JP3012827B2 - Suspended scaffold assembly method and suspended scaffold materials - Google Patents
Suspended scaffold assembly method and suspended scaffold materialsInfo
- Publication number
- JP3012827B2 JP3012827B2 JP10055145A JP5514598A JP3012827B2 JP 3012827 B2 JP3012827 B2 JP 3012827B2 JP 10055145 A JP10055145 A JP 10055145A JP 5514598 A JP5514598 A JP 5514598A JP 3012827 B2 JP3012827 B2 JP 3012827B2
- Authority
- JP
- Japan
- Prior art keywords
- scaffold
- suspended
- arrangement direction
- hanging
- scaffolding
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Bridges Or Land Bridges (AREA)
- Movable Scaffolding (AREA)
Description
【0001】[0001]
【発明の属する技術分野】本発明は高速道路、橋梁、プ
ラントの輸送管を配管するためのラック、建物等の建設
工事或はそれらの改修工事等を行う場合に、桁材や高欄
等の支持具から下方に足場材を吊り下げて吊り足場を作
るのに使用される吊り足場組立て工法と足場材に関する
ものである。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for supporting a girder or a railing when constructing or repairing a rack or a building for piping transportation pipes of a highway, a bridge, or a plant. The present invention relates to a method of assembling a suspended scaffold and a scaffold used to make a suspended scaffold by suspending the scaffold downward from a tool.
【0002】[0002]
【従来の技術】高速道路や橋梁等の工事を始めとする各
種の建設、土木工事では、吊り足場を作り、その上で建
設作業や改修工事等を行なうことが多い。この吊り足場
は従来は例えば以下のようにして組立てられていた。 a.第9図のように、作業者Mがのったクレ−ン等Cを
移動させながら、二本の桁材等の支持材Aにチェ−ン吊
下用クランプDを所定間隔で取付け、夫々のクランプD
にチェ−ンBを吊り下げる。 b.第10図のように吊り下げられているチェ−ンBに
親パイプと呼ばれる縦材Eを通し、その上に熟練した鳶
職人等の作業者Mがのって隣り合う縦材E同士を連接さ
せる(これを通常は親パイプを流すという)。 c.第11図のように吊り下げられている縦材Eの間
に、ころがしパイプと呼ばれる横材Fを渡してそれらを
直交クランプ等の固定具Gにより固定する。 d.同横材Fの中央部に腹起こしパイプと称される補助
材Hを載せ、これと横材Fとを直交クランプ等の固定具
Gで固定する。 e.第12図のように前記横材Fの上に足場板Jを載せ
て同横材Fに番線Kにより固定する。 f.前記足場板Jに作業者Mがのって、それより先の縦
材E間に別の横材Fを渡して固定し、その横材Fに足場
板Jを載せて固定する。この作業を繰返して所望とする
範囲に吊り足場を組立ててゆく。 g.第13図のように前記縦材Eに手摺Lを取付けた
り、必要に応じて、吊り足場の下に落下防止用ネットN
を張ったり、吊り足場の上に養生シ−トを被せたりす
る。2. Description of the Related Art In various types of construction including civil engineering works such as highways and bridges, and civil engineering works, a suspension scaffold is often formed, and construction work or repair work is performed on the suspended scaffold. This hanging scaffold has conventionally been assembled, for example, as follows. a. As shown in FIG. 9, the chain hanging clamps D are attached to the supporting members A such as two girder members at predetermined intervals while moving the crane or the like C on which the worker M is placed. Clamp D
The chain B is hung. b. As shown in FIG. 10, a vertical member E called a parent pipe is passed through a suspended chain B, and a worker M such as a skilled pirate is put on the chain B to connect the adjacent vertical members E to each other. (This is usually called the parent pipe). c. As shown in FIG. 11, a horizontal member F called a rolling pipe is passed between suspended vertical members E, and they are fixed by fixing members G such as orthogonal clamps. d. An auxiliary member H called a belly pipe is placed at the center of the horizontal member F, and the auxiliary member H and the horizontal member F are fixed with a fixing member G such as an orthogonal clamp. e. As shown in FIG. 12, a scaffold J is placed on the cross member F and fixed to the cross member F by a line K. f. An operator M rides on the scaffold J, passes another cross member F between the vertical members E, and fixes the scaffold J on the cross member F. This operation is repeated to assemble the suspended scaffold in a desired range. g. A handrail L is attached to the vertical member E as shown in FIG.
Or put a curing sheet on the hanging scaffold.
【0003】[0003]
【発明が解決しようとする課題】従来の吊り足場組立て
工法は以下のような問題があった。 a.第10図のように先に吊り下げられている縦材Eに
のって次の縦材Eをチェ−ンBの間に流さなければなら
ないので、その作業は熟練者でなければ難しく、しかも
手間と時間がかかる。また如何に熟練した鳶職人といえ
ども落下する危険性が高く、作業の安全面に多くの問題
があった。 b.第11図のように縦材Eに横材Fを渡して固定した
り、第12図のように足場板Jを固定したり、第13図
のように落下防止用ネットNを張ったりしなければなら
ないので、それらの作業が面倒であり、完成までに多く
の手間と時間がかかり、その分だけコスト高になり、し
かもこの吊り足場を仮設するために工期全体が長びく。 c.第9図のようにクレ−ンCを移動させなければなら
ないので、非常に面倒であり、手間もかかる。しかも例
えば高速道路の橋梁工事ではクレ−ンCを移動するため
に橋梁の下の道路を封鎖する必要があるので、通行の邪
魔になり、交通渋滞の原因ともなる。しかも橋梁の下が
川や池等の場合はクレ−ンを使用できないことがあり、
その場合は全て人手作業になるので作業性が著しく低下
し、しかも危険性も高まる。また、従来は吊り足場の組
み立てに必要な単管、足場板J、番線、落下防止用ネッ
トN等の各種部材が個別に独立してばらばらになってい
るので、現場での組立作業が面倒であるとか、組立中に
部品が落下して危険であるとか、各部品の管理や、取扱
い、運搬等が面倒で煩雑であるといった各種難点があっ
た。The conventional method of assembling a suspended scaffold has the following problems. a. As shown in FIG. 10, since the next vertical member E must be flown between the chains B on the first vertical member E suspended, the operation is difficult unless a skilled person. It takes time and effort. Also, no matter how skilled a stealthy craftsman is, the risk of falling is high, and there are many problems in work safety. b. As shown in FIG. 11, the cross member F must be passed over the vertical member E and fixed, the scaffold plate J must be fixed as shown in FIG. 12, and the fall prevention net N must be stretched as shown in FIG. However, such work is cumbersome, takes a lot of time and effort to complete, and the cost increases accordingly, and the entire construction period is prolonged due to the temporary installation of the hanging scaffold. c. Since the crane C must be moved as shown in FIG. 9, it is very troublesome and time-consuming. In addition, for example, in the construction of a highway bridge, it is necessary to block the road under the bridge in order to move the crane C, which hinders traffic and causes traffic congestion. In addition, when there is a river or pond under the bridge, crane cannot be used,
In such a case, all the operations are performed manually, so that the workability is significantly reduced and the danger is increased. Conventionally, various members such as a single pipe, a scaffold plate J, a track, and a fall prevention net N required for assembling a suspended scaffold are individually and independently separated, so that assembly work on site is troublesome. There have been various difficulties, such as the fact that parts fall down during assembly, which is dangerous, and the management, handling, transport, etc. of each part are cumbersome and complicated.
【0004】[0004]
【課題を解決するための手段】本発明の目的は、作業の
安全性が高く、作業性がよく、短期間に且つ未熟者でも
手軽に吊り足場を組み立てることができるようにした吊
り足場組立て工法と、足場材として必要な各種部材がま
とめられて一枚に形成されて吊り足場を組み立て易く、
管理、取扱も容易で、吊り足場を組み立て中に部品が落
下する危険もない足場材を提供することにある。SUMMARY OF THE INVENTION It is an object of the present invention to provide a method of assembling a suspended scaffold in which safety of work is high, workability is good, and a suspended scaffold can be easily assembled in a short time and even by an inexperienced person. And, various members required as a scaffolding material are put together and formed into one piece, making it easy to assemble the suspended scaffold,
An object of the present invention is to provide a scaffolding material that is easy to manage and handle, and has no danger of parts falling during assembling a suspended scaffold.
【0005】前記目的を達成するため、本発明の第1の
吊り足場組立て工法は、ワイヤ、チェーン等の索条を支
持材から吊り下げ、その吊り下げた索条に作業者がのれ
る広さの踏み材が取り付けられたパネル状の足場材を係
止して、同足場材を支持材にそれと交差する向きに吊り
下げ、この足場材の先方或は後方に他の足場材を前記足
場材と同様の向きに吊り下げ、両足場材のうち一方の足
場材の配列方向連結具と他方の足場材の配列方向連結受
部とを連結して両足場材を並べて連結し、この足場材の
吊り下げ及び連結を繰返して吊り足場を組立てる工法で
ある。In order to achieve the above object, a first method of assembling a suspended scaffold according to the present invention is to suspend a wire such as a wire or a chain from a support material, and to allow a worker to ride on the suspended rope. The panel-shaped scaffolding material to which the stepping material is attached is locked, and the scaffolding material is suspended from the supporting material in a direction crossing the supporting material, and another scaffolding material is attached to the scaffolding material ahead or behind the scaffolding material. lower down hanging same direction as, and connects the array direction coupling accepting portion in the arrangement direction coupling and the other scaffold of one scaffold of the feet Bazai connected side by side both scaffold, the scaffold Is a method of assembling a suspended scaffold by repeatedly suspending and connecting the suspended scaffold.
【0006】本発明の第2の吊り足場組立て工法は、作
業者がのれる広さの踏み材が取り付けられたパネル状の
足場材にワイヤ、チェーン等の索条を係止し、この索条
Bを支持材に吊り下げて同足場材を支持材と交差する向
きに支持材に吊り下げ、この足場材の先方或は後方に他
の足場材を前記足場材と同様の向きに吊り下げ、両足場
材のうち一方の足場材の配列方向連結具と他方の足場材
の配列方向連結受部とを連結して両足場材を並べて連結
し、この足場材の吊り下げ及び連結を繰返して吊り足場
を組立てる工法である。In the second method of assembling a suspended scaffold according to the present invention, a wire such as a wire or a chain is locked to a panel-shaped scaffold to which a stepping material large enough for an operator to attach is attached. B is hung on the supporting material, the same scaffolding material is hung on the supporting material in a direction intersecting with the supporting material, and another scaffolding material is hung in front of or behind the scaffolding material in the same direction as the scaffolding material , Of the two scaffolding materials, the arrangement direction connecting tool of one scaffolding material and the arrangement direction connection receiving portion of the other scaffolding material are connected to connect the two scaffolding materials side by side, and the suspension and connection of this scaffolding material are repeated and suspended. This is a method of assembling a scaffold.
【0007】本発明の第3の吊り足場組立て工法は、第
1又は第2の吊り足場組立て工法において、配列方向連
結具が足場材から外側に突設され、その配列方向連結具
を他方の足場材の配列方向連結受部に差し込んで両足場
材を連結し、この足場材の吊り下げ及び連結を繰返して
吊り足場を組立てる工法である。[0007] In a third method for assembling a suspended scaffold according to the present invention, in the first or second suspended scaffold assembling method, an arrangement direction connecting tool is protruded outward from a scaffold material, and the arrangement direction connecting tool is connected to the other scaffold. This is a method of assembling a suspended scaffold by inserting the two scaffolds into a connection receiving portion in the arrangement direction of the materials and connecting the two scaffolds repeatedly by repeatedly suspending and connecting the scaffolds.
【0008】本発明の第4の吊り足場組立て工法は、第
3の吊り足場組立て工法において、配列方向連結受部と
それに差し込まれた配列方向連結具とに貫通部材を差し
込んで両者を連結する工法である。The fourth method of assembling a suspended scaffold according to the present invention is the third method of assembling a suspended scaffold, wherein a penetrating member is inserted into an arrangement-direction connection receiving portion and an arrangement-direction coupling tool inserted therein to connect the two. It is.
【0009】本発明の第5の吊り足場組立て工法は、第
1乃至第4の夫々の吊り足場組立て工法において、支持
材と交差する向きに吊り下げたパネル状の足場材の横
に、それと同じ向きにして他のパネル状の足場材を吊り
下げ、横に隣接する両足場材の横連結受部に横連結具を
係止して足場材を横方向にも連結するようにしたことを
特徴とする吊り足場組立てる工法である。The fifth method of assembling a suspended scaffold according to the present invention is the same as the first to fourth methods of assembling a suspended scaffold, wherein the panel-shaped scaffold suspended in a direction intersecting with the support material is placed next to the same. Orienting the other panel-shaped scaffolding in the orientation, the horizontal connecting tool is locked to the horizontal connection receiving part of both horizontally adjacent scaffolding materials, and the scaffolding material is also connected in the horizontal direction This is a method of assembling a hanging scaffold.
【0010】本発明の第6の吊り足場組立て工法は、第
1乃至第5の夫々の吊り足場組立て工法において、足場
材の吊り下げ作業と連結作業を先に吊り下げた足場材の
上で行ない、この足場材の吊り下げと連結を繰返して吊
り足場を組立てる工法である。According to a sixth aspect of the present invention, in each of the first to fifth methods of assembling a suspended scaffold, the work of suspending and connecting the scaffold is performed on the previously suspended scaffold. This is a method of assembling a suspended scaffold by repeatedly suspending and connecting the scaffold material.
【0011】本発明の第7の吊り足場材は、基材に作業
者がのれる広さの網や板等の踏み材を取り付けてパネル
状にし、同基材の2箇所以上に支持材から吊り下げるチ
ェーン、ワイヤ等の索条を係止して基材を支持具にそれ
と交差する向きに吊り下げ可能な係止部を設け、基材
に、支持材と交差する向きに吊り下げて並べた足場材同
士を連結する配列方向連結具を設け、基材のうち配列方
向連結具と反対側に前記配列方向連結具を連結可能な配
列方向連結受部を設けたものである。According to a seventh aspect of the present invention, there is provided a hanging scaffold, which is formed by attaching a stepping material such as a net or a board large enough to allow an operator to attach to a base material and forming a panel. A hanging portion that can be hung in such a direction as to intersect with a hanging member such as a chain or a wire to suspend the base material in a direction intersecting with the support member is provided. And an arrangement direction connecting member for connecting the scaffolding members to each other, and an arrangement direction connection receiving portion capable of connecting the arrangement direction connecting member on a side of the base material opposite to the arrangement direction connecting member.
【0012】本発明の第8の吊り足場材は、第7記載の
吊り足場材の踏み板(2)に足場材(1)を索条(B)
で吊り下げるための貫通孔を設けたものである。According to an eighth aspect of the present invention , a scaffold (1) is connected to a tread (2) of the suspended scaffold according to the seventh aspect by a cable (B).
In this case, a through hole is provided for suspending .
【0013】本発明の第9の吊り足場材は、第7又は第
8の吊り足場材の配列方向連結具を基材から突設し、基
材のうち配列方向連結具と反対側に前記配列方向連結具
を差し込み可能な配列方向連結受部を設けたものであ
る。A ninth hanging scaffold according to the present invention is characterized in that a seventh or eighth hanging scaffolding arrangement connecting member is protruded from a base material, and the connecting member is arranged on the opposite side of the base material from the arrangement direction connecting member. An arrangement direction connection receiving portion into which the direction connection tool can be inserted is provided.
【0014】本発明の第10の吊り足場材は、第9の吊
り足場材において、配列方向連結受部を、基材内に形成
された差し込み孔としたものである。According to a tenth hanging scaffold of the present invention, in the ninth hanging scaffold, the connection receiving portion in the arrangement direction is an insertion hole formed in the base material.
【0015】本発明の第11の吊り足場材は、第7乃至
第10の吊り足場材において、基材を方形の枠状とした
ものである。An eleventh suspended scaffold according to the present invention is the same as the seventh to tenth suspended scaffolds, except that the base material has a rectangular frame shape.
【0016】本発明の第12の吊り足場材は、第9又は
第10の吊り足場材において、配列方向連結受部とそれ
に差し込まれた配列方向連結具とに貫通部材を差し込み
可能な穴を設けたものである。A twelfth hanging scaffold according to the present invention is the ninth or tenth hanging scaffold, wherein the arrangement direction connection receiving portion and the arrangement direction connection tool inserted therein are provided with holes through which a penetrating member can be inserted. It is a thing.
【0017】本発明の第13の吊り足場材は、第12の
吊り足場材において、配列方向連結具に形成された穴を
当該配列方向連結具の突出方向に横長としたものであ
る。According to a thirteenth hanging scaffold of the present invention, in the twelfth hanging scaffold, the holes formed in the arranging direction connecting member are horizontally elongated in the projecting direction of the arranging direction connecting member.
【0018】[0018]
【発明の実施形態】第1図〜第5図は本発明の吊り足場
組立て工法の一実施例であり、第6図〜第8図は同工法
に使用される足場材1の一例である。この足場材1は基
材1aに踏み材2を取り付けてパネル状にしてある。基
材1aは2本の金属製の角パイプ10が対向して配置さ
れ、その両端部に金属製の短い丸パイプ11を貫通させ
て両角パイプ10を連結して、作業者がのれる広さの細
長角型に形成されている。また前記角パイプ10間は適
宜間隔毎にアルミニウム製の軽量連結鋼材12により支
持固定されている。1 to 5 show an embodiment of a method for assembling a suspended scaffold according to the present invention, and FIGS. 6 to 8 show an example of a scaffold 1 used in the method. The scaffold 1 is formed in a panel shape by attaching a tread 2 to a substrate 1a. The base material 1a is provided with two metal square pipes 10 opposed to each other, and connects both square pipes 10 by penetrating a short metal round pipe 11 at both ends thereof. Is formed in an elongated rectangular shape. The square pipes 10 are supported and fixed at appropriate intervals by a lightweight connecting steel material 12 made of aluminum.
【0019】第1図〜第8図に示す3は係止部であり、
これは橋梁の桁材等の支持材Aから吊り下げられたチェ
−ン、ワイヤー等の索条Bを係止するためのものであ
り、前記基材1aの長手方向両端部に設けられている。
この実施例では係止部3として単管パイプを使用し、そ
れを基材1aの長手方向両側の丸パイプ11とそれより
内側に設けられた軽量連結鋼材12との間に渡してな
る。この係止部3に桁材等の支持材Aから吊り下げられ
ている索条Bを掛けることにより、前記基材1を支持材
Aにそれと交差する向きに吊り下げることができる。Reference numeral 3 shown in FIG. 1 to FIG.
This is for locking a rope B such as a chain or a wire suspended from a supporting material A such as a bridge girder, and is provided at both longitudinal ends of the base material 1a. .
In this embodiment uses a single-tube pipe as a locking part 3, comprising passing it between the longitudinal sides of the round pipe 11 and the weight connecting steel 12 provided therewith from the inner side of the substrate 1a. The base material 1 can be hung on the support material A in a direction intersecting the support material A by hanging the rope B suspended from the support material A such as a girder material on the locking portion 3.
【0020】第1図〜第8図の2は踏み材である。この
実施例の踏み材2にはエキスパンドメタルが使用されて
いる。この場合、踏み材2は基材1aの幅方には全幅に
亙って配置固定されているが、長さは基材1aの長手方
向の寸法よりも短くして、踏み材2の長手方向両端部と
基材1aと間に、隣り合う基材1a同士を横方向に連結
する横連結具5を差込んでセット可能な空間部22を形
成してある。また、踏み材2の長さを基材1aよりも短
くすることにより、軽量で、しかも足場面積の十分に広
い吊り足場を得ることができる。この場合、踏み材2を
基材1aの幅方向だけでなく長手方向の全面をも覆うよ
うに取付けておけば、足場面積の十分に広い吊り足場を
得ることができ、吊り足場上の物品が落下することもな
い。また、従来の第13図の様にように落下防止用ネッ
トNを張る必要がなく、その分だけ足場組立て作業が容
易になり、施工に要する時間を短縮でき、コストを低減
することができる。Reference numeral 2 in FIGS. 1 to 8 denotes a stepping material. Expanded metal is used for the stepping material 2 of this embodiment. In this case, the tread 2 is arranged and fixed over the entire width of the base 1a, but the length is shorter than the length of the base 1a in the longitudinal direction. A space portion 22 is formed between both ends and the base member 1a. The space member 22 can be set by inserting a horizontal connecting member 5 for connecting the adjacent base members 1a in the horizontal direction. Further, by making the length of the tread 2 shorter than that of the base material 1a, it is possible to obtain a suspended scaffold that is lightweight and has a sufficiently large scaffold area. In this case, if the tread 2 is attached so as to cover not only the width direction of the base material 1a but also the entire surface in the longitudinal direction, a suspended scaffold having a sufficiently large scaffold area can be obtained, and articles on the suspended scaffold can be obtained. There is no fall. Further, unlike the conventional case shown in FIG. 13, it is not necessary to extend the fall prevention net N, and the scaffold assembling work is facilitated by that much, the time required for the construction can be shortened, and the cost can be reduced.
【0021】踏み材2は網状のエキスパンドメタル以外
のものであってもよく、例えば板材とか樹脂製板等の平
板状のものを使用してもよい。踏み材2は基材1aの長
手方向両端部までの全面に取付けてもよい。踏み材2が
網状のものの場合はその網の目に索条Bを通して前記係
止部3に係止するのがよく、踏み材2が平板状のもので
しかも全面に取付けられた場合は、係止部3の近くに貫
通穴を開けて空間部22を形成し、その空間部22に索
条Bを通して係止部3に係止するのがよい。いずれの場
合も、基材1と踏み材2との間には横連結具5を差込ん
でセット可能な空間部22を形成してある。The stepping member 2 may be made of a material other than a net-like expanded metal. For example, a flat material such as a plate material or a resin plate may be used. The stepping material 2 may be attached to the entire surface up to both ends in the longitudinal direction of the base material 1a. When the tread 2 is in the form of a net, it is preferable that the tread 2 is fixed to the locking portion 3 through the cord B in the mesh of the net. It is preferable to form a space portion 22 by forming a through hole near the stop portion 3, and to lock the space portion 22 with the locking portion 3 through the cable B. In any case, a space portion 22 is formed between the base material 1 and the tread 2 so that the horizontal connecting member 5 can be inserted and set.
【0022】第3図、第6図、第7図に示す4は配列方
向連結具、21は配列方向連結受部であり、これらは支
持材Aに吊り下げられて配列方向(支持材Aの長手方
向)に隣接する2つの基材1a同士をその配列方向(前
後方向)に連結するためのものである。3, 6, and 7, reference numeral 4 denotes an arrangement direction connection tool, and 21 denotes an arrangement direction connection receiving portion. These are suspended by the support material A and are arranged in the arrangement direction (the support material A). This is for connecting two substrates 1a adjacent to each other in the longitudinal direction) in the arrangement direction (front-back direction).
【0023】この実施例の配列方向連結具4には第6
図、第7図に明示するようにB型ジョイントが使用さ
れ、その一端が基材1aの二本の丸パイプ11の夫々に
差込まれて取付けられ、他端が基材1の側面から外側に
突設されている。The arrangement direction connecting device 4 of this embodiment has a sixth
As shown in FIG. 7 and FIG. 7, a B-type joint is used, one end of which is inserted and attached to each of the two round pipes 11 of the base material 1a, and the other end of the base material 1 extends outward from the side surface of the base material 1. It is projected.
【0024】前記の配列方向連結受部21には基材1の
長手方向両端に取付けられた丸パイプ11の通孔のう
ち、配列方向連結具4が取付けられた端部と反対側の端
部を利用し、その端部を配列方向連結受部21としてあ
る。The arrangement direction connection receiving portion 21 has one end of the through holes of the round pipes 11 attached to both ends in the longitudinal direction of the base material 1 on the opposite side to the end where the arrangement direction connection tool 4 is attached. , And the end portion is used as the arrangement direction connection receiving portion 21.
【0025】そして、配列方向連結具4の他端側を他方
の基材1aの丸パイプ11の通孔(配列方向連結受部2
1)内に差込み、この配列方向連結具4に形成されてい
る貫通穴13と丸パイプ11に形成されている係止穴1
4とを位置合わせし、同丸パイプ11の外側からそれら
の穴13、14にグラビティ−ロック等の貫通部材15
を貫通させると、同配列方向連結具4が丸パイプ11か
ら抜けなくなるようにしてあり、これにより前記足場材
1が配列方向に連結されるようにしてある。The other end of the arrangement direction connecting member 4 is connected to the through hole (the arrangement direction connection receiving portion 2) of the round pipe 11 of the other substrate 1a.
1), the through holes 13 formed in the arrangement direction connecting tool 4 and the locking holes 1 formed in the round pipe 11.
4 and the through-holes 15 such as gravity locks are inserted into the holes 13 and 14 from outside the round pipe 11.
Is made to pass through the round pipe 11 so that the scaffold 1 is connected in the arrangement direction.
【0026】第5図、第8図に示す5は横連結具であ
り、これは第3図に示す様に基材1a同士をその長手方
向(配列方向に対して横方向)に連結するためのもので
ある。この連結具5には第8図に示すように通常の固定
クランプが使用されている。5 and 8 are horizontal connecting members for connecting the substrates 1a to each other in the longitudinal direction (lateral direction to the arrangement direction) as shown in FIG. belongs to. As shown in FIG. 8, a normal fixing clamp is used for the connecting member 5.
【0027】この横連結具5は基材1aと踏み材2の長
手方向両端部間に形成された空間部22に差込んでセッ
トすると共に、基材1aの長手方向(横方向)に並べら
れた2つの足場材1の丸パイプ11(この実施例では丸
パイプ11を横連結受部23としてある)に下方から係
止固定して両横連結受部23同士を連結し、これにより
基材1a同士を横方向に連結できるようにしてある。The horizontal connecting member 5 is inserted into and set in a space 22 formed between both ends of the base material 1a and the tread 2 in the longitudinal direction, and is arranged in the longitudinal direction (lateral direction) of the base material 1a. The two horizontal connection receiving portions 23 are connected to each other by being locked from below to the two round pipes 11 of the scaffolding material 1 (the round pipe 11 is used as the horizontal connection receiving portion 23 in this embodiment), and 1a can be connected in the lateral direction.
【0028】横連結具5は連結する2つの基材1aのい
ずれか一方の横連結受部23に予め取付けておいてもよ
く、それとは別にしておいて、現場で取付けるようにし
てもよい。横連結具5の構造やその連結機構は前記以外
のものであってもよい。The horizontal connecting member 5 may be previously attached to one of the two horizontal connecting receiving portions 23 of the two base materials 1a to be connected, or may be attached separately at the site. . The structure of the horizontal connecting tool 5 and its connecting mechanism may be other than those described above.
【0029】次に、本発明の吊り足場組立て工法の実施
例を説明する。 .第1図のように二本の桁材等の支持材Aの対向位置
にチェ−ン吊下用クランプDを取付けてそれに索条Bを
吊り下げる。 .その索条Bを足場材1の長手方向両端部に設けられ
ている係止部3の夫々に掛けて、その足場材1を支持材
A間に支持材Aに対して交差する向きにして水平に吊り
下げる。 .この足場材1の上面に取付けられている踏み材2に
第2図のように作業者Mがのって支持材Aの先方に別の
クランプDを取付け、それに索条Bを吊り下げる。 .この索条Bを第3図のように他の足場材1の長手方
向両端部に設けられている係止部3の夫々に掛けて、そ
の足場材1を先に吊り下げた足場材1の先方にそれと同
じ向きに吊り下げて並べる。 .後から吊り下げた足場材1に取付けられている配列
方向連結具4と先に吊り下げた足場材1の丸パイプ11
の通孔(配列方向連結受部21)とを第6図、第7図の
ように連結して二つの吊り足場材をその配列方向(前後
方向)に連結する。以下、第2図、第3図、第6図、第
7図の作業を繰返して第4図のように多数の足場材1を
その配列方向に連結して吊り足場を組立てる。この場
合、各足場材1には踏み材2が取付けられているので、
第12図に示す従来例のように別の足場板Jを横材Fに
番線Kで固定する必要がなく、また第13図に示す従来
例のように落下防止用ネットNを別に取付ける必要もな
い。 .前記のようにして組立てられた吊り足場の幅が狭い
場合には、第5図のように隣の支持材AにクランプDを
取付けてそれに索条Bを吊り下げ、その索条Bを別の足
場材1の係止部3に掛け、同足場材1を先に吊り下げら
れている足場材1の長手方向横に吊り下げる。この足場
材1と先に組立てられている足場材1の丸パイプ11
(横連結受部23)に横連結具(例えばクランプ)5を
係止固定して両足場材1を連結し、吊り足場を横方向に
所望幅に広げる。 .第5図のように組立てられた吊り足場には必要に応
じて手摺を取付けたり、養生シ−トを被せたりする。Next, an embodiment of the method of assembling a suspended scaffold according to the present invention will be described. . As shown in FIG. 1, a chain suspension clamp D is attached to a position opposite to a support member A such as two girder members, and a rope B is suspended therefrom. . The rope B is hung on each of the locking portions 3 provided at both ends in the longitudinal direction of the scaffold 1, and the scaffold 1 is interposed between the support materials A in a direction crossing the support material A and horizontally. Hang it on. . As shown in FIG. 2, an operator M mounts on the tread 2 attached to the upper surface of the scaffold 1, attaches another clamp D to the tip of the support A, and suspends the rope B therefrom. . As shown in FIG. 3, the rope B is hung on each of the locking portions 3 provided at both ends in the longitudinal direction of the other scaffolding material 1, and the scaffolding material 1 is suspended from the scaffolding material 1 previously. Hang it in the same direction as the other side. . The arrangement direction connecting device 4 attached to the scaffold 1 suspended from the rear and the round pipe 11 of the scaffold 1 suspended earlier
6 and 7 to connect the two hanging scaffolds in the arrangement direction (front-rear direction). Hereinafter, the operations of FIGS. 2, 3, 6, and 7 are repeated to connect a large number of scaffolds 1 in the arrangement direction as shown in FIG. 4 to assemble the suspended scaffold. In this case, since the tread 2 is attached to each scaffold 1,
It is not necessary to fix another scaffolding plate J to the cross member F with the wire K as in the conventional example shown in FIG. 12, and it is also necessary to separately attach a fall prevention net N as in the conventional example shown in FIG. Absent. . In the case where the width of the suspended scaffold assembled as described above is narrow, a clamp D is attached to the adjacent support member A as shown in FIG. 5, and the rope B is suspended therefrom. The scaffold 1 is hung on the locking portion 3 of the scaffold 1 and is suspended laterally in the longitudinal direction of the previously suspended scaffold 1. This scaffold 1 and the round pipe 11 of the scaffold 1 previously assembled
The horizontal connecting member (for example, a clamp) 5 is locked and fixed to the (horizontal connecting receiving portion 23) to connect the two scaffolding materials 1, and the hanging scaffold is expanded to a desired width in the horizontal direction. . Handrails may be attached to the suspended scaffold assembled as shown in FIG. 5 or a curing sheet may be put on as required.
【0030】[0030]
【発明の効果】本発明の第1、第2の吊り足場組立て工
法は次のような効果がある。 .人がのれる広さのパネル状の足場材を配列方向に吊
り下げて連結固定して吊り足場を作るため、その上に作
業者がのって順次別の足場材を吊り下げて連結固定する
ことができ、従来のように細く不安定な縦材(単管)や
横材(単管)の上に作業者がのる必要がなく、作業者が
落下する危険性も少なく、作業の安全性が著しく向上す
る。また、従来のようにクレ−ン等を使用しなくとも足
場組立て作業ができ、高速道路の橋梁工事等でその下の
道路を閉鎖する必要もなく、交通の妨げになることもな
い。また、クレ−ンを使用できない箇所ででも、安全に
且つ短期間に吊り足場を作ることができる。 .足場材が基材に踏み材を固定してパネル状にしてあ
るので、先に吊り下げた足場材の上に作業者がのり易
く、しかも安定性があり、足場材の吊り下げ、足場材の
連結等の作業が非常にし易くなり、吊り足場の組み立て
作業が安全になる。また、従来のように現場で組立てた
単管の上にそれとは別体の足場板をのせ、その足場板を
横材に番線で固定する必要もなく、足場組立て作業が容
易になる。 .足場材の基材に踏み材、配列方向連結具、配列方向
連結受部が取り付けられているので、その足場材を現場
で索条で吊り下げるだけで、他の部材を必要とせずに吊
り足場を組立てることができ、しかも熟練も要せず、誰
でも手軽に吊り足場を組立てることができる。 .基材に踏み材、配列方向連結具4、配列方向連結受
部が取り付けられているパネル状の足場材を吊り下げる
ので、吊り下げられて隣接する足場材のうち一方の足場
材の配列方向連結具と他方の足場材の配列方向連結受部
を連結するだけで隣接する足場材同士をその配列方向
(前後方向)に手軽に連結することができ、施工に要す
る時間を大幅に短縮でき、ひいては吊り足場組立てに要
するコストが大幅に低減する。 .足場材が支持材にそれと交差する向きに吊り下げら
れるので、多数の足場材を離れた2つの支持材間に吊り
下げて連結することにより、離れた2つの支持材間に吊
り足場を組立てることができる。 .足場材を吊り下げるのがチェーン、ワイヤ等の索条
であるため、索条の長さを調節して吊り下げる足場材の
高さを調節することができ、また、索条は360度いず
れの方向にも首振りできるので足場材に係止し易くもな
り、足場材を支持材と交差する向きに吊り下げることも
容易になる。The first and second methods of assembling a suspended scaffold according to the present invention have the following effects. . In order to create a suspended scaffold by suspending and connecting and fixing panel-shaped scaffolding materials large enough to allow people to hang, another worker is suspended on the scaffolding material and suspended and connected and fixed. This eliminates the need for workers to rest on thin and unstable vertical members (single pipes) or horizontal members (single pipes) as before, and reduces the risk of workers falling. The properties are significantly improved. In addition, the scaffold can be assembled without using a crane or the like as in the prior art, and there is no need to close the road below it during bridge construction of an expressway, and there is no hindrance to traffic. Further, even in a place where a crane cannot be used, a hanging scaffold can be made safely and in a short time. . Since the scaffolding material is a panel with the treading material fixed to the base material, it is easy for workers to climb on the scaffolding material that has been suspended first, and it is stable. Work such as connection becomes very easy, and assembling work of the suspended scaffold becomes safe. In addition, there is no need to mount a separate scaffold plate on a single pipe assembled in the field as in the related art, and fix the scaffold plate to the cross member with a line, which facilitates scaffold assembly work. . Since the stepping material, the arrangement direction connecting device, and the arrangement direction connection receiving portion are attached to the base material of the scaffolding material, the scaffolding material is simply hung with ropes at the site, and the hanging scaffolding does not require other members. Can be assembled, and without any skill, anyone can easily assemble the suspended scaffold. . Since the panel-like scaffolding material in which the stepping material, the arrangement direction connecting device 4 and the arrangement direction connection receiving portion are attached to the base material is suspended, one of the suspended and adjacent scaffolding materials is connected in the arrangement direction. By simply connecting the tool and the other scaffold in the direction of arrangement, the adjacent scaffolds can be easily connected to each other in the direction in which they are arranged (front-rear direction), and the time required for construction can be significantly reduced. The cost required for assembling the suspended scaffold is greatly reduced. . Assembling a suspended scaffold between two separate supports by suspending and connecting a number of scaffolds between two separate supports, as the scaffold is suspended in a direction crossing the support. Can be. . Since the scaffold is suspended by a rope such as a chain or a wire, the length of the rope can be adjusted to adjust the height of the suspended scaffold. Since the head can be swung in any direction, it is easy to engage the scaffold, and the scaffold can be easily suspended in a direction crossing the support.
【0031】本発明の第3の吊り足場組立て工法は、足
場材から外側に突設された配列方向連結具を他方の足場
材の配列方向連結受部に差し込んで両足場材を連結する
ので、足場材の連結が容易且つ確実になる。In the third method of assembling a suspended scaffold according to the present invention, the connecting members projecting outward from the scaffold are inserted into the receiving members of the other scaffold in the arranging direction to connect the two scaffolds. The connection of the scaffold is easy and reliable.
【0032】本発明の第4の吊り足場組立て工法は、配
列方向連結受部とそれに差し込まれた配列方向連結具と
に貫通部材を差し込んで両者を連結するので、連結が確
実になる。In the fourth method of assembling a suspended scaffold according to the present invention, the penetrating member is inserted into the arrangement-direction connection receiving portion and the arrangement-direction connection tool inserted therein, and the two are connected, so that the connection is ensured.
【0033】本発明の第5の吊り足場組立て工法は、横
に隣接する両足場材の横連結受部に横連結具を係止して
足場材を横方向にも連結するので、吊り足場を配列方向
だけでなく、横方向にも容易に組立てることができる。In the fifth method of assembling a suspended scaffold according to the present invention, the horizontal scaffolds are engaged with the laterally connected receiving portions of the two horizontally adjacent scaffolds to connect the scaffolds in the horizontal direction. It can be easily assembled not only in the arrangement direction but also in the horizontal direction.
【0034】本発明の第6の吊り足場組立て工法は、足
場材の吊り下げ作業と連結作業を先に吊り下げた足場材
の上で行なうので安全で、作業し易く、作業性も向上す
る。According to the sixth method of assembling a suspended scaffold of the present invention, the work of suspending and connecting the scaffold is performed on the previously suspended scaffold, so that the work is safe, easy to work, and workability is improved.
【0035】本発明の第7の吊り足場材はパネル状であ
るため、その上に作業者がのって次の吊り足場材を吊り
下げたり、後から吊り下げた吊り足場材を先に吊り下げ
た吊り足場材に連結したりすることができ、しかも、安
定した状態で吊り下げ作業や組立て作業を行うことがで
きるので、取扱が容易であり、作業者が安全であり、作
業もし易くなり、作業能率も向上する。また、1枚の吊
り足場材に係止部と、配列方向連結具と、配列方向連結
受部をまとめてあるので、他の部材を使用することな
く、その足場材1を吊り下げて連結するだけで手軽に吊
り足場を組立てることができ、熟練も要せず、誰でも組
立て可能である。踏み材が基材に固定されているので、
従来のように足場板を横材に番線で固定する必要がな
く、足場の組立て作業が容易になる。Since the seventh suspended scaffolding material of the present invention is in the form of a panel, an operator stands on it and suspends the next suspended scaffolding material, or suspends the suspended scaffolding material suspended later. It can be connected to a suspended hanging scaffold, and it can be suspended and assembled in a stable condition, so it is easy to handle, safe and easy to work. Also, work efficiency is improved. Further, a locking portion on one of the hanging scaffold, the arrangement direction connector, so are summarizes the arrangement direction coupling accepting portion, without using other members, and hanging the scaffold 1 Just by connecting, it is possible to assemble the suspended scaffold easily, without any skill, and anyone can assemble. Since the tread is fixed to the base material,
It is not necessary to fix the scaffold plate to the cross member with a wire as in the conventional art, and the assembling work of the scaffold becomes easy.
【0036】本発明の第8の吊り足場材は、基材に横連
結具を係止可能な横連結受部を設けたので、横方向への
連結も容易になり、吊り足場の横幅の調節も容易にな
る。According to the eighth suspended scaffolding material of the present invention, the lateral connection receiving portion capable of locking the lateral connecting member is provided on the base material, so that the lateral connection can be easily performed, and the lateral width of the suspended scaffold can be adjusted. Will also be easier.
【0037】本発明の第9の吊り足場材は、配列方向連
結具を基材から突設したので、それを配列方向連結受部
に差し込むだけで足場材の横方向への連結が可能にな
る、連結が容易にもなる。In the ninth suspension scaffold according to the present invention, since the arranging direction connecting members protrude from the base material, the scaffolding members can be connected in the lateral direction only by inserting them into the arranging direction connection receiving portions. Also, the connection becomes easy.
【0038】本発明の第10の吊り足場材は、配列方向
連結受部が基材内に形成された差し込み孔であるため、
配列方向連結受部の形成が容易になる。According to the tenth hanging scaffold of the present invention, the connection receiving portion in the arrangement direction is an insertion hole formed in the base material.
The formation of the arrangement direction connection receiving portion is facilitated.
【0039】本発明の第11の吊り足場材は、基材1a
が方形の枠状であるため、形状が安定する。An eleventh suspended scaffold according to the present invention comprises a substrate 1a
There for a rectangular frame-like shape is stabilized.
【0040】本発明の第11、12の吊り足場材は、配
列方向連結受部とそれに差し込まれた配列方向連結具と
に穴を設けたので、両穴に貫通部材を差し込むだけで、
両者を容易且つ確実に連結できる。In the eleventh and twelfth hanging scaffolds of the present invention, holes are provided in the arrangement direction connection receiving portion and the arrangement direction connection tool inserted therein, so that a penetrating member is simply inserted into both holes.
Both can be easily and reliably connected.
【図1】本発明の吊り足場組立て工法における第1工程
の一例を示す説明図。FIG. 1 is an explanatory view showing an example of a first step in a hanging scaffold assembly method of the present invention.
【図2】本発明の吊り足場組立て工法における第2工程
の一例を示す説明図。FIG. 2 is an explanatory view showing an example of a second step in the hanging scaffold assembly method of the present invention.
【図3】本発明の吊り足場組立て工法における第3工程
の一例を示す説明図。FIG. 3 is an explanatory view showing an example of a third step in the hanging scaffold assembly method of the present invention.
【図4】本発明の吊り足場組立て工法における第4工程
の一例を示す説明図。FIG. 4 is an explanatory view showing an example of a fourth step in the hanging scaffold assembly method of the present invention.
【図5】本発明の吊り足場組立て工法による吊り足場の
組立て途中の斜視図。FIG. 5 is a perspective view of a suspended scaffold according to the present invention, which is being assembled.
【図6】本発明の吊り足場材の一例を示す斜視図。FIG. 6 is a perspective view showing an example of a hanging scaffold according to the present invention.
【図7】本発明の吊り足場材の他例を示す斜視図。FIG. 7 is a perspective view showing another example of the hanging scaffold of the present invention.
【図8】本発明の吊り足場材の横への連結構造の説明
図。FIG. 8 is an explanatory view of a connecting structure of the hanging scaffold of the present invention to the side.
【図9】従来の吊り足場組立て工法の第1工程の説明
図。FIG. 9 is an explanatory view of a first step of a conventional hanging scaffold assembling method.
【図10】従来の吊り足場組立て工法の第2工程の説明
図。FIG. 10 is an explanatory view of a second step of the conventional hanging scaffold assembling method.
【図11】従来の吊り足場組立て工法の第3工程の説明
図。FIG. 11 is an explanatory view of a third step of the conventional hanging scaffold assembling method.
【図12】従来の吊り足場組立て工法の第4工程の説明
図。FIG. 12 is an explanatory view of a fourth step of the conventional hanging scaffold assembling method.
【図13】従来の吊り足場組立て工法の第5工程の説明
図。FIG. 13 is an explanatory view of a fifth step of the conventional hanging scaffold assembling method.
1は足場材 1aは基材 2は踏み材 3は係止部 4は配列方向連結具 5は横連結具 13は穴 15は貫通部材 21は配列方向連結受部 23は横連結受部 Aは支持材 Bは索条 1 is a scaffolding material 1a is a base material 2 is a stepping material 3 is a locking portion 4 is an arrangement direction connecting member 5 is a horizontal connecting member 13 is a hole 15 is a penetrating member 21 is an arrangement direction connecting receiving portion 23 is a horizontal connecting receiving portion A Support material B is a cord
Claims (13)
(A)から吊り下げ、その吊り下げた索条(B)に、基
材(1a)に作業者がのれる広さの踏み材(2)を取り
付けたパネル状の足場材(1)を係止して、同足場材
(1)を支持材(A)にそれと交差する向きに吊り下
げ、この足場材(1)の先方或は後方に他の足場材
(1)を前記足場材(1)と同様の向きに吊り下げ、両
足場材(1)のうち一方の足場材(1)の配列方向連結
具(4)と他方の足場材(1)の配列方向連結受部(2
1)とを連結して両足場材(1)を並べて連結し、この
足場材(1)の吊り下げ及び連結を繰返して吊り足場を
組立てるようにしたことを特徴とする吊り足場組立て工
法。A rope (B) such as a wire or a chain is suspended from a support material (A), and the suspended rope (B) is large enough to allow an operator to ride on a substrate (1a). The panel-shaped scaffolding material (1) to which the stepping material (2) is attached is locked, and the scaffolding material (1) is suspended from the support material (A) in a direction crossing the support material (A). other party or behind other scaffold (1) the scaffold (1) and the lower down hanging similar orientation, the arrangement direction of one scaffold of both <br/> scaffold (1) (1) The connecting direction receiving portion (2) of the connecting tool (4) and the other scaffolding material (1)
(1) connecting the two scaffolding materials (1) side by side and connecting them, and repeatedly suspending and connecting the scaffolding material (1) to assemble the suspended scaffolding material.
材(2)を取り付けたパネル状の足場材(1)に、ワイ
ヤ、チェーン等の索条(B)を係止し、この索条(B)
を支持材(A)に吊り下げて同足場材(1)を支持材
(A)と交差する向きに吊り下げ、この足場材(1)の
先方或は後方に他の足場材(1)を前記足場材(1)と
同様の向きに吊り下げ、両足場材(1)のうち一方の足
場材(1)の配列方向連結具(4)と他方の足場材
(1)の配列方向連結受部(21)とを連結して両足場
材(1)を並べて連結し、この足場材(1)の吊り下げ
及び連結を繰返して吊り足場を組立てるようにしたこと
を特徴とする吊り足場組立て工法。To 2. A substrate (1a) to the operator ride wide tread material (2) the digit panel-like scaffold Installing (1), engaging the wire, rope chain or the like (B) Stop this rope (B)
Hanging by the scaffold to support (A) to (1) reduced Ri suspended in a direction crossing the support material and (A), other party or backward to other scaffold the scaffold (1) (1) lower hanging the same direction as the scaffold (1) up, the arrangement direction of the array direction coupling (4) and the other scaffold of one scaffold, of the two scaffold (1) (1) (1) coupling accepting portion (21) and in tandem and joined side by side feet field material (1), hanging characterized in that so as to assemble the suspension scaffold repeated suspension and connection of the scaffold (1) Scaffold assembly method.
て工法において、配列方向連結具(4)が足場材(1)
から外側に突設され、その配列方向連結具(4)を他方
の足場材(1)の配列方向連結受部(21)に差し込ん
で両足場材(1)を連結し、この足場材(1)の吊り下
げ及び連結を繰返して吊り足場を組立てるようにしたこ
とを特徴とする吊り足場組立て工法。3. The hanging scaffold assembling method according to claim 1, wherein the arrangement direction connecting member (4) is a scaffold material (1).
The two scaffolds (1) are connected to each other by inserting the arrangement direction connection tool (4) into the arrangement direction connection receiving portion (21) of the other scaffold (1). The method of assembling a suspended scaffold, wherein the suspended scaffold is assembled by repeatedly suspending and connecting the suspended scaffold.
て、配列方向連結受部(21)とそれに差し込まれた配
列方向連結具(4)とに貫通部材(15)を差し込んで
両者を連結することを特徴とする吊り足場組立て工法。4. A method for assembling a suspended scaffold according to claim 3, wherein the penetrating member (15) is inserted into the arrangement direction connection receiving portion (21) and the arrangement direction connection tool (4) inserted therein to connect them. The method of assembling a suspended scaffold.
吊り足場組立て工法において、支持材(A)と交差する
向きに吊り下げたパネル状の足場材(1)の横に、それ
と同じ向きにして他のパネル状の足場材(1)を吊り下
げ、横に隣接する両足場材(1)の横連結受部(23)
に横連結具(5)を係止して足場材(1)を横方向にも
連結するようにしたことを特徴とする吊り足場組立て工
法。5. A according to any one of claims 1 to 4
In suspended Ri scaffold assembly method, next to the support (A) and hung in a direction intersecting panels shaped scaffold (1) therewith in the same direction hanging other panel-like scaffold material (1) Horizontal connection receiving portions (23) of both scaffolding materials (1) adjacent to the side
A method of assembling a suspended scaffold, characterized in that the horizontal connecting member (5) is locked to the scaffold (1) in the horizontal direction.
場組立て工法において、パネル状の足場材(1)の吊り
下げ作業、連結作業を先に吊り下げた足場材(1)の上
で行ない、このパネル状の足場材(1)の吊り下げと連
結を繰返して吊り足場を組立てるようにしたことを特徴
とする吊り足場組立て工法。6. A method for assembling a suspended scaffold according to any one of claims 1 to 5, wherein the suspending work and the connecting work of the panel-shaped scaffolding material (1) are performed on the suspended scaffolding material (1). And a method of assembling a suspended scaffold by repeatedly suspending and connecting the panel-shaped scaffolding material (1).
板等の踏み材(2)を取り付けてパネル状にし、同基材
(1a)の2箇所以上に支持材Aから吊り下げるチェー
ン、ワイヤ等の索条(B)を係止して基材(1a)を支
持具(A)にそれと交差する向きに吊り下げ可能な係止
部(3)を設け、基材(1a)に、支持材(A)と交差
する向きに吊り下げて並べた足場材(1)同士を連結す
る配列方向連結具(4)を設け、基材(1a)のうち配
列方向連結具(4)と反対側に前記配列方向連結具
(4)を連結可能な配列方向連結受部(21)を設けた
ことを特徴とする吊り足場材。7. A stepping member (2) such as a net or a plate large enough for an operator to attach to the substrate (1a) to form a panel, and supporting members A are provided at two or more locations on the substrate (1a). The base (1a) is provided on the support (A) with a locking portion (3) which can be hung in a direction intersecting with the chain (B) such as a chain or a wire suspended from the base. (1a) is provided with an arrangement direction connector (4) for connecting scaffolding materials (1) suspended and arranged in a direction intersecting with the support material (A), and an arrangement direction connector of the base material (1a). A hanging scaffolding material provided with an arrangement direction connection receiving portion (21) capable of connecting the arrangement direction connection tool (4) on the side opposite to (4).
板(2)に足場材(1)を索条(B)で吊り下げるため
の貫通孔を設けたことを特徴とする吊り足場材。8. The hanging scaffold according to claim 7 , wherein
To suspend the scaffolding (1) on a board (2) with a cord (B)
A suspended scaffolding material provided with through holes .
おいて、配列方向連結具(4)を基材(1a)から突設
し、基材(1a)のうち配列方向連結具(4)と反対側
に前記配列方向連結具(4)を差し込み可能な配列方向
連結受部(21)を設けたことを特徴とする吊り足場
材。9. hanging scaffold of claim 7 or claim 8, wherein
In this case, the arrangement direction connecting member (4) protrudes from the base material (1a), and the arrangement direction connecting member (4) can be inserted into a side of the base material (1a) opposite to the arrangement direction connecting member (4). A hanging scaffolding material provided with a simple arrangement direction connection receiving part (21).
列方向連結受部(21)が、基材(1a)内に形成され
た差し込み孔であることを特徴とする吊り足場材。10. The suspended scaffolding material according to claim 9, wherein the arrangement direction connection receiving portion (21) is an insertion hole formed in the base material (1a).
載の吊り足場材において、基材(1a)が方形の枠状で
あることを特徴とする吊り足場材。11. The suspended Ri scaffold serial <br/> mounting to any one of claims 7 to 10, hanging scaffold substrate (1a) is characterized in that it is a rectangular frame shape.
載の吊り足場材において、配列方向連結受部(21)と
それに差し込まれた配列方向連結具(4)とに貫通部材
(15)を差し込み可能な穴(13、14)を設けたこ
とを特徴とする吊り足場材。12. The suspension scaffold to any one of claims 9 to 1 1 serial <br/> mounting arrangement direction coupling accepting portion (21) with it plugged in the array direction coupling (4) Characterized in that holes (13, 14) into which a penetrating member (15) can be inserted are provided in the suspension scaffold.
配列方向連結具(4)に形成された穴(13)が当該配
列方向連結具(4)の突出方向に横長であることを特徴
とする吊り足場材。13. The hanging scaffold according to claim 12,
A hanging scaffold characterized in that a hole (13) formed in the arrangement direction connector (4) is horizontally long in a projecting direction of the arrangement direction connector (4).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP10055145A JP3012827B2 (en) | 1998-03-06 | 1998-03-06 | Suspended scaffold assembly method and suspended scaffold materials |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP10055145A JP3012827B2 (en) | 1998-03-06 | 1998-03-06 | Suspended scaffold assembly method and suspended scaffold materials |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2258922A Division JPH07103679B2 (en) | 1990-09-28 | 1990-09-28 | Suspension scaffold assembly method and scaffold material used for it |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH10311137A JPH10311137A (en) | 1998-11-24 |
JP3012827B2 true JP3012827B2 (en) | 2000-02-28 |
Family
ID=12990610
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP10055145A Expired - Lifetime JP3012827B2 (en) | 1998-03-06 | 1998-03-06 | Suspended scaffold assembly method and suspended scaffold materials |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP3012827B2 (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101074580B1 (en) | 2011-02-07 | 2011-10-17 | 주식회사백상 | Rope Plank |
JP5597161B2 (en) * | 2011-04-28 | 2014-10-01 | 株式会社新成工業 | Suspended scaffold assembly method, suspended scaffold structure, and scaffold connecting material |
-
1998
- 1998-03-06 JP JP10055145A patent/JP3012827B2/en not_active Expired - Lifetime
Also Published As
Publication number | Publication date |
---|---|
JPH10311137A (en) | 1998-11-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP5097313B2 (en) | Suspended scaffold and its installation method | |
US6557666B1 (en) | Modular hoarding system | |
JP6294601B2 (en) | Suspended scaffolding panel, suspension scaffold construction method and suspended scaffold panel unit | |
JPH10280669A (en) | Scaffolding unit | |
JPH07103679B2 (en) | Suspension scaffold assembly method and scaffold material used for it | |
JP3012827B2 (en) | Suspended scaffold assembly method and suspended scaffold materials | |
JPH11107218A (en) | Suspended scaffold and method of assembly construction thereof | |
JP2664642B2 (en) | Cover for covering the connecting space of hanging scaffold and connecting space covering structure using it | |
JP3761800B2 (en) | Scaffolding bracket, scaffolding frame and scaffold construction method | |
JPH0740594Y2 (en) | Hanging scaffolding material | |
JP4044893B2 (en) | Suspended scaffolding | |
JP2924659B2 (en) | Construction method of assembling scaffold | |
JP3084009B2 (en) | How to attach panels to the back of a girder of an elevated structure | |
JP2004232366A (en) | Suspended scaffolding | |
CN211229470U (en) | Multi-point suspension scaffold | |
JP2647801B2 (en) | Hanging scaffold panel | |
JP3671061B2 (en) | Suspension staircase and its temporary method | |
JPH08184179A (en) | Side surface protecting wall assembling method for suspended scaffold and side surface protecting panel therefor | |
JPH0711181B2 (en) | Portable walkway for construction | |
JPH09296601A (en) | Suspended scaffolding and construction method thereof | |
JP3047743B2 (en) | Assembly type scaffold for construction | |
JPH09189126A (en) | Container for scaffoling members | |
JP3100574B2 (en) | Suspended scaffold and its erection method | |
JP3075475U (en) | Scaffold for laying bridge pipelines | |
JPH10140822A (en) | Hanging scaffold |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
EXPY | Cancellation because of completion of term |