JP3029186U - Sheet pile wall - Google Patents

Sheet pile wall

Info

Publication number
JP3029186U
JP3029186U JP1995011474U JP1147495U JP3029186U JP 3029186 U JP3029186 U JP 3029186U JP 1995011474 U JP1995011474 U JP 1995011474U JP 1147495 U JP1147495 U JP 1147495U JP 3029186 U JP3029186 U JP 3029186U
Authority
JP
Japan
Prior art keywords
sheet pile
bracket
mountain
mountain portion
pile member
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP1995011474U
Other languages
Japanese (ja)
Inventor
久 田村
Original Assignee
佐田建設株式会社
株式会社ハイテックス
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 佐田建設株式会社, 株式会社ハイテックス filed Critical 佐田建設株式会社
Priority to JP1995011474U priority Critical patent/JP3029186U/en
Application granted granted Critical
Publication of JP3029186U publication Critical patent/JP3029186U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

(57)【要約】 【課題】 比較的施工深度の浅い矢板壁を、FRP製の
矢板等、比較的軽量な矢板部材で構築する場合につい
て、矢板部材の取り扱いを容易にし、矢板部材の特性を
生かす。 【解決手段】 平坦部1aと山部1bを交互に形成した
矢板部材1の山部2に、上下方向の長孔2を複数穿設す
る。腹起し支持用のブラケット3の端部に、矢板部材1
の山部1bと嵌合する凹部3aを形成し、凹部3aを形
成する端板4に鉤状の係止部材3bを設ける。矢板部材
1の山部1bとブラケット3の凹部3aを嵌合しつつ、
係止部材3bを腹起しの高さに応じて選択した長孔2に
係止し、矢板部材1でブラケット3の端部全体を受け
る。また、長孔2は吊り治具を取り付けて、矢板部材1
の吊り込み、引き抜きを行うための吊り込み孔兼用とす
る。
(57) 【Abstract】 PROBLEM TO BE SOLVED: To facilitate the handling of sheet pile members and to improve the characteristics of sheet pile members when constructing a sheet pile wall having a relatively shallow construction depth with a relatively lightweight sheet pile member such as an FRP sheet pile. Make use of it. A plurality of vertical elongated holes 2 are formed in a mountain portion 2 of a sheet pile member 1 in which flat portions 1a and mountain portions 1b are alternately formed. The sheet pile member 1 is attached to the end of the bracket 3 for supporting the angulation.
A recess 3a that fits into the ridge 1b is formed, and a hook-shaped locking member 3b is provided on the end plate 4 that forms the recess 3a. While fitting the mountain portion 1b of the sheet pile member 1 and the concave portion 3a of the bracket 3,
The locking member 3b is locked in the elongated hole 2 selected according to the height of the angulation, and the sheet pile member 1 receives the entire end of the bracket 3. Further, the long hole 2 is attached with a hanging jig, and the sheet pile member 1
It is also used as a suspending hole for suspending and extracting.

Description

【考案の詳細な説明】[Detailed description of the device]

【0001】[0001]

【考案が属する技術分野】[Technical field to which the device belongs]

本願考案は、開削工法における土留壁、止水壁等に利用される矢板壁、切梁を 支持するための矢板壁用ブラケット、および矢板部材を吊り込むための吊り治具 に関するもので、比較的施工深度の浅い矢板壁を比較的軽量な矢板部材によって 構築する場合に適している。 The present invention relates to a sheet pile wall used as a retaining wall, a water stop wall, etc. in the excavation method, a sheet pile wall bracket for supporting a cutting beam, and a hanging jig for suspending sheet pile members. It is suitable for constructing a sheet pile wall with a shallow construction depth using relatively lightweight sheet pile members.

【0002】[0002]

【従来の技術】[Prior art]

例えば、下水管、ガス管、その他の埋設物を開削工事により敷設する場合、あ るいは小口径管推進工法による管の埋設のための立坑の掘削等においては、施工 深度が深い場合、従来の木製の矢板等に代えて鋼矢板が用いられることが多い。 また、比較的軽量な矢板部材として、軽量鋼矢板、アルミニウム合金製の矢板、 あるいはFRP製の矢板等も用いられている。 For example, when laying sewage pipes, gas pipes, and other buried objects by excavation work, or when excavating vertical shafts for burying pipes by the small-diameter pipe propulsion method, etc. Steel sheet piles are often used instead of wooden sheet piles. Further, as a relatively lightweight sheet pile member, a lightweight steel sheet pile, an aluminum alloy sheet pile, or an FRP sheet pile is used.

【0003】 特に、FRP製の矢板の場合、機械的強度が高いだけでなく、非常に軽量であ ることから、運搬費用の軽減、作業の安全性の面等でも優れており、深度が2〜 数m程度までの施工では、大型の機械を必要とせず、ほとんど人力で作業を行う ことができるといった利点がある。Particularly, in the case of the FRP sheet pile, not only is it high in mechanical strength but also extremely lightweight, it is excellent in terms of transportation cost reduction, work safety, etc. -Construction up to a few meters has the advantage that large machines are not required and the work can be done almost manually.

【0004】[0004]

【考案が解決しようとする課題】[Problems to be solved by the device]

比較的深度の浅い施工では、従来、木製の矢板等が使用されてきたが、FRP 製の矢板は、上述のような利点があるにもかかわらず、未だ施工実績が少なく、 矢板部材の吊り込みや、腹起し、切梁の取り付け等に関する施工法が確立されて いないため、強度面や耐久性の面での利点が十分に生かされていない。 Conventionally, wooden sheet piles have been used for relatively shallow construction, but despite the advantages described above, FRP sheet piles still have a poor track record of construction, making it possible to suspend sheet pile members. In addition, since the construction method for angling and attachment of cutting beams has not been established, the advantages of strength and durability have not been fully utilized.

【0005】 このことは、軽量鋼矢板、アルミニウム合金製の矢板等の場合についても同様 である。This is also the case with lightweight steel sheet piles, aluminum alloy sheet piles, and the like.

【0006】 本願考案は、上述のような比較的施工深度の浅い矢板壁を、FRP製、アルミ ニウム合金製の矢板、あるいは軽量鋼矢板等の比較的軽量な矢板部材で構築する 場合について、矢板部材の取り扱いが容易で、施工性に優れ、それによって矢板 部材の持つ特性を十分に生かすことができる矢板壁の構築を可能とすることを目 的としたものである。The present invention is directed to a case where the sheet pile wall having a relatively shallow construction depth as described above is constructed by a sheet pile member made of FRP, an aluminum alloy sheet, or a lightweight steel sheet pile, which is relatively lightweight. The aim is to enable the construction of sheet pile walls that are easy to handle, have excellent workability, and can fully utilize the characteristics of sheet pile members.

【0007】[0007]

【課題を解決するための手段】[Means for Solving the Problems]

本願の請求項1に係る矢板壁は、平坦部と掘削側に突出する山部とを交互に形 成した水平断面が波形の矢板部材を用い、これに腹起しを支持するためのブラケ ットを取り付けるようにしたものである。 The sheet pile wall according to claim 1 of the present application uses a sheet pile member having a corrugated horizontal section in which flat portions and mountain portions projecting to the excavation side are alternately formed, and a bracket for supporting the abdomen is used for the sheet pile wall. It is designed to be attached.

【0008】 矢板部材の山部の頂部所定位置には上下方向の長孔が形成されており、一方ブ ラケットの端部には矢板部材の山部と嵌合する断面形状の凹部を形成し、この凹 部に設けた鉤状の係止部材を山部の長孔に係止するようになっている。A vertical elongated hole is formed at a predetermined position on the top of the mountain portion of the sheet pile member, while a recess having a cross-sectional shape that fits with the mountain portion of the sheet pile member is formed at the end of the bracket. The hook-shaped locking member provided in this recess is locked in the long hole of the mountain portion.

【0009】 この場合、矢板部材の山部と係止部材が突出する凹部との嵌合により、ブラケ ットを安定した支持状態で取り付けることができる。In this case, the bracket can be attached in a stable supporting state by fitting the mountain portion of the sheet pile member and the recessed portion from which the locking member projects.

【0010】 本願考案における矢板部材としては、主として軽量なFRP製のものを考えて いるが、その他アルミニウム合金製の矢板、軽量鋼矢板等にも適用可能であり、 比較的軽量で機械的強度に優れたものに適している。As the sheet pile member in the present invention, a lightweight FRP member is mainly considered, but it is also applicable to other aluminum alloy sheet piles, lightweight steel sheet piles, etc., and is relatively lightweight and has high mechanical strength. Suitable for excellent things.

【0011】 なお、長孔は山部の上下方向に間隔をおいて複数設けておくことで、ブラケッ トの取り付け位置(腹起し、切梁の設置高さ)を選択することができる。また、 この長孔は、ブラケット取付け孔の機能を有する他、後述するように吊り込み孔 兼用とすることができる。It should be noted that by providing a plurality of elongated holes at intervals in the vertical direction of the mountain portion, the bracket attachment position (raising and installation height of the cutting beam) can be selected. In addition to having the function of a bracket mounting hole, this long hole can also serve as a hanging hole as described later.

【0012】 本願の請求項2に係る矢板壁用ブラケットは、上述の請求項1で用いるブラケ ットについて、より具体的な形態を与えたもので、筒状部材の端部に矢板部材の 山部と嵌合する断面形状の凹部を形成する端板を固定し、この端板に鉤状の係止 部材を設けたものである。A bracket for a sheet pile wall according to claim 2 of the present application is a more specific form of the bracket used in claim 1 described above, in which the pile of the sheet pile member is provided at the end of the tubular member. The end plate that forms a recess having a cross-sectional shape that fits with the section is fixed, and a hook-shaped locking member is provided on the end plate.

【0013】 本願の請求項3に係る吊り治具は、請求項1で用いる矢板部材について、ブラ ケット取付け用の長孔を吊り込み孔として利用する場合の吊り治具であり、ワイ ヤー等の吊り材を玉掛けするための連結部と、矢板部材の山部の上下方向の長孔 に嵌入される係止部とからなる。A suspending jig according to claim 3 of the present application is a suspending jig in the case of using a long hole for attaching a bracket as a suspending hole in the sheet pile member used in claim 1, and is a suspending jig such as a wire. It is composed of a connecting portion for slinging the hanging material, and a locking portion fitted in a vertically elongated hole of the mountain portion of the sheet pile member.

【0014】 この係止部は鉛直に立てた状態で長孔を貫通可能な幅で、かつ水平に寝かせた 状態では前記山部の角度に応じたテーパーを設けた両側端部が矢板部材の山部の 地山側の内面に当接して係止される寸法、形状としてある。This locking portion has a width that allows it to pass through the long hole in a vertically standing state, and when it is laid horizontally, both side end portions provided with a taper according to the angle of the mountain portion have peaks of the sheet pile member. The size and shape are such that they will come into contact with the inner surface of the ground side on the natural side and be locked.

【0015】 すなわち、係止部を立てて長孔に嵌入して押し込んだ後、連結部を持って90 度回転させて引き寄せることで、水平になった係止部と矢板部材の山部(内側) が係止され、連結部に玉掛けした吊り材により、矢板部材を安定した支持状態で 施工位置に吊り込んだり、引き抜いたりすることができる。また、吊り込み後、 吊り治具を少し押し込み、連結部を持って90度回転させ、長孔から引き抜くこ とで、容易に取り外すことができる。That is, the locking portion is erected, fitted into the long hole and pushed in, and then the coupling portion is rotated by 90 degrees and pulled to bring the horizontal locking portion and the mountain portion of the sheet pile member (inner side). ) Is locked and the slinging member slung on the connecting portion allows the sheet pile member to be hung or pulled out at the construction position in a stable supporting state. Also, after hanging, the hanging jig is pushed in a little, the connection part is rotated 90 degrees, and it can be easily removed by pulling out from the long hole.

【0016】[0016]

【考案の実施の形態】[Embodiment of device]

図1および図2は、本願考案の矢板壁およびブラケットの一実施形態を示した ものである。 1 and 2 show an embodiment of a sheet pile wall and a bracket of the present invention.

【0017】 矢板部材1としては、FRP製の矢板部材等の機械的強度に優れ、かつ比較的 軽量であり、比較的施工深度の浅い施工に適したものを用いる。矢板部材1は、 図に示すように、平坦部1aと山部1bを交互に形成した水平断面が波形の矢板 部材であり、山部1bが施工における掘削側に突出するようにして矢板壁を形成 する。As the sheet pile member 1, a sheet pile member made of FRP or the like having excellent mechanical strength, being relatively lightweight, and being suitable for construction having a relatively shallow construction depth is used. As shown in the drawing, the sheet pile member 1 is a sheet pile member having a flat horizontal portion 1a and a mountain portion 1b which are alternately formed and has a corrugated horizontal cross section. Form.

【0018】 図示した例では、一体成形した2枚の矢板部材をボルト7で接続して一枚の矢 板部材1を形成し、図3に示すように上端にアングル8を固着することで、吊り 込み時や地盤への打設時に面外方向の変形が生じ難いようにしてある。In the illustrated example, two sheet pile members integrally formed are connected by bolts 7 to form one sheet pile member 1, and an angle 8 is fixed to the upper end as shown in FIG. It is designed so that deformation in the out-of-plane direction is unlikely to occur at the time of hanging or placing it on the ground.

【0019】 矢板部材1の山部1bの頂部には図3(a) に示されるように間隔をおいて複数 の長孔2が2列(1つの山部1bに)穿設されており、設置される腹起し9およ び切梁10の高さに応じて長孔2を選び、その長孔2に腹起し支持用のブラケッ ト3を取り付けるようになっている。As shown in FIG. 3 (a), a plurality of elongated holes 2 are formed in two rows (in one mountain portion 1b) at intervals at the top of the mountain portion 1b of the sheet pile member 1. The long hole 2 is selected according to the heights of the uprising member 9 and the truss 10 to be installed, and the uprising member 2 is attached with the bracket 3 for supporting the uprising member.

【0020】 また、本実施形態におけるブラケット3は、筒状のブラケット本体の端部に切 欠きを設け、この切欠き部分に水平断面をV字状とした端板4を固定して、矢板 部材1の山部1bと嵌合する凹部3aを形成し、端板4に鉤状の係止部材3bを 溶接等で取り付けたものである。In the bracket 3 according to the present embodiment, a notch is provided at an end of a tubular bracket body, and an end plate 4 having a V-shaped horizontal cross section is fixed to the notch so that the sheet pile member. The concave portion 3a is formed so as to fit with the ridge portion 1b of No. 1 and the hook-shaped locking member 3b is attached to the end plate 4 by welding or the like.

【0021】 ブラケット3の取り付けは、矢板部材1を順次打設して高さを揃えた状態で、 矢板部材1の上下方向の長孔2に係止部材3bを差し込むだけで、ワンタッチで 行うことができ、矢板部材1の山部1bとブラケット3の凹部3aが嵌合し合う 形状であるため、腹起し9を支持するブラケット3と土留壁を構成する矢板部材 1との間の応力伝達がスムーズであり、安定した支持構造が得られる。The bracket 3 can be attached with one touch by simply inserting the locking member 3b into the vertical hole 2 of the sheet pile member 1 in a state where the sheet pile members 1 are sequentially driven and the heights are made uniform. Since the mountain portion 1b of the sheet pile member 1 and the recessed portion 3a of the bracket 3 are fitted to each other, stress transmission between the bracket 3 that supports the uprising 9 and the sheet pile member 1 that forms the earth retaining wall is possible. Is smooth and a stable support structure can be obtained.

【0022】 図4〜図6は、本願考案の吊り治具の一実施形態を示したものである。4 to 6 show an embodiment of the hanging jig of the present invention.

【0023】 本願考案の吊り治具5は、上述のような矢板部材1について、ブラケット取付 け用の長孔2を吊り込み孔として利用するものであり、ワイヤー等の吊り材11 を玉掛けするための連結部5aと、矢板部材1の長孔2に嵌入される係止部5b とからなる。The hanging jig 5 of the present invention uses the long hole 2 for mounting the bracket as a hanging hole in the sheet pile member 1 as described above, for hanging the hanging member 11 such as a wire. And a locking portion 5b fitted in the elongated hole 2 of the sheet pile member 1.

【0024】 図示した例では、板状の連結部5aの中央に玉掛け用のシャックル6を取り付 けるための連結孔5cが形成されており、この連結部5aの下端に、連結部5a と直交するように、板状、略台形の係止部5bが一体に成形されている。In the illustrated example, a connecting hole 5c for mounting a shackle 6 for slinging is formed in the center of the plate-like connecting portion 5a, and the lower end of the connecting portion 5a is orthogonal to the connecting portion 5a. Thus, the plate-shaped, substantially trapezoidal locking portion 5b is integrally molded.

【0025】 係止部5bは、この部分を鉛直に立てることで、長孔2に通すことができ、長 孔2に通した後、90°回転させることで、図4に示すように係止部5bの両側 端のテーパー部分が矢板部材1の山部1bの内面に当接する形で係止され、引抜 き力に対して抜け出さないようになっている。The locking portion 5b can be passed through the long hole 2 by standing this portion vertically, and after passing through the long hole 2 and rotated by 90 °, the locking portion 5b is locked as shown in FIG. The tapered portions at both ends of the portion 5b are locked so as to abut against the inner surface of the mountain portion 1b of the sheet pile member 1 so that they do not come out against the pulling force.

【0026】 この状態で図6に示すようにシャックル6を介して吊り材11を取り付け、矢 板部材1の吊り込み、引き抜き等に利用することができる。In this state, as shown in FIG. 6, a suspending member 11 can be attached via a shackle 6 and used for suspending, pulling out, and the like of the sheet pile member 1.

【0027】 吊り治具5の取外しに関しては、少し押し込むことで係止状態を外し、連結部 5aを持って90度回転させることで、容易に長孔2から引き抜くことができる 。With respect to the removal of the hanging jig 5, it can be easily pulled out from the long hole 2 by releasing the locked state by pushing it a little and rotating it by 90 degrees while holding the connecting portion 5a.

【0028】[0028]

【考案の効果】 本願考案の矢板壁およびブラケットの場合、腹起し支持用のブラケットの取 り付けを、ワンタッチで行うことができ、かつ矢板部材の山部とブラケットの凹 部が嵌合し合う形状であるため、腹起しを支持するブラケットと土留壁を構成す る矢板部材との間の応力伝達がスムーズであり、安定した支持構造が得られる。[Effects of the Invention] In the case of the sheet pile wall and the bracket of the present invention, the mounting of the upright supporting bracket can be performed with one touch, and the mountain portion of the sheet pile member and the concave portion of the bracket are fitted together. Since the shapes are matched with each other, the stress is smoothly transmitted between the bracket that supports the uprising and the sheet pile member that constitutes the retaining wall, and a stable support structure can be obtained.

【0029】 本願考案の吊り治具は、矢板部材に設けたブラケット取付け用の長孔をその まま吊り込み孔として利用するものであり、取り付け、取り外しがワンタッチで 行なえるだけでなく、取り付け状態において矢板部材の山部内面にしっかり支持 され、吊り込み作業、引き抜き作業を、安全、確実に行うことができる。The hoisting jig of the present invention utilizes the long hole for mounting the bracket provided on the sheet pile member as the hoisting hole as it is. Not only can it be attached and detached with one touch, but also in the attached state. Since it is firmly supported on the inner surface of the mountain part of the sheet pile member, it is possible to safely and surely perform the hanging work and the pulling work.

【0030】 以上により、比較的施工深度の浅い矢板壁を、FRP製、アルミニウム合金 製の矢板、あるいは軽量鋼矢板等の比較的軽量な矢板部材で構築する場合につい て、矢板部材の取り扱いが容易が容易となり、矢板部材の持つ特性を十分に生か すことができる。As described above, it is easy to handle the sheet pile member when constructing the sheet pile wall having a relatively shallow depth of construction with a relatively lightweight sheet pile member such as a sheet made of FRP, an aluminum alloy, or a lightweight steel sheet pile. Therefore, the characteristics of sheet pile members can be fully utilized.

【提出日】平成8年4月8日[Submission date] April 8, 1996

【手続補正1】[Procedure Amendment 1]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】全文[Correction target item name] Full text

【補正方法】変更[Correction method] Change

【補正内容】[Correction content] 【考案の詳細な説明】[Detailed description of the device]

【0001】[0001]

【考案が属する技術分野】[Technical field to which the device belongs]

本願考案は、開削工法における土留壁、止水壁等に利用される矢板壁に関する もので、比較的施工深度の浅い矢板壁を比較的軽量な矢板部材によって構築する 場合に適している。The present invention is, earth retaining wall in open-cut method, but about the sheet pile wall to be used for water blocking wall or the like, is suitable when constructing a shallow sheet pile wall relatively construction depth with a relatively lightweight sheet pile member.

【0002】[0002]

【従来の技術】[Prior art]

例えば、下水管、ガス管、その他の埋設物を開削工事により敷設する場合、あ るいは小口径管推進工法による管の埋設のための立坑の掘削等においては、施工 深度が深い場合、従来の木製の矢板等に代えて鋼矢板が用いられることが多い。 また、比較的軽量な矢板部材として、軽量鋼矢板、アルミニウム合金製の矢板、 あるいはFRP製の矢板等も用いられている。 For example, when laying sewage pipes, gas pipes, and other buried objects by excavation work, or when excavating vertical shafts for burying pipes by the small diameter pipe propulsion method, etc. Steel sheet piles are often used instead of wooden sheet piles. Further, as a relatively lightweight sheet pile member, a lightweight steel sheet pile, an aluminum alloy sheet pile, or an FRP sheet pile is used.

【0003】 特に、FRP製の矢板の場合、機械的強度が高いだけでなく、非常に軽量であ ることから、運搬費用の軽減、作業の安全性の面等でも優れており、深度が2〜 数m程度までの施工では、大型の機械を必要とせず、ほとんど人力で作業を行う ことができるといった利点がある。Particularly, in the case of the FRP sheet pile, not only is it high in mechanical strength but also extremely lightweight, it is excellent in terms of transportation cost reduction, work safety, etc. -Construction up to a few meters has the advantage that large machines are not required and the work can be done almost manually.

【0004】[0004]

【考案が解決しようとする課題】[Problems to be solved by the device]

比較的深度の浅い施工では、従来、木製の矢板等が使用されてきたが、FRP 製の矢板は、上述のような利点があるにもかかわらず、未だ施工実績が少なく、 矢板部材の吊り込みや、腹起し、切梁の取り付け等に関する施工法が確立されて いないため、強度面や耐久性の面での利点が十分に生かされていない。 Conventionally, wooden sheet piles have been used for relatively shallow construction, but despite the advantages described above, FRP sheet piles still have a poor track record of construction, making it possible to suspend sheet pile members. In addition, since the construction method for angling and attachment of cutting beams has not been established, the advantages of strength and durability have not been fully utilized.

【0005】 このことは、軽量鋼矢板、アルミニウム合金製の矢板等の場合についても同様 である。This is also the case with lightweight steel sheet piles, aluminum alloy sheet piles, and the like.

【0006】 本願考案は、上述のような比較的施工深度の浅い矢板壁を、FRP製、アルミ ニウム合金製の矢板、あるいは軽量鋼矢板等の比較的軽量な矢板部材で構築する 場合について、矢板部材の取り扱いが容易で、施工性に優れ、それによって矢板 部材の持つ特性を十分に生かすことができる矢板壁の構築を可能とすることを目 的としたものである。The present invention is directed to a case where the sheet pile wall having a relatively shallow construction depth as described above is constructed by a sheet pile member made of FRP, an aluminum alloy sheet, or a lightweight steel sheet pile, which is relatively lightweight. The aim is to enable the construction of sheet pile walls that are easy to handle, have excellent workability, and can fully utilize the characteristics of sheet pile members.

【0007】[0007]

【課題を解決するための手段】[Means for Solving the Problems]

本願の請求項1に係る矢板壁は、平坦部と掘削側に突出する山部とを交互に形 成した水平断面が波形の矢板部材を用い、これに腹起しを支持するためのブラケ ットを取り付けるようにしたものである。 The sheet pile wall according to claim 1 of the present application uses a sheet pile member having a corrugated horizontal section in which flat portions and mountain portions projecting to the excavation side are alternately formed, and a bracket for supporting the abdomen is used for the sheet pile wall. It is designed to be attached.

【0008】 矢板部材の山部の頂部所定位置には上下方向の長孔が形成されており、一方ブ ラケットの端部には矢板部材の山部と嵌合する断面形状の凹部を形成し、この凹 部に設けた鉤状の係止部材を山部の長孔に係止するようになっている。A vertical elongated hole is formed at a predetermined position on the top of the mountain portion of the sheet pile member, while a recess having a cross-sectional shape that fits with the mountain portion of the sheet pile member is formed at the end of the bracket. The hook-shaped locking member provided in this recess is locked in the long hole of the mountain portion.

【0009】 この場合、矢板部材の山部と係止部材が突出する凹部との嵌合により、ブラケ ットを安定した支持状態で取り付けることができる。In this case, the bracket can be attached in a stable supporting state by fitting the mountain portion of the sheet pile member and the recessed portion from which the locking member projects.

【0010】 本願考案における矢板部材としては、主として軽量なFRP製のものを考えて いるが、その他アルミニウム合金製の矢板、軽量鋼矢板等にも適用可能であり、 比較的軽量で機械的強度に優れたものに適している。As the sheet pile member in the present invention, a lightweight FRP member is mainly considered, but it is also applicable to other aluminum alloy sheet piles, lightweight steel sheet piles, etc., and is relatively lightweight and has high mechanical strength. Suitable for excellent things.

【0011】 なお、長孔は山部の上下方向に間隔をおいて複数設けておくことで、ブラケッ トの取り付け位置(腹起し、切梁の設置高さ)を選択することができる。また、 この長孔は、ブラケット取付け孔の機能を有する他、後述するように吊り込み孔 兼用とすることができる。It should be noted that by providing a plurality of elongated holes at intervals in the vertical direction of the mountain portion, the bracket attachment position (raising and installation height of the cutting beam) can be selected. In addition to having the function of a bracket mounting hole, this long hole can also serve as a hanging hole as described later.

【0012】 本願の請求項2に係る矢板壁は、上述の請求項1で用いるブラケットについて 、より具体的な形態を与えたもので、筒状部材の端部に矢板部材の山部と嵌合す る断面形状の凹部を形成する端板を固定し、この端板に鉤状の係止部材を設けた ものである。The sheet pile wall according to claim 2 of the present application is a more specific form of the bracket used in the above-described claim 1, and the end portion of the tubular member is fitted to the mountain portion of the sheet pile member. An end plate that forms a recess having a different cross-sectional shape is fixed, and a hook-shaped locking member is provided on this end plate.

【0013】 なお、ブラケット取付け用の長孔は吊り込み孔兼用として利用することができ 、その場合の吊り治具としては、例えば ワイヤー等の吊り材を玉掛けするための 連結部と、矢板部材の山部の上下方向の長孔に嵌入される係止部とからなるもの 等を用いる。 The long hole for mounting the bracket can also be used as a hanging hole . As a hanging jig in that case, for example, a connecting portion for hanging a hanging material such as a wire and a sheet pile member are used. crest of vertical used such as those comprising a locking portion which is fitted into the long hole.

【0014】 この係止部は鉛直に立てた状態で長孔を貫通可能な幅で、かつ水平に寝かせた 状態では前記山部の角度に応じたテーパーを設けた両側端部が矢板部材の山部の 地山側の内面に当接して係止される寸法、形状としてある。This locking portion has a width that allows it to pass through the long hole in a vertically standing state, and when it is laid horizontally, both side end portions provided with a taper according to the angle of the mountain portion have peaks of the sheet pile member. The size and shape are such that they will come into contact with the inner surface of the ground side on the natural side and be locked.

【0015】 すなわち、係止部を立てて長孔に嵌入して押し込んだ後、連結部を持って90 度回転させて引き寄せることで、水平になった係止部と矢板部材の山部(内側) が係止され、連結部に玉掛けした吊り材により、矢板部材を安定した支持状態で 施工位置に吊り込んだり、引き抜いたりすることができる。また、吊り込み後、 吊り治具を少し押し込み、連結部を持って90度回転させ、長孔から引き抜くこ とで、容易に取り外すことができる。That is, the locking portion is erected, fitted into the long hole and pushed in, and then the coupling portion is rotated by 90 degrees and pulled to bring the horizontal locking portion and the mountain portion of the sheet pile member (inner side). ) Is locked and the slinging member slung on the connecting portion allows the sheet pile member to be hung or pulled out at the construction position in a stable supporting state. Also, after hanging, the hanging jig is pushed in a little, the connection part is rotated 90 degrees, and it can be easily removed by pulling out from the long hole.

【0016】[0016]

【考案の実施の形態】[Embodiment of device]

図1および図2は、本願考案の矢板壁の一実施形態を示したものである。1 and 2 show an embodiment of the sheet pile wall of the present invention.

【0017】 矢板部材1としては、FRP製の矢板部材等の機械的強度に優れ、かつ比較的 軽量であり、比較的施工深度の浅い施工に適したものを用いる。矢板部材1は、 図に示すように、平坦部1aと山部1bを交互に形成した水平断面が波形の矢板 部材であり、山部1bが施工における掘削側に突出するようにして矢板壁を形成 する。As the sheet pile member 1, a sheet pile member made of FRP or the like having excellent mechanical strength, being relatively lightweight, and being suitable for construction having a relatively shallow construction depth is used. As shown in the drawing, the sheet pile member 1 is a sheet pile member having a flat horizontal portion 1a and a mountain portion 1b which are alternately formed and has a corrugated horizontal cross section. Form.

【0018】 図示した例では、一体成形した2枚の矢板部材をボルト7で接続して一枚の矢 板部材1を形成し、図3に示すように上端にアングル8を固着することで、吊り 込み時や地盤への打設時に面外方向の変形が生じ難いようにしてある。In the illustrated example, two sheet pile members integrally formed are connected by bolts 7 to form one sheet pile member 1, and an angle 8 is fixed to the upper end as shown in FIG. It is designed so that deformation in the out-of-plane direction is unlikely to occur at the time of hanging or placing it on the ground.

【0019】 矢板部材1の山部1bの頂部には図3(a) に示されるように間隔をおいて複数 の長孔2が2列(1つの山部1bに)穿設されており、設置される腹起し9およ び切梁10の高さに応じて長孔2を選び、その長孔2に腹起し支持用のブラケッ ト3を取り付けるようになっている。As shown in FIG. 3 (a), a plurality of elongated holes 2 are formed in two rows (in one mountain portion 1b) at intervals at the top of the mountain portion 1b of the sheet pile member 1. The long hole 2 is selected according to the heights of the uprising member 9 and the truss 10 to be installed, and the uprising member 2 is attached with the bracket 3 for supporting the uprising member.

【0020】 また、本実施形態におけるブラケット3は、筒状のブラケット本体の端部に切 欠きを設け、この切欠き部分に水平断面をV字状とした端板4を固定して、矢板 部材1の山部1bと嵌合する凹部3aを形成し、端板4に鉤状の係止部材3bを 溶接等で取り付けたものである。In the bracket 3 according to the present embodiment, a notch is provided at an end of a tubular bracket body, and an end plate 4 having a V-shaped horizontal cross section is fixed to the notch so that the sheet pile member. The concave portion 3a is formed so as to fit with the ridge portion 1b of No. 1 and the hook-shaped locking member 3b is attached to the end plate 4 by welding or the like.

【0021】 ブラケット3の取り付けは、矢板部材1を順次打設して高さを揃えた状態で、 矢板部材1の上下方向の長孔2に係止部材3bを差し込むだけで、ワンタッチで 行うことができ、矢板部材1の山部1bとブラケット3の凹部3aが嵌合し合う 形状であるため、腹起し9を支持するブラケット3と土留壁を構成する矢板部材 1との間の応力伝達がスムーズであり、安定した支持構造が得られる。The bracket 3 can be attached with one touch by simply inserting the locking member 3b into the vertical hole 2 of the sheet pile member 1 in a state where the sheet pile members 1 are sequentially driven and the heights are made uniform. Since the mountain portion 1b of the sheet pile member 1 and the recessed portion 3a of the bracket 3 are fitted to each other, stress transmission between the bracket 3 that supports the uprising 9 and the sheet pile member 1 that forms the earth retaining wall is possible. Is smooth and a stable support structure can be obtained.

【0022】 図4〜図6は、本願考案の矢板壁に用いる吊り治具の一実施形態を示したもの である。4 to 6 show an embodiment of a hanging jig used for the sheet pile wall of the present invention.

【0023】 吊り治具5は、上述のような矢板部材1について、ブラケット取付け用の長孔 2を吊り込み孔として利用するものであり、ワイヤー等の吊り材11を玉掛けす るための連結部5aと、矢板部材1の長孔2に嵌入される係止部5bとからなる 。The hanging jig 5 uses the long hole 2 for mounting the bracket as a hanging hole in the sheet pile member 1 as described above, and a connecting portion for hanging a hanging material 11 such as a wire. 5a and a locking portion 5b fitted in the long hole 2 of the sheet pile member 1.

【0024】 図示した例では、板状の連結部5aの中央に玉掛け用のシャックル6を取り付 けるための連結孔5cが形成されており、この連結部5aの下端に、連結部5a と直交するように、板状、略台形の係止部5bが一体に成形されている。In the illustrated example, a connecting hole 5c for mounting a shackle 6 for slinging is formed in the center of the plate-like connecting portion 5a, and the lower end of the connecting portion 5a is orthogonal to the connecting portion 5a. Thus, the plate-shaped, substantially trapezoidal locking portion 5b is integrally molded.

【0025】 係止部5bは、この部分を鉛直に立てることで、長孔2に通すことができ、長 孔2に通した後、90°回転させることで、図4に示すように係止部5bの両側 端のテーパー部分が矢板部材1の山部1bの内面に当接する形で係止され、引抜 き力に対して抜け出さないようになっている。The locking portion 5b can be passed through the long hole 2 by standing this portion vertically, and after passing through the long hole 2 and rotated by 90 °, the locking portion 5b is locked as shown in FIG. The tapered portions at both ends of the portion 5b are locked so as to abut against the inner surface of the mountain portion 1b of the sheet pile member 1 so that they do not come out against the pulling force.

【0026】 この状態で図6に示すようにシャックル6を介して吊り材11を取り付け、矢 板部材1の吊り込み、引き抜き等に利用することができる。In this state, as shown in FIG. 6, a suspending member 11 can be attached via a shackle 6 and used for suspending, pulling out, and the like of the sheet pile member 1.

【0027】 吊り治具5の取外しに関しては、少し押し込むことで係止状態を外し、連結部 5aを持って90度回転させることで、容易に長孔2から引き抜くことができる 。With respect to the removal of the hanging jig 5, it can be easily pulled out from the long hole 2 by releasing the locked state by pushing it a little and rotating it by 90 degrees while holding the connecting portion 5a.

【0028】 上記の吊り治具は、矢板部材に設けたブラケット取付け用の長孔をそのまま吊 り込み孔として利用するものであり、取り付け、取り外しがワンタッチで行なえ るだけでなく、取り付け状態において矢板部材の山部内面にしっかり支持され、 吊り込み作業、引き抜き作業を、安全、確実に行うことができる。 [0028] The above suspension jig is to use as it is suspended interrupt hole elongated holes for bracket mounting provided on the sheet pile member, the mounting not only that perform removal with one-touch, sheet piles in the mounted state Since it is firmly supported on the inner surface of the mountain portion of the member, it is possible to safely and reliably carry out the hanging work and the pulling work.

【0029】[0029]

【考案の効果】[Effect of device]

本願考案の矢板壁の場合、腹起し支持用のブラケットの取り付けを、ワンタッIn the case of the sheet pile wall of the present invention, the one-tattling チで行うことができ、かつ矢板部材の山部とブラケットの凹部が嵌合し合う形状The shape that can be done with the chi, and the mountain portion of the sheet pile member and the concave portion of the bracket fit together. であるため、腹起しを支持するブラケットと土留壁を構成する矢板部材との間のTherefore, between the bracket that supports the abdomen and the sheet pile member that constitutes the earth retaining wall. 応力伝達がスムーズであり、安定した支持構造が得られる。The stress transmission is smooth and a stable support structure can be obtained.

【0030】 従って、比較的施工深度の浅い矢板壁を、FRP製、アルミニウム合金製の矢 板、あるいは軽量鋼矢板等の比較的軽量な矢板部材で構築する場合について、矢 板部材の取り扱いが容易が容易となり、矢板部材の持つ特性を十分に生かすこと ができる。 [0030] Therefore, a relatively construction depth shallow sheet pile wall, FRP made, aluminum alloy sheet piles, or the case of constructing a relatively lightweight sheet pile members such as light weight steel sheet piles, easy to handle arrows plate member It becomes easy and the characteristics of the sheet pile member can be fully utilized .

【図面の簡単な説明】[Brief description of drawings]

【図1】 本願考案の矢板壁およびブラケットの一実施
形態を示す水平断面図である。
FIG. 1 is a horizontal sectional view showing an embodiment of a sheet pile wall and a bracket of the present invention.

【図2】 図1のA−A断面図である。FIG. 2 is a sectional view taken along line AA of FIG.

【図3】 本願考案で用いる矢板部材の一例を示したも
ので、(a) は正面図、(b) は側面図である。
FIG. 3 shows an example of a sheet pile member used in the present invention, (a) is a front view, and (b) is a side view.

【図4】 本願考案の吊り治具の一実施形態を示す平面
図である。
FIG. 4 is a plan view showing an embodiment of a hanging jig of the present invention.

【図5】 吊り治具の斜視図である。FIG. 5 is a perspective view of a hanging jig.

【図6】 吊り治具を用いた玉掛けの一例を示す平面図
である。
FIG. 6 is a plan view showing an example of a sling using a hanging jig.

【符号の説明】[Explanation of symbols]

1…矢板部材、1a…平坦部、1b…山部、2…長孔、
3…ブラケット、3a…凹部、3b…係止部材、4…端
板、5…吊り治具、5a…連結部、5b…係止部、5c
…連結孔、6…シャックル、7…ボルト、8…アング
ル、9…腹起し、10…切梁、11…吊りワイヤー
1 ... sheet pile member, 1a ... flat part, 1b ... mountain part, 2 ... long hole,
3 ... Bracket, 3a ... Recessed part, 3b ... Locking member, 4 ... End plate, 5 ... Hanging jig, 5a ... Connection part, 5b ... Locking part, 5c
... Connection hole, 6 ... Shackle, 7 ... Bolt, 8 ... Angle, 9 ... Raised, 10 ... Cutting beam, 11 ... Hanging wire

─────────────────────────────────────────────────────
─────────────────────────────────────────────────── ───

【手続補正書】[Procedure amendment]

【提出日】平成8年4月8日[Submission date] April 8, 1996

【手続補正1】[Procedure Amendment 1]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】全文[Correction target item name] Full text

【補正方法】変更[Correction method] Change

【補正内容】[Correction content]

【書類名】 明細書[Document name] Statement

【考案の名称】 矢板壁[Name of device] Sheet wall

【実用新案登録請求の範囲】[Scope of utility model registration request]

【図面の簡単な説明】[Brief description of drawings]

【図1】 本願考案の矢板壁およびブラケットの一実施
形態を示す水平断面図である。
FIG. 1 is a horizontal sectional view showing an embodiment of a sheet pile wall and a bracket of the present invention.

【図2】 図1のA−A断面図である。FIG. 2 is a sectional view taken along line AA of FIG.

【図3】 本願考案で用いる矢板部材の一例を示したも
ので、(a) は正面図 (b) は側面図である。
FIG. 3 shows an example of a sheet pile member used in the present invention, in which (a) is a front view and (b) is a side view.

【図4】 本願考案で用いる吊り治具の一実施形態を示
す平面図である。
FIG. 4 is a plan view showing an embodiment of a hanging jig used in the present invention.

【図5】 吊り治具の斜視図である。FIG. 5 is a perspective view of a hanging jig.

【図6】 吊り治具を用いた玉掛けの一例を示す平面図
である。
FIG. 6 is a plan view showing an example of a sling using a hanging jig.

【符号の説明】 1…矢板部材、1a…平坦部、1b…山部、2…長孔、
3…ブラケット、3a …凹部、3b…係止部材、4…端板、5…吊り治具、5
a…連結部、5b…係止 部、5c…連結孔、6…シャックル、7…ボルト、8…
アングル、9…腹起し、 10…切梁、11…吊りワイヤー
[Explanation of reference numerals] 1 ... sheet pile member, 1a ... flat portion, 1b ... mountain portion, 2 ... long hole,
3 ... Bracket, 3a ... Recess, 3b ... Locking member, 4 ... End plate, 5 ... Hanging jig, 5
a ... connecting part, 5b ... locking part, 5c ... connecting hole, 6 ... shackle, 7 ... bolt, 8 ...
Angle, 9 ... raised, 10 ... cut beam, 11 ... hanging wire

Claims (3)

【実用新案登録請求の範囲】[Scope of utility model registration request] 【請求項1】 平坦部と掘削側に突出する山部とを交互
に形成した水平断面が波形の矢板部材と、腹起し支持用
のブラケットとを有する矢板壁であって、前記山部の頂
部所定位置には上下方向の長孔が形成されており、前記
ブラケットの端部に前記山部と嵌合する断面形状の凹部
を形成し、前記凹部に前記長孔に係止される鉤状の係止
部材を設けてあることを特徴とする矢板壁。
1. A sheet pile wall including a sheet pile member having a corrugated horizontal section in which a flat portion and a mountain portion projecting to the excavation side are alternately formed, and a bracket for supporting and raising a ridge, wherein A vertical elongated hole is formed at a predetermined position on the top, and a concave portion having a cross-sectional shape that fits with the mountain portion is formed at an end portion of the bracket, and the concave portion is hooked to the elongated hole. A sheet-pile wall characterized by being provided with a locking member.
【請求項2】 平坦部と掘削側に突出する山部とを交互
に形成した水平断面が波形の矢板部材の前記山部に取り
付けられる矢板壁用ブラケットであって、筒状部材の端
部に前記山部と嵌合する断面形状の凹部を形成する端板
を固定し、前記端板に前記山部の頂部所定位置に形成し
た上下方向の長孔に係止される鉤状の係止部材を設けて
なることを特徴とする矢板壁用ブラケット。
2. A sheet pile wall bracket attached to the mountain portion of a corrugated sheet pile member having a horizontal section in which a flat portion and a mountain portion projecting to the excavation side are alternately formed, the end portion of the tubular member being a bracket. A hook-shaped locking member that fixes an end plate that forms a recess having a cross-sectional shape that fits with the crest, and that is locked in a vertically elongated hole formed at a predetermined position on the top of the crest on the end plate. A bracket for a sheet pile wall characterized by being provided with.
【請求項3】 平坦部と掘削側に突出する山部とを交互
に形成した水平断面が波形の矢板部材を掘削位置に吊り
込むための吊り治具であって、吊り材を連結するための
連結部と、前記山部の頂部所定位置に形成した上下方向
の長孔に嵌入される係止部とからなり、前記係止部は係
止部を鉛直に立てた状態で前記長孔を貫通可能な幅で、
かつ水平に寝かせた状態では前記山部の角度に応じたテ
ーパーを設けた両側端部が前記山部の地山側の内面に当
接して係止される寸法、形状としてあることを特徴とす
る吊り治具。
3. A suspending jig for suspending a sheet pile member having a horizontal cross-section in which a flat portion and a mountain portion projecting to the excavating side are alternately formed at an excavating position, and for connecting suspending members. It consists of a connecting part and a locking part that is fitted into a vertically elongated hole formed at a predetermined position on the top of the mountain part, and the locking part penetrates the elongated hole with the locking part standing upright. Possible width,
In addition, in a state of being laid horizontally, the size and shape are such that both side end portions provided with a taper corresponding to the angle of the mountain portion come into contact with the inner surface of the mountain portion on the ground side and are locked. jig.
JP1995011474U 1995-10-30 1995-10-30 Sheet pile wall Expired - Lifetime JP3029186U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1995011474U JP3029186U (en) 1995-10-30 1995-10-30 Sheet pile wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1995011474U JP3029186U (en) 1995-10-30 1995-10-30 Sheet pile wall

Publications (1)

Publication Number Publication Date
JP3029186U true JP3029186U (en) 1996-09-27

Family

ID=43164231

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1995011474U Expired - Lifetime JP3029186U (en) 1995-10-30 1995-10-30 Sheet pile wall

Country Status (1)

Country Link
JP (1) JP3029186U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015143440A (en) * 2014-01-31 2015-08-06 大成建設株式会社 Horizontal force bearing member and horizontal force bearing structure
CN112575740A (en) * 2020-12-25 2021-03-30 广东三和管桩股份有限公司 Support pile and row pile

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015143440A (en) * 2014-01-31 2015-08-06 大成建設株式会社 Horizontal force bearing member and horizontal force bearing structure
CN112575740A (en) * 2020-12-25 2021-03-30 广东三和管桩股份有限公司 Support pile and row pile

Similar Documents

Publication Publication Date Title
JP6554101B2 (en) Method of laying foundations of offshore wind turbines and template used for laying foundations of offshore wind turbines
JP2009030428A (en) Simplified foundation and foundation construction method using the same
JP3029186U (en) Sheet pile wall
JP2009108611A (en) Reinforcement erecting tool and reinforcement erecting method
JP6741267B2 (en) Hanging equipment
JPS59199914A (en) Connectional erection of pc pile
JP3949320B2 (en) Uprising hanger sheet pile method
JP3824384B2 (en) Construction method of shaft and apparatus used in the method
CN220365003U (en) Foundation pit supporting device
JP2000017643A (en) Working method for pile head portion of diagonally assembled pile body
JP3541237B2 (en) Earth retaining panel for trench cut method
CN212609060U (en) Auxiliary lifting appliance for installation of building water supply engineering
JPH0137269Y2 (en)
CN219315700U (en) Quick combined spliced steel pipe pile
CN220704506U (en) Precast pile protects barrel mouth location protection device
JP4020920B2 (en) Pipe pile groove protector
CN217679229U (en) Transmission tower foundation and transmission tower
CN217352492U (en) Assembled steel sheet pile inner supporting system
CN113513034B (en) Buried anchor sealing structure for pile anchor support
CN214089889U (en) Foundation pit supporting device
JP3011093U (en) Sheet pile connecting device
JP4176237B2 (en) Construction method of underground water tank
JP4048786B2 (en) How to lay the bottom of the drainage pipe
JP3272704B2 (en) Soil retaining method for deep trench for burying underground pipes, and sheet pile retaining tower used for it
JP3053270U (en) Support member receiving piece used for simple earth retaining method