JP3228206B2 - Manufacturing process management method and management device used therefor - Google Patents

Manufacturing process management method and management device used therefor

Info

Publication number
JP3228206B2
JP3228206B2 JP34954397A JP34954397A JP3228206B2 JP 3228206 B2 JP3228206 B2 JP 3228206B2 JP 34954397 A JP34954397 A JP 34954397A JP 34954397 A JP34954397 A JP 34954397A JP 3228206 B2 JP3228206 B2 JP 3228206B2
Authority
JP
Japan
Prior art keywords
processing
processed
facility
candidate
priority
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP34954397A
Other languages
Japanese (ja)
Other versions
JPH11184925A (en
Inventor
光悦 北村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NEC Corp
Original Assignee
NEC Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NEC Corp filed Critical NEC Corp
Priority to JP34954397A priority Critical patent/JP3228206B2/en
Publication of JPH11184925A publication Critical patent/JPH11184925A/en
Application granted granted Critical
Publication of JP3228206B2 publication Critical patent/JP3228206B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Multi-Process Working Machines And Systems (AREA)
  • General Factory Administration (AREA)
  • Control By Computers (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、必要処理時間、納
期及び処理可能設備の状況等から処理される製品の順序
を管理し、半導体装置の製造に好適な製造工程の管理方
法及びそれに使用される管理装置に関し、特に、効率よ
く製品を処理することが可能な製造工程の管理方法及び
それに使用される管理装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention manages the order of products to be processed based on the required processing time, delivery date, the status of available equipment, and the like, and manages a manufacturing process suitable for manufacturing semiconductor devices and uses the method. In particular, the present invention relates to a management method of a manufacturing process capable of efficiently processing a product and a management device used for the same.

【0002】[0002]

【従来の技術】半導体装置は、製品毎に所定の複数の処
理工程を経て製造されている。そして、各処理工程に
は、所定の処理条件が設定されている。
2. Description of the Related Art A semiconductor device is manufactured through a plurality of predetermined processing steps for each product. Then, predetermined processing conditions are set for each processing step.

【0003】複数種の製品が処理される場合、どの製品
をどの工程にどのような順序で供給するかということ
は、効率的に設備を稼動させるために重要である。従来
の供給順序の決定方法としては、供給順序が決定される
対象の工程の前工程における終了時刻が前のものから対
象の工程に供給する方法がとられていた。しかし、この
方法では各製品の納期に拘わらず処理を進めるので、納
期が近く短期間で完成させる必要がある製品に関する納
期管理が困難である。
When a plurality of types of products are processed, it is important to supply which products to which processes and in what order in order to operate the equipment efficiently. As a conventional method of determining the supply order, a method has been adopted in which the supply time is supplied to the target process from the previous end time in the process preceding the target process for which the supply order is determined. However, in this method, since the process proceeds regardless of the delivery date of each product, it is difficult to manage the delivery date of a product that has a short delivery date and needs to be completed in a short period of time.

【0004】そこで、納期が近く短期間で製造する必要
がある製品がある場合には、工程管理者がその製品の進
捗状況を逐次監視し、各工程の作業者に指示を出して他
の製品より優先して作業させていた。しかし、人が管理
することができる範囲は狭く、詳細な指示を各工程に出
すことは困難である。
If there is a product that needs to be manufactured in a short time due to a short delivery time, a process manager monitors the progress of the product one by one, and issues instructions to workers in each process to provide other products. Had to be given priority. However, the range that can be managed by a person is narrow, and it is difficult to give detailed instructions to each process.

【0005】そこで、例えば、特開平7−29785号
公報に、処理の優先度を計算し、この優先度をもとにし
て製造工程を決定する工程管理システムが提案されてい
る。この公報に記載された従来の工程管理システムにお
いては、供給順序が決定される対象の工程の予定処理終
了日をA、実際の処理終了日をC、最終工程の予定処理
終了日をBとしたとき、下記数式1で優先度Dを定義し
ている。
Therefore, for example, Japanese Patent Application Laid-Open No. 7-29785 proposes a process management system that calculates the priority of processing and determines a manufacturing process based on the priority. In the conventional process management system described in this publication, the scheduled process end date of the process whose supply order is determined is A, the actual process end date is C, and the scheduled process end date of the final process is B. At this time, the priority D is defined by Expression 1 below.

【0006】[0006]

【数1】D=100×(B−C)/(B−A)D = 100 × (BC) / (BA)

【0007】そして、優先度Dの値が小さな順に各工程
で処理順を入れ替えて各製品を処理している。
[0007] Each product is processed by changing the processing order in each step in ascending order of the value of the priority D.

【0008】この従来の工程管理システムによれば、全
ての製品の納期を考慮して工程を管理することができ
る。
According to this conventional process management system, processes can be managed in consideration of delivery dates of all products.

【0009】[0009]

【発明が解決しようとする課題】しかしながら、特開平
7−29785号公報に記載された工程管理システムを
使用して各工程を管理する場合、処理される被処理物の
順序が入れ替えられた工程の後工程の状況に拘わらず、
優先度Dの値が小さい被処理物から処理するので、後工
程が作業不可能な状態なときには、被処理物が後工程で
設備待ちの状態となってしまう。この結果、その設備で
処理待ちの仕掛が蓄積されるという問題点がある。
However, when each process is managed using the process management system described in Japanese Patent Application Laid-Open No. 7-29785, the order of the objects to be processed is changed. Regardless of the status of post-processing,
Since the processing is performed from the processing object having a small value of the priority D, the processing object is in a state of waiting for the equipment in the post-processing when the post-processing is in a state where the work cannot be performed. As a result, there is a problem in that the work waiting for processing is accumulated in the equipment.

【0010】また、常に優先度Dの値が小さな被処理物
から処理されるため、優先度Dの値が大きな被処理物の
処理が妨げられるという問題点もある。
[0010] Further, since the processing is always performed from an object having a small value of the priority D, there is another problem that the processing of an object having a large value of the priority D is hindered.

【0011】更に、ある被処理物について前工程の終了
から後工程での処理までの時間が決められている場合に
も、優先度Dの値のみで後工程で処理される被処理物の
順序が決定されてしまうと、その被処理物が所定時間内
に後工程で処理されないこともある。
Further, even when the time from the end of the previous process to the process in the post-process is determined for a certain process, the order of the process in the post-process is determined only by the value of the priority D. Is determined, the object may not be processed in a subsequent process within a predetermined time.

【0012】本発明はかかる問題点に鑑みてなされたも
のであって、処理待ちの仕掛の蓄積を防止して優先度が
低い製品をも滞りなく処理することができると共に、工
程間の時間が規定されている被処理物を確実に規定時間
内で処理することができる製造工程の管理方法及びそれ
に使用される管理装置を提供することを目的とする。
SUMMARY OF THE INVENTION The present invention has been made in view of the above-mentioned problems, and prevents the accumulation of in-process products waiting to be processed, so that a low-priority product can be processed without delay. It is an object of the present invention to provide a management method of a manufacturing process and a management device used for the same, which can surely process a specified workpiece within a specified time.

【0013】[0013]

【0014】[0014]

【課題を解決するための手段】本発明に係る製造工程の
中央処理装置による管理方法は、複数種の被処理物を複
数種の処理工程の組み合わせで処理して製品を製造する
製造工程の中央処理装置による管理方法において、第1
の設備において処理可能な被処理物が製品情報記憶装置
に2種以上記憶されている場合に、前記処理可能な被処
理物の処理条件、残りの処理工程及びその処理時間並び
に納期に基づいて前記処理可能な被処理物の全てについ
て前記第1の設備での処理の優先度を前記中央処理装置
算出する工程と、前記中央処理装置が最も優先度が高
い処理可能な被処理物を処理候補とする工程と、前記中
央処理装置がその時点での処理候補について前記第1の
設備よりも後で使用される第2の設備の状態を示す情報
処理条件記憶装置から読み出して前記第1の設備にお
いて前記処理候補の処理を行うか行わないかの判断を行
う工程と、前記処理候補の処理を行わないと判断した場
合に、前記中央処理装置が前記処理候補の次に優先度が
高い処理可能な被処理物を処理候補として前記判断を行
う工程に戻る工程と、前記処理候補の処理を行うと判断
した場合に、前記中央処理装置が前記処理候補の処理を
前記第2の設備で最も優先して行うという予約を前記製
品情報記憶装置に記憶させる工程と、前記中央処理装置
前記処理候補を前記第1の設備に搬送することを搬送
装置に指示する工程と、前記中央処理装置が前記第2の
設備による前記処理候補の処理が開始された時点で前記
予約を前記製品情報記憶装置から消去する工程と、を有
することを特徴とする。
According to the present invention, there is provided a method for managing a manufacturing process by a central processing unit, wherein a plurality of types of workpieces are processed by a combination of a plurality of types of processing steps to manufacture a product. In the management method by the processing device, the first
When two or more types of objects to be processed in the equipment are stored in the product information storage device , the processing conditions of the object to be processed, the remaining processing steps, the processing time thereof, and the delivery date The central processing unit determines the priority of processing in the first facility for all of the processing-target objects based on
There a step of calculating, the step of said central processing unit to the highest priority process can be treated with candidate processing, the in
The central processing unit reads, from the processing condition storage device, information indicating the state of the second equipment used later than the first equipment for the processing candidate at that time, and reads the information of the processing candidate in the first equipment. A step of determining whether or not to perform the processing, and if it is determined that the processing of the processing candidate is not to be performed, the central processing unit determines an object to be processed having the next highest priority next to the processing candidate. A step of returning to the step of performing the determination as a processing candidate; and a reservation that the central processing unit performs the processing of the processing candidate with the highest priority in the second facility when it is determined that the processing of the processing candidate is performed. The above
Storing in an article information storage device , and the central processing unit
Said product the reservation at the time but that the step of instructing the transport apparatus to transport the processed candidate to said first equipment, the processing of the processing candidate said central processing unit by the second equipment is started Erasing from the information storage device .

【0015】本発明においては、第1の設備における処
理可能な被処理物の優先度を算出し、この優先度が最も
高いものについて、第2の設備のその時点での状態を示
す情報に基づいて第1の設備で処理するかしないかの判
断を行っているので、例えば、第2の設備が非稼動状態
のときにも仕掛が蓄積することが防止される。また、常
に優先度が高い被処理物から処理するわけではないの
で、優先度が高い被処理物が優先度が低い被処理物の処
理を妨げることが抑制される。
In the present invention, the priority of the object to be processed in the first equipment is calculated, and the highest priority is given to the highest priority based on information indicating the state of the second equipment at that time. Therefore, for example, even when the second facility is in a non-operating state, it is possible to prevent the in-process from accumulating. Further, since the processing is not always performed from the processing object having the higher priority, it is suppressed that the processing object having the higher priority interferes with the processing of the processing object having the lower priority.

【0016】[0016]

【0017】また、前記判断を行う工程は、前記中央処
理装置が前記第2の設備においてその後に処理が予定さ
れている被処理物の情報を調査する工程を有してもよ
い。
Further, the step of performing the determination is performed by the central processing unit.
The processing apparatus may include a step of examining information on the object to be processed which is scheduled to be subsequently processed in the second facility.

【0018】本発明に係る製造工程の管理装置は、複数
種の被処理物を複数種の処理工程の組み合わせで処理し
て製品を製造する製造工程の管理装置において、前記被
処理物の処理条件、残りの処理工程及びその処理時間並
びに納期からその被処理物の第1の設備での優先度を算
出する優先度算出手段と、前記第1の設備よりも後で使
用される第2の設備のその時点での状態を示す情報に基
づいて前記第1の設備での前記被処理物の処理を行うか
行わないかの判断を行う判断手段と、前記被処理物の処
理を行うと判断した場合に、前記被処理物の処理を前記
第2の設備で最も優先して行うという予約をする予約手
段と、前記第2の設備で前記被処理物の処理が終了した
後に前記予約を消去する予約消去手段と、を有すること
を特徴とする。
[0018] The manufacturing process management apparatus according to the present invention is a manufacturing process management apparatus for manufacturing a product by processing a plurality of types of workpieces by a combination of a plurality of types of processing steps. Priority calculating means for calculating the priority of the object to be processed in the first equipment from the remaining processing steps, the processing time thereof, and the delivery date; and second equipment used later than the first equipment. Determining means for determining whether or not to perform the processing of the object in the first facility based on information indicating a state at that time, and processing of the object to be processed.
Processing, the processing of the object is
A reservation person who makes a reservation to make the highest priority in the second facility
The processing of the object to be processed is completed in the step and the second facility
And a reservation erasing unit for erasing the reservation later .

【0019】本発明においては、第1の設備において処
理可能な被処理物の優先度が算出された後、最も優先度
が高い処理可能被処理物が選択され、その処理可能な被
処理物から製品を製造する際に第1の設備よりも後で使
用される第2の設備のその時点での状態を示す情報に基
づいて第1の設備でその処理可能な被処理物が処理され
るかされないかが判断される。このため、第2の設備が
非稼動状態のときにも仕掛が蓄積することが防止され
る。また、優先度が低い被処理物が優先度が高い被処理
物よりも先に処理されることもある。
In the present invention, after the priority of the object to be processed in the first facility is calculated, the object to be processed having the highest priority is selected, and the object to be processed is selected from the objects to be processed. Whether the processable object can be processed in the first facility based on information indicating the current state of the second facility used later than the first facility in manufacturing the product. It is determined whether it is not performed. For this reason, even when the second equipment is in the non-operation state, the accumulation of the work in progress is prevented. In addition, a low-priority workpiece may be processed before a high-priority workpiece.

【0020】[0020]

【0021】また、前記判断手段は、前記第2の設備
おいてその後に処理が予定されている被処理物の情報を
調査手段を有してもよい。
[0021] Further, the determination means is provided in the second facility .
In addition, it may have a means for investigating information on an object to be processed which is scheduled to be processed thereafter .

【0022】[0022]

【発明の実施の形態】以下、本発明の第1の実施例方法
に係る工程の管理方法について、添付の図面を参照して
具体的に説明する。図1は本実施例方法に使用する工程
の管理装置を示すブロック図である。本実施例において
は、中央演算装置1に各種データを入力するための入力
装置2が接続されている。また、製品毎にその製造に使
用される工程フロー、納期等の情報及び状況が記憶され
る製品情報記憶装置5、工程フロー毎に使用される工程
フロー及び設備群等が記憶される工程フロー記憶装置3
並びに設備群毎に使用される処理可能号機及び処理時間
等が記憶される処理条件記憶装置4が中央演算装置1に
接続されている。更に、工程フロー記憶装置3、処理条
件記憶装置4又は製品情報記憶装置5に記憶されている
データに基づいて製品となる被処理物の処理順序を決定
する処理順決定モジュール6が中央処理装置1に接続さ
れている。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, a method for managing processes according to a first embodiment of the present invention will be specifically described with reference to the accompanying drawings. FIG. 1 is a block diagram showing an apparatus for managing processes used in the method of this embodiment. In this embodiment, an input device 2 for inputting various data to the central processing unit 1 is connected. Further, a product information storage device 5 for storing information and status such as a process flow and a delivery date used for the manufacture for each product, and a process flow storage for storing a process flow and a facility group used for each process flow. Device 3
In addition, a processing condition storage device 4 that stores a processable machine used for each equipment group, a processing time, and the like is connected to the central processing unit 1. Further, the processing order determination module 6 that determines the processing order of the workpiece to be processed based on the data stored in the process flow storage device 3, the processing condition storage device 4, or the product information storage device 5 is included in the central processing unit 1. It is connected to the.

【0023】記憶装置3、4又は5に記憶されるデータ
について、下記表1乃至3を参照して説明する。表1は
工程フロー記憶装置3に記憶されるデータの構成の一例
を示しており、表2は処理条件記憶装置4に記憶される
データの構成の一例を示しており、表3は製品情報記憶
装置5に記憶されるデータの構成の一例を示している。
The data stored in the storage device 3, 4 or 5 will be described with reference to the following Tables 1 to 3. Table 1 shows an example of a configuration of data stored in the process flow storage device 3, Table 2 shows an example of a configuration of data stored in the processing condition storage device 4, and Table 3 shows a product information storage. 3 shows an example of a configuration of data stored in the device 5.

【0024】[0024]

【表1】 [Table 1]

【0025】[0025]

【表2】 [Table 2]

【0026】[0026]

【表3】 [Table 3]

【0027】上記表1に示すように、工程フロー記憶装
置3においては、工程フロー名毎にデータテーブルが設
定され、このデータテーブルには、処理段階毎の工程
名、処理に使用される設備群、処理条件及び指定フラグ
が記憶される。指定フラグは何工程先の設備状態をチェ
ックするかを示す数値である。
As shown in Table 1, in the process flow storage device 3, a data table is set for each process flow name, and the data table stores the process name for each processing stage and the equipment group used for the processing. , Processing conditions and designation flags are stored. The designated flag is a numerical value indicating the number of process destinations to check the equipment state.

【0028】また、上記表2に示すように、処理条件記
憶装置4においては、設備群毎にデータテーブルが設定
され、このデータテーブルには、処理条件、処理時間及
び処理可能な設備号機が記憶される。
As shown in Table 2, in the processing condition storage device 4, a data table is set for each equipment group, and in this data table, processing conditions, processing times, and equipment numbers that can be processed are stored. Is done.

【0029】更に、上記表3に示すように、製品情報記
憶装置5においては、製品番号毎にその製造に使用され
る工程フロー名、被処理物が仕掛かっている仕掛工程
名、処理待ち又は処理中を示す状態、後工程で予約して
いる設備及び納期日時が記憶される。
Further, as shown in Table 3, in the product information storage device 5, in each product number, the process flow name used for the production, the name of the in-process process in which the object is being processed, the process waiting or the process The state indicating the inside, the equipment reserved in the post-process, and the delivery date and time are stored.

【0030】また、中央演算装置1にはネットワーク7
が接続されており、ネットワーク7には、製造ライン8
中の各種設備9及び被処理物保管棚10が接続されてい
る。被処理物保管棚10は処理待ちの被処理物を保管す
るものである。また、各種設備9と被処理物保管棚10
との間又は被処理物保管棚10間で被処理物を搬送する
搬送装置11が設けられている。各種設備9から処理開
始、処理終了及び設備の状態等の情報がネットワーク7
を介して中央処理装置1に送信される。また、搬送装置
による被処理物の搬送がネットワーク7を介して中央処
理装置1により制御される。
The central processing unit 1 has a network 7
Are connected, and a network 7 is connected to a production line 8.
Various facilities 9 and the object storage shelf 10 are connected. The processing object storage shelf 10 stores the processing object waiting to be processed. In addition, various equipment 9 and a processing object storage shelf 10
And a transfer device 11 for transferring the object to be processed between the object storage shelves 10. Information such as the processing start, the processing end, and the state of the equipment from the various equipments 9 is transmitted to the network 7.
Is transmitted to the central processing unit 1 via the. The transport of the object by the transport device is controlled by the central processing unit 1 via the network 7.

【0031】次に、処理順決定モジュール6による処理
フローについて説明する。図2は処理順決定モジュール
による処理を示すフローチャートである。製造ライン8
中の設備9から、例えば、被処理物要求のトリガ信号が
ネットワーク7を介して中央処理装置1に入力される
と、中央処理装置1により処理順決定モジュール6が起
動される。
Next, a processing flow by the processing order determination module 6 will be described. FIG. 2 is a flowchart showing processing by the processing order determination module. Production line 8
For example, when a trigger signal of a request for an object to be processed is input to the central processing unit 1 via the network 7 from the facility 9 inside, the processing order determination module 6 is started by the central processing unit 1.

【0032】起動した処理順位決定モジュール6は中央
処理装置1を介して製品情報記憶装置5に記憶されてい
るデータから被処理物要求のトリガ信号を発した設備9
に予約されている被処理物を検索する(S1)。予約さ
れている被処理物がある場合には、その被処理物をその
設備9に搬送することを搬送装置11に指示する(S
8)。
The activated processing order determination module 6 issues a trigger signal for a request for an object to be processed from the data stored in the product information storage device 5 via the central processing unit 1.
(S1). If there is an object to be processed that has been reserved, it instructs the transport device 11 to transport the object to the equipment 9 (S
8).

【0033】一方、予約されている被処理物がない場合
には、後工程の処理設備で予約されている被処理物の有
無を前述の方法と同様の方法により検索する(S2)。
ここで、予約されている被処理物がある場合には、その
被処理物をトリガ信号を発した設備9に搬送することを
搬送装置11に指示する(S8)。
On the other hand, if there is no reserved object to be processed, the presence / absence of an object to be processed reserved in the subsequent processing equipment is searched by the same method as described above (S2).
Here, if there is an object to be processed that is reserved, it instructs the transport device 11 to transport the object to the facility 9 that has issued the trigger signal (S8).

【0034】ここでも、予約されている被処理物がない
場合には、中央処理装置1を介して製品情報記憶装置5
に記憶されているデータからトリガ信号を発した設備9
で処理することが可能な被処理物を検索する(S3)。
Here, if there is no object to be reserved, the product information storage device 5 is sent via the central processing unit 1.
Equipment 9 that has issued a trigger signal from data stored in
An object to be processed that can be processed is searched for (S3).

【0035】検索の結果(S4)、処理可能な被処理物
が1つの場合、工程フロー記憶装置3に記憶されたその
製品の工程フローを検索し、仕掛工程の指定フラグがO
nになっているかチェックする(S5)。指定フラグが
Offの場合、その被処理物をトリガ信号を発した設備
9に搬送することを搬送装置11に指示する(S8)。
As a result of the search (S4), if there is only one work piece to be processed, the process flow of the product stored in the process flow storage device 3 is searched, and the designation flag of the work-in-process is set to O.
It is checked whether the number is n (S5). When the designation flag is Off, the transfer device 11 is instructed to transfer the object to the equipment 9 that has issued the trigger signal (S8).

【0036】一方、指定フラグがOnの場合、指定フラ
グ内に記憶されている数値分だけ後の工程の処理条件に
応じることができる設備群を処理条件記憶装置4に記憶
されているデータから検索し、その設備群の状況をネッ
トワーク7を介してチェックする(S6)。チェックの
結果、その被処理物を処理することが可能であり他の被
処理物の予約がない号機が存在する場合、その設備群を
予約して、その被処理物の処理が完了するまで、他の被
処理物が処理されないようにする。また、製品情報記憶
装置5に予約した設備群を記憶させる(S7)。これに
より、前工程の終了から後工程での処理までの時間が決
められている場合でも、その時間内で対処することがで
きる。
On the other hand, when the designated flag is On, a group of equipment capable of responding to the processing conditions of the subsequent process by the numerical value stored in the designated flag is searched from the data stored in the processing condition storage device 4. Then, the status of the facility group is checked via the network 7 (S6). As a result of the check, if there is a unit that can process the object to be processed and there is no reservation for another object to be processed, reserve the equipment group, and until the processing of the object to be processed is completed. Prevent other objects from being processed. The reserved equipment group is stored in the product information storage device 5 (S7). Accordingly, even when the time from the end of the previous process to the processing in the subsequent process is determined, it is possible to cope within that time.

【0037】また、検索の結果(S4)、処理可能な被
処理物が2つ以上ある場合、それらの優先度αを算出す
る(S9)。優先度αは下記数式2で表される。
If there are two or more objects that can be processed as a result of the search (S4), the priority α is calculated (S9). The priority α is represented by the following equation (2).

【0038】[0038]

【数2】α=(最終工程終了までの処理時間の総和)/
((納期日時)−(現在日時))
Α = (total processing time until the end of the final step) /
((Delivery date and time)-(current date and time))

【0039】最終工程終了までの処理時間の総和は以下
のようにして算出される。先ず、工程フロー記憶装置3
に記憶されているデータから、残り工程及びその各工程
の処理条件が読込まれ、その処理条件に要する処理時間
が処理条件記憶装置4から読込まれる。そして、最終工
程終了までの処理時間の総和として、全ての残り工程に
要する処理時間が算出される。
The total processing time until the end of the final process is calculated as follows. First, the process flow storage device 3
The remaining steps and the processing conditions of each of the steps are read from the data stored in the processing conditions, and the processing time required for the processing conditions is read from the processing condition storage device 4. Then, the processing time required for all remaining steps is calculated as the sum of the processing times until the end of the final step.

【0040】上記数式2より、例えば、2種類の製品の
納期日時が等しく、被処理物の最終工程終了までの処理
時間の総和が相違する場合、最終工程終了までの処理時
間の総和が大きい方が優先度αが高くなり、優先して処
理される。また、2種類の被処理物の最終工程終了まで
の処理時間の総和が等しく、製品の納期日時が相違する
場合、納期日時が近く、納期日時と現在日時との差が小
さい方の優先度αが高くなり、優先して処理される。
From the above equation (2), for example, when the delivery dates and times of the two types of products are equal and the sum of the processing times until the end of the final process of the workpiece is different, the sum of the processing times until the end of the final process is larger Has a higher priority α, and is preferentially processed. In addition, when the sum of the processing times until the end of the final process of the two kinds of workpieces is equal and the delivery dates and times of the products are different, the priority α is set so that the delivery date and time is close and the difference between the delivery date and time and the current date and time is smaller. Is higher and is processed with priority.

【0041】優先度αを計算(S9)した後、優先度α
が最も大きい製品の指定フラグをチェックする(S1
0)。指定フラグがOffの場合、その製品の被処理物
をトリガ信号を発した設備9に搬送することを搬送装置
11に指示する(S8)。
After calculating the priority α (S9), the priority α
Check the designation flag of the product with the largest (S1)
0). If the designation flag is OFF, the transport device 11 is instructed to transport the object to be processed to the facility 9 that has issued the trigger signal (S8).

【0042】指定フラグがOnの場合、指定フラグ内に
記憶されている数値分だけ後の工程の処理条件に応じる
ことができる設備群を処理条件記憶装置4に記憶されて
いるデータから検索し、その設備群の状況をネットワー
ク7を介してチェックする(S11)。チェックの結
果、その被処理物を処理することが可能であり他の被処
理物の予約がない号機が存在する場合、その設備を予約
して、その被処理物の処理が完了するまで、他の被処理
物が処理されないようにする。また、製品情報記憶装置
5に予約した設備群を記憶させる(S7)。チェックの
結果、設備の予約が不可能な場合(S12)、次に優先
度αが高い被処理物について指定フラグをチェックする
(S10)。
When the designation flag is On, a group of equipment capable of responding to the processing condition of the subsequent process by the numerical value stored in the designation flag is searched from the data stored in the processing condition storage device 4, The status of the facility group is checked via the network 7 (S11). As a result of the check, if there is a unit that can process the object and there is no reservation for another object, reserve the equipment and wait until the processing of the object is completed. Is not processed. The reserved equipment group is stored in the product information storage device 5 (S7). As a result of the check, if it is impossible to reserve the equipment (S12), the designated flag is checked for the processing object having the next highest priority α (S10).

【0043】検索の結果(S4)、処理可能な被処理物
が2以上ある場合には、このように、優先度αが高い順
に指定フラグのチェックを行い(S10)、処理可能な
被処理物が決定したら、その被処理物をトリガ信号を発
した設備9に搬送することを搬送装置11に指示する
(S8)。
As a result of the search (S4), if there are two or more processable objects, the designation flags are checked in the order of higher priority α (S10), and the processable objects are checked. Is determined, the transfer device 11 is instructed to transfer the object to the equipment 9 that has issued the trigger signal (S8).

【0044】そして、予約された設備で予約被処理物の
処理を開始した時点で、製品情報記憶装置5内に記憶さ
れているデータを消去して予約を解除する。
Then, when the processing of the reserved object is started in the reserved facility, the data stored in the product information storage device 5 is erased to cancel the reservation.

【0045】本実施例方法においては、先ず、優先度α
の高低を基準にして被処理物の処理順序の目処を立てた
後、指定フラグをチェックすることにより、後工程の状
況をチェックして、後工程の設備状態が処理可能である
場合に限りその被処理物を処理するので、仕掛を蓄積す
ることが防止される。また、常に優先度αが高い製品の
被処理物から処理するわけではないので、優先度αが高
い製品が優先度αが低い製品の被処理物の処理を妨げる
ことが抑制される。
In the method of this embodiment, first, the priority α
After estimating the processing order of the object to be processed based on the height of the target, check the designated flag to check the status of the post-process, and only if the equipment state of the post-process is processable, Since the object to be processed is processed, the accumulation of work in progress is prevented. Further, since the processing is not always performed from the processing target of the product having the higher priority α, it is suppressed that the product having the higher priority α prevents the processing of the processing target of the product having the lower priority α.

【0046】次に、本発明の第2の実施例方法について
説明する。本実施例方法においても、第1の実施例方法
と同様に、図1に示す工程の管理装置が使用される。但
し、各記憶装置3、4又は5に記憶されるデータは第1
の実施例方法のものと相違する。表4は工程フロー記憶
装置3に記憶されるデータの構成の一例を示しており、
表5は処理条件記憶装置4に記憶されるデータの構成の
一例を示しており、表6は製品情報記憶装置5に記憶さ
れるデータの構成の一例を示している。
Next, a method according to a second embodiment of the present invention will be described. In the method according to the present embodiment, similarly to the method according to the first embodiment, the management apparatus for the process shown in FIG. 1 is used. However, the data stored in each storage device 3, 4 or 5 is the first data.
Is different from that of the embodiment method. Table 4 shows an example of the configuration of data stored in the process flow storage device 3,
Table 5 shows an example of the configuration of data stored in the processing condition storage device 4, and Table 6 shows an example of the configuration of data stored in the product information storage device 5.

【0047】[0047]

【表4】 [Table 4]

【0048】[0048]

【表5】 [Table 5]

【0049】[0049]

【表6】 [Table 6]

【0050】上記表4に示すように、工程フロー記憶装
置3においては、工程フロー名毎にデータテーブルが設
定され、このデータテーブルには、処理段階毎の工程
名、処理に使用される設備群及び処理条件が記憶され
る。第1の実施例と相違する点は、指定フラグが記憶さ
れない点である。
As shown in Table 4 above, in the process flow storage device 3, a data table is set for each process flow name, and the data table stores the process name for each processing stage and the equipment group used for the processing. And processing conditions are stored. The difference from the first embodiment is that the designation flag is not stored.

【0051】また、上記表5に示すように、処理条件記
憶装置4においては、設備群毎にデータテーブルが設定
され、このデータテーブルには、設備(号機)1台あた
りの仕掛限界値、設備(号機)毎の処理可能な処理条
件、各設備(号機)で処理が予定されている製品を示す
仕掛又は仕掛予定製品番号、各設備(号機)における
製品の処理予定数量を示す仕掛値及び各設備(号機)に
おける合計仕掛値が記憶される。仕掛値は、例えば各製
品の総処理予定数量に対するその設備(号機)で予定さ
れている処理数量の割合で表される。
As shown in Table 5 above, in the processing condition storage device 4, a data table is set for each equipment group, and this data table contains the work in process limit value per equipment (unit) and the equipment limit. The processing conditions that can be processed for each (unit), the products that are scheduled to be processed in each facility (unit) <br/> the in-process or planned product numbers , and the scheduled processing quantities of each product in each facility (unit) In- process value and each equipment (unit)
Definitive total widget value is stored. The in-process value is, for example,
Scheduled in the equipment (unit) for the total processing quantity of goods
Expressed as a percentage of the processed quantity.

【0052】更に、上記表6に示すように、製品情報記
憶装置5においては、製品番号毎に使用される工程フロ
ー名、被処理物が仕掛かっている工程名、処理待ち又は
処理中を示す状態及び納期日時が記憶される。第1の実
施例と相違する点は、後工程で予約している設備が記憶
されない点である。
Further, as shown in Table 6 above, in the product information storage device 5, a process flow name used for each product number, a process name in which an object is being processed, a status indicating that the process is waiting or in process. And the delivery date and time are stored. The difference from the first embodiment is that the equipment reserved in the subsequent process is not stored.

【0053】次に、処理順決定モジュール6による処理
フローについて説明する。図3は処理順決定モジュール
による処理を示すフローチャートである。製造ライン8
中の設備9から、例えば、被処理物要求のトリガ信号が
ネットワーク7を介して中央処理装置1に入力される
と、中央処理装置1により処理順決定モジュール6が起
動される。
Next, a processing flow by the processing order determination module 6 will be described. FIG. 3 is a flowchart showing the processing by the processing order determination module. Production line 8
For example, when a trigger signal of a request for an object to be processed is input to the central processing unit 1 via the network 7 from the facility 9 inside, the processing order determination module 6 is started by the central processing unit 1.

【0054】起動した処理順位決定モジュール6は中央
処理装置1を介して製品情報記憶装置5に記憶されてい
る情報からトリガ信号を発した設備9で処理することが
可能な被処理物を検索する(S21)。
The activated processing order determination module 6 searches the information stored in the product information storage device 5 via the central processing unit 1 for an object which can be processed by the equipment 9 which has issued the trigger signal. (S21).

【0055】検索の結果(S22)、処理可能な被処理
物が2以上ある場合、第1の実施例と同様の方法によ
り、被処理物の最終工程終了までの処理時間の総和及び
製品の納期日時と現在日時との差から優先度αを算出す
る(S23)。優先度αを算出した後、優先度αが最も
高い被処理物を検索し、その被処理物の後工程で使用さ
れる処理設備群を工程フロー記憶処置3に記憶されてい
るデータから検索する(S24)。また、検索の結果
(S22)、処理可能な被処理物が1のみの場合、優先
度αを算出することなくその被処理物の後工程で使用さ
れる処理設備群を工程フロー記憶処置3に記憶されてい
るデータから検索する(S24)。
As a result of the search (S22), if there are two or more workpieces that can be processed, the total processing time until the end of the final process of the workpieces and the delivery date of the product are obtained in the same manner as in the first embodiment. The priority α is calculated from the difference between the date and time and the current date and time (S23). After calculating the priority α, an object to be processed having the highest priority α is searched, and a processing facility group used in a subsequent process of the object to be processed is searched from the data stored in the process flow storage unit 3. (S24). Also, as a result of the search (S22), if only one processable object is processed, the processing equipment group used in the subsequent process of the object is stored in the process flow storage process 3 without calculating the priority α. A search is made from the stored data (S24).

【0056】そして、検索された処理条件で処理可能な
号機を処理条件記憶装置4に記憶されているデータから
検索し、検索された号機の稼働状況をネットワーク7を
介してチェックする(S25)。全ての号機が故障中又
はメンテナンス中等の理由で非稼働状態の場合には、次
に優先度αが高い製品の有無をチェックする(S2
6)。
Then, a machine which can be processed according to the searched processing condition is searched from the data stored in the processing condition storage device 4, and the operation status of the searched machine is checked via the network 7 (S25). If all the units are out of operation due to failure or maintenance, it is checked whether there is a product with the next highest priority α (S2).
6).

【0057】チェック(S24)の結果、稼働号機が存
在する場合、各号機の合計仕掛値を処理条件記憶装置4
に記憶されているデータから検索する(S27)。そし
て、全ての号機の合計仕掛値が仕掛限界値を超えている
ときには、次に優先度αが高い被処理物の有無をチェッ
クする(S26)。例えば、表5中の号機3の合計仕掛
値が仕掛限界値を超えている。一方、合計仕掛値が仕掛
限界値以下の設備号機が存在するときには、その号機の
合計仕掛値を以下の手順により変更する(S28)。仕
掛限界値以下の号機が1台のみ存在する場合には、仕掛
値1.0をその号機の仕掛合計値に加算する。表5中の
製品No.2がこれに該当する。また、仕掛限界値以下
の号機が2台以上存在する場合、仕掛値1.0を仕掛限
界値以下の号機台数で割る。そして、その計算結果の値
をそれぞれの号機の仕掛合計値に加算する。表5中の製
品No.5は、仕掛限界値以下の号機が2台存在する場
合に、それらの号機に割り振られた例である。いずれの
場合にも、全体で仕掛合計値は1増加することになる。
As a result of the check (S24), if there is an operating machine, the total in-process value of each machine is stored in the processing condition storage device 4.
(S27). Then, when the total in-process value of all the units exceeds the in-process limit value, it is checked whether or not there is an object to be processed having the next highest priority α (S26). For example, the total in-process value of the unit 3 in Table 5 exceeds the in-process limit value. On the other hand, when there is an equipment machine whose total work value is equal to or less than the work limit value, the total work value of the machine is changed by the following procedure (S28). If there is only one machine having a work in process limit or less, the work in progress 1.0 is added to the total work in progress of that machine. Product No. in Table 5 2 corresponds to this. Further, when there are two or more units having the in-process limit value or less, the in-process value 1.0 is divided by the number of units having the in-process limit value or less. Then, the value of the calculation result is added to the total work in process of each machine. Product No. in Table 5 5 is an example in which, when there are two units below the in-process limit value, those units are assigned to those units. In either case, the total work in progress is increased by one.

【0058】なお、合計仕掛値を変更するのと同時に、
処理条件記憶装置4内の製品No.が記憶されているフ
ィールドに、その製品No.及び算出された仕掛値を追
加記憶させる。
At the same time as changing the total work in process,
Product No. in the processing condition storage device 4 Is stored in the field where the product No. is stored. And the calculated in-process value are additionally stored.

【0059】次に、処理される製品が決定したら、その
被処理物をトリガ信号を発した目的の設備9に搬送する
ことを搬送装置11に指示する(S29)。
Next, when the product to be processed is determined, the transport device 11 is instructed to transport the object to the target facility 9 that has issued the trigger signal (S29).

【0060】また、各設備で処理条件記憶装置4内の製
品No.が記憶されるフィールドに記憶されている被処
理物の処理を開始した時点で、各号機の製品No.フィ
ールドからその製品No.を消去する共に、その被処理
物の仕掛値を各号機の合計仕掛値から減算し、この値を
処理条件記憶装置4内の製品No.フィールドに記憶さ
せる。
In each facility, the product No. in the processing condition storage device 4 is stored. When the processing of the object stored in the field in which is stored is started, the product No. of each unit is started. From the field, enter the product number. Is deleted, and the in-process value of the object is subtracted from the total in-process value of each unit. Remember in the field.

【0061】本実施例においては、優先度αの高低を基
準にして製品の被処理物の処理順序の目処を立てた後、
仕掛合計値をチェックすることにより、後工程の状況を
チェックして、後工程で仕掛値が上限を超えていない場
合に限りその被処理物を処理するので、仕掛を蓄積する
ことが防止される。また、本実施例においても、常に優
先度αが高い製品の被処理物から処理するわけではない
ので、優先度αが高い製品が優先度αが低い製品の被処
理物の処理を妨げることが抑制される。
In this embodiment, after setting the order of processing of the object to be processed based on the level of the priority α,
By checking the total work-in-progress, the status of the post-process is checked, and the work-piece is processed only when the work-in-process value does not exceed the upper limit in the post-process, thereby preventing accumulation of the work-in-progress. . Also in the present embodiment, since the processing is not always performed from the processing target of the product having the higher priority α, the product having the higher priority α may prevent the processing of the processing target of the product having the lower priority α. Is suppressed.

【0062】[0062]

【発明の効果】以上詳述したように、本発明によれば、
後の設備の状態に基づいて処理順序を判断する設備で被
処理物を処理するか否かの判断を行っているので、後の
設備が非稼動状態のときにも、その後の設備で仕掛が蓄
積することが防止される。また、優先度が低い被処理物
が優先度が高い被処理物よりも先に処理されることがあ
るので、優先度が低い製品をも滞りなく処理することが
できる。更に、工程間の時間が規定されている製品を確
実にその規定時間内で処理することができる。
As described in detail above, according to the present invention,
The equipment that determines the processing order based on the state of the later equipment determines whether or not to process the workpiece. Accumulation is prevented. In addition, since a low-priority object may be processed before a high-priority object, a low-priority product can be processed without delay. Further, a product in which the time between processes is specified can be surely processed within the specified time.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の実施例方法に使用する工程の管理装置
を示すブロック図である。
FIG. 1 is a block diagram showing an apparatus for managing processes used in a method according to an embodiment of the present invention.

【図2】第1の実施例方法における処理順決定モジュー
ルによる処理を示すフローチャートである。
FIG. 2 is a flowchart showing processing by a processing order determination module in the method of the first embodiment.

【図3】第2の実施例方法における処理順決定モジュー
ルによる処理を示すフローチャートである。
FIG. 3 is a flowchart showing processing by a processing order determination module in the method of the second embodiment.

【符号の説明】[Explanation of symbols]

1;中央処理装置 2;入力装置 3;工程フロー記憶装置 4;処理条件記憶装置 5;製品情報記憶装置 6;処理順決定モジュール 7;ネットワーク 8;製造ライン 9;設備 10;被処理物保管棚 11;搬送装置 DESCRIPTION OF SYMBOLS 1; Central processing unit 2; Input device 3; Process flow storage device 4; Processing condition storage device 5; Product information storage device 6; Processing order determination module 7; Network 8; Manufacturing line 9; 11; transport device

フロントページの続き (58)調査した分野(Int.Cl.7,DB名) G06F 17/60 G06F 19/00 B23Q 41/00 G05B 15/02 Continuation of front page (58) Fields investigated (Int.Cl. 7 , DB name) G06F 17/60 G06F 19/00 B23Q 41/00 G05B 15/02

Claims (4)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 複数種の被処理物を複数種の処理工程の
組み合わせで処理して製品を製造する製造工程の中央処
理装置による管理方法において、第1の設備において処
理可能な被処理物が製品情報記憶装置に2種以上記憶さ
れている場合に、前記処理可能な被処理物の処理条件、
残りの処理工程及びその処理時間並びに納期に基づいて
前記処理可能な被処理物の全てについて前記第1の設備
での処理の優先度を前記中央処理装置が算出する工程
と、前記中央処理装置が最も優先度が高い処理可能な被
処理物を処理候補とする工程と、前記中央処理装置が
の時点での処理候補について前記第1の設備よりも後で
使用される第2の設備の状態を示す情報を処理条件記憶
装置から読み出して前記第1の設備において前記処理候
補の処理を行うか行わないかの判断を行う工程と、前記
処理候補の処理を行わないと判断した場合に、前記中央
処理装置が前記処理候補の次に優先度が高い処理可能な
被処理物を処理候補として前記判断を行う工程に戻る工
程と、前記処理候補の処理を行うと判断した場合に、
記中央処理装置が前記処理候補の処理を前記第2の設備
で最も優先して行うという予約を前記製品情報記憶装置
に記憶させる工程と、前記中央処理装置が前記処理候補
を前記第1の設備に搬送することを搬送装置に指示する
工程と、前記中央処理装置が前記第2の設備による前記
処理候補の処理が開始された時点で前記予約を前記製品
情報記憶装置から消去する工程と、を有することを特徴
とする製造工程の中央処理装置による管理方法。
In a management method by a central processing unit for a manufacturing process of manufacturing a product by processing a plurality of types of workpieces by a combination of a plurality of types of processing steps, the workpieces that can be processed in the first facility are processed. When two or more types are stored in the product information storage device , the processing conditions of the processable object,
A step of remaining processing steps and the central processing unit the priority of processing at the first facilities for all the treatable article to be treated on the basis of the processing time and delivery time is calculated, said central processing unit highest priority and the step of high processable object to be treated a treatment candidate, the second of said central processing unit is used later than the first equipment for the treatment candidate at that point in time <br/> Stores information indicating the state of equipment at processing conditions
If it is determined not to perform the steps of performing a determination of whether non-use processing of the processing candidate in the first equipment reads from the device, the processing of the processing candidate, the central
If the processing device determines to perform the steps of returning to the step of performing said determining next higher priority processable object to be processed in the processing candidate as candidate treatments, the treatment of the treatment candidate, pre
Storing, in the product information storage device, a reservation that the central processing unit performs the processing of the processing candidate in the second facility with the highest priority; and the central processing unit stores the processing candidate in the second facility. first a step of instructing the transport apparatus to transport the facility, the central processing unit the second of said product said reservation when the processing is started in the processing candidate by facilities
Erasing the information from the information storage device .
【請求項2】 前記判断を行う工程は、前記中央処理装
置が前記第2の設備においてその後に処理が予定されて
いる被処理物の情報を調査する工程を有することを特徴
とする請求項1に記載の製造工程の中央処理装置による
管理方法。
2. The method according to claim 1, wherein the determining is performed by the central processing unit.
The method according to claim 1, wherein the apparatus further comprises a step of examining information on an object to be processed later in the second facility.
【請求項3】 複数種の被処理物を複数種の処理工程の
組み合わせで処理して製品を製造する製造工程の管理装
置において、前記被処理物の処理条件、残りの処理工程
及びその処理時間並びに納期からその被処理物の第1の
設備での優先度を算出する優先度算出手段と、前記第1
の設備よりも後で使用される第2の設備のその時点での
状態を示す情報に基づいて前記第1の設備での前記被処
理物の処理を行うか行わないかの判断を行う判断手段
と、前記被処理物の処理を行うと判断した場合に、前記
被処理物の処理を前記第2の設備で最も優先して行うと
いう予約をする予約手段と、前記第2の設備で前記被処
理物の処理が終了した後に前記予約を消去する予約消去
手段と、を有することを特徴とする製造工程の管理装
置。
3. A manufacturing process management apparatus for manufacturing a product by processing a plurality of types of workpieces by a combination of a plurality of types of processing steps, wherein the processing conditions of the workpieces, the remaining processing steps, and the processing time thereof. Priority calculating means for calculating the priority of the object to be processed in the first facility from the delivery date;
Determining means for determining whether or not to process the object to be processed in the first facility based on information indicating the state of the second facility to be used later than the second facility. A reservation means for making a reservation that processing of the object to be processed is given the highest priority in the second facility when it is determined that the processing of the object is to be performed; and And a reservation erasing means for erasing the reservation after the processing of the processed object is completed.
【請求項4】 前記判断手段は、前記第2の設備におい
てその後に処理が予定されている被処理物の情報を調査
手段を有することを特徴とする請求項3に記載の製造工
程の管理装置。
4. The manufacturing apparatus management apparatus according to claim 3, wherein said determining means has an investigating means for examining information on an object to be subsequently processed in said second facility. .
JP34954397A 1997-12-18 1997-12-18 Manufacturing process management method and management device used therefor Expired - Fee Related JP3228206B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP34954397A JP3228206B2 (en) 1997-12-18 1997-12-18 Manufacturing process management method and management device used therefor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP34954397A JP3228206B2 (en) 1997-12-18 1997-12-18 Manufacturing process management method and management device used therefor

Publications (2)

Publication Number Publication Date
JPH11184925A JPH11184925A (en) 1999-07-09
JP3228206B2 true JP3228206B2 (en) 2001-11-12

Family

ID=18404438

Family Applications (1)

Application Number Title Priority Date Filing Date
JP34954397A Expired - Fee Related JP3228206B2 (en) 1997-12-18 1997-12-18 Manufacturing process management method and management device used therefor

Country Status (1)

Country Link
JP (1) JP3228206B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU5269401A (en) * 2000-05-09 2001-11-20 Tokyo Electron Limited Semiconductor manufacturing system and control method thereof
JP2002075813A (en) 2000-08-24 2002-03-15 Mitsubishi Electric Corp Process control method and process control device

Also Published As

Publication number Publication date
JPH11184925A (en) 1999-07-09

Similar Documents

Publication Publication Date Title
KR100275639B1 (en) Production controller capable of controlling work start in each facility of a facility group taking buffer capacity of the facility group into consideration
US6434440B1 (en) Production estimate management system
US5745364A (en) Method of producing semiconductor wafer
US7058627B2 (en) Reticle management system
JP3228206B2 (en) Manufacturing process management method and management device used therefor
JP2800795B2 (en) Production control method and production control device
JPH09101987A (en) Project progress managing device
US6535778B2 (en) Process control method and process control apparatus
JP2001125621A (en) Laying system for operation lot in manufacturing process
JP2811827B2 (en) Production scheduling device
JPH0816206A (en) Method and device for determining starting order of processing
JP5455049B2 (en) Priority determination device
JP2702469B2 (en) Semiconductor wafer production method
JP3382805B2 (en) Production control method and production control method
JP5359312B2 (en) Manufacturing line process management method and process management system
JP3316806B2 (en) Semiconductor manufacturing management system
JP2600628B2 (en) Work order determination method considering multiple assignment conditions
JPH11188580A (en) Machining method of work
JP3246461B2 (en) Reticle transfer control method
JPH0744614A (en) Device for controlling production and method therefor
JPH0945596A (en) Production controller
JP2005310974A (en) Conveyance instruction issuer
JP2003316419A (en) Progress control unit and progress control method for production line
JPH0435853A (en) Production control device
JP3396042B2 (en) Product processing device and product processing method

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees