JP3263489B2 - Centering jig for pipe welding - Google Patents

Centering jig for pipe welding

Info

Publication number
JP3263489B2
JP3263489B2 JP18517893A JP18517893A JP3263489B2 JP 3263489 B2 JP3263489 B2 JP 3263489B2 JP 18517893 A JP18517893 A JP 18517893A JP 18517893 A JP18517893 A JP 18517893A JP 3263489 B2 JP3263489 B2 JP 3263489B2
Authority
JP
Japan
Prior art keywords
jig
pipe
centering
welding
attached
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP18517893A
Other languages
Japanese (ja)
Other versions
JPH0740084A (en
Inventor
正夫 光永
芳男 早川
浩司 小沢
功 佐藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tokyo Gas Co Ltd
Original Assignee
Tokyo Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokyo Gas Co Ltd filed Critical Tokyo Gas Co Ltd
Priority to JP18517893A priority Critical patent/JP3263489B2/en
Publication of JPH0740084A publication Critical patent/JPH0740084A/en
Application granted granted Critical
Publication of JP3263489B2 publication Critical patent/JP3263489B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Non-Disconnectible Joints And Screw-Threaded Joints (AREA)
  • Butt Welding And Welding Of Specific Article (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、ガス管、水道管等の溶
接時に用いられる芯出し冶具に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a centering jig used for welding gas pipes, water pipes and the like.

【0002】[0002]

【従来の技術】配管を溶接する際、この配管同士はその
開先間の寸法が所定の寸法に収められていて、かつ芯出
しが正確に行われた状態で溶接されることが必須であ
る。
2. Description of the Related Art When welding pipes, it is essential that the pipes be welded in such a manner that the gap between the pipes is set to a predetermined size and the centering is accurately performed. .

【0003】このため、従来は図4〜図9に示す方法に
より溶接作業を行っている。
[0003] For this reason, a welding operation is conventionally performed by a method shown in FIGS.

【0004】a.先ず、図4に示すように、2本の配管
の開先を突き合わせ、この配管を継ぐようにして開先間
隔調整冶具Aと芯出し冶具Bを溶接で取り付ける。因
に、32B管の場合、Aは4ケ所、Bは16ケ所取り付
ける。
A. First, as shown in FIG. 4, the grooves of two pipes are butted, and a groove spacing adjusting jig A and a centering jig B are attached by welding so as to join the pipes. By the way, in the case of 32B pipe, A is attached at 4 places and B is attached at 16 places.

【0005】b.次に、図5に示すように、開先間隔調
整冶具AのナットA′を回転して、配管同士の間隔を設
定寸法になるように調整する。
B. Next, as shown in FIG. 5, the nut A 'of the groove spacing adjusting jig A is rotated to adjust the spacing between the pipes to the set dimension.

【0006】c.次に、図6に示すように、芯出し冶具
Bの芯出しボルトB′を回転して、配管同士の芯出しを
行う。
C. Next, as shown in FIG. 6, the centering bolt B 'of the centering jig B is rotated to center the pipes.

【0007】d.次に図7に示すように、冶具AとBの
間にピースCを溶接して配管同士を仮接続した後、開先
寸法検査を行ってから冶具A・Bを取り外す。
D. Next, as shown in FIG. 7, after the pieces C are welded between the jigs A and B to temporarily connect the pipes, a groove dimension inspection is performed, and then the jigs A and B are removed.

【0008】e.次に、一層目の溶接を行ってからピー
スCを取り除き、本溶接を行う。
E. Next, after performing the first welding, the piece C is removed, and the main welding is performed.

【0009】f.次に、図8に示すように冶具A・B及
びピースCの溶接痕DをグラインダーEにより処理して
平滑に仕上げる。
F. Next, as shown in FIG. 8, the welding traces D of the jigs A and B and the piece C are processed by a grinder E to finish it smoothly.

【0010】g.次に、図9に示すように、溶接線及び
冶具溶接痕Dを含む周りLを浸透探傷検査処理し、欠陥
処理が見つかった場合にはグラインダーE処理をもう一
度行う。
G. Next, as shown in FIG. 9, the periphery L including the welding line and the jig welding trace D is subjected to the penetrant inspection processing, and when the defect processing is found, the grinder E processing is performed again.

【0011】[0011]

【発明が解決しようとする課題】しかし、上記溶接方法
によると、次のような欠点がある。
However, the above welding method has the following disadvantages.

【0012】a.配管口径が大きくなる程冶具A及びB
の数が増加するため、この冶具A・Bの溶接及びグライ
ンダー処理の作業時間が増大する。
A. Jigs A and B as pipe diameter increases
, The work time for welding and grinder processing of the jigs A and B increases.

【0013】b.冶具A・B及びピースCによる仮溶接
箇所が増加するため、溶接後の浸透探傷検査に際して欠
陥が検出される確率が高まり、検査後の再グラインダー
処理及び再浸透探傷検査作業時間が増加する。
B. Since the number of temporary welding spots by the jigs A and B and the piece C increases, the probability that a defect is detected during the penetration inspection after welding increases, and the time required for the re-grinder processing and the inspection operation after the inspection increases.

【0014】c.仮溶接箇所の増加は、配管の開先部分
に入熱を施すことになり、品質管理上好ましくない。こ
のため、仮溶接箇所の削減が課題とされている。
C. The increase in the number of temporary welding points causes heat to be input to the groove of the pipe, which is not preferable in quality control. For this reason, reducing the number of temporary welding locations has been an issue.

【0015】本発明の目的は、上記a〜cに記した課題
を改善することである。
An object of the present invention is to improve the above-mentioned problems a to c.

【0016】[0016]

【課題を解決するための手段】本発明に係る配管溶接用
芯出し冶具の構成は次のとおりである。
The construction of a centering jig for pipe welding according to the present invention is as follows.

【0017】配管の開先合わせを行うための冶具であっ
て、この冶具本体10、10´は、一方の配管に対して
上下方向から抱き合わせるようにして取り付けることが
できる二つ割り形状から成ると共にこの冶具本体10、
10´の両端には、二つ割りの冶具本体10、10´を
相互に着脱自在に連結して固定することができる固定手
段11、11´が取り付けられており、更に、前記冶具
本体10、10´の外周には、ホルダー固定板12が一
定の間隔で放射状に突出固定されており、更に、前記固
定板12には、先端側を水平方向に延長すると共にこの
延長した先端に垂直方向に向けてねじ孔16を設けた芯
出しボルト用のホルダー13がねじ14により着脱自在
に取り付けられており、更に、前記ホルダー13の先端
のねじ孔16には配管の中心方向を向き、且つ冶具本
体10、10´を取り付けた配管に対して芯出しを行う
他の配管の外周面に当接するように芯出しボルト15が
ねじ16の作用により出入り自在に取り付けられてい
る、ことを特徴とする配管溶接用芯出し冶具。
This is a jig for adjusting the groove of a pipe. The jig bodies 10, 10 'have a split shape which can be attached to one of the pipes so as to hold the pipe from above and below. Jig body 10,
At both ends of 10 ', fixing means 11, 11' which can removably connect and fix the split jig bodies 10, 10 'to each other are attached, and further, the jig bodies 10, 10' are further attached. the outer periphery of is projected fixed radially holder fixing plate 12 at regular intervals, further, the solid
The plate 12 has a front end extending horizontally and
A centering bolt holder 13 provided with a screw hole 16 in the extended tip in the vertical direction is detachably attached by a screw 14 , and further, a pipe hole of a pipe is provided in the screw hole 16 at the tip of the holder 13. A centering bolt 15 is attached so as to freely move in and out by the action of a screw 16 so as to face the center direction and to contact the outer peripheral surface of another pipe for centering the pipe to which the jig bodies 10 and 10 ′ are mounted. A centering jig for pipe welding.

【0018】[0018]

【作用】配管の開先を突き合わせ、これに開先間隔調整
冶具を取り付けて間隔寸法を調整する。この作業は従来
例と同じである。次に、二つ割り形状の冶具本体を配管
の一方の開先に上下から合わせ、その両端を固定手段で
強固に固定することにより配管に捲きつける。次にこの
冶具本体の芯出しボルトを利用して芯出しを行う。次に
ピースを溶接して仮止めを行い、開先寸法の検査を行っ
たのち、一層目の溶接を行い、次に間隔調整冶具及び芯
出し冶具(冶具本体)を配管から取り外し、本溶接後グ
ラインダー処理、浸透探傷検査を行う。
[Action] A groove of a pipe is abutted, and a groove gap adjusting jig is attached to the groove to adjust a gap dimension. This operation is the same as the conventional example. Next, the split jig body is vertically aligned with one of the grooves of the pipe, and both ends thereof are firmly fixed by fixing means, thereby being wound around the pipe. Next, centering is performed using the centering bolts of the jig body. Next, the pieces are welded and temporarily fixed, the groove dimensions are inspected, the first layer is welded, then the spacing adjustment jig and centering jig (jig body) are removed from the piping, and Perform grinder processing and penetrant inspection.

【0019】[0019]

【実施例】図1〜図3に本発明に係る芯出し冶具の構成
を示す。
1 to 3 show the structure of a centering jig according to the present invention.

【0020】10、10′は円形を二つ割り形状にした
冶具本体にして、この冶具本体10、10′はその両端
において固定手段としての固定ボルト11、11′によ
り固定自在である。12は前記冶具本体10、10′の
外周面に放射状に取り付けた固定板、13はこの固定板
12にネジ14により夫々取り付けられたホルダー、1
5はホルダー13の先端に形成したねじ孔16に対し
て、配管の中心方向に向けて出入り自在に螺合された芯
出しボルトである。なお、図1において、ホルダー13
及び芯出しボルト15の図示は一部省略してある。
Reference numerals 10 and 10 'denote jig bodies formed by dividing a circle into two parts. The jig bodies 10 and 10' can be fixed at both ends by fixing bolts 11 and 11 'as fixing means. Reference numeral 12 denotes a fixing plate radially attached to the outer peripheral surfaces of the jig bodies 10, 10 '. Reference numeral 13 denotes holders respectively attached to the fixing plate 12 by screws 14.
Reference numeral 5 denotes a centering bolt which is screwed into a screw hole 16 formed at the tip of the holder 13 so as to be able to move in and out toward the center of the pipe. Note that in FIG.
The illustration of the centering bolt 15 is partially omitted.

【0021】上記芯出し冶具を用いて行う溶接作業例を
次に説明する。
Next, an example of a welding operation performed using the above-described centering jig will be described.

【0022】配管の開先を突き合わせ、これに開先間隔
調整冶具(従来例と同一のもの)を取り付けて間隔寸法
を調整する。次に、冶具本体10、10′を配管の一方
の開先に上下から合わせ、その両端を固定ボルト11、
11′で強固に固定し、この冶具本体10、10′の芯
出しボルト15を利用して芯出しを行う(図3)。次に
ピース(従来例と同じ)を溶接して仮止めを行い、開先
寸法の検査を行ったのち、一層目の溶接を行い、次に間
隔調整冶具及び冶具本体10、10′を配管から取り外
し、本溶接後グラインダー処理、浸透探傷検査を行う。
The groove of the pipe is abutted, and a groove interval adjusting jig (the same as the conventional example) is attached to the groove to adjust the interval dimension. Next, the jig bodies 10 and 10 ′ are vertically aligned with one groove of the pipe, and both ends thereof are fixed with bolts 11.
11 'is firmly fixed, and centering is performed using the centering bolts 15 of the jig bodies 10, 10' (FIG. 3). Next, a piece (same as the conventional example) is welded and temporarily fixed, the groove dimensions are inspected, the first layer is welded, and then the gap adjusting jig and the jig bodies 10, 10 'are removed from the piping. After removal and main welding, grinder processing and penetrant inspection are performed.

【0023】[0023]

【発明の効果】本発明は以上のように、従来の芯出し冶
具Bに相当する部分は、二つ割り形状の冶具本体を配管
に上下から捲き付けてボルトで固定し、直接配管に溶接
しないようにした。この結果、次の効果を奏する。
As described above, according to the present invention, the portion corresponding to the conventional centering jig B is formed by winding a jig body of a split shape from above and below on a pipe and fixing it with bolts so as not to directly weld to the pipe. did. As a result, the following effects are obtained.

【0024】a.従来の溶接方法に比較して、芯出し冶
具Bを直接配管に溶接したり取り除いたりする手間及び
この溶接痕のグラインダー処理、浸透探傷検査の手間が
省ける。この結果、作業能率が向上すると共に浸透探傷
検査で欠陥が検出される確率が大巾に低下する。
A. Compared with the conventional welding method, the labor for directly welding or removing the centering jig B to / from the pipe, the grinder treatment of the welding trace, and the labor for the penetrant inspection can be saved. As a result, the work efficiency is improved, and the probability that a defect is detected by the penetrant inspection is significantly reduced.

【0025】b.溶接箇所が減少したため、溶接熱によ
り配管に及ぼす悪い影響も少なくなり、品質管理を十分
に行うことができる。
B. Since the number of welding spots is reduced, adverse effects on the piping due to welding heat are reduced, and quality control can be sufficiently performed.

【0026】c.二つ割りの冶具本体を、例えばアルミ
バンドで形成すると、軽量化するため、作業及び運搬な
どがしやすくなる。
C. When the split jig body is formed of, for example, an aluminum band, the weight and weight of the jig body are reduced, so that the work and the transportation are facilitated.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明に係る芯出し冶具の正面図。FIG. 1 is a front view of a centering jig according to the present invention.

【図2】芯出し冶具の一部を示す説明図。FIG. 2 is an explanatory view showing a part of a centering jig.

【図3】芯出し作業例の説明図。FIG. 3 is an explanatory diagram of an example of a centering operation.

【図4】従来の溶接作業において用いられる冶具の説明
図。
FIG. 4 is an explanatory view of a jig used in a conventional welding operation.

【図5】配管の間隔寸法調整例の説明図。FIG. 5 is an explanatory diagram of an example of adjusting a spacing between pipes.

【図6】配管の芯出し例の説明図。FIG. 6 is an explanatory diagram of an example of centering of a pipe.

【図7】配管をピースで仮り止めした例の説明図。FIG. 7 is an explanatory view of an example in which a pipe is temporarily fixed with a piece.

【図8】配管を溶接し、冶具及びピースの溶接痕をグラ
インダー処理している状況の説明図。
FIG. 8 is an explanatory view showing a situation where pipes are welded and welding marks on a jig and a piece are subjected to a grinder process.

【図9】浸透探傷検査範囲の説明図。FIG. 9 is an explanatory diagram of a penetrant inspection range.

【符号の説明】[Explanation of symbols]

10、10′ 冶具本体 11、11′ 固定ボルト 12 固定板 13 ホルダー 14 ネジ 15 芯出しボルト 16 ねじ孔 10, 10 'Jig body 11, 11' Fixing bolt 12 Fixing plate 13 Holder 14 Screw 15 Centering bolt 16 Screw hole

フロントページの続き (56)参考文献 実開 昭54−46824(JP,U) 実開 昭57−52292(JP,U) 実開 昭54−67720(JP,U) (58)調査した分野(Int.Cl.7,DB名) B23K 37/053 B23K 9/028 F16L 13/02 Continuation of the front page (56) References JP-A 54-46824 (JP, U) JP-A 57-52292 (JP, U) JP-A 54-67720 (JP, U) (58) Fields surveyed (Int) .Cl. 7 , DB name) B23K 37/053 B23K 9/028 F16L 13/02

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 配管の開先合わせを行うための冶具であ
って、この冶具本体10、10´は、一方の配管に対し
て上下方向から抱き合わせるようにして取り付けること
ができる二つ割り形状から成ると共にこの冶具本体1
0、10´の両端には、二つ割りの冶具本体10、10
´を相互に着脱自在に連結して固定することができる固
定手段11、11´が取り付けられており、更に、前記
冶具本体10、10´の外周には、ホルダー固定板12
が一定の間隔で放射状に突出固定されており、更に、前
記固定板12には、先端側を水平方向に延長すると共に
この延長した先端に垂直方向に向けてねじ孔16を設け
た芯出しボルト用のホルダー13がねじ14により着脱
自在に取り付けられており、更に、前記ホルダー13の
先端のねじ孔16には配管の中心方向を向き、且つ冶
具本体10、10´を取り付けた配管に対して芯出しを
行う他の配管の外周面に当接するように芯出しボルト1
5がねじ16の作用により出入り自在に取り付けられて
いる、ことを特徴とする配管溶接用芯出し冶具。
1. A jig for adjusting a groove of a pipe, wherein the jig bodies 10, 10 'have a split shape which can be attached to one of the pipes so as to hold the pipe from above and below. With this jig body 1
At both ends of 0, 10 ', two jig bodies 10, 10
′ Are attached to each other so that they can be detachably connected to each other and fixed, and a holder fixing plate 12 is provided on the outer periphery of the jig bodies 10 and 10 ′.
There are projected fixed radially at regular intervals, further, before
Serial to the fixing plate 12 is detachably attached by a holder 13 screw 14 for centering bolt having a screw hole 16 toward the vertical direction to the extended tip with extending the front end side in the horizontal direction further, the screw hole 16 of the tip of the holder 13, directed to the center direction of the pipe, and to abut against the outer peripheral surface of the other pipe to perform centering with respect to the pipe, fitted with a jig main body 10, 10 ' Centering bolt 1
5. A centering jig for welding a pipe, wherein 5 is attached so as to be able to move in and out by the action of a screw 16.
JP18517893A 1993-07-27 1993-07-27 Centering jig for pipe welding Expired - Fee Related JP3263489B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP18517893A JP3263489B2 (en) 1993-07-27 1993-07-27 Centering jig for pipe welding

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP18517893A JP3263489B2 (en) 1993-07-27 1993-07-27 Centering jig for pipe welding

Publications (2)

Publication Number Publication Date
JPH0740084A JPH0740084A (en) 1995-02-10
JP3263489B2 true JP3263489B2 (en) 2002-03-04

Family

ID=16166208

Family Applications (1)

Application Number Title Priority Date Filing Date
JP18517893A Expired - Fee Related JP3263489B2 (en) 1993-07-27 1993-07-27 Centering jig for pipe welding

Country Status (1)

Country Link
JP (1) JP3263489B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107654762A (en) * 2017-08-30 2018-02-02 中建六局安装工程有限公司 A kind of anchor ear and its construction method

Also Published As

Publication number Publication date
JPH0740084A (en) 1995-02-10

Similar Documents

Publication Publication Date Title
US3992123A (en) Pipe end machining apparatus
JP4774256B2 (en) Deburring device for friction stir welding
JP3263489B2 (en) Centering jig for pipe welding
JP5738003B2 (en) Welding jig
JP2009072795A (en) Welding tool
JPH07185878A (en) Jig for correcting deformation of groove of tube
JP2532790Y2 (en) Butt welding equipment for pipe-shaped members
JP2005088048A (en) Flange for absorbing welding deformation for piping joint, and piping joint using the same
JPS6054281A (en) Manufacture of build-up welded flange
JPH1047535A (en) Connecting method for butt member and its centering jig
JPH08168896A (en) Precise welding method for supplying fluid and welding jig
JP2020157367A (en) Welding training jig
JPS6192795A (en) Production of thin-walled pipe
KR20160001763U (en) The fit-up apparatus of pipeflange
CN210849024U (en) Fastening and automatic centering device
JPS6082297A (en) Jig for piping work
JPH0893965A (en) Jig for piping assembling and welding
JPH081380A (en) Welding equipment, and mechanism and method for positioning groove part
JP5940716B1 (en) Screw pump and manufacturing method thereof
JPS62230479A (en) Welding equipment for periphery of pipe
JPH04118173A (en) Method and equipment for welding column joint part diaphragm
JP5594814B2 (en) Tube welding method to circumferentially curved surface
JPH08238568A (en) Butt groove of fixed tube
JPH05280525A (en) Jointing nut fixing jig
JPS6333942B2 (en)

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees