JP2999735B2 - Connection tube and sheath - Google Patents
Connection tube and sheathInfo
- Publication number
- JP2999735B2 JP2999735B2 JP5594997A JP5594997A JP2999735B2 JP 2999735 B2 JP2999735 B2 JP 2999735B2 JP 5594997 A JP5594997 A JP 5594997A JP 5594997 A JP5594997 A JP 5594997A JP 2999735 B2 JP2999735 B2 JP 2999735B2
- Authority
- JP
- Japan
- Prior art keywords
- sheath
- precast
- connecting pipe
- housing
- telescopic cylinder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L5/00—Devices for use where pipes, cables or protective tubing pass through walls or partitions
- F16L5/02—Sealing
Description
【0001】[0001]
【発明の属する技術分野】本発明は接続管およびシース
に関するものである。BACKGROUND OF THE INVENTION The present invention relates to a connecting pipe and Sea scan
It relates to.
【0002】[0002]
【従来の技術】従来、プレキャスト部材の接合、例えば
プレキャスト鉄筋コンクリート梁22(以下プレキャス
ト梁という)と、プレキャスト鉄筋コンクリート柱23
(以下プレキャスト柱という)との接合おいて、これら
プレキャスト梁22とプレキャスト柱23とのシース2
4の接合部から目地モルタル25が入るのを防ぐため、
目地幅を手が入る幅まで広くしてシース24を手で接合
したり、あるいは輪切りのスポンジゴム26をシースの
先端部に貼り付けたりしていた。2. Description of the Related Art Conventionally, joining of precast members, for example, a precast reinforced concrete beam 22 (hereinafter referred to as a precast beam) and a precast reinforced concrete beam 23
(Hereinafter, referred to as a precast column), a sheath 2 of the precast beam 22 and the precast column 23.
In order to prevent joint mortar 25 from entering from the joint of 4,
The joint width has been widened to a width that can be easily reached, and the sheath 24 has been joined by hand, or a sponge rubber 26 cut into a circle has been attached to the distal end of the sheath.
【0003】[0003]
【発明が解決しようとする課題】しかし、従来のように
目地幅を手が入る幅まで広くすると、目地モルタルの量
が膨大になって不経済であったり、欠込み部が大きくな
って後作業の量が増し、工程の遅延にもなっていた。ま
た輪切りのスポンジゴムは貼付部が水に塗れて剥がれた
り、スポンジ部の断面欠損などの問題があり確実性を欠
いていた。However, if the joint width is increased to a width which can be easily accessed as in the prior art, the amount of joint mortar becomes enormous, which is uneconomical, and the cut-out portion becomes large, so that post-operation work becomes difficult. And the process was delayed. In addition, the sponge rubber in a slice has a problem in that the affixed portion is coated with water and peeled off, and the sponge portion has a cross-sectional defect, and thus lacks certainty.
【0004】本発明は上記のような問題点に鑑みてなさ
れたものであり、その目的は、プレキャスト梁とプレキ
ャスト柱との接合おいて、接合部から目地モルタルが入
らないようにシースを接合することである。[0004] The present invention has been made in view of the above problems, and an object of the present invention is to join a sheath so that joint mortar does not enter from a joint portion in joining a precast beam and a precast column. That is.
【0005】[0005]
【課題を解決するための手段】以上の課題を解決するた
めの本発明の接続管は、筒体の一方が差込み部をなし、
筒体の他方には収容部を備え、該収容部内に伸縮自在な
伸縮筒を収容し、収容部の前部には伸縮筒の伸び出しを
抑える押えピンを設けたことを特徴とする。またシース
は、シース本体の端部に接続管を設け、該接続管が差込
み部と収容部とから構成され、該収容部内には伸縮自在
な伸縮筒を収容するとともに、収容部には伸縮筒の伸び
出しを抑える押えピンを設けたことを特徴とする。 According to the connecting pipe of the present invention for solving the above problems, one of the cylindrical bodies forms an insertion portion,
A housing portion is provided on the other side of the cylindrical body, and a telescopic tube that can expand and contract is housed in the housing portion, and a holding pin for suppressing extension of the telescopic tube is provided at a front portion of the housing portion. In addition, the sheath has a connecting pipe provided at an end of the sheath body , the connecting pipe includes an insertion section and a housing section, and an elastic telescopic cylinder is housed in the housing section. providing the presser pins to suppress growth out you characterized.
【0006】押えピンを引き抜くと伸縮筒が収容部から
伸び出す。また伸び出した伸縮筒を縮めて、押えピンで
伸び出しを抑える。When the presser pin is pulled out, the telescopic cylinder extends from the housing. In addition, the extended telescopic cylinder is shrunk and the extension is suppressed with the presser pin.
【0007】シースにおける接続管の押えピンを引き抜
くと、伸縮筒が収容部から伸び出す。このシースをプレ
キャスト梁やプレキャスト柱などのプレキャスト部材に
埋設することにより、シースの接合が容易かつ確実に行
えるプレキャスト部材が提供できる。[0007] When the holding pin of the connecting tube in the sheath is pulled out, the telescopic tube extends from the accommodating portion. By embedding this sheath in a precast member such as a precast beam or a precast column, a precast member that can easily and reliably join the sheath can be provided.
【0008】[0008]
【0009】[0009]
【発明の実施の形態】以下、鉄筋コンクリート管の実施
の形態の一例を図面に基づいて詳細に説明する。図1は
本発明の接続管の断面図、図2は伸縮筒が伸び出した接
続管の断面図、図3の(1)は接続管の正面図、同
(2)および(3)は接続管の側面図、図4は接続管の
斜視図である。DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of a reinforced concrete pipe will be described below in detail with reference to the drawings. FIG. 1 is a cross-sectional view of a connecting pipe of the present invention, FIG. 2 is a cross-sectional view of a connecting pipe in which a telescopic tube is extended, FIG. 3 (1) is a front view of the connecting pipe, and FIGS. FIG. 4 is a side view of the pipe, and FIG. 4 is a perspective view of the connecting pipe.
【0010】接続管1は合成樹脂材で形成した筒体であ
り、後部の差込み部2と前部の収容部3とから構成され
ている。前記差込み部2は接続管1をシース4に取り付
ける働きをする。また収容部3は差込み部2より大径に
形成され、内側に伸縮自在な伸縮筒5を収容している。
この収容部3の前端部には鍔片6が形成され、ここにビ
ス取付用突片7が一体形成されている。The connection pipe 1 is a cylindrical body formed of a synthetic resin material, and includes a rear insertion portion 2 and a front accommodation portion 3. The insertion part 2 serves to attach the connecting tube 1 to the sheath 4. The accommodation section 3 is formed to have a larger diameter than the insertion section 2 and accommodates a telescopic cylinder 5 which is extendable and retractable inside.
A flange piece 6 is formed at the front end of the housing portion 3, and a screw mounting protrusion 7 is formed integrally therewith.
【0011】また伸縮筒5は収容部3の内面に密接した
固定部8と、バネ性を備えた蛇腹状の伸張部9とからな
り、この伸張部9が縮んだ状態で収容部3に収容され、
押えピン10で外側への伸び出しが抑えられている。し
たがって、図2に示すように、押えピン10を引き抜く
と伸張部9が収容部3から伸び出す。また伸縮筒5は収
容部3との間に設けたスプリング(図示せず)で伸び出
すようにしてもよく、この場合は蛇腹状の伸張部9は設
けない。The telescopic cylinder 5 comprises a fixed portion 8 closely contacting the inner surface of the housing portion 3 and a bellows-like extending portion 9 having spring properties. The expanding portion 9 is housed in the housing portion 3 in a contracted state. And
The extension to the outside is suppressed by the holding pin 10. Therefore, as shown in FIG. 2, when the holding pin 10 is pulled out, the extension portion 9 extends from the housing portion 3. The telescopic cylinder 5 may be extended by a spring (not shown) provided between the telescopic cylinder 5 and the accommodating section 3. In this case, the bellows-like extending section 9 is not provided.
【0012】図5は、上記の接続管1をシース4の先端
部に差し込んだものであり、差込み部2の表面には接着
剤が塗られている。伸縮筒5は、前記と同様に伸張部9
を縮めて収容部3に収容され、押えピン10で伸び出し
が抑えられている。したがって、押えピン10を引き抜
くと、伸張部9が収容部3から伸び出す。FIG. 5 shows the connection tube 1 inserted into the distal end of the sheath 4, and the surface of the insertion portion 2 is coated with an adhesive. The telescopic tube 5 is provided with the extension 9 as described above.
Is stored in the storage portion 3 and the extension is suppressed by the holding pin 10. Therefore, when the holding pin 10 is pulled out, the extension portion 9 extends from the housing portion 3.
【0013】図6は上記のシース4を埋設したプレキャ
スト梁やプレキャスト柱などのプレキャスト部材11で
あり、鍔片6がビス12で接合端面に固定されている。
この接合端面には、押えピン10を引き抜くための引き
抜き用スペース13が凹設されている。FIG. 6 shows a precast member 11 such as a precast beam or a precast pillar in which the above-mentioned sheath 4 is embedded. The flange piece 6 is fixed to a joint end face by a screw 12.
A pull-out space 13 for pulling out the holding pin 10 is formed in the joint end face.
【0014】次に、プレキャスト部材11の接合方法
を、プレキャスト梁14とプレキャスト柱15の接合を
例にして説明する。プレキャスト梁14はプレキャスト
柱15の顎部16に載せる接合突部17が突設され、上
下にPC鋼線などの緊張材18が挿入されるシース4が
埋設されている。このシース4の先端部には接続管1が
差し込まれ、ここに伸縮筒5が縮んだ状態で収容されて
いる。またプレキャスト柱15には、プレキャスト梁1
4を載せる顎部16が突設され、該顎部16およびその
上部にシース4が埋設され、これらの先端部の周囲にク
ッションゴム19が貼り付けられている。Next, a method of joining the precast member 11 will be described by taking the joining of the precast beam 14 and the precast column 15 as an example. The precast beam 14 has a connecting projection 17 protruding from the jaw 16 of the precast column 15, and the sheath 4 into which a tendon 18 such as a PC steel wire is inserted is embedded vertically. The connecting tube 1 is inserted into the distal end of the sheath 4, and the telescopic tube 5 is accommodated in the contracted state. In addition, the precast beam 15 has
A jaw 16 on which the jaws 4 are placed is protruded, and the sheath 4 is embedded in the jaw 16 and an upper portion thereof, and a cushion rubber 19 is adhered around these distal ends.
【0015】以上のようなプレキャスト梁14をプレキ
ャスト柱15の顎部16に載せてシース4の位置合わせ
をする[図7の(1)]。このとき接続管1の伸縮筒5
は押えピン10で収容部3に抑え込まれている。次に、
プレキャスト梁14とプレキャスト柱15とのシース4
に緊張材18を挿入するとともに、適宜の治具を用いて
押えピン10を引き抜く。これにより伸縮筒5が伸びて
プレキャスト柱15のクッションゴム19に押し当てら
れることによりシース4同士が密接される[図7の
(2)]。次に、目地部20に目地モルタル21を充填
するが、伸縮筒5がクッションゴム19に密接されてい
るため、目地モルタル21がシース4内に入ることがな
い。この目地モルタル21が硬化した後に、緊張材18
を緊張して接合が完了する[図7の(3)]。The precast beam 14 as described above is placed on the jaw 16 of the precast column 15 to position the sheath 4 [(1) in FIG. 7 ]. At this time, the telescopic tube 5 of the connecting pipe 1
Is held down by the holding pin 10 in the housing portion 3. next,
Sheath 4 of precast beam 14 and precast column 15
Is inserted, and the holding pin 10 is pulled out using an appropriate jig. As a result, the telescopic tube 5 is extended and pressed against the cushion rubber 19 of the precast column 15, whereby the sheaths 4 are brought into close contact with each other ((2) in FIG. 7 ). Next, the joint portion 20 is filled with the joint mortar 21, but the joint mortar 21 does not enter the sheath 4 because the telescopic cylinder 5 is in close contact with the cushion rubber 19. After the joint mortar 21 has hardened, the tendon 18
To complete the joining [(3) in FIG. 7 ].
【0016】[0016]
【発明の効果】プレキャスト部材のシースを接合する接
合管の構造を簡単にしたので、容易に製造できる。According to the present invention, the structure of the joining pipe for joining the sheath of the precast member is simplified, so that it can be easily manufactured.
【0017】押えピンを引き抜くという簡単な操作で接
合が容易かつ確実に行えるシースを提供できる。It is possible to provide a sheath that can be easily and reliably joined by a simple operation of pulling out the holding pin.
【0018】プレキャスト梁やプレキャスト柱などのプ
レキャスト部材の接合において、一方のシースから伸び
た伸縮筒が他方のシースに接続されることにより、これ
らのシースが容易かつ確実に接合できる。In joining precast members such as precast beams and precast columns, the expansion / contraction tube extending from one sheath is connected to the other sheath, so that these sheaths can be easily and reliably joined.
【0019】シースの接合部から目地材が入るのを防ぐ
ことができるとともに、目地幅を適正の幅に設定でき
る。The joint material can be prevented from entering from the joint portion of the sheath, and the joint width can be set to an appropriate width.
【0020】プレキャスト部材のシースの接合が容易か
つ確実に行えるので、接合作業が短期間に行える。Since the sheath of the precast member can be easily and reliably joined, the joining operation can be performed in a short time.
【図1】接続管の断面図である。FIG. 1 is a sectional view of a connecting pipe.
【図2】伸縮筒を伸ばした接続管の断面図である。FIG. 2 is a cross-sectional view of a connecting pipe in which a telescopic cylinder is extended.
【図3】(1)は接続管の正面図、(2)および(3)
は同側面図である。FIG. 3 (1) is a front view of a connecting pipe, (2) and (3).
Is a side view of the same.
【図4】接続管の斜視図である。FIG. 4 is a perspective view of a connection pipe.
【図5】接続管を設けたシースの断面図である。FIG. 5 is a cross-sectional view of a sheath provided with a connection tube.
【図6】接続管を設けたシースを埋設したプレキャスト
部材の断面図である。FIG. 6 is a sectional view of a precast member in which a sheath provided with a connection pipe is embedded.
【図7】(1)〜(3)はプレキャスト梁とプレキャス
ト柱の接合方法を示す断面図である。 FIG. 7 (1) to (3) are precast beams and precast beams
It is sectional drawing which shows the joining method of a pillar.
【図8】(1)および(2)はプレキャスト梁とプレキ
ャスト柱を接合した断面図である。 FIG. 8 (1) and (2) show precast beams and pre-cast beams.
It is sectional drawing which joined the just pillar.
【図9】従来のプレキャスト梁とプレキャスト柱の接合
部の断面図である。FIG. 9 is a cross-sectional view of a conventional joint between a precast beam and a precast column.
1 接続管 2 差込み部 3 収容部 4、24 シース 5 伸縮筒 6 鍔片 7 ビス取付用突片 8 固定部 9 伸張部 10 押えピン 11 PC部材 14、22 プレキャスト梁 15、23 プレキャスト柱 18 緊張材 19 クッションゴム1 connecting tube 2 insertion portion 3 housing portions 4,24 the sheath 5 telescopic tube 6 flange piece 7 bis Shin mounting projection piece 8 fixed portion 9 Zhang portion 10 pressing the pin 11 PC members 14 and 22 precast beams 15, 23 precast pillar 18 strain Material 19 Cushion rubber
───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.7,DB名) E04C 5/00 - 5/20 F16L 5/00 - 5/02 E04B 1/22 ──────────────────────────────────────────────────続 き Continued on the front page (58) Fields surveyed (Int. Cl. 7 , DB name) E04C 5/00-5/20 F16L 5/00-5/02 E04B 1/22
Claims (6)
方には収容部を備え、該収容部内に伸縮自在な伸縮筒を
収容し、収容部の前部には伸縮筒の伸び出しを抑える押
えピンを設けたことを特徴とする接続管。1. One of the cylinders forms an insertion portion, the other of the cylinders has a storage portion, and a telescopic tube that can be extended and retracted is stored in the storage portion. A connecting pipe characterized by having a presser pin for holding out.
張部と、固定部とからなることを特徴とする請求項1に
記載の接続管。Wherein said extension sleeve is accordion-like Shin having a spring property
The connecting pipe according to claim 1, comprising a tension part and a fixing part .
間にスプリングを設けたことを特徴とする請求項1に記
載の接続管。3. The connecting pipe according to claim 1, wherein a spring is provided between a rear end of the telescopic cylinder and a bottom of the housing .
続管が差込み部と収容部とから構成され、該収容部内に
は伸縮自在な伸縮筒を収容するとともに、収容部には伸
縮筒の伸び出しを抑える押えピンを設けたことを特徴と
するシース。4. A connecting pipe is provided at an end of the sheath body , the connecting pipe includes an insertion portion and a housing portion, and a telescopic tube that can be extended and retracted is housed in the housing portion. A sheath provided with a holding pin for suppressing extension of the cylinder.
張部と、固定部とからなることを特徴とする請求項4に
記載のシース。5. The telescopic cylinder has a bellows- like extension having a spring property.
The sheath according to claim 4, comprising a tension portion and a fixing portion .
間にスプリングを設けたことを特徴とする請求項4に記
載のシース。6. The sheath according to claim 4, wherein a spring is provided between a rear end of the telescopic cylinder and a bottom of the housing .
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP5594997A JP2999735B2 (en) | 1997-03-11 | 1997-03-11 | Connection tube and sheath |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP5594997A JP2999735B2 (en) | 1997-03-11 | 1997-03-11 | Connection tube and sheath |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH10252222A JPH10252222A (en) | 1998-09-22 |
JP2999735B2 true JP2999735B2 (en) | 2000-01-17 |
Family
ID=13013336
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP5594997A Expired - Lifetime JP2999735B2 (en) | 1997-03-11 | 1997-03-11 | Connection tube and sheath |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2999735B2 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP3128092A1 (en) * | 2015-08-04 | 2017-02-08 | Felix L. Sorkin | Collapsible pocket former element |
US9827721B2 (en) | 2015-08-04 | 2017-11-28 | Felix Sorkin | Collapsible element pocket former |
US10072429B2 (en) | 2014-05-19 | 2018-09-11 | Felix Sorkin | Modified pocket former |
Families Citing this family (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4660803B2 (en) * | 2000-05-12 | 2011-03-30 | 東拓工業株式会社 | Joint structure of precast segment in PC bridge |
FR2970724B1 (en) * | 2008-10-06 | 2014-01-03 | Freyssinet | CONNECTING PRECASTRAIN SHEATH STRINGS OF A WORK HAVING A SERIES OF PREFABRICATED ELEMENTS. |
KR101024373B1 (en) * | 2009-06-09 | 2011-03-23 | 한미기초개발주식회사 | Method for contstructing pipe propulsion structure using prestress and pipe propulsion structure constructed thereby |
JP2012202069A (en) * | 2011-03-24 | 2012-10-22 | Tokyo Fabric Kogyo Kk | Sheath and bridge fall prevention device |
EP3460140A1 (en) | 2013-12-20 | 2019-03-27 | CCL Stressing International Limited | A construction and a method of making a construction |
KR101515327B1 (en) * | 2014-03-19 | 2015-04-28 | 중앙대학교 산학협력단 | connector of internal prestressing steel duct and precast structures with the connector |
CN109403638B (en) * | 2018-11-07 | 2021-05-11 | 同济大学 | Horizontal flat prestressing force corrugated pipe anchor clamps and threading system |
KR102116868B1 (en) * | 2018-12-07 | 2020-05-29 | 서울시립대학교 산학협력단 | Post tension press method for intrusion block of grout in PC joint connection |
CN109811657B (en) * | 2019-01-23 | 2021-11-19 | 南昌大学 | Construction method of prestressed pipeline at wet joint section of precast concrete member |
JP7221084B2 (en) * | 2019-03-01 | 2023-02-13 | 鹿島建設株式会社 | RESIN MOLDED PRODUCT, METHOD FOR MANUFACTURING THE SAME, AND INSERT FOR SHEATH CONNECTION MOLDING |
WO2022021105A1 (en) * | 2020-07-29 | 2022-02-03 | 黄寿美 | Prefabricated beam column sleeved with corrugated pipe |
-
1997
- 1997-03-11 JP JP5594997A patent/JP2999735B2/en not_active Expired - Lifetime
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US10072429B2 (en) | 2014-05-19 | 2018-09-11 | Felix Sorkin | Modified pocket former |
EP3128092A1 (en) * | 2015-08-04 | 2017-02-08 | Felix L. Sorkin | Collapsible pocket former element |
US9827721B2 (en) | 2015-08-04 | 2017-11-28 | Felix Sorkin | Collapsible element pocket former |
Also Published As
Publication number | Publication date |
---|---|
JPH10252222A (en) | 1998-09-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP2999735B2 (en) | Connection tube and sheath | |
US6305430B1 (en) | Reinforcement structure for pipe | |
JP2001522424A (en) | Method of manufacturing a component having a prefabricated structure and a prestressed structure made with the component | |
JPS6355245A (en) | Splice sleeve for lapped reinforcing bar | |
KR100273909B1 (en) | Telescopic rod antenna apparatus | |
JP3836848B2 (en) | Construction method of underground anchor | |
JP3455422B2 (en) | Joint structure and expansion jig | |
JP2554513B2 (en) | Fixing end structure of embedded member | |
JPS5923179A (en) | Displacement absorbing waterproof treating mechanism of penetrating piping | |
JP2769111B2 (en) | Joints used for connecting manholes and conduits, and crimping jigs therefor | |
JPH0621951Y2 (en) | Anchor structure | |
JPH04216766A (en) | Fixing member fixable in drill hole equipped with undercut | |
JPH10102992A (en) | Connecting device | |
JPH0741770Y2 (en) | Tensile material | |
JP2002357091A (en) | Connecting structure | |
JPH0518415Y2 (en) | ||
JPH0979236A (en) | Leg opening control nail | |
JPH084498Y2 (en) | Anti-corrosion equipment for tensile materials | |
JP2829284B2 (en) | Corner construction material temporary holding jig and method for holding corner construction material using the jig | |
JPS6016666A (en) | Connection of pc precast member | |
EP0807717A1 (en) | Rod material for earth anchor and method of using the same | |
JP3615843B2 (en) | Installation method of flexible segment | |
JPH08333795A (en) | Joint structure | |
JP2542107Y2 (en) | Mortar sleeve plug | |
JPH0726416Y2 (en) | Anchor bond sheath |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20071105 Year of fee payment: 8 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20081105 Year of fee payment: 9 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20091105 Year of fee payment: 10 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20101105 Year of fee payment: 11 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20111105 Year of fee payment: 12 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20121105 Year of fee payment: 13 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20121105 Year of fee payment: 13 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20131105 Year of fee payment: 14 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
EXPY | Cancellation because of completion of term |