 (en) * 2005-04-21 2011-06-01 ナガタ工業株式会社 Removal method of expansion joint

Also Published As

Publication number Publication date
JP2001073321A (en) 2001-03-21

Similar Documents

Publication Publication Date Title
US3357517A (en) Mobile scaffold
US5015147A (en) Excavating apparatus
JP3294829B2 (en) Floor slab peeler with casters
KR100833751B1 (en) Moving and supporting apparatus of vehicle for working of bridge slab
JP6525717B2 (en) Boom attaching / detaching device and attaching / detaching method
JPH06136722A (en) Bridge floor plate disassembly method and device therefor
JP2524537Y2 (en) Multifunctional tunnel construction equipment
JP3288024B2 (en) Jack lever device for removing floor slabs
JP3593612B2 (en) Method for removing residual stress from tower steel structure composed of angle iron
WO2020066120A1 (en) Work machine
JP4587765B2 (en) Reaction force receiving structure of climbing crane
JP4308896B2 (en) Removal method of bridge deck
US4340098A (en) Log splitter and attachment for tractor
JP3123984U (en) Heavy equipment pulling device
JP2007063819A (en) Lifting and lowering device of working machine
JP6554434B2 (en) Placement device for construction machine work equipment
JP6620992B2 (en) Building demolition machine and building demolition method
JP6173771B2 (en) Building demolition method and building demolition support device used therefor
JP2995680B1 (en) Floor slab removal equipment
JP3413760B2 (en) Passenger conveyor installation equipment
JP6735256B2 (en) Mounting table device for construction machine work machine
JP3450117B2 (en) Drilling equipment for excavators
US2850191A (en) Portable elevator tower
JP2002309517A (en) Work scaffold for overhanging construction of steel girder and overhanging construction method for steel girder
JP3628118B2 (en) Building raising method

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080405

Year of fee payment: 6

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090405

Year of fee payment: 7

LAPS Cancellation because of no payment of annual fees