JP2905052B2 - Column / beam joining method - Google Patents

Column / beam joining method

Info

Publication number
JP2905052B2
JP2905052B2 JP21260693A JP21260693A JP2905052B2 JP 2905052 B2 JP2905052 B2 JP 2905052B2 JP 21260693 A JP21260693 A JP 21260693A JP 21260693 A JP21260693 A JP 21260693A JP 2905052 B2 JP2905052 B2 JP 2905052B2
Authority
JP
Japan
Prior art keywords
column
bar
precast
hollow precast
hollow
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP21260693A
Other languages
Japanese (ja)
Other versions
JPH0762731A (en
Inventor
和久 末岡
俊久 清水
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Okumuragumi KK
Original Assignee
Okumuragumi KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Okumuragumi KK filed Critical Okumuragumi KK
Priority to JP21260693A priority Critical patent/JP2905052B2/en
Publication of JPH0762731A publication Critical patent/JPH0762731A/en
Application granted granted Critical
Publication of JP2905052B2 publication Critical patent/JP2905052B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】この発明は、鉄筋コンクリート製
の柱と梁との接合工法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for joining reinforced concrete columns and beams.

【0002】[0002]

【従来の技術】従来、コンクリート構造物は、現場で構
造物全体を構築する現場打コンクリート打設工法が採ら
れている。しかしながら、この工法は、型枠や鉄筋組立
て作業が繁雑なうえに、作業者の技量によって施工精度
にばらつきが生じやすいという欠点を有する。そこで、
繰り返し作業の多い高層建築物等の場合には、柱,梁お
よびスラブ等の構造部材を工場等の他の場所で分割して
製造し、この製造された各構造部材を現場で接合して組
立てるプレキャスト工法が採られている。
2. Description of the Related Art Conventionally, for a concrete structure, a cast-in-place concrete casting method for constructing the entire structure on site has been adopted. However, this construction method has the drawbacks that the assembling work of the formwork and the reinforcing bar is complicated, and that the construction accuracy tends to vary depending on the skill of the operator. Therefore,
In the case of a high-rise building or the like in which repetitive work is frequently performed, structural members such as columns, beams, and slabs are divided and manufactured in another place such as a factory, and the manufactured structural members are joined and assembled on site. Precast method is adopted.

【0003】上記プレキャスト工法によれば、各構造部
材を予め工場等で製造するので品質の信頼性は高いとい
う利点がある。ところが、各構造部材の重量が大きい場
合には、現場への搬入時や組立て施工時に高能力の揚重
機を使用しなければならなくなる。そこで、各構造部材
の寸法を小さくして重量が軽くなるように考慮する必要
がある。
According to the precast method, since each structural member is manufactured in advance at a factory or the like, there is an advantage that the reliability of quality is high. However, when the weight of each structural member is large, it is necessary to use a high-capacity lifting machine at the time of carrying into the site or at the time of assembling. Therefore, it is necessary to reduce the weight of each structural member so as to reduce the weight.

【0004】ところで、上記プレキャスト工法において
梁と上下階のプレキャスト柱とを接合する際には、プレ
キャスト柱の底部にスリーブを埋設しておき、このスリ
ーブ内に下階のプレキャスト柱の柱主筋を挿入して接合
するのが一般的である。その際に、柱全体をプレキャス
トコンクリートとすると重量が大きくなり、大容量の重
機が必要となる。それを避けるために、柱の外郭に当た
る部分のみをプレキャスト化して中空プレキャスト柱型
枠(以下、単に中空プレキャスト柱と言う)を形成し、現
場で組み立てた後に残りのコンクリートを打設する方法
が取られる。
By the way, in joining the beams and the precast columns on the upper and lower floors in the above precast method, a sleeve is buried at the bottom of the precast column, and the main reinforcement of the lower precast column is inserted into the sleeve. It is common to join them together. At this time, if the entire column is made of precast concrete, the weight increases, and a heavy-capacity heavy machine is required. In order to avoid this, a method of precasting only the portion corresponding to the outer shell of the column to form a hollow precast column formwork (hereinafter simply referred to as a hollow precast column) and assembling it on site and then casting the remaining concrete is adopted. Can be

【0005】その際における上下階のプレキャスト柱の
接合は、次のような2つの重ね継ぎ手によって実施され
る。
[0005] At this time, the joining of the precast columns on the upper and lower floors is performed by the following two lap joints.

【0006】(1) 柱主筋と帯筋を内蔵すると共に、柱
主筋を柱頭から上階のスラブ面以上に突出させた中空プ
レキャスト柱を立設する。そして、この中空プレキャス
ト柱上にプレキャスト梁の端部を載架して柱・梁接合部
(以下、パネルゾーンと言う)に梁下端主筋,柱主筋およ
び梁上端主筋を配筋し、コンクリートを打設して柱・梁
を一体に接合する。次に、上記スラブ面以上に突出した
柱主筋に上階の中空プレキャスト柱が挿入されて重ね継
ぎ手を構成する。
(1) A hollow precast column having a column main bar and a stirrup built therein and having a column main bar protruding from the column capital beyond the slab surface of the upper floor is erected. Then, place the end of the precast beam on this hollow precast column, and
(Hereinafter referred to as the panel zone) The main bar at the bottom of the beam, the main bar at the column and the main bar at the top of the beam are arranged, concrete is cast, and the column and beam are joined together. Next, a hollow precast pillar on the upper floor is inserted into a pillar main bar projecting above the slab surface to form a lap joint.

【0007】(2) 図8に示すように、柱主筋1aと帯
筋2aを内蔵する中空プレキャスト柱A上にプレキャス
ト梁Bを載架する。そして、パネルゾーンを高さ方向に
貫通する長さを有する縦筋1cとその中間部に巻き付け
られた帯筋2cとから成る上下柱接合用の先組鉄筋C
を、その帯筋2cが上記パネルゾーンに位置するように
してその縦筋1cを中空プレキャスト柱Aの中空部に挿
入させて配筋し、コンクリートを打設する。こうして、
柱・梁を一体に接合した後に、スラブ面上に突出した先
組鉄筋Cに上階の中空プレキャスト柱(図示せず)が挿入
されて重ね継ぎ手を形成する。
(2) As shown in FIG. 8, a precast beam B is mounted on a hollow precast column A containing a column main bar 1a and a band bar 2a. Then, a pre-assembled reinforcing bar C for joining the upper and lower columns, which is composed of a vertical bar 1c having a length penetrating the panel zone in the height direction and a band 2c wound around an intermediate portion thereof.
The longitudinal bar 1c is inserted into the hollow part of the hollow precast column A so that the stirrup 2c is positioned in the panel zone, and the reinforcing bars are arranged, and concrete is poured. Thus,
After joining the columns and beams together, a hollow precast column (not shown) on the upper floor is inserted into a pre-assembled reinforcing bar C protruding on the slab surface to form a lap joint.

【0008】[0008]

【発明が解決しようとする課題】しかしながら、上記従
来のプレキャスト工法における重ね継ぎ手には、以下の
ような問題点がある。 (イ) 上記(1)の重ね継ぎ手の場合 下階の中空プレキャスト柱から突出した柱主筋は上
階の中空プレキャスト柱とかち合う。そのために、下階
の中空プレキャスト柱の柱主筋を、上階の中空プレキャ
スト柱の中空部に容易に挿入できるように内側に曲げ加
工する必要がある。 上述のように柱主筋を内側に曲げ加工しているため
に、パネルゾーンの柱帯筋を取り付ける際には取り付け
位置に応じて帯筋の外径を変える必要がある。 柱頭から突出している柱主筋の長さを、上階の中空
プレキャスト柱との重ね継ぎ手を形成するための長さ分
に加えて、梁の高さ分の長さだけ長く形成する必要があ
る。そのため、中空プレキャスト柱の柱主筋の突出部が
長大となって、中空プレキャスト柱を運搬する際やプレ
キャスト梁や床等の配設の際における作業性が悪い。 上記下階の中空プレキャスト柱の柱主筋と上階の中
空プレキャスト柱の柱主筋との重ね継ぎ手部分において
は、下階の中空プレキャスト柱の柱主筋が上階の中空プ
レキャスト柱の柱主筋の内側に挿入されるので応力中心
距離が短くなる。したがって、内側に位置する下階の中
空プレキャスト柱の重ね継ぎ手部分およびパネルゾーン
内の柱主筋を補強(大径化あるいは高強度化)する必要が
ある。
However, the lap joint in the above-mentioned conventional precast method has the following problems. (A) In the case of the lap joint of (1) above, the pillar main bar projecting from the hollow precast column on the lower floor is in contact with the hollow precast column on the upper floor. For this purpose, it is necessary to bend inward so that the main bar of the hollow precast column on the lower floor can be easily inserted into the hollow portion of the hollow precast column on the upper floor. As described above, since the column main reinforcement is bent inward, when attaching the column reinforcement in the panel zone, it is necessary to change the outer diameter of the reinforcement according to the mounting position. It is necessary to make the length of the pillar main bar projecting from the column capital longer by the length of the beam in addition to the length for forming the lap joint with the hollow precast pillar on the upper floor. For this reason, the protruding portion of the column main reinforcement of the hollow precast column becomes long, and workability is poor when transporting the hollow precast column or arranging the precast beam, the floor, and the like. In the overlapping joint portion between the column main bar of the hollow precast column on the lower floor and the column main bar of the hollow precast column on the upper floor, the column main bar of the hollow precast column on the lower floor is inside the column main bar of the hollow precast column on the upper floor. Since it is inserted, the stress center distance is shortened. Therefore, it is necessary to reinforce (increase the diameter or increase the strength) the lap joint portion of the hollow precast column on the lower floor located inside and the column main reinforcement in the panel zone.

【0009】(ロ) 上記(2)の重ね継ぎ手の場合 一本の中空プレキャスト柱Aは、上側から挿入され
る上側の先組鉄筋Cの縦筋1cと下側から挿入される下
側の先組鉄筋(図示せず)の縦筋とによって重ね継ぎ手を
形成する。そのために、中空プレキャスト柱Aは少なく
とも重ね継ぎ手長さの2倍の長さを必要とする。この重
ね継ぎ手の長さは、鉄筋径“d"を25mmとすると40
d以上必要とし、その結果、階高は2m以上となる。 意匠的な面から、結合された中空プレキャスト柱A
の外面とプレキャスト梁Bの外面とを同一面にする場合
がある。その際には、プレキャスト梁Bの梁主筋の被り
厚さおよびパネルゾーンにおける先組鉄筋Cの縦筋1c
の被り厚さが厚くなるので、剥落の危険性を防止するた
めに補強筋を設ける必要がある。 上記重ね継ぎ手の箇所においては、中空プレキャス
ト柱Aの柱主筋の内側に先組鉄筋Cの縦筋1cが挿入さ
れるので応力中心距離が短くなる。したがって、中空プ
レキャスト柱Aの柱主筋を補強(大径化あるいは高強度
化)する必要がある。
(B) In the case of the lap joint of the above (2), one hollow precast column A is composed of the vertical bar 1c of the upper pre-assembled reinforcing bar C inserted from the upper side and the lower bar 1c inserted from the lower side. A lap joint is formed with a vertical bar of a braided reinforcing bar (not shown). For that purpose, the hollow precast column A needs at least twice the length of the lap joint. The length of the lap joint is 40 when the rebar diameter “d” is 25 mm.
d or more, and as a result, the floor height becomes 2 m or more. Hollow precast pillar A joined from the design point of view
And the outer surface of the precast beam B may be the same. In this case, the thickness of the main reinforcing bar of the precast beam B and the longitudinal reinforcing bar 1c of the pre-assembled reinforcing bar C in the panel zone were measured.
Therefore, it is necessary to provide reinforcing bars in order to prevent the risk of peeling. At the location of the lap joint, the vertical reinforcing bar C of the pre-assembled reinforcing bar C is inserted inside the column main bar of the hollow precast column A, so that the stress center distance is shortened. Therefore, it is necessary to reinforce (increase the diameter or increase the strength) the column main reinforcement of the hollow precast column A.

【0010】そこで、この発明の目的は、中空プレキャ
スト柱から突出する柱主筋の長さを短くでき、階高を低
くでき、結合された中空プレキャスト柱の外面と梁の外
面とを補強筋なしで同一面にでき、重ね継ぎ手を形成す
る際に応力中心距離が短くならない柱・梁の接合工法を
提供することにある。
Accordingly, an object of the present invention is to reduce the length of a main bar projecting from a hollow precast column, reduce the floor height, and connect the outer surface of a joined hollow precast column and the outer surface of a beam without reinforcing bars. An object of the present invention is to provide a method of joining columns and beams that can be formed on the same surface and does not shorten the distance between stress centers when forming a lap joint.

【0011】[0011]

【課題を解決するための手段】上記目的を達成するため
に、請求項1に係る発明の柱・梁の接合工法は、柱頭か
ら長くとも上階のスラブ面まで突出して柱型枠の内壁面
に沿って筒状に固設されている柱主筋及び帯筋を内蔵し
た中空プレキャスト柱をスラブ上に建て込み、下端主筋
およびスターラップ筋が埋設された半プレキャストコン
クリート梁の端部を上記中空プレキャスト柱上に載置し
た後、柱・梁接合部を水平方向に貫通させて上記半プレ
キャストコンクリート梁間に下端連結筋を架け渡し、上
記柱・梁接合部を高さ方向に貫通する長さを有する縦筋
及びこの縦筋を下側で固定して上記中空プレキャスト柱
の柱主筋が形成する筒と同じ寸法の筒を形成する帯筋か
ら成る先組鉄筋の上記帯筋内に,上記柱・梁接合部内に在
る上記中空プレキャスト柱の柱主筋を挿入して配筋し、
上記半プレキャストコンクリート梁に沿って上記柱・梁
接合部を貫通させて、上記スターラップ筋の上辺内側に
上端主筋を配筋し、上記中空プレキャスト柱内,半プレ
キャストコンクリート梁内および柱・梁接合部内にコン
クリートを打設して柱と梁とを一体化することを特徴と
している。
In order to achieve the above object, according to the first aspect of the present invention, there is provided a method for joining a column and a beam, comprising: A hollow precast column with built-in column main bars and stirrups fixed in a cylindrical shape along the slab is built on the slab, and the end of the semi-precast concrete beam in which the lower main bar and stirrup bars are buried is hollow precast. After being placed on a column, the column / beam joint is penetrated in the horizontal direction to bridge the lower end connecting bar between the semi-precast concrete beams, and has a length that penetrates the column / beam joint in the height direction. The column and beam are inserted into the band of the pre-assembled rebar comprising a vertical bar and a bar having the same dimensions as the column formed by the column main bar of the hollow precast column by fixing the vertical bar on the lower side. The hollow plenum in the joint Insert the main bar of the just column and arrange it,
Penetrating the column / beam joint along the semi-precast concrete beam, arranging the upper main bar inside the upper side of the stirrup streak, and inside the hollow precast column, semi-precast concrete beam and column / beam joint It is characterized by casting concrete in the section and integrating the column and the beam.

