JP3249100B2 - Method of manufacturing PCa beam member with U-shaped cross section and formwork device therefor - Google Patents

Method of manufacturing PCa beam member with U-shaped cross section and formwork device therefor

Info

Publication number
JP3249100B2
JP3249100B2 JP26533699A JP26533699A JP3249100B2 JP 3249100 B2 JP3249100 B2 JP 3249100B2 JP 26533699 A JP26533699 A JP 26533699A JP 26533699 A JP26533699 A JP 26533699A JP 3249100 B2 JP3249100 B2 JP 3249100B2
Authority
JP
Japan
Prior art keywords
formwork
air
core
panel
air panel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP26533699A
Other languages
Japanese (ja)
Other versions
JP2001088115A (en
Inventor
雅嗣 鬼塚
祐司 若林
敦昌 西尾
和也 浦川
悟 近藤
展郎 多田
和安 田村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Okamoto Industries Inc
Sato Kogyo Co Ltd
Original Assignee
Okamoto Industries Inc
Sato Kogyo Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Okamoto Industries Inc, Sato Kogyo Co Ltd filed Critical Okamoto Industries Inc
Priority to JP26533699A priority Critical patent/JP3249100B2/en
Publication of JP2001088115A publication Critical patent/JP2001088115A/en
Application granted granted Critical
Publication of JP3249100B2 publication Critical patent/JP3249100B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、せん断補強筋の内
側に中子筋を備える断面U字状PCa(プレキャストコ
ンクリート)梁部材の製造方法およびその型枠装置に関
する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of manufacturing a U-shaped PCa (precast concrete) beam member having a core bar inside a shear reinforcing bar, and a formwork apparatus therefor.

【0002】[0002]

【従来の技術】この種の中空PCa部材は、中空部を形
成するために設置した内型枠の外側に肉厚分の隙間を空
けて外型枠を配置し、これら内型枠と外型枠との間の空
間部分にコンクリートを流し込んでまたは圧入により製
造される。この場合に問題となるのは、非常に狭隘な空
間での作業を強いられる内型枠の組立作業と、流し込ん
だコンクリートが硬化した後の内型枠の脱型作業であ
る。
2. Description of the Related Art In a hollow PCa member of this type, an outer mold is provided with a gap corresponding to a thickness outside an inner mold provided for forming a hollow portion. It is manufactured by pouring or pressing concrete in the space between the frame and the space. The problems in this case are the work of assembling the inner formwork, which requires the work in a very narrow space, and the work of removing the inner formwork after the poured concrete has hardened.

【0003】前述の問題を解決するために近年は、特開
平5−16131号公報、特開昭62−233206号
公報、特開平5−278022号公報などで示されるよ
うに、内型枠としてエアチューブを用いたプレキャスト
コンクリート部材の製造方法が提案されている。前者の
特開平5−16131号公報を例に採り説明すると、そ
の製造方法は、図7に示されるように、四側外面に夫々
突起52,52…が形成された剛性平板51A〜51D
を張設したエアチューブ50を用い、外型枠53内部に
せん断補強筋(スターラップ)54,54…を長手方向
に所定間隔で配設するとともに、主筋55,55…をそ
の内側に配設し、前記せん断補強筋54,54…の内部
に収縮させた前記エアチューブ50を挿入し、次いで給
気によりエアチューブ50を膨らまして内型枠とし、前
記外型枠53とエアチューブ50との間にコンクリート
を充填することにより、図8に示される断面U字状PC
a梁部材55を製造する方法が提案されている。脱型に
当たっては、前記エアチューブから脱気を行い収縮させ
ることにより、コンクリート面から剥離させるようにす
る。
In order to solve the above-mentioned problems, in recent years, as disclosed in JP-A-5-16131, JP-A-62-233206, JP-A-5-278022, etc. A method for manufacturing a precast concrete member using a tube has been proposed. Taking the former Japanese Patent Application Laid-Open No. 5-16131 as an example, the manufacturing method is as follows. As shown in FIG. 7, the rigid flat plates 51A to 51D each having projections 52, 52.
Are arranged at predetermined intervals in the longitudinal direction inside the outer mold frame 53, and the main reinforcements 55, 55 are arranged inside thereof. , And the contracted air tube 50 is inserted into the inside of the shear reinforcing bars 54, 54, and then the air tube 50 is inflated by air supply to form an inner mold. By filling concrete in between, PC with U-shaped cross section shown in FIG.
A method for manufacturing the a-beam member 55 has been proposed. At the time of demolding, the air tube is degassed and shrunk so as to be separated from the concrete surface.

【0004】[0004]

【発明が解決しようとする課題】しかしながら、図1に
示される、せん断補強筋4Aの他に中子筋4Bを備える
PCa梁部材を製造する場合には、前記エアチューブ5
0による内型枠は使用することができない。また、前記
エアチューブ50の場合には、脱型時に各エアチューブ
50の各側面が均等に収縮することはなく、四側面の
内、一側面または二側面がコンクリート面が張り付いた
状態で収縮するため、エアチューブ50をコンクリート
面から完全に剥離させるのに手間が掛かるなどの問題が
あった。
However, in the case of manufacturing a PCa beam member shown in FIG. 1 having a core reinforcing bar 4B in addition to the shear reinforcing bar 4A, the air tube 5 is required.
An inner mold with 0 cannot be used. Further, in the case of the air tube 50, each side surface of each air tube 50 does not shrink evenly when the mold is removed, and one or two of the four side surfaces shrink in a state where the concrete surface is stuck. Therefore, there is a problem that it takes time and effort to completely separate the air tube 50 from the concrete surface.

【0005】また、脱気によってコンクリート面から剥
離させようとした場合には、チューブ容積が大きいた
め、かなりの量のエアを脱気しなければならず作業効率
が悪くなるとともに、給気に際しても同量のエアを給気
しなければならず、脱型および組立に時間が掛かり作業
効率が悪いなどの問題があった。
[0005] Further, in the case of trying to separate from the concrete surface by degassing, a considerable amount of air must be degassed due to the large volume of the tube. The same amount of air had to be supplied, and there was a problem that the demolding and assembling took a long time and the work efficiency was poor.

【0006】さらに、前記エアチューブ50の場合には
その位置固定方法が難しく、コンクリート打設時に移動
したり浮き上がったりすることがある。そのため、常に
安定して製品精度を確保することが困難であるなどの問
題もあった。
Further, in the case of the air tube 50, the position fixing method is difficult, and the air tube 50 may move or float at the time of placing concrete. Therefore, there has been a problem that it is difficult to always stably secure product accuracy.

【0007】そこで本発明の主たる課題は、せん断補強
筋の内側に中子筋を備える断面U字状PCa梁部材を製
作対象として、内型枠の設置および脱型を効率化かつ容
易化するとともに、内型枠の位置固定が簡単かつ確実に
行えコンクリート打設時の移動や浮き上がりを防止し製
品精度を確保し得るその製造方法およびその型枠装置を
提供することにある。
Accordingly, a main object of the present invention is to improve the efficiency and facilitation of installation and removal of an inner mold from a U-shaped PCa beam member having a core bar inside a shear reinforcing bar. It is another object of the present invention to provide a manufacturing method and a formwork apparatus capable of easily and reliably fixing the position of an inner formwork, preventing movement and floating during concrete casting and ensuring product accuracy.

【0008】[0008]

【課題を解決するための手段】前記課題を解決するため
の本発明製造方法は、少なくとも底型枠および側型枠を
含んで構成される外型枠を設置する第1工程と、前記外
型枠の内部に、周方向筋としてせん断補強筋およびこの
せん断補強筋の内側に配置される中子筋を含む組鉄筋を
所定位置に設置する第2工程と、エアの吸気または脱気
により膨縮可能とされる、マット状の側部内型枠用エア
パネル2枚と底部内型枠用エアパネル1枚とを持ち込
み、前記側部内型枠用エアパネルを前記せん断補強筋と
中子筋とによって囲まれた断面縦長形状の側部空間に挿
入し、給気によって側部内型枠用エアパネルの表裏面を
夫々前記せん断補強筋および中子筋とに圧接させること
により移動不能に固定するとともに、前記底部内型枠用
エアパネルを前記中子筋によって囲まれた空間内であっ
て前記側部内型枠用エアパネル間の底部位置に配置し、
給気によって底部内型枠用エアパネルの両側部を夫々中
子筋に圧接させることにより移動不能に固定する第3工
程と、前記中子筋の上部筋と前記底部内型枠用エアパネ
ル上面との間に浮上がり防止用スペーサ部材を挿入設置
する第4工程と、前記側部内型枠用エアパネルおよび底
部内型枠用エアパネルと、前記外型枠とによって形成さ
れる空間にコンクリートを充填する第工程と、エアの
脱気により前記側部内型枠用エアパネルおよび底部内型
枠用エアパネルを収縮させ、内型枠の脱型を行うととも
に、外型枠の脱型を行う第工程と、からなることを特
徴とするものである。
According to the manufacturing method of the present invention for solving the above-mentioned problems, there is provided a first step of installing an outer mold including at least a bottom mold and a side mold; A second step of installing a braided reinforcing bar including a shear reinforcing bar as a circumferential bar and a core bar arranged inside the shear reinforcing bar at a predetermined position inside the frame, and expanding and contracting by air intake or deaeration. It is possible to bring in two mat-shaped side inner formwork air panels and one bottom inner formwork air panel, and surround the side inner formwork air panel with the shear reinforcement and the core. It is inserted into the side space having a vertically long cross section, and is fixed immovably by pressing the front and back surfaces of the air panel for the side inner formwork with the shear reinforcing bars and the core bars by supplying air, respectively, and fixing the bottom inner mold. Inside the air panel for the frame A space surrounded by the muscle located at the bottom position between air panel for the side in formwork,
A third step of fixing both sides of the bottom inner formwork air panel immovably by pressurizing the both sides of the bottom inner formwork air panel with the replenishing muscles, and an upper muscle of the refilling muscles and the bottom inner formwork air panel;
Insert a spacer to prevent lifting between the upper surface
Fourth step and the air panel for the side in formwork for air panel, and a bottom portion formwork, a fifth step of filling concrete in a space defined by said outer frame, the inner side by degassing of the air to be the mold for pneumatic panel and a bottom portion formwork for air panel is deflated and performs demolding of inner mold, in which the sixth step of performing demolding of outer molds, characterized in that it consists to.

【0009】この場合において、前記側部内型枠用エア
パネルを中子筋側に分離不能に固定することが望まし
い。固定手段として、たとえば粘着テープまたは面ファ
スナーテープなどを用いることができる。また、前記側
部内型枠用エアパネルおよび底部内型枠用エアパネルを
設置した後、その内側位置において前記側部内型枠用エ
アパネルと底部内型枠用エアパネルとを結合用テープで
連結するのが望ましい。前記側部内型枠用エアパネルは
中子筋側に固定されることにより、脱型時(脱気時)に
コンクリート面側から収縮し、脱気により脱型が確実に
成されるようになるとともに、一方前記底部内型枠用エ
アパネルについては、その内面側位置において側部内型
枠用エアパネルに連結されていることにより、コンクリ
ート面側から収縮し脱気により脱型が確実に成されるよ
うになる。
In this case, it is desirable to fix the side inner formwork air panel inseparably to the core muscle side. As the fixing means, for example, an adhesive tape or a hook-and-loop fastener tape can be used. Further, it is preferable that after the side inner form air panel and the bottom inner form air panel are installed, the side inner form air panel and the bottom inner form air panel are connected to each other by a bonding tape at an inner position thereof. . The air panel for the side inner formwork is fixed to the core muscle side, so that it shrinks from the concrete surface side during demolding (during degassing), and the demolding is surely performed by degassing. On the other hand, the bottom inner form air panel is connected to the side inner form air panel at the inner surface side position, so that the mold is contracted from the concrete surface side and demolding is surely performed by deaeration. Become.

【0010】他方、その型枠装置は、少なくとも底型枠
および側型枠を含んで構成される外型枠と、この外型枠
の内部に設置される、周方向筋としてせん断補強筋およ
びこのせん断補強筋の内側に配置される中子筋を含む組
鉄筋に対し、前記せん断補強筋と中子筋とによって囲ま
れた断面縦長形状の側部空間に挿入される、エアの吸気
または脱気により膨縮可能とされるマット状の側部内型
枠用エアパネル2枚と、前記中子筋によって囲まれた空
間内であって前記側部内型枠用エアパネル間の底部位置
に挿入される、エアの吸気または脱気により膨縮可能と
されるマット状の前記底部内型枠用エアパネル1枚と、
前記中子筋の上部筋と前記底部内型枠用エアパネル上面
との間に挿入設置される浮上がり防止用スペーサ部材
と、からなることを特徴とするものである。
On the other hand, the formwork device includes an outer formwork including at least a bottom formwork and a side formwork, and a shear reinforcement as a circumferential reinforcement installed inside the outer formwork. With respect to the braided rebar including the rebar arranged inside the shear reinforcement, air is taken in or deaerated to be inserted into a side space having a vertically long cross section surrounded by the shear reinforcement and the rebar. Two mat-shaped side inner formwork air panels that can be expanded and contracted by the air, and air inserted into a bottom position between the side inner formwork air panels in a space surrounded by the core streaks. A mat-shaped bottom inner formwork air panel that can be expanded and contracted by air intake or deaeration,
The upper muscle of the core muscle and the upper surface of the bottom inner formwork air panel
Lifting prevention spacer member inserted between
And characterized by the following.

【0011】この場合において、前記側型枠の上部位置
に設置され、前記組鉄筋を吊持する組鉄筋用吊り治具を
けるようにするのが望ましい。
[0011] In this case, is installed in an upper position of the side mold, it is desirable to a jig hanging set rebar Jisuru hanging the set rebar <br/> set Keru like.

【0012】なお、本明細書において、前記「中子筋」
の概念は、剪断補強筋として配設されるもの以外に、組
立筋やエアパネルを支持する目的をもって設置される捨
て筋などをも含むものである。
In the present specification, the "core muscle"
The concept includes not only the reinforcing bars arranged as shear reinforcing bars, but also the disintegrating bars installed for the purpose of supporting the assembly panel and the air panel.

【0013】[0013]

【発明の実施の形態】以下、本発明の実施の形態につい
て図面を参照しながら詳述する。
Embodiments of the present invention will be described below in detail with reference to the drawings.

【0014】図1は本発明に係る断面U字状PCa梁部
材製造用型枠装置1の断面図であり、図2は内型枠用エ
アパネル5A〜5Cのユニット化要領図であり、図3は
側部内型枠用エアパネル5A、5Bの挿入設置状態を示
す要部拡大斜視図である。
FIG. 1 is a sectional view of a formwork apparatus 1 for manufacturing a U-shaped PCa beam member according to the present invention, and FIG. 2 is a unitized view of the inner formwork air panels 5A to 5C. FIG. 5 is an enlarged perspective view of a main part showing a state in which the side panel inner form air panels 5A and 5B are inserted and installed.

【0015】本例に示される型枠装置1は、上面側に底
せき板3aを備える底型枠3と、この底型枠3の上面両
側に起立支持された、内面側に側面せき板2a、2bを
備える側型枠2A、2Bと、これら側型枠2A、2Bの
内部に挿入設置される、せん断補強筋4Aの他に中子筋
4Bを備える先組鉄筋4と、この先組鉄筋4を支持材と
して設置される3枚の内型枠用エアパネル5A〜5Cと
から構成されるものである。
The formwork apparatus 1 shown in this embodiment has a bottom formwork 3 provided with a bottom weir 3a on the upper surface side, and a side weir board 2a on the inner surface, which is supported upright on both sides of the upper surface of the bottom formwork 3. , 2b, and a pre-assembled rebar 4 having a core reinforcing bar 4B in addition to the shear reinforcement 4A inserted and installed inside the side molds 2A, 2B. And three air panels 5A to 5C for the inner formwork which are installed as supporting members.

【0016】以下、具体的に詳述すると、床面Fに対
し、所定方向に沿って平行配置された複数本の、本例で
は3本のH形鋼10,10…を敷設したその上側に、上
面側に底せき板3aを備える底型枠3を配設するととも
に、この底型枠3の上面両側にそれぞれ起立支持され
た、内面側に側面せき板2a、2bを備える側型枠2
A、2Bを配設して外型枠が構成されている。
More specifically, a plurality of, in this example, three H-shaped steels 10, 10 arranged in parallel to a floor surface F along a predetermined direction are laid on the upper side of the floor surface F. A bottom formwork 3 provided with a bottom weir 3a on the upper surface side, and a side formwork 2 comprising side weirs 2a, 2b on the inner surface, which are supported upright on both upper surfaces of the bottom form 3, respectively.
A and 2B are arranged to form an outer formwork.

【0017】前記側型枠2A、2Bの上部には先組鉄筋
用吊り治具6が設けられている。この先組鉄筋用吊り治
具6は、固定用ボルト10によって前記側型枠2A、2
Bの頂部に夫々固定される脚部11、11と、これら脚
部11,11間に跨って横架される梁部12と、この梁
部12から垂下された左右一対の鉄筋係止フック13,
13から構成される吊り治具であり、前記側型枠2A、
2Bの少なくとも長手方向両端部に1カ所づつ計2カ所
に設けられるか、好ましくは先組鉄筋4を撓ませること
なく吊持するために先組鉄筋4の長手方向に沿って所定
間隔で複数設けられる。
At the upper part of the side molds 2A and 2B, a hanging jig 6 for a pre-assembled rebar is provided. The hanging jig 6 for the pre-assembled rebar is fixed to the side formwork 2A, 2
B, legs 11, 11 fixed respectively to the top of B, a beam portion 12 laid across the legs 11, 11, and a pair of right and left rebar locking hooks 13 suspended from the beam portion 12. ,
13 is a hanging jig, and the side formwork 2A,
It is provided at a total of two places, one at each of both ends in the longitudinal direction of 2B, or preferably, a plurality of them are provided at predetermined intervals along the longitudinal direction of the pre-assembled rebar 4 to suspend the pre-assembled rebar 4 without bending. Can be

【0018】前記外型枠の内部には、前記先組鉄筋用吊
り治具5に吊持されて先組鉄筋4が所定位置に吊持され
る。図示される先組鉄筋4は、主に外周部に設けられる
せん断補強筋4Aと、このせん断補強筋4Aの各隅部お
よび下辺に軸方向に配設される主筋4C、4C…と、前
記せん断補強筋4Aの内部に設けられる中子筋4Bと、
この中子筋4Bを組み立てるために上辺に軸方向に沿っ
て2本配設された組立筋4d、4dとから構成されるも
ので、たとえばPCa部材の製作ヤード隣接箇所で組み
立てられ、クレーン等の揚重設備により外型枠内部に吊
り降ろされ、前記先組鉄筋用吊り治具6によって所定位
置に吊持される。後述の内型枠用エアパネル5A〜5C
は、前記先組鉄筋4に固定される。従って、内型枠用エ
アパネル5A〜5Cの位置決め精度を確保するために
は、前記先組鉄筋4の位置決めを精度良く行う必要があ
り、前述した先組鉄筋用吊り治具6が好適に使用され
る。なお、前記主筋4C,4C…に代えて、パイプを用
いるようにしてもよい。
Inside the outer die frame, the pre-assembled reinforcing bar 4 is suspended at a predetermined position by being suspended by the pre-assembled reinforcing bar suspending jig 5. The pre-assembled reinforcing bar 4 shown in the drawing includes a shear reinforcing bar 4A mainly provided on the outer peripheral portion, and main reinforcing bars 4C, 4C,... Disposed axially at each corner and lower side of the shear reinforcing bar 4A. A core bar 4B provided inside the reinforcing bar 4A,
It is composed of two assembling bars 4d and 4d arranged in the upper side along the axial direction to assemble the core bar 4B. The assembling bars are assembled at a location adjacent to the PCa member manufacturing yard, such as a crane. It is suspended inside the outer mold frame by the lifting equipment, and is suspended at a predetermined position by the pre-assembled reinforcing bar suspending jig 6. Air panels 5A to 5C for inner formwork to be described later
Is fixed to the pre-assembled reinforcing bar 4. Therefore, in order to secure the positioning accuracy of the inner formwork air panels 5A to 5C, it is necessary to accurately position the pre-assembled rebar 4, and the above-described hanging jig 6 for pre-assembled rebar is preferably used. You. Note that a pipe may be used instead of the main bars 4C.

【0019】本型枠装置で内型枠として使用されるエア
パネル5A〜5Cは、エアの給気および脱気により膨張
および収縮が可能な、ほぼフラットかつ平行な2面を有
するマット状のエア構造体であり、たとえば特開平9−
151604号に記載されるもの等を用いることができ
る。
The air panels 5A to 5C used as inner molds in the present mold apparatus are mat-shaped air structures having two substantially flat and parallel surfaces which can be expanded and contracted by air supply and deaeration. Body, for example,
No. 151604 can be used.

【0020】側面内型枠となる2枚の側部エアパネル5
A、5Bと、底面内型枠となる1枚の底部内型枠用エア
パネル5Cの計3枚によって内型枠が構成されており、
これら内型枠用エアパネル5A〜5Cは、図2に示され
るように、共にその外面を覆うコッターシート14が面
ファスナーまたは接着剤等により貼設されたエアパネル
ユニットPとして提供される。前記コッターシート1
4は、防水布用帆布の一種であるターポリンシート14
Aにコッター形成用型木14Bを所定間隔で配設し、こ
れら各コッター形成用型木14Bを覆うコッターシート
14Cを設けた構造のシート材であり、内型枠用エアパ
ネル5A〜5Cを保護し転用回数を増やすために用いら
れている。したがって、仮に前記内型枠用エアパネル5
A〜5Cに直接コッター形成用突部を形成する場合には
前記コッターシート14は省略することができる。
Two side air panels 5 serving as side inner molds
A, 5B and a bottom inner formwork air panel 5C serving as a bottom inner formwork make up an inner formwork in total of three sheets,
Pneumatic Panel 5A~5C for those in formwork, as shown in FIG. 2, cotter sheet 14 together covering the outer surface is provided as an air panel unit P U, which is affixed by a surface fastener or adhesive. The cotter sheet 1
4 is a tarpaulin sheet 14 which is a kind of canvas for waterproof cloth.
A is a sheet material having a structure in which cotter forming dies 14B are arranged at a predetermined interval in A, and a cotter sheet 14C covering each cotter forming dies 14B is provided, and protects the inner formwork air panels 5A to 5C. It is used to increase the number of diversions. Therefore, if the air panel 5 for the inner
When the cotter forming protrusions are formed directly on A to 5C, the cotter sheet 14 can be omitted.

【0021】前記側部内型枠用エアパネル5A、5Bと
しては、厚みがせん断補強筋4Aと中子筋4Bとの間の
断面縦長状の側部空間幅に相当する厚み、若しくはこれ
よりも若干厚め(数mm〜十数mm程度)とされるエアパネ
ルが用いられ、図1に示されるように、脱気により収縮
させた状態でせん断補強筋4Aと中子筋4Bとの間の側
部空間に挿入され、給気によって側部内型枠用エアパネ
ル5A、5Bの表裏面を夫々前記せん断補強筋4Aおよ
び中子筋4Bとに圧接させることにより動かないように
固定される。なお、側部内型枠用エアパネル5A、5B
は夫々コッター形成用突部面を外側に向けて配設される
とともに、コッター形成突部はせん断補強筋4Aに重な
らない位置に予め配置される。
As the air panels 5A and 5B for the side inner formwork, the thickness is equivalent to or slightly larger than the side space width of the longitudinal cross section between the shear reinforcing bar 4A and the core bar 4B. (About several mm to several tens of mm), an air panel is used. As shown in FIG. 1, the air panel is contracted by deaeration and is provided in a side space between the shear reinforcement 4A and the core 4B. It is inserted and is fixed so as not to move by pressing the front and back surfaces of the side inner form air panels 5A and 5B against the shear reinforcing bars 4A and the core bars 4B by air supply. In addition, the air panels 5A, 5B for the side inner formwork
Are disposed with the cotter forming protrusions facing outward, respectively, and the cotter forming protrusions are previously arranged at positions not overlapping the shear reinforcing bars 4A.

【0022】前記側部内型枠用エアパネル5A、5Bの
設置が完了したならば、図3に示されるように、中子筋
4Bを跨いで側部内型枠用エアパネル5A、5Bの外面
側に張設された固定用テープ15によって中子筋4B側
に固定するようにする。側面内型枠用エアパネル5A、
5Bを中子筋4B側に固定しておくことにより、脱気時
において、側面内型枠用エアパネル5A、5Bは外面側
(コンクリート面側)から収縮しコンクリート面からの
剥離が確実に行われるようになる。なお、前記固定用テ
ープ15としては粘着テープでも代用が可能であるが、
繰り返し使用が容易に行える面ファスナーテープを用い
るのが望ましい。また、前記固定用テープ15として
は、同図に波線で示されるように、側部内型枠用エアパ
ネル5A、5Bの長手方向に連続した長尺テープを用い
るようにしてもよい。固定位置についても、上下方向に
複数段に亘って配置するのが望ましい。
When the installation of the side inner form air panels 5A, 5B is completed, as shown in FIG. 3, the outer side of the side inner form air panels 5A, 5B is stretched over the core 4B. The fixation tape 15 is used to fix to the core muscle 4B side. Air panel 5A for side inner formwork,
By fixing 5B to the core muscle 4B side, the air panels 5A and 5B for the side inner mold are contracted from the outer surface side (concrete surface side) at the time of degassing, and the peeling from the concrete surface is reliably performed. Become like In addition, as the fixing tape 15, an adhesive tape can be used instead,
It is desirable to use a hook-and-loop fastener tape which can be easily used repeatedly. As the fixing tape 15, a long tape continuous in the longitudinal direction of the air panels 5A and 5B for the side inner formwork may be used as shown by a broken line in FIG. Regarding the fixing position, it is desirable to dispose it in a plurality of stages in the vertical direction.

【0023】一方、底部に配置される底部内型枠用エア
パネル5Cとしては、中子筋4Bの内幅よりも若干大き
めの寸法幅、具体的には中子筋4Bの内幅よりも(中子
筋径×2倍)+α程度大きめの寸法幅とされるエアパネ
ルが用いられ、前記中子筋4Bによって囲まれた空間内
であって、かつ前記側部内型枠用エアパネル5A、5B
間の底部位置に配置される。この底部内型枠用エアパネ
ル5Cも側部内型枠用エアパネル5A、5Bと同様に、
給気によって底部内型枠用エアパネルの両側部を夫々前
記中子筋4Bに圧接させることにより動かないように固
定される。
On the other hand, the bottom inner formwork air panel 5C disposed at the bottom has a dimension width slightly larger than the inner width of the core streaks 4B, specifically, the inner width of the core streaks 4B (the middle width). An air panel having a size width approximately larger than (strevel diameter × 2) + α is used, and the air panel 5A, 5B for the side inner formwork is in a space surrounded by the core streaks 4B.
It is located in the bottom position between. The air panel 5C for the bottom inner form is also similar to the air panels 5A and 5B for the side inner form,
By supplying air, both sides of the bottom inner formwork air panel are pressed against the core muscles 4B so as to be fixed so as not to move.

【0024】底部内型枠用エアパネル5Cの設置が完了
したならば、図1に示されるように、前記側部内型枠用
エアパネル5A、5Bおよび底部内型枠用エアパネル5
Cの内面側位置において、前記側部内型枠用エアパネル
5A、5Bと底部内型枠用エアパネル5Cとを結合用テ
ープ20,20で連結するするようにする。結合用テー
プ20によって相互に連結しておくことにより脱気時に
おいて、底部内型枠用エアパネル5Cは外面側(コンク
リート面側)から収縮しコンクリート面からの剥離が確
実に行われるようになる。
When the installation of the bottom inner formwork air panel 5C is completed, as shown in FIG. 1, the side inner formwork air panels 5A and 5B and the bottom inner formwork air panel 5C are provided.
At the inner surface side of C, the side inner form air panels 5A and 5B and the bottom inner form air panel 5C are connected by connecting tapes 20 and 20. By being connected to each other by the bonding tape 20, the air panel 5C for the bottom inner formwork contracts from the outer surface side (concrete surface side) at the time of degassing, so that peeling from the concrete surface is reliably performed.

【0025】前記底部内型枠用エアパネル5Cは、図4
に示されるように、膨張によって底部内型枠用エアパネ
ル5Cの側部に中子筋4Bが食い込み、かつ中子筋4B
部以外の側辺部分が側部内型枠用エアパネル5A、5B
に圧接することにより、エアパネル接合部の隙間が封鎖
され、コンクリート打設時にコンクリートノロが漏れ出
るのを防止するようになる。この底部内型枠用エアパネ
ル5Cには、浮き上がり防止のために、図1に示される
ように、中子筋4Bの上部筋と底部内型枠用エアパネル
5C上面との間に挿入設置される浮上がり防止用スペー
サ部材16を設けるようにする。特に、高流動性コンク
リートを圧入によって充填する場合には、圧力に抗する
ために前記浮上がり防止用スペーサ部材16を設けるこ
とにより底部内型枠用エアパネル5Cの浮き上がりを確
実に防止できるようになる。なお、前記側部および底部
内型枠用エアパネル5A〜5Cに対する給気および脱気
は、加圧減圧ポンプおよびコンプレッサーを使用し、エ
ア供給路の中間に設けた圧力計を監視しながら行うよう
にする。
The bottom inner mold frame air panel 5C is shown in FIG.
As shown in the figure, the core muscle 4B bites into the side of the bottom inner form air panel 5C due to the expansion, and the core muscle 4B
Side panels other than the part are air panels 5A, 5B for the side inner formwork
By pressing against the air gap, the gap at the joint portion of the air panel is closed, so that the concrete slag is prevented from leaking out when the concrete is poured. As shown in FIG. 1, the air panel 5 </ b> C for the bottom inner formwork is inserted and installed between the upper streak of the core bar 4 </ b> B and the upper surface of the bottom inner formwork air panel 5 </ b> C in order to prevent floating. to provided the migration prevention spacer member 16. In particular, when high-fluidity concrete is filled by press-fitting, it is necessary to provide the floating prevention spacer member 16 in order to resist pressure.
This ensures that the bottom inner formwork air panel 5C is lifted up.
You can really prevent it. In addition, the air supply and deaeration to the side and bottom inner formwork air panels 5A to 5C are performed by using a pressure reducing pump and a compressor while monitoring a pressure gauge provided in the middle of the air supply path. I do.

【0026】一方、コンクリート打設は、図5に示され
るように、外型枠の上部位置に漏斗状のコンクリート投
入口17を設け、外型枠と内型枠との間の空間にコンク
リートを打設するようにする。前記漏斗状コンクリート
投入口17にはコンクリートの流れ込みを促すために簡
易バイブレータ18を設けるようにするとともに、コン
クリートを密実にかつ流動勾配を均等化するために型枠
架台に対してテーブルバイブレータ19を設けるように
するのがよい。
On the other hand, as shown in FIG. 5, for concrete casting, a funnel-shaped concrete inlet 17 is provided at an upper position of the outer formwork, and concrete is filled in a space between the outer formwork and the inner formwork. Make sure to cast it. The funnel-shaped concrete inlet 17 is provided with a simple vibrator 18 to promote the inflow of concrete, and a table vibrator 19 is provided to the formwork base in order to make the concrete dense and equalize the flow gradient. It is better to do so.

【0027】コンクリート打設が完了したならば、その
後コンクリートの硬化を待って脱型作業に入る。脱型は
側部内型枠用エアパネル5A、5Bおよび底部内型枠用
エアパネル5Cから脱気を行い収縮させた後撤去し、一
方、側型枠2A、2Bについては基部のボルトを取り外
すことにより行う。
When the concrete placement is completed, the concrete is hardened and the mold is removed. Demolding is performed by degassing and shrinking from the side inner form air panels 5A and 5B and the bottom inner form air panel 5C and then removing them, while removing the base bolts for the side form 2A and 2B. .

【0028】[0028]

【発明の効果】以上詳説のとおり本発明によれば、せん
断補強筋の内側に中子筋を備える断面U字状PCa梁部
材を製作対象として、内型枠の設置および脱型を効率化
かつ容易化できるようになるとともに、内型枠の位置固
定が簡単かつ確実に行えコンクリート打設時の移動や浮
き上がりを防止し製品精度を確保し得るようになる。
As described above in detail, according to the present invention, the installation and demolding of the inner formwork can be performed efficiently with the U-shaped PCa beam member having a core inside the shear reinforcing bars. The inner mold can be easily and reliably fixed in position and prevented from moving or floating at the time of placing concrete, thereby ensuring product accuracy.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明に係る断面U字状PCa梁部材製造用型
枠装置1の断面図である。
FIG. 1 is a cross-sectional view of a formwork device 1 for manufacturing a U-shaped PCa beam member according to the present invention.

【図2】内型枠用エアパネル5A〜5Cのユニット化要
領図である。
FIG. 2 is a view showing how to unitize the inner formwork air panels 5A to 5C.

【図3】側部内型枠用エアパネル5A、5Bの挿入状態
を示す要部拡大斜視図である。
FIG. 3 is an enlarged perspective view of a main part showing an inserted state of the side panel inner frame air panels 5A and 5B.

【図4】図1のIV−IV線矢視図である。FIG. 4 is a view taken along the line IV-IV in FIG. 1;

【図5】断面U字状PCa梁部材製造用型枠装置を示
す、(A)は断面図、(B)は端部側面図である。
5 (A) is a sectional view, and FIG. 5 (B) is an end side view showing a formwork device for manufacturing a U-shaped PCa beam member in cross section.

【図6】本型枠装置によって製造された断面U字状PC
a梁部材を示す、(A)は正面図、(B)は側面図である。
FIG. 6 is a cross-sectional U-shaped PC manufactured by the formwork apparatus.
(A) is a front view and (B) is a side view showing a beam member.

【図7】従来のエアチューブ50を用いた断面U字状P
Ca梁部材の製造要領を示す図である。
FIG. 7 shows a U-shaped section P using a conventional air tube 50;
It is a figure which shows the manufacturing point of a Ca beam member.

【図8】製造された断面U字状PCa梁部材55を示す
斜視図である。
FIG. 8 is a perspective view showing a manufactured PCa beam member 55 having a U-shaped cross section.

【符号の説明】[Explanation of symbols]

1…断面U字状PCa梁部材製造用型枠装置、2A・2
B…側型枠、3…底型枠、4…先組鉄筋、4A…せん断
補強筋、4B…中子筋、4C…主筋、5A・5B…側部
内型枠用エアパネル、5C…底部内型枠用エアパネル、
6…先組鉄筋用吊り治具、15…固定用テープ、16…
浮上がり防止用スペーサ部材、20…結合用テープ
DESCRIPTION OF SYMBOLS 1 ... Form device for manufacturing PCa beam member with U-shaped cross section, 2A.2
B: Side formwork, 3: Bottom formwork, 4: Pre-assembled reinforcement, 4A: Shear reinforcement, 4B: Core reinforcement, 4C: Main reinforcement, 5A, 5B: Air panel for side inner formwork, 5C: Bottom inner form Air panel for frame,
6 ... Pre-assembled hanging bar jig, 15 ... Fixing tape, 16 ...
Floating prevention spacer member, 20 ... bonding tape

───────────────────────────────────────────────────── フロントページの続き (72)発明者 若林 祐司 神奈川県厚木市三田47−3 佐藤工業株 式会社中央技術研究所内 (72)発明者 西尾 敦昌 神奈川県厚木市三田47−3 佐藤工業株 式会社中央技術研究所内 (72)発明者 浦川 和也 神奈川県厚木市三田47−3 佐藤工業株 式会社中央技術研究所内 (72)発明者 近藤 悟 神奈川県厚木市三田47−3 佐藤工業株 式会社中央技術研究所内 (72)発明者 多田 展郎 埼玉県八潮市大字浮塚336番地1 トー ヨー産業株式会社内 (72)発明者 田村 和安 埼玉県上尾市大字原市1536−3 (56)参考文献 特開 平4−64665(JP,A) 特開 平9−267323(JP,A) 特開 平8−323725(JP,A) (58)調査した分野(Int.Cl.7,DB名) B28B 7/00 - 7/46 B28B 23/00 - 23/22 ──────────────────────────────────────────────────続 き Continuing from the front page (72) Inventor Yuji Wakabayashi 47-3 Mita, Atsugi-shi, Kanagawa Sato Industrial Co., Ltd. (72) Inventor Atsumasa Nishio 47-3 Mita, Atsugi-shi, Kanagawa Sato Industrial Co., Ltd. (72) Inventor Kazuya Urakawa 47-3 Mita, Atsugi-shi, Kanagawa Prefecture, Sato Kogyo Co., Ltd. Inside the Central Technology Research Laboratory (72) Satoru Kondo 47-3 Mita, Atsugi-shi, Kanagawa Sato Kogyo Co., Ltd. (72) Inventor: Nobuo Tada, 336-1, Utsuzuka, Yashio-shi, Saitama Toyo Sangyo Co., Ltd. (72) Inventor: Kazuyasu Tamura 1536-3, Ojihara-shi, Ageo, Saitama (56) References JP-A-4-64665 (JP, A) JP-A-9-267323 (JP, A) JP-A-8-323725 (JP, A) (58) Fields investigated (Int. Cl. 7 , DB name) B 28B 7/00-7/46 B28B 23/00-23/22

Claims (5)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】少なくとも底型枠および側型枠を含んで構
成される外型枠を設置する第1工程と、 前記外型枠の内部に、周方向筋としてせん断補強筋およ
びこのせん断補強筋の内側に配置される中子筋を含む組
鉄筋を所定位置に設置する第2工程と、 エアの吸気または脱気により膨縮可能とされる、マット
状の側部内型枠用エアパネル2枚と底部内型枠用エアパ
ネル1枚とを持ち込み、前記側部内型枠用エアパネルを
前記せん断補強筋と中子筋とによって囲まれた断面縦長
形状の側部空間に挿入し、給気によって側部内型枠用エ
アパネルの表裏面を夫々前記せん断補強筋および中子筋
とに圧接させることにより移動不能に固定するととも
に、前記底部内型枠用エアパネルを前記中子筋によって
囲まれた空間内であって前記側部内型枠用エアパネル間
の底部位置に配置し、給気によって底部内型枠用エアパ
ネルの両側部を夫々中子筋に圧接させることにより移動
不能に固定する第3工程と、前記中子筋の上部筋と前記底部内型枠用エアパネル上面
との間に浮上がり防止用スペーサ部材を挿入設置する第
4工程と、 前記側部内型枠用エアパネルおよび底部内型枠用エアパ
ネルと、前記外型枠とによって形成される空間にコンク
リートを充填する第工程と、 エアの脱気により前記側部内型枠用エアパネルおよび底
部内型枠用エアパネルを収縮させ、内型枠の脱型を行う
とともに、外型枠の脱型を行う第工程と、 からなることを特徴とする断面U字状PCa梁部材の製
造方法。
1. A first step of installing an outer formwork including at least a bottom formwork and a side formwork; and a shear reinforcement as a circumferential reinforcement inside the outer formwork and the shear reinforcement. A second step of installing a braided rebar including a core bar arranged inside of a predetermined position, and two mat-shaped side inner formwork air panels which can be expanded and contracted by air intake or deaeration. One air panel for the bottom inner form is brought in, and the air panel for the side inner form is inserted into a side space having a vertically long cross section surrounded by the shear reinforcement and the core, and air is supplied to the side inner form. The front and back surfaces of the frame air panel are immovably fixed by being pressed against the shear reinforcing bars and the core bars, respectively, and the bottom inner form air panel is in a space surrounded by the core bars. Air pad for the side inner formwork Placed in the bottom position between Le, the third step of fixing immovably, the upper muscle of the core muscles by pressing the both sides of the air panel for the bottom portion formwork respectively core muscles by supply air Air panel top for bottom inner formwork
Insert a spacer member for preventing floating between
A fourth step, a fifth step of filling a space formed by the air panel for the side inner formwork and the air panel for the bottom inner formwork, and the outer formwork with the concrete, and the side inner formwork by deaeration of air. the use air panel and bottom portion formwork for air panel is deflated and performs demolding of inner mold, and a sixth step for demolding the outer molds, U-shaped cross section PCa beams characterized by comprising the Manufacturing method.
【請求項2】前記側部内型枠用エアパネルを中子筋側に
分離不能に固定する請求項1記載の断面U字状PCa梁
部材の製造方法。
2. The method for manufacturing a U-shaped cross-section PCa beam member according to claim 1, wherein the side inner formwork air panel is fixed to the core line side so as to be inseparable.
【請求項3】前記側部内型枠用エアパネルおよび底部内
型枠用エアパネルを設置した後、その内面側位置におい
て前記側部内型枠用エアパネルと底部内型枠用エアパネ
ルとを結合用テープで連結する請求項1,2いずれかに
記載の断面U字状PCa梁部材の製造方法。
3. After the side inner form air panel and the bottom inner form air panel are installed, the side inner form air panel and the bottom inner form air panel are connected to each other with a bonding tape at the inner surface side. The method for manufacturing a PCa beam member having a U-shaped cross section according to claim 1.
【請求項4】少なくとも底型枠および側型枠を含んで構
成される外型枠と、 この外型枠の内部に設置される、周方向筋としてせん断
補強筋およびこのせん断補強筋の内側に配置される中子
筋を含む組鉄筋に対し、前記せん断補強筋と中子筋とに
よって囲まれた断面縦長形状の側部空間に挿入される、
エアの吸気または脱気により膨縮可能とされるマット状
の側部内型枠用エアパネル2枚と、 前記中子筋によって囲まれた空間内であって前記側部内
型枠用エアパネル間の底部位置に挿入される、エアの吸
気または脱気により膨縮可能とされるマット状の前記底
部内型枠用エアパネル1枚と、前記中子筋の上部筋と前記底部内型枠用エアパネル上面
との間に挿入設置される浮上がり防止用スペーサ部材
と、 からなることを特徴とする断面U字状PCa梁部材の製
造用型枠装置。
4. An outer formwork including at least a bottom formwork and a side formwork; a shear reinforcement as a circumferential reinforcement installed inside the outer formwork; and an inside of the shear reinforcement. For the braided rebar including the core to be arranged, inserted into the side space of the elongated cross section surrounded by the shear reinforcement and the core,
Two mat-shaped side inner formwork air panels that can be expanded and contracted by air intake or deaeration, and a bottom position between the side inner formwork air panels in a space surrounded by the core muscle A mat-shaped bottom inner formwork air panel inserted into the airbag and configured to be inflatable by inhalation or deaeration of air, an upper streak of the core muscle, and an upper surface of the bottom inner formwork air panel
Lifting prevention spacer member inserted between
And a formwork device for manufacturing a PCa beam member having a U-shaped cross section.
【請求項5】前記側型枠の上部位置に設置され、前記組
鉄筋を吊持する組鉄筋用吊り治具を含む請求項4記載の
断面U字状PCa梁部材の製造用型枠装置。
5. The formwork apparatus for manufacturing a PCa beam member having a U-shaped cross section as set forth in claim 4, further comprising a suspending jig for the braided reinforcement installed at an upper position of the side formwork and suspending the braided reinforcement.
JP26533699A 1999-09-20 1999-09-20 Method of manufacturing PCa beam member with U-shaped cross section and formwork device therefor Expired - Lifetime JP3249100B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP26533699A JP3249100B2 (en) 1999-09-20 1999-09-20 Method of manufacturing PCa beam member with U-shaped cross section and formwork device therefor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP26533699A JP3249100B2 (en) 1999-09-20 1999-09-20 Method of manufacturing PCa beam member with U-shaped cross section and formwork device therefor

Publications (2)

Publication Number Publication Date
JP2001088115A JP2001088115A (en) 2001-04-03
JP3249100B2 true JP3249100B2 (en) 2002-01-21

Family

ID=17415780

Family Applications (1)

Application Number Title Priority Date Filing Date
JP26533699A Expired - Lifetime JP3249100B2 (en) 1999-09-20 1999-09-20 Method of manufacturing PCa beam member with U-shaped cross section and formwork device therefor

Country Status (1)

Country Link
JP (1) JP3249100B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105538484B (en) * 2015-12-11 2018-01-02 上海建工材料工程有限公司 It is a kind of to be used to prevent U-shaped beam mould and the U-shaped beam preparation method for putting that tension stress destroys
CN110202670A (en) * 2019-06-30 2019-09-06 重庆大业新型建材集团有限公司 A kind of any modulus precast concrete beam molding machine
JP7443207B2 (en) 2020-09-11 2024-03-05 鹿島建設株式会社 Concrete placement methods and concrete placement systems
CN114102847A (en) * 2021-10-26 2022-03-01 中国一冶集团有限公司 Prefabricated T-beam slurry leakage prevention device and construction method

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0464665A (en) * 1990-07-02 1992-02-28 Daisue Kensetsu Kk Manufacture of u-type concrete member
JPH08323725A (en) * 1995-05-30 1996-12-10 Mitsui Constr Co Ltd Form device for pc member
JPH09267323A (en) * 1996-03-29 1997-10-14 Maeda Corp Manufacturer of half precast member with core reinforcing

Also Published As

Publication number Publication date
JP2001088115A (en) 2001-04-03

Similar Documents

Publication Publication Date Title
JP3249100B2 (en) Method of manufacturing PCa beam member with U-shaped cross section and formwork device therefor
JP2568319B2 (en) Manufacturing method of precast concrete beam
CN108582426A (en) A kind of producing device and production method of stiffened column
CN210562953U (en) Prefabricated plate and coincide floor
JP3076566B1 (en) Inner mold for manufacturing hollow PCa members
JP2685414B2 (en) Hollow precast concrete pillar molding apparatus and molding method
JP3029908B2 (en) Construction method of concrete structure
JP2820904B2 (en) Concrete column formwork
JPH0825338A (en) Manufacture of hollow pc beam
JP4476403B2 (en) Forming apparatus for manufacturing hollow PCa member and manufacturing method using the same
JP5869425B2 (en) Formation method of through hole
JP3696971B2 (en) Joint mechanism for bridge slab placement
JP4287640B2 (en) Inner mold and method for producing hollow concrete body
JP2962121B2 (en) Sliding form method
JP3179321B2 (en) Precast member manufacturing method, manufacturing apparatus, and precast member
JP2899350B2 (en) Slab casting method with manhole
JP4392772B2 (en) Method for producing flexible precast culvert
JP2625564B2 (en) How to build reinforced concrete columns
JP4236966B2 (en) Molding method and molding form of outer shell PCa pillar
JPH0633037Y2 (en) Formwork for tunnel lining
JPH0788826A (en) Preparation of inside hollow beam and bag body used for preparation of inside hollow beam
JPH06155431A (en) Production of form object made of precast concrete
JPS62176806A (en) Manufacture of hollow concrete molding member
JPH0340162B2 (en)
JP2005299344A (en) Remaining form for side ditch floor slab

Legal Events

Date Code Title Description
TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20011009

R150 Certificate of patent or registration of utility model

Ref document number: 3249100

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081109

Year of fee payment: 7

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101109

Year of fee payment: 9

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313117

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101109

Year of fee payment: 9

R360 Written notification for declining of transfer of rights

Free format text: JAPANESE INTERMEDIATE CODE: R360

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101109

Year of fee payment: 9

R370 Written measure of declining of transfer procedure

Free format text: JAPANESE INTERMEDIATE CODE: R370

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101109

Year of fee payment: 9

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313117

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101109

Year of fee payment: 9

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111109

Year of fee payment: 10

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121109

Year of fee payment: 11

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313117

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131109

Year of fee payment: 12

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

EXPY Cancellation because of completion of term