JP3270705B2 - Delivery planning system - Google Patents

Delivery planning system

Info

Publication number
JP3270705B2
JP3270705B2 JP6031597A JP6031597A JP3270705B2 JP 3270705 B2 JP3270705 B2 JP 3270705B2 JP 6031597 A JP6031597 A JP 6031597A JP 6031597 A JP6031597 A JP 6031597A JP 3270705 B2 JP3270705 B2 JP 3270705B2
Authority
JP
Japan
Prior art keywords
delivery
collection
schedule
period
planning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP6031597A
Other languages
Japanese (ja)
Other versions
JPH10254964A (en
Inventor
昇 本間
昇八 杉本
昭彦 小島
栄 小原
秀介 上田
勇 竹田
裕之 水野
高一 渋沢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Mitsubishi Electric Building Techno-Service Co Ltd
Original Assignee
Mitsubishi Electric Corp
Mitsubishi Electric Building Techno-Service Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp, Mitsubishi Electric Building Techno-Service Co Ltd filed Critical Mitsubishi Electric Corp
Priority to JP6031597A priority Critical patent/JP3270705B2/en
Publication of JPH10254964A publication Critical patent/JPH10254964A/en
Application granted granted Critical
Publication of JP3270705B2 publication Critical patent/JP3270705B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Warehouses Or Storage Devices (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】この発明は納入先からの物品
納入要求に基づいて、1日当たりの配送能力が充分生か
されるような配送スケジュールを計画する配送計画シス
テムに関する。また、納入先からの物品回収要求に基づ
いて1日当たりの配送能力に余裕があれば、回収スケジ
ュールを計画する。或いは、回収先と同じ納入先への配
送スケジュールが計画されていれば、配送と同時に回収
を行うように回収スケジュールを計画する配送計画シス
テムに関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a delivery planning system for planning a delivery schedule based on a product delivery request from a delivery destination so that daily delivery capacity can be fully utilized. Further, if there is a margin in the daily delivery capacity based on the article collection request from the delivery destination, a collection schedule is planned. Alternatively, the present invention relates to a delivery planning system that plans a collection schedule so that collection is performed simultaneously with delivery if a delivery schedule to the same delivery destination as the collection destination is planned.

【0002】[0002]

【従来の技術】[Prior art]

従来例1.本発明の配送計画システムに類似する従来例
に「特開平6−290185」の「ダイナミック型自動
配車装置」や、「特開平7−53018」の「物流シス
テム」又「特開平1−231200」の「配車計画方
法」等がある。上記従来の発明は、荷主からの荷物の配
送要求を受け、荷物の届先に対し車両を配車する発明で
ある。特に、「特開平6−290185」の発明は、刻
時変化する道路状況等の動的な変化情報を入力し、上記
変化情報をふまえて配送計画を行うことを特徴としてい
る。また、「特開平7−53018」の発明は、配送セ
ンターに入荷された商品を入荷仮置き場にあふれさせな
いために、トラックからの荷降ろしを行った後に迅速に
仕分けゾーンに振り分けるように、出荷先別の仕分け計
画処理を行う。さらに、出荷検品ゾーンである出荷平置
き場を出荷すべき商品の入った梱包容器、或いは、かご
車であふれさせないために、商品の入った梱包容器、或
いは、かご車が仕分けゾーンから到着すると同時に出荷
方面別にトラックへ載せる車載処理を迅速に行うよう
に、配車計画を行うことを特徴としている。また、「特
開平1−231200」の発明は、車両に積載する貨物
を決定する時の貨物の組合せにおける制約条件や使用で
きる車種の制約条件を考慮して配車計画を行うことを特
徴としている。
Conventional example 1. Conventional examples similar to the delivery planning system of the present invention include a "dynamic automatic dispatching device" of "Japanese Patent Laid-Open No. 6-290185", a "distribution system" of "Japanese Patent Application Laid-Open No. 7-53018" and There is a "vehicle allocation planning method". The above-mentioned conventional invention is an invention in which a delivery request of a package is received from a shipper and a vehicle is dispatched to a destination of the package. In particular, the invention of Japanese Patent Laid-Open No. 6-290185 is characterized in that dynamic change information such as road conditions that change with time is input, and a delivery plan is made based on the change information. In addition, in order to prevent the goods received at the distribution center from overflowing to the temporary storage area, the invention disclosed in Japanese Patent Application Laid-Open No. Hei 7-53018 is designed so that the goods are unloaded from the truck and then quickly distributed to the sorting zone. Perform another sorting planning process. In addition, in order to prevent the shipping flat storage area, which is the shipping inspection zone, from being filled with the packing containers or the carts to be shipped, the shipping containers or the carts containing the products should be shipped at the same time as they arrive from the sorting zone. It is characterized in that a vehicle allocation plan is made so that on-board processing for loading on a truck for each direction is performed quickly. In addition, the invention of Japanese Patent Application Laid-Open No. 1-2231200 is characterized in that a vehicle allocation plan is performed in consideration of the restrictions on the combination of the cargos and the restrictions on the types of vehicles that can be used when determining the cargo to be loaded on the vehicle.

【0003】従来例2.また、従来の配送計画システム
は、納入要求がなされたら既日に配送を実行するように
計画している。このため、予定の配車では配送が不可能
な場合は、別の車をチャーターして既日配送を実現して
いる。
Conventional example 2. In addition, the conventional delivery planning system plans to execute delivery on the same day when a delivery request is made. For this reason, if delivery is not possible with the scheduled dispatch, another car is chartered to realize delivery on the same day.

【0004】[0004]

【発明が解決しようとする課題】上記した従来の発明
は、渋滞を避けいかに速く配送を行うかを計画したり、
トラックに効率よく荷物を積載することを計画したり、
入荷された商品を検品してから出荷先別に仕分けを行
い、トラックに積載するまでの処理を迅速に行うように
計画していた。このため、上記した従来の発明には、納
入期限という概念がなく、納入期限を考慮した上で1日
の配送先件数を平準化することができないという問題が
ある。また、平準化できないということは、予定してい
た配送手段、例えば、車による配送能力を超えた配送ス
ケジュールが計画されることになる。このときには、配
送手段を別に用意して対応することになり、配送コスト
が高くなるという問題がある。また、従来例には1日当
たりの配送能力という概念がなく、複数の納入先からの
納入希望日が重なると、予定していた配車では配送しき
れなくなるので、予定外の配送手段を別に用意すること
になり、配送コストが高くなるという問題がある。ま
た、定期的な配送サイクルに従い、納入を行っている納
入先であっても従来例では配送サイクルという概念がな
いため、配送サイクル以外の日にも、配送が行われるよ
うになり、配送コストが高くなるという問題がある。
SUMMARY OF THE INVENTION The above-mentioned conventional invention is intended to plan how fast delivery can be performed while avoiding congestion,
Planning to load cargo efficiently on trucks,
The company planned to inspect the received goods, sort them by shipping destination, and quickly process the goods before loading them on trucks. For this reason, the above-mentioned conventional invention does not have the concept of the delivery deadline, and has a problem that the number of destinations per day cannot be equalized in consideration of the delivery deadline. In addition, the fact that the leveling cannot be performed means that a delivery schedule that exceeds the scheduled delivery means, for example, the delivery capability by car, is planned. In this case, there is a problem that a delivery means is separately prepared and the delivery cost is increased. Further, in the conventional example, there is no concept of the daily delivery capacity, and if the desired delivery dates from a plurality of delivery destinations overlap, the scheduled delivery will not be able to complete the delivery, so an unscheduled delivery means is separately prepared. As a result, there is a problem that the delivery cost increases. Also, according to the regular delivery cycle, even in the case of a delivery destination that is delivering, there is no concept of a delivery cycle in the conventional example, so delivery is performed on days other than the delivery cycle, and the delivery cost is reduced. There is a problem of becoming high.

【0005】この発明は、上記の問題点を解決するため
になされたもので、以下のことを目的としている。納入
期限を考慮し、1日の配送先件数を平準化する。また、
1日当たりの配送能力を考慮し、配送能力内で配送スケ
ジュールを計画する。また、定期的な配送サイクルと合
わせて配送スケジュールを計画する。
[0005] The present invention has been made to solve the above problems, and has the following objects. Considering the delivery deadline, equalize the number of destinations per day. Also,
Consider the daily delivery capacity and plan the delivery schedule within the delivery capacity. Also, a delivery schedule is planned along with a regular delivery cycle.

【0006】[0006]

【課題を解決するための手段】この発明に係る物品の納
入先からの物品納入要求情報を入力する納入要求情報入
力部を備え、上記物品納入要求情報に従い配送スケジュ
ールを計画する配送計画システムは、以下の要素を有す
ることを特徴とする。 (a)配送サイクル情報記憶部が、納入先毎に定められ
た定期的な配送スケジュールを配送サイクル情報として
記憶し、(b)配送計画部が、上記納入要求情報入力部
が入力した物品納入要求情報と上記配送サイクル情報記
憶部に記憶されている配送サイクル情報に基づいて物品
の配送スケジュールを計画し、(c)配送スケジュール
記憶部が、上記配送計画部が計画した配送スケジュール
を記憶し、(d)配送スケジュール出力部が、上記配送
スケジュール記憶部が記憶している配送スケジュールを
取り出して出力する。
According to the present invention, there is provided a delivery planning system including a delivery request information input section for inputting delivery request information from a delivery destination of an article, and planning a delivery schedule according to the delivery request information. It has the following elements. (A) A delivery cycle information storage unit stores a regular delivery schedule defined for each delivery destination as delivery cycle information, and (b) a delivery plan unit sends the goods delivery request input by the delivery request information input unit. Planning a delivery schedule of the article based on the information and the delivery cycle information stored in the delivery cycle information storage unit; (c) the delivery schedule storage unit stores the delivery schedule planned by the delivery planning unit; d) The delivery schedule output unit extracts and outputs the delivery schedule stored in the delivery schedule storage unit.

【0007】また、上記配送計画システムが備える配送
サイクル情報設定部が、上記配送サイクル情報を設定
し、設定した配送サイクル情報を上記配送サイクル情報
記憶部に記憶させることを特徴とする。
A delivery cycle information setting section provided in the delivery planning system sets the delivery cycle information, and stores the set delivery cycle information in the delivery cycle information storage section.

【0008】また、上記物品納入要求情報が、少なくと
も納入先情報と納入締め切り日と納入物品情報とにより
構成されていることを特徴とする。
[0008] The article delivery request information is characterized by comprising at least delivery destination information, delivery deadline date, and delivered article information.

【0009】また、この発明に係る少なくとも納入先情
報と納入締め切り日と納入物品情報とにより構成されて
いる物品納入要求情報を入力する納入要求情報入力部を
備え、上記物品納入要求情報に従い配送スケジュールを
計画する配送計画システムは、以下の要素を有すること
を特徴とする。 (a)配送可能期間設定部が、予め所定の日数を配送可
能期間として定め、(b)配送可能期間記憶部が、上記
配送可能期間設定部が定めた配送可能期間を記憶し、
(c)配送計画部が、上記配送可能期間記憶部に記憶さ
れている配送可能期間と上記物品納入要求情報の納入締
め切り日とにより同一納入先からの所定の物品納入要求
と別の物品納入要求とをまとめて配送件数を1件とする
ように配送スケジュールを計画し、(d)配送スケジュ
ール記憶部が、上記配送計画部が計画した配送スケジュ
ールを記憶する、(e)配送スケジュール出力部が、上
記配送スケジュール記憶部が記憶している配送スケジュ
ールを取り出して出力する。
In addition, the present invention further includes a delivery request information input section for inputting delivery request information comprising at least delivery destination information, delivery deadline, and delivery item information, and a delivery schedule according to the delivery request information. Is characterized by having the following elements. (A) a deliverable period setting unit previously determines a predetermined number of days as a deliverable period, and (b) a deliverable period storage unit stores the deliverable period determined by the deliverable period setting unit,
(C) The delivery planning unit uses the deliverable period stored in the deliverable period storage unit and the delivery deadline of the article delivery request information to request a predetermined article delivery from the same delivery destination and another article delivery request. And (d) the delivery schedule storage unit stores the delivery schedule planned by the delivery planning unit, and (e) the delivery schedule output unit, The delivery schedule stored in the delivery schedule storage unit is extracted and output.

【0010】また、上記配送計画部が備える配送可能期
間算出部が、上記配送可能期間記憶部より配送可能期間
を取り出し、上記配送可能期間と上記物品納入要求情報
の納入締め切り日とにより上記納入締め切り日が上記配
送可能期間に含まれるように配送可能実施期間を求め、
上記配送計画部が備える同日配送計画部が、上記配送可
能期間算出部が求めた同一納入先からの所定の物品納入
要求に対する配送可能実施期間と、別の物品納入要求に
対する配送可能実施期間を比較して重複する配送可能日
を求め、所定の物品と別の物品とをまとめて配送件数を
1件とするとともに、上記重複する配送可能日の所定の
1日を同時配送する配送日として配送スケジュールを計
画することを特徴とする。
[0010] Further, a deliverable period calculation unit provided in the delivery planning unit retrieves a deliverable period from the deliverable period storage unit, and sets the delivery deadline based on the deliverable period and the delivery deadline of the article delivery request information. The delivery period is calculated so that the day is included in the delivery period,
The same-day delivery planning unit included in the delivery planning unit compares the delivery possible execution period for a given item delivery request from the same delivery destination obtained by the delivery possible period calculation unit with the delivery possible implementation period for another product delivery request In addition, a predetermined delivery date is obtained by combining the predetermined article and another article to make the number of deliveries one, and the delivery day is used as a delivery date for simultaneous delivery of the above-mentioned predetermined delivery possible day. It is characterized by planning.

【0011】また、上記配送計画システムが、1日当た
りに所定の配送能力を有し、上記納入要求入力部が、複
数の納入先からの物品納入要求情報を入力し、上記配送
計画部が備える配送可能期間算出部が、上記配送可能期
間記憶部より配送可能期間を取り出し、上記配送可能期
間と上記複数の納入先からの物品納入要求情報の納入締
め切り日とにより上記納入締め切り日が上記配送可能期
間に含まれるように納入先毎に配送可能実施期間を求
め、上記配送計画部が備えるまとめ配送計画部が、上記
配送可能期間算出部が求めた納入先毎の配送可能実施期
間を比較して重複する配送可能日を求め、上記重複する
配送可能日より上記配送能力を越えない範囲で複数の納
入先への配送日を計画することを特徴とする。
The delivery planning system has a predetermined delivery capacity per day, the delivery request input unit inputs goods delivery request information from a plurality of delivery destinations, and the delivery planning unit includes The possible period calculation unit retrieves the deliverable period from the deliverable period storage unit, and calculates the delivery deadline based on the deliverable period and the delivery deadline of the goods delivery request information from the plurality of delivery destinations. The delivery possible implementation period for each delivery destination is obtained so that it is included in the delivery schedule, and the collective delivery planning unit provided in the delivery planning unit compares the delivery possible implementation period for each delivery destination obtained by the delivery possible period calculation unit and overlaps A delivery date to be delivered to a plurality of destinations within a range that does not exceed the delivery capability from the overlapping delivery date.

【0012】また、上記配送計画システムが備える未計
画情報記憶部が、上記配送スケジュールに組み込むこと
ができない物品納入要求情報を記憶し、上記配送計画シ
ステムが備える再調整可能期間記憶部が、上記配送計画
部が計画した上記配送スケジュールを再調整することが
できる再調整可能期間を記憶し、上記配送計画システム
が備える再調整可能期間設定部が、上記再調整可能期間
を設定し設定した再調整可能期間を上記再調整可能期間
記憶部に記憶し、上記配送計画部が備える未計画情報出
力部が、上記配送スケジュールに組み込むことができな
い上記物品納入要求情報を上記未計画情報記憶部に記憶
し、上記配送計画部が備える配送再計画部が、上記配送
スケジュールの計画終了後、上記未計画納入要求情報が
存在する場合、上記再調整可能期間において1日当たり
の配送能力に余裕がある日を検索し、上記未計画情報記
憶部より物品納入要求情報を取り出し、上記配送能力に
余裕がある日に上記物品納入要求情報の配送スケジュー
ルを計画することを特徴とする。
The unplanned information storage section of the delivery planning system stores article delivery request information that cannot be incorporated in the delivery schedule, and the readjustable period storage section of the delivery planning system stores the delivery possible information. A re-adjustable period for re-adjusting the delivery schedule planned by the planning unit is stored, and a re-adjustable period setting unit included in the delivery planning system sets the re-adjustable period and sets the re-adjustable period. The period is stored in the re-adjustable period storage unit, and the unplanned information output unit provided in the delivery planning unit stores the article delivery request information that cannot be incorporated in the delivery schedule in the unplanned information storage unit. If the delivery re-planning unit included in the delivery planning unit has completed the planning of the delivery schedule and the unplanned delivery request information exists, In the re-adjustable period, a search is made for a day on which there is room in the delivery capacity per day, and the article delivery request information is retrieved from the unplanned information storage unit, and the delivery schedule of the article delivery request information on a day on which there is room in the delivery capacity It is characterized by planning.

【0013】また、上記納入要求情報入力部が、少なく
とも回収先情報と回収依頼日とを物品回収要求情報とし
て入力し、上記配送計画部が備える回収計画部が、上記
配送スケジュールの計画終了後、上記回収依頼日以降に
上記回収先の配送スケジュールが計画されている所定の
日を検索し、上記所定の日に上記物品回収要求情報の回
収スケジュールを計画し、上記配送計画システムが備え
る未計画回収情報記憶部が、上記回収スケジュールに組
み込むことができない物品回収要求情報を記憶し、上記
配送計画部が備える未計画回収情報出力部が、上記回収
スケジュールに組み込むことができない物品回収要求情
報を上記未計画回収情報記憶部に記憶することを特徴と
する。
Further, the delivery request information input section inputs at least the collection destination information and the collection request date as article collection request information, and the collection planning section provided in the delivery planning section, after finishing the planning of the delivery schedule, A predetermined date on which a delivery schedule of the collection destination is planned after the collection request date is searched, a collection schedule of the article collection request information is planned on the predetermined day, and an unplanned collection provided in the delivery planning system is performed. The information storage unit stores the item collection request information that cannot be incorporated in the collection schedule, and the unplanned collection information output unit provided in the delivery planning unit outputs the item collection request information that cannot be incorporated in the collection schedule. It is stored in a plan collection information storage unit.

【0014】また、上記回収計画部が備える同日回収再
計画部が、上記回収依頼日以降に上記1日当たりの配送
能力を越えない日が発生した場合、上記未計画回収情報
記憶部より物品回収要求情報を取り出し、上記1日当た
りの配送能力を越えない日に上記物品回収要求情報の回
収スケジュールを計画することを特徴とする。
The same-day collection and re-planning unit provided in the collection planning unit, when a day that does not exceed the daily delivery capacity after the collection request date occurs, sends an item collection request from the unplanned collection information storage unit. The method is characterized in that information is taken out and a collection schedule of the article collection request information is planned on a day that does not exceed the daily delivery capacity.

