JP3138949B2 - How to install beam members - Google Patents

How to install beam members

Info

Publication number
JP3138949B2
JP3138949B2 JP04352149A JP35214992A JP3138949B2 JP 3138949 B2 JP3138949 B2 JP 3138949B2 JP 04352149 A JP04352149 A JP 04352149A JP 35214992 A JP35214992 A JP 35214992A JP 3138949 B2 JP3138949 B2 JP 3138949B2
Authority
JP
Japan
Prior art keywords
girder
pier
building
piers
yard
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP04352149A
Other languages
Japanese (ja)
Other versions
JPH06173459A (en
Inventor
壮次 金井
節夫 上條
峯男 小林
政之 大河内
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP04352149A priority Critical patent/JP3138949B2/en
Publication of JPH06173459A publication Critical patent/JPH06173459A/en
Application granted granted Critical
Publication of JP3138949B2 publication Critical patent/JP3138949B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、軌道や道路などの上方
に構築する建設物の梁部材の架設方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for erection of a beam member of a building constructed above a track or a road.

【0002】[0002]

【従来の技術】従来、軌道や道路などの交通機関上を跨
いで、この交通機関上に建設物を構築する場合、構築予
定位置の近辺に大型クレーンなどを配置し建設物部材を
移送して、建設物を構築していた。
2. Description of the Related Art Conventionally, when a building is constructed on a transportation system such as a track or a road, and a construction material is constructed on the transportation system, a large crane or the like is arranged near a planned construction position to transfer the construction member. Was building a building.

【0003】[0003]

【発明が解決しようとする問題点】前記した従来の構築
方法にあっては、建設物の構築予定場所が軌道や道路な
どの交通機関の上方に位置し、その構築予定場所の周辺
がビルなどに囲まれている場合、大型クレーンなどを配
置する場所が確保することが困難である。このような状
況においては、交通機関を一定期間閉鎖して建設物の構
築を行わなくてはならない。
In the above-described conventional construction method, the construction site of a building is located above a transportation system such as a track or a road, and the surroundings of the construction site are a building or the like. In such a case, it is difficult to secure a place for arranging a large crane or the like. In such a situation, transportation must be closed for a period of time to construct a building.

【0004】[0004]

【本発明の目的】本発明は以上の問題を解決するために
成されたもので、その目的とするところは、下方を往来
する交通機関に支障を来たすことなく行える梁部材の架
設方法を提供することにある。
SUMMARY OF THE INVENTION The present invention has been made to solve the above-mentioned problems, and an object of the present invention is to provide a method of erection of a beam member which can be carried out without hindering a traffic system traveling underneath. Is to do.

【0005】[0005]

【問題点を解決するための手段】本発明は、建築物の構
築予定地を挟んで対向する位置に橋脚を設置し、一方の
該橋脚の構築予定地の反対側に組立ヤードを設置し、該
組立ヤードの上面にはグラウンドアンカーで固定された
支持門が設置され、組立ヤード上から前記支持門内を通
して、対向する橋脚に向けて桁を移動させ、該桁の後端
に連結具により次に移動する桁の先端を連結させ、桁を
両側の橋脚上に架設した後、前記連結具を取り外し、架
設した桁を橋脚に沿って移動させて行う梁部材の架設方
法である。また本発明は、各橋脚の外側に組立ヤードを
設置し、各組立ヤードから対向する橋脚に向けて桁を移
動させ、各橋脚のほぼ中央で各桁を連結して行うこと特
徴とする上記に記載の梁部材の架設方法である。
According to the present invention, a pier is installed at a position facing a construction site of a building, and an assembly yard is installed on a side opposite to the construction site of one of the piers. A support gate fixed by a ground anchor is installed on the upper surface of the assembly yard, and a girder is moved from the assembly yard through the support gate toward an opposing pier, and then connected to the rear end of the girder by a connecting tool. This is a method of erection of a beam member by connecting the leading ends of moving girders, setting the girders on piers on both sides, removing the connecting tool, and moving the erected girders along the piers. Further, the present invention is characterized in that an assembling yard is installed outside each pier, a girder is moved from each assembling yard toward an opposing pier, and each girder is connected substantially at the center of each pier. It is a method of erection of the beam member described.

【0006】[0006]

【実施例1】以下図面を参照しながら建設物における桁
の架設方法について説明する。 <イ>橋脚及び作業台の構築(図1、図2) ビル51に囲まれた線路22の両脇に線路22に沿って
橋脚31及び32を構築する。この橋脚31及び32
は、例えば鉄筋コンクリートで形成する。橋脚31及び
32の高さは、往来する電車21の架線の高さ以上に設
定する。橋脚31上面で後述する作業台41の延長位置
に支承車輪44を設置する。ビル51間の狭い場所を利
用し、橋脚31に隣接させて作業台41を構築する。作
業台41は、建設物の基礎部材となる桁11の組み立て
又は送り出しを行う場所であり、前記橋脚31の上面と
同じ高さに構築する。作業台41の上面に支持門42を
設置する。支持門42は、図2に示す様に、作業台41
から送り出された桁11の後方が浮上しないよう支持す
る部位である。この支持門42は、門型の形状を呈して
おり、橋脚32の方向に開口した向きに設置される。支
持門42の上端面から下方の地中に向けてグラウンドア
ンカー43を打設して支持門42を固定する。このグラ
ウンドアンカー43により、桁11の浮上に対する支持
耐力を十分に確保できる。支持門42の内面には、支持
車輪45を設置する。また、作業台41の上面に支承車
輪44を設置する。
Embodiment 1 A method of erection of a girder in a building will be described below with reference to the drawings. <A> Construction of Bridge Piers and Worktables (FIGS. 1 and 2) Bridge piers 31 and 32 are constructed along the track 22 on both sides of the track 22 surrounded by the building 51. These piers 31 and 32
Is formed of, for example, reinforced concrete. The height of the piers 31 and 32 is set to be equal to or higher than the height of the overhead wire of the traveling train 21. A support wheel 44 is installed on an upper surface of the pier 31 at an extended position of a work table 41 described later. The work table 41 is constructed adjacent to the pier 31 using a narrow space between the buildings 51. The work table 41 is a place for assembling or sending out the girder 11 serving as a foundation member of a building, and is constructed at the same height as the upper surface of the pier 31. A support gate 42 is installed on the upper surface of the worktable 41. The support gate 42 is, as shown in FIG.
This is a part for supporting the back of the spar 11 sent out from the surface so as not to float. The support gate 42 has a gate-like shape, and is installed in a direction opening toward the pier 32. A ground anchor 43 is driven downward from the upper end surface of the support gate 42 into the ground to fix the support gate 42. With this ground anchor 43, the supporting strength against the floating of the spar 11 can be sufficiently ensured. A support wheel 45 is installed on the inner surface of the support gate 42. Further, a support wheel 44 is installed on the upper surface of the worktable 41.

【0007】<ロ>桁の組立及び送り出し(図2) 作業台41上で桁11aの組み立てを行う。桁11a
は、構築する建設物の基礎として構成する鉄骨部材であ
る。組み立てながら桁11aの先端を支持門42内に挿
通し、さらに支承車輪44上に移動させて、徐々に桁1
1aを橋脚32に向けて送り出す。桁11aを半分以上
送り出し、桁11aの重心が支承車輪44を越えると、
桁11aの先端が下方に向く。この時、桁11aの後端
は支持門42内の支持車輪45で上方から支持されるの
で、桁11aを水平に送り出し続けることができる。ま
た、支持門42をグラウンドアンカー43で固定してい
るので、支持門42が引き抜けることはない。ある程度
桁11aを送り出して空いた作業台41上で次に送り出
す桁11bを組み立てる。そして、桁11aの後端に桁
11bの先端を連結具12で連結する。この状態で、桁
11aが橋脚32に到達するまで送り出す。この時、桁
11aの後端は支持門42を通過してしまうが、連結し
た桁11bの重量と桁11bの支持門42による支持と
により、桁11aを水平を維持して送り出し続けること
ができる。桁11の送り出しは、支持車輪45又は支承
車輪44をモータなどの駆動源により駆動する様に構成
し、支持車輪45又は支承車輪44に回転力を付与して
行う。尚、この送り出しの方法については、桁11の後
方からジャッキにより押し出すなどのその他公知の方法
で行っても良い。
<B> Assembling and sending out the spar (FIG. 2) The spar 11a is assembled on the work table 41. Digit 11a
Is a steel frame member configured as a foundation of a building to be constructed. While assembling, the tip of the spar 11a is inserted into the support gate 42 and further moved on the support wheel 44 to gradually move the spar 1
1a is sent out toward the pier 32. When the girder 11a is sent out by more than half and the center of gravity of the girder 11a exceeds the bearing wheel 44 ,
The tip of the spar 11a faces downward. At this time, the rear end of the spar 11a is supported from above by the support wheels 45 in the support gate 42, so that the spar 11a can be continuously fed horizontally. Further, since the support gate 42 is fixed by the ground anchor 43, the support gate 42 is not pulled out. The girder 11b to be sent out next is assembled on the work table 41 which has sent out the girder 11a to some extent. Then, the leading end of the spar 11b is connected to the rear end of the spar 11a by the connecting tool 12. In this state, the beam is sent out until the girder 11a reaches the pier 32. At this time, the rear end of the girder 11a passes through the support gate 42, but the weight of the connected girder 11b and the support of the girder 11b by the support gate 42 can keep the girder 11a horizontal and continue to send it out. . The beam 11 is sent out by driving the support wheel 45 or the support wheel 44 by a drive source such as a motor and applying a rotational force to the support wheel 45 or the support wheel 44 . In addition, about this sending-out method, you may perform by other well-known methods, such as pushing out from behind the girder 11 with a jack.

【0008】<ハ>桁の切離し及び移動(図3) 送り出した桁11aの先端が橋脚32まで到達したら、
連結具12を取り外して、桁11aと桁11bを切り離
す。桁11aを橋脚31及び32の長手方向に沿って所
定位置まで移動させる。その移動方法としては、例え
ば、橋脚31及び32上面に設置した台車又はすべり板
の上に桁11aを載せ、油圧ジャッキ又はウインチ等を
駆動源として移動させることができる。このような移動
方法を採用すれば、桁11aの滑動抵抗を低減でき、能
率良く行うことができる。
<C> Separation and movement of the girder (FIG. 3) When the tip of the sent girder 11a reaches the pier 32,
The connecting tool 12 is removed, and the girders 11a and 11b are separated. The girder 11a is moved to a predetermined position along the longitudinal direction of the piers 31 and 32. As a moving method, for example, the girder 11a can be placed on a cart or a slide plate installed on the upper surface of the piers 31 and 32, and can be moved using a hydraulic jack or a winch as a drive source. If such a moving method is adopted, the sliding resistance of the spar 11a can be reduced, and it can be performed efficiently.

【0009】<ニ>最終桁の送り出し 順次桁11の送り出し、連結、橋脚31及び32上の移
動を行う。そして、最終の桁11を送り出す際には、あ
る程度重量を有する仮桁部材を最終の桁11の後端に連
結し送り出しを行う。送り出しを終了後、最終の桁11
と仮桁部材を切り離す。以上の様に、全ての桁11の架
設作業を終えたら、桁11間に梁部材等を配設して使用
目的に応じた建設物を構築する。本実施例は、電車の線
路の上方に構築する建設物の梁部材の架設方法である
が、建設物の下方は電車の線路や道路などの交通機関に
限らず、建物などが建っている場合などであってもよ
い。
<D> Sending out last girder Sending out, connecting, and moving on the piers 31 and 32 sequentially. When sending out the last girder 11, a temporary girder member having a certain weight is connected to the rear end of the last girder 11 and sent out. After sending out, the last digit 11
And the temporary girder member. As described above, when the work of erection of all the girders 11 is completed, a beam member or the like is arranged between the girders 11 to construct a construction corresponding to the purpose of use. The present embodiment is a method of erection of a beam member of a construction to be constructed above a railroad track of a train. And so on.

【0010】[0010]

【実施例2】図4に示す様に、本実施例は、橋脚31と
橋脚32との距離が長い場合に用いる方法であり、橋脚
31の外側に作業台41aを設置し、橋脚32の外側に
作業台41bを設置して建設物を構築するものである。
桁の架設方法は、それぞれ橋脚31及び32から桁11
を送り出し、橋脚31と橋脚32のほぼ中央で桁11a
と桁11aとを連結し、桁11aの後端に連結した桁1
1bを切り離し、連結した桁11aを橋脚31及び32
に沿って所定位置まで移動させる。そして、桁11を全
て架設した後に、桁11間に梁部材等を配設して建設物
を構築する。本実施例の様に、橋脚31と橋脚32との
距離が長い場合など、橋脚31及び32の両側から桁1
1を送り出せば、安全に桁11の架設作業を行うことが
できる。
Embodiment 2 As shown in FIG. 4, this embodiment is a method used when the distance between the pier 31 and the pier 32 is long, and a work table 41a is installed outside the pier 31 and The work table 41b is installed in the building to construct a construction.
The method of erection of the girder is from the piers 31 and 32 to the girder 11 respectively.
And the girder 11a is almost at the center of the pier 31 and the pier 32.
1 connected to the rear end of the column 11a
1b, and the connected girder 11a is connected to piers 31 and 32.
To a predetermined position. Then, after all the girders 11 are erected, a beam member or the like is arranged between the girders 11 to construct a construction. When the distance between the pier 31 and the pier 32 is long as in the present embodiment, the beam 1
If 1 is sent out, the work of erection of the girder 11 can be performed safely.

【0011】[0011]

【発明の効果】本発明は以上説明したようになるから次
のような効果を得ることができる。 <イ> 周囲をビルなどに囲まれた線路や道路などの交
通機関の上方に、交通機関の往来に支障を来たすことな
く建設物を構築することができる。
As described above, the present invention has the following effects. <B> A building can be constructed above a transportation system such as a track or a road surrounded by buildings or the like without interfering with traffic.

【0012】<ロ> 建設物の基礎部材となる梁部材、
例えば桁を組立ヤードから送り出して架設するので、桁
の架設作業に広い場所を必要としない。
<B> A beam member serving as a foundation member of a building,
For example, since the girder is sent out from the assembly yard and erected, a large space is not required for the erection work of the girder.

【図面の簡単な説明】[Brief description of the drawings]

【図1】 建設物の構築工程の説明図FIG. 1 is an explanatory diagram of a construction process of a building.

【図2】 桁の送り出し工程の説明図FIG. 2 is an explanatory diagram of a girder sending process.

【図3】 桁の移動工程の平面図FIG. 3 is a plan view of a girder moving process.

【図4】 実施例2の説明図FIG. 4 is an explanatory view of a second embodiment.

───────────────────────────────────────────────────── フロントページの続き (72)発明者 大河内 政之 東京都新宿区西新宿一丁目25番1号 大 成建設株式会社内 (56)参考文献 特開 平3−90703(JP,A) 特開 昭49−57648(JP,A) (58)調査した分野(Int.Cl.7,DB名) E04G 21/14 E01D 21/00 E04B 1/35 ────────────────────────────────────────────────── ─── Continuation of front page (72) Inventor Masayuki Okochi 1-25-1, Nishishinjuku, Shinjuku-ku, Tokyo Taisei Corporation Co., Ltd. (56) References JP-A-3-90703 (JP, A) JP 49-57648 (JP, A) (58) Fields investigated (Int. Cl. 7 , DB name) E04G 21/14 E01D 21/00 E04B 1/35

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 建築物の構築予定地を挟んで対向する位
置に橋脚を設置し、 一方の該橋脚の構築予定地の反対側に組立ヤードを設置
し、 該組立ヤードの上面にはグラウンドアンカーで固定され
た支持門が設置され、 組立ヤード上から前記支持門内を通して、対向する橋脚
に向けて桁を送り出し、 該桁の後端には連結具により
次に送り出し予定の桁の先端を連結させて行い、 桁を
両側の橋脚上に架設した後、前記連結具を取り外し、 架設した桁を橋脚に沿って移動させて行う、 梁部材の架設方法。
1. A pier is installed at a position opposite to a planned construction site of a building, and an assembly yard is installed on a side opposite to the construction site of one of the piers, and a ground anchor is provided on an upper surface of the assembly yard. A support gate fixed at is installed, and a girder is sent out from the assembly yard through the support gate to the opposite pier, and a rear end of the girder is connected to a leading end of the next girder to be sent out by a connector. A method of erection of a beam member, comprising: after installing a girder on piers on both sides, removing the connecting tool, and moving the erected girder along the pier.
【請求項2】 各橋脚の外側に組立ヤードを設置し、 各組立ヤードから対向する橋脚に向けて桁を移動させ、 各橋脚のほぼ中央で各桁を連結して行うこと特徴とす
る、 前記請求項1に記載の梁部材の架設方法。
2. An assembling yard is installed outside each pier, a girder is moved from each assembling yard to an opposing pier, and each girder is connected at substantially the center of each pier. A method for erection of the beam member according to claim 1.
JP04352149A 1992-12-10 1992-12-10 How to install beam members Expired - Fee Related JP3138949B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP04352149A JP3138949B2 (en) 1992-12-10 1992-12-10 How to install beam members

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP04352149A JP3138949B2 (en) 1992-12-10 1992-12-10 How to install beam members

Publications (2)

Publication Number Publication Date
JPH06173459A JPH06173459A (en) 1994-06-21
JP3138949B2 true JP3138949B2 (en) 2001-02-26

Family

ID=18422116

Family Applications (1)

Application Number Title Priority Date Filing Date
JP04352149A Expired - Fee Related JP3138949B2 (en) 1992-12-10 1992-12-10 How to install beam members

Country Status (1)

Country Link
JP (1) JP3138949B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5414352B2 (en) * 2009-05-12 2014-02-12 株式会社竹中工務店 Housing moving method and structure
JP5414351B2 (en) * 2009-05-12 2014-02-12 株式会社竹中工務店 Housing moving method and structure

Also Published As

Publication number Publication date
JPH06173459A (en) 1994-06-21

Similar Documents

Publication Publication Date Title
JP5295989B2 (en) Rotating support structure for construction of overhanging beam of bridge pier
JP3440422B2 (en) Bridge construction method and bridge construction device
JP2918475B2 (en) Pier construction method, pier dismantling method and lift-up / rotation device
JP2000230205A (en) Elevated track construction method and device
JP3138949B2 (en) How to install beam members
CN109797657B (en) Cast-in-situ bridge template support system device and bridge cast-in-situ construction method
JPH11158814A (en) Method of constructing portal pier for viaduct
JPH0336362B2 (en)
JP2585174B2 (en) How to fix scaffolding for temporary tents
CN217710363U (en) Square column steel formwork component for road and bridge building
JP2592512B2 (en) Construction method of PC snow shelter
JPH10131508A (en) Material transport device of temporarily set curing body
JP2000230204A (en) Elevated track construction method and device
JPH0350841B2 (en)
JPS6138066A (en) Assembling of suspension scaffold
JPH11158817A (en) Balancing erection construction for bridge at height and transferable slinging lifting device therefor
JP3318133B2 (en) How to build artificial ground
JPS603363A (en) Construction of precast concrete large beam
JPH049901B2 (en)
JPH1181679A (en) Construction for building
JPH08338131A (en) Form support construction and execution method thereof
JPS61151398A (en) Pier for constructing concrete of floor part
SU688550A1 (en) Device for joining reinforced-concrete panel to steal beam
JPS621910A (en) Working vehicle for repairing bridge and its construction
JPS5976303A (en) Construction of shed

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091215

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091215

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101215

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111215

Year of fee payment: 11

LAPS Cancellation because of no payment of annual fees