【0012】また、請求項2に係る発明は、上記請求項
1に係る発明の柱・梁接合工法において、上記先組鉄筋
の縦筋が形成する筒および中空プレキャスト柱の柱主筋
が形成する筒は四角筒であり、上記先組鉄筋における隅
角の縦筋は、上記プレキャスト柱型枠における隅角の柱
主筋を挟むことができるように二重に配筋されているこ
とを特徴としている。
According to a second aspect of the present invention, in the column / beam joining method according to the first aspect of the present invention, the cylinder formed by the vertical reinforcement of the pre-assembled rebar and the column main reinforcement of the hollow precast column. Is a square tube, wherein the vertical bars at the corners of the pre-assembled rebar are doubly arranged so as to sandwich the column main bar at the corners of the precast column formwork.

【0013】[0013]

【実施例】以下、この発明を図示の実施例により詳細に
説明する。本実施例における柱・梁の接合工法は、上・下
階の中空プレキャスト柱と梁とを先組鉄筋で接合する柱
・梁の接合工法である。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, the present invention will be described in detail with reference to the illustrated embodiments. The column / beam joining method in this embodiment is a column / beam joining method in which hollow precast columns and beams on the upper and lower floors are joined by pre-assembled rebar.

【0014】図1および図2は、本実施例における柱・
梁の接合工法によって形成された柱・梁の接合構造の説
明図である。図1および図2に示すように、中空プレキ
ャスト柱11の柱主筋11aは、柱型枠の内壁面に沿っ
て四角筒に固設され、柱頭11bから長くとも上階のス
ラブ面まで突出している。また、上記中空プレキャスト
柱11の柱頭11b上に一端部が載置されてパネルゾー
ンを形成する2本の梁12,13は、下端主筋とスター
ラップ筋12b,13bが埋設された半プレキャストコン
クリート梁である。
FIG. 1 and FIG. 2 show the pillars in this embodiment.
It is explanatory drawing of the joining structure of the column and the beam formed by the joining method of the beam. As shown in FIG. 1 and FIG. 2, the column main reinforcement 11a of the hollow precast column 11 is fixed to a square tube along the inner wall surface of the column form, and protrudes from the column capital 11b to the longest slab surface on the upper floor. . The two beams 12, 13 having one end placed on the capital 11b of the hollow precast column 11 to form a panel zone are semi-precast concrete beams in which a lower main bar and stirrup bars 12b, 13b are embedded. It is.

【0015】本実施例において用いられる先組鉄筋は、
図2に示すように、上記パネルゾーンを高さ方向に貫通
する長さを有する縦筋14aの下側半分を帯筋14bで固
定して四角筒を形成している。そして、この縦筋14a
が形成する四角筒の寸法は上記中空プレキャスト柱の柱
主筋11aが形成する四角筒と同じ寸法になるようにし
ている。このように形成された先組鉄筋14の帯筋14
b内に上記パネルゾーンにおける中空プレキャスト柱1
1の柱主筋11aを挿入し、中空プレキャスト柱11の
柱主筋11aを先組鉄筋の縦筋14aに添わせて、柱主筋
11aの突出部と先組鉄筋14の縦筋14aの下側とで重
ね継ぎ手を形成する。一方、上階のスラブ面から上方に
突出している先組鉄筋14の上側半分には上階の中空プ
レキャスト柱(図示せず)の下部中空部をかぶせて重ね継
ぎ手を形成する。こうして、上記上下階の中空プレキャ
スト柱と2本の梁を接合するのである。
The pre-assembled rebar used in this embodiment is:
As shown in FIG. 2, the lower half of the vertical streak 14 a having a length penetrating the panel zone in the height direction is fixed to the streak 14 b to form a square tube. And this vertical line 14a
Is made to have the same dimensions as the square tube formed by the column main bar 11a of the hollow precast column. The strip bar 14 of the pre-assembled reinforcing bar 14 thus formed
The hollow precast column 1 in the panel zone in b
The first main bar 11a is inserted, and the main bar 11a of the hollow precast column 11 is attached to the vertical bar 14a of the pre-assembled reinforcing bar. Form a lap joint. On the other hand, the lower half of a hollow precast pillar (not shown) on the upper floor is covered on the upper half of the pre-assembled reinforcing bar 14 projecting upward from the slab surface on the upper floor to form an overlapping joint. In this way, the hollow precast columns on the upper and lower floors and the two beams are joined.

【0016】上記先組鉄筋14における縦筋14aの上
端には、フック14cが設けられている。こうして、先
組鉄筋14を上側の中空プレキャスト柱内に挿入する際
における作業性の向上を図っている。
A hook 14c is provided at an upper end of the longitudinal bar 14a of the pre-assembled reinforcing bar 14. Thus, the workability when inserting the pre-assembled rebar 14 into the upper hollow precast column is improved.

【0017】上述のような柱・梁の結合構造において
は、図3(a)に示すように、下階の中空プレキャスト柱
11の柱主筋11aの突出部と先組鉄筋14の下側半分
との重ね継ぎ手の大部分は、上記パネルゾーン内に形成
されている。ここで、重ね継ぎ手長さは中空プレキャス
ト柱11の柱主筋11aの太さ等によって変動する。し
たがって、先組鉄筋14の下側半分と中空プレキャスト
柱11の柱主筋11aとの重ね継ぎ手が、上記パネルゾ
ーン内に収まりきらずに中空プレキャスト柱内に延長さ
れる場合がある。しかしながら、その場合においても、
重ね継ぎ手の大部分はパネルゾーン内に形成されるの
で、中空プレキャスト柱11内に延長される部分の長さ
は全重ね継ぎ手長さよりも十分短い。したがって、本実
施例での中空プレキャスト柱11の長さは少なくとも重
ね継ぎ手長さの2倍からパネルゾーンの高さを差し引い
た長さ以上であればよく、従来の先組鉄筋を使用した場
合よりも階高を低くできる。
In the column / beam joint structure as described above, as shown in FIG. 3 (a), the projecting portion of the column main bar 11a of the hollow precast column 11 on the lower floor and the lower half of the pre-assembled reinforcing bar 14 are formed. Most of the lap joints are formed in the panel zone. Here, the length of the lap joint varies depending on the thickness of the column main bar 11a of the hollow precast column 11, and the like. Therefore, the overlap joint between the lower half of the pre-assembled reinforcing bar 14 and the column main bar 11a of the hollow precast column 11 may be extended into the hollow precast column without fitting into the panel zone. However, even in that case,
Since the majority of the lap joint is formed in the panel zone, the length of the portion extending into the hollow precast column 11 is sufficiently shorter than the length of the entire lap joint. Therefore, the length of the hollow precast column 11 in the present embodiment may be at least a length obtained by subtracting the height of the panel zone from at least twice the length of the lap joint. Can also lower the floor height.

【0018】尚、図3(b)は図3(a)におけるA−A矢視
断面図であり、図3(c)は図3(a)におけるB−B矢視断
面図であり、図3(d)は図3(a)におけるC−C矢視断面
図であり、図3(e)は図3(a)のD−D矢視断面図であ
る。
FIG. 3B is a sectional view taken along the line AA in FIG. 3A, and FIG. 3C is a sectional view taken along the line BB in FIG. 3A. 3 (d) is a sectional view taken along the line CC in FIG. 3 (a), and FIG. 3 (e) is a sectional view taken along the line DD in FIG. 3 (a).

【0019】上述のように、本実施例においては、中空
プレキャスト柱11の柱主筋11aを柱型枠の内側に沿
って四角筒状に固設しており、中空プレキャスト柱11
の柱主筋11aが形成する四角筒の寸法と先組鉄筋14
の縦筋14aが形成する四角筒の寸法とは同じ寸法にな
っている。さらに、柱主筋11aと縦筋14aとの位置関
係は、図3(b)および図3(e)に示すように、重ね継ぎ手
を形成する際に互いに摺接するようになっている。した
がって、先組鉄筋14の縦筋14aと中空プレキャスト
柱の柱主筋11aとは互いが形成する四角筒が同軸にな
るように配筋される。その結果、縦筋14aと柱主筋1
1aとは同じ四角筒の面上に配筋されることになり、重
ね継ぎ手の形成によって応力中心距離は短くならないの
である。したがって、本実施例によれば、上記中空プレ
キャスト柱11の柱主筋11aを補強する必要がない。
As described above, in the present embodiment, the column main reinforcement 11a of the hollow precast column 11 is fixed in a square cylindrical shape along the inside of the column formwork.
Of the square tube formed by the column main reinforcement 11a and the pre-assembled rebar 14
Are the same as the dimensions of the square tube formed by the vertical stripes 14a. Further, as shown in FIGS. 3 (b) and 3 (e), the positional relationship between the column main bar 11a and the vertical bar 14a is such that they are in sliding contact with each other when forming the lap joint. Therefore, the vertical bars 14a of the pre-assembled reinforcing bars 14 and the column main bars 11a of the hollow precast columns are arranged so that the square tubes formed by each other are coaxial. As a result, the vertical bar 14a and the column main bar 1
1a is to be arranged on the surface of the same square tube, and the formation of the lap joint does not shorten the stress center distance. Therefore, according to the present embodiment, there is no need to reinforce the column main bar 11a of the hollow precast column 11.

【0020】また、本実施例における上記パネルゾーン
内に挿入される先組鉄筋14における帯筋設置箇所は重
ね継ぎ手形成箇所を兼ねているので、先組鉄筋14をそ
の分だけ短くして軽く形成できる。したがって、上記中
空プレキャスト柱11と梁12,13とを接合する際
に、先組鉄筋14を人力で搬送でき、接合作業を容易に
実施できる。
In the present embodiment, the location of the straps in the pre-assembled rebar 14 inserted into the panel zone also serves as the lap joint forming location, so that the pre-assembled rebar 14 is shortened by that amount and formed lightly. it can. Therefore, when the hollow precast column 11 and the beams 12, 13 are joined, the pre-assembled rebar 14 can be transported manually, and the joining operation can be easily performed.

【0021】さらに、本実施例における柱・梁の接合構
造によれば、以下のような効果が得られる。図4は上記
パネルゾーンにおける縦断面図である。尚、図4(a)は
本実施例に係る縦断面図であり、図4(b)は従来例にお
ける縦断面図である。
Further, according to the joint structure of the column and the beam in this embodiment, the following effects can be obtained. FIG. 4 is a longitudinal sectional view in the panel zone. 4A is a longitudinal sectional view according to the present embodiment, and FIG. 4B is a longitudinal sectional view in a conventional example.

【0022】図4(b)に示す従来の柱・梁接合工法によっ
て得られる柱・梁の接合構造によれば、パネルゾーン3
1内に挿入されている鉄筋は先組鉄筋34の縦筋34a
のみである。そして、この先組鉄筋34は中空プレキャ
スト柱32の中空部に挿入され、梁35の最外に位置す
る上端主筋35aおよび下端連結筋35bは先組鉄筋34
の縦筋34aよりも内方に位置している。そのために、
上端主筋35a,下端連結筋35bおよび先組鉄筋34の
縦筋34aは共にパネルゾーン31のコンクリート外面
31aからはかなり離れた位置に在る。したがって、最
外に位置する上端主筋35a,下端連結筋35bの被り厚
さd1および先組鉄筋34の縦筋34aの被り厚さd2
大きく、その値が100mmを越える場合には剥落の危険
が生ずるために補強筋36を挿入する必要が生ずるので
ある。
According to the column / beam joining structure obtained by the conventional column / beam joining method shown in FIG.
Reinforcing bars inserted in 1 are longitudinal bars 34a of pre-assembled reinforcing bars 34.
Only. The pre-assembled reinforcing bar 34 is inserted into the hollow portion of the hollow precast column 32, and the uppermost main reinforcing bar 35 a and the lower connecting bar 35 b located at the outermost position of the beam 35 are connected to the pre-assembled reinforcing bar 34.
Is located more inward than the vertical streak 34a. for that reason,
The upper main bar 35a, the lower connecting bar 35b, and the vertical bar 34a of the pre-assembled reinforcing bar 34 are all located far away from the concrete outer surface 31a of the panel zone 31. Thus, the upper end main reinforcement 35a located outermost, thick d 1 and previously set rebar 34 suffers a lower end connected muscle 35b thickness d 2 suffer vertical stripe 34a is large, the spalling if the value exceeds 100mm It is necessary to insert the reinforcement 36 in order to create a danger.

【0023】これに対して、図4(a)においては、下側
の中空プレキャスト柱22の柱主筋22bはパネルゾー
ン21内に突出しており、先組鉄筋24の縦筋24aは
柱主筋22bと同列に配列されている。したがって、柱
主筋22bおよび縦筋24aは図4(b)に示す従来例にお
ける縦筋34aの位置よりも外方に位置することにな
る。その結果、梁25に架け渡された上端主筋25aお
よび下端連結筋25bのうち最外に位置する上端主筋2
5aおよび下端連結筋25bを図4(b)の場合よりも外方
に位置させることができる。したがって、上記梁25の
外面と中空プレキャスト柱22,23の外面22a,23a
とを同一面にする際に、梁25における最外に位置する
上端主筋25aおよび下端連結筋25bの被り厚さ“d1"
を小さくできる。同様に、パネルゾーン21にコンクリ
ートを打設して上記パネルゾーン21のコンクリート外
面21aと中空プレキャスト柱22,23の外面22a,2
3aとを同一面にする際に、パネルゾーン21内におけ
る最外に位置する鉄筋(すなわち、柱主筋22b)の被り
厚さ“d2"も小さくなって中空プレキャスト柱22,2
3と同じ通常の値となる。すなわち、本実施例によれば
補強筋の挿入は不要となるのである。
On the other hand, in FIG. 4 (a), the column main bar 22b of the lower hollow precast column 22 projects into the panel zone 21, and the vertical bar 24a of the pre-assembled rebar 24 is connected to the column main bar 22b. They are arranged in the same row. Therefore, the column main bar 22b and the vertical bar 24a are located outside the position of the vertical bar 34a in the conventional example shown in FIG. As a result, the uppermost main reinforcement 2 located at the outermost position of the upper main reinforcement 25a and the lower connection muscle 25b bridged over the beam 25.
5a and the lower connecting muscle 25b can be positioned more outward than in the case of FIG. 4 (b). Therefore, the outer surface of the beam 25 and the outer surfaces 22a, 23a of the hollow precast columns 22, 23 are provided.
When making the same plane, the thickness “d 1 ” of the covering of the uppermost main reinforcing bar 25 a and the lowermost connecting bar 25 b located at the outermost position in the beam 25.
Can be reduced. Similarly, concrete is poured into the panel zone 21, and the concrete outer surface 21a of the panel zone 21 and the outer surfaces 22a, 2 of the hollow precast columns 22, 23 are cast.
3a, the outermost reinforcing bar (that is, the column main bar 22b) in the panel zone 21 also has a smaller covering thickness "d2", so that the hollow precast columns 22, 2 have the same thickness.
It has the same normal value as 3. That is, according to the present embodiment, the insertion of the reinforcing bar becomes unnecessary.

【0024】上述のような本実施例による柱・梁の接合
構造は、次のような柱・梁の接合工法によって実現でき
る。以下、本実施例における柱・梁の接合工法につい
て、図5に従って詳細に述べる。
The column / beam joining structure according to the present embodiment as described above can be realized by the following column / beam joining method. Hereinafter, the method of joining columns and beams in this embodiment will be described in detail with reference to FIG.

【0025】図5(a)に示すように、柱頭から主筋11
a,11a'が突出した中空プレキャスト柱11,11'を建
て込む。次に、図5(b)に示すように、上記中空プレキ
ャスト柱11,11'間に半プレキャストコンクリート梁
13を架設する。
As shown in FIG. 5 (a), the main streaks 11
A hollow precast pillar 11, 11 'from which a, 11a' protrudes is erected. Next, as shown in FIG. 5B, a semi-precast concrete beam 13 is erected between the hollow precast columns 11, 11 '.

【0026】次に、図5(c)に示すように、パネルゾー
ンを貫通させて半プレキャストコンクリート梁13の間
に下端連結筋15,15'を配筋する。次に、図5(d)に
示すように、上記先組鉄筋14,14'の帯筋14b,14
b'内にパネルゾーンにおける中空プレキャスト柱11,
11'の柱主筋11a,11a'を挿入するようにして、先
組鉄筋14の下側がパネルゾーン内に挿入される。その
際に、最下層の帯筋14b,14b'が下端連結筋15,1
5'に当接することで、図5(e)に示すように、先組鉄筋
14,14'は落下せずに上側半分をパネルゾーンから上
方に突出させて位置決めされる。次に図5(e)に示すよ
うに、半プレキャストコンクリート梁13,13',…に
沿ってパネルゾーンを貫通させて、半プレキャストコン
クリート梁13,13',…のスターラップ筋13b,13
b',…の上辺内側に上端主筋16を配筋する。
Next, as shown in FIG. 5C, lower end connecting bars 15, 15 'are arranged between the semi-precast concrete beams 13 so as to penetrate the panel zone. Next, as shown in FIG. 5 (d), the strip bars 14b, 14
b ′ hollow precast columns 11 in the panel zone,
The lower side of the pre-assembled reinforcing bar 14 is inserted into the panel zone such that the column main bars 11a, 11a 'of 11' are inserted. At this time, the lowermost stirrups 14b, 14b '
By contacting 5 ', as shown in FIG. 5 (e), the pre-assembled reinforcing bars 14, 14' are positioned with the upper half protruding upward from the panel zone without falling. Next, as shown in FIG. 5 (e), the stirrup bars 13b, 13 of the semi-precast concrete beams 13, 13 ',.
b ′,... The upper main bar 16 is arranged inside the upper side.

【0027】次に、図5(f)に示すように、上記中空プ
レキャスト柱11,11'の空間,半プレキャストコンク
リート梁13の空間およびパネルゾーンにコンクリート
17を打設して上階のスラブ面を形成する。次に、図5
(g)に示すように、上記スラブ面から上半分が上方に突
出している先組鉄筋14,14'に上階の中空プレキャス
ト柱18,18'を建て込む。こうして、上下階の中空プ
レキャスト柱11,18と半プレキャストコンクリート
梁13との接合を実施する。
Next, as shown in FIG. 5 (f), concrete 17 is poured into the space of the hollow precast columns 11, 11 ', the space of the semi-precast concrete beam 13, and the panel zone, and the upper slab surface is formed. To form Next, FIG.
As shown in (g), hollow precast columns 18, 18 'on the upper floor are erected on the pre-assembled reinforcing bars 14, 14' whose upper half protrudes upward from the slab surface. Thus, the joining of the hollow precast columns 11 and 18 on the upper and lower floors and the semi-precast concrete beam 13 is performed.

【0028】上述のように、本実施例においては、柱頭
11bから長くとも上階のスラブ面まで突出した柱主筋
11aを有する中空プレキャスト柱11をスラブ上に建
て込む。そして、この中空プレキャスト柱11,11,…
間に半プレキャストコンクリート梁12,13を架設
し、形成されたパネルゾーン内に突出している中空プレ
キャスト柱11の柱主筋11aが先組鉄筋14における
下側半分に巻き付けられた帯筋14b内に挿入されるよ
うにして、中空プレキャスト柱11の柱主筋11aと先
組鉄筋14の縦筋14aとで重ね継ぎ手を形成する。さ
らに、上記先組鉄筋14の上側半分に上階の中空プレキ
ャスト柱を建て込んで重ね継ぎ手を形成する。
As described above, in this embodiment, the hollow precast pillar 11 having the pillar main bar 11a protruding from the capital 11b to the slab surface of the upper floor at the longest is built on the slab. And this hollow precast pillar 11,11, ...
Half precast concrete beams 12 and 13 are erected between them, and the column main reinforcement 11a of the hollow precast column 11 projecting into the formed panel zone is inserted into the band reinforcement 14b wound around the lower half of the pre-assembled reinforcing bar 14. In this way, the lap joint is formed by the column main reinforcement 11a of the hollow precast column 11 and the vertical reinforcement 14a of the pre-assembled reinforcing bar 14. Further, a hollow precast column on the upper floor is erected in the upper half of the pre-assembled reinforcing bar 14 to form a lap joint.

【0029】このように、上記中空プレキャスト柱11
と上側の先組鉄筋14との重ね継ぎ手の大部分をパネル
ゾーン内に形成し、当該中空プレキャスト柱11と下側
の先組鉄筋14との重ね継ぎ手を当該中空プレキャスト
柱11内に形成する。そのために、中空プレキャスト柱
11の長さは少なくとも重ね継ぎ手長さの2倍からパネ
ルゾーンの高さを差し引いた長さ以上在ればよい。した
がって、本実施例によれば、中空プレキャスト柱の長さ
が少なくとも重ね継ぎ手長さの2倍以上必要である従来
の柱・梁の接合工法よりも階高を低くできるのである。
As described above, the hollow precast column 11
Most of the lap joint between the upper pre-assembled reinforcing bar 14 and the upper pre-assembled reinforcing bar 14 is formed in the panel zone, and the lap joint between the hollow precast post 11 and the lower pre-assembled reinforcing bar 14 is formed in the hollow precast post 11. For this purpose, the length of the hollow precast column 11 may be at least as long as the length obtained by subtracting the height of the panel zone from at least twice the length of the lap joint. Therefore, according to the present embodiment, the floor height can be made lower than the conventional column / beam joining method in which the length of the hollow precast column is at least twice the length of the lap joint.

【0030】その際に、上記パネルゾーン内に挿入され
る先組鉄筋14における帯筋14b設置箇所は、中空プ
レキャスト柱11の柱主筋11aとの重ね継ぎ手形成箇
所を兼ねているため、先組鉄筋14をその分だけ短くし
て軽く形成できる。
At this time, the installation location of the strip reinforcement 14b in the pre-assembled rebar 14 inserted into the panel zone also serves as a location for forming a lap joint with the column main reinforcement 11a of the hollow precast column 11, so that the pre-assembled rebar is provided. 14 can be shortened by that much and can be formed lightly.

【0031】また、上記中空プレキャスト柱11の柱主
筋11aは柱型枠の内壁面に沿って固設されており、中
空プレキャスト柱11の柱主筋11aが形成する四角筒
と先組鉄筋14の縦筋14aが形成する四角筒とは同じ
寸法を有する。そして、両四角筒が上記パネルゾーン内
で同軸になるように配筋されるので、縦筋14aと柱主
筋11aは同じ四角筒の面上に配筋されることになり、
先組鉄筋14の挿入によって応力中心距離は短くならな
い。したがって、中空プレキャスト柱11の柱主筋11
aを補強する必要がないのである。
The column main reinforcing bar 11a of the hollow precast column 11 is fixed along the inner wall surface of the column formwork. It has the same dimensions as the square tube formed by the streaks 14a. And since both square pipes are arranged so that they may become coaxial in the above-mentioned panel zone, the vertical bar 14a and the column main bar 11a will be arranged on the same square pipe surface,
The insertion of the pre-assembled rebar 14 does not shorten the stress center distance. Therefore, the column main bar 11 of the hollow precast column 11
There is no need to reinforce a.

【0032】また、上記パネルゾーン内には中空プレキ
ャスト柱11の柱主筋11aが突出しているために、半
プレキャストコンクリート梁12,13の外面とパネル
ゾーンのコンクリート外面と中空プレキャスト柱11の
外面とを同一面にする際に、半プレキャストコンクリー
ト梁12,13に架け渡された最外に位置する上端主筋
16,下端連結筋15の被り厚さおよびパネルゾーンに
おける最外に位置する鉄筋(柱主筋11a)の被り厚さを
薄くできる。したがって、パネルゾーンのコンクリート
面を中空プレキャスト柱11の面と同一面にする際に、
剥落防止のための補強筋を配筋する必要がない。
Also, since the column main reinforcement 11a of the hollow precast column 11 projects into the panel zone, the outer surfaces of the semi-precast concrete beams 12, 13 and the concrete outer surface of the panel zone and the outer surface of the hollow precast column 11 are separated. When making the same plane, the thickness of the outermost upper reinforcing bar 16 and the lowermost connecting bar 15 which are bridged over the semi-precast concrete beams 12 and 13 and the outermost reinforcing bar (column main bar 11a) in the panel zone ) Can be made thinner. Therefore, when making the concrete surface of the panel zone the same as the surface of the hollow precast column 11,
There is no need to arrange reinforcing bars to prevent spalling.

【0033】また、上記先組鉄筋14は、複数の縦筋1
4aを帯筋14bによって筒状に固定して形成されてい
る。したがって、先組鉄筋14をパネルゾーン内に挿入
した際に、半プレキャストコンクリート梁12,13間
に配筋された下端連結筋15に先組鉄筋14の最下層の
帯筋14bが当接して、パネルゾーン内における先組鉄
筋14の位置が正しく設定される。さらに、上記先組鉄
筋14の縦筋14aの上部は、先端を折り曲げてフック
14cを形成している。したがって、先組鉄筋14は上
側の中空プレキャスト柱内に挿入し易い。
Further, the pre-assembled rebar 14 includes a plurality of longitudinal rebars 1.
4a is formed by being fixed in a tubular shape by a band 14b. Therefore, when the pre-assembled reinforcing bar 14 is inserted into the panel zone, the lowermost reinforcing bar 14b of the pre-assembled reinforcing bar 14 abuts against the lower end connecting bar 15 arranged between the semi-precast concrete beams 12, 13. The position of the pre-assembled rebar 14 in the panel zone is set correctly. Further, the upper part of the vertical bar 14a of the pre-assembled reinforcing bar 14 has a hook 14c formed by bending the tip. Therefore, the pre-assembled rebar 14 is easy to insert into the upper hollow precast column.

【0034】上述したように、上記中空プレキャスト柱
11の柱主筋11aと先組鉄筋14の縦筋14aとは、同
一四角筒の面上に配筋されるので、先組鉄筋14の挿入
によって中空プレキャスト柱11の応力中心距離は短く
ならないのである。しかしながら、先組鉄筋14の縦筋
14aの配筋を更に厳密に検討すると、次のような改良
点が潜んでいる。図6は、図3(a)におけるD−D矢視
断面図の例である。図6(a)及び図6(b)において、
先組鉄筋14の縦筋14aが形成する四角筒の隅部に位
置する縦筋14a'は、中空プレキャスト柱11の柱主筋
11aが形成する四角筒の隅に位置する柱主筋11a'の
一側にしか添うことができない。したがって、中空プレ
キャスト柱11に生ずる応力のバランスは、中空プレキ
ャスト柱11のX軸およびY軸に対して不均衡になるの
である。
As described above, the column main reinforcement 11a of the hollow precast column 11 and the vertical reinforcement 14a of the pre-assembled reinforcing bar 14 are arranged on the same square tube surface. The distance between the centers of stress of the precast columns 11 does not become short. However, when the arrangement of the longitudinal bars 14a of the pre-assembled reinforcing bars 14 is more closely examined, the following improvements are lurking. FIG. 6 is an example of a cross-sectional view taken along the line DD in FIG. 6 (a) and 6 (b),
The vertical bar 14a 'located at the corner of the square tube formed by the vertical bar 14a of the pre-assembled reinforcing bar 14 is one side of the column main bar 11a' located at the corner of the square tube formed by the column main bar 11a of the hollow precast column 11. You can only follow. Therefore, the balance of the stress generated in the hollow precast column 11 becomes unbalanced with respect to the X axis and the Y axis of the hollow precast column 11.

【0035】次に、上述した中空プレキャスト柱11に
生ずる応力バランスの不均衡を解消する実施例について
述べる。本実施例における先組鉄筋41の縦筋41aで
は、図7に示すように、縦筋14aが形成する四角筒の
隅角に縦筋41a"を追加して、上記四角筒の隅角の柱主
筋11a'を挟むことができるように縦筋を二重に配筋し
ている。したがって、図7(a)に示す先組鉄筋41を図
7(b)に示す中空プレキャスト柱11に挿入する際に、
図7(c)に示すように、中空プレキャスト柱11の隅角
の柱主筋11a'が先組鉄筋41の隅角の二重に配筋され
た2本の縦筋41a',41a"によって挟みこまれて、上
記先組鉄筋14が形成する四角筒の隣接する2つの側面
における配筋が同じになる。その結果、本実施例によれ
ば、上記中空プレキャスト柱11に生ずる応力のバラン
スが、中空プレキャスト柱11のX軸およびY軸に対し
て均等になるという効果を奏するのである。
Next, a description will be given of an embodiment for eliminating the imbalance of the stress balance generated in the hollow precast column 11 described above. In the vertical bar 41a of the pre-assembled rebar 41 in this embodiment, as shown in FIG. 7, a vertical bar 41a "is added to the corner of the square tube formed by the vertical bar 14a, and The longitudinal bars are double-arranged so that the main bars 11a 'can be sandwiched in. Therefore, the pre-assembled rebar 41 shown in Fig. 7A is inserted into the hollow precast column 11 shown in Fig. 7B. At that time,
As shown in FIG. 7 (c), the pillar main bar 11a 'at the corner of the hollow precast column 11 is sandwiched between two longitudinal bars 41a', 41a "which are double-arranged at the corner of the pre-assembled reinforcing bar 41. As a result, the arrangement of the reinforcing bars on the two adjacent sides of the square tube formed by the pre-assembled reinforcing bars 14 becomes the same, and as a result, according to the present embodiment, the balance of the stress generated in the hollow precast column 11 is reduced. This has the effect of making the hollow precast column 11 uniform with respect to the X axis and the Y axis.

【0036】上記各実施例においては、上記パネルゾー
ン内に設置する先組鉄筋14の帯筋14bは矩形を有す
る複数の帯筋14bを所定間隔で配列して設置している
が、これに限定されるものではない。例えば、1本の鉄
筋をスパイラル状に先組鉄筋14の縦筋14aに巻き付
けてもよい。
In each of the above embodiments, a plurality of strips 14b having a rectangular shape are arranged at predetermined intervals as the strips 14b of the pre-assembled reinforcing bars 14 installed in the panel zone. It is not something to be done. For example, one reinforcing bar may be spirally wound around the vertical bar 14a of the pre-assembled reinforcing bar 14.

【0037】[0037]

【発明の効果】以上より明らかなように、請求項1に係
る発明の柱・梁の接合工法では、柱型枠の内壁面に沿っ
て固設されて筒状を成している柱主筋が柱頭から長くと
も上階のスラブ面まで突出している中空プレキャスト柱
を建て込み、半プレキャストコンクリート梁を架設した
後、柱・梁接合部を水平方向に貫通させて上記半プレキ
ャストコンクリート梁間に下端連結筋を架け渡し、先組
鉄筋における帯筋内に上記柱・梁接合部内に在る上記中
空プレキャスト柱の柱主筋を挿入し、上記半プレキャス
トコンクリート梁に沿って上記柱・梁接合部を貫通させ
て上端主筋を配筋し、上記中空プレキャスト柱内,半プ
レキャストコンクリート梁内および柱・梁接合部内にコ
ンクリートを打設して柱と梁を一体化するので、1本の
中空プレキャスト柱は、上側の先組鉄筋との重ね継ぎ手
の大部分を柱・梁接合部内において形成する一方、下側
の先組鉄筋との重ね継ぎ手を当該中空プレキャスト柱内
において形成する。したがって、この発明によれば、用
いる中空プレキャスト柱の長さは少なくとも重ね継ぎ手
長さの2倍からパネルゾーンの高さを差し引いた長さ以
上を有しておればよく、階高を低くすることが可能とな
る。
As is apparent from the above description, in the column / beam joining method according to the first aspect of the present invention, the column main reinforcement fixed along the inner wall surface of the column form and forming a cylindrical shape is used. A hollow precast column protruding from the capital to the slab surface of the upper floor at the longest is erected, and a semi-precast concrete beam is erected. And insert the column main bar of the hollow precast column in the column / beam joint into the stirrup of the pre-assembled rebar, and penetrate the column / beam joint along the semi-precast concrete beam Reinforce the upper main bar and cast concrete into the hollow precast column, semi-precast concrete beam and column / beam joint to integrate the column and beam, so one hollow precast column Forms the majority of the lap joint with the upper pre-assembled rebar in the column-beam joint, while forming the lap joint with the lower pre-assembled rebar in the hollow precast column. Therefore, according to the present invention, the length of the hollow precast column to be used should be at least twice as long as the length of the lap joint minus the height of the panel zone. Becomes possible.

【0038】さらに、上記中空プレキャスト柱の柱主筋
の突出量は長くとも上階のスラブ面までであるから、柱
主筋の突出量を従来よりも短くできる。さらに、上記中
空プレキャスト柱の柱主筋はパネルゾーン内に突出して
いる。したがって、上記半プレキャストコンクリート梁
の外面とパネルゾーンのコンクリート外面と中空プレキ
ャスト柱の外面とを同一面にする際に、上記半プレキャ
ストコンクリート梁に沿って配筋された最外に位置する
上端主筋,下端連結筋の被り厚さおよび上記パネルゾー
ンにおける最外に位置する鉄筋の被り厚さが薄くなり、
補強筋を配筋する必要がない。
Further, since the projecting amount of the column main reinforcement of the hollow precast column is at most as long as the upper slab surface, the projecting amount of the column main reinforcement can be made shorter than before. Further, the column main reinforcement of the hollow precast column projects into the panel zone. Therefore, when the outer surface of the semi-precast concrete beam and the concrete outer surface of the panel zone and the outer surface of the hollow precast column are flush with each other, the uppermost main reinforcement located at the outermost position arranged along the semi-precast concrete beam, The cover thickness of the lower connecting bar and the cover thickness of the outermost reinforcing bar in the panel zone are reduced,
There is no need to arrange reinforcement.

【0039】さらに、上記中空プレキャスト柱の柱主筋
は柱型枠の内側に沿って筒状に固設される一方、上記先
組鉄筋の縦筋は上記中空プレキャスト柱の柱主筋が形成
する筒と同一寸法を有する筒を形成しているので、上記
縦筋を柱主筋の中へ夫々が形成する筒が同軸になるよう
に挿入した際に、縦筋は柱主筋と同じ筒の面上に配列さ
れる。したがって、上記先組鉄筋の帯筋内に中空プレキ
ャスト柱の柱主筋を挿入して重ね継ぎ手を形成するに際
して応力中心距離が短くなることがなく、上記中空プレ
キャスト柱の柱主筋を補強する必要がない。
Further, the column main reinforcement of the hollow precast column is fixedly provided in a cylindrical shape along the inside of the column formwork, while the vertical reinforcement of the pre-assembled rebar is the same as the cylinder formed by the column main reinforcement of the hollow precast column. Since the tubes having the same dimensions are formed, the vertical bars are arranged on the same cylinder surface as the column main bars when the vertical bars are inserted into the column main bars so that the tubes formed by each become coaxial. Is done. Therefore, when the column main bar of the hollow precast column is inserted into the strip bar of the pre-assembled rebar and the overlap joint is formed, the stress center distance does not become short, and there is no need to reinforce the column main bar of the hollow precast column. .

【0040】また、請求項2に係る発明の柱・梁の接合
工法によれば、四角筒を成す先組鉄筋の隅角に位置する
縦筋を四角筒を成す上記中空プレキャスト柱における隅
角の柱主筋を挟むことができるように二重に配筋してい
るので、上記先組鉄筋の縦筋が形成する四角筒における
隣接する2つの側面上の配筋を同じにできる。したがっ
て、上記中空プレキャスト柱に生ずる応力の分布を、上
記中空プレキャスト柱の側面に垂直な中心線に対して均
衡に保つことができる。
According to the column / beam joining method according to the second aspect of the present invention, the vertical bars located at the corners of the pre-assembled rebar forming the square tube are connected to the corners of the hollow precast column forming the square tube. Since the reinforcing bars are double-arranged so that the column main bars can be sandwiched therebetween, the reinforcing bars on two adjacent side surfaces of the square tube formed by the vertical bars of the pre-assembled rebar can be made the same. Therefore, the distribution of the stress generated in the hollow precast column can be kept balanced with respect to the center line perpendicular to the side surface of the hollow precast column.

【図面の簡単な説明】[Brief description of the drawings]

【図1】この発明の柱・梁の接合工法によって形成され
る柱・梁の接合構造の説明図である。
FIG. 1 is an explanatory view of a column / beam joining structure formed by the column / beam joining method of the present invention.

【図2】図1に続く柱・梁の接合構造の説明図である。FIG. 2 is an explanatory view of a column / beam joining structure following FIG. 1;

【図3】図1および図2に示す柱・梁の接合構造の断面
図である。
FIG. 3 is a cross-sectional view of the column / beam joint structure shown in FIGS. 1 and 2;

【図4】図3とは異なる柱・梁の接合構造におけるパネ
ルゾーンの拡大断面図である。
FIG. 4 is an enlarged sectional view of a panel zone in a column / beam joint structure different from FIG.

【図5】この発明の柱・梁の接合工法を示す図である。FIG. 5 is a view showing a method for joining columns and beams according to the present invention.

【図6】図3(a)におけるD−D矢視断面図の例であ
る。
6 is an example of a cross-sectional view taken along the line DD in FIG. 3 (a).

【図7】先組鉄筋の配筋構造の図6とは異なる例を示す
図および中空プレキャスト柱の柱主筋との関係を示す図
である。
FIG. 7 is a diagram illustrating an example of a reinforcing arrangement of pre-assembled reinforcing bars different from FIG. 6 and a diagram illustrating a relationship between hollow precast columns and column main bars.

【図8】従来の柱・梁の接合構造の説明図である。FIG. 8 is an explanatory view of a conventional column / beam joint structure.

【符号の説明】[Explanation of symbols]

11,22,23…中空プレキャスト柱、11a,22b…
柱主筋、12,13,25…半プレキャストコンクリート
梁、14,24,41…先組鉄筋、 14a,24
a,41a…縦筋、14b,24b,41b…帯筋、
14c…フック、15,25b…下端連結筋、
16,25a…上端主筋。
11, 22, 23 ... hollow precast columns, 11a, 22b ...
Column main reinforcement, 12, 13, 25 ... semi-precast concrete beam, 14, 24, 41 ... pre-assembled rebar, 14a, 24
a, 41a ... vertical streak, 14b, 24b, 41b ... band streak,
14c: hook, 15, 25b: bottom connecting bar,
16, 25a: Upper main bar.

───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.6,DB名) E04B 1/16 E04B 1/20 ──────────────────────────────────────────────────続 き Continued on the front page (58) Field surveyed (Int.Cl. 6 , DB name) E04B 1/16 E04B 1/20

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 柱頭から長くとも上階のスラブ面まで突
出して柱型枠の内壁面に沿って筒状に固設されている柱
主筋および帯筋を内蔵した中空プレキャスト柱型枠をス
ラブ上に建て込み、 下端主筋およびスターラップ筋が埋設された半プレキャ
ストコンクリート梁の端部を上記中空プレキャスト柱型
枠上に載置した後、 柱・梁接合部を水平方向に貫通させて上記半プレキャス
トコンクリート梁間に下端連結筋を架け渡し、 上記柱・梁接合部を高さ方向に貫通する長さを有する縦
筋およびこの縦筋を下側で固定して上記中空プレキャス
ト柱の柱主筋が形成する筒と同じ寸法の筒を形成する帯
筋から成る先組鉄筋の上記帯筋内に、上記柱・梁接合部
内に在る上記中空プレキャスト柱型枠の柱主筋を挿入し
て配筋し、 上記半プレキャストコンクリート梁に沿って上記柱・梁
接合部を貫通させて、上記スターラップ筋の上辺内側に
上端主筋を配筋し、 上記中空プレキャスト柱型枠内,半プレキャストコンク
リート梁内および柱・梁接合部内にコンクリートを打設
して、柱と梁とを一体化することを特徴とする柱・梁の
接合工法。
1. A hollow precast column form including a column main reinforcing bar and a band reinforcing fixed in a cylindrical shape along an inner wall surface of a column form and protruding from a capital to a slab surface of an upper floor at the longest. After placing the end of the semi-precast concrete beam with the bottom main reinforcement and stirrup reinforcement embedded in the hollow precast column formwork, the column-beam joint is penetrated horizontally and the semi-precast A lower connecting bar is bridged between concrete beams, and a vertical bar having a length penetrating the column / beam joint in the height direction, and the vertical bar is fixed at a lower side to form a column main bar of the hollow precast column. Inserting and arranging the column main reinforcement of the hollow precast column formwork in the column / beam joint into the above-mentioned reinforcement of the pre-assembled reinforcing bar comprising the reinforcement having the same dimensions as the cylinder, Half precast concrete Penetrate the column / beam joint along the beam, and arrange the upper main bar inside the upper side of the stirrup streak, inside the hollow precast column formwork, semi-precast concrete beam, and inside the column / beam joint. A method of joining columns and beams, in which concrete is cast into the building and the columns and beams are integrated.
【請求項2】 請求項1に記載の柱・梁接合工法におい
て、 上記先組鉄筋の縦筋が形成する筒および中空プレキャス
ト柱型枠の柱主筋が形成する筒は四角筒であり、 上記先組鉄筋における隅角の縦筋は、上記プレキャスト
柱型枠における隅角の柱主筋を挟むことができるように
二重に配筋されていることを特徴とする柱・梁接合工
法。
2. The column / beam joining method according to claim 1, wherein the tube formed by the longitudinal bars of the pre-assembled rebar and the tube formed by the column main bars of the hollow precast column form are square tubes. A column / beam joining method, wherein the vertical bars at the corners of the braided reinforcing bars are double-arranged so as to sandwich the column main bars at the corners of the precast column formwork.
JP21260693A 1993-08-27 1993-08-27 Column / beam joining method Expired - Fee Related JP2905052B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP21260693A JP2905052B2 (en) 1993-08-27 1993-08-27 Column / beam joining method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP21260693A JP2905052B2 (en) 1993-08-27 1993-08-27 Column / beam joining method

Publications (2)

Publication Number Publication Date
JPH0762731A JPH0762731A (en) 1995-03-07
JP2905052B2 true JP2905052B2 (en) 1999-06-14

Family

ID=16625481

Family Applications (1)

Application Number Title Priority Date Filing Date
JP21260693A Expired - Fee Related JP2905052B2 (en) 1993-08-27 1993-08-27 Column / beam joining method

Country Status (1)

Country Link
JP (1) JP2905052B2 (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4054422B2 (en) * 1997-11-13 2008-02-27 キヤノン株式会社 Camera and interchangeable lens device
CN109281422A (en) * 2018-11-09 2019-01-29 沈阳建筑大学 Prefabricated concrete structure wall-column all steel key connection structure and assembling method
CN109339230A (en) * 2018-11-16 2019-02-15 华侨大学 A kind of prefabricated assembling type reinforced concrete column splicing node structure and its construction method
CN114960936B (en) * 2022-04-06 2023-11-24 南通苏中建设有限公司 Prefabricated frame beam column assembly type node connecting device
CN114658170A (en) * 2022-04-18 2022-06-24 中建八局第二建设有限公司 Large-section reinforcing steel beam positioning device and construction method thereof

Also Published As

Publication number Publication date
JPH0762731A (en) 1995-03-07

Similar Documents

Publication Publication Date Title
JP2905052B2 (en) Column / beam joining method
JP2980793B2 (en) Column / beam joining method
JPH03132532A (en) Construction method of precast reinforced concrete column and beam
JPH066818B2 (en) Reinforced steel composite column
CA3162116C (en) Method for assembling a building using concrete columns
JP3028297B2 (en) Half precast slab and floor structure using the same
JPH06104993B2 (en) Construction method of steel pipe precast concrete columns
JPH0452321Y2 (en)
US11808025B1 (en) Method for assembling a building using concrete columns
JP2592224Y2 (en) Structure of joint between RC beam and steel structure
JP2643641B2 (en) Building method using PC members
JPS6134468Y2 (en)
JPH0588331B2 (en)
JP2984626B2 (en) PC pillar construction method and its PC pillar
JP2004076336A (en) Precast concrete (pc) column, beam-column connection structure, and method for connecting beam and column
JP2002097716A (en) Short support slab supporting structure
JPS6220571Y2 (en)
JP2518568Y2 (en) Connection structure of steel beams to concrete columns
JPH05230935A (en) Precase concrete made beam frame member
JPS5941564A (en) Arranging of reinforcing wire of wall type reinforced concrete structure
JPH0448136B2 (en)
JPH0673785A (en) Steel framed reinforced concrete column and construction of this column and steel skeleton beam
JPH0874381A (en) Reinforcement unit and construction method of reinforced concrete-made building using the same
JPH1181450A (en) Floor/wall type reinforced concrete structure with no beam
JPH0144860B2 (en)

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees