JP3227746U - Concrete placement structure - Google Patents

Concrete placement structure Download PDF

Info

Publication number
JP3227746U
JP3227746U JP2020002226U JP2020002226U JP3227746U JP 3227746 U JP3227746 U JP 3227746U JP 2020002226 U JP2020002226 U JP 2020002226U JP 2020002226 U JP2020002226 U JP 2020002226U JP 3227746 U JP3227746 U JP 3227746U
Authority
JP
Japan
Prior art keywords
plate portion
formwork
opening
concrete
frame plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2020002226U
Other languages
Japanese (ja)
Inventor
孝 永田
孝 永田
Original Assignee
守屋八潮建設株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 守屋八潮建設株式会社 filed Critical 守屋八潮建設株式会社
Priority to JP2020002226U priority Critical patent/JP3227746U/en
Application granted granted Critical
Publication of JP3227746U publication Critical patent/JP3227746U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

【課題】きわめて施工性の優れるコンクリート打設構造を提供する。
【解決手段】コンクリート打設構造1は、コンクリートの型枠2に形成される開口高H1と開口幅W1とを有する矩形の型枠開口部20と;開口高H1よりも高い枠高と開口幅W1と略同一の枠幅とを有し、型枠の内面に当接するように配置される枠板部と、枠板部に取り付けられて型枠に掛止され、型枠の外側まで延びる掛止部5と、枠板部又は掛止部に取り付けられて、枠板部の内部開口を通じてコンクリートを型枠内に投入するためのシューター部6と、を一体に有する打設投入装置3と;を備える。
【選択図】図1
PROBLEM TO BE SOLVED: To provide a concrete casting structure having extremely excellent workability.
SOLUTION: A concrete casting structure 1 has a rectangular formwork opening 20 having an opening height H1 and an opening width W1 formed in a concrete formwork 2; a frame height and an opening width higher than the opening height H1. A frame plate portion having a frame width substantially the same as that of W1 and arranged so as to abut on the inner surface of the mold, and a hook attached to the frame plate portion and hooked on the mold and extending to the outside of the mold. A casting and loading device 3 that integrally has a stop portion 5 and a shooter portion 6 that is attached to the frame plate portion or the hook portion and for loading concrete into the formwork through the internal opening of the frame plate portion; To be equipped.
[Selection diagram] Fig. 1

Description

本考案は、型枠の中間位置において、コンクリートの打設に使用されるコンクリート打設構造に関するものである。 The present invention relates to a concrete placing structure used for placing concrete at an intermediate position of a formwork.

従来から、建築や土木の構造物は、型枠内に鉄筋を組み、コンクリートを打設することで構築されることが一般的である。このコンクリートは、セメント、骨材、水等の混合物であるため、コンクリートの落下距離が所定高さ(例えば1.5メートル)以上になると、コンクリートが分離してしまう恐れがある。そのため、高さのある構造物を作る場合には、コンクリートの分離を防止するために、コンクリートを所定の高さ毎に区切って構築することが行われている。 Traditionally, architectural and civil engineering structures have generally been constructed by assembling reinforcing bars in the formwork and placing concrete. Since this concrete is a mixture of cement, aggregate, water and the like, if the falling distance of the concrete exceeds a predetermined height (for example, 1.5 meters), the concrete may separate. Therefore, when making a tall structure, concrete is divided into predetermined heights in order to prevent separation of concrete.

一方で、このように所定の高さ毎に区切って構築すると、所定の高さ毎にコンクリートの養生期間が必要となるため、全体の施工期間が長くなるうえに、コストも嵩んでしまうという問題点がある。そのため、例えば特許文献1には、型枠を貫通するコンクリート投入口が形成されている枠体と、コンクリート投入口を塞ぐ蓋体と、蓋体拘束具と、を備える、コンクリード打設枠が開示されている。 On the other hand, if the concrete is constructed by dividing it into predetermined heights in this way, a concrete curing period is required for each predetermined height, which causes a problem that the entire construction period becomes long and the cost increases. There is a point. Therefore, for example, in Patent Document 1, a concrete casting frame including a frame body in which a concrete input port penetrating the formwork is formed, a lid body for closing the concrete input port, and a lid restraint is provided. It is disclosed.

特開平9−141631号公報Japanese Unexamined Patent Publication No. 9-141631

しかしながら、特許文献1の構造は、鋼製の型枠を使用するケーソンに適用することを前提としている。そのため、合板製の型枠を使用する一般的な構造物に適用する際には、型枠側にあらかじめ金物を設置しておく必要があり、施工性の優れないものであった。 However, the structure of Patent Document 1 is premised on being applied to a caisson using a steel formwork. Therefore, when applied to a general structure using a plywood formwork, it is necessary to install hardware in advance on the formwork side, which is not excellent in workability.

そこで、本考案は、きわめて施工性の優れるコンクリート打設構造を提供することを目的としている。 Therefore, it is an object of the present invention to provide a concrete casting structure having extremely excellent workability.

前記目的を達成するために、本考案のコンクリート打設構造は、コンクリートの型枠に形成される開口高と開口幅とを有する矩形の型枠開口部と;前記開口高よりも高い枠高と前記開口幅と略同一の枠幅とを有する枠板部であって、前記型枠の内面に当接するように配置される、枠板部と、前記枠板部に取り付けられて前記型枠に掛止される掛止部であって、前記型枠の外側まで延びる掛止部と、前記枠板部又は前記掛止部に取り付けられて、前記枠板部の内部開口を通じてコンクリートを前記型枠内に投入するためのシューター部と、を一体に有する打設投入装置と;を備えている。 In order to achieve the above object, the concrete casting structure of the present invention comprises a rectangular formwork opening having an opening height and an opening width formed in a concrete formwork; and a frame height higher than the opening height. A frame plate portion having a frame width substantially the same as the opening width, which is arranged so as to abut on the inner surface of the mold, and a frame plate portion attached to the frame plate portion and attached to the mold. A hooking portion that is hooked and extends to the outside of the formwork, and is attached to the frame plate portion or the hooking portion, and concrete is formed through the internal opening of the frame plate portion. It is provided with a shooter portion for throwing into the inside and a casting throwing device integrally having.

このように、本考案のコンクリート打設構造は、コンクリートの型枠に形成される開口高と開口幅とを有する矩形の型枠開口部と;開口高よりも高い枠高と開口幅と略同一の枠幅とを有する枠板部であって、型枠の内面に当接するように配置される、枠板部と、枠板部に取り付けられて型枠に掛止される掛止部であって、型枠の外側まで延びる掛止部と、枠板部又は掛止部に取り付けられて、枠板部の内部開口を通じてコンクリートを型枠内に投入するためのシューター部と、を一体に有する打設投入装置と;を備えている。このような構成であれば、掛止部を型枠に掛止することで、コンクリート打設投入装置を型枠に容易に固定できるため、きわめて施工性の優れるコンクリート打設構造となる。 As described above, the concrete casting structure of the present invention is substantially the same as the rectangular formwork opening having the opening height and the opening width formed in the concrete formwork; the frame height and the opening width higher than the opening height. A frame plate portion having a frame width of the above, which is arranged so as to abut on the inner surface of the mold, and a hook portion which is attached to the frame plate portion and hooked on the mold. It integrally has a hooking portion that extends to the outside of the formwork and a shooter portion that is attached to the frame plate portion or the hooking portion and for pouring concrete into the formwork through the internal opening of the frame plate portion. It is equipped with a casting input device and; With such a configuration, the concrete placing device can be easily fixed to the formwork by hooking the hooking portion on the formwork, so that the concrete placing structure has extremely excellent workability.

コンクリート打設構造を正面から見た斜視図である。It is a perspective view which looked at the concrete casting structure from the front. コンクリート打設構造を背面から見た斜視図である。It is a perspective view which looked at the concrete casting structure from the back. コンクリート打設構造を切断した断面斜視図である。It is sectional drawing which cut the concrete casting structure. 打設投入装置の斜視図である。It is a perspective view of the driving input device. コンクリート打設構造の使用手順を説明する手順図である。It is a procedure diagram explaining the use procedure of a concrete placing structure. コンクリート打設構造の使用手順を説明する手順図である。It is a procedure diagram explaining the use procedure of a concrete placing structure.

以下、本考案の実施の形態について図面を参照して説明する。ただし、以下の実施例に記載されている構成要素は例示であり、本考案の技術範囲をそれらのみに限定する主旨のものではない。 Hereinafter, embodiments of the present invention will be described with reference to the drawings. However, the components described in the following examples are examples, and the technical scope of the present invention is not limited to them.

(全体構成)
まず、図1を用いて本考案のコンクリート打設構造1の全体構成を説明する。本考案のコンクリート打設構造1は、図1に示すように、コンクリートの型枠2の形成される矩形の型枠開口部20と、この型枠開口部20に取り付けられる打設投入装置3と、から概ね構成されている。
(overall structure)
First, the overall configuration of the concrete casting structure 1 of the present invention will be described with reference to FIG. As shown in FIG. 1, the concrete casting structure 1 of the present invention includes a rectangular formwork opening 20 in which a concrete formwork 2 is formed, and a casting input device 3 attached to the formwork opening 20. , Is generally composed of.

型枠2は、高さのある合板製の型枠であり、その途中に矩形の型枠開口部20が形成されている。型枠開口部20は、所定の開口高H1と、所定の開口幅W1と、を有する矩形の開口部である。この型枠開口部20は、コンクリートの打込み面から、所定の高さ以下に設置されることが好ましい。 The formwork 2 is a tall plywood formwork, and a rectangular formwork opening 20 is formed in the formwork 2. The formwork opening 20 is a rectangular opening having a predetermined opening height H1 and a predetermined opening width W1. The formwork opening 20 is preferably installed at a predetermined height or less from the concrete driving surface.

すなわち、一般にコンクリートを打設する際に、型枠の高さが大きい場合には、型枠に投入口を設けるか、縦シュートあるいは輸送管の吐出口を打込み面近くまで下げて、コンクリートを打込まなければならない。吐出口と打込み面との高低差は、コンクリートの分離を防止するために、1.5m以下が標準とされている。型枠開口部20は、具体的には、250mm×250mmの寸法とすることができる。 That is, in general, when placing concrete, if the height of the formwork is large, a loading port is provided in the formwork, or a vertical chute or a discharge port of a transport pipe is lowered to near the driving surface to cast concrete. Must be crowded. The standard height difference between the discharge port and the driving surface is 1.5 m or less in order to prevent the concrete from separating. Specifically, the formwork opening 20 can have a size of 250 mm × 250 mm.

(打設投入装置の構成)
そして、本実施例では、型枠開口部20に打設投入装置3が取り付けられている。打設投入装置3は、図1〜図4に示すように、鋼板によって形成されるものであり、枠板部4と、枠板部4に取り付けられる掛止部5と、枠板部4及び/又は掛止部5に取り付けられるシューター部6と、を一体に備えて構成されている。さらに、コンクリート打設後には、図示したように、開口部を塞ぐように蓋板部8が設置される。逆に言うと、コンクリート打設時には、蓋板部8は設置されていない。
(Configuration of casting device)
Then, in this embodiment, the casting loading device 3 is attached to the formwork opening 20. As shown in FIGS. 1 to 4, the driving loading device 3 is formed of a steel plate, and has a frame plate portion 4, a hooking portion 5 attached to the frame plate portion 4, the frame plate portion 4, and the frame plate portion 4. / Or a shooter portion 6 attached to the hook portion 5 is integrally provided. Further, after the concrete is placed, the lid plate portion 8 is installed so as to close the opening as shown in the figure. To put it the other way around, the lid plate portion 8 is not installed at the time of placing concrete.

枠板部4は、内部に内部開口40を有し、薄い鋼板(例えば、2mmの厚みの鋼板)によってコ字又はロ字の平板状に形成されるものであり、前述した型枠開口部20の開口高H1よりも高い枠高H2と、型枠開口部20の開口幅W1と略同一の枠幅W2とを有する。枠板部4は、図示したように、型枠2の背面側において、型枠2の内面(背面)と接するように配置される。加えて、枠板部4の側縁4aは、型枠開口部20を通じて出し入れしやすいように、背面側に折り曲げられている。また、このように枠板部4の側縁4aが折り曲げられていることで、型枠2との隙間かセメントノロが漏れるおそれを防止できる。 The frame plate portion 4 has an internal opening 40 inside, and is formed in a U-shaped or square-shaped flat plate shape by a thin steel plate (for example, a steel plate having a thickness of 2 mm), and the above-mentioned mold opening 20 It has a frame height H2 higher than the opening height H1 and a frame width W2 substantially the same as the opening width W1 of the mold opening 20. As shown in the drawing, the frame plate portion 4 is arranged on the back surface side of the mold 2 so as to be in contact with the inner surface (back surface) of the mold 2. In addition, the side edge 4a of the frame plate portion 4 is bent to the back side so that it can be easily taken in and out through the form opening 20. Further, since the side edge 4a of the frame plate portion 4 is bent in this way, it is possible to prevent the gap between the frame plate portion 4 and the cement glue from leaking.

打設投入装置3が型枠開口部20に設置された状態では、枠板部4の上縁41及び下縁42は、型枠開口部20の上下に重なり合った状態となっている。後述するように、重なり合う量(高さ)は、下縁42よりも上縁41の方が多くなっている。 In the state where the casting device 3 is installed in the formwork opening 20, the upper edge 41 and the lower edge 42 of the frame plate portion 4 are in a state of being overlapped on the upper and lower sides of the formwork opening 20. As will be described later, the amount of overlap (height) is larger in the upper edge 41 than in the lower edge 42.

掛止部5は、鋼板によって形成され、枠板部4に取り付けられて型枠2に掛止されるものであり、型枠2の外側まで延びている。具体的には、掛止部5は、設置された状態で、型枠開口部20の上縁近傍から上方に延びる上部掛止部51と、型枠開口部20の下縁に引っ掛けられる下部掛止部52と、から構成される。 The hooking portion 5 is formed of a steel plate, is attached to the frame plate portion 4, and is hooked on the mold 2, and extends to the outside of the mold 2. Specifically, the hooking portion 5 is an upper hooking portion 51 extending upward from the vicinity of the upper edge of the formwork opening 20 and a lower hooking portion hooked on the lower edge of the formwork opening 20 in the installed state. It is composed of a stop portion 52 and.

この上部掛止部51は、枠板部4の上縁41との間で、型枠2を挟みこむようになっている。すなわち、上部掛止部51は、枠板部4との間に所定の隙間53を形成するように、正面側に斜め上方向に延びている。また、上部掛止部51の長さ(高さ)及び隙間53の深さは、下部掛止部52よりも長く(深く)される。さらに、上部掛止部51の先端位置よりも、枠板部4の上縁41はより高い位置まで伸びている。 The upper hooking portion 51 sandwiches the formwork 2 with the upper edge 41 of the frame plate portion 4. That is, the upper hooking portion 51 extends diagonally upward toward the front side so as to form a predetermined gap 53 with the frame plate portion 4. Further, the length (height) of the upper hooking portion 51 and the depth of the gap 53 are made longer (deeper) than that of the lower hooking portion 52. Further, the upper edge 41 of the frame plate portion 4 extends to a higher position than the tip position of the upper hook portion 51.

ここにおいて、この上部掛止部51と枠板部4との間に形成される斜めの隙間53は、枠板部4の外面から少し離間するようにされている。そして、この左右の隙間53に、固定棒7が架け渡されて、押し込まれるようになっている。固定棒7としては、例えば鋼製の丸棒や異形鉄筋を用いることができる。 Here, the diagonal gap 53 formed between the upper hooking portion 51 and the frame plate portion 4 is set to be slightly separated from the outer surface of the frame plate portion 4. Then, the fixing rod 7 is bridged and pushed into the left and right gaps 53. As the fixing rod 7, for example, a steel round bar or a deformed reinforcing bar can be used.

固定棒7は、斜めの隙間53に押し込まれることで、楔(くさび)効果によって、打設投入金物3を型枠2に押し付けるようになっている。すなわち、隙間53は上方に斜めに開くように形成されるため、この隙間53に上方から固定棒7を押し込むことで、枠板部4の正面側が型枠2の背面側(裏側)に押し付けられるようになっている。 When the fixing rod 7 is pushed into the diagonal gap 53, the casting input hardware 3 is pressed against the formwork 2 by the wedge effect. That is, since the gap 53 is formed so as to open diagonally upward, the front side of the frame plate portion 4 is pressed against the back side (back side) of the formwork 2 by pushing the fixing rod 7 into the gap 53 from above. It has become like.

同様に、下部掛止部52は、枠板部4の下縁42との間で、型枠2を挟みこむようになっている。すなわち、下部掛止部52は、枠板部4との間に所定の隙間54を形成するように、正面側に斜め下方向に延びている。また、下部掛止部52の長さ(高さ)及び隙間54の深さは、上部掛止部51よりも短く(浅く)される。さらに、下部掛止部52の先端位置と枠板部4の下縁42の先端位置は、略同一高さとなっている。 Similarly, the lower hooking portion 52 sandwiches the formwork 2 with the lower edge 42 of the frame plate portion 4. That is, the lower hooking portion 52 extends diagonally downward toward the front surface so as to form a predetermined gap 54 with the frame plate portion 4. Further, the length (height) of the lower hooking portion 52 and the depth of the gap 54 are shorter (shallow) than the upper hooking portion 51. Further, the tip position of the lower hook portion 52 and the tip position of the lower edge 42 of the frame plate portion 4 are substantially the same height.

ここにおいて、この下部掛止部52と枠板部4の間に形成される斜めの隙間54は、枠板部4の外面と接するようにされている。すなわち、この隙間54の幅は、型枠2の厚み(幅)と略同一となっている。 Here, the diagonal gap 54 formed between the lower hook portion 52 and the frame plate portion 4 is made to be in contact with the outer surface of the frame plate portion 4. That is, the width of the gap 54 is substantially the same as the thickness (width) of the mold 2.

シューター部6は、一枚の鋼板を折り曲げて、側板と底板とを有する溝状(コ字状)に形成され、枠板部4及び/又は掛止部5に取り付けられる。シューター部6で受けたコンクリートは、枠板部4の内部開口40を通じてコンクリートを型枠2内に投入される。シューター部6は、受けたコンクリートが型枠2内に流れるように、型枠2側が下がるように斜めに取り付けられている。さらに、シューター部6の底板の基部には、後述する蓋板部8と同じ厚みの段差が設けられており、後述する蓋板部8の下部を嵌め込めるようになっている。 The shooter portion 6 is formed in a groove shape (U-shape) having a side plate and a bottom plate by bending a single steel plate, and is attached to the frame plate portion 4 and / or the hook portion 5. As for the concrete received by the shooter portion 6, the concrete is thrown into the form 2 through the internal opening 40 of the frame plate portion 4. The shooter portion 6 is obliquely attached so that the received concrete flows into the formwork 2 so that the formwork 2 side is lowered. Further, the base of the bottom plate of the shooter portion 6 is provided with a step having the same thickness as the lid plate portion 8 described later, so that the lower portion of the lid plate portion 8 described later can be fitted.

蓋板部8は、型枠2と同程度の厚みのある樹脂製の矩形の板であり、枠板部4の内部開口40よりも縦横長さが大きく形成される。例えば、内部開口40が180mm×220mmであれば、蓋板部8は190mm×230mmとされる。蓋板部8は、後のコンクリートの打設時に型枠2の内側を見ることができるように、透明な合成樹脂(例えば、アクリル製)によって形成されることが好ましい。 The lid plate portion 8 is a rectangular plate made of resin having the same thickness as the mold 2, and is formed to have a larger vertical and horizontal length than the internal opening 40 of the frame plate portion 4. For example, if the internal opening 40 is 180 mm × 220 mm, the lid plate portion 8 is 190 mm × 230 mm. The lid plate portion 8 is preferably formed of a transparent synthetic resin (for example, made of acrylic) so that the inside of the mold 2 can be seen at the time of placing concrete later.

この蓋板部8は、コンクリート打設構造1が設置される高さの付近までコンクリートが打設された後に設置される。具体的には、蓋板部8の下部は、シューター部6の底板の基部の段差と枠板部4の間に挟まれ、蓋板部8の上部は、隙間53に押し込まれた固定棒7と枠板部4との間に挟まれる。 The lid plate portion 8 is installed after the concrete has been placed up to the vicinity of the height at which the concrete placing structure 1 is installed. Specifically, the lower portion of the lid plate portion 8 is sandwiched between the step at the base of the bottom plate of the shooter portion 6 and the frame plate portion 4, and the upper portion of the lid plate portion 8 is a fixing rod 7 pushed into the gap 53. It is sandwiched between the frame plate portion 4 and the frame plate portion 4.

(使用手順)
次に、図5(a)、(b)、図6(a)、(b)を用いて、本実例のコンクリート打設構造1の使用手順(コンクリート打設方法)について説明する。コンクリート打設方法は、型枠2に型枠開口部20を設ける工程と、枠板部4を背面側に挿し込む工程と、固定棒7を隙間53に押し込む工程と、コンクリートを打設する工程と、蓋板部を配置する工程と、を備えている。
(Usage procedure)
Next, the procedure for using the concrete placing structure 1 (concrete placing method) of this example will be described with reference to FIGS. 5 (a), 5 (b), 6 (a), and (b). The concrete placing method includes a step of providing a formwork opening 20 in the formwork 2, a step of inserting the frame plate portion 4 into the back side, a step of pushing the fixing rod 7 into the gap 53, and a step of placing concrete. And a step of arranging the lid plate portion.

はじめに、型枠2に矩形の型枠開口部20を設ける。具体的には、合板製の型枠2に丸鋸等によって矩形(四角形)の穴をあける。 First, the form 2 is provided with a rectangular form opening 20. Specifically, a rectangular hole is made in the plywood formwork 2 with a circular saw or the like.

次に、図5(a)に示すように、型枠開口部20を通じて、枠板部4の上縁41を型枠2の背面側に挿し込み、次に枠板部4の下縁42を背面側に移動させて型枠2の背面側に挿し込んだ後に、全体を下に下げて掛止部5の隙間54に型枠2を嵌め込む。 Next, as shown in FIG. 5A, the upper edge 41 of the frame plate portion 4 is inserted into the back surface side of the mold 2 through the form opening 20, and then the lower edge 42 of the frame plate portion 4 is inserted. After moving it to the back side and inserting it into the back side of the mold 2, the whole is lowered and the mold 2 is fitted into the gap 54 of the hooking portion 5.

そうすると、打設投入装置3の全体の重心は型枠2の外側にあるため、下部掛止部52の隙間54を回転中心として打設投入装置3は外側に回転しようとすることになり、結果として、枠板部4の上部は、型枠2の背面側に押し付けられることになる。 Then, since the center of gravity of the entire driving throwing device 3 is outside the formwork 2, the driving throwing device 3 tries to rotate outward with the gap 54 of the lower hooking portion 52 as the center of rotation. As a result, the upper portion of the frame plate portion 4 is pressed against the back surface side of the mold 2.

次に、図5(b)に示すように、固定棒7を上方から隙間53に押し込んだうえで、振動によって脱落しないように、両端を釘等によって固定する。このように、隙間53に固定棒7が押し込まれることで、枠板部4の前面が型枠2の背面に押し付けられて、打設投入装置3が型枠2にしっかりと固定される。 Next, as shown in FIG. 5B, the fixing rod 7 is pushed into the gap 53 from above, and both ends are fixed with nails or the like so as not to fall off due to vibration. By pushing the fixing rod 7 into the gap 53 in this way, the front surface of the frame plate portion 4 is pressed against the back surface of the formwork 2, and the casting loading device 3 is firmly fixed to the formwork 2.

次に、図6(a)に示すように、シューター部6を介して、型枠2内にコンクリートが流し込まれる(打設される)。このように、本実施例のコンクリート打設構造1を使用することで、コンクリートが落下する高さが抑制されるため、コンクリートの分離が防止される。 Next, as shown in FIG. 6A, concrete is poured (cast) into the formwork 2 via the shooter portion 6. As described above, by using the concrete placing structure 1 of the present embodiment, the height at which the concrete falls is suppressed, so that the separation of the concrete is prevented.

最後に、図6(b)に示すように、型枠開口部20の下縁の高さ近傍までコンクリートが打設されて上がってくると、蓋板部8によって枠板部4の内部開口40が塞がれる。その際には、固定棒7を一時的に取り外し、蓋板部8を設置した後に、もう一度固定棒7を押し込んでこれを固定する。さらに上部にコンクリートが打設される際には、透明な蓋板部8を通じて内部の様子を見ることができる。 Finally, as shown in FIG. 6B, when concrete is poured up to the vicinity of the height of the lower edge of the formwork opening 20, the lid plate 8 raises the internal opening 40 of the frame plate 4. Is blocked. In that case, the fixing rod 7 is temporarily removed, the lid plate portion 8 is installed, and then the fixing rod 7 is pushed in again to fix the lid plate portion 8. Further, when concrete is poured on the upper part, the inside can be seen through the transparent lid plate portion 8.

その後、型枠2の解体時に、コンクリート打設構造1もいっしょに撤去・解体される。なお、本考案のコンクリート打設構造1は、ほぼ鋼製であることから、使用後によく洗浄すれば、何度でも再利用することができる。 After that, when the formwork 2 is dismantled, the concrete placing structure 1 is also removed and dismantled. Since the concrete casting structure 1 of the present invention is made of steel, it can be reused as many times as necessary if it is thoroughly washed after use.

(効果)
次に、本実施例のコンクリート打設構造1の奏する効果を列挙して説明する。
(effect)
Next, the effects of the concrete casting structure 1 of this embodiment will be listed and described.

(1)上述してきたように、本実施例のコンクリート打設構造1は、コンクリートの型枠2に形成される開口高H1と開口幅W1とを有する矩形の型枠開口部20と;開口高H1よりも高い枠高H2と開口幅W1と略同一の枠幅W2とを有する枠板部4であって、型枠2の内面に当接するように配置される、枠板部4と、枠板部4に取り付けられて型枠2に掛止される掛止部5であって、型枠2の外側まで延びる掛止部5と、枠板部4又は掛止部5に取り付けられて、枠板部4の内部開口40を通じてコンクリートを型枠2内に投入するためのシューター部6と、を一体に有する打設投入装置3と;を備えている。このような構成であれば、掛止部5を型枠2に掛止することで、コンクリート打設投入装置3を型枠2に容易に固定できるため、きわめて施工性の優れるコンクリート打設構造1となる。 (1) As described above, the concrete casting structure 1 of the present embodiment has a rectangular formwork opening 20 having an opening height H1 and an opening width W1 formed in the concrete formwork 2; and an opening height; A frame plate portion 4 having a frame height H2 higher than H1 and a frame width W2 substantially the same as the opening width W1 and arranged so as to abut on the inner surface of the mold 2. A hooking portion 5 attached to a plate portion 4 and hooked on a mold 2, which is attached to a hooking portion 5 extending to the outside of the mold 2 and a frame plate portion 4 or a hooking portion 5. It is provided with a shooter portion 6 for injecting concrete into the form 2 through the internal opening 40 of the frame plate portion 4, and a casting and charging device 3 integrally having. With such a configuration, the concrete placing device 3 can be easily fixed to the form 2 by hooking the hooking portion 5 on the form 2, so that the concrete placing structure 1 is extremely excellent in workability. It becomes.

そして、本実施例のコンクリート打設構造1を用いれば、コンクリートの打込み面との高低差を抑制できるため、コンクリートの分離を防止することができる。したがって、品質の優れたコンクリート構造物を構築することができる。なお、構築されたコンクリート構造物には、枠板部4の厚み分の凹部が生じるものの、この枠板部4はきわめて薄く形成されるため、外観を損なうこともない。 Then, if the concrete placing structure 1 of the present embodiment is used, the height difference from the concrete driving surface can be suppressed, so that the separation of concrete can be prevented. Therefore, it is possible to construct a concrete structure having excellent quality. Although the constructed concrete structure has recesses corresponding to the thickness of the frame plate portion 4, the frame plate portion 4 is formed extremely thin, so that the appearance is not impaired.

(2)また、打設投入装置3の掛止部5は、型枠開口部20の上縁に掛止される上部掛止部51と型枠開口部20の下縁に掛止される下部掛止部52とから構成されて、枠板部4の左右両側に配置されていることが好ましい。このように構成することで、きわめて容易に打設投入装置3を型枠開口部20に配置できる。 (2) Further, the hooking portion 5 of the casting loading device 3 is hooked on the upper hooking portion 51 which is hooked on the upper edge of the formwork opening 20 and the lower portion which is hooked on the lower edge of the mold opening 20. It is preferable that it is composed of the hooking portion 52 and is arranged on both the left and right sides of the frame plate portion 4. With such a configuration, the casting loading device 3 can be arranged in the formwork opening 20 very easily.

(3)さらに、打設投入装置3の上部掛止部51は、上方に向かって型枠2から離れる方向に斜めに伸びて、型枠2との間にV字状の隙間53を形成するとともに、V字状の隙間53に上方から押し込まれて、枠板部4を型枠2の内面に向かって押し付ける固定棒7をさらに備えることが好ましい。このように構成することで、容易に打設投入装置3を型枠2に押し付けて一体化・固定できる。 (3) Further, the upper hooking portion 51 of the casting loading device 3 extends diagonally upward in the direction away from the formwork 2 to form a V-shaped gap 53 with the formwork 2. At the same time, it is preferable to further include a fixing rod 7 which is pushed into the V-shaped gap 53 from above and pushes the frame plate portion 4 toward the inner surface of the mold 2. With this configuration, the casting loading device 3 can be easily pressed against the form 2 to be integrated and fixed.

(4)また、枠板部4の内部開口40を塞ぐ蓋板部8をさらに備えることで、このコンクリート打設構造1よりも上にコンクリートを打設する際にも、型枠開口部20(内部開口40)からのコンクリートの漏れを防止できる。加えて、構築されたコンクリートには、薄い凹部が形成されるだけであり、強度上、外観上も好ましい。 (4) Further, by further providing the lid plate portion 8 for closing the internal opening 40 of the frame plate portion 4, the formwork opening 20 (4) can be used even when concrete is placed above the concrete placing structure 1. Leakage of concrete from the internal opening 40) can be prevented. In addition, the constructed concrete only has thin recesses, which is preferable in terms of strength and appearance.

(5)さらに、固定棒7は、蓋板部8の外側に押し込まれて、蓋板部8を型枠2の外面に向かって押し付けるようになっていることで、蓋板部8を容易かつ強固に、間接的に型枠2に固定することができる。 (5) Further, the fixing rod 7 is pushed to the outside of the lid plate portion 8 to push the lid plate portion 8 toward the outer surface of the mold 2, so that the lid plate portion 8 can be easily pressed. It can be firmly and indirectly fixed to the mold 2.

(6)また、枠板部4の側縁は、折り曲げられていることで、型枠開口部20に打設投入装置3を嵌め込む際に、左右の側縁が引っ掛かりにくくなり、いっそうスムーズに打設投入装置3を設置できる。 (6) Further, since the side edges of the frame plate portion 4 are bent, the left and right side edges are less likely to be caught when the casting device 3 is fitted into the formwork opening 20, which makes it smoother. The casting input device 3 can be installed.

以上、図面を参照して、本考案の実施例を詳述してきたが、具体的な構成は、この実施例に限らず、本考案の要旨を逸脱しない程度の設計的変更は、本考案に含まれる。 Although the embodiment of the present invention has been described in detail with reference to the drawings, the specific configuration is not limited to this embodiment, and design changes to the extent that the gist of the present invention is not deviated are included in the present invention. included.

1 :コンクリート打設構造
2 :型枠
20 :型枠開口部
3 :打設投入装置
4 :枠板部
40 :内部開口
41 :上縁
42 :下縁
4a :側縁
5 :掛止部
51 :上部掛止部
52 :下部掛止部
53 :隙間
54 :隙間
6 :シューター部
7 :固定棒
8 :蓋板部
H1 :開口高
H2 :枠高
W1 :開口幅
W2 :枠幅
1: Concrete casting structure 2: Formwork 20: Formwork opening 3: Casting loading device 4: Frame plate 40: Internal opening 41: Upper edge 42: Lower edge 4a: Side edge 5: Hooking part 51: Upper hooking part 52: Lower hooking part 53: Gap 54: Gap 6: Shooter part 7: Fixed rod 8: Lid plate part H1: Opening height H2: Frame height W1: Opening width W2: Frame width

Claims (6)

コンクリートの型枠に形成される開口高と開口幅とを有する矩形の型枠開口部と;
前記開口高よりも高い枠高と前記開口幅と略同一の枠幅とを有する枠板部であって、前記型枠の内面に当接するように配置される、枠板部と、
前記枠板部に取り付けられて前記型枠に掛止される掛止部であって、前記型枠の外側まで延びる掛止部と、
前記枠板部又は前記掛止部に取り付けられて、前記枠板部の内部開口を通じてコンクリートを前記型枠内に投入するためのシューター部と、
を一体に有する打設投入装置と;
を備えている、コンクリート打設構造。
With a rectangular formwork opening having an opening height and opening width formed in a concrete formwork;
A frame plate portion having a frame height higher than the opening height and a frame width substantially the same as the opening width, which is arranged so as to abut on the inner surface of the mold.
A hooking portion attached to the frame plate portion and hooked on the mold, and a hooking portion extending to the outside of the mold.
A shooter portion that is attached to the frame plate portion or the hook portion and for pouring concrete into the formwork through the internal opening of the frame plate portion.
With a driving input device that has
The concrete casting structure is equipped with.
前記打設投入装置の前記掛止部は、前記型枠開口部の上縁に掛止される上部掛止部と前記型枠開口部の下縁に掛止される下部掛止部とから構成されて、前記枠板部の左右両側に配置されている、請求項1に記載された、コンクリート打設構造。 The hooking portion of the casting loading device includes an upper hooking portion that is hooked on the upper edge of the formwork opening and a lower hooking portion that is hooked on the lower edge of the formwork opening. The concrete casting structure according to claim 1, which is arranged on the left and right sides of the frame plate portion. 前記打設投入装置の前記上部掛止部は、上方に向かって前記型枠から離れる方向に斜めに伸びて、前記型枠との間にV字状の隙間を形成するとともに、
前記V字状の隙間に上方から押し込まれて、前記枠板部を前記型枠の前記内面に向かって押し付ける固定棒をさらに備える、請求項2に記載された、コンクリート打設構造。
The upper hooking portion of the driving loading device extends diagonally upward in a direction away from the mold to form a V-shaped gap with the mold.
The concrete casting structure according to claim 2, further comprising a fixing rod that is pushed into the V-shaped gap from above and presses the frame plate portion toward the inner surface of the formwork.
前記枠板部の前記内部開口を塞ぐ蓋板部をさらに備える、請求項3に記載された、コンクリート打設構造。 The concrete casting structure according to claim 3, further comprising a lid plate portion that closes the internal opening of the frame plate portion. 前記固定棒は、前記蓋板部の外側に押し込まれて、前記蓋板部を前記型枠の前記外面に向かって押し付けるようになっている、請求項4に記載された、コンクリート打設構造。 The concrete casting structure according to claim 4, wherein the fixing rod is pushed to the outside of the lid plate portion to press the lid plate portion toward the outer surface of the formwork. 前記枠板部の側縁は、折り曲げられている、請求項1乃至請求項5のいずれか一項に記載された、コンクリート打設構造。 The concrete casting structure according to any one of claims 1 to 5, wherein the side edge of the frame plate portion is bent.
JP2020002226U 2020-06-09 2020-06-09 Concrete placement structure Expired - Fee Related JP3227746U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2020002226U JP3227746U (en) 2020-06-09 2020-06-09 Concrete placement structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2020002226U JP3227746U (en) 2020-06-09 2020-06-09 Concrete placement structure

Publications (1)

Publication Number Publication Date
JP3227746U true JP3227746U (en) 2020-09-17

Family

ID=72428928

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2020002226U Expired - Fee Related JP3227746U (en) 2020-06-09 2020-06-09 Concrete placement structure

Country Status (1)

Country Link
JP (1) JP3227746U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114033168A (en) * 2021-10-20 2022-02-11 上海市基础工程集团有限公司 Reusable material filling port device suitable for constructional column pouring

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114033168A (en) * 2021-10-20 2022-02-11 上海市基础工程集团有限公司 Reusable material filling port device suitable for constructional column pouring

Similar Documents

Publication Publication Date Title
US20120192506A1 (en) Concrete weldment
JP3227746U (en) Concrete placement structure
KR101203318B1 (en) Elevator pit
KR101098998B1 (en) Recyclable hybrid type connecting device for steel beam to concrete wall and method thereof
JP2009019371A (en) Forming implement and constructing method of construction joint part of underground wall and underground wall
JP2007177492A (en) Pier reinforcing method
JP3560767B2 (en) Discarded formwork panel
JP2000064794A (en) Receiving block for shield-tunnel partition, partition using receiving block, and construction method thereof
KR102105771B1 (en) Water proofing plate installed with forms
KR20220002858U (en) Base assembly for supporting steel pillar for telecommunication facilities
JP6722508B2 (en) Forming method and concrete slab formation method
JPH09242086A (en) Heat insulating footing panel which also serves as form and constructing method of heat insulating footing using it
JP6332947B2 (en) Grout injection mold for column base members
JP6903409B2 (en) How to connect concrete structures
JP2843286B2 (en) Concrete casting frame and concrete wall construction method using the same
JP5608060B2 (en) Housing construction method and formwork for following housing
JP2008150820A5 (en)
KR200306755Y1 (en) Rest for euro-form panel
JP2011111726A (en) Method for forming floor
KR100912608B1 (en) A coupling installation sturcture of the sliding door frame which has the mountain type and rail type bottom frame and improved durability and keeping horizontality
JP5851088B2 (en) Construction method of cast-in-place concrete block formwork and retaining wall
JP4676683B2 (en) Concrete wall
JP2020148019A (en) Method of constructing reinforced concrete structure
US20150308114A1 (en) Wall construction system and component thereof
KR200254797Y1 (en) a break net to lea of concrete

Legal Events

Date Code Title Description
R150 Certificate of patent or registration of utility model

Ref document number: 3227746

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees