JP2526333B2 - How to build a vertical shaft - Google Patents
How to build a vertical shaftInfo
- Publication number
- JP2526333B2 JP2526333B2 JP3331194A JP33119491A JP2526333B2 JP 2526333 B2 JP2526333 B2 JP 2526333B2 JP 3331194 A JP3331194 A JP 3331194A JP 33119491 A JP33119491 A JP 33119491A JP 2526333 B2 JP2526333 B2 JP 2526333B2
- Authority
- JP
- Japan
- Prior art keywords
- watertight structure
- slot
- groove hole
- hole
- watertight
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
Description
【0001】[0001]
【産業上の利用分野】本発明は、立坑の構築方法に関
し、特に道路,鉄道,上下水道等の大深度トンネル用の
発進立坑を形成するのに適した立坑の構築方法に関す
る。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of constructing a vertical shaft, and more particularly to a method of constructing a vertical shaft suitable for forming a starting vertical shaft for deep tunnels such as roads, railways, water and sewers.
【0002】[0002]
【従来の技術】従来、深さ70m以上に達する大深度立
坑の構築に際しては、高水圧対策等から、連続地中壁又
はニューマチックケーソン工法が採用されていた。2. Description of the Related Art Conventionally, when constructing a deep shaft having a depth of 70 m or more, a continuous underground wall or a pneumatic caisson method has been adopted in order to prevent high water pressure.
【0003】前記連続地中壁を用いた大深度立坑では、
3〜4mごとに円形リングを上方から順次構築し、上方
から下方へコンクリート打ちを行って連続壁にそった支
保工を形成する逆巻き工法により立坑を構築していた。In the deep shaft using the continuous underground wall,
Circular rings were sequentially constructed from the top every 3 to 4 m, and concrete shafts were constructed from the top to the bottom to form a support along the continuous wall.
【0004】また、ニューマチックケーソン工法では、
底部にスラブ構造を設けた作業室から土砂を排出しなが
らこれを沈下させ、所定の支持層に到達させるようにし
たもので、作業室内に浸入する水を排除するため、作業
室に圧縮空気を供給するようにしていた。In the pneumatic caisson method,
The work chamber with a slab structure at the bottom is designed to sink the soil and reach it to reach a predetermined support layer.In order to remove water that enters the work chamber, compressed air is supplied to the work chamber. I was trying to supply.
【0005】[0005]
【発明が解決しようとする課題】前記従来の連続地中壁
を用いた大深度立坑では、3〜4mの掘削毎に円形リン
グの構築及びコンクリート打ちを行う必要があり、工期
が長くかかり、場合によっては数年を要することもある
という問題があった。In the conventional deep shaft using the continuous underground wall, it is necessary to construct a circular ring and to concrete concrete every 3 to 4 m excavation. There was a problem that it could take several years.
【0006】また、地中壁下端からの高圧の地下水の浸
透により、ボイリングや盤ぶくれのおそれが高く、その
対応策のためにコストアップが余儀なくされているとい
う問題があった。[0006] In addition, there is a high risk of boiling or bulging due to the infiltration of high-pressure groundwater from the lower end of the underground wall.
【0007】さらに、ニューマチックケーソン工法によ
り大深度立坑を構築する場合には、地下水を安全に征服
できるが、圧気下での作業であり、圧力が増加すると、
健康管理上、加圧減圧に多くの時間を要し、実作業時間
が極端に短くなり、作業能率が低下し、工期も長くかか
るという問題があった。Further, when constructing a deep shaft by the pneumatic caisson method, groundwater can be safely conquered, but it is work under pressure, and if the pressure increases,
Due to health management, it takes a lot of time to pressurize and depressurize, and the actual work time is extremely short, the work efficiency is reduced, and the construction period is long.
【0008】本発明は、前記従来の問題点に鑑みて成さ
れたものであって、その目的は、大深度立坑に要する工
期の短縮,コストダウン化,高水圧対策等をすべて解決
し、安全な施工が可能な立坑の構築方法を提供すること
にある。The present invention has been made in view of the above-mentioned conventional problems, and the purpose thereof is to shorten the construction period required for a deep shaft, reduce costs, prevent high water pressure, etc. It is to provide a method of constructing a vertical shaft that enables various construction.
【0009】[0009]
【課題を解決するための手段】本発明は、前記目的を達
成するためになしたもので、請求項1の発明は、拡径掘
削手段を備えた掘削機により泥水掘削を行って地中に溝
孔を形成する工程と、前記溝孔の先端部に前記拡径掘削
手段を用いて拡大溝孔部を形成する工程と、前記溝孔内
に、筒状の水密性構造体を沈設する工程と、前記溝孔の
孔壁と前記水密性構造体の外周との間隙を固化させる工
程と、を含み、前記水密性構造体の底部をシールド掘進
機の発進用坑口とすることを特徴としている。The present invention is made to achieve the above object, and the invention of claim 1 is to make a muddy water excavation by an excavator equipped with a diameter expanding excavation means to the underground. A step of forming a slot, a step of forming an enlarged slot portion at the tip of the slot by using the diameter-expanding excavating means, and a step of submerging a tubular watertight structure in the slot. And a step of solidifying a gap between the hole wall of the groove hole and the outer periphery of the watertight structure, wherein the bottom of the watertight structure is used as a starting hole for a shield machine. .
【0010】また、請求項2の発明は、請求項1におい
て、前記水密性構造体は、プレキャストコンクリート版
を水密性継手により接続して組立てられ、かつその底部
側壁に取外し可能な蓋体を備え、前記溝孔の孔壁と前記
水密性構造体の外周との間隙を固化させた後、前記蓋体
を取外してそこからシールド掘進機を発進させることを
特徴としている。The invention of claim 2 provides the watertight structure according to claim 1, wherein the watertight structure is assembled by connecting a precast concrete slab through a watertight joint, and the bottom side wall of the watertight structure has a removable lid. After solidifying the gap between the hole wall of the slot and the outer periphery of the watertight structure, the lid is removed and the shield machine is started from there.
【0011】[0011]
【作用】前記構成の立坑の構築方法にあっては、掘削機
により泥水掘削を行って地中に溝孔を形成することによ
り、土砂の崩壊を防止しつつ容易に溝孔の形成ができ、
しかもある程度大きな口径を持った大深度の立坑を短期
間で構築することができ、工期の短縮,低コスト化が可
能となる。According to the method of constructing a shaft having the above-described configuration, by forming a slot in the ground by excavating muddy water with an excavator, the slot can be easily formed while preventing collapse of earth and sand.
In addition, a shaft with a large diameter and a large depth can be constructed in a short period of time, and the construction period can be shortened and the cost can be reduced.
【0012】また、掘削機の拡径掘削手段を用いて拡大
溝孔部を形成することにより、前記溝孔の先端部を容易
に拡大することができ、この拡大溝孔部の大きさを十分
にとることにより、シールド掘進機の搬入,組立が容易
となり、掘削効率の向上が可能となり、いっそう低コス
ト化が期待できる。Further, by forming the enlarged groove hole portion by using the diameter expanding and excavating means of the excavator, the tip end portion of the groove hole can be easily enlarged, and the size of the enlarged groove hole portion is sufficiently large. With this, it becomes easy to carry in and assemble the shield machine, it becomes possible to improve excavation efficiency, and further cost reduction can be expected.
【0013】さらに、溝孔の掘削,水密性構造体の沈
設,拡大溝孔部形成等の作業を水中作業で処理すること
ができるため、大深度特有の高水圧対策を特別に講ずる
必要がない。Further, since the work such as excavation of the groove hole, the sinking of the watertight structure and the formation of the enlarged groove portion can be performed by underwater operation, it is not necessary to take special measures for high water pressure peculiar to large depth. .
【0014】そしてさらに、溝孔の孔壁と水密性構造体
の外周との間隙を固化させることにより、止水ゾーンを
形成することができ、漏水対策になり、シールド掘進機
の発進防護も兼ねることが可能となる。Furthermore, by solidifying the gap between the hole wall of the groove and the outer periphery of the watertight structure, a water stop zone can be formed, which is a measure against water leakage and also serves as start protection for the shield machine. It becomes possible.
【0015】[0015]
【実施例】以下、本発明の好適な実施例について、図面
を参照して詳細に説明する。DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENT A preferred embodiment of the present invention will be described in detail below with reference to the drawings.
【0016】図1〜図6は、本発明の一実施例に係る立
坑の構築方法を示す図である。1 to 6 are views showing a method of constructing a shaft according to an embodiment of the present invention.
【0017】まず、図1に示すように、地面10に口元
ケーシング12を圧入後、ハンマグラブ等で地面を所定
深さ掘削して口元14を形成する。この口元14は、構
築しようとする立坑の口径よりも大きめに形成してお
く。First, as shown in FIG. 1, after the mouth casing 12 is press-fitted into the ground 10, the mouth 14 is excavated to a predetermined depth by a hammer mug or the like to form the mouth 14. The mouth 14 is formed to be larger than the diameter of the shaft to be constructed.
【0018】次に、図2に示すように前記口元14に、
掘削機としてのリバースサーキュレーションドリル機1
6を設置し、このリバースサーキュレーションドリル機
16にて前記口元14から掘削して溝孔18を形成す
る。このリバースサーキュレーションドリル機16は、
口元14上に設置したベース20にロータリーテーブル
22を取り付け、このロータリーテーブル22に内部中
空のドリルロッド24を垂下支持させ、このドリルロッ
ド24の先端に掘削ビット26を取り付けるようになっ
ている。そして、ロータリーテーブル22及びドリルロ
ッド24により掘削ビット26が回転し、この掘削ビッ
ト26の回転により、掘削した土砂をドリルロッド24
を介して水と共に吸い上げ、溝孔18外に排出して沈殿
池に導き、そこで土砂を沈殿させた後、その表面水を再
び溝孔18内に還流し、泥水28を溝孔18内に入れた
まま掘削を行うようになっている。この場合、泥水28
の水圧が側圧に対抗すると同時に泥水28の粘土,シル
トの微粒子を壁面に浸透付着させて泥皮膜を作るので、
土砂の崩壊を防ぐことができ、また水の流れが逆循環で
あるため、ドリルロッド24内の流速は速いが溝孔18
内の流れは非常に緩慢なので溝孔18の内壁を痛める心
配は少ない。Next, as shown in FIG.
Reverse circulation drill machine 1 as an excavator
6 is installed, and the reverse circulation drill machine 16 excavates from the mouth 14 to form a slot 18. This reverse circulation drill machine 16
A rotary table 22 is mounted on a base 20 installed on the mouth 14, and a hollow drill rod 24 is suspended from the rotary table 22, and a drill bit 26 is mounted on the tip of the drill rod 24. Then, the drill bit 26 is rotated by the rotary table 22 and the drill rod 24, and the drill bit 26 is rotated by the rotation of the drill bit 26 so that the excavated earth and sand is removed from the drill rod 24.
The water is sucked up along with the water, discharged to the outside of the slot 18 and led to the sedimentation basin. After the sediment is settled, the surface water is returned to the slot 18 again, and the muddy water 28 is put into the slot 18. The excavation is to be carried out while standing. In this case, muddy water 28
At the same time, the water pressure of the muddy water opposes the lateral pressure, and at the same time, the clay and silt fine particles of the muddy water 28 penetrate and adhere to the wall to form a mud film
Since the collapse of earth and sand can be prevented, and the flow of water is in reverse circulation, the flow velocity in the drill rod 24 is high, but the
Since the internal flow is very slow, there is little fear that the inner wall of the slot 18 will be damaged.
【0019】また、掘削ビット26は、口径7m〜12
m程度の大口径の物を用いている。なお、この掘削ビッ
ト26は、ドリルロッド24に取り付けたスタビライザ
30によって振れどめがなされ、安定した掘削が成し得
るようになっている。The drill bit 26 has a diameter of 7 m to 12 m.
The thing with a large diameter of about m is used. The drill bit 26 is shaken by a stabilizer 30 attached to the drill rod 24, so that stable drilling can be achieved.
【0020】このように、リバースサーキュレーション
ドリル機16によって溝孔18の掘削を行うため、連続
的な掘削を行うことができ、70m以上の大深度の立坑
でも短期間に掘削ができ、コストも削減できることとな
る。As described above, since the reverse circulation drilling machine 16 excavates the slot 18, continuous excavation can be performed, and even a shaft with a large depth of 70 m or more can be excavated in a short period of time, and the cost is high. It can be reduced.
【0021】さらに、前記掘削ビット26には、拡径掘
削手段としての拡翼ビット32が伸縮可能に取り付けら
れるようになっている。Further, a wing expanding bit 32 as a diameter expanding digging means is attached to the digging bit 26 so as to be expandable and contractible.
【0022】次いで、図3に示すように、リバースサー
キュレーションドリル機16の掘削ビット26によって
溝孔18の先端部付近まで掘削した状態において、前記
掘削ビット26に取り付けた拡翼ビット32を広げ、溝
孔18の先端部に拡大溝孔部34を形成する。この場
合、拡翼ビット32の口径が12m〜15mに設定さ
れ、拡大溝孔部34を大きくとることができるため、溝
孔18の口径をシールド掘進機を挿入するに十分な最小
限の状態に抑えることができ、そのため溝孔18の掘削
期間を短くすることが可能となる。また、この拡翼ビッ
ト32による掘削の際には、前記スタビライザ30を溝
孔18内に位置決めし、掘削ビット26及び拡翼ビット
32部分のみをスライドロッド36を移動させて掘削す
ることにより、掘削時の安定化を図るようにしている。Next, as shown in FIG. 3, with the excavation bit 26 of the reverse circulation drill machine 16 being excavated to the vicinity of the tip of the slot 18, the expanding blade bit 32 attached to the excavation bit 26 is expanded, The enlarged slot portion 34 is formed at the tip of the slot 18. In this case, since the diameter of the expanding blade bit 32 is set to 12 m to 15 m and the enlarged groove hole portion 34 can be made large, the diameter of the groove hole 18 is set to a minimum state sufficient for inserting the shield machine. Therefore, the excavation period of the slot 18 can be shortened. When excavating with the wing bit 32, the stabilizer 30 is positioned in the slot 18, and only the dig bit 26 and the wing bit 32 are excavated by moving the slide rod 36. We try to stabilize the time.
【0023】次に、前記拡大溝孔部34の掘削終了後、
図4に示すように、リバースサーキュレーションドリル
機16を取り外し、前記溝孔18内に筒状の水密構造体
40を沈設する。この水密性構造体40は、シールド掘
進機の分割ブロック長よりも大きな内径に形成されるも
ので、プレキャストコンクリート版等で形成された短尺
筒状の構造材41を複数上下方向に水密性の継手などに
より水密状態で長尺筒状に組立て連結されている。ま
た、この水密性構造体40の底部には、図6に示すよう
に、側壁にシールド掘進機発進用の坑口46が形成さ
れ、この坑口46を取外して可能な蓋体42にて密閉す
るようになっている。そして、連結された水密性構造体
40をクレーン等にて吊り下げ、前記溝孔18内に沈下
させる。この場合、水密性構造体40内に泥水44を注
入し、浮力を調整しつつ沈下させていく。また、水密性
構造体40の外周と溝孔18の内周面との間には、間隙
が形成されており、前記水密性構造体40などの沈下と
共に、溝孔18内の泥水28が加圧されて口元14から
排出され、溝孔18内の泥水28の排水作業は特別行う
必要がない。なお水密性構造体40は、適宜継ぎ足され
て溝孔18内に挿入される。Next, after excavation of the enlarged slot portion 34,
As shown in FIG. 4, the reverse circulation drill machine 16 is removed, and the tubular watertight structure 40 is sunk in the slot 18. The watertight structure 40 is formed to have an inner diameter larger than the divided block length of the shield machine, and a plurality of short tubular structural members 41 formed of a precast concrete slab or the like are vertically watertight joints. It is assembled and connected in a long tube shape in a watertight state. Further, as shown in FIG. 6, at the bottom of the watertight structure 40, a side wall is formed with a pit 46 for launching a shield machine, and the pit 46 is removed so that the lid 42 can be sealed. It has become. Then, the connected watertight structure 40 is hung by a crane or the like to be submerged in the slot 18. In this case, the muddy water 44 is injected into the watertight structure 40 to adjust the buoyancy and sink the muddy water. Further, a gap is formed between the outer periphery of the watertight structure 40 and the inner peripheral surface of the groove 18, and when the watertight structure 40 or the like sinks, the muddy water 28 in the groove 18 is added. There is no need to perform a special draining operation of the muddy water 28 that is pressurized and discharged from the mouth 14, and that is inside the slot 18. The watertight structure 40 is appropriately added and inserted into the slot 18.
【0024】そして、水密性構造体40の底部が拡大溝
孔部34の底部まで沈下した状態において、溝孔18の
孔壁と水密性構造体40の外周との間隙を泥水固化させ
る。このように、溝孔18の孔壁と水密性構造体40の
外周との間隙を泥水固化させることにより、その周りに
止水ゾーンが形成され、漏水対策になる上に、シールド
発進防護も兼ねることが可能となる。Then, in the state where the bottom of the watertight structure 40 is settled down to the bottom of the enlarged groove portion 34, the gap between the hole wall of the groove 18 and the outer periphery of the watertight structure 40 is solidified with muddy water. In this way, by solidifying the gap between the hole wall of the groove hole 18 and the outer periphery of the watertight structure 40 with muddy water, a water stop zone is formed around the gap, which is a measure against water leakage and also serves as a shield starting protection. It becomes possible.
【0025】そして更に、前記泥水固化が完了した状態
で、図5に示すように、坑口46を密閉している蓋体4
2を取外すと共に、水密性構造40の底部にシールド掘
進機48を設置し、坑口46よりシールド掘進機48を
推進させていけば、拡大溝孔部34を容易に掘進して推
進でき、発進時の掘削の時間を短縮することが可能とな
る。Further, in the state where the solidification of the muddy water is completed, as shown in FIG. 5, the lid body 4 for sealing the wellhead 46 is closed.
When 2 is removed and the shield machine 48 is installed at the bottom of the watertight structure 40 and the shield machine 48 is propelled from the wellhead 46, the enlarged groove hole portion 34 can be easily excavated and propelled. It is possible to shorten the time for excavation.
【0026】尚、シールド掘進機48は、地上で組立て
て搬入しても良く、あるいは水密性構造体40内で組立
てても良い。The shield machine 48 may be assembled on the ground and carried in, or assembled in the watertight structure 40.
【0027】また、シールド掘進機48によりシールド
トンネルを構築した後は、立杭を基礎杭として利用する
ことができ、この場合十分な断面強度を得ることが可能
である。After constructing the shield tunnel by the shield machine 48, the standing pile can be used as a foundation pile, and in this case, sufficient cross-section strength can be obtained.
【0028】本発明は、前記実施例に限定されるもので
はなく、本発明の要旨の範囲内において、種々の変更が
可能である。The present invention is not limited to the above embodiments, but various modifications can be made within the scope of the present invention.
【0029】例えば、掘削機としてリバースサーキュレ
ーションドリル機を用いているが、これに限らず、ジェ
ット噴流による掘削機、その他のものを用いることも可
能である。For example, although the reverse circulation drill machine is used as the excavator, the excavator is not limited to this, and it is also possible to use an excavator using a jet jet or the like.
【0030】また、拡径掘削手段として拡翼ビットを用
いているが、これに限らず、前記と同様にジェット噴流
によるもの、その他のものを用いることも可能である。Further, although the expanding blade bit is used as the diameter expanding and excavating means, the invention is not limited to this, and it is also possible to use a jet jet or another one as described above.
【0031】更に、本実施例においては掘削ビット及び
拡翼ビット32にて円形状断面の溝孔18及び拡大溝孔
部34を形成するようにしているが、これに限らず矩形
断面の溝孔及び拡大溝孔部を形成することも可能であ
る。Further, in this embodiment, the excavating bit and the expanding blade bit 32 are used to form the slot 18 and the enlarged slot portion 34 having a circular cross section, but the present invention is not limited to this, and the slot having a rectangular cross section is also provided. Also, it is possible to form the enlarged slot portion.
【0032】そして更に、水密性構造体40に、プレキ
ャストコンクリート版製のものを用いているが、これに
限らず鋼材製のものを用いることも可能である。Further, although the watertight structure 40 is made of a precast concrete slab, the watertight structure 40 is not limited to this and may be made of a steel material.
【0033】また、溝孔の孔壁と水密性構造体の外周と
の間隙を泥水固化させるようにしているが、これに限ら
ず、コンクリート置換による固化手段を採用することも
可能である。Further, the gap between the hole wall of the groove hole and the outer periphery of the watertight structure is made to be solidified with muddy water, but the present invention is not limited to this, and solidification means by concrete replacement can also be adopted.
【0034】更に、シールド掘進機によって一方向にの
み掘進する例について示したが、これに限らず二方向以
上でも可能である。Further, an example in which the shield machine excavates in only one direction is shown, but the invention is not limited to this, and it is also possible in two or more directions.
【0035】また、溝孔及び拡大溝孔部は、円形断面に
限らず、矩形断面として形成することも可能である。Further, the slot hole and the enlarged slot portion are not limited to the circular cross section, but can be formed to have a rectangular cross section.
【0036】[0036]
【発明の効果】以上説明したように、本発明の立坑の構
築方法にあっては、掘削機により泥水掘削を行って地中
に溝孔を形成することにより、土砂の崩壊を防止しつつ
容易に溝孔を形成でき、しかもある程度大きな口径を持
った大深度の立坑を短期間で構築することができ、工期
の短縮,低コスト化がなし得る。As described above, in the method of constructing a shaft according to the present invention, muddy water is excavated by an excavator to form a groove hole in the ground, thereby preventing the collapse of the earth and sand and making it easy. A groove can be formed in the shaft, and a deep shaft with a relatively large diameter can be constructed in a short period of time, which can shorten the construction period and reduce the cost.
【0037】また、掘削機の拡径掘削手段を用いて拡大
溝孔部を形成することにより、前記溝孔の先端部を容易
に拡大することができ、この拡大溝孔部の大きさを十分
にとることにより、シールド掘進機の搬入,組立が容易
となり、掘削効率の向上が可能となり、いっそう低コス
ト化が期待できる。Further, by forming the enlarged groove hole portion by using the diameter expanding excavating means of the excavator, the tip portion of the groove hole can be easily enlarged, and the size of the enlarged groove hole portion is sufficiently large. With this, it becomes easy to carry in and assemble the shield machine, it becomes possible to improve excavation efficiency, and further cost reduction can be expected.
【0038】さらに、溝孔の掘削,水密性構造体の沈
設,拡大溝孔部形成等の作業を水中作業で処理すること
ができるため、大深度特有の高水圧対策を特別に講ずる
必要がない。Further, since the work such as excavation of the groove hole, the sinking of the watertight structure, and the formation of the expanded groove portion can be performed by underwater operation, it is not necessary to take special measures for high water pressure peculiar to the large depth. .
【0039】そしてさらに、溝孔の孔壁と水密性構造体
の外周との間隙を固化させることにより、止水ゾーンを
形成することができ、漏水対策になり、シールド掘進機
の発進防護も兼ねることができる。Further, by solidifying the gap between the hole wall of the groove hole and the outer periphery of the watertight structure, a water stop zone can be formed, which is a measure against water leakage and also serves as a start protection for the shield machine. be able to.
【図1】本発明の一実施例に係る立坑の構築方法におけ
る口元の構築状態を示す断面図である。FIG. 1 is a cross-sectional view showing a state in which a mouth is constructed in a method for constructing a vertical shaft according to an embodiment of the present invention.
【図2】図1の状態からリバースサーキュレーションド
リル機にて溝孔を形成する状態を示す断面図である。FIG. 2 is a cross-sectional view showing a state in which a slot is formed by a reverse circulation drill machine from the state of FIG.
【図3】図2の状態から拡大溝孔部を形成する状態を示
す断面図である。FIG. 3 is a cross-sectional view showing a state in which an enlarged slot portion is formed from the state of FIG.
【図4】リバースサーキュレーションドリル機にて形成
した溝孔内に水密性構造体を沈設する状態を示す断面図
である。FIG. 4 is a cross-sectional view showing a state in which a watertight structure is submerged in a slot formed by a reverse circulation drill machine.
【図5】図4において沈設した水密性構造体の外周と溝
孔の孔壁との間隙を泥水固化させ、シールド掘進機を発
進させる状態を示す断面図である。FIG. 5 is a cross-sectional view showing a state in which the gap between the outer periphery of the watertight structure that has been sunk in FIG. 4 and the hole wall of the groove hole is solidified with muddy water and the shield machine is started.
【図6】水密性構造材の底部の状態を示す一部破断斜視
図である。FIG. 6 is a partially cutaway perspective view showing a state of the bottom portion of the watertight structural material.
12 口元ケーシング 14 口元 16 リバースサーキュレーションドリル機 18 溝孔 28 泥水 32 拡翼ビット 34 拡大溝孔部 40 水密性構造体 46 坑口
TD00470112 Mouth Casing 14 Mouth 16 Reverse Circulation Drill Machine 18 Groove 28 Muddy Water 32 Expanding Blade Bit 34 Expanding Groove 40 Watertight Structure 46 Wellhead
TD004701
Claims (2)
掘削を行って地中に溝孔を形成する工程と、 前記溝孔の先端部に前記拡径掘削手段を用いて拡大溝孔
部を形成する工程と、 前記溝孔内に、筒状の水密性構造体を沈設する工程と、 前記溝孔の孔壁と前記水密性構造体の外周との間隙を固
化させる工程と、 を含み、 前記水密性構造体の底部をシールド掘進機の発進用坑口
とすることを特徴とする立坑の構築方法。1. A step of performing muddy water excavation by an excavator having a diameter-expanding excavation means to form a groove hole in the ground, and an enlarged groove hole portion using the diameter-expansion excavating means at the tip of the groove hole. And a step of depositing a tubular watertight structure in the groove hole, and a step of solidifying a gap between the hole wall of the groove hole and the outer periphery of the watertight structure. A method for constructing a vertical shaft, wherein the bottom of the watertight structure is used as a starting hole for a shield machine.
密性継手により接続して組立てられ、かつその底部側壁
に取外し可能な蓋体を備え、 前記溝孔の孔壁と前記水密性構造体の外周との間隙を固
化さた後、前記蓋体を取外してそこからシールド掘進機
を発進させることを特徴とする立坑の構築方法。2. The watertight structure according to claim 1, wherein the watertight structure is assembled by connecting a precast concrete slab with a watertight joint, and a bottom side wall of the watertight structure includes a removable lid, and the hole wall of the groove hole is formed. A method for constructing a shaft, comprising solidifying a gap between the watertight structure and the outer periphery of the watertight structure, removing the lid, and starting the shield machine from there.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP3331194A JP2526333B2 (en) | 1991-11-20 | 1991-11-20 | How to build a vertical shaft |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP3331194A JP2526333B2 (en) | 1991-11-20 | 1991-11-20 | How to build a vertical shaft |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH05141177A JPH05141177A (en) | 1993-06-08 |
JP2526333B2 true JP2526333B2 (en) | 1996-08-21 |
Family
ID=18240943
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP3331194A Expired - Fee Related JP2526333B2 (en) | 1991-11-20 | 1991-11-20 | How to build a vertical shaft |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2526333B2 (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH06146310A (en) * | 1992-11-10 | 1994-05-27 | Takenaka Komuten Co Ltd | Construction method of great depth shaft having large section |
JP2907762B2 (en) * | 1995-08-25 | 1999-06-21 | 地建興業株式会社 | Manhole building block and manhole construction method |
-
1991
- 1991-11-20 JP JP3331194A patent/JP2526333B2/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
JPH05141177A (en) | 1993-06-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US5823276A (en) | Diamond-tipped core barrel and method of using same | |
US4815894A (en) | Construction and use of subsea bore holes | |
CN113356211A (en) | Cast-in-place pile hole dredging device for civil engineering construction | |
CN111764819B (en) | Buried drilling treatment method for collapsed hole of pile foundation in aeolian sand stratum | |
JP2526333B2 (en) | How to build a vertical shaft | |
JP2006194031A (en) | Pillar construction method | |
JP2526335B2 (en) | How to build a vertical shaft | |
JP2625065B2 (en) | How to build a shaft | |
JP2526334B2 (en) | How to build a vertical shaft | |
JP3224008B2 (en) | Underwater ground improvement method | |
JPH08199566A (en) | Construction method of pile | |
JP2809105B2 (en) | How to build an underground tank | |
JPH07268878A (en) | Method for immersing caisson and structure of cutting face of caisson | |
JPS61113924A (en) | Method of forming pileform body | |
JPH0325121A (en) | Sinking of pile in inner drilling pile method | |
JPH02311617A (en) | Construction of foundation pile | |
JPS60119818A (en) | Construction work of custom-made pile | |
JP2024092597A (en) | Removal method of caisson foundation | |
JPS6286223A (en) | Settlement work of prefabricated pile | |
JPH11350474A (en) | Construction method for liner plate vertical shaft | |
JPS57140421A (en) | Construction of large-diameter in-situ cast pile | |
JPS60126491A (en) | Ground drilling method | |
JPS61117323A (en) | Method of burying ready-made pile | |
JPS6175122A (en) | Caisson sinking method employed in method of constructing building foundation | |
JPS62101718A (en) | Caisson settlement work suitable for hard ground or the like |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 19960220 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090614 Year of fee payment: 13 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090614 Year of fee payment: 13 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110614 Year of fee payment: 15 |
|
LAPS | Cancellation because of no payment of annual fees |