【0015】さらに、上記回収計画部が備えるまとめ回
収再計画部が、上記回収先に対する物品の配送スケジュ
ールが上記回収依頼日以降の所定の日に計画された場
合、上記未計画回収情報記憶部より物品回収要求情報を
取り出し、上記所定の日に上記物品回収要求情報の回収
スケジュールを計画することを特徴とする。
Further, when the delivery schedule of the goods to the collection destination is planned on a predetermined date after the collection request date, the uncollected collection information storage unit stores the uncollected collection information. The present invention is characterized in that the article collection request information is taken out and a collection schedule of the article collection request information is planned on the predetermined day.

【0016】[0016]

【発明の実施の形態】BEST MODE FOR CARRYING OUT THE INVENTION

実施の形態1.実施の形態1では、事業所単位に配送サ
イクルが決められており、配送サイクルと納入締め切り
日に基づいて配送スケジュールを計画する配送計画シス
テムについて以下に説明を行う。
Embodiment 1 FIG. In the first embodiment, a delivery cycle is determined for each office, and a delivery planning system that plans a delivery schedule based on a delivery cycle and a delivery deadline will be described below.

【0017】始めに、図面の説明を行う。図1は、実施
の形態1における配送計画システムのシステム構成図の
一例である。図1において、1は配送計画システムであ
る。2は物品納入要求情報であり、物品納入要求情報2
は、少なくとも納入先情報と納入締め切り日と納入物品
情報とにより構成されている。4は納入要求情報入力部
であり、物品納入要求情報2を配送計画システム1に入
力する。3は配送サイクル情報であり、この実施の形態
1では事業所ごとに配送サイクルが決められており、事
業所ごとの配送サイクルを配送サイクル情報3として配
送計画システム1に入力する。6は配送サイクル情報設
定部であり、7は配送サイクル情報記憶部である。配送
サイクル情報設定部6が配送サイクル情報3を配送計画
システム1に入力し、入力した配送サイクル情報3を配
送サイクル情報記憶部7に格納する。8は配送計画部で
あり、納入要求情報入力部4より入力した物品納入要求
情報2と配送サイクル情報記憶部7に記憶されている配
送サイクル情報3に基づいて、配送スケジュールを計画
する。9は配送スケジュール記憶部であり、配送計画部
8が計画した配送スケジュールを記憶する。10は配送
スケジュール出力部であり、配送スケジュール記憶部9
に保管されている配送スケジュールを出力する。11は
配送スケジュールであり、配送スケジュール出力部10
より出力される。
First, the drawings will be described. FIG. 1 is an example of a system configuration diagram of a delivery planning system according to the first embodiment. In FIG. 1, reference numeral 1 denotes a delivery planning system. 2 is goods delivery request information, and goods delivery request information 2
Is composed of at least delivery destination information, delivery deadline date, and delivered article information. Reference numeral 4 denotes a delivery request information input unit, which inputs the article delivery request information 2 to the delivery planning system 1. Reference numeral 3 denotes delivery cycle information. In the first embodiment, a delivery cycle is determined for each office, and the delivery cycle for each office is input to the delivery planning system 1 as delivery cycle information 3. Reference numeral 6 denotes a delivery cycle information setting unit, and reference numeral 7 denotes a delivery cycle information storage unit. The delivery cycle information setting unit 6 inputs the delivery cycle information 3 to the delivery planning system 1 and stores the input delivery cycle information 3 in the delivery cycle information storage unit 7. Reference numeral 8 denotes a delivery planning section, which plans a delivery schedule based on the article delivery request information 2 input from the delivery request information input section 4 and the delivery cycle information 3 stored in the delivery cycle information storage section 7. A delivery schedule storage unit 9 stores the delivery schedule planned by the delivery planning unit 8. Reference numeral 10 denotes a delivery schedule output unit, and a delivery schedule storage unit 9
Output the delivery schedule stored in. Reference numeral 11 denotes a delivery schedule, and a delivery schedule output unit 10
Output.

【0018】図2は、実施の形態1における配送計画シ
ステムのネットワーク構成図である。図2において、2
00は配送センターであり、図1に示した配送計画シス
テム1は、配送センター200に設置されているものと
する。また、配送センター200は、A事業所201、
B事業所202、C事業所203をネットワークで接続
している。201から203の各事業所は、配送センタ
ー200の配送計画システム1に対して物品納入要求情
報2を送信する。配送サイクル情報3は、配送センター
200において入力する情報である。また、配送センタ
ー200の配送計画システム1からは、配送スケジュー
ル11が201から203の各事業所に配信される。ま
た、A事業所201の配送サイクルは毎週月曜日であ
り、B事業所202の配送サイクルは毎週水曜日と金曜
日であり、C事業所203の配送サイクルは毎日とす
る。配送サイクル情報記憶部7には、上記で説明した各
事業所201から203の配送サイクルが格納されてい
る。
FIG. 2 is a network configuration diagram of the delivery planning system according to the first embodiment. In FIG. 2, 2
Reference numeral 00 denotes a delivery center, and the delivery planning system 1 shown in FIG. Also, the distribution center 200 is a business establishment 201,
The B establishment 202 and the C establishment 203 are connected by a network. Each of the business offices 201 to 203 transmits the article delivery request information 2 to the delivery planning system 1 of the delivery center 200. The delivery cycle information 3 is information input in the delivery center 200. Further, the delivery schedule 11 is delivered from the delivery planning system 1 of the delivery center 200 to each of the offices 201 to 203. The delivery cycle of the establishment A 201 is every Monday, the delivery cycle of the establishment B 202 is every Wednesday and Friday, and the delivery cycle of the establishment C 203 is every day. The delivery cycle information storage unit 7 stores the delivery cycles of each of the establishments 201 to 203 described above.

【0019】図3は、実施の形態1における配送スケジ
ュールの計画手順の一例を示す流れ図である。図4は、
従来の計画手順を実行した一具体例を示す図である。図
5は、図3の計画手順を実行した一具体例を示す図であ
る。
FIG. 3 is a flowchart showing an example of a procedure for planning a delivery schedule according to the first embodiment. FIG.
It is a figure which shows one specific example which performed the conventional planning procedure. FIG. 5 is a diagram showing a specific example of executing the planning procedure of FIG.

【0020】次に、図3の流れ図に従い、図5の具体例
について説明を行う。始めに、納入要求情報入力部4
は、201から203の各事業所より物品納入要求情報
2を入力する(S1)。そして、配送計画部8が納入要
求情報入力部4より物品納入要求情報2を受け取り、物
品納入要求情報2の納入先情報を参照して配送サイクル
情報記憶部7より該当する事業所の配送サイクル情報を
取得する(S2)。例えば、納入要求情報入力部4が入
力した物品納入要求情報2は、B事業所202からの物
品納入要求情報であるとする。また、4件の物品納入要
求情報が入力されたとして、それぞれの納入締め切り日
は、10/9(水),10/11(金),10/16
(水),10/17(木)であるとする。B事業所20
2の配送サイクルは、図5に示すように、毎週/水・金
である。配送計画部8は、上記納入締め切り日と配送サ
イクルと受注日を比較して、直近の納入予定日を求める
(S3)。尚、受注日は、物品納入要求情報2が配送計
画システム1に入力された日付であり、この実施の形態
1では、受注日を10/1とする。10/9(水)と1
0/11(金)と10/16(水)の納入締め切り日で
ある物品納入要求は、配送サイクルと一致するため、配
送計画部8は、10/9と10/11と10/16にそ
れぞれ配送スケジュールを計画する。しかし、10/1
7(木)の物品納入要求は、配送サイクルと一致しない
ため、配送計画部8は、納入締め切り日よりも前の日付
で、かつ、配送サイクルと一致する納入予定日を検索す
る(S4)。その結果、10/16の納入予定日が求め
られるので、配送計画部8は、10/17の納入締め切
り日である物品納入要求に対して、図5に示すように、
10/16に配送スケジュールを計画する(S5)。上
記例では、受注日を10/1としていた。このため、受
注日から納入締め切り日までは、かなり日数的に余裕が
あった。しかし、受注日と納入締め切り日に余裕がない
と、納入締め切り日と受注日との間に、配送サイクルと
一致する日が存在しない場合がある(S4)。この場合
は、納入締め切り日に配送手段を別途チャーターし、配
送サイクルに組み込む(S6)。
Next, a specific example of FIG. 5 will be described with reference to the flowchart of FIG. First, the delivery request information input unit 4
Inputs the goods delivery request information 2 from each of the business establishments 201 to 203 (S1). Then, the delivery planning unit 8 receives the goods delivery request information 2 from the delivery request information input unit 4, refers to the delivery destination information of the goods delivery request information 2, and stores the delivery cycle information of the corresponding business office from the delivery cycle information storage unit 7. Is obtained (S2). For example, it is assumed that the article delivery request information 2 input by the delivery request information input unit 4 is article delivery request information from the B establishment 202. Also, assuming that four pieces of article delivery request information are input, the respective delivery deadlines are October 9 (Wed), October 11 (Fri), and October 16
(Wed) and 10/17 (Thu). Office B 20
The second delivery cycle is weekly / water / gold, as shown in FIG. The delivery planning unit 8 compares the delivery deadline with the delivery cycle and the order receipt date to obtain the latest scheduled delivery date (S3). The order receiving date is the date when the article delivery request information 2 was input to the delivery planning system 1. In the first embodiment, the order receiving date is set to 10/1. October 9 (Wed) and 1
Since the goods delivery request, which is the delivery deadline of 0/11 (Fri) and 10/16 (Wed), matches the delivery cycle, the delivery planning unit 8 sets the delivery schedule to 10/9, 10/11 and 10/16, respectively. Plan your delivery schedule. However, 10/1
Since the article delivery request on 7 (Thu) does not match the delivery cycle, the delivery planning unit 8 searches for a scheduled delivery date that is earlier than the delivery deadline and matches the delivery cycle (S4). As a result, a scheduled delivery date of 10/16 is obtained, and the delivery planning unit 8 responds to the article delivery request, which is the delivery deadline of 10/17, as shown in FIG.
A delivery schedule is planned on October 16 (S5). In the above example, the order receiving date is 10/1. For this reason, there was a considerable number of days from the order receipt date to the delivery deadline date. However, if there is no margin between the order receiving date and the delivery deadline, there may be no date matching the delivery cycle between the delivery closing date and the order receiving date (S4). In this case, the delivery means is separately chartered on the delivery deadline and incorporated into the delivery cycle (S6).

【0021】図4に、従来の配送計画システムによって
計画された配送スケジュールを示す。従来では、配送計
画システムに配送サイクルという概念がないため、納入
締め切り日に配送スケジュールを計画する。このため、
10/17が納入締め切り日である物品納入要求は、そ
のまま10/17に配送スケジュールが計画される。図
4と図5の10/7の週と10/14の週の2週間の配
送スケジュールを比較すると、1日の配送を1台のトラ
ックで行うとすると、従来は1台のトラックを4日使用
していた。しかし、この発明の配送計画システムでは、
1台のトラックを3日使用する。このため、トラックの
使用率を25%削減できる。
FIG. 4 shows a delivery schedule planned by the conventional delivery planning system. Conventionally, the delivery schedule system does not have the concept of the delivery cycle, so the delivery schedule is planned on the delivery deadline. For this reason,
For an article delivery request for which October 17 is the delivery deadline, a delivery schedule is planned for October 17 as it is. Comparing the two-week delivery schedules of the week of October 7 and the week of October 14 in FIGS. 4 and 5, assuming that one day of delivery is performed by one truck, one truck has conventionally been replaced by four days. I was using. However, in the delivery planning system of the present invention,
Use one truck for 3 days. Therefore, the use rate of the truck can be reduced by 25%.

【0022】実施の形態2.実施の形態2では、同一の
納入先からの物品納入要求ごとに納入締め切り日からあ
る所定の数日間を遡って配送実施可能な期間を求める。
そして、物品納入要求ごとに求めた配送実施可能期間を
比較し、重複する日を求める。求めた重複する日の所定
の1日に、複数の物品をまとめて納入する配送計画シス
テムについて以下に説明を行う。尚、上記納入締め切り
日から遡るある所定の数日間を配送可能期間とする。
Embodiment 2 FIG. In the second embodiment, for each item delivery request from the same delivery destination, a period in which delivery can be performed by going back a predetermined number of days from the delivery deadline is obtained.
Then, the delivery feasible periods obtained for each article delivery request are compared, and an overlapping date is obtained. The following describes a delivery planning system that collectively delivers a plurality of articles on a predetermined day on the determined overlapping day. Note that a certain predetermined number of days before the delivery deadline is set as a deliverable period.

【0023】図6は、実施の形態2における配送計画シ
ステムの構成図である。図6において、13は配送可能
期間情報である。配送可能期間情報13は、図2に示す
配送センター200において入力する情報である。この
実施の形態2では、配送可能期間はすべての事業所につ
いて同じ期間を設定する。しかし、各事業所ごとに配送
可能期間が異なっていても構わない。各事業所ごとに配
送可能期間が異なる場合は、各事業所ごとに配送実施可
能期間を求める。この実施の形態2では、配送可能期間
は、全事業所共通で5日間とする(5日間の中に納入締
め切り日も含める)。14は配送可能期間設定部であ
り、配送可能期間情報13を入力する。15は配送可能
期間記憶部であり、配送可能期間設定部14は、入力し
た配送可能期間情報13を配送可能期間記憶部15に記
憶する。また、配送計画部8は、配送可能期間算出部8
1と同日配送計画部82を備える。配送可能期間算出部
81は、配送可能期間記憶部15より配送可能期間を取
り出し、物品納入要求情報の納入締め切り日と上記配送
可能期間より物品納入要求に対する配送可能実施期間を
求める。同日配送計画部82は、同一納入先からの複数
の物品納入要求の配送可能実施期間をそれぞれ比較し
て、1日でも重複する日があれば、同一納入先からの別
々の物品納入要求を同じ日にまとめて納入するように配
送スケジュールを計画する。図6における他の符号につ
いては、図1の同一の符号と同じ機能を有するため説明
は省略する。図7は、実施の形態2における同日配送計
画の計画手順を示す流れ図である。図8は、従来の配送
計画システムによって配送スケジュールを計画した一具
体例を示す図である。図9は、実施の形態2における図
7の計画手順を実行した一具体例を示す図である。
FIG. 6 is a configuration diagram of a delivery planning system according to the second embodiment. In FIG. 6, reference numeral 13 denotes deliverable period information. The deliverable period information 13 is information input in the delivery center 200 shown in FIG. In the second embodiment, the same delivery possible period is set for all the establishments. However, the delivery period may be different for each business establishment. If the delivery available period differs for each business establishment, the delivery available period is obtained for each business establishment. In the second embodiment, the deliverable period is set to 5 days for all business establishments (the delivery deadline is also included in the 5 days). Reference numeral 14 denotes a deliverable period setting unit for inputting deliverable period information 13. Reference numeral 15 denotes a deliverable period storage unit, and the deliverable period setting unit 14 stores the input deliverable period information 13 in the deliverable period storage unit 15. Further, the delivery planning unit 8 includes a deliverable period calculation unit 8.
1 and the same day delivery planning unit 82. The deliverable period calculation unit 81 extracts the deliverable period from the deliverable period storage unit 15 and obtains a deliverable execution period for the item delivery request from the delivery deadline of the item delivery request information and the deliverable period. The same-day delivery planning unit 82 compares the deliverable implementation periods of a plurality of goods delivery requests from the same delivery destination, and if there is a day that overlaps even one day, separate delivery requests from the same delivery destination are the same. Plan delivery schedules to deliver in batches per day. The other symbols in FIG. 6 have the same functions as the same symbols in FIG. FIG. 7 is a flowchart showing a planning procedure of a same-day delivery plan in the second embodiment. FIG. 8 is a diagram showing a specific example in which a delivery schedule is planned by a conventional delivery planning system. FIG. 9 is a diagram showing a specific example of executing the planning procedure of FIG. 7 in the second embodiment.

【0024】次に、図7の流れ図に従い、図9の具体例
について説明を行う。尚、実施の形態2では、実施の形
態1と同様に、配送計画システムは、図2に示したネッ
トワーク構成をしている。そして、図2には図示してい
ないが、201から203の各事業所には、それぞれ複
数の現場が配置されているものとする。物品納入要求が
発生すると事業所は、配送センター200に対して物品
納入要求情報2を送信する。納入要求情報入力部4は、
物品納入要求情報を入力し、配送計画部8に送信する。
配送可能期間算出部81は、物品納入要求情報の納入締
め切り日を取得する(S10)。次に、配送計画期間を
配送可能期間記憶部15より取得する(S11)。この
実施の形態2では、すべての事業所について配送可能期
間を同じにする。例えば、配送可能期間を5日とする。
事業所ごとに配送可能期間が異なっている場合、配送可
能期間算出部81は、事業所別に配送可能期間を配送可
能期間記憶部15より取り出して配送可能実施期間を求
める。配送可能期間算出部81は、納入締め切り日と配
送可能期間とにより配送可能実施期間開始日と配送可能
実施期間終了日を求める(S12)。図9によると、A
現場からの物品納入要求が、10/7(月),10/9
(水),10/11(金)をそれぞれ納入締め切り日と
して3件入力されている。尚、図9では、A現場から物
品納入要求情報が配送センター200へ入力されること
を示している。ここでは、各現場から物品納入要求情報
を直接配送センターへ入力しているが、各現場から事業
所経由で物品納入要求情報を配送センターへ入力しても
構わない。また、配送可能期間は事業所ごとに定めるこ
ともできると説明したが、現場ごとに定めることも可能
である。現場ごとに配送可能期間を定めた場合、配送可
能期間算出部81は、配送可能期間記憶部15より現場
ごとの配送可能期間を取り出し、納入締め切り日と配送
可能期間とに基づいて、配送可能実施期間を算出する。
配送可能期間算出部81は、納入締め切り日を含んで、
納入締め切り日から配送可能期間を遡って配送可能実施
期間を算出する。但し、配送センター及び事業所、現場
は土曜日と日曜日は休日となるため、土曜、日曜を除い
て配送スケジュールを計画する。図9によると、物品a
に対する配送可能実施期間は、10/1(火)〜10/
7(月)となる。同日配送計画部82は、配送可能期間
算出部81より物品aの配送可能実施期間を受け取る。
同日配送計画部82は、先行の納入要求の中にA現場を
納入先とする物品納入要求が存在するかを確認する(S
13)。この例では、先行の納入要求の中にA現場を納
入先とする物品納入要求が存在しないため、10/7
(月)をA現場への納入予定日として配送スケジュール
を計画する(S16)。
Next, a specific example of FIG. 9 will be described with reference to the flowchart of FIG. In the second embodiment, as in the first embodiment, the delivery planning system has the network configuration shown in FIG. Although not shown in FIG. 2, it is assumed that a plurality of sites are arranged at each of the business establishments 201 to 203. When an article delivery request occurs, the establishment transmits the article delivery request information 2 to the distribution center 200. The delivery request information input unit 4
The article delivery request information is input and transmitted to the delivery planning unit 8.
The deliverable period calculation unit 81 acquires the delivery deadline of the article delivery request information (S10). Next, the delivery plan period is acquired from the deliverable period storage unit 15 (S11). In the second embodiment, the deliverable period is the same for all business establishments. For example, the possible delivery period is five days.
When the deliverable period differs for each business establishment, the deliverable period calculation unit 81 extracts the deliverable period for each business place from the deliverable period storage unit 15 and obtains a deliverable implementation period. The deliverable period calculation unit 81 obtains the start date of the deliverable implementation period and the end date of the deliverable implementation period based on the delivery deadline and the deliverable period (S12). According to FIG.
Article delivery request from the site is October 7 (Mon), October 9
Three (Wed) and 10/11 (Fri) are input as the delivery deadline, respectively. Note that FIG. 9 shows that the article delivery request information is input to the distribution center 200 from the site A. Here, the goods delivery request information is directly input from each site to the distribution center, but the goods delivery request information may be input from each site via the business office to the distribution center. Also, although the delivery possible period can be determined for each business establishment, it can be determined for each site. When the deliverable period is set for each site, the deliverable period calculation unit 81 extracts the deliverable period for each site from the deliverable period storage unit 15 and implements deliverable based on the delivery deadline and the deliverable period. Calculate the period.
The deliverable period calculation unit 81 includes the delivery deadline date,
The delivery possible period is calculated by going back the delivery possible period from the delivery deadline. However, since the Saturdays and Sundays are holidays for the distribution center, business office, and site, the delivery schedule is planned excluding Saturdays and Sundays. According to FIG.
Delivery period is 10/1 (Tue) to 10 /
7 (Mon). The same day delivery plan unit 82 receives the deliverable execution period of the article a from the deliverable period calculation unit 81.
The same-day delivery planning unit 82 checks whether there is an article delivery request with the delivery destination of the site A among the preceding delivery requests (S
13). In this example, since there is no item delivery request to the site A as a delivery destination in the preceding delivery request,
A delivery schedule is planned with (Month) as the scheduled delivery date to the site A (S16).

【0025】続いて、納入要求情報入力部4は、A現場
を納入先とする物品納入要求情報(物品b)を入力す
る。納入要求情報入力部4は、物品納入要求情報を配送
計画部8に送る。配送可能期間算出部81は、上記で説
明した物品aと同様に物品bの配送可能実施期間を算出
する。図9によると、物品bの配送可能実施期間は、1
0/3(木)〜10/9(水)となる。先行の納入要求
の中にA現場を納入先とする納入要求(物品aの納入要
求)が存在するので(S13)、物品bに対する配送可
能実施期間と先行納入要求に対する配送可能実施期間を
比較する(S14)。物品aと物品bのそれぞれの配送
実施可能期間は、10/3(木)〜10/7(月)の3
日間が重複している。このため、この例では、物品aと
物品bの納入予定日は、10/7(月)に配送スケジュ
ールを計画する(S15)。さらに、A現場からの物品
cの納入要求を納入要求情報入力部4が入力する。配送
計画部8は、納入要求情報入力部4より物品納入要求情
報を受け取る。配送可能期間算出部81は、物品a及び
物品bと同様に物品cについても、配送可能実施期間を
算出する。図9によると、物品cの配送可能実施期間
は、10/7(月)〜10/11(金)となる。先行す
る納入要求の中にA現場を納入先とする納入要求(物品
aと物品bの納入要求)が存在するので(S13)、物
品cに対する配送可能実施期間と先行する物品aと物品
bのそれぞれの配送可能実施期間を比較する(S1
4)。比較した結果、物品aと物品bと物品cは、10
/7(月)に配送可能実施期間が重なる。このため、同
日配送計画部82は、物品a、物品b、物品cに対する
配送スケジュールを10/7(月)に組み入れるように
計画する(S15)。
Subsequently, the delivery request information input section 4 inputs the article delivery request information (article b) with the delivery destination being the site A. The delivery request information input unit 4 sends the article delivery request information to the delivery planning unit 8. The deliverable period calculation unit 81 calculates a deliverable execution period of the article b in the same manner as the article a described above. According to FIG. 9, the delivery possible implementation period of the article b is 1
0/3 (Thu) to 10/9 (Wed). Since there is a delivery request (delivery request for the article a) to the site A as the delivery destination in the preceding delivery request (S13), the delivery available execution period for the article b and the delivery available implementation period for the advance delivery request are compared. (S14). The delivery available period of each of the article a and the article b is 10/3 (Thu) to 10/7 (Mon).
Days overlap. Therefore, in this example, a delivery schedule is planned for the scheduled delivery date of the article a and the article b on October 7 (Monday) (S15). Further, the delivery request information input unit 4 inputs a delivery request for the article c from the site A. The delivery planning unit 8 receives the article delivery request information from the delivery request information input unit 4. The deliverable period calculation unit 81 calculates a deliverable execution period for the article c as well as the article a and the article b. According to FIG. 9, the delivery possible implementation period of the article c is 10/7 (month) to 10/11 (Fri). Since there is a delivery request (delivery request for the article a and the article b) to the site A as the delivery request in the preceding delivery request (S13), the delivery available period for the article c and the delivery time of the preceding article a and the article b are determined. Compare the respective delivery possible implementation periods (S1
4). As a result of comparison, article a, article b, and article c
/ 7 (month) overlaps the delivery possible implementation period. Therefore, the same-day delivery planning unit 82 plans to incorporate the delivery schedule for the articles a, b, and c into 10/7 (month) (S15).

【0026】図8に、従来の配送計画システムに物品a
と物品bと物品cの物品納入要求を入力した場合の配送
スケジュールの計画結果を示す。従来の配送計画システ
ムには、配送可能期間という概念がないため、それぞれ
の納入要求情報の納入締め切り日が納入日となるように
配送スケジュールを計画する。その結果、物品aは10
/7(月)に配送スケジュールが計画され、物品bは1
0/9(水)に、また、物品cは10/11(金)にそ
れぞれ配送スケジュールが計画される。この結果、A現
場に対する配送は3回になる。しかし、この発明におけ
る配送計画システムでは、物品a、物品b、物品cはと
もに、10/7(月)にA現場へ配送スケジュールが計
画されているため、複数の納入要求された物品が1回の
配送で同時に納入できる。このように、この発明の配送
計画システムを用いれば、配送回数を削減することがで
き、配送手段、例えば、トラックなどの使用効率をあげ
ることができる。また、配送手段の利用コストを減らす
ことができる。
FIG. 8 shows an article a in the conventional delivery planning system.
7 shows the result of planning a delivery schedule when inputting an item delivery request for item b and item c. Since the conventional delivery planning system does not have a concept of a deliverable period, a delivery schedule is planned such that the delivery deadline of each delivery request information is the delivery date. As a result, article a is 10
Delivery schedule is planned on / 7 (Mon), and item b is 1
A delivery schedule is scheduled for 0/9 (Wed) and for the article c on October 11 (Fri). As a result, the delivery to the site A is performed three times. However, in the delivery planning system according to the present invention, since the delivery schedule of the article a, the article b, and the article c is planned to the site A on October 7 (Monday), a plurality of articles requested to be delivered once are provided. Can be delivered at the same time. As described above, by using the delivery planning system of the present invention, the number of deliveries can be reduced, and the use efficiency of delivery means such as trucks can be increased. Further, the use cost of the delivery means can be reduced.

【0027】尚、上記物品a、物品b、物品cは、それ
ぞれの配送可能実施期間に重なる日が存在していた。し
かし、例えば、物品cの配送可能実施期間が物品aや物
品bと重なる日が存在しない場合は、物品cの納入締め
切り日に配送を行うよう同日配送計画部82は、配送ス
ケジュールを計画する。
Incidentally, the above-mentioned article a, article b, and article c had dates that overlapped the respective delivery-performing periods. However, for example, when there is no day on which the delivery period of the article c overlaps with the article a or the article b, the same-day delivery planning unit 82 plans the delivery schedule so that delivery is performed on the delivery deadline of the article c.

【0028】実施の形態3.実施の形態3では、配送計
画システムに、予め1日当たりの配送能力を設定する。
そして、同一納入先への同日配送スケジュールを計画し
た後で(同日配送スケジュールは、実施の形態2におい
て説明を行った)、異なる納入先への配送スケジュール
を計画する場合、1日の納入先件数が配送能力を超えな
い範囲で計画する配送計画システムについて以下に説明
を行う。
Embodiment 3 In the third embodiment, the delivery capacity per day is set in advance in the delivery planning system.
Then, after planning the same-day delivery schedule to the same delivery destination (the same-day delivery schedule has been described in the second embodiment), when planning a delivery schedule to different destinations, the number of destinations per day The following describes a delivery planning system that plans within a range that does not exceed the delivery capacity.

【0029】図10は、実施の形態3における配送計画
システムの構成図である。図10において、物品納入要
求情報2は複数の事業所、或いは、複数の現場からの物
品納入要求情報を入力する。このため、納入要求情報入
力部4も複数の事業所、或いは、現場からの物品納入要
求情報を入力する。配送計画部8は、配送可能期間算出
部81の他に、まとめ配送計画部84を備える。配送可
能期間算出部81は、納入要求情報入力部4が複数の事
業所、或いは、複数の現場からの物品納入要求情報を入
力するため、納入先ごとの配送可能実施期間を算出す
る。尚、実施の形態3では、配送可能期間記憶部15に
記憶している配送可能期間は、すべての事業所及びすべ
ての現場について同一の配送可能期間を記憶している。
しかし、事業所ごと、或いは、現場ごとに配送可能期間
が異なっていても構わない。この場合、配送可能期間算
出部81は、該当する事業所、或いは、現場の配送可能
期間を配送可能期間記憶部15より取り出し、配送可能
期間と納入締め切り日に基づいて配送可能実施期間を算
出する。まとめ配送計画部84は、1日当たりの配送能
力の範囲内において複数の事業所、或いは、現場に物品
を配送する配送スケジュールを計画する。まとめ配送計
画部84の詳細な動作については、後で説明を行う。そ
の他の符号については、上記実施の形態2と同様である
ため説明を省略する。
FIG. 10 is a configuration diagram of a delivery planning system according to the third embodiment. In FIG. 10, article delivery request information 2 is input with article delivery request information from a plurality of establishments or a plurality of sites. For this reason, the delivery request information input unit 4 also inputs goods delivery request information from a plurality of offices or sites. The delivery plan unit 8 includes a collective delivery plan unit 84 in addition to the deliverable period calculation unit 81. The deliverable period calculation unit 81 calculates a deliverable execution period for each delivery destination because the delivery request information input unit 4 inputs the goods delivery request information from a plurality of offices or a plurality of sites. Note that, in the third embodiment, the deliverable period stored in the deliverable period storage unit 15 stores the same deliverable period for all offices and all sites.
However, the deliverable period may be different for each office or each site. In this case, the deliverable period calculation unit 81 retrieves the deliverable period of the relevant office or site from the deliverable period storage unit 15, and calculates the deliverable execution period based on the deliverable period and the delivery deadline. . The summary delivery planning unit 84 plans a delivery schedule for delivering the goods to a plurality of offices or sites within the range of the daily delivery capacity. The detailed operation of the collective delivery plan unit 84 will be described later. The other reference numerals are the same as those in the second embodiment, and a description thereof will be omitted.

【0030】図11は、実施の形態3における配送スケ
ジュールの計画手順を説明する流れ図である。図12か
ら図16は、実施の形態3における配送スケジュールの
計画過程を具体的に説明する図である。図17は、従来
の配送計画システムにおいて計画した配送スケジュール
を示す図である。
FIG. 11 is a flowchart for explaining a procedure for planning a delivery schedule according to the third embodiment. FIG. 12 to FIG. 16 are diagrams specifically illustrating a delivery schedule planning process according to the third embodiment. FIG. 17 is a diagram showing a delivery schedule planned in the conventional delivery planning system.

【0031】次に、図11の流れ図に従い、図12から
図16を用いてまとめ配送計画部における配送スケジュ
ールの計画手順を説明する。図11のS20〜S24
は、上記実施の形態2の図7のS10〜S14と同様の
処理である。図12に、納入先から入力された物品納入
要求情報より配送可能期間算出部81が算出した配送可
能実施期間を示す。尚、実施の形態3では、実施の形態
2と同様に、配送可能期間を5日とする。例えば、A現
場からは、10/11を納入締め切り日とする納品10
0aと、10/14を納入締め切り日とする物品101
aと10/10を納入締め切り日とする納品102aが
入力されている。配送可能期間算出部81は、上記実施
の形態2と同様に、配送可能期間記憶部15より取りだ
した配送可能期間(5日間)と物品100a,101
a,102aのそれぞれの納入締め切り日をもとに、配
送可能実施期間を算出する(S20〜S22)。物品1
01aに対する配送可能実施期間は、図12の期間10
0である。また、物品101aに対する配送可能実施期
間は、図12の期間101である。さらに、物品102
aに対する配送可能実施期間は、図12の期間102で
ある。以下、同じようにB現場、C現場、D現場、E現
場からそれぞれ入力された物品納入要求情報の納入締め
切り日と配送可能期間とにより、それぞれの物品に対す
る配送可能実施期間を算出する。図12に示す期間10
4,105,107,108,109,111,11
2,114,115が配送可能期間算出部81が算出し
た配送可能実施期間である。尚、事業所及び各現場は、
土曜日、日曜日は休日とするため、土曜日と日曜日は配
送期間に含めず、配送可能実施期間を算出する。
Next, the procedure of planning a delivery schedule in the collective delivery planning section will be described with reference to the flowchart of FIG. 11 and FIGS. S20 to S24 in FIG.
Is a process similar to S10 to S14 in FIG. 7 of the second embodiment. FIG. 12 shows a deliverable execution period calculated by the deliverable period calculation unit 81 from the article delivery request information input from the delivery destination. In the third embodiment, the deliverable period is set to 5 days, as in the second embodiment. For example, from the A site, delivery 10/11 with delivery deadline 10
Goods 101 with delivery deadlines 0a and 10/14
The delivery 102a with the delivery deadline of a and 10/10 is input. The deliverable period calculation unit 81 stores the deliverable period (5 days) extracted from the deliverable period storage unit 15 and the articles 100a and 101, as in the second embodiment.
The delivery possible execution period is calculated based on the delivery deadlines a and 102a (S20 to S22). Article 1
The delivery possible execution period for 01a is the period 10 in FIG.
0. The delivery possible execution period for the article 101a is the period 101 in FIG. Further, the article 102
The delivery possible execution period for a is a period 102 in FIG. Hereinafter, similarly, the delivery possible execution period for each article is calculated from the delivery deadline and the deliverable period of the article delivery request information respectively input from the B spot, the C spot, the D spot, and the E spot. Period 10 shown in FIG.
4,105,107,108,109,111,11
2, 114 and 115 are delivery possible execution periods calculated by the delivery possible period calculation unit 81. In addition, the office and each site,
Since Saturday and Sunday are holidays, the delivery possible period is calculated without including Saturday and Sunday in the delivery period.

【0032】次に、まとめ配送計画部84が、先行の物
品納入要求の中に同じ納入先からの物品納入要求がある
か確認する(S23)。同じ納入先からの物品納入要求
がある場合は、配送可能期間算出部81が算出したそれ
ぞれの物品納入要求に対する配送可能実施期間を比較す
る。比較した結果、重複する期間があれば、重複する期
間の1日に複数の物品納入要求を1件にまとめて配送す
るように配送スケジュールを計画する(S24,S2
5)。例えば、A現場からの物品100a,101a,
102aの納入要求に対する配送可能実施期間の重複す
る期間は、重複期間103である。また、重複期間10
6は、B現場からの物品104a,105aの物品納入
要求に対する重複期間である。同じように、C現場にお
ける重複期間は重複期間110であり、D現場における
重複期間は重複期間113であり、E現場における重複
期間は重複期間116である。続いて、まとめ配送計画
部84は、各現場への配送スケジュールを1日当たりの
配送能力を考慮して計画する(S26)。この実施の形
態3では、1日当たりの配送能力を1日の保有トラック
数1台、1台のトラックが配送可能な納入先件数は3件
とする。つまり、1日の配送件数は最大3件までとな
る。このため、まとめ配送計画部84は、配送スケジュ
ールを決定する際、1日の納入先件数が3件以内になる
よう計画する。計画する途中で1日当たりの納入先件数
が3件以上になるような場合は、納入先ごとの重複する
期間内で配送スケジュールの日にちを変更する。
Next, the collective delivery planning unit 84 checks whether there is an article delivery request from the same delivery destination in the preceding article delivery request (S23). When there is an article delivery request from the same delivery destination, the delivery available period calculated for each article delivery request calculated by the deliverable period calculation unit 81 is compared. As a result of the comparison, if there is an overlapping period, a delivery schedule is planned so that a plurality of goods delivery requests are delivered together in one day in the overlapping period (S24, S2).
5). For example, articles 100a, 101a,
The overlap period of the delivery available execution period for the delivery request of 102a is an overlap period 103. In addition, overlapping period 10
Reference numeral 6 denotes an overlap period in response to a request for goods delivery of the goods 104a and 105a from the site B. Similarly, the overlap period at site C is overlap period 110, the overlap period at site D is overlap period 113, and the overlap period at site E is overlap period 116. Subsequently, the collective delivery planning unit 84 plans a delivery schedule to each site in consideration of the delivery capacity per day (S26). In the third embodiment, the daily delivery capacity is assumed to be one truck per day, and the number of delivery destinations to which one truck can be delivered is three. That is, the maximum number of deliveries per day is three. Therefore, when determining the delivery schedule, the collective delivery planning unit 84 plans so that the number of deliveries per day is within three. If the number of delivery destinations per day becomes three or more during planning, change the delivery schedule date within the overlapping period for each delivery destination.

【0033】図13に、まとめ配送計画部84が1日当
たりの配送能力を考慮する前の各現場への配送スケジュ
ールを示す。A現場を例にすると、図12よりA現場の
重複期間103は、10/8(火)〜10/10(木)
であった。このため、まとめ配送計画部84は、図13
に示すように、A現場への納入予定日117aを重複期
間の最終日である10/10(木)に仮決定する。同じ
ように、B現場、C現場、D現場、E現場についても図
13に示すように、納入予定日118a,119a,1
20a,121aを重複期間の最終日に仮決定する。図
13に示した各現場への配送スケジュールを、1日当た
りの配送能力と比較すると、配送能力の範囲内で納入が
行えるように計画されている。但し、図13では、10
/9(水)にB現場のみに納入を行うスケジュールにな
っている。また、10/14(月)には、E現場のみに
配送スケジュールが計画されている。各現場の配送スケ
ジュールを変更することにより、さらに、トラックの使
用回数を減らすことができる。このため、まとめ配送計
画部84は、1日当たりの配送能力を考慮して、再度配
送スケジュールの計画を行う。
FIG. 13 shows a delivery schedule to each site before the collective delivery planning unit 84 considers the daily delivery capacity. Taking the site A as an example, FIG.
Met. For this reason, the collective delivery planning unit 84
As shown in (2), the scheduled delivery date 117a to the site A is provisionally determined to be 10/10 (Thursday), which is the last day of the overlapping period. Similarly, as shown in FIG. 13, scheduled delivery dates 118a, 119a, and 1 for the B site, the C site, the D site, and the E site.
20a and 121a are provisionally determined on the last day of the overlap period. Comparing the delivery schedule to each site shown in FIG. 13 with the daily delivery capacity, it is planned that the delivery can be performed within the range of the delivery capacity. However, in FIG.
It is scheduled to be delivered to site B only on Wednesday, September 9. Also, on October 14 (Monday), a delivery schedule is planned only for the E site. By changing the delivery schedule at each site, the number of trucks used can be further reduced. For this reason, the collective delivery plan unit 84 re-plans the delivery schedule in consideration of the delivery capacity per day.

【0034】図14に、再度行った配送スケジュールの
計画結果を示す。図14によると、10/9(水)に
は、A現場とB現場への配送スケジュールを計画してい
る。また、10/10(木)には、C現場、D現場、E
現場への配送スケジュールを計画している。図13と図
14の配送スケジュールを比べると、図13では、トラ
ックを3日間使用してA,B,C,D,E現場への配送
を行っていた。しかし、図14では、トラックを2日間
使用してA,B,C,D,E現場への配送を行うように
計画している。また、再計画後の配送スケジュールは、
1日当たりの配送能力内になるように計画されている。
FIG. 14 shows the result of planning the delivery schedule again. According to FIG. 14, on October 9 (Wednesday), a delivery schedule to site A and site B is planned. On October 10 (Thursday), C site, D site, E
Planning a delivery schedule to the site. Comparing the delivery schedules of FIG. 13 and FIG. 14, in FIG. 13, the trucks are used for three days to deliver to the sites A, B, C, D, and E. However, in FIG. 14, the trucks are planned to be used for two days for delivery to the A, B, C, D, and E sites. Also, the delivery schedule after re-planning,
It is planned to be within daily delivery capacity.

【0035】さらに、F現場からの物品納入要求情報が
配送計画システム1に入力される。F現場からの物品納
入要求情報の納入締め切り日は、10/10(木)であ
るものとする。配送可能期間算出部81は、F現場から
の納入締め切り日と配送可能期間とをもとに、配送可能
実施期間を算出する(S20〜S22)。
Further, article delivery request information from the F site is input to the delivery planning system 1. The delivery deadline of the goods delivery request information from the F site is assumed to be 10/10 (Thursday). The deliverable period calculation unit 81 calculates a deliverable implementation period based on the delivery deadline from the F site and the deliverable period (S20 to S22).

【0036】図15に、F現場の物品122aに対する
配送可能実施期間を示す。F現場の配送可能期間は、期
間122である。先行の物品納入要求情報の中にF現場
からの物品納入要求が存在しないため、S24とS25
の処理は行わない。まとめ配送計画部84は、1日当た
りの配送件数が3件を超えないように、F現場への配送
スケジュールを決定する。例えば、F現場からの物品納
入要求情報の納入締め切り日は、10/10(木)であ
る。図14を見ると、10/10(木)には、すでにA
現場とC現場とD現場への3件の配送スケジュールが計
画されていて、配送能力に余裕がない。このため、F現
場への配送スケジュールは、10/10(木)に組み入
れることができない。まとめ配送計画部84は、F現場
の配送可能実施期間である期間122の内、10/10
(木)を除いた日の1日に配送スケジュールを計画す
る。まとめ配送計画部84は、これまで計画した配送ス
ケジュールを検索し、10/4〜10/9の間で、1日
の配送件数が3件に満たない日を検索する。図14によ
ると、10/9(水)は、A現場とB現場への2件の配
送スケジュールが計画されていて、配送能力に余裕があ
るる。このため、まとめ配送計画部84は、F現場への
配送スケジュールを10/9(水)に決定する。
FIG. 15 shows a deliverable execution period for the article 122a at the site F. The deliverable period of the F site is a period 122. Since there is no article delivery request from the site F in the preceding article delivery request information, S24 and S25
Is not performed. The summary delivery planning unit 84 determines a delivery schedule to the F site so that the number of deliveries per day does not exceed three. For example, the delivery deadline of the article delivery request information from the site F is 10/10 (Thursday). Referring to FIG. 14, on October 10 (Thursday), A
There are three delivery schedules planned for the site, site C and site D, and there is no room for delivery capacity. For this reason, the delivery schedule to the F site cannot be incorporated into October 10 (Thursday). The collective delivery planning unit 84 sets the date and time of the
A delivery schedule is planned for one day excluding (Thu). The collective delivery plan unit 84 searches for a delivery schedule that has been planned so far, and searches for a day in which the number of deliveries per day is less than three from 10/4 to 10/9. According to FIG. 14, on October 9 (Wednesday), two delivery schedules are planned to the site A and the site B, and there is room in the delivery capacity. Therefore, the collective delivery plan unit 84 determines the delivery schedule to the F site to be 10/9 (Wed).

【0037】図16に、まとめ配送計画部84が計画し
たA現場からF現場への配送スケジュールを示す。図1
6によると、10/9(水)と10/10(木)は、と
もに1日の配送件数が3件である。
FIG. 16 shows a delivery schedule from the site A to the site F planned by the collective delivery planning section 84. FIG.
According to No. 6, both October 9 (Wed) and October 10 (Thu) have three deliveries per day.

【0038】図17は、従来の配送計画システムによっ
て、A現場〜F現場の物品納入要求に基づいて計画した
配送スケジュールを示している。図17によると、10
/9(水)にはA現場とB現場への配送スケジュールが
計画されている。また、10/10(木)には、C現場
とD現場とE現場への配送スケジュールが計画されてい
る。さらに、F現場から物品納入要求情報が入力される
と、従来の配送計画システムでは、10/10(木)に
配送スケジュールを計画する。但し、1日の配送能力は
3件であるため、F現場への納入は別のトラックをチャ
ーターして行うようになる。このため、従来の配送計画
システムでは、10/10(木)に2台のトラックを用
いるため、トラックの使用コストが高くなる。しかし、
この発明における配送計画システムでは、まとめ配送計
画部が納入先ごとの配送可能実施期間を求め、配送可能
実施期間内で1日当たりの配送能力の範囲内になるよう
に、配送スケジュールを計画する。このため、従来より
も配送手段、例えば、トラックの使用効率が良くなり、
また、使用コストを抑えることができる。
FIG. 17 shows a delivery schedule planned by the conventional delivery planning system based on the article delivery requests at the sites A to F. According to FIG.
On / 9 (Wednesday), a delivery schedule to site A and site B is planned. Also, on October 10 (Thu), a delivery schedule to the site C, site D, and site E is planned. Further, when the article delivery request information is input from the F site, the conventional delivery planning system plans a delivery schedule on October 10 (Thursday). However, since the daily delivery capacity is three, delivery to the F site will be made by chartering another truck. For this reason, in the conventional delivery planning system, two trucks are used every 10/10 (Thursday), so that the truck use cost increases. But,
In the delivery planning system according to the present invention, the collective delivery planning unit obtains a delivery possible execution period for each delivery destination, and plans a delivery schedule so as to fall within a range of daily delivery capacity within the delivery possible implementation period. For this reason, the use efficiency of the delivery means, for example, the truck becomes better than before,
Further, the use cost can be reduced.

【0039】また、上記説明においてまとめ配送計画部
84は、配送計画システム1に入力された物品納入要求
情報ごとに配送可能実施期間を求め、さらに、同一の納
入先への配送スケジュールが計画されている場合は、配
送可能実施期間内で同じ日に同一の納入先へ納入が行わ
れるように、重複する配送可能実施期間を求めていた。
しかし、この機能は、上記実施の形態2で説明した同日
配送計画部82が有している機能である。このため、同
一納入先における配送可能実施期間の重複する期間を求
める処理までは(図11のS20〜S22の処理)、同
日配送計画部82によって処理を行うようにしても構わ
ない。
In the above description, the collective delivery planning section 84 obtains the delivery possible period for each item delivery request information input to the delivery planning system 1, and further plans a delivery schedule to the same delivery destination. If there is, a duplicate delivery possible period is required so that delivery is made to the same destination on the same day within the delivery possible period.
However, this function is a function of the same-day delivery planning unit 82 described in the second embodiment. For this reason, the same-day delivery planning unit 82 may perform the process up to the process of obtaining an overlapping period of the delivery available period at the same delivery destination (the processes of S20 to S22 in FIG. 11).

【0040】実施の形態4.実施の形態4では、上記実
施の形態3において説明したまとめ配送計画部84によ
る配送スケジュールの計画を行った後、1日の配送件数
が配送能力を超えてしまう場合に、配送能力を超える物
品納入要求を保管しておき、所定のタイミングで上記配
送能力を超える物品納入要求の配送スケジュールを再計
画する配送計画システムについて以下に説明を行う。
Embodiment 4 FIG. In the fourth embodiment, after the delivery schedule is planned by the collective delivery planning unit 84 described in the third embodiment, if the number of deliveries per day exceeds the delivery capacity, the goods delivery exceeding the delivery capacity is performed. A delivery planning system for storing requests and re-planning the delivery schedule of an article delivery request exceeding the delivery capacity at a predetermined timing will be described below.

【0041】図18は、実施の形態4における配送計画
システムの構成図である。図18において、85は未計
画情報出力部である。また、19は未計画情報記憶部で
ある。未計画情報出力部85は、まとめ配送計画部84
において、配送スケジュールの計画を行った結果、1日
の配送能力を超えるために配送スケジュールに組み込む
ことができない物品納入要求情報を、未計画情報記憶部
19に出力する。未計画情報記憶部19は、未計画情報
出力部85によって出力された物品納入要求情報を記憶
する。16は再調整可能期間情報である。再調整可能期
間情報16は、まとめ配送計画部84によって配送スケ
ジュールの計画が行われた結果、1日の配送能力を超え
るために配送スケジュールに組み込むことができなかっ
た物品納入要求情報の配送計画を再度行うために、再計
画が可能である期間を指定する情報である。17は再調
整可能期間設定部であり、再調整可能期間情報16を入
力する。18は再調整可能期間記憶部であり、再調整可
能期間設定部17によって入力された再調整可能期間情
報16を記憶する。この実施の形態4では、再調整可能
期間情報は配送計画システムにおいてただ1つとする。
つまり、すべての事業所及びすべての現場について、同
一の再調整可能期間情報を有するものとする。尚、再調
整可能期間情報は事業所、或いは、現場によってそれぞ
れ異なる期間を設定することもできる。この場合、配送
スケジュールの再計画を行うときに、算出する再調整可
能期間(配送スケジュールの再調整を行う対象期間)
は、事業所単位又は現場単位に設定された再調整可能期
間情報を用いて算出する。86は配送再計画部である。
配送再計画部86は、まとめ配送計画部84によって配
送スケジュールの計画が行われた後、未計画情報が存在
する場合、再調整可能期間情報を再調整可能期間記憶部
18より取得し、再調整可能期間を求める。そして、求
めた再調整可能期間の範囲において、未計画情報を再度
配送スケジュールに組み込むことを計画する。他の符号
については、上記実施の形態3と同様であるため説明は
省略する。
FIG. 18 is a configuration diagram of a delivery planning system according to the fourth embodiment. In FIG. 18, reference numeral 85 denotes an unplanned information output unit. Reference numeral 19 denotes an unplanned information storage unit. The unplanned information output unit 85 is a collective delivery planning unit 84
As a result of the planning of the delivery schedule, the article delivery request information which cannot be incorporated into the delivery schedule due to exceeding the daily delivery capacity is output to the unplanned information storage unit 19. The unplanned information storage unit 19 stores the article delivery request information output by the unplanned information output unit 85. Reference numeral 16 denotes readjustable period information. The re-adjustable period information 16 indicates the delivery plan of the goods delivery request information that could not be incorporated into the delivery schedule because the delivery schedule was planned by the collective delivery planning unit 84 and exceeded the daily delivery capacity. This information specifies a period during which re-planning is possible in order to perform again. A readjustable period setting unit 17 inputs readjustable period information 16. Reference numeral 18 denotes a readjustable period storage unit that stores readjustable period information 16 input by the readjustable period setting unit 17. In the fourth embodiment, there is only one readjustable period information in the delivery planning system.
That is, it is assumed that the same re-adjustable period information is provided for all establishments and all sites. The re-adjustable period information may be set to different periods depending on the establishment or the site. In this case, when re-planning the delivery schedule, the re-adjustable period calculated (target period for re-adjusting the delivery schedule)
Is calculated using the readjustable period information set for each business establishment or each site. 86 is a delivery re-planning unit.
The delivery re-planning unit 86 acquires the re-adjustable period information from the re-adjustable period storage unit 18 when the unscheduled information exists after the delivery schedule is planned by the collective delivery planning unit 84, and performs the readjustment. Find possible period. Then, it is planned to incorporate the unplanned information into the delivery schedule again within the range of the obtained readjustable period. The other reference numerals are the same as those in the third embodiment, and a description thereof will not be repeated.

【0042】図19は、実施の形態4の配送スケジュー
ルの再計画手順を示す流れ図である。図20は、未計画
情報を具体例を用いて説明する図である。図20におい
て、130は未計画情報である。実施の形態4では、実
施の形態3と同様に1日の保有トラック数を1台とし、
1台のトラックで配送可能な件数は3件とする。このた
め、10/10(木)の配送件数が4件であるため、4
件目の物品納入要求情報が未計画情報130となって、
未計画情報出力部85によって未計画情報記憶部19に
出力されている。図21は、再調整可能期間を具体的に
説明する図である。実施の形態4では、再調整可能期間
情報を5日と設定する。再調整可能期間は、配送スケジ
ュールの再調整を行う日の翌日を含めて5日先の期間と
する。しかし、土曜日、日曜日は事業所、或いは、現場
が休日のため再調整可能期間には含まない。例えば、再
計画を行う当日が火曜日である場合は、翌日の水曜日か
ら次の週の木曜日までを再調整可能期間とする。また、
図中○印は異なる事業所、或いは、異なる現場への配送
スケジュールを示す。図22は、従来の配送計画システ
ムにおいて計画された配送スケジュールを示す図であ
る。
FIG. 19 is a flowchart showing a procedure for replanning the delivery schedule according to the fourth embodiment. FIG. 20 is a diagram illustrating unplanned information using a specific example. In FIG. 20, reference numeral 130 denotes unplanned information. In the fourth embodiment, as in the third embodiment, the number of trucks held per day is one,
The number of deliverable items per truck is three. Because of this, the number of deliveries on October 10 (Thu) is four,
The item delivery request information of the item becomes unplanned information 130,
It is output to the unplanned information storage unit 19 by the unplanned information output unit 85. FIG. 21 is a diagram specifically illustrating the readjustment period. In the fourth embodiment, the readjustable period information is set to 5 days. The re-adjustable period is a five-day period including the day after the day on which the delivery schedule is readjusted. However, Saturdays and Sundays are not included in the re-adjustable period because the office or site is a holiday. For example, if the day of the re-planning is Tuesday, the re-adjustable period is from Wednesday of the next day to Thursday of the next week. Also,
In the figure, the circles indicate delivery schedules to different offices or different sites. FIG. 22 is a diagram showing a delivery schedule planned in the conventional delivery planning system.

【0043】次に、図19の流れ図に従い、図20,図
21を用いて配送スケジュールの再計画手順を以下に説
明する。図19のS30の処理を開始する前に、まとめ
配送計画部84によって配送スケジュールの計画を行っ
た後、1日当たりの配送能力を超えるために配送スケジ
ュールに組み込むことができない物品納入要求情報は、
未計画情報として、未計画情報出力部85により未計画
情報記憶部19に記憶されているものとする。また、配
送再計画部86による配送スケジュールの計画は、事業
所及び現場からの物品納入要求情報2の受信処理が終了
した後、行うものとする。
Next, the procedure for re-planning the delivery schedule will be described below with reference to FIGS. 20 and 21 in accordance with the flowchart of FIG. Before starting the process of S30 in FIG. 19, after the delivery schedule is planned by the collective delivery plan unit 84, the article delivery request information that cannot be incorporated in the delivery schedule because the daily delivery capacity is exceeded is:
It is assumed that the unplanned information is stored in the unplanned information storage unit 19 by the unplanned information output unit 85. The delivery schedule planning by the delivery re-planning unit 86 is performed after the process of receiving the article delivery request information 2 from the office and the site is completed.

【0044】図19において、配送再計画部86は未計
画情報が存在するか確認する(S30)。未計画情報が
存在しない場合は、そのまま処理を終了する。未計画情
報が存在する場合は、再調整可能期間記憶部18より再
調整可能期間情報を取得する(S31)。そして、取得
した再調整可能期間情報と本日の日付をもとに、再調整
開始日及び再調整終了日を算出する(S32)。例え
ば、本日の日付が10/4(金)である場合、再調整可
能期間は翌日を含めて5日間先となるため、再調整開始
日は10/7(月)となり、再調整終了日は10/11
(金)となる。そして、配送再計画部86は、再調整開
始日から再調整終了日までの1日ごとに、以下に説明す
るS33からS40までの処理を繰り返し行う。S33
の処理では、配送再計画部86は、再調整日における納
入件数を取得する。そして、納入件数が配送能力よりも
小さい場合は、再調整日における配送能力に余裕がある
と判断し(S34)、未計画情報記憶部19より未計画
情報を取り出し、再調整日に新たな配送スケジュールを
組み込む。但し、未計画情報記憶部19より未計画情報
を取り出す場合、再調整日までに納入締め切り日が到来
していない未計画情報を取り出す。特に、納入締め切り
日が再調整日以降である未計画情報が複数ある場合は、
最も納入締め切り日が小さい未計画情報を優先して取得
する(S35)。未計画情報の取得ができた場合は(S
36)、再調整日に新たな配送スケジュールを追加する
(S37)。そして、配送再計画部86は、配送スケジ
ュールに組み込むことができた未計画情報を未計画情報
記憶部19より消去する(S38)。その後、再度S3
3の再調整日における納入件数を取得する。ここで、取
得する納入件数には、直前に組み込んだ配送スケジュー
ルが加えられている。納入件数が配送能力を上回ってい
る場合は、配送能力に余裕がないため再調整日を1日先
に進める(S39)。このとき、土曜日及び日曜日は事
業所、或いは、現場の休日であるため、この実施の形態
4では、土曜日及び日曜日を除いて再調整日を1日先に
進める。上記で説明したように、S33〜S40の処理
は、再調整日が再調整終了日を超えるまで繰り返し行う
(S41)。例えば、図21は、配送スケジュールの再
調整を行う翌日の日付が10/7(月)である場合の配
送スケジュールを示している。図21では、翌日の日付
が10/7であるため、再調整開始日は10/7(月)
となり、再調整終了日は10/11(金)となる。そし
て、配送再計画部86が10/7から順に1日ごとに1
0/11を超えるまで、図19のS33〜S40の処理
を繰り返し行う。再調整開始日である10/7では、納
入件数が配送能力と同じであるため(S34)、再調整
日を1日先に進め10/8とする(S39)。図21に
よれば、10/8の納入件数は2件であるため、配送能
力に余裕がある(S34)。このため、配送再計画部8
6は、未計画情報記憶部19より再調整日以降に、納入
締め切り日が到来する物品納入要求情報を取得する。例
えば、未計画情報130が未計画情報記憶部19より取
り出され、図21に示すように、10/8(火)の配送
スケジュールに追加する。
In FIG. 19, the delivery re-planning unit 86 checks whether there is any unplanned information (S30). If there is no unplanned information, the process ends. If there is unplanned information, re-adjustable period information is obtained from the re-adjustable period storage unit 18 (S31). Then, a readjustment start date and a readjustment end date are calculated based on the obtained readjustable period information and today's date (S32). For example, if today's date is 10/4 (Fri), the re-adjustable period will be 5 days ahead including the next day, so the readjustment start date will be 10/7 (Monday), and the readjustment end date will be 10/11
(Fri). Then, the delivery re-planning unit 86 repeats the processing from S33 to S40 described below every day from the readjustment start date to the readjustment end date. S33
, The delivery re-planning unit 86 acquires the number of deliveries on the readjustment date. If the number of deliveries is smaller than the delivery capacity, it is determined that there is enough delivery capacity on the readjustment date (S34), the unplanned information is extracted from the unplanned information storage unit 19, and a new delivery date on the readjustment date is obtained. Incorporate a schedule. However, when extracting the unplanned information from the unplanned information storage unit 19, the unplanned information whose delivery deadline date has not arrived by the readjustment date is extracted. In particular, if there are multiple pieces of unplanned information whose delivery deadline is after the readjustment date,
The unplanned information with the smallest delivery deadline is preferentially acquired (S35). If unplanned information can be obtained (S
36), a new delivery schedule is added on the readjustment date (S37). Then, the delivery re-planning unit 86 deletes the unplanned information that could be incorporated into the delivery schedule from the unplanned information storage unit 19 (S38). After that, S3 again
Get the number of deliveries on the readjustment date of 3. Here, the delivery schedule acquired immediately before is added to the number of deliveries to be acquired. If the number of deliveries exceeds the delivery capacity, the readjustment date is advanced by one day because there is no room in the delivery capacity (S39). At this time, since Saturday and Sunday are business office or site holidays, in Embodiment 4, the readjustment date is advanced by one day except for Saturday and Sunday. As described above, the processes of S33 to S40 are repeatedly performed until the readjustment date exceeds the readjustment end date (S41). For example, FIG. 21 shows a delivery schedule when the date of the next day when the delivery schedule is readjusted is 10/7 (month). In FIG. 21, since the date of the next day is 10/7, the readjustment start date is 10/7 (month).
And the end date of the readjustment will be October 11 (Fri). Then, the delivery re-planning unit 86 starts from 10/7 and
Until it exceeds 0/11, the processing of S33 to S40 in FIG. 19 is repeatedly performed. On 10/7, which is the readjustment start date, the number of deliveries is the same as the delivery capacity (S34), so the readjustment date is advanced one day ahead to 10/8 (S39). According to FIG. 21, since the number of deliveries in 10/8 is two, there is room in the delivery capacity (S34). For this reason, the delivery re-planning unit 8
6 obtains, from the unplanned information storage unit 19, the article delivery request information whose delivery deadline comes after the readjustment date. For example, the unplanned information 130 is retrieved from the unplanned information storage unit 19 and added to the delivery schedule of 10/8 (Tue) as shown in FIG.

【0045】図22に、従来の配送計画システムにおけ
る配送スケジュールの例を示す。図22では、10/1
0(木)に配送能力を超える物品納入要求情報が存在し
ている(この発明の配送計画システムでは、配送能力を
超える物品納入要求情報は未計画情報130とする)。
従来の配送計画システムでは、未計画情報130を、別
の配送手段であるトラックをチャーターして10/10
(木)に別のチャーターしたトラックによって納入を行
うように配送スケジュールを計画する。このため、10
/10(木)では、2台のトラックで納入を行うことに
なる。しかし、この発明における配送計画システムを用
いれば、未計画情報となった物品納入要求情報は、未計
画情報記憶部に一時保管され、所定のタイミングで再調
整可能期間内の配送能力を確認し、配送能力に余裕があ
る日が存在すると、未計画の物品納入要求情報を配送能
力に余裕がある日の配送スケジュールに組み込む。この
ため、配送手段、例えば、トラックは1日1台で配送を
行うことができる。
FIG. 22 shows an example of a delivery schedule in a conventional delivery planning system. In FIG. 22, 10/1
The goods delivery request information exceeding the delivery capacity exists at 0 (tree) (in the delivery planning system of the present invention, the goods delivery request information exceeding the delivery capacity is referred to as unplanned information 130).
In the conventional delivery planning system, the unplanned information 130 is obtained by charting a truck as another delivery means.
Plan your delivery schedule to deliver on another chartered truck on Thursday. Therefore, 10
In the case of / 10 (Thu), delivery will be made by two trucks. However, if the delivery planning system according to the present invention is used, the article delivery request information that has become unplanned information is temporarily stored in the unplanned information storage unit, and confirms the delivery capability within the re-adjustable period at a predetermined timing. If there is a day when the delivery capacity is available, the unplanned article delivery request information is incorporated into the delivery schedule on the day when the delivery capacity is available. For this reason, delivery means, for example, trucks can be delivered by one vehicle per day.

【0046】また、別の例として図23は、まとめ配送
計画部84における配送スケジュールを計画した後、未
計画情報131として、10/9(水)には未計画情報
131a,131b、10/10(木)には未計画情報
131cが存在していることを示している。本日日付が
10/4(金)である場合は、再調整可能期間は、10
/7(月)〜10/11(金)となる。配送再計画部8
6は、上記再調整可能期間において配送能力に余裕のあ
る日が存在するか確認する。図23によると、10/7
に配送能力に余裕があることがわかる。未計画情報13
1aと131bは、納入締め切り日が10/9(水)で
ある。また、未計画情報131cは、10/10(木)
が納入締め切り日である。配送再計画部86は、未計画
情報記憶部より10/7以降の納入締め切り日であり、
10/7に最も近い納入締め切り日を持つ未計画情報を
取得する。このため、配送再計画部86は、未計画情報
131aを未計画情報記憶部19より取り出し、図24
のように、10/7(月)の配送スケジュールに組み込
む。10/7の配送件数は、これにより3件になるため
配送能力に余裕がなくなる。続いて、次の10/8
(火)の配送件数を確認すると、図23によると、1件
分の余裕がある。このため、配送再計画部86は、未計
画情報記憶部19より未計画情報131bを取得し、1
0/8の配送スケジュールに組み込む。これで10/8
の配送件数は3件になるため、他の配送スケジュールを
入れることはできない。続いて、配送再計画部86は、
10/9,10/10,10/11の順に1日の配送件
数を確認する。10/11に1件分の余裕があるが未計
画情報記憶部19に記憶されている未計画情報131c
は納入締め切り日が10/10であるため10/11に
配送スケジュールを組み込むことができない。ここで
は、未計画情報131cを未計画のまま未計画情報記憶
部19に記憶していた。しかし、納入締め切り日が到来
する前に、別の配送手段をチャーターして納入を行うよ
うに計画するものである。
FIG. 23 shows another example. As shown in FIG. 23, after the delivery schedule is planned by the collective delivery planning section 84, the unplanned information 131a, 131b, and the 10/10 (Tree) indicates that unplanned information 131c exists. If today is 10/4 (Fri), the re-adjustable period is 10
/ 7 (Monday) to 10/11 (Friday). Delivery replanning unit 8
No. 6 confirms whether there is a day when the delivery capacity has a margin in the re-adjustable period. According to FIG.
It can be seen that there is room in the delivery capacity. Unplanned information 13
For 1a and 131b, the delivery deadline is 10/9 (Wed). In addition, the unplanned information 131c is Thursday, October 10
Is the delivery deadline. The delivery re-planning unit 86 is a delivery deadline date of 10/7 or later from the unplanned information storage unit,
Unplanned information having the delivery deadline closest to 10/7 is acquired. For this reason, the delivery re-planning unit 86 extracts the unplanned information 131a from the unplanned information storage unit 19, and
Is incorporated in the delivery schedule of 10/7 (month). As a result, the number of deliveries of 10/7 becomes three, so that there is no room in the delivery capacity. Then, the next 10/8
When the number of deliveries of (Tue) is confirmed, according to FIG. 23, there is room for one delivery. For this reason, the delivery re-planning unit 86 acquires the unplanned information 131b from the unplanned information storage unit 19, and
Incorporate into the 0/8 delivery schedule. This is 10/8
Since the number of deliveries is three, other delivery schedules cannot be entered. Subsequently, the delivery re-planning unit 86
The number of deliveries per day is checked in the order of October 9, October 10, and October 11. The unplanned information 131c stored in the unplanned information storage unit 19 has room for one case on October 11
Since the delivery deadline is 10/10, the delivery schedule cannot be incorporated on 10/11. Here, the unplanned information 131c is stored in the unplanned information storage unit 19 without being planned. However, before the deadline for delivery is reached, another delivery method is chartered and the delivery is planned.

【0047】実施の形態5.実施の形態5では、物品の
配送スケジュールを計画するとともに、物品の回収スケ
ジュールを計画する配送計画システムについて以下に説
明を行う。
Embodiment 5 In the fifth embodiment, a description will be given below of a delivery planning system that plans a delivery schedule of articles and a collection schedule of articles.

【0048】図25から図28は、実施の形態5におけ
る配送計画システムの構成図である。図25において、
20は物品回収要求情報である。物品回収要求情報20
は、各事業所、或いは、各現場より入力される情報であ
る。物品回収要求情報20は、少なくとも回収先情報と
回収日を指定する回収依頼日情報と回収を希望する物品
を指定する回収物品情報より構成される。納入要求情報
入力部4は、物品納入要求情報2の他に物品回収要求情
報20を新たに入力する。納入要求情報入力部4が入力
した物品納入要求情報2及び物品回収要求情報20は、
配送計画部8に送る。87は回収計画部であり、納入要
求情報入力部4より渡された物品回収要求情報20をも
とに、回収スケジュールを計画する。88は未計画回収
情報出力部である。21は未計画回収情報記憶部であ
る。回収計画部87によって回収スケジュールが決定さ
れなかった物品回収要求情報20は、未計画回収情報出
力部88によって未計画回収情報記憶部21に出力され
る。他の符号については、上記実施の形態4において説
明した符号と同様であるため説明は省略する。
FIGS. 25 to 28 are configuration diagrams of a delivery planning system according to the fifth embodiment. In FIG.
Reference numeral 20 denotes article collection request information. Goods collection request information 20
Is information input from each office or each site. The article collection request information 20 includes at least collection destination information, collection request date information designating the collection date, and collection article information designating the article desired to be collected. The delivery request information input unit 4 newly inputs the article collection request information 20 in addition to the article delivery request information 2. The article delivery request information 2 and the article collection request information 20 input by the delivery request information input unit 4 are:
Send to delivery planning section 8. A collection planning unit 87 plans a collection schedule based on the article collection request information 20 passed from the delivery request information input unit 4. Reference numeral 88 denotes an unplanned collection information output unit. Reference numeral 21 denotes an unplanned collection information storage unit. The item collection request information 20 for which the collection schedule has not been determined by the collection planning unit 87 is output to the unplanned collection information storage unit 21 by the unplanned collection information output unit 88. The other reference numerals are the same as those described in the fourth embodiment, and a description thereof will not be repeated.

【0049】図25は、上記実施の形態4において説明
した配送計画システムの配送計画部8が回収計画部87
と未計画回収情報出力部88を備え、配送計画システム
1が未計画回収情報記憶部21を新たに備えた配送計画
システムの構成図である。また、図26は、上記実施の
形態3において説明した配送計画システム1の配送計画
部8が回収計画部87と未計画回収情報出力部88を備
え、配送計画システム1が未計画回収情報記憶部21を
備えた配送計画システムの構成図を示している。また、
図27は、上記実施の形態2において説明した配送計画
システム1の配送計画部8が回収計画部87と未計画回
収情報出力部88を備え、配送計画システム1が未計画
回収情報記憶部21を備えた配送計画システムの構成図
を示している。また、図28は、上記実施の形態1にお
いて説明した配送計画システム1の配送計画部8が回収
計画部87と未計画回収情報出力部88を備え、配送計
画システム1が未計画回収情報記憶部21を備えた配送
計画システムの構成図を示している。この実施の形態5
では、特に上記実施の形態4で説明した配送計画システ
ム1が回収計画部87を備えた例について説明を行う。
上記実施の形態1から実施の形態3において説明した配
送計画システム1が回収計画部87を備える場合も、回
収計画部87の動作は、これから説明する図25におけ
る回収計画部87と同様の動作を行うものとする。ま
た、未計画回収情報出力部88と未計画回収情報記憶部
21についても同様に、図26から図28の未計画回収
情報出力部88と未計画回収情報記憶部21は、図25
の同じ符号のそれと同様の動作をするものとする。
FIG. 25 shows that the delivery planning unit 8 of the delivery planning system described in the fourth embodiment is different from the collection planning unit 87.
FIG. 1 is a configuration diagram of a delivery planning system including an unplanned collection information output unit 88 and a delivery planning system 1 newly including an unplanned collection information storage unit 21. In FIG. 26, the delivery planning unit 8 of the delivery planning system 1 described in the third embodiment includes a collection planning unit 87 and an unplanned collection information output unit 88. FIG. 1 shows a configuration diagram of a delivery planning system provided with 21. Also,
FIG. 27 shows that the delivery planning unit 8 of the delivery planning system 1 described in the second embodiment includes a collection planning unit 87 and an unplanned collection information output unit 88, and the delivery planning system 1 includes the unplanned collection information storage unit 21. 1 shows a configuration diagram of a delivery planning system provided. FIG. 28 shows that the delivery planning unit 8 of the delivery planning system 1 described in the first embodiment includes a collection planning unit 87 and an unplanned collection information output unit 88, and that the delivery planning system 1 includes an unplanned collection information storage unit. FIG. 1 shows a configuration diagram of a delivery planning system provided with 21. Embodiment 5
Now, an example in which the delivery planning system 1 described in the fourth embodiment includes the collection planning unit 87 will be described.
Even when the delivery planning system 1 described in the first to third embodiments includes the collection planning unit 87, the operation of the collection planning unit 87 is the same as the operation of the collection planning unit 87 in FIG. Assumed to be performed. Similarly, the unplanned collection information output unit 88 and the unplanned collection information storage unit 21 of FIG. 26 to FIG.
Perform the same operation as that of the same reference numeral.

【0050】図29は、実施の形態5における回収スケ
ジュールの計画手順を示す流れ図である。図30は、物
品回収要求情報の発生例を示す図である。図30におい
て、140はC場所からの物品回収要求である。また、
□、△、○はまとめ配送計画部84、配送再計画部86
が既に計画したA場所、B場所、C場所に対する配送ス
ケジュールを示している。図31は、回収計画部87に
よる回収スケジュールの計画過程の一例を説明する図で
ある。図31では、回収要求140はC場所であるた
め、既に配送スケジュールとして計画されているC場所
への配送スケジュールと同じ10/10(木)に回収を
行うことができることを示している。
FIG. 29 is a flowchart showing a procedure for planning a collection schedule according to the fifth embodiment. FIG. 30 is a diagram illustrating an example of generation of the article collection request information. In FIG. 30, reference numeral 140 denotes an article collection request from location C. Also,
□, △, ○ are the collective delivery planning section 84 and the delivery re-planning section 86
Shows delivery schedules for the places A, B, and C that have already been planned. FIG. 31 is a diagram illustrating an example of a collection schedule planning process performed by the collection planning unit 87. FIG. 31 shows that since the collection request 140 is the location C, the collection can be performed on October 10 (Thursday), which is the same as the delivery schedule to the location C already planned as the delivery schedule.

【0051】次に、図29の流れ図に従い、図30と図
31を用いて回収スケジュールの計画手順について説明
する。尚、図29の処理を行う前に、すでにまとめ配送
計画部84と配送再計画部86によって図30に示す
□、△、○の配送スケジュールが計画されているものと
する。図29では、始めに、事業所、或いは、現場から
物品回収要求情報20が配送計画システム1に入力され
る(S50)。特に、ここでは回収日の指定がなされて
いる回収要求が発生しているものとする。しかし、S5
0には図示していないが、回収日の指定がされていない
回収要求も入力する。納入要求情報入力部4は、物品回
収要求情報20を入力し、配送計画部8に渡す。回収計
画部87は、納入要求情報入力部4より渡された物品回
収要求情報20の回収依頼日情報をもとに、すでに計画
されている配送スケジュールを検索し、指定されている
回収依頼日の配送スケジュールに回収先と同じ事業所、
或いは、場所の配送スケジュールが存在するか確認する
(S51)。例えば、図30のように、10/10
(木)が回収日である回収依頼がC場所より発生したも
のとする。図30の配送スケジュールを見ると、10/
10(木)にはC場所への配送スケジュールが存在す
る。このため、回収要求140は、10/10(木)に
配送と同時に回収を行うようスケジュールに組み込む
(S52)。もし、すでに計画されている配送スケジュ
ールの中の回収依頼日に同一回収先(納入先)の配送ス
ケジュールが計画されていない場合は、別途配送手段を
確保し(例えば、配送手段はトラックとする)、回収を
行うよう回収スケジュールを10/10(木)の回収依
頼日に組み込む。しかし、物品の回収については、特に
回収日の指定がなくても物品の回収は行えるため、回収
日の指定のない物品回収要求情報20を配送計画システ
ム1に入力することも可能である。この場合、上記S5
3において、回収日の日付指定がなされていない回収要
求の場合は、未計画回収情報出力部88が未計画回収情
報記憶部21に未計画の物品回収要求情報を記憶させ
る。また、上記S51では、物品回収要求情報に回収日
の指定日がなされている場合、配送スケジュールの中に
同一の回収日(納入日)に同一回収先(納入先)が存在
するか検索を行っていた。しかし、回収日の指定がない
場合は、物品回収要求情報20を受け付けた日より将来
の日付において、配送スケジュールに同一の回収先(納
入先)の配送スケジュールがあるか検索を行い、同一の
回収先(納入先)の配送スケジュールが存在する場合
は、その日に回収スケジュールを組み込む。例えば、1
0/7(月)にC場所からの回収依頼が発生すると(本
日日付は10/7(月)とする)、回収計画部87は、
本日日付より将来の配送スケジュールを確認する。例え
ば、10/7(月)からの10/11(金)までのC場
所への配送スケジュールが計画されてなく、10/14
(月)にはC場所への配送スケジュールが計画されてい
ると、回収計画部87は、10/7(月)に受け付けた
回収依頼を図32のように、10/14(月)に回収ス
ケジュールを計画する。
Next, the procedure of planning the collection schedule will be described with reference to FIGS. 30 and 31 in accordance with the flowchart of FIG. It is assumed that the delivery schedules of □, Δ, and に shown in FIG. 30 have already been planned by the collective delivery planning unit 84 and the delivery re-planning unit 86 before the processing in FIG. 29 is performed. In FIG. 29, first, the article collection request information 20 is input to the delivery planning system 1 from an office or a site (S50). In particular, it is assumed here that a collection request for which a collection date is specified has occurred. However, S5
Although not shown at 0, a collection request for which a collection date is not specified is also input. The delivery request information input section 4 inputs the article collection request information 20 and passes it to the delivery planning section 8. The collection planning unit 87 searches for a delivery schedule that is already planned based on the collection request date information of the article collection request information 20 passed from the delivery request information input unit 4, and retrieves the specified collection request date. The same business office as the collection destination in the delivery schedule,
Alternatively, it is confirmed whether a delivery schedule of the place exists (S51). For example, as shown in FIG.
It is assumed that a collection request in which (Thu) is the collection date has been issued from location C. Looking at the delivery schedule of FIG.
10 (Thu) has a delivery schedule to location C. For this reason, the collection request 140 is incorporated into the schedule so that collection is performed simultaneously with delivery on October 10 (Thursday) (S52). If the delivery schedule of the same collection destination (delivery destination) is not planned on the collection request date in the already planned distribution schedule, a separate delivery means is secured (for example, the delivery means is a truck). , The collection schedule is incorporated into the collection request date on October 10 (Thursday). However, as for the collection of the articles, since the articles can be collected without specifying the collection date, it is also possible to input the article collection request information 20 with no specified collection date to the delivery planning system 1. In this case, the above S5
In 3, in the case of a collection request for which a collection date is not specified, the unplanned collection information output unit 88 causes the unplanned collection information storage unit 21 to store unplanned article collection request information. In S51, if the specified date of collection date is set in the item collection request information, a search is performed to determine whether the same collection destination (delivery destination) exists on the same collection date (delivery date) in the delivery schedule. I was However, if the collection date is not specified, a search is made to see if there is a delivery schedule of the same collection destination (delivery destination) in the delivery schedule on a date in the future from the date on which the item collection request information 20 is received, and the same collection is performed. If there is a delivery schedule for the destination (delivery destination), the collection schedule is incorporated on that day. For example, 1
When a collection request is issued from the place C on 0/7 (Monday) (today is 10/7 (Monday)), the collection planning unit 87
Check future delivery schedules from today. For example, the delivery schedule to the place C from October 7 (Mon) to October 11 (Fri) is not planned, and
If a delivery schedule to place C is planned on (Mon), the collection planning unit 87 collects the collection request received on October 7 (Mon) on October 14 (Mon) as shown in FIG. Plan your schedule.

【0052】図33に、従来の配送計画システムにおけ
る回収スケジュールの計画結果の一例を示す。図33に
示す配送スケジュールは、10/7から(月)から10
/11(金)の期間にC場所への配送スケジュールは計
画されていない。例えば、10/10(木)にC場所か
らの回収依頼が発生すると、回収要求141は10/1
0(木)にC場所への配送スケジュールが計画されてい
ないにも係わらず、10/10に配送要求141の回収
スケジュールを計画する。しかし、この発明における配
送計画システムでは、回収計画部87が回収スケジュー
ルよりも配送スケジュールを優先し、配送スケジュール
が計画されている日に回収スケジュールも同時に行うよ
うに、回収スケジュールの計画を行う。このため、図3
3の10/10(木)に発生した回収依頼は、この発明
における配送計画システムでは、未計画回収情報出力部
88によって未計画回収情報記憶部21に未計画の物品
回収要求情報20を記憶する。
FIG. 33 shows an example of a planning result of a collection schedule in the conventional delivery planning system. The delivery schedule shown in FIG. 33 is from 10/7 (Mon) to 10
No delivery schedule is planned for location C during the period / 11 (Fri). For example, if a collection request from location C occurs on October 10 (Thu), the collection request 141 is
Although the delivery schedule to location C is not planned at 0 (Thu), the collection schedule of delivery request 141 is planned at 10/10. However, in the delivery planning system according to the present invention, the collection planning unit 87 plans the collection schedule so that the delivery schedule is prioritized over the collection schedule and the collection schedule is also performed on the day when the delivery schedule is planned. For this reason, FIG.
In the delivery planning system according to the present invention, the unplanned collection information output unit 88 stores the unplanned item collection request information 20 in the unplanned collection information storage unit 21 for the collection request generated on October 3 (Thursday) of the third. .

【0053】実施の形態6.実施の形態6では、上記実
施の形態5において、未計画回収情報となった物品回収
要求情報の回収スケジュールを再計画する配送計画シス
テムについて以下に説明を行う。尚、実施の形態6で説
明する回収スケジュールの再計画の処理は、1日の業務
終了後、例えば、事業所、或いは、現場からの物品納入
要求情報及び物品回収要求情報の入力が終了した後に行
うものとする。
Embodiment 6 FIG. In the sixth embodiment, a delivery planning system that replans the collection schedule of the item collection request information that has become unplanned collection information in the fifth embodiment will be described below. Note that the process of replanning the collection schedule described in the sixth embodiment is performed after the end of one day's work, for example, after the input of the goods delivery request information and the goods collection request information from the business site or the site is completed. Assumed to be performed.

【0054】図34は、実施の形態6における配送計画
システムの構成図である。図34において、回収計画部
87は、同日回収再計画部89とまとめ回収再計画部9
0を備える。まとめ回収再計画部90は、未計画となっ
ている回収要求情報と同一回収先(納入先)の配送スケ
ジュールが計画された場合、上記配送スケジュールを計
画した日と同じ日に、未計画となっている物品回収要求
情報の回収スケジュールを計画する。また、同日回収再
計画部89は、すでに計画した配送スケジュール及び回
収スケジュールの中で1日当たりの配送能力に満たない
日が存在した場合、上記配送能力に満たない日に未計画
になっている物品回収要求情報の回収スケジュールを計
画する。他の符号については、上記実施の形態5と同様
とするため説明を省略する。尚、実施の形態6では、図
34のまとめ回収再計画部90についてその動作の説明
を行う。同日回収再計画部89については、別の実施の
形態において、その動作を詳細に説明する。図35は、
実施の形態6における回収スケジュールの再計画手順を
示す流れ図である。図36は、実施の形態6におけるま
とめ回収再計画部による回収スケジュールの再計画過程
を説明する図である。図36において、150及び15
1は回収要求を示している。回収要求150の回収依頼
日は10/10(木)である。また、回収要求151の
回収依頼日は、10/11(金)である。回収要求15
0,151が配送計画システムに入力され、回収計画部
87によって回収スケジュールを計画したが、回収依頼
日より前に同一回収先(納入先)への配送スケジュール
が存在しない、かつ、1日当たりの配送能力に余裕のあ
る日が存在しないため未計画回収情報となり、回収要求
150,151は、未計画回収情報記憶部21に記憶さ
れているものとする。未計画となった回収要求150,
151は、一定の期間が経過した後、回収先と同一場所
への配送スケジュールが計画されると、まとめ回収再計
画部90によって回収スケジュールが計画される。図3
7は、従来の配送計画システムにおける回収スケジュー
ルの計画結果を示す図である。
FIG. 34 is a configuration diagram of a delivery planning system according to the sixth embodiment. In FIG. 34, the collection planning unit 87 is the same-day collection re-planning unit 89 and the collection recovery re-planning unit 9
0 is provided. When the delivery schedule of the same collection destination (delivery destination) as the unplanned collection request information is planned, the collective collection re-planning unit 90 becomes unplanned on the same day as the planned delivery schedule. A collection schedule for the required goods collection request information. In addition, the same-day collection re-planning unit 89, if there is a day less than the daily delivery capacity in the already scheduled delivery schedule and collection schedule, unplanned items on the day less than the delivery capacity Plan a collection schedule for collection request information. The other reference numerals are the same as in the fifth embodiment, and a description thereof will not be repeated. In the sixth embodiment, the operation of the collective collection / replanning unit 90 shown in FIG. 34 will be described. The operation of the same day collection / replanning unit 89 will be described in detail in another embodiment. FIG.
33 is a flowchart showing a procedure for replanning a collection schedule in the sixth embodiment. FIG. 36 is a diagram illustrating a process of replanning the collection schedule by the collective collection and replanning unit according to the sixth embodiment. In FIG. 36, 150 and 15
1 indicates a collection request. The collection request date of the collection request 150 is 10/10 (Thu). The collection request date of the collection request 151 is October 11 (Fri). Collection request 15
0,151 is input to the delivery planning system, and a collection schedule is planned by the collection planning unit 87. However, there is no delivery schedule to the same collection destination (delivery destination) before the collection request date, and daily delivery is performed. Since there is no day with sufficient capacity, the information is unplanned collection information, and the collection requests 150 and 151 are stored in the unplanned collection information storage unit 21. Unplanned collection request 150,
151, when a delivery schedule to the same place as the collection destination is planned after a certain period has elapsed, the collection schedule is planned by the collective collection and replanning unit 90. FIG.
FIG. 7 is a diagram showing a result of planning a collection schedule in a conventional delivery planning system.

【0055】次に、図35の流れ図に従い、図36を用
いてまとめ回収再計画部90による回収再計画手順を説
明する。尚、まとめ回収再計画部90による回収再計画
は、事業所及び現場からの物品納入要求情報及び物品回
収要求情報の入力が終了した後行う処理である。始め
に、まとめ回収再計画部90は、未計画回収情報記憶部
21を参照し、未計画回収情報が存在するか確認する
(S60)。未計画回収情報が存在しない場合は、その
まま処理を終了する。未計画回収情報が存在する場合
は、未計画回収情報記憶部21より回収依頼日の小さい
回収要求情報から優先して取り出す(S61)。例え
ば、図36では、回収要求150と回収要求151が未
計画回収情報記憶部21に記憶されている。回収依頼日
は、回収要求150の方が小さいため、まとめ回収再計
画部90は回収要求150を優先して取り出す。次に、
まとめ回収再計画部90は、すでに計画済みの配送スケ
ジュールを確認し、同一回収先(納入先)への配送スケ
ジュールが計画されているかを確認する。回収要求15
0は、C場所の回収要求であるため、まとめ回収再計画
部90は、配送スケジュールの中にC場所への配送計画
があるか確認する。図36によると、10/7(月)と
10/8(火)にC場所への配送スケジュールが計画さ
れている。このまとめ回収再計画の処理を行っている当
日の日付が10/7(月)であるとすると、翌日以降に
回収スケジュールを再計画するため、まとめ回収再計画
部90は、回収要求150を10/8(火)に回収スケ
ジュールを計画する(S63)。このとき、1日当たり
の配送能力を計算する場合、すでに配送スケジュールが
計画されている同一納入先(回収先)への回収要求であ
るため、追加した回収スケジュールは件数に加算しな
い。もし、配送スケジュールの中に同一回収先(納入
先)への配送スケジュールが存在しない場合は、別途回
収(配送)手段、例えば、トラックをチャーターして回
収を実施するようにスケジュールする(S64)。その
後、回収スケジュールを追加した回収要求情報を、未計
画回収情報記憶部21より削除する(S65)。但し、
別途配送手段をチャーターして回収を実施するのは、回
収依頼日が指定されている回収要求である。回収依頼日
が指定されていない回収要求は、いつ回収を行っても構
わないので、回収先と同じ納入先への配送スケジュール
が発生するまで、未計画回収情報記憶部21に回収要求
情報を保管しておく。次に、まとめ回収再計画部90
は、回収要求151の回収スケジュールをS60〜S6
5の順で再計画する。回収要求151には、回収依頼日
が指定されている。まとめ回収再計画の処理を行ってい
る当日の日付が10/7(月)であるので、10/8
(火)以降10/11(金)までにC場所への配送スケ
ジュールがあるか確認する。10/8(火)に、C場所
への配送スケジュールが計画されている。このため、回
収要求151の回収スケジュールを10/8(火)に計
画する。また、回収要求150も10/8(火)に回収
スケジュールを計画したが、すでに10/8(火)には
C場所への配送スケジュールが計画されているため、配
送能力の件数は、回収スケジュールを追加しても3件の
ままである。また、図37に示した従来の配送計画シス
テムにおける回収スケジュールでは、10/10(木)
にC場所への配送スケジュールがないにも係わらず、回
収要求150の回収スケジュールを10/10(木)に
決定している。このため、例えば、1日当たりの配送能
力が3件である場合は、回収要求150を行うために別
途トラックなどの回収(配送)手段をチャーターして、
回収を行わなければならない。このため、この発明にお
ける配送計画システムに比べトラックを余分に保有して
いなくてはならなくなり、回収作業の経費が増えること
になる。
Next, the collection and re-planning procedure by the collective collection and re-planning unit 90 will be described with reference to FIG. Note that the collection and re-planning by the collective collection and re-planning unit 90 is a process performed after the input of the article delivery request information and the article collection request information from the business office and the site is completed. First, the collective collection and replanning unit 90 refers to the unplanned collection information storage unit 21 and checks whether unplanned collection information exists (S60). If there is no unplanned collection information, the process ends. If there is unplanned collection information, the unplanned collection information storage unit 21 preferentially retrieves the collection request information with a smaller collection request date (S61). For example, in FIG. 36, the collection request 150 and the collection request 151 are stored in the unplanned collection information storage unit 21. Since the collection request date is smaller for the collection request 150, the collective collection and replanning unit 90 takes out the collection request 150 with priority. next,
The collective collection and re-planning unit 90 checks the already-planned delivery schedule and checks whether a delivery schedule to the same collection destination (delivery destination) is planned. Collection request 15
Since 0 is a request for collection at the place C, the collective collection and re-planning unit 90 checks whether the delivery schedule includes a delivery plan to the place C. According to FIG. 36, a delivery schedule to location C is planned on October 7 (Mon) and October 8 (Tue). Assuming that the date on which the collective collection re-planning process is performed is 10/7 (Monday), the collective collection re-planning unit 90 sets the collection request 150 to 10 A collection schedule is planned on / 8 (Tue) (S63). At this time, when calculating the daily delivery capacity, since the request is a collection request to the same delivery destination (collection destination) whose delivery schedule is already planned, the added collection schedule is not added to the number of cases. If the delivery schedule does not include a delivery schedule to the same collection destination (delivery destination), a separate collection (delivery) unit, for example, a charter is scheduled to carry out collection by chartering a truck (S64). Thereafter, the collection request information to which the collection schedule has been added is deleted from the unplanned collection information storage unit 21 (S65). However,
Separately carrying out collection by chartering a delivery means is a collection request in which a collection request date is specified. A collection request for which a collection request date is not specified may be collected at any time. Therefore, the collection request information is stored in the unplanned collection information storage unit 21 until a delivery schedule to the same delivery destination as the collection destination occurs. Keep it. Next, the collective collection re-planning unit 90
Sets the collection schedule of the collection request 151 to S60 to S6.
Re-plan in order of 5. The collection request 151 specifies a collection request date. Since the date of the day when the processing of the collective collection and re-planning is performed is 10/7 (month), it is 10/8
From (Tue) to 10/11 (Fri), check if there is a delivery schedule to place C. On October 8 (Tue), a delivery schedule to place C is planned. Therefore, the collection schedule of the collection request 151 is planned to be 10/8 (Tue). Also, the collection schedule of the collection request 150 was planned on October 8 (Tue), but the delivery schedule to location C has already been planned on October 8 (Tue). Even if is added, three cases remain. In the collection schedule in the conventional delivery planning system shown in FIG.
However, the collection schedule of the collection request 150 is determined to be 10/10 (Thursday) even though there is no delivery schedule to the place C. For this reason, for example, when the delivery capacity per day is three, the collection (delivery) means such as a truck is separately chartered in order to perform the collection request 150,
Recovery must be performed. For this reason, compared with the delivery planning system of the present invention, an extra truck must be owned, and the cost of the collection operation increases.

【0056】実施の形態7.実施の形態7では、図34
に示した同日回収再計画部89による回収スケジュール
の再計画手順について以下に説明を行う。図38は、実
施の形態7における回収スケジュールの再計画手順を示
す流れ図である。図39は、実施の形態7における同日
回収再計画部による回収スケジュールの再計画過程を説
明する図である。図39において、未計画回収情報記憶
部21には、上記実施の形態6で説明した図36と同様
に回収要求150と151が未計画の回収要求情報とし
て記憶されている。回収要求150と151は、まとめ
回収再計画部90による回収再計画を行ったとき、回収
スケジュールが計画できずに未計画となっているものと
する。同日回収再計画部89は、未計画回収情報記憶部
21に未計画の回収要求情報が存在することを確認する
と、すでに計画済みの配送スケジュールを確保して、1
日の配送能力に満たない日があると、その日に未計画の
回収情報の回収スケジュールを計画する。
Embodiment 7 FIG. In Embodiment 7, FIG.
The re-planning procedure of the collection schedule by the same-day collection re-planning unit 89 shown in FIG. FIG. 38 is a flowchart showing a procedure for replanning the collection schedule in the seventh embodiment. FIG. 39 is a diagram illustrating a process of replanning the collection schedule by the same day collection and replanning unit according to the seventh embodiment. In FIG. 39, collection requests 150 and 151 are stored as unplanned collection request information in the unplanned collection information storage unit 21 as in FIG. 36 described in the sixth embodiment. The collection requests 150 and 151 are unplanned because the collection schedule cannot be planned when the collective collection and replanning unit 90 performs the collection and replanning. When confirming that the unplanned collection information storage unit 21 has the unplanned collection request information, the collection and replanning unit 89 on the same day secures the already scheduled delivery schedule and
If there is a day less than the day's delivery capacity, a collection schedule of unplanned collection information is planned on that day.

【0057】次に、図38の流れ図に従い、図39を用
いて同日回収再計画部89による回収スケジュールの再
計画手順を説明する。尚、同日回収再計画部89による
回収スケジュールの再計画は、事業所及び現場からの物
品納入要求情報及び物品回収要求情報の入力が停止、終
了した後、かつ、まとめ回収再計画部90による回収ス
ケジュールの再計画を行った後、行うものとする。始め
に、同日回収再計画部89は、未計画回収情報が未計画
回収情報記憶部21に存在するか確認する(S70)。
未計画回収情報が存在しない場合は、処理を終了する。
未計画回収情報が存在する場合は、回収依頼日の小さい
回収要求情報を優先して、未計画回収情報記憶部21よ
り回収要求情報を取り出す。回収日の指定のない回収要
求については、回収依頼日の指定のある回収要求情報の
処理が終了してから取り出す(S71)。例えば、図3
9では、未計画回収情報記憶部21に回収要求150と
回収要求151が記憶されている。回収要求150に
は、回収依頼日が10/10(木)と指定されており、
回収要求151には回収依頼日が指定されていないもの
とする。同日回収再計画部89は、回収要求150を優
先して、未計画回収情報記憶部21より取り出す。次
に、同日回収再計画部89は、すでに計画を行っている
回収スケジュールの中に未計画となっている回収要求と
同じ回収先の回収スケジュールが計画されているか確認
する(S72)。同じ回収先への回収スケジュールが計
画されている場合は、計画済みの回収スケジュールと同
じ日に、別の回収要求の回収スケジュールを組み入れる
(S73)。このとき、1日当たりの配送能力を計算す
る場合は、新たに追加した回収スケジュールを件数に加
算しない。上記S72の処理で、同じ回収先(納入先)
への回収スケジュールが計画されていない場合は、同日
回収再計画部89は、当日日付より後の日の配送スケジ
ュールの中に、1日当たりの配送能力に満たない配送件
数である日が存在するかを確認する(S73)。配送能
力に満たない配送件数の日が存在する場合は、上記配送
能力に満たない日に回収スケジュールを計画する(S7
4)。例えば、1日当たりの配送能力を3件とする。ま
た、当日日付は、同日配送再計画処理を行っている日の
日付であり、10/7(月)とする。図39を見ると、
当日日付の翌日10/8(火)に配送件数が2件である
日が存在する。このため、同日回収再計画部89は、1
0/8(火)に回収要求150に対する回収スケジュー
ルを計画する。そして、同日回収再計画部89は、未計
画回収情報記憶部21より回収スケジュールの再計画を
行うことができた回収要求情報を消去する(S75)。
Next, a procedure for replanning the collection schedule by the same day collection / replanning unit 89 will be described with reference to FIG. The rescheduling of the collection schedule by the same day collection and replanning unit 89 is performed after the input of the goods delivery request information and the goods collection request information from the office and the site is stopped and completed, and the collection by the collective collection and replanning unit 90 is performed. It shall be performed after rescheduling the schedule. First, the same day collection and replanning unit 89 checks whether unplanned collection information exists in the unplanned collection information storage unit 21 (S70).
If there is no unplanned collection information, the process ends.
When there is unplanned collection information, the collection request information is extracted from the unplanned collection information storage unit 21 with priority given to the collection request information with a smaller collection request date. A collection request without a collection date is extracted after the processing of the collection request information with the collection request date is completed (S71). For example, FIG.
9, a collection request 150 and a collection request 151 are stored in the unplanned collection information storage unit 21. In the collection request 150, the collection request date is specified as 10/10 (Thu),
It is assumed that the collection request 151 does not specify a collection request date. On the same day, the collection re-planning unit 89 takes out the collection request 150 from the unplanned collection information storage unit 21 with priority. Next, the same day collection re-planning unit 89 checks whether the collection schedule of the same collection destination as the unplanned collection request is planned in the collection schedule already planned (S72). If a collection schedule for the same collection destination is planned, a collection schedule for another collection request is incorporated on the same day as the planned collection schedule (S73). At this time, when calculating the daily delivery capacity, the newly added collection schedule is not added to the number of cases. In the process of S72, the same collection destination (delivery destination)
If no collection schedule is planned, the same-day collection and re-planning unit 89 determines whether there is a day of the number of deliveries less than the daily delivery capacity in the delivery schedule of the day after the date of the day. Is confirmed (S73). If there are days with the number of deliveries less than the delivery capacity, a collection schedule is planned on a day less than the delivery capacity (S7).
4). For example, the delivery capacity per day is three. The date on the day is the date when the same day delivery re-planning process is performed, and is set to 10/7 (month). Looking at FIG. 39,
On 10/8 (Tue) the next day of the day, there is a day when the number of deliveries is two. Therefore, the same day collection and replanning unit 89
On 0/8 (Tue), a collection schedule for the collection request 150 is planned. Then, the same day collection and replanning unit 89 deletes the collection request information from which the collection schedule can be replanned from the unplanned collection information storage unit 21 (S75).

【0058】次に、同日回収再計画部89は、回収要求
151を未計画回収情報記憶部21より取り出す。そし
て、上記S74,S75の処理で10/8(火)に回収
要求150の回収スケジュールを計画したので、S7
2,S73の処理により回収要求151の回収スケジュ
ールを10/8(火)に計画することができる。
Next, the same day collection / replanning unit 89 extracts the collection request 151 from the unplanned collection information storage unit 21. Then, since the collection schedule of the collection request 150 was planned on October 8 (Tue) in the processing of S74 and S75, S7
2. The collection schedule of the collection request 151 can be planned to be 10/8 (Tue) by the processing of S73.

【0059】以上のように、実施の形態7では、回収ス
ケジュールを再計画する場合に、まず、同じ回収先への
回収スケジュールが計画されている日に、別の未計画に
なっている回収要求の回収スケジュールを組み込むこと
を優先している。もし、同じ回収先への回収スケジュー
ルが計画されていない場合は、さらに、1日当たりの配
送能力を計算し、1日当たりの配送能力に満たない配送
件数の日が存在する場合は、その日に回収スケジュール
を計画する。このため、図39で説明した例のように、
回収要求150と回収要求151が同じ回収先であるの
で、回収要求150の回収スケジュールを先に計画した
後で、同じに日に回収要求151の回収スケジュールを
計画できる。そして、同じ回収先なので、例えば、1台
のトラックで回収作業を2件行うことができる。
As described above, in the seventh embodiment, when the collection schedule is re-planned, first, on the day when the collection schedule to the same collection destination is planned, another unplanned collection request The priority is to incorporate a collection schedule. If a collection schedule is not planned for the same collection destination, the daily delivery capacity is further calculated. To plan. Therefore, as in the example described in FIG.
Since the collection request 150 and the collection request 151 are the same collection destination, after the collection schedule of the collection request 150 is planned first, the collection schedule of the collection request 151 can be planned on the same day. Since the collection destination is the same, for example, two collection operations can be performed by one truck.

【0060】[0060]

【発明の効果】以上のように、この発明の配送計画シス
テムによれば、配送サイクル情報に合わせて配送スケジ
ュールを計画することができる。このため、配送サイク
ルを定期便による配送と考えると、定期便に配送スケジ
ュールを合わせることによって、配送手段、例えば、ト
ラックなどの使用効率を高めることができる効果があ
る。
As described above, according to the delivery planning system of the present invention, a delivery schedule can be planned according to delivery cycle information. For this reason, if the delivery cycle is considered to be delivery by regular flights, there is an effect that the use efficiency of delivery means, for example, trucks, can be improved by adjusting the delivery schedule to the regular flights.

【0061】また、配送可能期間に基づいて配送可能実
施期間を求め、同一納入先への配送スケジュールは、そ
れぞれの物品納入要求に対する配送可能実施期間の中の
重複する1日にまとめ配送を行うように計画する。この
ため、同一配送先への配送スケジュールは1つにまとめ
られるので、配送手段、例えば、トラックなどによる配
送を行う場合、従来の配送計画システムよりもトラック
を使用する回数を減らすことができる効果がある。
Further, the delivery possible period is obtained based on the delivery possible period, and the delivery schedule to the same delivery destination is set such that the delivery is performed on one overlapping day in the delivery possible period for each item delivery request. To plan. For this reason, the delivery schedules to the same delivery destination are combined into one, so that when performing delivery by delivery means, for example, trucks, the effect of reducing the number of times the trucks are used as compared with the conventional delivery planning system is obtained. is there.

【0062】また、配送計画システムが1日当たりの配
送能力を有する場合、複数の納入先への配送スケジュー
ルは、配送可能実施期間内で1日当たりの配送件数を配
送能力ぎりぎりになるよう計画することができる。この
ため、1日当たりの配送手段、例えば、トラックなどの
使用効率を高めることができる効果がある。
When the delivery planning system has a daily delivery capacity, the delivery schedule to a plurality of delivery destinations may be planned so that the number of deliveries per day is within the delivery capacity within the delivery possible implementation period. it can. For this reason, there is an effect that the use efficiency of a daily delivery means, for example, a truck can be improved.

【0063】また、一度計画した配送スケジュールに組
み込むことができなかった配送要求は、未計画配送要求
として保管しておくことができる。そして、一度配送ス
ケジュールを行った後、一定期間経過後再度再調整可能
期間において、配送スケジュールの再計画を行うことが
できる。さらに、配送スケジュールの再計画を行う場合
は、配送能力に余裕がある日に未計画となっている配送
要求の配送スケジュールを計画する。従って、配送要求
を受けた日に配送スケジュールが確定できなくても、後
日取消や変更の配送スケジュールが発生すると、それら
の変更状況に基づいて新たな配送スケジュールを追加す
ることができる。このため、一度計画した配送スケジュ
ールに変更が生じても自動的に配送状況を把握し、配送
スケジュールを再計画するので、最適な配送計画を常に
行うことができる効果がある。
A delivery request that cannot be incorporated into a once-planned delivery schedule can be stored as an unplanned delivery request. Then, after the delivery schedule is once performed, the delivery schedule can be re-planned in the re-adjustable period after a certain period has elapsed. Further, when re-planning the delivery schedule, a delivery schedule of a delivery request that is unplanned on a day when the delivery capacity is available is planned. Therefore, even if the delivery schedule cannot be determined on the day when the delivery request is received, if a delivery schedule of cancellation or change occurs at a later date, a new delivery schedule can be added based on the change status. For this reason, even if there is a change in the once-scheduled delivery schedule, the delivery status is automatically grasped and the delivery schedule is rescheduled, so that there is an effect that an optimal delivery schedule can always be made.

【0064】また、配送スケジュールとともに回収スケ
ジュールも計画する。そして、回収スケジュールは、回
収先(納入先)と同じ回収先に配送スケジュールがある
場合、配送スケジュールと同じ日に回収を行うよう回収
スケジュールが計画される。このため、同一回収先への
回収は配送作業と同時に行われるため、配送手段、例え
ば、トラックなどの使用効率を高めることができる効果
がある。
In addition, a collection schedule is planned together with the delivery schedule. Then, as for the collection schedule, when a delivery schedule is provided at the same collection destination as the collection destination (delivery destination), the collection schedule is planned to perform collection on the same day as the distribution schedule. For this reason, the collection to the same collection destination is performed simultaneously with the delivery operation, so that there is an effect that the use efficiency of the delivery means, for example, the truck can be improved.

【0065】さらに、回収スケジュールを計画したとき
に、同一回収先(納入先)への配送スケジュールが存在
しないために未計画となっている回収要求が存在してい
る場合、一度回収スケジュールの計画を行った後、再度
回収スケジュールを行う。再度の回収スケジュールで
は、配送能力に余裕がある日に回収スケジュールを計画
する。例えば、回収依頼日が指定されていない回収要求
である場合は、いつ回収作業を行ってもよいので、配送
能力に余裕がある日に回収スケジュールを計画すれば、
例えば、トラック等の配送手段を有効に使用できる効果
がある。
Further, when the collection schedule is planned, if there is a collection request that is unplanned because there is no delivery schedule to the same collection destination (delivery destination), once the collection schedule is planned. After that, perform the collection schedule again. In the second collection schedule, a collection schedule is planned on a day when there is room in the delivery capacity. For example, if the collection request date is a collection request that is not specified, collection work may be performed at any time, so if you plan a collection schedule on a day when there is enough delivery capacity,
For example, there is an effect that delivery means such as a truck can be used effectively.

【図面の簡単な説明】[Brief description of the drawings]

【図1】 この発明の実施の形態1における配送計画シ
ステムの構成図。
FIG. 1 is a configuration diagram of a delivery planning system according to a first embodiment of the present invention.

【図2】 この発明の実施の形態1における配送計画シ
ステムのネットワーク構成図。
FIG. 2 is a network configuration diagram of a delivery planning system according to the first embodiment of the present invention.

【図3】 この発明の実施の形態1における配送スケジ
ュールの計画手順の一例を示す流れ図。
FIG. 3 is a flowchart illustrating an example of a delivery schedule planning procedure according to the first embodiment of the present invention.

【図4】 従来の計画手順を実行した一具体例を示す
図。
FIG. 4 is a diagram showing a specific example of executing a conventional planning procedure.

【図5】 図3の計画手順を実行した一具体例を示す
図。
FIG. 5 is a diagram showing a specific example of executing the planning procedure of FIG. 3;

【図6】 この発明の実施の形態2における配送計画シ
ステムの構成図。
FIG. 6 is a configuration diagram of a delivery planning system according to a second embodiment of the present invention.

【図7】 この発明の実施の形態2における同日配送計
画の計画手順を示す流れ図。
FIG. 7 is a flowchart showing a planning procedure of a same-day delivery plan according to the second embodiment of the present invention.

【図8】 従来の計画手順を実行した一具体例を示す
図。
FIG. 8 is a diagram showing a specific example of executing a conventional planning procedure.

【図9】 図7の計画手順を実行した一具体例を示す
図。
FIG. 9 is a diagram showing a specific example of executing the planning procedure of FIG. 7;

【図10】 この発明の実施の形態3における配送計画
システムの構成図。
FIG. 10 is a configuration diagram of a delivery planning system according to a third embodiment of the present invention.

【図11】 この発明の実施の形態3における配送スケ
ジュールの計画手順を説明する流れ図。
FIG. 11 is a flowchart illustrating a procedure for planning a delivery schedule according to the third embodiment of the present invention.

【図12】 この発明の実施の形態3における配送スケ
ジュールの計画過程を具体的に説明する図。
FIG. 12 is a diagram specifically explaining a planning process of a delivery schedule according to the third embodiment of the present invention.

【図13】 この発明の実施の形態3における配送スケ
ジュールの計画過程を具体的に説明する図。
FIG. 13 is a diagram specifically explaining a planning process of a delivery schedule according to the third embodiment of the present invention.

【図14】 この発明の実施の形態3における配送スケ
ジュールの計画過程を具体的に説明する図。
FIG. 14 is a diagram specifically explaining a planning process of a delivery schedule according to the third embodiment of the present invention.

【図15】 この発明の実施の形態3における配送スケ
ジュールの計画過程を具体的に説明する図。
FIG. 15 is a diagram specifically illustrating a delivery schedule planning process according to the third embodiment of the present invention.

【図16】 この発明の実施の形態3における配送スケ
ジュールの計画過程を具体的に説明する図。
FIG. 16 is a diagram specifically illustrating a process of planning a delivery schedule according to the third embodiment of the present invention.

【図17】 従来の配送計画システムにおいて計画した
配送スケジュールを示す図。
FIG. 17 is a diagram showing a delivery schedule planned by a conventional delivery planning system.

【図18】 この発明の実施の形態4における配送計画
システムの構成図。
FIG. 18 is a configuration diagram of a delivery planning system according to a fourth embodiment of the present invention.

【図19】 この発明の実施の形態4における配送スケ
ジュールの計画手順を示す流れ図。
FIG. 19 is a flowchart showing a procedure for planning a delivery schedule according to the fourth embodiment of the present invention.

【図20】 この発明の実施の形態4における未計画情
報を具体例を用いて説明する図。
FIG. 20 is a diagram for explaining unplanned information according to a fourth embodiment of the present invention using a specific example.

【図21】 この発明の実施の形態4における再調整可
能期間を具体的に説明する図。
FIG. 21 is a diagram specifically illustrating a readjustment period according to the fourth embodiment of the present invention.

【図22】 従来の配送計画システムにおいて計画され
た配送スケジュールを示す図。
FIG. 22 is a diagram showing a delivery schedule planned in a conventional delivery planning system.

【図23】 この発明の実施の形態4における未計画情
報を具体例を用いて説明する図。
FIG. 23 is a view for explaining unplanned information according to a fourth embodiment of the present invention using a specific example.

【図24】 この発明の実施の形態4における再調整可
能期間を具体的に説明する図。
FIG. 24 is a diagram specifically illustrating a readjustable period according to the fourth embodiment of the present invention.

【図25】 この発明の実施の形態5における配送計画
システムの構成図。
FIG. 25 is a configuration diagram of a delivery planning system according to a fifth embodiment of the present invention.

【図26】 この発明の実施の形態5における配送計画
システムの構成図。
FIG. 26 is a configuration diagram of a delivery planning system according to a fifth embodiment of the present invention.

【図27】 この発明の実施の形態5における配送計画
システムの構成図。
FIG. 27 is a configuration diagram of a delivery planning system according to a fifth embodiment of the present invention.

【図28】 この発明の実施の形態5における配送計画
システムの構成図。
FIG. 28 is a configuration diagram of a delivery planning system according to a fifth embodiment of the present invention.

【図29】 この発明の実施の形態5における回収スケ
ジュールの計画手順を示す流れ図。
FIG. 29 is a flowchart showing a procedure for planning a collection schedule according to the fifth embodiment of the present invention.

【図30】 この発明の実施の形態5における物品回収
要求情報の発生例を示す図。
FIG. 30 is a diagram showing an example of generation of article collection request information according to Embodiment 5 of the present invention.

【図31】 この発明の実施の形態5における回収計画
部による回収スケジュールの計画過程の一例を説明する
図。
FIG. 31 is a diagram illustrating an example of a collection schedule planning process by a collection planning unit according to Embodiment 5 of the present invention.

【図32】 この発明の実施の形態5における回収計画
部による回収スケジュールの計画過程の一例を説明する
図。
FIG. 32 is a diagram illustrating an example of a collection schedule planning process performed by a collection planning unit according to Embodiment 5 of the present invention.

【図33】 従来の配送計画システムにおける回収スケ
ジュールの計画結果の一例を示す図。
FIG. 33 is a view showing an example of a result of planning a collection schedule in a conventional delivery planning system.

【図34】 この発明の実施の形態6における配送計画
システムの構成図。
FIG. 34 is a configuration diagram of a delivery planning system according to a sixth embodiment of the present invention.

【図35】 この発明の実施の形態6における回収スケ
ジュールの計画手順を示す流れ図。
FIG. 35 is a flowchart showing a procedure for planning a collection schedule according to the sixth embodiment of the present invention.

【図36】 この発明の実施の形態6におけるまとめ回
収再計画部による再計画過程を説明する図。
FIG. 36 is a diagram for explaining a replanning process by the collective collection and replanning unit according to the sixth embodiment of the present invention.

【図37】 従来の配送計画システムにおいて計画され
た回収スケジュールを示す図。
FIG. 37 is a diagram showing a collection schedule planned in a conventional delivery planning system.

【図38】 この発明の実施の形態7における回収スケ
ジュールの計画手順を示す流れ図。
FIG. 38 is a flowchart showing a procedure for planning a collection schedule according to the seventh embodiment of the present invention.

【図39】 この発明の実施の形態7における同日回収
再計画部による回収再計画の計画過程を説明する図。
FIG. 39 is a view for explaining a recovery / planning process by the same-day recovery / replanning unit according to the seventh embodiment of the present invention.

【符号の説明】[Explanation of symbols]

1 配送計画システム、2 物品納入要求情報、3 配
送サイクル情報、4納入要求情報入力部、6 配送サイ
クル情報設定部、7 配送サイクル情報記憶部、8 配
送計画部、9 配送スケジュール記憶部、10 配送ス
ケジュール出力部、11 配送スケジュール、13 配
送可能期間情報、14 配送可能期間設定部、15 配
送可能期間記憶部、16 再調整可能期間情報、17
再調整可能期間設定部、18 再調整可能期間記憶部、
19 未計画情報記憶部、20物品回収要求情報、21
未計画回収情報記憶部、81 配送可能期間算出部、
82 同日配送計画部、84 まとめ配送計画部、85
未計画情報出力部、86 配送再計画部、87 回収
計画部、88 未計画回収情報出力部、89同日回収再
計画部、90 まとめ回収再計画部、100,101,
102,104,105,107,108,109,1
11,112,114,115 期間、100a,10
1a,102a,104a,105a,107a,10
8a,109a,111a,112a,114a,11
5a 物品、103,106,110,113,116
重複期間、117,118,119,120,12
1,122 期間、117a,118a,119a,1
20a,121a,122a 納入予定日、117b,
118b,119b,120b,121b 配送スケジ
ュール、130,131,131a,131b,131
c 未計画情報、140,141,150,151 回
収要求、200 配送センター、201 A事業所、2
02 B事業所、203 C事業所。
1 delivery planning system, 2 article delivery request information, 3 delivery cycle information, 4 delivery request information input section, 6 delivery cycle information setting section, 7 delivery cycle information storage section, 8 delivery planning section, 9 delivery schedule storage section, 10 delivery Schedule output unit, 11 delivery schedule, 13 deliverable period information, 14 deliverable period setting unit, 15 deliverable period storage unit, 16 readjustable period information, 17
Readjustable period setting unit, 18 readjustable period storage unit,
19 unplanned information storage unit, 20 article collection request information, 21
Unplanned collection information storage unit, 81 Delivery possible period calculation unit,
82 Same day delivery planning department, 84 Consolidated delivery planning department, 85
Unplanned information output section, 86 Delivery re-planning section, 87 Collection planning section, 88 Unplanned collection information output section, 89 Same-day collection re-planning section, 90 Collective collection re-planning section, 100, 101,
102, 104, 105, 107, 108, 109, 1
11, 112, 114, 115 period, 100a, 10
1a, 102a, 104a, 105a, 107a, 10
8a, 109a, 111a, 112a, 114a, 11
5a Articles, 103, 106, 110, 113, 116
Overlap period 117, 118, 119, 120, 12
1,122 period, 117a, 118a, 119a, 1
20a, 121a, 122a Expected delivery date, 117b,
118b, 119b, 120b, 121b Delivery schedule, 130, 131, 131a, 131b, 131
c Unplanned information, 140, 141, 150, 151 Collection request, 200 distribution center, 201 A establishment, 2
02 B establishment, 203 C establishment.

───────────────────────────────────────────────────── フロントページの続き (72)発明者 小島 昭彦 東京都千代田区丸の内二丁目2番3号 三菱電機株式会社内 (72)発明者 小原 栄 東京都千代田区丸の内二丁目2番3号 三菱電機株式会社内 (72)発明者 上田 秀介 東京都千代田区大手町二丁目6番2号 三菱電機ビルテクノサービス株式会社内 (72)発明者 竹田 勇 東京都千代田区大手町二丁目6番2号 三菱電機ビルテクノサービス株式会社内 (72)発明者 水野 裕之 東京都荒川区荒川七丁目19番1号 メル テック・ビジネス株式会社内 (72)発明者 渋沢 高一 東京都荒川区荒川七丁目19番1号 メル テック・ビジネス株式会社内 (56)参考文献 特開 平6−28369(JP,A) 特開 平6−263220(JP,A) 特開 平6−176040(JP,A) 特開 平5−242121(JP,A) 特開 平7−210610(JP,A) 特開 平8−212494(JP,A) (58)調査した分野(Int.Cl.7,DB名) G06F 17/60 B65G 1/137 JICSTファイル(JOIS)──────────────────────────────────────────────────続 き Continuing on the front page (72) Inventor Akihiko Kojima 2-3-2 Marunouchi, Chiyoda-ku, Tokyo Mitsubishi Electric Corporation (72) Inventor Sakae 2-3-2 2-3 Marunouchi, Chiyoda-ku, Tokyo Mitsubishi Electric (72) Inventor Shusuke Ueda 2-6-1, Otemachi, Chiyoda-ku, Tokyo Mitsubishi Electric Building Techno Service Co., Ltd. (72) Isamu Takeda 2-6-1, Otemachi, Chiyoda-ku, Tokyo Mitsubishi Inside Denki Building Techno Service Co., Ltd. (72) Inventor Hiroyuki Mizuno 7-19-1, Arakawa, Arakawa-ku, Tokyo Inside Meltech Business Co., Ltd. (72) Takaichi Shibusawa 7-1-1, Arakawa, Arakawa-ku, Tokyo No. Meltech Business Co., Ltd. (56) References JP-A-6-28369 (JP, A) JP-A-6-263220 (JP, A) JP-A-6-176040 (JP, A) JP-A-5-242121 (JP, A) JP-A-7-210610 (JP, A) JP-A 8-212494 (JP, A) (58) Survey Field (Int.Cl. 7 , DB name) G06F 17/60 B65G 1/137 JICST file (JOIS)

Claims (7)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 少なくとも納入先情報と納入締め切り日
と納入物品情報とにより構成されている物品納入要求情
報を入力する納入要求情報入力部を備え、上記物品納入
要求情報に従い配送スケジュールを計画する配送計画シ
ステムにおいて、以下の要素を有することを特徴とする
配送計画システム (a)予め所定の日数を配送可能期間として定める配送
可能期間設定部、 (b)上記配送可能期間設定部が定めた配送可能期間を
記憶する配送可能期間記憶部、 (c)上記配送可能期間記憶部に記憶されている配送可
能期間と上記物品納入要求情報の納入締め切り日とによ
り同一納入先からの所定の物品納入要求と別の物品納入
要求とをまとめて配送件数を1件とするように配送スケ
ジュールを計画する配送計画部、 (d)上記配送計画部が計画した配送スケジュールを記
憶する配送スケジュール記憶部、 (e)上記配送スケジュール記憶部が記憶している配送
スケジュールを取り出して出力する配送スケジュール出
力部。
[1] At least delivery destination information and delivery deadline
Delivery request information consisting of the delivery information and the delivery information
And a delivery request information input section for inputting
Delivery planning system that plans delivery schedules according to request information
The stem has the following elements:
Delivery planning system (a) Delivery in which a predetermined number of days is determined in advance as a deliverable period
Possible period setting unit, (b) The possible delivery period determined by the possible delivery period setting unit
Delivery period storage unit for storing, delivery available stored in (c) above delivery period storage unit
And the delivery deadline of the goods delivery request information
Request for delivery of a specified product from the same delivery destination and delivery of another product
The delivery schedule so that the number of delivery
Delivery planning unit to plan Joule, the (d) the delivery schedule in which the delivery planning unit had planned serial
Delivery schedule storage unit for憶delivery for storing a storage unit (e) the delivery schedule
Delivery schedule output that extracts and outputs the schedule
Force part.
【請求項2】 上記配送計画部は、 上記配送可能期間記憶部より配送可能期間を取り出し、
上記配送可能期間と上記物品納入要求情報の納入締め切
り日とにより上記納入締め切り日が上記配送可能期間に
含まれるように配送可能実施期間を求める配送可能期間
算出部と、 上記配送可能期間算出部が求めた同一納入先からの所定
の物品納入要求に対する配送可能実施期間と、別の物品
納入要求に対する配送可能実施期間を比較して重複する
配送可能日を求め、所定の物品と別の物品とをまとめて
配送件数を1件とするとともに、上記重複する配送可能
日の所定の1日を同時配送する配送日として配送スケジ
ュールを計画する同日配送計画部とを備えたことを特徴
とする請求項1記載の配送計画システム。
2. The delivery planning unit retrieves a deliverable period from the deliverable period storage unit,
Deadline for delivery period and delivery request information
Due to the delivery date, the above delivery deadline is
Delivery time period for which delivery time is required to be included
The calculation unit and the predetermined delivery from the same delivery destination determined by the delivery possible period calculation unit
Delivery possible period for goods delivery request of another and another goods
Overlapping delivery available period for delivery request
Find the delivery date and combine a given item with another item
The number of deliveries is reduced to one and duplicate deliveries are possible.
Delivery schedule as a delivery date for simultaneous delivery of a given day
The same day delivery planning department that plans the schedule
The delivery planning system according to claim 1, wherein
【請求項3】 上記配送計画システムは、1日当たりの
配送可能な納入先件数を示す配送能力情報を記憶してお
り、 上記納入要求入力部は、複数の納入先からの物品納入要
求情報を入力し、 上記配送計画部は、 上記配送可能期間記憶部より配送可能期間を取り出し、
上記配送可能期間と上記複数の納入先からの物品納入要
求情報の納入締め切り日とにより上記納入締め切り日が
上記配送可能期間に含まれるように納入先毎に配送可能
実施期間を求める配送可能期間算出部と、 上記配送可能期間算出部が求めた納入先毎の配送可能実
施期間を比較して重複する配送可能日を求め、上記重複
する配送可能日より上記配送能力情報により示される配
送可能な納入先件数を超えない範囲で複数の納入先への
配送日を計画するまとめ配送計画部とを備えたことを特
徴とする請求項1記載の配送計画システム。
3. The delivery planning system according to claim 1, wherein
Store delivery capacity information indicating the number of deliverable deliveries
In the delivery request input section, the
Request information, the delivery planning unit retrieves a deliverable period from the deliverable period storage unit,
Delivery period and delivery of goods from multiple destinations
The delivery deadline above depends on the delivery deadline of the request
Can be delivered to each delivery destination within the above delivery available period
A deliverable period calculation unit for determining an implementation period, and a deliverable actual value for each destination determined by the deliverable period calculation unit.
Comparing the service periods, finding duplicate delivery dates,
Delivery date indicated by the above-mentioned delivery capacity information.
To multiple destinations as long as the number of
It has a summary delivery planning section that plans delivery dates.
2. The delivery planning system according to claim 1, wherein
【請求項4】 上記配送計画システムは、さらに、 上記配送スケジュールに組み込むことができない物品納
入要求情報を記憶する未計画情報記憶部と、 上記配送計画部が計画した上記配送スケジュールを再調
整することができる再調整可能期間を記憶する再調整可
能期間記憶部と、 上記再調整可能期間を設定し設定した再調整可能期間を
上記再調整可能期間記憶部に記憶する再調整可能期間設
定部とを備え、 上記配送計画部は、 上記配送スケジュールに組み込むことができない上記物
品納入要求情報を上記未計画情報記憶部に記憶する未計
画情報出力部と、 上記配送スケジュールの計画終了後、上記未計画納入要
求情報が存在する場合、上記再調整可能期間において1
日当たりの配送可能な納入先件数に余裕がある日を検索
し、上記未計画情報記憶部より物品納入要求情報を取り
出し、検索した上記配送可能な納入先件数に余裕がある
日に上記物品納入要求情報の配送スケジュールを計画す
る配送再計画部とを備えたことを特徴とする請求項3記
載の配送計画システム。
4. The delivery planning system further includes an article delivery system that cannot be incorporated into the delivery schedule.
Unscheduled information storage unit for storing incoming request information and readjustment of the delivery schedule planned by the delivery planning unit
Re-adjustable to remember the re-adjustable period that can be adjusted
And the re-adjustable period set by setting the re-adjustable period.
The readjustable period setting stored in the readjustable period storage
And a tough, the delivery plan section, the product can not be incorporated into the delivery schedule
Not storing product delivery request information in the unplanned information storage section
Image information output unit, and after completion of the above delivery schedule planning,
If the request information exists, 1
Search for days when there is room for the number of deliverable destinations per day
And retrieves the goods delivery request information from the unplanned information storage section.
There is room for the number of deliverable destinations retrieved and searched
Plan the delivery schedule of the above goods delivery request information on a day
3. A delivery re-planning unit according to claim 3, wherein
On-board delivery planning system.
【請求項5】 上記納入要求情報入力部は、少なくとも
回収先情報と回収依頼日とを物品回収要求情報として入
力し、 上記配送計画部は、 上記配送スケジュールの計画終了後、上記回収依頼日以
降に上記回収先の配送スケジュールが計画されている所
定の日を検索し、上記所定の日に上記物品回収要求情報
の回収スケジュールを計画する回収計画部を備え、 上記配送計画システムは、さらに、上記回収スケジュー
ルに組み込むことができない物品回収要求情報を記憶す
る未計画回収情報記憶部を備え、 上記配送計画部は、 上記回収スケジュールに組み込むことができない物品回
収要求情報を上記未計画回収情報記憶部に記憶する未計
画回収情報出力部を備えたことを特徴とする請求項1〜
4のいずれかに記載の配送計画システム。
5. The delivery request information input unit according to claim 1 , wherein
Enter collection destination information and collection request date as item collection request information.
The force, the delivery plan unit, after the planned completion of the delivery schedule, the collection request date more than
Where the delivery schedule of the above collection destination is planned
Search for a specific day and retrieve the goods collection request information on the specific day
A collection planning unit for planning a collection schedule of the collection, and the delivery planning system further includes a collection schedule.
Stores the item collection request information that cannot be incorporated into
Equipped with an empty plan recovery information storage unit that, the delivery planning unit, the article times that can not be incorporated into the collection schedule
Not storing the collection request information in the unplanned collection information storage unit
An image collection information output unit is provided.
4. The delivery planning system according to any one of 4.
【請求項6】 上記回収計画部は、上記回収依頼日以降
に上記1日当たりの配送可能な納入先件数を越えない日
が発生した場合、上記未計画回収情報記憶部より物品回
収要求情報を取り出し、上記1日当たりの配送可能な納
入先件数を越えない日に上記物品回収要求情報の回収ス
ケジュールを計画する同日回収再計画部を備えたことを
特徴とする請求項5記載の配送計画システム。
6. The collection planning unit, after the collection request date
A day that does not exceed the number of deliverable destinations per day
If an error occurs, the unplanned collection information storage unit
Take out the payment request information, and
On the day that the number of destinations does not exceed
That it has a same-day collection and re-planning department
6. The delivery planning system according to claim 5, wherein:
【請求項7】 上記回収計画部は、上記回収先に対する
物品の配送スケジュールが上記回収依頼日以降の所定の
日に計画された場合、上記未計画回収情報記憶部より物
品回収要求情報を取り出し、上記所定の日に上記物品回
収要求情報の回収スケジュールを計画するまとめ回収再
計画部を備えたことを特徴とする請求項5又は6のいず
れか記載の配送計画システム。
7. The collection planning unit according to claim 1, wherein
If the delivery schedule of the goods is
If planned on the day, the unplanned collection information storage
The product collection request information is taken out, and the goods
Planning the collection schedule of the collection request information
7. A method according to claim 5, further comprising a planning unit.
A delivery planning system as described.
JP6031597A 1997-03-14 1997-03-14 Delivery planning system Expired - Fee Related JP3270705B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP6031597A JP3270705B2 (en) 1997-03-14 1997-03-14 Delivery planning system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP6031597A JP3270705B2 (en) 1997-03-14 1997-03-14 Delivery planning system

Publications (2)

Publication Number Publication Date
JPH10254964A JPH10254964A (en) 1998-09-25
JP3270705B2 true JP3270705B2 (en) 2002-04-02

Family

ID=13138631

Family Applications (1)

Application Number Title Priority Date Filing Date
JP6031597A Expired - Fee Related JP3270705B2 (en) 1997-03-14 1997-03-14 Delivery planning system

Country Status (1)

Country Link
JP (1) JP3270705B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113023382A (en) * 2019-12-24 2021-06-25 乐天株式会社 Conveyance system, control device, and method

Families Citing this family (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001155285A (en) * 1999-11-29 2001-06-08 Hitachi Building Systems Co Ltd Parts delivery managing device for equipment
JP2002024496A (en) * 2000-07-06 2002-01-25 Nissho Iwai Corp Device, system and method for adjustment of transaction, information recording medium and program product
JP2002042005A (en) * 2000-07-31 2002-02-08 Fujitsu Ltd Delivery control method and device therefor, and delivery information service method
JP2002092496A (en) * 2000-09-14 2002-03-29 Nec Corp Network transaction method, data processing method and device, data communication system and information storage medium
JP2002197154A (en) * 2000-12-25 2002-07-12 Nippon Signal Co Ltd:The Aggregated home-delivery system
US6629034B1 (en) * 2001-06-06 2003-09-30 Navigation Technologies Corp. Driving profile method and system
JP2010204862A (en) * 2009-03-02 2010-09-16 Fujitsu Ltd Merchandise selection support method, merchandise selection support device, and program
JP2011113432A (en) * 2009-11-30 2011-06-09 Takumi Giken:Kk System and method for supporting cash supply plan
JP2015230721A (en) * 2014-06-03 2015-12-21 健悟 幸田 Shipment management system
JP6834600B2 (en) * 2017-03-02 2021-02-24 富士通株式会社 Delivery plan creation program, delivery plan creation method, and delivery plan creation device
KR102630280B1 (en) * 2020-09-29 2024-02-02 (주)이너보틀 method, appratus, system, program and computer-readable medium for collecting waste
KR20220149374A (en) * 2021-04-30 2022-11-08 (주)이너보틀 Method, apparatus and system for collecting waste
KR20240011431A (en) * 2022-07-19 2024-01-26 쿠팡 주식회사 Electronic apparatus and delivery management method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113023382A (en) * 2019-12-24 2021-06-25 乐天株式会社 Conveyance system, control device, and method
US11816627B2 (en) 2019-12-24 2023-11-14 Rakuten Group, Inc. Transport system, control device, and method

Also Published As

Publication number Publication date
JPH10254964A (en) 1998-09-25

Similar Documents

Publication Publication Date Title
JP3270705B2 (en) Delivery planning system
US11443396B2 (en) Systems and methods for prioritizing trailers at receiving facility
Dondo et al. The heterogeneous vehicle routing and truck scheduling problem in a multi-door cross-dock system
CN111344726A (en) Dynamic truck routing between automation facilities
US7991634B2 (en) Vehicle transport load optimization
JP7092201B2 (en) Logistics system and logistics method
KR102284951B1 (en) Cargo relay and dispatch system
JP2005075634A (en) Joint delivery information management system
KR20180114344A (en) System and method for managing input and output of container using information network
JP2007084320A (en) Lead acid battery delivery system
JPH08272402A (en) Inference device for raw material transportation plan assignment of ships
JP2002203158A (en) Work planning method and work planning device
KR102093511B1 (en) Transport management system between consignor-carrier and transport management method using the same
JP2002183257A (en) System for managing order reception and order placing
JP5532542B2 (en) Shipping lot creation method and apparatus
JP2005060108A (en) Physical distribution management system
JP2000255719A (en) Automated storage and its control method
JP2910219B2 (en) Distribution method and distribution system
JP2023006316A (en) matching system
JP7292725B2 (en) Information processing equipment
WO2023181239A1 (en) Information processing device and method
JPH01188256A (en) Part production instructing device
JP3161330B2 (en) Inbound and outbound processing instructions
JP7470986B2 (en) Information processing device
JP2004227320A (en) Shipping planning method

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20020108

RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20040520

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080118

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090118

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090118

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100118

Year of fee payment: 8

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313117

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100118

Year of fee payment: 8

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110118

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120118

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130118

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140118

Year of fee payment: 12

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees