JPH10219838A - Ridge part side hanging structure of roof panel - Google Patents

Ridge part side hanging structure of roof panel

Info

Publication number
JPH10219838A
JPH10219838A JP2756397A JP2756397A JPH10219838A JP H10219838 A JPH10219838 A JP H10219838A JP 2756397 A JP2756397 A JP 2756397A JP 2756397 A JP2756397 A JP 2756397A JP H10219838 A JPH10219838 A JP H10219838A
Authority
JP
Japan
Prior art keywords
hanging
ridge
locking member
roof panel
metal hanger
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP2756397A
Other languages
Japanese (ja)
Inventor
Takeshi Saito
健 齊藤
Shogo Matsumura
昭吾 松村
Kazushi Yamashita
一志 山下
Tsuyoshi Mochiine
都世志 用稲
Shuichi Motohashi
修一 本橋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NIKKEN BIRUKON KK
Original Assignee
NIKKEN BIRUKON KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NIKKEN BIRUKON KK filed Critical NIKKEN BIRUKON KK
Priority to JP2756397A priority Critical patent/JPH10219838A/en
Publication of JPH10219838A publication Critical patent/JPH10219838A/en
Withdrawn legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To improve working efficiency by providing a metal hanger lock member on a ridge wrapping installing backing material so as to connect two ridge part side end parts of rafters to each other and installing a ridge part metal hanger on this metal hanger lock member free to connect and disconnect. SOLUTION: A ridge part metal hanger 29 free to connect and disconnect is fixed on a wire 26 by providing a metal hanger lock member 15 on a ridge wrapping installing backing material 8 installed so as to connect ridge part side end parts of at least two pieces of rafters 5 of a unitized roof panel 3. Thereafter, at the time of hanging down the roof panel 3, a lower part of the ridge part metal hanger 29 is fitted into a square hole of the metal hanger lock member 15 and connected to it by a connecting pin 16, and hanging work is carried out in an upward position where the ridge part metal hanger 29 does not mar a roofing 7, etc. Thereafter, after hanging in the roof panel 3 on purlins of a roof truss, the ridge part metal hanger 29 becoming useless is separated from the metal hanger lock member 15 by operation from the ground side. Consequently, it is possible to facilitate hanging work.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】この発明は、垂木、野地板を
はじめ屋根葺き材まで仕上げたユニット部材としての屋
根パネルを、先行して構築された小屋組の屋根面へ、全
て地上側からのクレーン等による吊り込み作業として施
工するための吊り手段、特に棟包みの取付け下地材を利
用して棟部側を吊る棟部側吊り構造の技術分野に属す
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a crane from the ground side, in which a roof panel as a unit member finished with a roofing material such as a rafter, a field board, and the like is mounted on a roof surface of a previously constructed hut. The present invention belongs to the technical field of a ridge side suspension structure for suspending a ridge side by using a hanging means for constructing as a hanging operation by using a mounting base material of a wrapper.

【0002】[0002]

【従来の技術】近年、建築を可能な限り工場生産化する
目的で建築部材のユニット化、機能複合化がめざましく
進展している。屋根構造に関しても、垂木、野地板をは
じめ屋根葺き材その他の必要関連部品の全てを仕上げた
ユニット部材としての屋根パネルが種々公知である。ま
た、こうした屋根パネルの吊り具、吊り構造も種々開発
されている(例えば特開平5ー214771号、特開平
5ー222773号、特開平6ー10463号、特開平
6ー136957号、特許第2510794号などを参
照)。
2. Description of the Related Art In recent years, unitization and functional integration of building members have been remarkably progressing in order to produce buildings as much as possible in factories. Regarding the roof structure, various types of roof panels are known as unit members in which all necessary related parts such as rafters, floor boards, roofing materials, and the like are finished. Also, various types of hanging devices and hanging structures for such a roof panel have been developed (for example, JP-A-5-214771, JP-A-5-222773, JP-A-6-10463, JP-A-6-136957, and JP2510794). Issue).

【0003】上述した各従来技術の開発目標は、屋根パ
ネルを安全に吊り込むこと、及び屋根パネルの特に軟弱
な屋根葺き材などを損傷させないこと、等々に重点があ
ると理解される。しかしながら、これらの従来技術で
は、屋根職人が小屋組の上に上り、吊り込んだ屋根パネ
ルから吊り金物を取り外す作業、及び屋根パネルと屋根
パネルの間の雨仕舞いのため接合処理を行う必要があっ
た。
[0003] It is understood that the development goals of each of the prior art described above are focused on safely hanging the roof panel, and not damaging the particularly soft roofing material of the roof panel. However, in these conventional techniques, it is necessary for the roofer to climb on the hut, remove the hanging hardware from the suspended roof panel, and perform the joining process because of the rainfall between the roof panels. Was.

【0004】建物の屋根の構築に関しては、不順な天候
に左右されない施工を行うため1日で完成できることが
是非にも望まれる。また、その施工法として屋根の上に
屋根職人が上って作業することを不要とし、特別な技術
や職方(屋根職人)を必要とせず、一般作業員による施
工が出来ることも強く望まれている。こうした開発目標
を達成するためには、屋根パネルを、葺き材のほか止
水、水切り等の必要関連部品の全てが一枚のパネルにユ
ニット化された構成にすることが肝要である。そして、
同屋根パネルの吊り込みと吊り金物に関しては、吊り金
物は用済み後に地上からの簡単な操作で屋根パネルから
離脱させることができ、しかも敷設された屋根パネルの
接合部や棟部分の完全な雨仕舞いのために別途接合部材
等を取り付ける必要がない構造が望まれる。ところで、
図1に各構成要素を分解状態で示した、ユニット化屋根
パネルによる屋根構造の場合、ユニット化屋根パネル3
は、垂木5、野地板6のほか屋根葺き材7(金属瓦)ま
で仕上げたユニット部材として構成され(図2参照)、
図1の例では屋根の棟から軒先まで連続した長さにユニ
ット化されている。屋根の構法としては、まず小屋組1
を先行して構築し、その屋根面の母屋2の上に複数のユ
ニット化屋根パネル3を予め決められた順序で規則的に
吊り込み、位置決め固定した後に、棟に棟包み4、4′
をやはり吊り込んで設置する。
[0004] With regard to the construction of the roof of a building, it is highly desirable that the construction can be completed in one day in order to carry out construction not affected by unfavorable weather. In addition, it is strongly desired that the construction method can be performed by general workers without requiring a roof craftsman to work on the roof, requiring no special skills or craftsman (roofer). ing. In order to achieve these development goals, it is imperative that the roof panel be constructed in such a way that all necessary parts such as roofing material, water stoppage, drainage, etc. are unitized into one panel. And
Regarding the hanging of the roof panel and the hanging hardware, the hanging hardware can be detached from the roof panel by simple operation from the ground after use, and complete rainfall at the joint of the laid roof panel and the ridge part. A structure that does not need to separately attach a joining member or the like for closing is desired. by the way,
In the case of a roof structure with unitized roof panels in which each component is shown in an exploded state in FIG.
Is configured as a unit member that has been completed to the roofing material 7 (metal tile) in addition to the rafter 5, the ground board 6, and the like (see FIG. 2).
In the example of FIG. 1, the unit is unitized to have a continuous length from the roof ridge to the eaves. As for the roof construction method,
And a plurality of unitized roof panels 3 are regularly suspended in a predetermined order on the roof purlin 2 and fixed in position.
Is also suspended and installed.

【0005】前記棟包み4、4′の設置手段はこれまで
にも種々考案され実施されている。その一手段として、
図3と図6に示したものは、ユニット化された屋根パネ
ル3の少なくとも2本の隣り合う垂木5、5の棟部側端
部間を連結するように棟包みの取付け下地材8を複数の
木ネジ14で取付け固定する。一方、予め棟包み4又は
4′のブラケット10へダブルナット11で上部を固定
した連結ボルト12の下部を、前記取付け下地材8の下
縁へ引っ掛けて止めた受け金具9のボルト孔へ通し、下
方からナット13を締め付けて固定する。図6中の符号
25は棟部の換気部材であり、多数の通気孔を有する。
[0005] Various means have been devised and implemented for installing the ridges 4, 4 '. As one means,
3 and 6 show a plurality of mounting base materials 8 of a ridge wrapping so as to connect at least two ridge side ends of adjacent rafters 5, 5 of a unitized roof panel 3. FIG. And fix it with wood screws 14. On the other hand, the lower part of the connection bolt 12, the upper part of which has been previously fixed to the bracket 10 of the ridge packet 4 or 4 ′ with the double nut 11, is passed through the bolt hole of the receiving bracket 9 which has been hooked and stopped on the lower edge of the mounting base material 8. The nut 13 is tightened and fixed from below. Reference numeral 25 in FIG. 6 denotes a ridge ventilation member having a large number of ventilation holes.

【0006】棟包み4の上述した設置手段によれば、棟
包みの取付け下地材8を垂木5へ取り付ける分だけ部品
費と手間を要するが、一方では下地材8の長さ(通例5
0cm弱)の範囲内であれば、棟包み4又は4′のブラケ
ット10の位置が多少ずれても取付けを行える融通性が
ある。また、両側の屋根パネル3、3の垂木端面の間の
狭い場所での取付け作業を回避できるので、施工上に至
便でもある。
According to the above-described means for installing the ridge parcel 4, the parts cost and labor are required for mounting the ridge parcel mounting base material 8 to the rafter 5, but the length of the base material 8 (usually 5
Within a range of less than 0 cm), there is versatility to mount even if the position of the bracket 10 of the ridge packet 4 or 4 'is slightly shifted. In addition, installation work can be avoided in a narrow place between the end faces of the rafters of the roof panels 3 on both sides, which is convenient for construction.

【0007】[0007]

【本発明が解決しようとする課題】そこで本発明の目的
は、上記のように屋根パネルにわざわざ取り付けられる
棟包みの取付け下地材を出来るだけ活用する方策とし
て、同下地材を利用して吊る屋根パネルの棟部側吊り構
造を提供することである。
SUMMARY OF THE INVENTION Accordingly, an object of the present invention is to provide a roof that is suspended using the base material as a measure to utilize as much as possible the base material of the ridge wrapper that is purposely mounted on the roof panel as described above. An object of the present invention is to provide a ridge-side suspension structure for panels.

【0008】[0008]

【課題を解決するための手段】上述の課題を解決するた
めの手段として、請求項1記載の発明に係る屋根パネル
の棟部側吊り構造は、ユニット化された屋根パネルの少
なくとも2本の垂木の棟部側端部間を連結するように取
付けられた棟包みの取付け下地材に吊り金具係止部材が
設けられていること、前記吊り金具係止部材へ着脱自在
な棟部吊り金物はクレーンのワイヤーに止着されてお
り、前記吊り金具係止部材との連結手段が設けられてい
ること、前記棟部吊り金物と吊り金具係止部材との連結
は地上側から解除操作が可能であり、同連結の解除によ
って吊り金具係止部材と棟部吊り金物とは離脱すること
を特徴とする。
According to another aspect of the present invention, there is provided a roof panel ridge side suspension structure according to the present invention, wherein at least two rafters of a unitized roof panel are provided. A hanging metal latch member is provided on a mounting base material of a ridge packet attached so as to connect between the ridge side end portions of the ridge portion, and a ridge hanging metal detachable to the hanging metal latch member is a crane. Is fixed to the wire of the above, the connection means with the hanging metal locking member is provided, the connection between the ridge hanging metal object and the hanging metal locking member can be released from the ground side can be released operation The hanging metal latch member and the ridge hanging metal piece are detached by releasing the connection.

【0009】請求項2記載の発明は、請求項1に記載し
た吊り金具係止部材が、棟包みの取付け下地材の前面へ
鉛直方向に貫通する孔を形成する筒形部材として設けら
れ、棟部吊り金物の下部は前記吊り金具係止部材の孔へ
嵌まる大きさ、形状に形成されており、両者の連結手段
として吊り金具係止部材及び棟部吊り金物双方の共通な
位置に水平方向に連結ピンを通すピン孔が設けられてお
り、連結ピンの先端部に前記ピン孔の口径よりも大径に
膨らんだ抜け止めバネが取付けられていることを特徴と
する。
According to a second aspect of the present invention, the hanging member locking member according to the first aspect is provided as a cylindrical member having a vertically penetrating hole formed in a front surface of a mounting base material of the ridge package. The lower part of the hanging member is formed in a size and shape to fit into the hole of the hanging member locking member, and is connected to a common position of both the hanging member locking member and the ridge part hanging member as a connecting means for the two. And a pin hole through which the connecting pin is passed, and a retaining spring bulging to a diameter larger than the diameter of the pin hole is attached to the tip of the connecting pin.

【0010】請求項3記載の発明は、請求項2に記載し
た棟部部吊り金物と吊り金具係止部材との連結を解除す
る手段として、連結ピンの頭部に地上へ届く長さの引き
抜き用ロープが止着されており、一方、地上側から操作
する長い操作管の上端に吊り金具係止部材に反力をとる
反力受けが設けられ、且つ前記ロープの引張りガイドを
備えた連結解除工具が使用されることを特徴とする。
According to a third aspect of the present invention, as the means for releasing the connection between the ridge portion hanging hardware and the hanging metal fitting locking member according to the second aspect, the length of the connecting pin is extended to reach the head to the ground. A rope is fixed on the upper end of a long operation tube operated from the ground side, a reaction force receiving member for taking a reaction force on a hanging metal locking member is provided, and the rope is provided with a pulling guide for releasing the connection. A tool is used.

【0011】[0011]

【発明の実施形態及び実施例】本願発明は、図1に各構
成要素を分解状態で示した、ユニット化屋根パネル3に
よる屋根の構築に好適に実施される。図2は、前記屋根
パネル3の軒先側と棟側の双方をクレーンのワイヤー2
6で吊り、小屋組の屋根面の傾斜に沿う姿勢とした吊り
状態を示している。屋根パネル3の軒先側には軒先部吊
り金物22を使用し、薄鋼板などから成る屋根葺き材7
を傷つけないようにパネル端縁から長く突き出た位置を
吊る。棟側には棟部吊り金物29を使用し、やはり屋根
葺き材7や野地板6を傷つけない態様で吊る。軒先部吊
り金物22及び棟部吊り金物29はそれぞれ、クレーン
のワイヤー26の端末へシャックル27によって止着さ
れており、クレーン作業において繰り返し使用が可能と
されている。
BEST MODE FOR CARRYING OUT THE INVENTION The present invention is suitably applied to the construction of a roof by a unitized roof panel 3 in which each component is shown in an exploded state in FIG. FIG. 2 shows a crane wire 2 on both the eaves side and the ridge side of the roof panel 3.
6 shows a suspended state in a posture of hanging along the inclination of the roof surface of the hut group. On the eaves side of the roof panel 3, eaves hanging hardware 22 is used, and a roofing material 7 made of a thin steel plate or the like is used.
Hang the position protruding long from the panel edge so as not to damage the panel. The ridge side hanging hardware 29 is used on the ridge side, and the roofing material 7 and the field board 6 are also hung in a manner not to damage. The eaves hanging hardware 22 and the ridge hanging hardware 29 are each fixed to the terminal of the wire 26 of the crane by the shackle 27, and can be repeatedly used in crane work.

【0012】ちなみに軒先部吊り金物22を使用する軒
先側吊り金具係止部材20たるC形鋼等の補強用軽量形
鋼は、屋根パネル3の垂木5の側面に沿って同垂木の軒
先部分に必要な長さに付設されている。図2に示した軒
先部吊り金物22は、軒先側吊り金具係止部材20の溝
内へ挿入し、同吊り金具係止部材22の先端部に突設し
た抜け止め突起21を軒先部吊り金物22の掛け止め孔
23へ嵌めてロックされる。板バネ24が軒先部吊り金
物22を起こす作用によって前記のロック状態が常時保
持される。軒先部吊り金物22の先端部に設けた孔18
へロープ19が止着され、該ロープ19を地上側から強
く引き下げることによって前記抜け止め突起21が掛け
止め孔23から外れ、更に軒先部吊り金物22を吊り金
具係止部材20から抜き外すことができる。
Incidentally, a light-weight reinforcing steel such as a C-shaped steel as the eave-side hanging metal fitting locking member 20 using the eave-side hanging metal fitting 22 is provided along the side surface of the rafter 5 of the roof panel 3 at the eaves of the same rafter. It is attached to the required length. The eaves hanging hardware 22 shown in FIG. 2 is inserted into the groove of the eaves side hanging metal locking member 20, and the retaining projection 21 projecting from the tip of the hanging metal locking member 22 is attached to the eaves hanging metal. It is fitted into the latch hole 23 of 22 and locked. The above-mentioned locked state is always maintained by the action of the leaf spring 24 raising the eaves hanging hardware 22. Hole 18 provided at the tip of eaves hanging hardware 22
When the rope 19 is fastened and the rope 19 is strongly pulled down from the ground side, the retaining projection 21 is detached from the latch hole 23, and the eaves hanging hardware 22 is further removed from the hanging metal fitting member 20. it can.

【0013】さて、請求項1記載の発明に係る屋根パネ
ルの棟部側吊り構造は、上述のようにユニット化された
屋根パネル3の少なくとも2本の垂木5、5の棟部側端
部間を連結するように取付けられた棟包みの取付け下地
材8に吊り金具係止部材15が設けられる(図3参
照)。一方、前記吊り金具係止部材15へ着脱自在な棟
部吊り金物29はクレーンのワイヤー26に止着されて
おり、前記吊り金具係止部材15との連結手段として連
結ピン16が設けられている。前記棟部吊り金物29と
吊り金具係止部材15との連結は後述するように地上側
から解除操作が可能に構成され、同連結の解除によって
吊り金具係止部材15と棟部吊り金物29とは離脱する
構成で実施される。
According to the first aspect of the present invention, the ridge side suspension structure of the roof panel is provided between the ridge side ends of at least two rafters 5, 5 of the roof panel 3 unitized as described above. Are attached to the mounting base material 8 of the ridge package attached so as to connect the hooks (see FIG. 3). On the other hand, a ridge hanging part 29 detachable from the hanging part locking member 15 is fixed to a wire 26 of a crane, and a connecting pin 16 is provided as connecting means with the hanging part locking member 15. . The connection between the ridge hanging member 29 and the hanging member locking member 15 is configured to be released from the ground side as described later, and by releasing the connection, the hanging member locking member 15 and the ridge hanging member 29 are connected. Is implemented in a detachable configuration.

【0014】更に具体的に図3以下に示した実施例を説
明する。1枚の屋根パネル3の下面に、勾配方向に長
く、幅方向には一例として45cmの間隔で5本平行に配
置された垂木5のうち、両側2本ずつの垂木5、5の棟
部側端部間を連結する態様で棟包みの取付け下地材8が
両サイドに1個ずつ合計2個取付けられる(図3)。下
地材8は鋼板の加工品であり、両端部を複数の木ネジ1
4で垂木5に強く固定される。
The embodiment shown in FIG. 3 and subsequent figures will be described more specifically. On the lower surface of one roof panel 3, among the rafters 5, which are long in the gradient direction and are arranged in parallel in the width direction at an interval of 45 cm as an example, two rafters 5 on each side, and the ridge side of the five rafters A total of two mounting base materials 8 are mounted on both sides, one on each side, in a manner to connect the ends (FIG. 3). The base material 8 is a processed product of a steel plate.
At 4, it is strongly fixed to the rafter 5.

【0015】前記棟包み下地材8の前面に、吊り金具係
止部材15が、鉛直方向に貫通する角孔15aを形成す
る筒形部材として一体的に設けられている。これに対し
て、棟部吊り金物29は、その下半部が、前記吊り金具
係止部材15が形成する角孔15aへ嵌まる大きさ、形
状に形成されている。さらに、両者の連結手段として、
吊り金具係止部材15及び棟部吊り金物29双方の側面
の共通な位置に、両者を連結する連結ピン16を水平方
向に通すピン孔17、28が設けられている。なお、吊
り金具係止部材15のピン孔17は、棟部吊り金物29
のピン孔28との位置合わせを容易にするため、上下方
向に少し長い長孔状に設けられている。棟部吊り金物2
9の前面には、吊り金具係止部材15への嵌め込み深さ
を規制するストッパ30が設けられている。前記連結ピ
ン16の先端部には、吊り金具係止部材15のピン孔1
7の口径よりも大径に膨らんだ抜け止めバネ31が取付
けられている。
On the front surface of the ridge base material 8, a suspending member locking member 15 is integrally provided as a tubular member forming a square hole 15a penetrating in the vertical direction. On the other hand, the ridge hanging member 29 is formed in such a size and shape that the lower half thereof fits into the square hole 15a formed by the hanging member locking member 15. Furthermore, as a connecting means of both,
Pin holes 17 and 28 are provided at a common position on the side surfaces of both the hanging metal latch member 15 and the ridge hanging metal fitting 29 so as to horizontally pass a connecting pin 16 connecting the two. The pin hole 17 of the hanging member locking member 15 is
In order to facilitate the alignment with the pin hole 28, it is provided in the shape of a long hole slightly longer in the vertical direction. Ridge hanging hardware 2
On the front surface of the stopper 9, a stopper 30 for regulating the fitting depth to the hanging fitting locking member 15 is provided. At the tip of the connecting pin 16, a pin hole 1
A retaining spring 31 swelled to a diameter larger than the diameter of 7 is attached.

【0016】従って、屋根パネル3を吊り上げる際に
は、図2〜図4に示したように、棟部吊り金物29の下
部を吊り金具係止部材15の角孔15aの中へ嵌め込
み、両者のピン孔17と28の位置を合わせ、連結ピン
16を水平に通して連結する。そうすると、連結ピン1
6の抜け止めバネ31の抜け止め作用により安全な吊り
作業を行える。棟部吊り金物29は屋根葺き材(瓦)7
や野地板6を傷つけない上向き姿勢で吊り作業が行なわ
れる(図2、図4)。
Accordingly, when the roof panel 3 is lifted, as shown in FIGS. 2 to 4, the lower portion of the ridge hanging metal fitting 29 is fitted into the square hole 15a of the hanging metal fitting locking member 15, and both of them are fitted. The positions of the pin holes 17 and 28 are aligned, and the connection pins 16 are passed horizontally to be connected. Then, connecting pin 1
The safe suspending operation can be performed by the retaining action of the retaining spring 31 of FIG. The ridge hanging hardware 29 is a roofing material (tile) 7
The hanging operation is performed in an upward posture that does not damage the ground plate 6 (FIGS. 2 and 4).

【0017】次に、図4のように小屋組1の母屋2上に
屋根パネル3を吊り込み、位置決め固定をした後、無用
となった棟部吊り金物29を地上側からの操作で吊り金
具係止部材15と分離する手段、即ち、棟部部吊り金物
29と吊り金具係止部材15との連結を解除する手段と
して、前記連結ピン16の頭部(環状部)に地上側から
引張り操作するロープ36が地上へ届く長さのものとし
て止着されている(図3)。一方、地上側から作業員が
操作する連結解除工具は図5A,Bの構成で用意され
る。その構成は、地上の作業員が手に持って支持する長
い操作管32の上端に、上述した棟包み下地材8の吊り
金具係止部材15へ下方から嵌めて反力をとる、上向き
に溝形を成す反力受け33が設けられ、該反力受け33
から横方向へ突き出された腕34の先端部に前記連結ピ
ン16のロープ36の引張りガイド35を備えている。
Next, as shown in FIG. 4, after the roof panel 3 is hung on the purlin 2 of the hut assembly 1 and fixed in position, the unnecessary ridge hanging hardware 29 is lifted by operation from the ground side. As means for separating from the locking member 15, that is, means for releasing the connection between the ridge part hanging hardware 29 and the hanging fitting locking member 15, a pulling operation is performed on the head (annular portion) of the connecting pin 16 from the ground side. Rope 36 is fastened to reach the ground (FIG. 3). On the other hand, a disconnection tool operated by an operator from the ground side is prepared in the configuration shown in FIGS. 5A and 5B. The structure is such that an upward groove is formed by fitting the upper end of the long operation tube 32 held by the worker on the ground to the hanging metal latching member 15 of the above-described wrapping base material 8 from below to take a reaction force. A reaction force receiver 33 having a shape is provided.
A pulling guide 35 for a rope 36 of the connecting pin 16 is provided at the tip of an arm 34 protruding laterally from the arm.

【0018】要するに、地上側の作業員が手で支えた操
作管32の反力受け33を吊り金具係止部材15へ嵌め
込み十分な反力を確保する。また、引張りガイド35へ
は連結ピン16のロープ36を通す。そして、地上へ届
いたロープ36を強く引くと、引張りガイド35の位置
で屈曲し連結ピン16と同じ水平方向になったロープの
強い引張力により、抜け止めバネ31を縮めつつ連結ピ
ン16を抜くことができ、棟部吊り金物29を吊り金具
係止部材15から分離できるのである。
In short, the reaction force receiver 33 of the operation tube 32 supported by the worker on the ground side is fitted into the suspension fitting locking member 15 to secure a sufficient reaction force. The rope 36 of the connecting pin 16 is passed through the pulling guide 35. When the rope 36 reaching the ground is pulled strongly, the connecting pin 16 is pulled out while contracting the retaining spring 31 by the strong tensile force of the rope bent at the position of the pulling guide 35 and in the same horizontal direction as the connecting pin 16. Therefore, the ridge hanging metal fitting 29 can be separated from the hanging metal fitting locking member 15.

【0019】[0019]

【本発明が奏する効果】本発明に係る屋根パネルの棟部
側吊り構造によれば、葺き材のほか止水、水切り等の必
要関連部品の全てを一枚のパネルにユニット化した構成
の屋根パネルを対象にして、軟弱な葺き材等を一切傷つ
けない吊り込み作業ができる。そして、屋根パネルの吊
り込み設置を行った後に無用となった棟部吊り金物は、
地上からロープを引く等の簡単な操作で手際良く簡単、
確実に屋根パネルから離脱させることができる。従っ
て、屋根の施工に際して屋根の上に屋根職人が登って作
業することは全く無用であり、省人化と作業能率の向
上、及び作業員の安全性の向上に寄与する。しかも当該
吊り構造を実施しても雨仕舞い等の後処置が必要となる
不都合も発生しないから、この意味からも作業効率が良
く、ひいては1日で屋根を完成する目標の達成を容易に
可能ならしめる。
According to the roof panel ridge-side suspension structure of the present invention, the roof has a structure in which all necessary related parts such as waterproofing, draining, etc. are unitized into one panel in addition to the roofing material. A hanging work can be performed on the panel without damaging any soft roofing material. And the ridge hanging hardware that became useless after the hanging installation of the roof panel,
Simple and easy operation such as pulling a rope from the ground,
It can be reliably detached from the roof panel. Therefore, it is absolutely unnecessary for a roofer to work on the roof when constructing the roof, which contributes to labor saving, improvement of work efficiency, and improvement of worker safety. Moreover, even if the suspension structure is implemented, there is no inconvenience that a post-treatment such as a rain break is required. Therefore, in this sense, the work efficiency is high, and it is possible to easily achieve the goal of completing the roof in one day. Close.

【図面の簡単な説明】[Brief description of the drawings]

【図1】屋根の構成要素を分解状態で示した斜視図であ
る。
FIG. 1 is a perspective view showing components of a roof in an exploded state.

【図2】屋根パネルの吊り状態を示した側面図である。FIG. 2 is a side view showing a suspended state of a roof panel.

【図3】屋根パネルの棟部側端部の棟包み下地材の取付
け状態を示す斜視図である。
FIG. 3 is a perspective view showing an attached state of a ridge base material on a ridge side end of a roof panel.

【図4】屋根パネルを小屋組の上面へ吊り込んだ状態を
示した側面図である。
FIG. 4 is a side view showing a state in which a roof panel is hung on the upper surface of a hut.

【図5】Aは連結ピンを抜く連結解除工具の使用状態を
示した立面図、Bはロープガイドの正面図である。
FIG. 5A is an elevation view showing a use state of a connection release tool for pulling out a connection pin, and FIG. 5B is a front view of a rope guide.

【図6】棟包みを取付けた屋根の棟部構造図である。FIG. 6 is a structural view of a ridge portion of a roof to which a wrapper is attached.

【符号の説明】[Explanation of symbols]

3 屋根パネル 8 棟包みの取付け下地材 15 吊り金具係止部材 29 棟部吊り金物 26 クレーンのワイヤー 16 連結ピン 17 ピン孔 28 ピン孔 31 抜け止めバネ 36 引き抜き用ロープ 32 操作管 33 反力受け 35 引張りガイド REFERENCE SIGNS LIST 3 Roof panel 8 Building base material for building wrapping 15 Suspension fitting locking member 29 Building hanging hardware 26 Crane wire 16 Connecting pin 17 Pin hole 28 Pin hole 31 Retaining spring 36 Pull-out rope 32 Operating pipe 33 Reaction force receiver 35 Tension guide

───────────────────────────────────────────────────── フロントページの続き (72)発明者 用稲 都世志 東京都江東区木場二丁目8番3号 株式会 社ニッケンビルコン内 (72)発明者 本橋 修一 東京都江東区木場二丁目8番3号 株式会 社ニッケンビルコン内 ──────────────────────────────────────────────────続 き Continuing on the front page (72) Inventor Toshishi Ina, 2-8-3 Kiba, Koto-ku, Tokyo Inside Nikken Building Con (72) Inventor Shuichi Motobashi 2--8, Kiba, Koto-ku, Tokyo No. 3 Inside Nikken Building Con

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 ユニット化された屋根パネルの少なくと
も2本の垂木の棟部側端部間を連結するように取付けら
れた棟包みの取付け下地材に吊り金具係止部材が設けら
れていること、 前記吊り金具係止部材へ着脱自在な棟部吊り金物はクレ
ーンのワイヤーに止着されており、前記吊り金具係止部
材との連結手段が設けられていること、 前記棟部吊り金物と吊り金具係止部材との連結は地上側
から解除操作が可能であり、同連結の解除によって吊り
金具係止部材と棟部吊り金物とは離脱することを特徴と
する、屋根パネルの棟部側吊り構造。
1. A hanging member locking member is provided on a mounting base material of a ridge wrap mounted so as to connect at least two ridge side ends of a rafter of a unitized roof panel. The ridge hanging member detachably attached to the hanging member locking member is fixed to a wire of a crane, and connecting means for the hanging member locking member is provided. The connection with the metal fitting locking member can be released from the ground side, and the lifting metal locking member and the ridge hanging metal piece are detached by releasing the connection. Construction.
【請求項2】 請求項1に記載した吊り金具係止部材
は、棟包みの取付け下地材の前面へ鉛直方向に貫通する
孔を形成する筒形部材として設けられ、棟部吊り金物の
下部は前記吊り金具係止部材の孔へ嵌まる大きさ、形状
に形成されており、両者の連結手段として吊り金具係止
部材及び棟部吊り金物双方の共通な位置に水平方向に連
結ピンを通すピン孔が設けられており、連結ピンの先端
部に前記ピン孔の口径よりも大径に膨らんだ抜け止めバ
ネが取付けられていることを特徴とする、屋根パネルの
棟部側吊り構造。
2. The hanging member locking member according to claim 1, which is provided as a cylindrical member that forms a hole that vertically penetrates a front surface of a mounting base material of a ridge package, and a lower portion of the ridge hanging material is provided. A pin that is formed in a size and a shape that fits into the hole of the hanging fitting locking member and that passes a connecting pin in a horizontal direction to a common position of both the hanging fitting locking member and the ridge hanging fitting as a connecting means for both. A hole is provided, and a retaining spring bulging to a diameter larger than the diameter of the pin hole is attached to a tip portion of the connecting pin.
【請求項3】 請求項2に記載した棟部部吊り金物と吊
り金具係止部材との連結を解除する手段として、連結ピ
ンの頭部に地上へ届く長さの引き抜き用ロープが止着さ
れており、一方、地上側から操作する長い操作管の上端
に吊り金具係止部材に反力をとる反力受けが設けられ、
且つ前記ロープの引張りガイドを備えた連結解除工具が
使用されることを特徴とする、屋根パネルの棟部側吊り
構造。
3. A pulling rope having a length reaching the ground is fixed to the head of the connecting pin as means for releasing the connection between the ridge part hanging hardware and the hanging fitting locking member according to claim 2. On the other hand, a reaction force receiver is provided at the upper end of the long operation tube operated from the ground side to take a reaction force on the hanging bracket locking member,
And a ridge-side suspension structure of the roof panel, wherein a disconnection tool having a pulling guide for the rope is used.
JP2756397A 1997-02-12 1997-02-12 Ridge part side hanging structure of roof panel Withdrawn JPH10219838A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2756397A JPH10219838A (en) 1997-02-12 1997-02-12 Ridge part side hanging structure of roof panel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2756397A JPH10219838A (en) 1997-02-12 1997-02-12 Ridge part side hanging structure of roof panel

Publications (1)

Publication Number Publication Date
JPH10219838A true JPH10219838A (en) 1998-08-18

Family

ID=12224508

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2756397A Withdrawn JPH10219838A (en) 1997-02-12 1997-02-12 Ridge part side hanging structure of roof panel

Country Status (1)

Country Link
JP (1) JPH10219838A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110386546A (en) * 2019-08-05 2019-10-29 中冶天工(天津)装备制造有限公司 A kind of hanging method for the installation of more steel structure wall purlins

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110386546A (en) * 2019-08-05 2019-10-29 中冶天工(天津)装备制造有限公司 A kind of hanging method for the installation of more steel structure wall purlins

Similar Documents

Publication Publication Date Title
US5163799A (en) Wall panel lifting and supporting device
WO1998020215A1 (en) Safety rail system
JPH10219838A (en) Ridge part side hanging structure of roof panel
JP3299727B2 (en) Eave reinforcement metal, eave structure and eave formation method
JP2602190Y2 (en) Simple scaffolding roof
JPH10212801A (en) Suspension structure on ridge side of roof panel
JP2598251Y2 (en) Hanging equipment for building panels
JPH10183919A (en) Eaves edge hanging structure of roof panel
JPH10205048A (en) Hanging structure of roof panel on ridge part side
JP2540395B2 (en) Method of engaging horizontal roofing roof plate and suspension
CN110577145B (en) Color steel plate hoisting and traction device and use method thereof
JPH0533618Y2 (en)
JPS644024B2 (en)
JP3050242B2 (en) Roof panel
JP2510794B2 (en) Sling for roof panel
JP2553091Y2 (en) Roof panel suspension
JP2534194Y2 (en) Roof panel suspension
JP3079222B2 (en) Field connection method
JP2004183203A (en) Safely device for work on roof
JP3513695B2 (en) Exterior wall support
JPS6237895Y2 (en)
JPH04363448A (en) Structure for installing roof panel
JPH0518034A (en) Roof panel
JPH05263503A (en) Coupler for ridge capping
JPH0510623U (en) Roof panel suspension equipment

Legal Events

Date Code Title Description
A300 Withdrawal of application because of no request for examination

Free format text: JAPANESE INTERMEDIATE CODE: A300

Effective date: 20040511