JP2979112B2 - Pile construction method under obstacles - Google Patents

Pile construction method under obstacles

Info

Publication number
JP2979112B2
JP2979112B2 JP7025465A JP2546595A JP2979112B2 JP 2979112 B2 JP2979112 B2 JP 2979112B2 JP 7025465 A JP7025465 A JP 7025465A JP 2546595 A JP2546595 A JP 2546595A JP 2979112 B2 JP2979112 B2 JP 2979112B2
Authority
JP
Japan
Prior art keywords
pile
construction method
obstacle
steel sheet
pile construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP7025465A
Other languages
Japanese (ja)
Other versions
JPH08218362A (en
Inventor
雄一 芳野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP7025465A priority Critical patent/JP2979112B2/en
Publication of JPH08218362A publication Critical patent/JPH08218362A/en
Application granted granted Critical
Publication of JP2979112B2 publication Critical patent/JP2979112B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、シートパイル等の鋼矢
板による杭を配管等の障害物下に圧入する障害物下の杭
施工法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of constructing a pile under an obstacle by pressing a pile made of steel sheet pile such as a sheet pile under an obstacle such as a pipe.

【0002】[0002]

【従来の技術】既設地上式タンクの基礎地盤の地震時等
の液状化対策工として、リング矢板工法がある。このリ
ング矢板工法は、シートパイル等の鋼矢板による杭を円
形に連続させて打ち込み、その内側は締め切り部分とし
て杭相互の引張抵抗力を利用して内部の土水の動きを抑
制することにより構造物の沈下、変形を防ぐ工法であ
る。
2. Description of the Related Art As a countermeasure against liquefaction in the event of an earthquake on the foundation ground of an existing above-ground tank, there is a ring sheet pile method. This ring sheet pile construction method is to strike a pile of steel sheet piles such as sheet piles continuously in a circular shape, and to control the movement of internal soil water by using the tensile resistance of the piles as a deadline inside. This is a method of preventing sinking and deformation of objects.

【0003】このような鋼矢板リングによる地盤の液状
化対策工法を初めとして、シートパイル等の鋼矢板によ
る杭を連続させて圧入する杭工法の場合に、配管等の障
害物があり、直上から鋼矢板の打ち込みが許容されない
部分については、従来は、配管等の障害物を一度取り外
し、杭施工後、障害物をもとにもどすか、施工支障物の
直下を深く掘り込み、高さの低い静的鋼矢板打設機械を
セットして、短く切った鋼矢板(長さは支障物直下の掘
削深さと打設機械から決まる余裕高さを差し引いて求め
られる)を継ぎ足しながら、所定の幅、深度になるまで
繰り返すという工法が採られる。
[0003] In the case of the pile construction method in which piles made of steel sheet piles such as sheet piles are continuously inserted by press-fitting such as the soil liquefaction countermeasure construction method using such steel sheet pile rings, there are obstacles such as pipes. For parts where driving of steel sheet piles is not permissible, conventionally, obstacles such as pipes were removed once, and after pile construction, the obstacles were restored, or the obstacles were dug deep beneath the construction obstacles, and the height was low. Set the static steel sheet pile driving machine, and cut the short cut steel pile (the length is obtained by subtracting the excavation depth just below the obstacle and the extra height determined from the driving machine), and add the predetermined width, The method of repeating until the depth reaches is adopted.

【0004】[0004]

【発明が解決しようとする課題】しかし、障害物自体を
撤去、再取り付けするのでは、非常な手間と時間がかか
る。さらに、障害物の内容によってはプラントの運転停
止の事態を引き起し、場合によっては撤去不可能なこと
も多い。
However, removing and reattaching the obstacle itself takes a lot of trouble and time. Further, depending on the contents of the obstacle, the operation of the plant may be stopped, and in some cases, it is impossible to remove the obstacle.

【0005】また、前記のごとく構造物の近傍を深く掘
り下げ、小型の施工機械で施工する方法では深く掘り下
げることにより生じる影響は構造物の種類によっては無
視できない。さらに、短小な鋼矢板を継ぎ足しながら、
かつ、接合用の爪(セクション)による継手を噛み合わ
せて行くことは、高度の施工精度が要求されると同時に
多大な時間と工数が要求される。
[0005] Further, as described above, in the method of digging deeply in the vicinity of the structure and constructing it with a small construction machine, the effect caused by digging deeply cannot be ignored depending on the type of the structure. Furthermore, while adding short and small steel sheet piles,
In addition, engaging the joints with the joining claws (sections) requires a high degree of construction accuracy and also requires a great deal of time and man-hours.

【0006】本発明の目的は前記従来例の不都合を解消
し、鋼矢板等の杭を連続的に打ち込む場合に、配管等の
障害物を撤去することなく、また、杭を短くすることな
く簡単かつ迅速に施工できる障害物下の杭施工法を提供
することにある。
SUMMARY OF THE INVENTION An object of the present invention is to solve the disadvantages of the prior art and to easily drive a pile such as a steel sheet pile without removing obstacles such as pipes and without shortening the pile. Another object of the present invention is to provide a pile construction method under obstacles that can be constructed quickly.

【0007】[0007]

【課題を解決するための手段】本発明は前記目的を達成
するため、第1に、配管等の障害物下に下に鋼矢板等の
杭を圧入する杭施工法において、斜め打込み可能な打設
機械で鋼矢板等の杭は障害物をかわして斜方向から圧入
し、その杭の下端を支点に鉛直に引き起こすこと、第2
に、引き起こしは杭の地上突出部をくわえ、鉛直方向に
引くまたは押すこと、第3に、引き起こしは、杭の継手
部に添って高圧水噴射ノズルをスライド可能に設け、該
ノズルからの高圧水で地盤を切削しながら行うことを要
旨とするものである。
SUMMARY OF THE INVENTION In order to achieve the above object, the present invention firstly provides a pile construction method for press-fitting a pile such as a steel sheet pile under an obstacle such as a pipe. Pile such as steel sheet pile, dodging obstacles, and press-fitting obliquely with a construction machine to raise the lower end of the pile vertically at the fulcrum.
In addition, the cause is to hold the protrusion of the pile above the ground and pull or push in the vertical direction. Third, the cause is to slidably provide a high-pressure water injection nozzle along the joint part of the pile, and the high-pressure water from the nozzle is provided. The gist is to perform while cutting the ground.

【0008】[0008]

【作用】請求項1記載の本発明によれば、配管等の障害
物を避けて鋼矢板等の杭を斜方向から圧入し、さらに、
その杭の下端を支点に鉛直に引き起こすことにより障害
物を動かすことなく、また、杭の長さを短くすることな
く障害物の直下に杭を鉛直に打設することができる。
According to the first aspect of the present invention, a pile such as a steel sheet pile is press-fitted obliquely while avoiding an obstacle such as a pipe.
By raising the lower end of the pile vertically at the fulcrum, the pile can be driven vertically just below the obstacle without moving the obstacle and without reducing the length of the pile.

【0009】請求項2記載の本発明によれば、前記作用
に加えて、引き起こしの作業は地上からこれを簡単に行
うことができ、請求項3記載の本発明によれば、地盤抵
抗が大きく引きまたは押しきれないような場合でも高圧
水で地盤を緩めて抵抗を少なくすることができる。
According to the second aspect of the present invention, in addition to the above-described operation, the operation of causing the operation can be easily performed from the ground, and according to the third aspect of the present invention, the ground resistance is large. Even in the case where it cannot be pulled or pushed completely, the ground can be loosened with high-pressure water to reduce the resistance.

【0010】[0010]

【実施例】以下、本発明の実施例を図面について詳細に
説明する。図1は本発明の障害物下の杭施工法の1実施
例を示す側面図、図2は図1のA−A線矢視図、図3は
図1のB−B線矢視図、図4は図1のC−C線矢視図で
ある。
DESCRIPTION OF THE PREFERRED EMBODIMENTS Embodiments of the present invention will be described below in detail with reference to the drawings. FIG. 1 is a side view showing an embodiment of a method of pile construction under obstacles according to the present invention, FIG. 2 is a view taken along line AA of FIG. 1, FIG. 3 is a view taken along line BB of FIG. FIG. 4 is a view taken along line CC in FIG.

【0011】さきに杭施工法の状況を図5、図6につい
て説明すると、図中1は配管等の障害物であり、2a,
2bはシートパイルなどによる鋼矢板等の杭である。な
お、鋼矢板リングとして杭2a,2bを連続的に接続さ
せる場合に鋼矢板リングはこの障害物1があるところで
欠損部となる。杭2bはこの欠損部にセットするもの
で、形状は杭2aと相違して平板的なものでもよいが、
これら杭2a,2bは接合用の爪(セクション)による
継手3を側端部に形成している。
The situation of the pile construction method will be described with reference to FIGS. 5 and 6. In FIG.
2b is a pile such as a steel sheet pile made of a sheet pile or the like. When the piles 2a and 2b are continuously connected as a steel sheet pile ring, the steel sheet pile ring becomes a defective portion where the obstacle 1 exists. The stake 2b is set in this missing portion, and the shape may be flat, unlike the stake 2a,
These piles 2a and 2b form a joint 3 at the side end by a joining claw (section).

【0012】図2に示すように杭2bを掴む圧入用チャ
ック4を上下動させるリーダーマスト5を斜めに設ける
などした斜め打込み可能な打設機械6を用いて、障害物
1のに下に杭2bを障害物1をかわして斜方向から圧入
する。なお、布掘りで多少掘り下げておくことも行う。
As shown in FIG. 2, a pile machine is provided under the obstacle 1 by using a slanting driving machine 6 in which a leader mast 5 for vertically moving a press-fit chuck 4 for gripping the pile 2b is provided. 2b is press-fitted obliquely over the obstacle 1. It is also possible to dig a little with cloth digging.

【0013】そして杭2bの下端を支点に鉛直な状態に
なるように引き起こすが、この引き起こしを行う方法と
しては、図にも示すように先端にチャック7を取り付け
たワイヤー8を使用し、該チャック7で杭2bの地上突
出部をくわえ、ワイヤー8をウインチその他の巻上機で
鉛直方向に引き寄せる方法や重機の先端にチャックを有
するブームで鉛直方向に押す方法などが採用し得る。
The lower end of the stake 2b is caused to be vertical with respect to the fulcrum. As a method for causing the lower end, a wire 8 having a chuck 7 attached to the tip as shown in FIG. A method in which the ground protruding portion of the pile 2b is held at 7 and the wire 8 is pulled vertically by a winch or other hoisting machine, or a method in which the wire 8 is vertically pushed by a boom having a chuck at the tip of a heavy machine can be adopted.

【0014】また、杭2bの継手3の部分にスライド可
能に噛み合う継手9を有する高圧水噴射ノズル10を杭2
bの側端部にスライド可能に設け、該ノズル10からの高
圧水で地盤を切削しながら前記杭2bの引き起しを行う
ようにする。図中11はノズル10への送水管である。
A high-pressure water jet nozzle 10 having a joint 9 slidably engaged with the joint 3 of the pile 2b is provided.
The pile 2b is slidably provided at the side end of the pile 2b so as to raise the pile 2b while cutting the ground with high-pressure water from the nozzle 10. In the figure, reference numeral 11 denotes a water supply pipe to the nozzle 10.

【0015】このようにすることで、地盤抵抗が大きく
引きまたは押しきれないような場合でもノズル10からの
高圧水で地盤を緩めて杭2bへの抵抗を少なくすること
ができる。
In this manner, even when the ground resistance cannot be pulled or pushed completely, the ground can be loosened by the high-pressure water from the nozzle 10 and the resistance to the pile 2b can be reduced.

【0016】[0016]

【発明の効果】以上述べたように本発明の障害物下の杭
施工法は、配管等の障害物下に鋼矢板等の杭を連続的に
圧入する場合において、配管等の障害物を撤去すること
なく、また、杭を短くすることなく簡単かつ迅速に施工
できるものである。
As described above, the pile construction method under an obstacle according to the present invention removes an obstacle such as a pipe when continuously inserting a pile such as a steel sheet pile under an obstacle such as a pipe. The construction can be performed easily and quickly without making the pile and shortening the pile.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の障害物下の杭施工法の1実施例を示す
側面図である。
FIG. 1 is a side view showing one embodiment of a method of pile construction under an obstacle according to the present invention.

【図2】図1のA−A線矢視図である。FIG. 2 is a view taken along the line AA of FIG. 1;

【図3】図1のB−B線矢視図である。FIG. 3 is a view taken in the direction of arrows BB in FIG. 1;

【図4】図1のC−C線矢視図である。FIG. 4 is a view taken along line CC of FIG. 1;

【図5】鋼矢板リングの施工例を示す正面図である。FIG. 5 is a front view showing a construction example of a steel sheet pile ring.

【図6】鋼矢板リングの施工例を示す平面図である。FIG. 6 is a plan view showing a construction example of a steel sheet pile ring.

【符号の説明】[Explanation of symbols]

1…障害物 2a,2b…杭 3…継手 4…チャック 5…リーダーマスト 6…打設機械 7…チャック 8…ワイヤー 9…継手 10…ノズル 11…送水管 DESCRIPTION OF SYMBOLS 1 ... Obstruction 2a, 2b ... Pile 3 ... Joint 4 ... Chuck 5 ... Leader mast 6 ... Placing machine 7 ... Chuck 8 ... Wire 9 ... Joint 10 ... Nozzle 11 ... Water pipe

Claims (3)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 配管等の障害物下に下に鋼矢板等の杭を
圧入する杭施工法において、斜め打込み可能な打設機械
で鋼矢板等の杭は障害物をかわして斜方向から圧入し、
その杭の下端を支点に鉛直に引き起こすことを特徴とす
る障害物下の杭施工法。
1. A pile construction method for press-fitting a pile such as a steel sheet pile under an obstacle such as a pipe. In a pile construction method, a pile machine such as a steel sheet pile is pressed obliquely from an oblique direction by a driving machine capable of oblique driving. And
A pile construction method under an obstacle, characterized in that the lower end of the pile is raised vertically to a fulcrum.
【請求項2】 引き起こしは杭の地上突出部をくわえ、
鉛直方向に引くまたは押す請求項1記載の障害物下の杭
施工法。
2. The raising means includes a protrusion on the ground of the pile,
The method according to claim 1, wherein the pile is pulled or pushed vertically.
【請求項3】 引き起こしは、杭の継手部に添って高圧
水噴射ノズルをスライド可能に設け、該ノズルからの高
圧水で地盤を切削しながら行う請求項1または請求項2
記載の障害物下の杭施工法。
Wherein causing the slidable high pressure water injection nozzles along the joint portion of the pile, according to claim 1 or claim 2 carried out while cutting the soil at high pressure water from the nozzle
Pile construction method under obstacles as described.
JP7025465A 1995-02-14 1995-02-14 Pile construction method under obstacles Expired - Fee Related JP2979112B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP7025465A JP2979112B2 (en) 1995-02-14 1995-02-14 Pile construction method under obstacles

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP7025465A JP2979112B2 (en) 1995-02-14 1995-02-14 Pile construction method under obstacles

Publications (2)

Publication Number Publication Date
JPH08218362A JPH08218362A (en) 1996-08-27
JP2979112B2 true JP2979112B2 (en) 1999-11-15

Family

ID=12166781

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7025465A Expired - Fee Related JP2979112B2 (en) 1995-02-14 1995-02-14 Pile construction method under obstacles

Country Status (1)

Country Link
JP (1) JP2979112B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4939858B2 (en) * 2006-07-12 2012-05-30 株式会社技研製作所 Pile press machine and pile press method

Also Published As

Publication number Publication date
JPH08218362A (en) 1996-08-27

Similar Documents

Publication Publication Date Title
JPWO2010089985A1 (en) Steel member for foundation, method for placing steel member for foundation, and continuous steel wall for foundation
JP2979112B2 (en) Pile construction method under obstacles
JP2863487B2 (en) Pile pull-out method and device
JP4604698B2 (en) Screwed pile and its construction method
KR20060079446A (en) Apparatus for reducing pull-out resistance of pile and pull-out method thereof
JP2018193845A (en) Method for creating soil improvement body and casing pipe
JP2820247B2 (en) Pile pull-out method and device
JPH1136296A (en) Pc hollow pile and construction method for underground structure
JPS62273322A (en) Drawing work of existing pile and drawer therefor
JP3056461B2 (en) Pile removal method and pile removal casing
JPS6120107Y2 (en)
JPH076000Y2 (en) Water jet hose
JP2807587B2 (en) Water sheet for steel sheet pile and ground excavation method
JPH0978569A (en) Steel pipe sheet pile
JPH1113062A (en) Simplified pneumatic caisson earth retaining construction method
CN219470900U (en) Steel sheet pile
JP3538810B2 (en) Steel pipe buried pile and method of supporting steel pipe buried pile
JPH07103559B2 (en) Construction method for steel pipe piles
JPH1037202A (en) Cutting excavation method and device removing underground spring water
JP2964406B1 (en) Driving protection device for protective fence post
JPH05287742A (en) Pile burying method
JP2540789Y2 (en) Rod connecting device for excavation of steel pipe pile construction machine
JPH11117317A (en) Steel hollow-cylinder for embedding in underground
JP3563133B2 (en) Pre-boring method by auger
JP2023010227A (en) Device for constructing sand pile

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees