JP3091624B2 - Girder device - Google Patents

Girder device

Info

Publication number
JP3091624B2
JP3091624B2 JP06043793A JP4379394A JP3091624B2 JP 3091624 B2 JP3091624 B2 JP 3091624B2 JP 06043793 A JP06043793 A JP 06043793A JP 4379394 A JP4379394 A JP 4379394A JP 3091624 B2 JP3091624 B2 JP 3091624B2
Authority
JP
Japan
Prior art keywords
bracket
cutting beam
cutting
pin
girder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP06043793A
Other languages
Japanese (ja)
Other versions
JPH07252837A (en
Inventor
悟 川上
元男 松本
Original Assignee
住友金属建材株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 住友金属建材株式会社 filed Critical 住友金属建材株式会社
Priority to JP06043793A priority Critical patent/JP3091624B2/en
Publication of JPH07252837A publication Critical patent/JPH07252837A/en
Application granted granted Critical
Publication of JP3091624B2 publication Critical patent/JP3091624B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】この発明は、おもに地盤中に排水
管やガス管等を埋設する際に、掘削溝の左右両側部に立
設される山止めパネルを支持するために使用される切り
梁装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a cutting device used to support a retaining panel installed on both left and right sides of an excavation groove when a drain pipe or a gas pipe is buried mainly in the ground.
Related to beam devices.

【0002】[0002]

【従来の技術及び発明が解決しようとする課題】一般
に、道路等の地盤面下には排水管やガス管等の多くの設
備管が埋設されている。この種の工事は地盤面上に所定
深さの掘削溝を道路に沿って掘り、その左右側壁を山止
めパネルで崩壊しないように保護し、掘削溝の底に設備
管を吊り込んで布設した後、前記山止めパネルを撤去し
埋め戻している。
2. Description of the Related Art Generally, many equipment pipes such as drain pipes and gas pipes are buried under the ground surface of a road or the like. In this type of construction, a digging groove of a predetermined depth was dug along the road on the ground surface, the left and right side walls of the digging groove were protected by collapsing panels, and equipment pipes were suspended and laid at the bottom of the digging groove. Later, the retaining panel was removed and backfilled.

【0003】また、工事に際しては、左右山止めパネル
間にこの山止めパネルを支持するために切り梁ジャッキ
が設置され、この切り梁ジャッキは掘削溝が深い場合に
は何段にも設置されている。そして、設備管を掘削溝の
底に吊り込む際にこの切り梁ジャッキを一時的に撤去す
る必要がある。
[0003] Further, at the time of construction, a girder jack is installed between the left and right girder panels in order to support the girder panel, and this girder jack is installed in multiple stages when the excavation groove is deep. I have. It is necessary to temporarily remove the girder jack when suspending the equipment pipe at the bottom of the excavation trench.

【0004】しかし、この種の切り梁ジャッキは掘削溝
に沿って幾つも設置され、しかも、掘削溝が深い場合に
は何段にも設置されているので、これを一つ一つ撤去
し、再びセットするのには、多大の手間暇を必要とし、
工事がきわめて煩わしい等の課題があった。また、掘削
溝が深い場合には、作業員が掘削溝の中に入り込む必要
があるので、危険を伴う等の課題もあった。
[0004] However, a plurality of such cutting beam jacks are installed along the excavation groove, and when the excavation groove is deep, they are installed in multiple stages. It takes a lot of time and effort to set it again,
There was a problem that the construction was extremely troublesome. In addition, when the excavation groove is deep, it is necessary for an operator to enter the excavation groove, and thus there is a problem that it involves danger.

【0005】また、支柱及び切り梁ジャッキは一つ一つ
設置するので、多くの労力を費やし作業効率がきわめて
悪い等の課題があった。
[0005] Further, since the strut and the cut beam jack are installed one by one, there is a problem that much labor is required and the work efficiency is extremely poor.

【0006】更に、この切り梁ジャッキの端部は支柱に
取り付けられたブラケットを介して取り付けられている
ので、このブラケットが邪魔になって埋設管吊り込みス
ペースが狭くなり、掘削溝の開口幅の割りには大径の埋
設管を吊り込むことが出来ない等の課題もあった。仮に
可能であっても、その都度ブラケットを一時取り外す必
要があり、作業性の低下が免れないものであった。
Further, since the end of the cutting beam jack is attached via a bracket attached to the column, the bracket hinders the space for hanging the buried pipe, and the opening width of the excavation groove is reduced. There were also problems such as the inability to hang large diameter buried pipes. Even if possible, it was necessary to temporarily remove the bracket each time, which inevitably reduced the workability.

【0007】この発明は、以上の課題を解決するために
なされたもので、掘削溝の左右両側に立設された左右支
柱間に架け渡される切り梁の設置及び撤去を簡単にかつ
安全に行うことができ、しかも、掘削溝の開口幅一杯の
大径の埋設管の設置も難無く行えるようにした切り梁装
置を提供することを目的とする
SUMMARY OF THE INVENTION The present invention has been made to solve the above-mentioned problems, and easily and safely installs and removes a girder spanning between left and right supports erected on the left and right sides of a digging groove. it can, moreover, cut RyoSo you allow without difficulty be installed in the buried pipe of large diameter opening width cup of excavation
The purpose is to provide a device .

【0008】[0008]

【課題を解決するための手段】以上の課題を解決するた
めの手段として、この発明に係る切り梁装置は、請求項
1として、掘削溝の左右両側部にそれぞれ立設されて山
止めパネルを支持する左右支柱と、この左右支柱間に架
け渡されて左右支柱を支持する切り梁と、左右支柱にそ
れぞれ突設されて切り梁と支柱とを連結するブラケット
とを有する切り梁装置において、ブラケットに切り梁の
端部を水平方向に回転自在に連結する連結ピンを挿入す
るためのピン孔を設け、かつブラケットを支柱内に収納
できるように取り付ける。
[Means for Solving the Problems ] To solve the above problems,
According to another aspect of the present invention, there is provided a cutting beam device according to the present invention.
As one, it is set up on the left and right sides of the
Right and left supports that support the stop panel, and
The beam that is passed over and supports the left and right supports,
Brackets projecting from each other to connect the beam and the column
In a girder device having a girder,
Insert the connecting pin that connects the ends so that they can rotate freely in the horizontal direction.
Pin holes for mounting, and the bracket is stored in the column
Attach so that you can.

【0009】請求項2として、請求項1の切り梁装置に
おいて、ブラケットを支柱の上下方向に所定間隔おきに
取り付ける。
According to a second aspect of the present invention, there is provided the cutting beam device according to the first aspect.
The bracket at predetermined intervals in the vertical direction of the column.
Attach.

【0010】請求項3として、請求項1または2の切り
梁装置において、ブラケットに切り梁の回転を阻止する
ストッパーを挿入するためのピン孔を設ける。
According to a third aspect of the present invention,
In the beam device, the bracket prevents the beam from rotating
A pin hole for inserting a stopper is provided.

【0011】[0011]

【実施例】実施例1. 図1〜図4は、この発明に係る切り梁装置の一実施例を
示し、図において、符号1は道路の地盤面上に、道路に
沿って所定深さに掘削された掘削溝、2はこの掘削溝1
の左右両側部に立設され、掘削溝1の左右側壁を崩壊し
ないように保護する山止めパネル、3は隣接する山止め
パネル2,2 間にそれぞれ立設され、山止めパネル2を倒
れないように支持する支柱である。また、符号4は対向
する左右支柱3,3 間に、一端を回転軸に水平方向にスイ
ング自在に架け渡され、左右支柱3,3 を倒れないように
支持する切り梁、そして符号Aは掘削溝1の底部に布設
される給・排水管等の埋設管である。
[Embodiment 1] 1 to 4 show an embodiment of a girder device according to the present invention. In the drawings, reference numeral 1 denotes an excavation groove excavated at a predetermined depth along the road on the ground surface of the road, and 2 denotes This excavation groove 1
, Which are erected on both left and right sides of the digging groove 1 to protect the left and right side walls of the excavation groove 1 from collapsing, 3 are erected between the adjacent gusset panels 2, 2 so that the gusset panel 2 does not fall down. It is a supporting column. Reference numeral 4 denotes a cross-beam which is hung between the opposed left and right columns 3, 3 so that one end thereof can be freely swung in a horizontal direction about a rotation axis, and which supports the left and right columns 3, 3 so as not to fall down. It is a buried pipe such as a supply / drain pipe laid at the bottom of the groove 1.

【0012】支柱3は、溝形鋼からなる2本のガイド支
柱3a,3a を背中合わせに抱き合わせることにより構成さ
れ、掘削溝1の両側に所定間隔おきに立設されている。
The column 3 is formed by tying two guide columns 3a, 3a made of channel steel back to back, and is provided upright on both sides of the excavation groove 1 at predetermined intervals.

【0013】そして、ガイド支柱3a,3a の凹部に山止め
パネル2の端部がそれぞれ嵌め込まれている。また、ガ
イド支柱3a,3a 間には、切り梁4の端部が連結される切
り梁連結用ブラケット5(以下「ブラケット5」とい
う)が水平シャフト6を介して取り付けられている。
尚、ブラケット5は支柱3の長さに応じて支柱3の上下
方向に複数個取り付けられている。
The ends of the retaining panel 2 are fitted into recesses of the guide posts 3a, 3a, respectively. Further, between the guide posts 3a, 3a, a cutting beam connecting bracket 5 (hereinafter referred to as "bracket 5") to which the end of the cutting beam 4 is connected is mounted via a horizontal shaft 6.
In addition, a plurality of brackets 5 are attached to the up and down direction of the column 3 according to the length of the column 3.

【0014】ブラケット5は水平シャフト6を軸に上下
方向に自由に回転し、かつ、埋設管Aの吊り込みの際に
邪魔にならず、左右支柱3,3 間に可能な限り大きな開口
幅を確保できるようにガイド支柱3a,3a 間に収納できる
ように取り付けられている。
The bracket 5 rotates freely about the horizontal shaft 6 in the vertical direction, does not hinder the hanging of the buried pipe A, and has the largest possible opening width between the left and right columns 3, 3. It is attached so that it can be stored between the guide posts 3a so that it can be secured.

【0015】また、ブラケット5の先端部には、切り梁
4の端部を連結する連結ピン7が挿入されるピン孔8
と、切り梁4を回転しないように固定する固定ピン9が
挿入されるピン孔10がそれぞれ形成されている。
A pin hole 8 into which a connecting pin 7 for connecting the end of the cutting beam 4 is inserted is formed at the tip of the bracket 5.
And a pin hole 10 into which a fixing pin 9 for fixing the cutting beam 4 so as not to rotate is inserted.

【0016】また、ガイド支柱3a,3a 間には、各ブラケ
ット5の下側に位置して、ブラケット5を水平状態より
下方に回転しないように阻止するストッパー11が取り付
けられている。
A stopper 11 is provided between the guide posts 3a and 3a, which is located below each bracket 5 and prevents the bracket 5 from rotating below a horizontal state.

【0017】ストッパー11のブラケット5との当接部に
は下り勾配(水平軸に対して5°程度)のテーパ部11a
が形成され(図4参照)、左右支柱3,3 を切り梁4によ
って連結したままでも交互に地盤中に打ち込めるように
なっている。
The stopper 11 comes into contact with the bracket 5 at a tapered portion 11a having a downward slope (about 5 ° with respect to the horizontal axis).
(See FIG. 4) so that the left and right columns 3, 3 can be alternately driven into the ground while being connected by the cutting beams 4.

【0018】切り梁4には左右支柱3,3 間のスパンに自
由に対応できるようにねじ式ジャッキや油圧式ジャッキ
が使用され、その両端に連結ピン7と固定ピン9が挿入
されるピン孔8と10がそれぞれ形成されている。そし
て、切り梁4は左右支柱3,3 間に架け渡され、かつ、両
端が切り梁4の端部及びブラケット5のピン孔8と10に
それぞれ挿入される連結ピン7と固定ピン9とによって
左右支柱3,3 に連結されている。
A screw type jack or a hydraulic type jack is used for the cutting beam 4 so that it can freely cope with the span between the right and left columns 3, 3 and a pin hole into which a connecting pin 7 and a fixing pin 9 are inserted at both ends. 8 and 10 are formed respectively. The cutting beam 4 is bridged between the left and right columns 3, 3 and both ends are connected by connecting pins 7 and fixing pins 9 which are inserted into the ends of the cutting beam 4 and the pin holes 8 and 10 of the bracket 5, respectively. It is connected to the left and right columns 3,3.

【0019】このような構成において、この切り梁装置
の使用方法について説明すると、切り梁4の一端4aの連
結ピン7と固定ピン9を引き抜いて、切り梁4の一端4a
を一方の支柱3より切り離し、また、切り梁4の他端4b
の固定ピン9を引き抜く。
In such a configuration, the method of using this cutting beam device will be described. The connecting pin 7 and the fixing pin 9 at one end 4a of the cutting beam 4 are pulled out, and one end 4a of the cutting beam 4 is pulled out.
From one of the columns 3 and the other end 4b of the cut beam 4
Pull out the fixing pin 9 of.

【0020】次に、切り梁4を他端4bの連結ピン7を中
心に水平方向にスイングさせて山止めパネル2の内側に
沿わせる。また、一端4a側のブラケット5を水平シャフ
ト6を中心に上側に回転させ、ガイド支柱3a,3a 間に収
納する。
Next, the beam 4 is swung in the horizontal direction about the connecting pin 7 at the other end 4b so as to extend along the inside of the retaining panel 2. Further, the bracket 5 on one end 4a side is rotated upward around the horizontal shaft 6 and is housed between the guide posts 3a.

【0021】そして、掘削溝1の底部に埋設管Aを吊り
込み、埋設管Aの吊り込みが完了したら、切り梁4を前
記の動作を逆に行うことにより、左右支柱3,3 間に再び
架け渡す。
Then, when the buried pipe A is suspended at the bottom of the excavation groove 1, and when the buried pipe A is completely suspended, the above-mentioned operation is performed in reverse for the cutting beam 4, so that the left and right columns 3, 3 are again placed. Hang over.

【0022】また、実施例のように切り梁4が複数段に
架け渡されている場合には、上側の切り梁4から下側の
切り梁4へと前記動作を順次行って埋設管Aを掘削溝1
の底部に布設する。
In the case where the cutting beam 4 is bridged in a plurality of steps as in the embodiment, the above operation is sequentially performed from the upper cutting beam 4 to the lower cutting beam 4 to remove the buried pipe A. Drilling ditch 1
Laid at the bottom of the.

【0023】以上の方法により、掘削溝1の底部に埋設
管Aを吊り込む際に、切り梁4の架け渡し及び撤去をワ
ンタッチで行うことがてきる。
According to the above-described method, when the buried pipe A is hung on the bottom of the excavation groove 1, the bridge 4 can be bridged and removed with one touch.

【0024】また、左右支柱3,3 及び切り梁4の設置も
一度に行うことができ、更に、掘削溝1の底部にブラケ
ット5に邪魔されることなく、掘削幅一杯の大径の埋設
管Aを吊り込むこともできる。
Also, the left and right columns 3, 3 and the cutting beam 4 can be installed at the same time, and a large-diameter buried pipe of the full excavation width is provided at the bottom of the excavation groove 1 without being disturbed by the bracket 5. A can also be suspended.

【0025】尚、切り梁4の左右両端は全く同じ構成に
なっているので、何れを支柱3より切り離し、何れを回
転軸にスイングさせるかは現場の状況に応じて自由に選
択できる。
Since the left and right ends of the cutting beam 4 have exactly the same configuration, it is possible to freely select which one is separated from the column 3 and which is to be swung about the rotation axis according to the situation at the site.

【0026】[0026]

【発明の効果】この発明は以上説明したように構成さ
れ、左右支柱間に架け渡される切り梁の両端は左右支柱
に着脱自在な連結ピンによって連結され、かつ、切り梁
はその一端を回転軸にスイングさせて架け渡し及び撤去
するので、掘削溝の底部に埋設管を設置する際に、切り
梁の架け渡し及び撤去作業をワンタッチで行うことがで
きて地下埋設管の設置作業の著しい向上が図れる効果が
ある。
The present invention is constructed as described above. Both ends of the cutting beam bridged between the left and right supports are connected to the left and right supports by detachable connecting pins, and one end of the cutting beam has a rotating shaft. It can be installed and buried at the bottom of the excavation trench by one-touch operation. There is an effect that can be achieved.

【0027】また、前記連結ピンによる切り梁両端の連
結及び切り梁のスイングをを地上より治具を使用して行
うようにすれば、作業員が掘削溝内に入り込む必要がな
くなるので、作業の安全性が図れる効果もある。
If the connecting pins are used to connect the ends of the cutting beam and swing the cutting beam from above the ground by using a jig, it is not necessary for the operator to enter the excavation groove, so that the work is not required. There is also an effect that safety can be achieved.

【0028】また、左右支柱は切り梁を架け渡したまま
の状態で掘削溝の左右両側部に交互に打ち込んで設置で
きるので、左右支柱及び切り梁を一つ一つ設置する手間
が省けて施工の大幅な省力化が図れる効果がある。
Also, since the left and right columns can be alternately driven into the left and right sides of the excavation groove with the cutting beams being bridged, the labor for installing the left and right columns and cutting beams one by one can be saved. This has the effect of greatly reducing labor.

【0029】更に、切り梁の端部は、支柱に、回転して
支柱内に収納できるように取り付けられたブラケットに
連結ピンによって連結されているので、埋設管の設置に
際し、前記ブラケットを支柱内に一時収納することによ
り、ブラケットに妨げられることなく掘削溝一杯の大径
の埋設管をも吊り込むことができる効果がある。
Further, since the end of the cut beam is connected to a support by a connecting pin to a bracket mounted so as to be rotatable and housed in the support, the bracket is connected to the support when the buried pipe is installed. By temporarily storing the buried pipe, a large-diameter buried pipe full of an excavation groove can be hung without being hindered by the bracket.

【図面の簡単な説明】[Brief description of the drawings]

【図1】この発明に係る切り梁装置の一実施例の使用状
態を示す平面図である。
FIG. 1 is a plan view showing a use state of an embodiment of a cutting beam device according to the present invention.

【図2】図1におけるa−a線断面図である。FIG. 2 is a sectional view taken along line aa in FIG.

【図3】図1におけるイ部拡大平面図である。FIG. 3 is an enlarged plan view of a portion A in FIG.

【図4】図3におけるb−b線断面図である。FIG. 4 is a sectional view taken along line bb in FIG. 3;

【符号の説明】[Explanation of symbols]

1…掘削溝、2…山止めパネル、3…支柱、4…切り
梁、5…ブラケット、6…水平シャフト、7…連結ピ
ン、8…ピン孔、9…固定ピン、10…ピン孔、11…スト
ッパー、A…埋設管
DESCRIPTION OF SYMBOLS 1 ... Excavation groove, 2 ... Ground stop panel, 3 ... Strut, 4 ... Cut beam, 5 ... Bracket, 6 ... Horizontal shaft, 7 ... Connection pin, 8 ... Pin hole, 9 ... Fixation pin, 10 ... Pin hole, 11 ... stopper, A ... buried pipe

───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.7,DB名) E02D 17/08 ──────────────────────────────────────────────────続 き Continued on front page (58) Field surveyed (Int.Cl. 7 , DB name) E02D 17/08

Claims (3)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 掘削溝の左右両側部にそれぞれ立設され
て山止めパネルを支持する左右支柱と、この左右支柱間
に架け渡されて左右支柱を支持する切り梁と、左右支柱
にそれぞれ突設されて切り梁と支柱とを連結するブラケ
ットとを有する切り梁装置において、ブラケットは切り
梁の端部を水平方向に回転自在に連結する連結ピンを挿
入するためのピン孔を有し、かつ支柱内に収納できるよ
うに左右支柱にそれぞれ取り付けてあることを特徴とす
る切り梁装置。
1. The digging trench is erected on both left and right sides.
Between the left and right supports that support the retaining panel
Girder that supports the left and right supports spanned by
Brackets projecting from each other and connecting the cutting beam and the support
In a girder device having a slot,
Insert a connecting pin that connects the end of the beam so that it can rotate freely in the horizontal direction.
It has a pin hole for
It is characterized in that it is attached to each of the left and right supports
Cutting beam device.
【請求項2】 ブラケットは支柱の上下方向に所定間隔
おきに取り付けてあることを特徴とする請求項1記載の
切り梁装置。
2. A bracket is provided at a predetermined interval in a vertical direction of a column.
2. The method according to claim 1, wherein the mounting is performed every other time.
Cut beam device.
【請求項3】 ブラケットに切り梁の回転を固定する固
定ピンを挿入するためのピン孔を設けてあることを特徴
とする請求項1または2記載の切り梁装置。
3. A fixing device for fixing rotation of a cutting beam to a bracket.
3. The cutting beam device according to claim 1, wherein a pin hole for inserting a fixed pin is provided.
JP06043793A 1994-03-15 1994-03-15 Girder device Expired - Fee Related JP3091624B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP06043793A JP3091624B2 (en) 1994-03-15 1994-03-15 Girder device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP06043793A JP3091624B2 (en) 1994-03-15 1994-03-15 Girder device

Publications (2)

Publication Number Publication Date
JPH07252837A JPH07252837A (en) 1995-10-03
JP3091624B2 true JP3091624B2 (en) 2000-09-25

Family

ID=12673630

Family Applications (1)

Application Number Title Priority Date Filing Date
JP06043793A Expired - Fee Related JP3091624B2 (en) 1994-03-15 1994-03-15 Girder device

Country Status (1)

Country Link
JP (1) JP3091624B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3541237B2 (en) * 1996-06-12 2004-07-07 日鐵建材工業株式会社 Earth retaining panel for trench cut method

Also Published As

Publication number Publication date
JPH07252837A (en) 1995-10-03

Similar Documents

Publication Publication Date Title
KR20200124949A (en) Anchor Tension way sheathing structure and sheathing method of construction
JP3091624B2 (en) Girder device
WO2018047926A1 (en) Hydraulic turbine suspending device
JPS6145022B2 (en)
JPH05287745A (en) Mounting method for wale in column aligning method
JP2000257069A (en) Earth retaining and earth retaining construction method
JP3927058B2 (en) Simple mountain fastening method
JPS6136589Y2 (en)
JP3394999B2 (en) Guide pipe construction method of high strength cast-in-place concrete pile
CN217923640U (en) Supporting device for rotary digging pile construction
JPS5838024Y2 (en) Support for earth retaining structure for trench excavation
JP2579584B2 (en) Earth retaining method and earth retaining box
JPS63171902A (en) Coated plate
JP2024047855A (en) Method of constructing temporary piles installed in the basement of an existing structure
JP3325156B2 (en) Soil support method and structure in excavation trench
JP2592901B2 (en) How to put a long pipe into the groove in sheet pile construction
JPH10252080A (en) Method for reinforcing foundation of pier for high level road
JPH0874257A (en) Earth retaining device for excavated groove
JP6851180B2 (en) How to rebuild the building
JP2858050B2 (en) Shaft excavation method
JPS6027157Y2 (en) Equipment for pulling out earth retaining structures, etc. in excavated trenches
JP3105487B2 (en) Construction machine with piping guide arm
JP2001164870A (en) Construction method for vertical shaft
JPS5845530B2 (en) pile support device
JPS5985022A (en) Underground continuous wall constructing work

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20000711

LAPS Cancellation because of no payment of annual fees