JP2977480B2 - Burying method of manhole pipe - Google Patents

Burying method of manhole pipe

Info

Publication number
JP2977480B2
JP2977480B2 JP7346081A JP34608195A JP2977480B2 JP 2977480 B2 JP2977480 B2 JP 2977480B2 JP 7346081 A JP7346081 A JP 7346081A JP 34608195 A JP34608195 A JP 34608195A JP 2977480 B2 JP2977480 B2 JP 2977480B2
Authority
JP
Japan
Prior art keywords
manhole
pipe
hole
water
central pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP7346081A
Other languages
Japanese (ja)
Other versions
JPH09158228A (en
Inventor
和範 谷本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHUO BOORINGU KK
Original Assignee
CHUO BOORINGU KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHUO BOORINGU KK filed Critical CHUO BOORINGU KK
Priority to JP7346081A priority Critical patent/JP2977480B2/en
Publication of JPH09158228A publication Critical patent/JPH09158228A/en
Application granted granted Critical
Publication of JP2977480B2 publication Critical patent/JP2977480B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、地下に埋設される下水
管きょの方向、勾配又は管径の変化する個所に管きょ内
の点検、清掃また管きょの連絡のために設けられるマン
ホールの埋設方法に関するものである。下水管きょは陶
管、鉄筋コンクリート管などで作られているがマンホー
ルはコンクリート管で構成されたものがほとんどであ
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention is provided for inspection, cleaning and communication of pipe drains at locations where the direction, gradient or diameter of a drain pipe buried underground changes. The method of burying manholes. Sewage pipes are made of pottery pipes, reinforced concrete pipes, etc., but most manholes are made of concrete pipes.

【0002】[0002]

【従来技術】マンホールの外径は、900mm、1200
mm、1500mm等の種類があり、これを地下に埋設する
ためには、ベノト工法や、リバース工法、アースドリル
工法等によりマンホールの管径よりも大きな穴を穿孔
し、かかる後にマンホール管をその穴に挿入して所定の
深さに埋設した後、穴とマンホール管との間に土壌等を
埋め込んで固定する方法が取られている。
2. Description of the Related Art The outer diameter of a manhole is 900 mm, 1200 mm.
mm, 1500 mm, etc., and in order to bury it underground, a hole larger than the diameter of the manhole pipe is drilled using the Benoto method, reverse method, earth drill method, etc. And then buried at a predetermined depth, and then burying soil or the like between the hole and the manhole pipe and fixing it.

【0003】[0003]

【発明が解決しようとする課題】しかしながら、かかる
従来の埋設方法の場合には、一旦回転ビットや回転バケ
ットを装着した状態で別個に穴をあけた後にコンクリー
ト製のマンホール管を埋設する方式であるために一度穴
をあけた後に掘削機の取外し作業を終了した後にマンホ
ール管の埋設作業を行わなければならないために時間が
かかり過ぎるという不都合がある。また穴を開けた後に
管を挿入する方式であるために地中とマンホール管との
間に隙間が生じ、しっかりと固定しにくいという不都合
やマンホールがコンクリート等で作られている関係から
経時変化や地震・地上を走る交通機関等の発生する振動
によりひび割れが生じ、マンホール内の汚水が地中に滲
み出すおそれがある等の不都合があった。そこで本発明
はかかる従来技術の欠点に鑑みなされたもので、マンホ
ール管の埋設作業に時間がかからず、埋設後にマンホー
ル管が前述した原因によりひび割れ等してもマンホール
管内から地中に汚水が滲み出しにくくなるようなマンホ
ール管の埋設方法を提供することを目的とする。
However, in the case of the conventional burying method, a concrete manhole pipe is buried after a hole is separately drilled once with a rotating bit or a rotating bucket attached. For this reason, there is a disadvantage that it takes too much time because the manhole pipe must be buried after the drilling machine has been removed after the hole has been drilled once. Also, since the pipe is inserted after drilling, there is a gap between the ground and the manhole pipe, and it is difficult to fix it firmly. There were inconveniences such as the occurrence of cracks due to earthquakes and vibrations generated by transportation running on the ground, and the possibility that sewage in the manhole would seep into the ground. Therefore, the present invention has been made in view of the drawbacks of the related art, and the burying work of the manhole pipe does not take much time. It is an object of the present invention to provide a method for burying a manhole tube that does not easily seep out.

【0004】[0004]

【課題を解決するための手段】すなわち本発明は、有底
筒状のコンクリート製のマンホール管の底部中央に穴を
あけると共にマンホール管上部から底部中央の穴に向け
て中央パイプを挿入すると共に該パイプの一端を穴と接
続する工程と、該マンホール管底部外面にビット等の掘
削手段を接合する工程と、マンホール管の外周に該マン
ホールを所定のスピードで回転させると共にマンホール
を下方に押さえ付ける回転屈伸機を装着する工程と、前
記マンホール管内に水を供給し満タンにした後に前記中
央パイプに水、汚泥又はベントナイト安定液等の液体連
続的に注入する工程と、逆流を防止しながらマンホール
底部中央の穴から地中に向けて液体を排出する工程と、
吸い上げポンプを介してマンホール管の外周の地中から
湧き出る汚泥を連続的に吸い取る工程と、マンホール管
が所定の深さまで埋設された後に前記中央パイプに水ガ
ラス、ポルトランドセメント、エンテ等の土壌硬化剤を
注入しマンホール管の外周付近の土壌を土壌硬化剤で固
める工程と、埋設終了後に中央パイプを撤去すると共に
マンホール内の水を抜いた後に中央の穴を閉塞する工程
とからなるマンホール管の埋設方法により本目的を達成
する。
That is, according to the present invention, a hole is made at the bottom center of a bottomed cylindrical concrete manhole pipe, and a central pipe is inserted from the top of the manhole pipe toward the bottom center hole. A step of connecting one end of the pipe to the hole, a step of joining a drilling means such as a bit to the outer surface of the bottom of the manhole pipe, and a rotation of rotating the manhole at a predetermined speed on the outer periphery of the manhole pipe and pressing the manhole downward. A step of installing a bending and stretching machine, a step of continuously injecting water, sludge, or a bentonite stabilizing liquid into the central pipe after supplying water to the manhole pipe to fill the manhole, and a bottom of the manhole while preventing backflow. Discharging the liquid from the center hole into the ground,
A step of continuously sucking sludge that springs out of the ground around the manhole pipe through a suction pump, and a soil hardening agent such as water glass, Portland cement, and ente in the central pipe after the manhole pipe is buried to a predetermined depth. Of the manhole pipe by injecting water and solidifying the soil near the outer periphery of the manhole pipe with a soil hardener, and removing the central pipe after completion of the embedding and closing the central hole after draining the water in the manhole The method achieves this objective.

【0005】[0005]

【作用】本発明にかかる埋設方法では、マンホールの中
央底部に穴をあけ、該穴とマンホール上部とを中央パイ
プを介して接続するために中央パイプ内とその外周とは
隔離された形となり、中央パイプ内は泥水であっても掘
削の前後においてマンホール内を清水で満たしておくこ
とになる。そしてマンホール管の外周にビット等の掘削
手段を装着し、中央パイプから液体を供給した状態でマ
ンホール管を所定のスピードにて回転させると、中央パ
イプから吐き出される液体により土壌の硬度はやわらか
い状態となりビットにより掘削を促進させる。また掘削
によって生じた汚泥はマンホールの外周と土との隙間か
ら破砕された岩石と共に噴出するが、吸い上げポンプに
よりマンホール管外周部の液体は強制的に吸引されるの
で、掘削に伴う汚泥を効率良く除去することが可能とな
る。次に掘削終了後に中央パイプから土壌硬化剤を注入
することによりマンホール管外周の地中に該土壌硬化剤
が滲み込み、埋設されたマンホール管の外周部及び底部
における地表の強度を強くすることがでいると共にマン
ホール管外周が硬化剤で固められた土壌により全面に渡
り覆われることとなる。さらに、供給する土壌硬化剤
は、マンホール管の内径よりかなり細い中央パイプを介
して供給されるために、土壌硬化剤は必要最低限もので
済むこととなる。そして埋設終了後にマンホール管内の
水を抜くと共に中央パイプを撤去することにより管内を
きれいなまま埋設することとなる。
In the embedding method according to the present invention, a hole is formed in the center bottom of the manhole, and the inside of the center pipe and its outer periphery are separated from each other in order to connect the hole and the upper part of the manhole via the center pipe. Even if the central pipe is muddy, the manhole will be filled with fresh water before and after excavation. Then, drilling means such as bits are attached to the outer periphery of the manhole pipe, and when the manhole pipe is rotated at a predetermined speed in a state where the liquid is supplied from the central pipe, the hardness of the soil is softened by the liquid discharged from the central pipe. Bits facilitate excavation. In addition, the sludge generated by excavation is ejected together with the crushed rock from the gap between the perimeter of the manhole and the soil, but the liquid at the perimeter of the manhole pipe is forcibly sucked by the suction pump, so the sludge accompanying the excavation can be efficiently removed. It can be removed. Next, after the excavation is completed, the soil hardener is injected into the ground around the outer periphery of the manhole pipe by injecting the soil hardener from the central pipe to increase the strength of the ground surface at the outer circumference and the bottom of the buried manhole pipe. At the same time, the outer periphery of the manhole tube is entirely covered with soil hardened with the hardener. Further, since the supplied soil hardener is supplied through a central pipe which is considerably smaller than the inner diameter of the manhole pipe, the required amount of the soil hardener is minimal. After the burial is completed, the manhole pipe is drained and the central pipe is removed, so that the pipe is buried with the pipe clean.

【0006】[0006]

【発明の実施の形態】以下に本発明を図示された実施例
に従って詳細に説明する。図1は、本発明にかかる工法
を図式したものであり、1はコンクリート製で有底筒状
のマンホール管であり、該マンホール管1の底部中央に
は中央パイプ3を接続するための貫通穴2が穿孔されて
おり、該穴2に接続された中央パイプ3はマンホール管
1の上方まで伸びている。マンホール管1の底部外周に
は、鋼鉄性の掘削手段としてのビット4が円錐状に接合
されており、底部の穴2の外側には中央パイプ3から供
給される液体が逆流しないように逆流防止弁5が装着さ
れている。尚、本実施例では円錐状のビット4を接合す
るように構成したが、これに限定されるものではなく三
角錐、四角錐状のビットを用いても良い。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention will be described below in detail with reference to the illustrated embodiments. FIG. 1 schematically illustrates a construction method according to the present invention. Reference numeral 1 denotes a cylindrical bottomed manhole pipe made of concrete, and a through hole for connecting a central pipe 3 is provided at the bottom center of the manhole pipe 1. The center pipe 3 connected to the hole 2 extends above the manhole pipe 1. A bit 4 as a steel drilling means is conically joined to the outer periphery of the bottom of the manhole pipe 1, and a backflow preventing liquid supplied from the central pipe 3 does not flow back outside the hole 2 at the bottom. Valve 5 is mounted. In this embodiment, the conical bit 4 is joined, but the present invention is not limited to this, and a triangular pyramid or quadrangular pyramid bit may be used.

【0007】次に6は地表に固定されたマンホール管1
を油圧チャック手段7で保持すると共に所定のスピード
で管1を回転させるための回転屈伸機であり、回転数と
しては2〜3回/秒が好ましい。8は、マンホール管1
の外周付近に配置した吸水パイプ9を介して前記ビット
4で破砕された岩石及び土壌からなる汚泥を吸い込むた
めのポンプであり、該ポンプ8で吸い上げた汚泥はパイ
プ11を介して濾過槽10に導かれ、沈殿等により液体
と固体とに分別される。分別された液体は、濾過槽10
からチューブ12を介して前記中央パイプ3に導かれ、
該中央パイプ3を介して再び掘削部に噴出される。尚、
ポンプ8により吸引・送水される汚泥の量は、掘削する
マンホール管の径により異なるが、100〜1000リ
ットル/分程度が好ましく、また濾過槽10から中央パ
イプ3を介して供給される水の量より多いことが好まし
い。また14は、噴出する汚泥を効率良くポンプ8で吸
い上げるために予め掘られた予備穴であり、ある程度の
汚泥を貯溜できる程度のもので良い。
Next, reference numeral 6 denotes a manhole tube 1 fixed to the ground surface.
Is held by the hydraulic chuck means 7 and the tube 1 is rotated at a predetermined speed. The rotation speed is preferably 2-3 times / second. 8 is the manhole tube 1
Is a pump for sucking the sludge composed of the rock and the soil crushed by the bit 4 through a water absorbing pipe 9 arranged near the outer periphery of the filter. The sludge sucked up by the pump 8 is supplied to a filtration tank 10 through a pipe 11. It is separated into a liquid and a solid by precipitation and the like. The separated liquid is supplied to the filtration tank 10
Through the tube 12 to the central pipe 3,
It is ejected again to the excavation part via the central pipe 3. still,
The amount of sludge sucked and sent by the pump 8 depends on the diameter of the manhole pipe to be excavated, but is preferably about 100 to 1000 liters / minute, and the amount of water supplied from the filtration tank 10 through the central pipe 3. More is preferred. Reference numeral 14 denotes a preliminary hole dug in advance for efficiently sucking out the ejected sludge by the pump 8, and may be a hole capable of storing a certain amount of sludge.

【0008】以上述べた構成において本発明にかかるマ
ンホール管の埋設方法では、以下の(a)乃至(h)の
工程によりマンホール管1を埋設する。 (a)マンホール管1の中央に穴2を穿孔し該穴2に中
央パイプ3を挿入して接続する。 (b)さらにマンホール管1の底部に掘削用のビット4
を接続する。接続に際してはマンホール管の回転により
ビット4が外れないようにしっかり固定する。 (c)また地表から突出しているマンホール管1に地表
に固定した回転屈伸機6を装着する。 (d)中央パイプ3の外周のマンホール管1内には清水
16を満たすことによりマンホール管の重量が重くなる
ようする。 (e)中央パイプ3の内部に循環する掘削促進用の液体
(汚泥又はベントナイト)を濾過槽10から連続的に注
入する。 (f)吸い上げポンプ8を介して地中のマンホール管1
の外周から噴出する汚泥を吸い取り濾過槽10まで送水
する。 以上のような工程を経て回転屈伸機6を駆動することに
よりコンクリート製のマンホール管1は、毎分2〜3回
の回転数にて回転することにより、該マンホール管1の
底部に設けたビット4及び管1の重みにより下方の土壌
を中央パイプ3から供給される液体と共に掘削すること
になり、掘削に伴う摩擦熱を押さえながら且つ土壌に液
体を供給することによる流動化を利用しながら効率良く
掘削する。 (g)そしてマンホール管1が所定の深さまで沈んだ後
に、中央パイプ3から供給される液体を土壌硬化剤に切
り換え、マンホール管1の外周付近の土壌を固めると共
にマンホール管1の外周のシール製を強化する。 (h)土壌硬化剤の供給終了後にマンホール内に満たし
た水を抜き取った後に中央パイプ3を穴2から外し、該
穴2に栓18を挿入して閉塞する。そしてマンホール管
の埋設作業が終了することとなる。
In the method for burying a manhole tube according to the present invention having the above-described configuration, the manhole tube 1 is buried by the following steps (a) to (h). (A) A hole 2 is pierced in the center of the manhole tube 1 and a central pipe 3 is inserted into the hole 2 for connection. (B) Further, a drill bit 4 is provided at the bottom of the manhole pipe 1.
Connect. At the time of connection, the bit 4 is firmly fixed so that the bit 4 does not come off due to rotation of the manhole tube. (C) In addition, the rotary bending and stretching machine 6 fixed to the surface of the ground is attached to the manhole tube 1 protruding from the surface of the ground. (D) The manhole pipe 1 on the outer periphery of the central pipe 3 is filled with fresh water 16 to increase the weight of the manhole pipe. (E) A liquid (sludge or bentonite) for promoting excavation circulating inside the central pipe 3 is continuously injected from the filtration tank 10. (F) Underground manhole pipe 1 via suction pump 8
The sludge spouting from the outer periphery is sucked and supplied to the filtration tank 10. By driving the rotary bending and stretching machine 6 through the above-described steps, the concrete manhole pipe 1 is rotated at a rotation speed of 2 to 3 times per minute, so that the bit provided at the bottom of the manhole pipe 1 is rotated. 4 and the weight of the pipe 1, the lower soil is excavated together with the liquid supplied from the central pipe 3, so that the frictional heat accompanying the excavation can be suppressed and the fluidization by supplying the liquid to the soil can be performed efficiently. Drill well. (G) After the manhole pipe 1 sinks to a predetermined depth, the liquid supplied from the central pipe 3 is switched to a soil hardening agent to solidify the soil near the outer circumference of the manhole pipe 1 and to make a seal around the outer circumference of the manhole pipe 1. To strengthen. (H) After the supply of the soil hardening agent is completed, the water filled in the manhole is drained, and then the central pipe 3 is removed from the hole 2, and a plug 18 is inserted into the hole 2 to close the hole. Then, the work of burying the manhole pipe is completed.

【0009】[0009]

【発明の効果】以上述べたように本発明にかかるマンホ
ール管の埋設方法によれば、マンホール管を回転させる
ことにより地中に埋め込む方法により埋設するように構
成していることから、従来の方法に比較して埋設作業が
簡単であると共に埋設に使用する機器が少なくて済む。
また、マンホール管の中央底部に開けた穴に中央パイプ
を接続し、該中央パイプから液体を供給しながら掘削を
行い、掘削により破砕された岩石・土壌等をマンホール
管の外周に設置した吸い上げポンプを介して吸引するよ
うに構成したので、比較的回転屈伸機に体する負荷を押
さえながら効率良く掘削することができる。さらに、埋
設終了後に中央パイプを介して土壌硬化剤を供給し、マ
ンホール管の外周の土壌を硬化させるように構成したの
で、マンホール管が地盤沈下等により落ちこんだり、例
えマンホール管にひび割れ等により傷ついて内部の汚水
が地中に漏れることを防ぐことができる。
As described above, according to the method for burying a manhole pipe according to the present invention, the manhole pipe is buried in the ground by rotating the manhole pipe. In comparison with the method, the embedding work is simple and the number of devices used for embedding is reduced.
In addition, a suction pipe in which a central pipe is connected to a hole formed in the center bottom of the manhole pipe, excavation is performed while supplying liquid from the central pipe, and rocks and soil crushed by the excavation are installed on the outer periphery of the manhole pipe. , It is possible to excavate efficiently while relatively suppressing the load on the rotary bending and stretching machine. Furthermore, since the soil hardening agent is supplied via the central pipe after the burial is completed and the soil around the manhole pipe is hardened, the manhole pipe falls down due to land subsidence, etc., and the manhole pipe is damaged by cracks etc. To prevent internal wastewater from leaking into the ground.

【図面の簡単な説明】[Brief description of the drawings]

【図1】 本発明にかかる埋設方法の概略を示す正面断
面図である。
FIG. 1 is a front sectional view schematically showing an embedding method according to the present invention.

【図2】 本発明の方法によりマンホール管を埋設した
状態を示すマンホール管の縦断面図である。
FIG. 2 is a longitudinal sectional view of the manhole pipe showing a state where the manhole pipe is buried by the method of the present invention.

【符号の説明】[Explanation of symbols]

1 マンホール管 2 穴 3 中央パイプ 4 掘削用ビット 5 逆流防止弁 6 回転屈伸機 7 油圧チャック手段 8 吸い上げポンプ 9 パイプ 10 濾過槽 12 チューブ 14 予備穴 16 清水 18 栓 20 土壌に硬化剤が注入された部分 DESCRIPTION OF SYMBOLS 1 Manhole pipe 2 Hole 3 Central pipe 4 Drilling bit 5 Check valve 6 Rotating bending and stretching machine 7 Hydraulic chuck means 8 Suction pump 9 Pipe 10 Filtration tank 12 Tube 14 Preparatory hole 16 Fresh water 18 Plug 20 Hardening agent was injected into soil part

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 有底筒状のコンクリート製のマンホール
管の底部中央に穴をあけると共にマンホール管上部から
底部中央の穴に向けて中央パイプを挿入すると共に該パ
イプの一端を穴と接続する工程と、該マンホール管底部
外面にビット等の掘削手段を接合する工程と、マンホー
ル管の外周に該マンホールを所定のスピードで回転させ
ると共にマンホールを下方に押さえ付ける回転屈伸機を
装着する工程と、前記マンホール管内に水を供給し満タ
ンにした後に前記中央パイプに水、汚泥又はベントナイ
ト安定液等の液体連続的に注入する工程と、逆流を防止
しながらマンホール底部中央の穴から地中に向けて液体
を排出する工程と、吸い上げポンプを介してマンホール
管の外周の地中から湧き出る汚泥を連続的に吸い取る工
程と、マンホール管が所定の深さまで埋設された後に前
記中央パイプに水ガラス、ポルトランドセメント、エン
テ等の土壌硬化剤を注入しマンホール管の外周付近の土
壌を土壌硬化剤で固める工程と、埋設終了後に中央パイ
プを撤去すると共にマンホール内の水を抜いた後に中央
の穴を閉塞する工程とからなるマンホール管の埋設方
法。
1. A step of drilling a hole at the center of the bottom of a bottomed cylindrical concrete manhole pipe, inserting a central pipe from the top of the manhole pipe to a hole at the center of the bottom, and connecting one end of the pipe to the hole. Joining a digging means such as a bit to the outer surface of the bottom of the manhole pipe, and attaching a rotary bending and stretching machine that rotates the manhole at a predetermined speed and presses down the manhole on the outer periphery of the manhole pipe; A step of continuously injecting water, sludge or bentonite stabilizing liquid into the central pipe after supplying water to the manhole pipe and filling the same, filling the central pipe from the center hole of the manhole bottom into the ground while preventing backflow. A step of discharging a liquid, a step of continuously sucking sludge flowing from underground around the manhole pipe through a suction pump, After the burial is buried to a predetermined depth, a step of injecting a soil hardening agent such as water glass, Portland cement, and ente into the central pipe and solidifying the soil near the outer periphery of the manhole pipe with the soil hardening agent, Removing the water from the manhole and closing the center hole after removing the water from the manhole.
【請求項2】 吸い上げポンプにより吸い取った水を沈
殿槽に導き、該沈殿槽で濾過された水を中央パイプに導
き、連続的に中央パイプに液体を供給するように構成し
たことを特徴とする請求項1記載のマンホール管の埋設
方法。
2. The apparatus according to claim 1, wherein the water sucked by the suction pump is guided to a settling tank, the water filtered in the settling tank is guided to a central pipe, and the liquid is continuously supplied to the central pipe. The method for burying a manhole tube according to claim 1.
JP7346081A 1995-12-11 1995-12-11 Burying method of manhole pipe Expired - Lifetime JP2977480B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP7346081A JP2977480B2 (en) 1995-12-11 1995-12-11 Burying method of manhole pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP7346081A JP2977480B2 (en) 1995-12-11 1995-12-11 Burying method of manhole pipe

Publications (2)

Publication Number Publication Date
JPH09158228A JPH09158228A (en) 1997-06-17
JP2977480B2 true JP2977480B2 (en) 1999-11-15

Family

ID=18381016

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7346081A Expired - Lifetime JP2977480B2 (en) 1995-12-11 1995-12-11 Burying method of manhole pipe

Country Status (1)

Country Link
JP (1) JP2977480B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4901634B2 (en) * 2007-07-31 2012-03-21 福岡建設株式会社 Manhole pipe burial method
JP5340011B2 (en) * 2009-04-24 2013-11-13 福岡建設株式会社 Manhole pipe burial method and manhole pipe used in the manhole pipe burial method
JP5340012B2 (en) * 2009-04-24 2013-11-13 福岡建設株式会社 Manhole pipe burial method
CN117007378B (en) * 2023-09-25 2023-12-15 上海勘测设计研究院有限公司 Geological stratification water pumping test device

Also Published As

Publication number Publication date
JPH09158228A (en) 1997-06-17

Similar Documents

Publication Publication Date Title
CN101270576A (en) Secondary segmenting slip casting method for miniature pile
CN110318410A (en) A kind of deep basal pit chance artesian water is prominent to gush decompression drought stress construction method
JP3776831B2 (en) Groundwater level lowering device
JP2002047676A (en) Buoyancy preventing structure and its construction method
JP2977480B2 (en) Burying method of manhole pipe
JP2003206691A (en) Shield machine arrival construction method
JP3673186B2 (en) Concrete pile setting method and pile head gripping device
JP7255072B2 (en) Infiltration well repair method
JP3893052B2 (en) Joint structure of manhole for propulsion pipe and its construction method
JP3971241B2 (en) Method of laying pipe in submarine ground and excavation tip device used for pipe laying method
JP2685426B2 (en) Tube mounting method for buried objects
JPS61211414A (en) Reduction well construction method
JPH11158861A (en) Method for draining underground water
JP3488887B2 (en) Well drilling method
JP3673171B2 (en) Concrete pile setting method
JPS6156734B2 (en)
RU2087617C1 (en) Method for construction of cast-in-place pile
JPH1130092A (en) Cut-off device for tunnel opening
CN102433901B (en) Repair and treatment method of prestressed pipe pile with bending and breaking defects
JP2526333B2 (en) How to build a vertical shaft
JPS6335767B2 (en)
JPS60119818A (en) Construction work of custom-made pile
JPH02311617A (en) Construction of foundation pile
JP3944005B2 (en) Chemical injection method to press-fit shaft and its excavation ground
JP2003041568A (en) Underground water treatment method in reconstructing existing building

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R360 Written notification for declining of transfer of rights

Free format text: JAPANESE INTERMEDIATE CODE: R360

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313113

R360 Written notification for declining of transfer of rights

Free format text: JAPANESE INTERMEDIATE CODE: R360

R370 Written measure of declining of transfer procedure

Free format text: JAPANESE INTERMEDIATE CODE: R370

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080910

Year of fee payment: 9

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313113

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080910

Year of fee payment: 9

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090910

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100910

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110910

Year of fee payment: 12

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120910

Year of fee payment: 13

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120910

Year of fee payment: 13

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130910

Year of fee payment: 14

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term