JP2876451B2 - Construction method of L-shaped retaining wall - Google Patents
Construction method of L-shaped retaining wallInfo
- Publication number
- JP2876451B2 JP2876451B2 JP35527393A JP35527393A JP2876451B2 JP 2876451 B2 JP2876451 B2 JP 2876451B2 JP 35527393 A JP35527393 A JP 35527393A JP 35527393 A JP35527393 A JP 35527393A JP 2876451 B2 JP2876451 B2 JP 2876451B2
- Authority
- JP
- Japan
- Prior art keywords
- retaining wall
- shaped retaining
- foundation
- reinforcing bar
- cast
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Retaining Walls (AREA)
Description
【0001】[0001]
【産業上の利用分野】道路、宅地造成などの築造に用い
られるL形擁壁の構築工法。[Industrial application] Construction method of L-shaped retaining wall used for construction of roads and residential land.
【0002】[0002]
【従来技術】従来のL形擁壁を道路、宅地造成などに用
いるときは図1に示すように、まづ、L形擁壁101の
底面101b相当幅だけ掘削した後、該底面101bに
基礎杭103を少なくとも2本打ち込む。つぎに、該基
礎杭103に鉄筋104を植え込んだ後、基礎コンクリ
ート102を打設する。2. Description of the Related Art As shown in FIG. 1, when a conventional L-shaped retaining wall is used for the construction of a road or a residential land, first, after excavating a width equivalent to the bottom surface 101b of the L-shaped retaining wall 101, a foundation is formed on the bottom surface 101b. At least two piles 103 are driven. Next, after the reinforcing bar 104 is implanted in the foundation pile 103, the foundation concrete 102 is cast.
【0003】最後にL形擁壁101を基礎コンクリート
102上に載置固定する。ところで、このような従来工
法では、基礎杭103を2本を打ち込むだけのL形擁壁
101は底面幅を必要とする。したがって、基礎杭10
3を2本の打ち込むだけの幅に対応するだけの掘削幅W
1を要することになる。したがって、L形擁壁1の底面
1bの幅が大きくなるとともに掘削幅W1はかなり大き
なものになるという問題点を残している。[0003] Finally, an L-shaped retaining wall 101 is placed and fixed on a foundation concrete 102. By the way, in such a conventional construction method, the L-shaped retaining wall 101 in which only two foundation piles 103 are driven requires a bottom width. Therefore, the foundation pile 10
Excavation width W only corresponding to the width of just driving two 3
1 would be required. Therefore, there is a problem that the width of the bottom surface 1b of the L-shaped retaining wall 1 is increased and the excavation width W1 is considerably increased.
【0004】[0004]
【発明が解決しようとする課題】道路、宅地造成工事な
どにおいて、L形擁壁を構築するとき、L形擁壁の構築
のための掘削幅を可及的小さくすること。SUMMARY OF THE INVENTION When constructing an L-shaped retaining wall in a road or a residential land development, etc., the excavation width for constructing the L-shaped retaining wall is made as small as possible.
【0005】[0005]
【技術的手段】第1工程として、L形擁壁1の底面1b
相当幅だけの地盤を掘削し、第2工程として、掘削部底
面に1本の基礎杭3を打ち込んだ後、該基礎杭3に水平
状の基礎鉄筋4aと、垂直状の上部鉄筋4bとからなる
鉄筋4を植え込み、[Technical Means] As the first step, the bottom surface 1b of the L-shaped retaining wall 1
After excavating the ground of a considerable width, and as a second step, driving one foundation pile 3 into the bottom of the excavation part, the foundation pile 3 is made up of a horizontal foundation reinforcing bar 4a and a vertical upper reinforcing bar 4b. The rebar 4
【0006】第3工程として基礎鉄筋4aを埋蔵する基
礎コンクリート を打設し、第4工程として、L形擁壁
1の鉄筋挿通孔1hに上部鉄筋4bを挿通しながら、L
形擁壁1を基礎コンクリート2上に載置固定し、第5工
程として、上部鉄筋4bを垂直から水平に折り曲げて場
所打ちコンクリート5を上部鉄筋4bを埋蔵するように
打設する、L形擁壁の構築工法。In a third step, a foundation concrete for burying the base reinforcing bar 4a is cast, and in a fourth step, while the upper reinforcing bar 4b is inserted into the reinforcing bar insertion hole 1h of the L-shaped retaining wall 1, the L is inserted.
The L-shaped retaining wall 1 is placed and fixed on the foundation concrete 2 and, as a fifth step, the upper reinforcing bar 4b is bent from vertical to horizontal and the cast-in-place concrete 5 is cast so as to bury the upper reinforcing bar 4b. Wall construction method.
【0007】[0007]
【作用】基礎杭3は1本だけですむので、L形擁壁構築
のため掘削幅が従来に比べ小さくなる。また、基礎コン
クリート2、場所打ちコンクリート5に基礎鉄筋4a、
上部鉄筋4bを埋設するので、L形擁壁1の安定度も充
分である。[Function] Since only one foundation pile 3 is required, the excavation width becomes smaller than before because of the construction of the L-shaped retaining wall. In addition, the basic concrete 2, the cast-in-place concrete 5, the basic reinforcing steel 4a,
Since the upper reinforcing bar 4b is embedded, the stability of the L-shaped retaining wall 1 is also sufficient.
【0008】[0008]
【実施例】以下、本発明工法の実施例を図面に基づいて
説明する。本発明工法はL型擁壁として図1に示す従来
工法に用いられたものに比べて、底面1bの幅の小さい
ものを用いる。また底面1bには図4(a)(b)に示
すようにその中央に鉄筋挿通孔1hを設けるか、あるい
は、図4(c)のように、両側に半円状の鉄筋挿通孔1
h,1hを設ける。DESCRIPTION OF THE PREFERRED EMBODIMENTS Embodiments of the method of the present invention will be described below with reference to the drawings. In the method of the present invention, an L-shaped retaining wall having a smaller width of the bottom surface 1b than that used in the conventional method shown in FIG. 1 is used. Further, the bottom surface 1b is provided with a reinforcing bar insertion hole 1h at the center thereof as shown in FIGS. 4 (a) and 4 (b), or as shown in FIG.
h, 1h.
【0009】第1工程:まづ、L形擁壁1の底面1bの
幅に相当する分だけの掘削を行なう。図3においてWは
本発明工法における掘削幅を示す。First step: First, excavation is performed by an amount corresponding to the width of the bottom surface 1b of the L-shaped retaining wall 1. In FIG. 3, W indicates the excavation width in the method of the present invention.
【0010】第2工程:つぎに図2のように掘削部底面
に1本の基礎杭3を打ち込んだ後、該基礎杭3に鉄筋4
を植え込む。鉄筋4は水平の基礎鉄筋4aと垂直の上部
鉄筋4bとからなる。Second step: Next, as shown in FIG. 2, one foundation pile 3 is driven into the bottom of the excavated portion, and
Implant. The reinforcing bar 4 includes a horizontal base reinforcing bar 4a and a vertical upper reinforcing bar 4b.
【0011】第3工程: つぎに図2 のように基礎コンクリート2を打設し、基
礎鉄筋4aを基礎コンクリート2内に埋蔵せしめる。Third step: Next, as shown in FIG. 2, the foundation concrete 2 is cast, and the foundation reinforcement 4a is embedded in the foundation concrete 2.
【0012】第4工程: つぎに図 3に示すように上部鉄筋4bをその鉄筋挿通
孔1hに挿通しながら、L形擁壁1を基礎コンクリート
2上に載置固定する。Fourth step: Next, as shown in FIG. 3, the L-shaped retaining wall 1 is placed and fixed on the foundation concrete 2 while the upper reinforcing bar 4b is inserted into the reinforcing bar insertion hole 1h.
【0013】第5工程:つぎに図 3に示すように上部
鉄筋4bを垂直から水平に折り曲げた後、場所打ちコン
クリート5を打設する。場所打ちコンクリート5はL形
擁壁1の鉄筋挿通孔1hに流入し、基礎コンクリート
2、L形擁壁1と固結一体化される。図5は図3のf5
−f5矢視図である。本発明工法においては基礎杭3は
1本だけですむのでその掘削幅は従来のW1に比べWに
縮小される。Fifth step: Next, as shown in FIG. 3, the upper reinforcing bar 4b is bent from vertical to horizontal, and then cast-in-place concrete 5 is cast. The cast-in-place concrete 5 flows into the reinforcing bar insertion hole 1h of the L-shaped retaining wall 1 and is consolidated and integrated with the foundation concrete 2 and the L-shaped retaining wall 1. FIG. 5 shows f5 in FIG.
It is an arrow f5 view. In the method of the present invention, only one foundation pile 3 is required, so that the excavation width is reduced to W compared to the conventional W1.
【0014】[0014]
【発明の効果】基礎鉄筋4aが基礎コンクリート2に、
上部鉄筋4bが場所打ちコンクリート5内に埋蔵され、
かつ、場所打ちコンクリート5は基礎コンクリート2お
よびL形擁壁1と固結一体化されるので、1本の基礎杭
のみで充分にL形擁壁の安定が保てる。According to the present invention, the foundation rebar 4a is used for the foundation concrete 2.
The upper reinforcing bar 4b is buried in the cast-in-place concrete 5,
Moreover, since the cast-in-place concrete 5 is consolidated and integrated with the foundation concrete 2 and the L-shaped retaining wall 1, the stability of the L-shaped retaining wall can be sufficiently maintained with only one foundation pile.
【図1】 従来のL形擁壁の構築工法の断面図、FIG. 1 is a cross-sectional view of a conventional construction method of an L-shaped retaining wall,
【図2】 第1、第2、第3工程の断面図、FIG. 2 is a cross-sectional view of first, second, and third steps;
【図3】 第4、第5工程の断面図、FIG. 3 is a sectional view of fourth and fifth steps,
【図4】 (a) 鉄筋挿通孔1hが中央にある場合のL形擁壁1
の平面図、 (b) 図4(a)の4b−4b矢視図、 (c) 同じく鉄筋挿通孔1hが両側に半円状に配置さ
れたときの平面図、FIG. 4 (a) L-shaped retaining wall 1 when reinforcing bar insertion hole 1h is at the center
(B) a view taken in the direction of arrows 4b-4b in FIG. 4 (a), (c) a plan view when the rebar insertion holes 1h are similarly arranged on both sides in a semicircle,
【図5】 図3f5−f5矢視図、FIG. 5 is a view taken in the direction of arrows in FIGS.
1:L型擁壁 1b:底面 1h:鉄筋挿通孔 2:基礎コンクリート 3:基礎杭 4:鉄筋 4a:基礎鉄筋 4b:上部鉄筋 5:場所打
ちコンクリート 101:L型擁壁 101b:底面 102:基
礎コンクリート 103:基礎杭 104:鉄筋 W,W1:掘
削幅1: L-shaped retaining wall 1b: Bottom 1h: Reinforcement insertion hole 2: Foundation concrete 3: Foundation pile 4: Reinforcement 4a: Foundation reinforcement 4b: Top reinforcement 5: Cast-in-place concrete 101: L-type retaining wall 101b: Bottom 102: Foundation Concrete 103: Foundation pile 104: Rebar W, W1: Excavation width
Claims (1)
1hを穿設したものを用い、 第1工程として、L形擁壁1の底面1b相当幅だけの地
盤を掘削し、 第2工程として、掘削部底面に1本の基礎杭3を打ち込
んだ後、該基礎杭3に水平状の基礎鉄筋4aと、垂直状
の上部鉄筋4bとからなる鉄筋4を植え込み、第3工程
として基礎鉄筋4aを埋蔵する基礎コンクリート2を打
設し、 第4工程として、L形擁壁1の鉄筋挿通孔1hに上部鉄
筋4bを挿通しながら、L形擁壁1を基礎コンクリート
2上に載置固定し、 第5工程として、上部鉄筋4bを垂直から水平に折り曲
げて場所打ちコンクリート5を上部鉄筋4bを埋蔵する
ように打設する、L形擁壁の構築工法。1. An L-shaped retaining wall 1 having a bottom surface 1b provided with a reinforcing bar insertion hole 1h is used. As a first step, a ground having a width equivalent to the width of the bottom surface 1b of the L-shaped retaining wall 1 is excavated. As a process, after one foundation pile 3 is driven into the bottom of the excavation part, a reinforcement 4 composed of a horizontal foundation reinforcement 4a and a vertical upper reinforcement 4b is implanted into the foundation pile 3, and a foundation is formed as a third step. The foundation concrete 2 for burying the reinforcing bar 4a is cast. As a fourth step, the L-shaped retaining wall 1 is placed on the foundation concrete 2 while the upper reinforcing bar 4b is inserted into the reinforcing-bar insertion hole 1h of the L-shaped retaining wall 1. As a fifth step, an L-shaped retaining wall construction method in which the upper reinforcing bar 4b is bent from vertical to horizontal and the cast-in-place concrete 5 is cast so as to bury the upper reinforcing bar 4b.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP35527393A JP2876451B2 (en) | 1993-12-30 | 1993-12-30 | Construction method of L-shaped retaining wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP35527393A JP2876451B2 (en) | 1993-12-30 | 1993-12-30 | Construction method of L-shaped retaining wall |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH07197478A JPH07197478A (en) | 1995-08-01 |
