JP2818305B2 - Roof panel hanging jig - Google Patents

Roof panel hanging jig

Info

Publication number
JP2818305B2
JP2818305B2 JP40210690A JP40210690A JP2818305B2 JP 2818305 B2 JP2818305 B2 JP 2818305B2 JP 40210690 A JP40210690 A JP 40210690A JP 40210690 A JP40210690 A JP 40210690A JP 2818305 B2 JP2818305 B2 JP 2818305B2
Authority
JP
Japan
Prior art keywords
roof panel
eaves
hanging
ridge
jig
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP40210690A
Other languages
Japanese (ja)
Other versions
JPH04216761A (en
Inventor
章洋 藤原
知昭 吉澤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Panasonic Electric Works Co Ltd
Original Assignee
Matsushita Electric Works Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Matsushita Electric Works Ltd filed Critical Matsushita Electric Works Ltd
Priority to JP40210690A priority Critical patent/JP2818305B2/en
Publication of JPH04216761A publication Critical patent/JPH04216761A/en
Application granted granted Critical
Publication of JP2818305B2 publication Critical patent/JP2818305B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、屋根パネルの吊下げ施
工治具に関し、詳しくはその葺設作業を容易迅速におこ
なえるようにしようと技術に係るものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a jig for suspending a roof panel, and more particularly, to a technique for easily and quickly performing a roofing operation.

【0002】[0002]

【従来の技術】従来、基材の表面に瓦板が葺設された屋
根パネルを施工(葺設)するのに、吊下げ金具を基材の
側端部に係止してクレーンにて吊下げ、そして、屋根上
において所定位置よりややずれた位置で吊下げ金具を外
し、その後、人手で屋根パネルを横(棟長さ)方向に移
動させて瓦板を隣接の屋根パネルに重ねて、所定位置に
屋根パネルを葺設するものである。
2. Description of the Related Art Conventionally, when constructing (roofing) a roof panel in which a tile plate is laid on the surface of a base material, a hanging bracket is locked to a side end of the base material and suspended by a crane. Lowering, and remove the hanging bracket at a position slightly off the predetermined position on the roof, and then manually move the roof panel in the horizontal (ridge length) direction and stack the tiles on the adjacent roof panel, A roof panel is laid at a predetermined position.

【0003】[0003]

【発明が解決しようとする課題】ところがこのような手
段のものにおいては、屋根パネルを所定位置からずらし
た位置に仮置きし、その後、人手で所定位置に移動させ
るものであり、その作業が面倒であり、屋根パネルの施
工性が低いという問題があった。本発明はこのような問
題を解消しようとするものであり、その目的とするとこ
ろは、クレーンによる吊下げ作業にて葺設作業がおこな
え、人手により屋根パネルを移動させて位置合わせをお
こなう作業を回避し、施工性を大幅に高めることができ
る屋根パネルの吊下げ施工治具を提供するにある。
However, in such means, the roof panel is temporarily placed at a position shifted from a predetermined position, and then is manually moved to the predetermined position. However, there is a problem that the workability of the roof panel is low. The present invention is intended to solve such a problem, and an object of the present invention is to perform a roofing operation by a hanging operation using a crane, and to perform an operation of manually moving a roof panel and performing positioning. An object of the present invention is to provide a jig for hanging a roof panel, which can avoid the problem and can greatly enhance workability.

【0004】[0004]

【課題を解決するための手段】本発明の屋根パネルの吊
下げ施工治具は、基材1の表面に瓦板2が葺設されると
もにその施工状態において瓦板2が妻方向において重ね
られる屋根パネルの吊下げ施工治具であって、基材1の
両方の妻側で軒棟方向に長い妻側端部材7,7の軒側及
び棟側端部において略水平方向に吊下げ孔3が貫通さ
れ、妻側端部材7の下面及び両側面を抱持するU字型の
治具本体8に略水平方向に貫通する通孔9が形成され、
治具本体8を妻側端部材7の軒側及び棟側端部において
抱持させるとともに通孔9と吊下げ孔3とに挿抜自在に
保持ピン10が挿入され、クレーンからの吊下げワイヤ
ー12が係着される係着部11が治具本体8から軒棟方
向に延出されて成ることを特徴とするものである。
According to the jig for hanging a roof panel of the present invention, a tile 2 is laid on the surface of a base material 1 and the tile 2 is stacked in the direction of the wife in the construction state. A jig for hanging a roof panel, comprising: a pair of hanging ends 3 that are long in the direction of the eaves on both ends of the base material 1 and extend substantially horizontally in the eaves side and the end of the eaves side of the eaves side. Is penetrated, and a through-hole 9 is formed in the U-shaped jig main body 8 holding the lower surface and both side surfaces of the wife side end member 7 so as to penetrate in a substantially horizontal direction.
The jig body 8 is held at the eaves side and the ridge side end of the wife side end member 7, and the holding pin 10 is inserted into the through hole 9 and the hanging hole 3 so as to be freely inserted and removed, and the hanging wire 12 from the crane Is attached to the jig body 8 in the direction of the eaves ridge.

【0005】[0005]

【作用】このように、基材1の両方の妻側で軒棟方向に
長い妻側端部材7,7の軒側及び棟側端部において略水
平方向に吊下げ孔3が貫通され、妻側端部材7の下面及
び両側面を抱持するU字型の治具本体8に略水平方向に
貫通する通孔9が形成され、治具本体8を妻側端部材7
の軒側及び棟側端部において抱持させるとともに通孔9
と吊下げ孔3とに挿抜自在に保持ピン10が挿入され、
クレーンからの吊下げワイヤー12が係着される係着部
11が治具本体8から軒棟方向に延出されることによっ
て、基材1の妻側端部材7の軒側及び棟側端部におい
て、略U字型の治具本体8を下方から抱持し、保持ピン
10を治具本体8の通孔9及び妻側端部材7の吊下げ孔
3に挿通し、係着部11にクレーンの吊下げワイヤー1
2を係着し、かかる吊下げ状態で、屋根パネルAの妻方
向の位置決めをおこない、かかる位置決め状態で屋根パ
ネルAを下降させて、基材1の表面に葺設されて妻方向
に突出している瓦板2を隣接の屋根パネルAに重ねて葺
設するのであり、かかる場合、保持ピン10を抜き、治
具本体8を妻側端部材7の長さ方向の端部に向けてスラ
イドさせて外し、このように屋根パネルAの施工におい
て屋根パネルAの妻方向の位置合わせを人手でおこなう
のを回避するようにしたものである。
As described above, the hanging holes 3 are penetrated substantially horizontally in the eaves side and the ridge side ends of the end sides 7 and 7 which are long in the eaves ridge direction on both ends of the base material 1. A through hole 9 is formed in the U-shaped jig body 8 holding the lower surface and both side surfaces of the side end member 7 so as to penetrate the jig body 8 in a substantially horizontal direction.
And eaves 9
And the holding pin 10 is inserted into the hanging hole 3 so as to be freely inserted and removed,
The attachment portion 11 to which the hanging wire 12 from the crane is attached is extended from the jig body 8 in the eaves ridge direction, so that the eaves side and the ridge end of the end member 7 of the base material 1 at the eaves side end member 7. , The jig body 8 having a substantially U-shape is held from below, and the holding pin 10 is inserted through the through hole 9 of the jig body 8 and the hanging hole 3 of the end member 7 on the side of the crane. Hanging wire 1
In this suspended state, the roof panel A is positioned in the wife direction, and the roof panel A is lowered in such a positioned state to be laid on the surface of the base material 1 and project in the wife direction. In this case, the holding pin 10 is pulled out and the jig body 8 is slid toward the end of the end member 7 in the longitudinal direction. In this way, it is possible to avoid manually positioning the roof panel A in the wife direction in the construction of the roof panel A.

【0006】[0006]

【実施例】屋根パネルAは棟から軒に至る長さにしてあ
るが、その長さは短くしてもよいものである。そして屋
根パネルAは枠材が枠組みされた基材1としてのパネル
枠4の上面に瓦板2がその軒側部分が露出するように積
層されて葺設されている。屋根パネルAの軒側端部及び
片側の妻側端部から瓦板2が突出されている。そして、
基材1の両方の妻側で軒棟方向に長い妻側端部材7,7
の軒側及び棟側端部において略水平方向に吊下げ孔3が
貫通されている。
DESCRIPTION OF THE PREFERRED EMBODIMENTS Although the length of the roof panel A is from the ridge to the eaves, the length may be shortened. The roof panel A has a tiled board 2 laminated and roofed on the upper surface of a panel frame 4 as a base material 1 on which a frame material is framed so that the eaves side portion is exposed. The tile panel 2 protrudes from the eaves-side end of the roof panel A and one end of the roof panel A. And
Wife-side end members 7, 7 long on both wife sides of the base material 1 in the eaves ridge direction
At the eaves side and the ridge side end, a suspension hole 3 is penetrated in a substantially horizontal direction.

【0007】治具本体8は、妻側端部材7の下面及び両
側面を抱持するU字型に形成され、この治具本体8に略
水平方向に貫通する通孔9が形成されている。そして治
具本体8にはそのU字型の溝方向、つまり軒棟方向に係
着部11が延出され、これが立ち上げられていて、クレ
ーン側の吊下げワイヤー12が係着できるようにしてあ
る。具体的には板材をコ字型に折曲した抱持部材13に
曲成した丸棒材14を溶接して施工治具15が構成され
る。
The jig main body 8 is formed in a U-shape to hold the lower surface and both side surfaces of the end member 7, and the jig main body 8 is formed with a through hole 9 penetrating in a substantially horizontal direction. . The jig body 8 has an engaging portion 11 extending in the U-shaped groove direction, that is, in the direction of the eaves ridge. The engaging portion 11 is raised, and the hanging wire 12 on the crane side can be engaged. is there. Specifically, a construction jig 15 is formed by welding a round bar material 14 bent to a holding member 13 obtained by bending a plate material into a U-shape.

【0008】しかして、治具本体8を妻側端部材7の軒
側及び棟側端部において抱持させるとともに通孔9と吊
下げ孔3とに挿抜自在に保持ピン10を挿入し、クレー
ン操作により吊下げワイヤー12を介して屋根パネルA
を吊下げ、かかる吊下げ状態で、屋根パネルAの妻方向
の位置決めをおこない、かかる位置決め状態で屋根パネ
ルAを下降させて、基材1の表面に葺設されて妻方向に
突出している瓦板2を隣接の屋根パネルAの被重ね部6
に重ねて葺設するのであり、このように屋根パネルAの
施工において屋根パネルAの妻方向の位置合わせを人手
でおこなうのを回避するものである。そして、被重ね部
6には防水シート16は貼着されているものである。
Thus, the jig main body 8 is held at the eaves side and the ridge side end of the wife side end member 7, and the holding pins 10 are inserted into the through holes 9 and the suspension holes 3 so as to be freely inserted and removed, and the crane Roof panel A through the suspension wire 12 by operation
In such a suspended state, the roof panel A is positioned in the end direction, and the roof panel A is lowered in the positioned state, and the roof tile that is laid on the surface of the base material 1 and protrudes in the end direction. Plate 2 is overlapped with adjacent roof panel A
In this way, it is possible to avoid manually positioning the roof panel A in the wife direction in the construction of the roof panel A. The waterproof sheet 16 is attached to the overlapped portion 6.

【0009】[0009]

【発明の効果】本発明は上述のように、基材の両方の妻
側で軒棟方向に長い妻側端部材の軒側及び棟側端部にお
いて略水平方向に吊下げ孔が貫通され、妻側端部材の下
面及び両側面を抱持するU字型の治具本体に略水平方向
に貫通する通孔が形成され、治具本体を妻側端部材の軒
側及び棟側端部において抱持させるとともに通孔と吊下
げ孔とに挿抜自在に保持ピンが挿入され、クレーンから
の吊下げワイヤーが係着される係着部が治具本体から軒
棟方向に延出されるから、基材の妻側端部材の軒側及び
棟側端部において、略U字型の治具本体を下方から抱持
し、保持ピンを治具本体の通孔及び妻側端部材の吊下げ
孔に挿通し、係着部にクレーンの吊下げワイヤーを係着
し、かかる吊下げ状態で、屋根パネルの妻方向の位置決
めをおこない、かかる位置決め状態で屋根パネルを下降
させて、基材の表面に葺設されて妻方向に突出している
瓦板を隣接の屋根パネルに重ねて葺設するのであり、か
かる場合、保持ピンを抜き、治具本体を妻側端部材の長
さ方向の端部に向けてスライドさせて外し、このように
屋根パネルの施工において屋根パネルの妻方向の位置合
わせを人手でおこなうのを回避することができ、その施
工性を大幅に高めることができるという利点がある。
As described above, according to the present invention, the hanging holes are penetrated substantially horizontally in the eaves side and the ridge side end of the eaves side end member which is long in the eaves ridge direction on both ends of the base material, A through hole is formed in the U-shaped jig body that holds the lower surface and both side surfaces of the wife side end member in a substantially horizontal direction, and the jig body is disposed at the eaves side and the ridge side end of the wife side end member. The holding pin is inserted into the through hole and the hanging hole so that it can be inserted and pulled out, and the hanging part from which the hanging wire from the crane is hooked extends from the jig body toward the eaves ridge. At the eaves side and the ridge side end of the end member on the eaves side, the substantially U-shaped jig body is held from below, and the holding pins are inserted into the through holes of the jig body and the hanging holes of the end member on the wife side. Insert the crane's suspending wire into the engaging section, and position the roof panel in the direction of the wife in the suspended state. The roof panel is lowered in the positioning state, and the tiles that are laid on the surface of the base material and protruding in the wife direction are overlaid on the adjacent roof panel, and in this case, the holding pins are pulled out, The jig body is slid toward the longitudinal end of the end member on the wife side and removed, thus avoiding manual alignment of the roof panel in the wife direction in the construction of the roof panel. There is an advantage that the workability can be greatly improved.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の一実施例を示す一部省略した斜視図で
ある。
FIG. 1 is a partially omitted perspective view showing an embodiment of the present invention.

【図2】同上の治具本体の正面図である。FIG. 2 is a front view of the jig body according to the first embodiment.

【図3】同上の治具本体の側面図である。FIG. 3 is a side view of the jig main body.

【図4】同上の保持ピンの正面図である。FIG. 4 is a front view of the holding pin.

【図5】同上の施工状態の斜視図である。FIG. 5 is a perspective view of the same working state.

【図6】同上の施工状態の説明図である。FIG. 6 is an explanatory diagram of a construction state of the above.

【図7】同上の部分断面図である。FIG. 7 is a partial sectional view of the same.

【符号の説明】[Explanation of symbols]

1 基材 2 瓦板 3 吊下げ孔 7 妻側端部材 8 治具本体 9 通孔 10 保持ピン 11 係着部 12 吊下げワイヤー DESCRIPTION OF SYMBOLS 1 Base material 2 Tile plate 3 Hanging hole 7 Wife end member 8 Jig main body 9 Through hole 10 Holding pin 11 Engagement part 12 Hanging wire

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 基材の表面に瓦板が葺設されるともにそ
の施工状態において瓦板が妻方向において重ねられる屋
根パネルの吊下げ施工治具であって、基材の両方の妻側
で軒棟方向に長い妻側端部材の軒側及び棟側端部におい
て略水平方向に吊下げ孔が貫通され、妻側端部材の下面
及び両側面を抱持するU字型の治具本体に略水平方向に
貫通する通孔が形成され、治具本体を妻側端部材の軒側
及び棟側端部において抱持させるとともに通孔と吊下げ
孔とに挿抜自在に保持ピンが挿入され、クレーンからの
吊下げワイヤーが係着される係着部が治具本体から軒棟
方向に延出されて成ることを特徴とする屋根パネルの吊
下げ施工治具。
1. A jig for hanging a roof panel on which tiles are laid on the surface of a base material and in which state the tiles are stacked in the direction of the wives, wherein the jigs are provided on both wives sides of the base material. At the eaves side and the ridge side end of the eaves side end member that is long in the eaves ridge direction, a suspension hole is penetrated in a substantially horizontal direction, and a U-shaped jig body holding the lower surface and both side surfaces of the wife side end member is provided. A through hole penetrating in a substantially horizontal direction is formed, the jig body is held at the eaves side and the ridge side end of the wife end member, and a holding pin is inserted into the through hole and the hanging hole so as to be freely inserted and removed, A jig for hanging a roof panel, wherein an engaging portion to which a hanging wire from a crane is attached extends from the jig body toward the eaves ridge.
JP40210690A 1990-12-14 1990-12-14 Roof panel hanging jig Expired - Fee Related JP2818305B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP40210690A JP2818305B2 (en) 1990-12-14 1990-12-14 Roof panel hanging jig

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP40210690A JP2818305B2 (en) 1990-12-14 1990-12-14 Roof panel hanging jig

Publications (2)

Publication Number Publication Date
JPH04216761A JPH04216761A (en) 1992-08-06
JP2818305B2 true JP2818305B2 (en) 1998-10-30

Family

ID=18511920

Family Applications (1)

Application Number Title Priority Date Filing Date
JP40210690A Expired - Fee Related JP2818305B2 (en) 1990-12-14 1990-12-14 Roof panel hanging jig

Country Status (1)

Country Link
JP (1) JP2818305B2 (en)

Also Published As

Publication number Publication date
JPH04216761A (en) 1992-08-06

Similar Documents

Publication Publication Date Title
JP2818305B2 (en) Roof panel hanging jig
JPH04221160A (en) Suspension execution jig for roof panel
JP3025202U (en) Scaffolding work floor gap cover
JP2004346601A (en) Hanger for unit panel, and unit panel construction method
JP2628759B2 (en) Panel lifting jig and panel lifting method
JP7169632B2 (en) sling
JP2556387Y2 (en) Wall panel steady rest jig
JPH06136957A (en) Suspending structure for roof panel body
JP2553094Y2 (en) Roof panel suspension
JP2553092Y2 (en) Roof panel suspension
JPH0683686U (en) Floor panel hanger
JP2534194Y2 (en) Roof panel suspension
JP3013841B1 (en) Wing structure
JP3391555B2 (en) Roof replacement structure and stool stand
JP2553091Y2 (en) Roof panel suspension
JP2001164750A (en) Cloth frame with board
JPH11256788A (en) Construction jig for roof panel
JP4074864B2 (en) Ceiling board temporary fixing tool
JP2021123923A (en) Attaching metal fitting
JPH0682298U (en) Extension pipe for handrails of frame scaffolding
JPH11117464A (en) Water-proofing structure for roof on outer wall edge of building
JP2557144Y2 (en) Roof panel suspension support structure
JPH1037419A (en) Device for hanging roof panel
JPH10219838A (en) Ridge part side hanging structure of roof panel
JPH10196029A (en) Roof structure and work execution method therefor

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 19980804

LAPS Cancellation because of no payment of annual fees