JP2926279B2 - Tunnel excavation method - Google Patents

Tunnel excavation method

Info

Publication number
JP2926279B2
JP2926279B2 JP5371691A JP5371691A JP2926279B2 JP 2926279 B2 JP2926279 B2 JP 2926279B2 JP 5371691 A JP5371691 A JP 5371691A JP 5371691 A JP5371691 A JP 5371691A JP 2926279 B2 JP2926279 B2 JP 2926279B2
Authority
JP
Japan
Prior art keywords
tunnel
rock
slit
tunnel excavation
line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP5371691A
Other languages
Japanese (ja)
Other versions
JPH04272389A (en
Inventor
亮二 小林
英和 青木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Komatsu Ltd
Original Assignee
Komatsu Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Komatsu Ltd filed Critical Komatsu Ltd
Priority to JP5371691A priority Critical patent/JP2926279B2/en
Publication of JPH04272389A publication Critical patent/JPH04272389A/en
Application granted granted Critical
Publication of JP2926279B2 publication Critical patent/JP2926279B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】この発明はスリット形成装置によ
りトンネル掘削線に沿ってスリットを形成しながらトン
ネルを掘削するトンネル掘削工法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a tunnel excavation method for excavating a tunnel while forming a slit along a tunnel excavation line by a slit forming apparatus.

【0002】[0002]

【従来の技術】従来岩盤にトンネルを掘削するトンネル
掘削工法には,予め岩盤に穿孔してこの孔内に爆薬を装
填し,爆薬の爆発力を利用して岩盤を破壊する方法が一
般に採用されている。しかしこの方法は爆薬を使用する
ため作業に危険が伴うと共に,騒音や振動が発生するた
め施工できる地域に規制を受ける不具合がある。上記不
具合を改善するため近年では削岩機などの機械を使用し
たトンネル掘削工法が種々提案されている。
2. Description of the Related Art Conventionally, in a tunnel excavation method for excavating a tunnel in a bedrock, a method in which a bedrock is drilled in advance and an explosive is charged in the hole, and the bedrock is destroyed by using the explosive force of the explosive is generally adopted. ing. However, this method involves the danger of the operation due to the use of explosives, and has a problem that it is restricted in the area where it can be constructed due to noise and vibration. In recent years, various tunnel excavation methods using machines such as rock drills have been proposed in order to improve the above-mentioned problems.

【0003】[0003]

【発明が解決しようとする課題】しかし従来の機械によ
るトンネル掘削工法は,岩盤に多数の孔を穿設して岩盤
を割岩するなどの方法を採用しているため,掘削するの
に多くの時間を要して1日の掘削量が少ないことから,
作業能率が悪い不具合がある。
However, the conventional tunnel excavation method using a machine employs a method in which a large number of holes are formed in the rock and the rock is divided, so that it takes much time to excavate. And the amount of drilling per day is small,
There is a problem with poor work efficiency.

【0004】またトンネル掘削線周辺の仕上りが悪いた
め,掘削後ロッドヘッダなどの掘削機を使用してトンネ
ル掘削線に沿って仕上げ作業を行う必要があり,この仕
上げ作業にも多くの時間を要すると共に,掘削工具の消
耗が早いため経費も嵩むなどの不具合があった。この発
明は上記従来の不具合を改善する目的でなされたもの
で,トンネル壁面が平滑に仕上げられるようにしたトン
ネル掘削工法を提供しようとするものである。
[0004] Further, since the finish around the tunnel excavation line is poor, it is necessary to perform a finishing operation along the tunnel excavation line using an excavator such as a rod header after excavation, and this finishing operation also requires much time. At the same time, there was a problem that the expenditure of the drilling tool was fast and the cost increased. SUMMARY OF THE INVENTION The present invention has been made for the purpose of improving the above-mentioned conventional problems, and an object of the present invention is to provide a tunnel excavation method in which a tunnel wall surface can be finished smoothly.

【0005】[0005]

【課題を解決するための手段】この発明は上記目的を達
成するために,トンネルを掘削すべき岩盤のトンネル掘
削線に沿ってスリットを形成した後スリットの内側に多
数の割岩孔を穿設し,次にトンネル掘削線の両端付近を
割岩して芯抜きすることにより空間を形成したら,空間
近傍の割岩孔より空間に向けて割岩を開始し,トンネル
掘削線内全体の割岩を行うと共に、トンネル掘削機の両
端付近に少し多目の割岩孔を穿設してこの部分の割岩及
び芯抜きを容易にしたものである。
According to the present invention, in order to achieve the above object, a slit is formed along a tunnel excavation line of a bedrock where a tunnel is to be excavated, and then a number of split rock holes are formed inside the slit. Then, the space is formed by splitting the core near the both ends of the tunnel excavation line and cutting the core, then starting the split rock toward the space from the split rock hole near the space, performing the split rock on the entire tunnel excavation line, A slightly larger number of split rock holes were drilled near both ends of the excavator to facilitate splitting and core cutting of this portion.

【作用】上記方法によりトンネルを掘削することによ
り,トンネル内壁が平滑に仕上がるため,掘削後トンネ
ル内壁の仕上げ作業が不用になる。
When the tunnel is excavated by the above method, the inner wall of the tunnel is finished smoothly, so that the finishing work of the inner wall of the tunnel after the excavation becomes unnecessary.

【0006】[0006]

【実施例】この発明方法の一実施例を図面を参照して詳
述する。図1において1はトンネル掘削中のスリット形
成装置で,マスト2の上部に設けられたガイドセル3上
にスイング自在なプレートとその両側にサイドドリル
(何れも図示せず)が設けられており,上記プレートの
先端に岩盤にスリットを形成するラインビットが,そし
てサイドドリルの先端にドリルビット(何れも図示せ
ず)が設けられている。岩盤にトンネルを掘削するに当
って,上記スリット形成装置1を使用して図2に示すよ
うにトンネル掘削線4に沿ってスリット5を形成する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS One embodiment of the method of the present invention will be described in detail with reference to the drawings. In FIG. 1, reference numeral 1 denotes a slit forming apparatus during tunnel excavation, which is provided with a swingable plate on a guide cell 3 provided on an upper part of a mast 2 and side drills (both not shown) on both sides thereof. A line bit for forming a slit in the rock is provided at a tip of the plate, and a drill bit (neither is shown) is provided at a tip of the side drill. When a tunnel is excavated in a bedrock, a slit 5 is formed along a tunnel excavation line 4 using the slit forming apparatus 1 as shown in FIG.

【0007】スリット5を形成するに当っては,まずラ
インビット及びドリルビットをトンネル掘削線4上に位
置させてドリルビットにより一定間隔の孔6を穿孔しな
がら上記プレートをスイングさせて,プレートの先端に
取付けたラインビットにより各孔6の間にスリット5を
形成する。スリット5の深さが予め設定した深さに達し
たらラインビット及びドリルビットを移動して,すでに
穿設した孔6及びスリット5に連続して再び孔6及びス
リット5を穿設する。
In forming the slit 5, first, a line bit and a drill bit are positioned on the tunnel drilling line 4, and the plate is swung while drilling holes 6 at regular intervals by the drill bit. A slit 5 is formed between each hole 6 by a line bit attached to the tip. When the depth of the slit 5 reaches a preset depth, the line bit and the drill bit are moved, and the hole 6 and the slit 5 are drilled again following the hole 6 and the slit 5 already drilled.

【0008】以下上記動作を繰返してまず円弧状のトン
ネル計画線4に沿ってスリット5を形成し,円弧状のス
リット5を形成したら,円弧状のトンネル掘削線4の下
端に連続させて水平方向に1本ないし複数数のスリット
7を上記スリット形成装置1を使用して形成する。なお
水平方向のスリット7を形成してから円弧状のスリット
5を形成するようにしてもよい。
[0008] The above operation is repeated to form a slit 5 along the arcuate tunnel planning line 4 first. After the arcuate slit 5 has been formed, the slit 5 is connected to the lower end of the arcuate tunnel excavation line 4 and is horizontally extended. One or a plurality of slits 7 are formed using the slit forming apparatus 1. Note that the arc-shaped slit 5 may be formed after the horizontal slit 7 is formed.

【0009】上記のようにしてトンネル掘削線4に沿っ
てスリット5,7を形成したら,次に図3に示すように
トンネル内に岩盤穿孔機9を入れて,図4に示すように
岩盤に多数の割岩孔10を穿設する。また円弧状スリット
5と水平方向のスリット7の接続部である両端付近11に
は他の部分より少し多目に割岩孔10を穿設する。
After the slits 5 and 7 have been formed along the tunnel excavation line 4 as described above, a rock drilling machine 9 is then inserted into the tunnel as shown in FIG. A number of split rock holes 10 are drilled. In the vicinity 11 of both ends, which is a connection portion between the arc-shaped slit 5 and the horizontal slit 7, a cut rock hole 10 is formed slightly larger than other portions.

【0010】以上のようにしてスリット5,7及び割岩
孔10の穿設を終了したら,図5に示すようにトンネル内
に割岩機13を投入して,まず両端付近11を図6に示すよ
うに割岩する。両端付近11は他の部分より少し多目に割
岩孔10が穿設されているのと,スリット5,7に近いた
め,比較的容易に割岩が可能である。また割岩方法とし
ては割岩孔10にクサビを挿入してクサビにより割岩孔10
を押し広げたり,ブレーカを併用するなどの方法が採用
でき,掘削効率を上げるため割岩機13を複数機併用して
もよい。
When the slits 5, 7 and the rock hole 10 have been drilled as described above, the rock rocker 13 is put into the tunnel as shown in FIG. To rock. In the vicinity 11 of both ends, the fractured rock hole 10 is drilled slightly more than the other parts, and because it is close to the slits 5 and 7, the fractured rock can be formed relatively easily. In addition, as a method of split rock, a wedge is inserted into the split rock hole 10, and
Or using a breaker in combination, and a plurality of split rock drills 13 may be used in combination to increase excavation efficiency.

【0011】上記のようにして両端付近の割岩が終了し
たら,次に図6に示すようにすでに割岩した両端付近11
近傍の割岩孔10にクサビを挿入して,割岩により形成さ
れた空間14に向って割岩を繰返すことにより,スリット
5,7の内側の岩盤を全て割岩して取除くもので,この
割岩作業は図7に示すように油圧ブレーカ15を併用する
ことにより,さらに能率向上が図れるようになる。
When the rocks near both ends are completed as described above, next, as shown in FIG.
A wedge is inserted into the nearby rock hole 10 and the rock is repeated toward the space 14 formed by the rock, thereby removing all the rock inside the slits 5 and 7 by cutting. By using the hydraulic breaker 15 as shown in FIG. 7, the efficiency can be further improved.

【0012】以上のようにして予め形成したスリット
5,6の深さ分の割岩が終了したら割岩した岩石を取除
いて再びトンネル内にスリット形成装置1を投入し,図
1から図7までの動作を繰返すもので,トンネル掘削線
4に沿って予めスリット5,7を形成して掘り進むた
め,トンネル内壁が平滑に仕上がり,割岩後の仕上げ作
業が不用になると共に,割岩中の地山の緩みも防止する
ことができる。
When the split rocks of the depths of the slits 5 and 6 formed in advance as described above are completed, the split rock is removed, and the slit forming apparatus 1 is put into the tunnel again, and the slits shown in FIGS. The operation is repeated, and slits 5 and 7 are formed in advance along the tunnel excavation line 4, so that the inner wall of the tunnel is finished smoothly, and the finishing work after the split rock is unnecessary, and the ground in the split rock is loosened. Can also be prevented.

【0013】[0013]

【発明の効果】この発明は以上詳述したように,予めト
ンネル掘削線に沿ってスリットを形成した後トンネル掘
削線内に割岩孔を穿設し,かつトンネル掘削線の両端付
近より割岩を開始して,トンネル掘削線内全体を割岩す
るようにしたことから,掘削されたトンネルの内壁は平
滑に仕上り,掘削後の仕上げ作業を必要としない。そし
て両端付近は他の部分より少し多目に割岩孔を穿設して
いるのと、スリットに近いため比較的容易に割岩及び芯
抜きが可能である。これによってトンネルの掘削が能率
よく行えると共に,掘削中地山の緩みも少ないため内壁
をコンクリートで覆工する必要がなく,また覆工が必要
な場合でも余掘り量が少ないため,コンクリート覆工量
が低減できて経済的である。
As described above in detail, according to the present invention, a slit is formed in advance along a tunnel excavation line, and then a split rock hole is formed in the tunnel excavation line, and split rock is started near both ends of the tunnel excavation line. As a result, since the entire inside of the tunnel excavation line is split, the inner wall of the excavated tunnel is finished smoothly and does not require finishing work after excavation. And near the both ends, there are slightly more rock holes than the other parts, and because it is close to the slit, it is relatively easy to cut rock and core. As a result, tunnel excavation can be carried out efficiently, and there is little loosening of the ground during excavation, so there is no need to cover the inner wall with concrete. Can be reduced and it is economical.

【0014】またトンネル掘削線の両端付近を芯抜きし
てから割岩するため,コーナ付近の払いがきれいに仕上
がると共に,芯抜き孔を別に穿設する必要がないため,
芯抜き孔を穿設する手間を省略することもできる。
In addition, since cores are cut out near both ends of the tunnel excavation line and the rock is split, the wiping around the corners is finished cleanly, and it is not necessary to separately drill a cored hole.
It is also possible to omit the trouble of forming the coring hole.

【図面の簡単な説明】[Brief description of the drawings]

【図1】この発明の一実施例になるトンネル掘削方法を
示す説明図である。
FIG. 1 is an explanatory view showing a tunnel excavation method according to an embodiment of the present invention.

【図2】トンネル掘削線に沿ってスリットを形成した状
態の説明図である。
FIG. 2 is an explanatory view showing a state where a slit is formed along a tunnel excavation line.

【図3】割岩孔を穿設している状態の説明図である。FIG. 3 is an explanatory view showing a state in which a split rock hole is formed.

【図4】穿設された割岩孔の説明図である。FIG. 4 is an explanatory diagram of a drilled rock hole.

【図5】割岩状態の説明図である。FIG. 5 is an explanatory view of a split rock state.

【図6】割岩により形成された空間を示す説明図であ
る。
FIG. 6 is an explanatory diagram showing a space formed by the split rock.

【図7】油圧ブレーカを使用して割岩している状態の説
明図である。
FIG. 7 is an explanatory diagram of a state in which a rock break is performed using a hydraulic breaker.

【符号の説明】[Explanation of symbols]

4 トンネル掘削線 5 スリット 7 スリット 10 割岩孔 11 両端付近 14 空間 4 Tunnel excavation line 5 Slit 7 Slit 10 Split rock hole 11 Near both ends 14 Space

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 トンネルを掘削すべき岩盤のトンネル掘
削線(4)に沿ってスリット(5),(7)を形成した後スリッ
(5),(7)の内側に多数の割岩孔(10)を穿設し,次にト
ンネル掘削線(4)の両端付近を割岩して芯抜きすること
により空間(14)を形成したら,空間(14)近傍の割岩孔(1
0)より空間(14)に向けて割岩を開始して,トンネル掘削
(4)内全体の割岩を行うと共に、トンネル掘削線(4)の
両端付近(11)に少し多目の割岩孔(10)を穿設してこの部
分の割岩及び芯抜きを容易にしてなるトンネル掘削工
法。
1. After forming slits (5) and (7) along a tunnel excavation line (4) of a bedrock where a tunnel is to be excavated, a number of split rock holes (10 ) are formed inside the slits (5) and (7). ) were bored, When then forms a space (14) by coring and Wariiwa the vicinity of both ends tunneling line (4), the space (14) near the Wariiwa hole (1
0) to start the Wariiwa towards more space (14), performs Wariiwa overall the tunnel boring line (4), tunnel boring line (4)
Drill slightly larger rock holes (10) near both ends (11)
Tunnel excavation method that makes it easier to split rock and core .
JP5371691A 1991-02-27 1991-02-27 Tunnel excavation method Expired - Lifetime JP2926279B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP5371691A JP2926279B2 (en) 1991-02-27 1991-02-27 Tunnel excavation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP5371691A JP2926279B2 (en) 1991-02-27 1991-02-27 Tunnel excavation method

Publications (2)

Publication Number Publication Date
JPH04272389A JPH04272389A (en) 1992-09-29
JP2926279B2 true JP2926279B2 (en) 1999-07-28

Family

ID=12950557

Family Applications (1)

Application Number Title Priority Date Filing Date
JP5371691A Expired - Lifetime JP2926279B2 (en) 1991-02-27 1991-02-27 Tunnel excavation method

Country Status (1)

Country Link
JP (1) JP2926279B2 (en)

Also Published As

Publication number Publication date
JPH04272389A (en) 1992-09-29

Similar Documents

Publication Publication Date Title
JP2926279B2 (en) Tunnel excavation method
JP3465202B2 (en) Blasting method
JP3119979B2 (en) Underground space formation blasting method
WO1991016524A1 (en) Method of excavating tunnel
US4673218A (en) Tunnel excavation method
JP3123875B2 (en) Method of forming continuous grooves
JPS63167889A (en) Multi-air hammer device
JP2876102B2 (en) Perforator for the outer periphery of tunnel face
JP3440375B2 (en) Drainage pipe and pre-draining method for tunnel
JP3250873B2 (en) Tunnel boring machine
JP2760476B2 (en) Rock tunnel excavation method
JP3052195B2 (en) Drilling method and equipment for large diameter pits
KR102566443B1 (en) Vibration-Free Rock Crushing with 3 Free-face Excavation Method
JPH03290588A (en) Rock-bed grooving method and guide bar for main down-the-haul drill therewith
JPS603396A (en) Tunnel drilling method
JPS5894598A (en) Level drilling method and drill guide used therein
JP2879283B2 (en) Preparation method for pretreatment work such as ground improvement in tunnel excavation
JPS62248792A (en) Bit for drill for forming slot to base rock, etc.
JPH06307178A (en) Excavation of ground
JP2000073366A (en) Ground anchor removing method
JPH11310920A (en) Execution method of hollow pile by variable bit
JPH0340958Y2 (en)
JPH02136492A (en) Excavating method of tunnel
JPS6124723A (en) Method of forming pile hole
JPS6110629A (en) Method of excavating large diameter vertical hole