JP2876451B2 true JP2876451B2 (en) | 1999-03-31 |
Family
ID=18442975
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP35527393A Expired - Lifetime JP2876451B2 (en) | 1993-12-30 | 1993-12-30 | Construction method of L-shaped retaining wall |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2876451B2 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6568147B1 (en) * | 2000-11-09 | 2003-05-27 | John Eugene Sumner, Sr. | Method and system for emplacing mobile and modular constructions |
-
1993
- 1993-12-30 JP JP35527393A patent/JP2876451B2/en not_active Expired - Lifetime
Also Published As
Publication number | Publication date |
---|---|
JPH07197478A (en) | 1995-08-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP2876451B2 (en) | Construction method of L-shaped retaining wall | |
JPS58120924A (en) | Block for assembling retaining wall | |
JPH09209377A (en) | Constructing method for l-shaped retaining wall | |
JP2927727B2 (en) | Construction method of underground structure | |
JP3059058U (en) | Solid foundation structure with stabilizer | |
JPH0721196B2 (en) | Reverse construction method of underground structure | |
JPS6117696A (en) | Construction of underground head | |
JP3026134B2 (en) | How to build underground structures under roads | |
JP2797066B2 (en) | Solid foundation method with stabilizer | |
JP2824217B2 (en) | Construction method of retaining wall and retaining material for retaining wall | |
JP2001003376A (en) | L-shaped retaining wall block and its execution method | |
JPH0726569A (en) | Pile foundation construction method for structure exposed to partial earth pressure | |
JP3306372B2 (en) | Construction method of L-shaped retaining wall | |
JP3328580B2 (en) | Construction method of L-shaped retaining wall | |
JP2565452B2 (en) | Construction method of self-supporting retaining wall | |
JPH11323966A (en) | Footing block for retaining wall | |
JPH0813405A (en) | Widening construction of road | |
JP4097646B2 (en) | Concrete wall | |
JP2003336254A (en) | Concrete pile and construction method of foundation structure by use thereof | |
JP2022091053A (en) | Reinforcement body of earth retaining wall, and installation method of reinforcement body | |
JPH06212648A (en) | Foundation construction | |
JPS6024249B2 (en) | How to build a basement | |
JPS6241833A (en) | Construction of side ditch | |
JP2524892B2 (en) | Building foundation method | |
JPH05230842A (en) | Construction method of underground structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080122 Year of fee payment: 9 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Year of fee payment: 10 Free format text: PAYMENT UNTIL: 20090122 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Year of fee payment: 10 Free format text: PAYMENT UNTIL: 20090122 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100122 Year of fee payment: 11 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Year of fee payment: 11 Free format text: PAYMENT UNTIL: 20100122 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Year of fee payment: 12 Free format text: PAYMENT UNTIL: 20110122 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Year of fee payment: 13 Free format text: PAYMENT UNTIL: 20120122 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120122 Year of fee payment: 13 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Year of fee payment: 14 Free format text: PAYMENT UNTIL: 20130122 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20140122 Year of fee payment: 15 |
|
EXPY | Cancellation because of completion of term |