JP2807338B2 - Distribution system control system - Google Patents

Distribution system control system

Info

Publication number
JP2807338B2
JP2807338B2 JP2328137A JP32813790A JP2807338B2 JP 2807338 B2 JP2807338 B2 JP 2807338B2 JP 2328137 A JP2328137 A JP 2328137A JP 32813790 A JP32813790 A JP 32813790A JP 2807338 B2 JP2807338 B2 JP 2807338B2
Authority
JP
Japan
Prior art keywords
accident
information
distribution system
distribution
storage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2328137A
Other languages
Japanese (ja)
Other versions
JPH04197033A (en
Inventor
政泰 飛田
英治 平井
正樹 庄司
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Meidensha Corp
Toshiba Corp
Tokyo Electric Power Co Holdings Inc
Original Assignee
Meidensha Corp
Toshiba Corp
Tokyo Electric Power Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Meidensha Corp, Toshiba Corp, Tokyo Electric Power Co Inc filed Critical Meidensha Corp
Priority to JP2328137A priority Critical patent/JP2807338B2/en
Publication of JPH04197033A publication Critical patent/JPH04197033A/en
Application granted granted Critical
Publication of JP2807338B2 publication Critical patent/JP2807338B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Description

【発明の詳細な説明】 A.産業上の利用分野 本発明は配電系統を制御する配電系統制御システムに
関するものである。
The present invention relates to a distribution system control system for controlling a distribution system.

B.発明の概要 本発明は、配電線を接続または切断する開閉器を備え
た配電系統と、これに接続された上位系統とによって構
成された電力系統に接続し、上位系統または配電系統で
発生した事故に関する複数の事故情報を含む事故メッセ
ージを、上位系統を監視制御する上位システムから受け
取り、この事故メッセージにもとづいて配電系の開閉器
を制御する配電系統制御システムにおいて、 上位システムが送出する事故メッセージら抽出した事
故情報記憶する複数の記憶領域を持つ記憶手段と、抽出
した事故情報をキーにして記憶手段に記憶されている各
事故情報を検索し、関係するものをさがす情報検索手段
と、情報検索手段が関係する事故情報を見つけたとき、
抽出した事故情報を、情報検索手段が見つけた記憶手段
に記憶されている事故情報と同一の記憶領域に記憶さ
せ、一方、情報検索手段が関係するものを見つけること
ができなかったときは、抽出した事故情報を、検索した
上記記憶手段に記憶されている事故情報とは異なる記憶
領域に記憶させる記憶制御手段とを備え、そして、記憶
手段の記憶領域に記憶されている事故情報をもとに配電
系統の開閉器を制御し、事故復旧操作を実施する復旧制
御手段を備えることによって、 複数の事故が同時に発生し、これらに関する事故情報
がランダムに送信されてきても、発生した事故ごとに事
故情報を適切に管理することを可能とし、また、上位系
統の事故復旧操作の終了時点を事故ごとにとらえ、個々
の事故に対して的確なタイミングで配電系統の事故復旧
操作を実施することを可能とするものである。
B. Summary of the Invention The present invention connects to a power system composed of a distribution system equipped with a switch for connecting or disconnecting a distribution line and a higher system connected to the distribution system, and generates power in the higher system or the distribution system. An accident message containing multiple accident information related to the accident that was received from the upper system that monitors and controls the upper system, and the upper system sends out the accident that is sent by the upper system in the distribution system control system that controls the switch of the distribution system based on this accident message. A storage means having a plurality of storage areas for storing accident information extracted from messages, an information search means for searching each accident information stored in the storage means using the extracted accident information as a key, and searching for a related one; When the information search means finds relevant accident information,
The extracted accident information is stored in the same storage area as the accident information stored in the storage means found by the information search means. On the other hand, if the information search means cannot find the relevant information, the extraction is performed. Storage control means for storing the retrieved accident information in a storage area different from the retrieved accident information stored in the storage means, and based on the accident information stored in the storage area of the storage means. By providing recovery control means for controlling the switches in the distribution system and performing recovery operations, multiple accidents occur at the same time. Information can be managed appropriately, and the end point of the higher-level system's accident recovery operation can be grasped for each accident, and the distribution system can be properly timed for each accident. It is possible to carry out an accident recovery operation.

C.従来の技術 近年、配電系統の操作を自動化するため配電系統制御
システムが導入されつつある。配電系統制御システムと
は、一般に配電線の各所に配置された開閉器とそれらを
監視制御する制御システムとによって構成されたものを
指すが、狭義には、制御システムのみを電系統制御シス
テムと呼ぶ。ここでは、制御システムのことを配電系統
制御システムということにする。
C. Prior Art In recent years, a distribution system control system has been introduced to automate the operation of the distribution system. The distribution system control system generally refers to a system configured by switches arranged in various parts of a distribution line and a control system for monitoring and controlling them, but in a narrow sense, only the control system is referred to as a system control system. . Here, the control system is referred to as a distribution system control system.

この種の配電系統制御システムを備えた従来の電力系
統のブロック図を第3図に示す。この電力系統は、上位
系統3、配電系統4によって構成し、それぞれ上位シス
テム2、配電系統制御システム1が接続している。上位
系統3は配電線CB以上の配変所、変電所、および発送電
系統であり、図には例として配変所31を示した。配電系
統4は配電線立上り線路5以降の配電線群であり、この
ケーブルによって上位系統3に接続されている。配電系
統4の配電線41にはこれを接続または切断する自動開閉
器として、遠制機能付きの幹線開閉器42、連係開閉器43
等が設けられている。
FIG. 3 is a block diagram of a conventional power system provided with such a distribution system control system. This power system is composed of a higher system 3 and a distribution system 4, and a higher system 2 and a distribution system control system 1 are connected to each other. The upper system 3 is a distribution substation, a substation, and a transmission power system of distribution line CB or higher, and a distribution substation 31 is shown as an example in the figure. The distribution system 4 is a distribution line group after the distribution line rising line 5 and is connected to the upper system 3 by this cable. As an automatic switch for connecting or disconnecting the distribution line 41 of the distribution system 4, a main line switch 42 with a remote control function and a link switch 43 are provided.
Etc. are provided.

配電系統制御システム1と上記システム2、および上
位システム2と上位系統3とはそれぞれ通信線6、7に
よって接続されている。また、配電系統4の上記開閉器
と配変所31とは通信線または配電線搬送設備群(図では
省略)によって接続されている。
The distribution system control system 1 and the above system 2 and the upper system 2 and the upper system 3 are connected by communication lines 6 and 7, respectively. The switch of the distribution system 4 and the distribution station 31 are connected by a communication line or a group of distribution line transport equipment (not shown).

幹線開閉器42、連係開閉器43等の自動開閉器は、両側
線路の充停電変化に応じて現地で自動操作される一方、
配電系統制御システム1との間で上位システム2および
上位系統3を中継して監視制御情報の送受信を行い、こ
れにより遠隔的に操作される。
The automatic switches such as the main line switch 42 and the link switch 43 are automatically operated on site in accordance with the change of charging / discharging of both sides of the track,
The upper system 2 and the upper system 3 are relayed with the distribution system control system 1 to transmit and receive monitoring control information, thereby being remotely operated.

ところで、配電系統操作を目的別に分類すると、事故
復旧操作、予定停止操作、負荷切替操作、緊急停止操作
等に分類できる。これらの操作の中で特に重要なのは事
故復旧操作である。操作の必要上、配電線を人為的に停
止させる場合には、あらかじめ停電時間や停電範囲を縮
小するようコントロールすることが可能である。しか
し、事故によって停電する場合にはこのようなコントロ
ールは不可能である。予告なしに配電線が長時間、広範
囲に亘って停電するのは、その地域の経済活動あるいは
社会生活に甚大な影響を与える。従って、事故による停
電を迅速に復旧する、いわゆる事故復旧操作が配電系統
制御システムにとって極めて重要である。
By the way, when the distribution system operation is classified by purpose, it can be classified into an accident recovery operation, a scheduled stop operation, a load switching operation, an emergency stop operation, and the like. The most important of these operations is the accident recovery operation. Due to the necessity of the operation, when the distribution line is artificially stopped, it is possible to control in advance to reduce the power outage time and the power outage range. However, such control is not possible when a power failure occurs due to an accident. Long-term, widespread blackouts of distribution lines without notice have a tremendous impact on local economic activity or social life. Therefore, a so-called accident restoration operation for quickly restoring a power failure due to an accident is extremely important for the distribution system control system.

事故復旧操作を行うにはまず事故発生時刻、事故発生
箇所、事故種別、上位系統復旧操作状況等の事故状況を
正しく把握する必要がある。事故による配電系統の停電
は、配電線41そのものに発生した事故や、上位系統3が
事故によって停電し、これが波及して生じる。具体的に
は、前者は例えば配電線事故、後者はバンク事故、電源
事故等である。
In order to perform an accident recovery operation, it is first necessary to correctly understand the accident status, such as the time at which the accident occurred, the location where the accident occurred, the type of accident, and the status of the upper system restoration operation. The power outage of the distribution system due to the accident is caused by an accident occurring in the distribution line 41 itself or a power outage of the higher system 3 due to the accident, which spreads. Specifically, the former is, for example, a distribution line accident, and the latter is a bank accident, a power supply accident, or the like.

これらの事故は上位系統を監視制御している現地自動
機器や上位システム2が検知し、まず上位系統3におい
て事故復旧操作が行われる。例えば、再閉路リレーによ
る再閉路、再々閉路あるいは上位システム2の遠方操作
による系統切替等が実施される。配電系統4の復旧操作
はこれらの操作が終了した後開始する。これに至るまで
の間、上位システム2は配変所31を始めとする上位系統
3の機器群から情報を収集し、事故情報を随時メッセー
ジ形式に編集して配電系統制御システム1へ送信する。
通常、1件の事故について、事故発生状況を第1報の事
故メッセージで通知し、上位系統3における復旧操作状
況や再事故発生状況等を第2,第3報の事故メッセージで
通知する。また、上位システム2は常時、上位系統3の
機器群の状態を収集し、それを遠方監視制御情報(上位
システムが遠方の各配変所等に対して監視制御を行うに
必要な“故障・異常情報SV:Supervisoryおよび電圧・電
流等の計測情報TM:Telemeter".以下、SV・TM情報と称
す。)として編集し配電系統制御システムに送信する。
配電系統制御システム1はこれらの情報によって事故状
況を認識する。
These accidents are detected by local automatic equipment monitoring and controlling the upper system and the upper system 2, and an accident recovery operation is first performed in the upper system 3. For example, re-closing by a re-closing relay, re-closing, or system switching by remote operation of the host system 2 is performed. The operation of restoring the distribution system 4 starts after these operations are completed. Until this time, the upper system 2 collects information from the equipment group of the upper system 3 including the distribution station 31, edits the accident information into a message format as needed, and transmits it to the distribution system control system 1.
Usually, for one accident, the status of the occurrence of the accident is notified by the accident message of the first report, and the status of the recovery operation in the upper system 3 and the status of the occurrence of the re-accident are notified by the accident messages of the second and third reports. The upper system 2 constantly collects the status of the equipment group of the upper system 3 and transmits the collected information to the remote monitoring control information ("failure / failure necessary for the higher system to monitor and control each remote distribution station, etc." The information is edited as abnormality information SV: Supervisory and measurement information TM: Telemeter "(hereinafter referred to as SV / TM information) such as voltage and current, and transmitted to the distribution system control system.
The distribution system control system 1 recognizes the accident situation based on the information.

D.発明が解決しようとする課題 配電系統制御システムが上位システムからの事故メッ
セージにもとづいて事故状況を認識する場合、ある時間
内に発生する事故が1件だけのときは特に問題は生じな
い。すなわち、1件の事故に関する事故メッセージやSV
・TM情報のみがその事故の進展状況に応じて時系列的に
順次送信されてくる。配電系統制御システムは事故に関
する情報を最初に受信してから上位系統の事故復旧操作
の終了情報を受信するまでの間、その事故にのみ注目し
ていればよく、事故情報の管理あるいは配電系統におけ
る事故復旧操作の起動時期の把握は容易に行える。
D. Problems to be Solved by the Invention When the distribution system control system recognizes an accident situation based on an accident message from a higher-level system, no particular problem occurs when only one accident occurs within a certain time. In other words, an accident message or SV related to one accident
-Only TM information is transmitted in chronological order according to the progress of the accident. The distribution system control system only needs to pay attention to the accident from the first reception of the information on the accident to the reception of the termination information of the higher-level accident recovery operation. It is easy to grasp the start time of the accident recovery operation.

しかし、実際にはある時間内に発生する事故は1件と
は限らず、数件の事故が短時間内に発生し、事故メッセ
ージおよびSV・TM情報がランダムに送信されてくる場合
がしばしばある。配電系統制御システムはこのような場
合でも事故情報の管理が行え、そして個々の事故に対し
て配電系統における事故復旧操作のタイミングを的確に
把握できなければならない。
However, in reality, the number of accidents that occur within a certain time period is not limited to one, and several accidents occur within a short time, and accident messages and SV / TM information are often transmitted randomly. . In such a case, the distribution system control system must be able to manage the accident information, and be able to accurately grasp the timing of the accident recovery operation in the distribution system for each individual accident.

本発明の目的は、このような要求を満たし、複数の事
故が同時に発生しても適切に事故情報の管理が行え、個
々の事故に対する配電系統の事故復旧操作を的確なタイ
ミングで実施できる配電系統制御システムを提供するこ
とにある。
SUMMARY OF THE INVENTION An object of the present invention is to satisfy such a demand, perform a proper management of accident information even when a plurality of accidents occur at the same time, and execute an accident recovery operation of the distribution system for each accident at an appropriate timing. It is to provide a control system.

E.課題を解決するための手段 本発明の配電系統制御システムは、配電線を接続また
は切断する開閉器を備えた配電系統と、これに接続され
た上位系統と、この上位系統を監視制御する上位システ
ムによって構成された電力系統に接続し、上記上位シス
テムまたは上記配電系統で発生した事故に関する複数の
事故事情を含む事故メッセージを、上記上位システムか
ら受け取り、この事故メッセージにもとづいて上記開閉
器を制御する配電系統制御システムにおいて、 上記事故メッセージから上記事故情報を抽出する情報
抽出手段と、 上記情報抽出手段が抽出した上記事故情報を記憶する
複数の記憶領域を持つ記憶手段と、 上記情報抽出手段が抽出した事故情報をキーにして上
記記憶手段に記憶されている各事故情報を検索し、関係
するものをさがす情報検索手段と、 上記情報検索手段が関係する事故情報を見つけたと
き、上記情報抽出手段が抽出した上記事故情報を、上記
情報検索手段が見つけた上記記憶手段に記憶されている
事故情報と同一の記憶領域に記憶させ、上記情報検索手
段が関係するものを見つけることができなかったとき、
上記情報抽出手段が抽出した事故情報を、上記情報検索
手段が検索した上記記憶手段に記憶されている事故情報
とは異なる記憶領域に記憶させる記憶制御手段と、 上記記憶手段の上記記憶領域に記憶されている事故情
報をもとに上記開閉器を制御し、事故復旧操作を実施す
る復旧制御手段とを備えたことを特徴とする。
E. Means for Solving the Problems The distribution system control system of the present invention monitors and controls a distribution system provided with a switch for connecting or disconnecting a distribution line, a higher system connected thereto, and this higher system. Connected to the power system configured by the host system, received from the host system an accident message including a plurality of accident situations related to the accident that occurred in the host system or the distribution system, based on the accident message, the switch based on the accident message In the power distribution system control system to be controlled, information extraction means for extracting the accident information from the accident message, storage means having a plurality of storage areas for storing the accident information extracted by the information extraction means, and the information extraction means Searches for each accident information stored in the storage means using the accident information extracted by When the information retrieval means finds related accident information, the accident information extracted by the information extraction means is stored in the storage means found by the information retrieval means. When the information retrieval means cannot find a relevant one,
Storage control means for storing the accident information extracted by the information extraction means in a storage area different from the accident information stored in the storage means searched by the information search means; and storage in the storage area of the storage means Recovery control means for controlling the switch based on the performed accident information and performing an accident recovery operation.

F.作用 上位系統あるいは配電系統で事故が発生すると、上記
システムはこれを検知し、事故メッセージを配電系統制
御システムに送る。配電系統制御システムはこれを受け
取ると、情報抽出手段に送る。情報抽出手段はこれを受
け取り、事故情報を抽出する。情報検索手段はこの抽出
された事故情報をキーにして、記憶手段内の事故情報を
検索し、関係するものをさがす。
F. Action When an accident occurs in the upper system or the distribution system, the above system detects this and sends an accident message to the distribution system control system. Upon receiving this, the distribution system control system sends it to the information extracting means. The information extraction means receives this and extracts accident information. The information search means searches the accident information in the storage means by using the extracted accident information as a key, and searches for related information.

記憶制御手段は、上記情報検索手段が関係するものを
見つけたとき、情報抽出手段が抽出した事故情報を、比
較のために記憶手段から読み出した上記事故情報と同一
の記憶領域に記憶させる。一方、情報検索手段が関係す
るものを見つけることができなかったときは、記憶制御
手段は情報抽出手段が抽出した事故情報を、記憶手段に
すでに記憶されている事故情報とは異なる記憶領域に記
憶させる。
When the information retrieval means finds a relevant one, the storage control means stores the accident information extracted by the information extraction means in the same storage area as the accident information read from the storage means for comparison. On the other hand, when the information search means cannot find a relevant one, the storage control means stores the accident information extracted by the information extraction means in a storage area different from the accident information already stored in the storage means. Let it.

復旧制御手段は、記憶手段の記憶領域に記憶されてい
る事故情報をもとに、配電系統の開閉器を制御し、事故
復旧操作を実施する。
The recovery control unit controls the switch of the distribution system based on the accident information stored in the storage area of the storage unit, and performs an accident recovery operation.

G.実施例 次に本発明の一実施例について説明する。本実施例の
配電系統制御システムを備えた電力系統のブロック図を
第1図に示す。この電力系統は、上位系統103、配電系
統104によって構成し、それぞれに上位システム102、配
電系統制御システムが接続している。配電系統制御シス
テム101と上位システム102、および上位システム102と
上位系統103とはそれぞれ通信線106、107によって接続
され、上位系統103と配電系統104とは配電線立上り線路
105によって接続されている。
G. Embodiment Next, an embodiment of the present invention will be described. FIG. 1 is a block diagram of an electric power system including the distribution system control system according to the present embodiment. This power system is composed of a higher system 103 and a distribution system 104, and a higher system 102 and a distribution system control system are connected to each other. The distribution system control system 101 and the upper system 102, and the upper system 102 and the upper system 103 are connected by communication lines 106 and 107, respectively, and the upper system 103 and the distribution system 104 are connected to a distribution line rising line.
Connected by 105.

以下では、まず上位系統103、配電系統104、および上
位システム102について説明し、その後配電系統制御シ
ステム101について詳しく説明する。上位系統103は配電
線CB以上の配変所、変電所、および発送電系統であり、
図には例として配変所131を示した。配電系統104は配電
線立上り線路105以降の配電線群である。配電系統104の
配電線141にはこれを接続または切断する自動開閉器と
して、例えば幹線開閉器142、連係開閉器143が設けられ
ている。これら開閉器と配変所131とは通信線または配
電線搬送設備群(図では省略)によって接続されてい
る。幹線開閉器142および連係開閉器143は、配電系統制
御システム101により遠隔的に操作されて入りまたは切
りとなる。これら開閉器と配電系統制御システム101と
は上位システム102および上位系統103を中継して監視制
御情報の送受信を行う。
Hereinafter, the upper system 103, the distribution system 104, and the upper system 102 will be described first, and then the distribution system control system 101 will be described in detail. The upper system 103 is a distribution station, a substation, and a transmission power system of distribution line CB and higher,
The figure shows the distribution station 131 as an example. The distribution system 104 is a distribution line group after the distribution line rising line 105. The distribution line 141 of the distribution system 104 is provided with, for example, a main line switch 142 and a link switch 143 as automatic switches for connecting or disconnecting the distribution line 141. These switches and the distribution station 131 are connected by a communication line or a group of distribution line transport equipment (not shown). The main switch 142 and the link switch 143 are remotely operated by the distribution system control system 101 to be turned on or off. These switches and the distribution system control system 101 transmit and receive monitoring control information via the upper system 102 and the upper system 103.

上位システム102は通信線107を通じて上位系統103を
監視制御する。上位システム102は常時、上位系統103の
機器群の状態を収集し、それをSV・TM情報によって通信
線106を通じて配電系統制御システム101に送信する。ま
た、上位系統103あるいは配電系統104に事故が発生した
場合にはそれを検知し、事故復旧操作を行う。また同時
に、事故に関する情報をメッセージ形式に編集し、事故
メッセージとして配電系統制御システム101に送信す
る。
The host system 102 monitors and controls the host system 103 through the communication line 107. The host system 102 constantly collects the state of the device group of the host system 103 and transmits the collected state to the power distribution system control system 101 via the communication line 106 using SV / TM information. Further, when an accident occurs in the upper system 103 or the distribution system 104, it is detected and an accident recovery operation is performed. At the same time, information on the accident is edited into a message format and transmitted to the distribution system control system 101 as an accident message.

上記系統103あるいは配電系統104において、バンク事
故、電源事故、配電線事故等が発生すると、これらは上
位系統103を監視制御している現地自動機器あるいは上
位システム102によって検知され、まず上位系統103にお
いて、例えば、再閉路リレーによる再閉路、再再閉路あ
るいは上位システム102の遠方操作による系統切替等の
事故復旧操作が行われる。配電系統104の事故復旧操作
はこれらの操作が終了した後、配電系統制御システム10
1によって開始される。これに至るまでの間、上位シス
テム102は配変所131を始めとする上位系統103の機器群
から情報を収集し、事故情報を随時メッセージ形式に編
集して配電系統制御システム101へ送信する。
In the above-mentioned system 103 or the distribution system 104, when a bank accident, a power supply accident, a distribution line accident, or the like occurs, these are detected by a local automatic device or an upper system 102 that monitors and controls the upper system 103, and first, the upper system 103 For example, an accident recovery operation such as a reclosing by a reclosing relay, a reclosing, or a system switching by a remote operation of the host system 102 is performed. After these operations are completed, the recovery operation of the distribution system 104
Started by one. Until this time, the upper system 102 collects information from the equipment group of the upper system 103 including the distribution station 131, edits the accident information into a message format as needed, and transmits it to the distribution system control system 101.

上位システム102は、通常、1件の事故について、事
故発生状況を第1報の事故メッセージで通知し、上位系
統103における復旧操作状況や再事故発生状況等を第2,
第3報の事故メッセージで通知する。具体的には、第1
報の事故メッセージで事故発生日時、事故関連設備、関
連する上位系統103の設備状態、その他の情報を伝え、
第2、第3報の事故メッセージで事故発生日時、事故関
連設備、復旧操作状況、その他の情報を伝える。配電系
統制御システム101はこれらの事故メッセージをもとに
事故情報を管理し、そして上位系統103の事故復旧状態
を把握し、上位系統103の事故復旧操作が終了した後、
配電系統104の事故復旧操作を実施する。
The host system 102 usually notifies the accident occurrence status of one accident by the accident message of the first report, and reports the recovery operation status and the re-occurrence occurrence status of the host system 103 to the second and the second.
Notify by the third accident message. Specifically, the first
In the accident message of the report, the date and time of the accident, the accident-related equipment, the equipment status of the related upper system 103, and other information,
The date and time of the accident, the equipment related to the accident, the status of the recovery operation, and other information are reported in the second and third accident messages. The distribution system control system 101 manages the accident information based on these accident messages, grasps the accident recovery state of the upper system 103, and after the accident recovery operation of the upper system 103 is completed,
Perform an accident recovery operation of the distribution system 104.

次に、配系統制御システム101について詳しく説明す
る。メモリ111は、上位システム102から送られてくる事
故情報を、事故ごとに分けて記憶するための複数の記憶
領域を持つ。情報検索部113は後述するメモリ制御部112
がメモリ111から読み出した事故情報を、後述する情報
抽出部114からの事故情報をキーにして検索し、その関
係するものをさがす。
Next, the distribution system control system 101 will be described in detail. The memory 111 has a plurality of storage areas for storing accident information sent from the host system 102 for each accident. The information search unit 113 is a memory control unit 112 described later.
Retrieves the accident information read from the memory 111 by using the accident information from the information extracting unit 114 described later as a key, and searches for related information.

メモリ制御部112は、情報検索部113が事故情報が関係
するものを見つけたとき、情報抽出部114が抽出した事
故情報を、比較のためにメモリ111から読み出した事故
情報と同一の記憶領域に追加して記憶させる。一方、情
報検索部113が関係するものを見つけられなかったとき
は、メモリ制御部112は情報抽出部114が抽出した事故情
報を、メモリ111にすでに記憶されている事故情報とは
異なる記憶領域に記憶させる。
The memory control unit 112 stores the accident information extracted by the information extraction unit 114 in the same storage area as the accident information read from the memory 111 for comparison when the information search unit 113 finds one related to the accident information. Add and memorize. On the other hand, when the information search unit 113 cannot find a relevant one, the memory control unit 112 stores the accident information extracted by the information extraction unit 114 in a storage area different from the accident information already stored in the memory 111. Remember.

情報抽出部114は上位システム102から送られてくる第
1〜第3報の事故メッセージから事故発生日時、事故関
連設備、関連する上位系統103の設備状態、復旧操作状
況等の事故情報を抽出し、情報検索部113に出力する。
The information extraction unit 114 extracts accident information such as the date and time of occurrence of the accident, the accident-related equipment, the equipment state of the associated higher-order system 103, the status of the recovery operation, and the like from the accident messages of the first to third reports sent from the upper system 102. Is output to the information retrieval unit 113.

復旧制御部115は、メモリ制御部112がメモリ111から
読み出した事故情報をもとに配電系統104の幹線開閉器1
42および連係開閉器143を操作し、配電系統104の事故復
旧を行う。これら開閉器を操作するための監視制御情報
は通信線106に出力し、上位システム102および上位系統
103を中継して開閉器に送る。
The recovery control unit 115, based on the accident information read from the memory 111 by the memory control unit 112, the main switch 1 of the distribution system 104
By operating the switch 42 and the link switch 143, the accident of the distribution system 104 is recovered. Monitoring and control information for operating these switches is output to the communication line 106, and the host system 102 and host system
Relay 103 and send it to the switch.

次に、配電系統制御システム101の動作を説明する。
上位系統103で最初の事故が発生したとすると、上記シ
ステム102はこれを検知し、その第1報の事故メッセー
ジを配電系統制御システム101に送る。情報抽出部114は
これを受け取ると、事故発生日時、事故関連設備等の事
故情報を抽出する。情報検索部113はこれらを受け取
り、これらをキーにしてメモリ制御部112を通じてメモ
リ111から読み出した事故情報を検索する。この場合に
は、受信した事故情報に関係する事故情報はメモリ111
にはまだ記憶されていないので、情報検索部113は、関
係するものなしと判定する。メモリ制御部112はこのと
き、情報抽出部114が抽出したすべての事故情報を情報
検索部113から受け取り、それらを新たに発生した事故
の情報として、その事故のために確保したメモリ111の
記憶領域に書き込む。
Next, the operation of the distribution system control system 101 will be described.
Assuming that the first accident has occurred in the upper system 103, the system 102 detects this and sends an accident message of the first report to the distribution system control system 101. Upon receipt of the information, the information extraction unit 114 extracts accident information such as the date and time of occurrence of the accident, accident-related equipment, and the like. The information search unit 113 receives these, and searches for the accident information read from the memory 111 through the memory control unit 112 using these as a key. In this case, the accident information related to the received accident information is stored in the memory 111.
Has not been stored yet, the information search unit 113 determines that there is nothing related. At this time, the memory control unit 112 receives all the accident information extracted by the information extracting unit 114 from the information retrieving unit 113, and uses them as information on newly occurring accidents in the storage area of the memory 111 reserved for the accident. Write to.

上位系統103において別の事故が発生すると、上位シ
ステム102は同様にこれを検知し、その第1報の事故メ
ッセージを配電系統制御システム101に送る。情報抽出
部114はこれを受け取ると、事故発生日時、事故関連設
備等の事故情報を抽出する。情報検索部113はこれを受
け取り、これをキーにしてメモリ制御部112を通じてメ
モリ111から読み出した事故情報を検索する。この場合
には、メモリ111には最初の事故の事故情報が記憶され
ているので、情報検索部113にはその事故情報が与えら
れる。これらは異なる事故のものであり、関係しないた
め、情報検索部113は関係するものなしと判定する。そ
のためメモリ制御部112は、情報抽出部114が抽出した事
故情報を情報検索部113から受け取り、それらを新たに
発生した別の事故の情報として、メモリ111に新たに記
憶領域を確保して記憶させる。
When another accident occurs in the upper system 103, the upper system 102 similarly detects this and sends an accident message of the first report to the distribution system control system 101. Upon receipt of the information, the information extraction unit 114 extracts accident information such as the date and time of occurrence of the accident, accident-related equipment, and the like. The information search unit 113 receives this, and searches for the accident information read from the memory 111 through the memory control unit 112 using the information as a key. In this case, since the accident information of the first accident is stored in the memory 111, the accident information is given to the information retrieval unit 113. Since these are different accidents and are not related, the information search unit 113 determines that there is no related one. Therefore, the memory control unit 112 receives the accident information extracted by the information extraction unit 114 from the information search unit 113, and secures and stores a new storage area in the memory 111 as information on another accident that has newly occurred. .

次に、上位システム102が最初に発生した事故の第2
報の事故メッセージを送出すると、情報抽出部114はこ
のメッセージを受け取り、事故発生日時、事故関連設備
等の事故情報を抽出する。情報検索部113は抽出された
事故発生日時および事故関連設備をキーにして、メモリ
制御部112を通じてメモリ111から読み出した事故情報を
検索する。メモリ111には最初の事故の事故情報が記憶
されているので、その事故情報が情報検索部113に与え
られたとき、情報検索部113はこれら2つの事故の事故
発生日時および事故関連設備が関連すると判定する。メ
モリ制御部112は、事故情報が関係すると判定された第
2報の事故メッセージから抽出された事故情報を最初の
事故の関係情報として、メモリ111にすでに確保されて
いる最初の事故のための記憶領域に追加して書き込む。
上位システムが最初の事故の第3報の事故メッセージを
送出した場合にも同様に処理され、その事故情報は同じ
記憶領域に追加して書き込まれる。
Next, the upper-level system 102
When an informational accident message is transmitted, the information extracting unit 114 receives this message and extracts accident information such as the date and time of occurrence of the accident and accident-related equipment. The information retrieving unit 113 retrieves the accident information read from the memory 111 through the memory control unit 112 using the extracted accident occurrence date and time and the accident-related equipment as keys. Since the accident information of the first accident is stored in the memory 111, when the accident information is given to the information retrieving unit 113, the information retrieving unit 113 associates the date and time of the accident and the accident-related equipment of these two accidents. It is determined. The memory control unit 112 stores the accident information extracted from the accident message of the second report determined to be related to the accident information as the first accident related information for the first accident already secured in the memory 111. Write in addition to the area.
The same processing is performed when the host system sends the third accident message of the first accident, and the accident information is additionally written in the same storage area.

また、上位システム102が2番目に発生した事故の第
2報の事故情報を出力した場合には、その事故情報の事
故発生日時および事故関連設備は2番目の事故のために
確保した記憶領域から読み出した事故情報と関係するた
め、その事故情報はメモリ111に2番目の事故のために
確保した記憶領域に追加して書き込まれる。
When the host system 102 outputs the accident information of the second report of the second accident, the accident date and time of the accident information and the accident-related equipment are stored in the storage area reserved for the second accident. Since the accident information is related to the read accident information, the accident information is additionally written in the memory 111 in the storage area reserved for the second accident.

一方、さらに別の事故が発生した場合には、その事故
情報の事故発生日時および事故関連設備はメモリ111に
すでに記憶されているいずれの事故情報とも関係しない
ため、これらは新たに発生した事故の情報として別の記
憶領域に記憶される。
On the other hand, if another accident has occurred, the date and time of the accident and the accident-related equipment in the accident information are not related to any accident information already stored in the memory 111. The information is stored in another storage area.

第2図は、事故メッセージから抽出した事故情報がメ
モリ111にいかに記憶されるかを概念的に示すものであ
る。最初の事故の第1報の事故情報は、そのために確保
した記憶領域である事故情報ファイルAに格納され
(a)、一方、次に発生した事故の第1報の事故情報は
別の記憶領域である事故情報ファイルBに格納される
(b)。また、2番目に発生した事故の第2、第3報の
事故情報は、上述した事故情報の関係有無の判定によっ
て「関係あり」となり、事故情報ファイルBに追加され
る(c)。
FIG. 2 conceptually shows how the accident information extracted from the accident message is stored in the memory 111. The accident information of the first report of the first accident is stored in the accident information file A which is a storage area reserved for that purpose (a), while the accident information of the first report of the next accident is stored in another storage area. (B). In addition, the accident information of the second and third reports of the second occurrence of the accident becomes “related” by the above-mentioned determination of the presence or absence of the relation of the accident information, and is added to the accident information file B (c).

復旧制御部115は、メモリ制御部112を通じてメモリ11
1から事故情報を読み出して監視しており、事故情報と
して上位系統103の事故復旧操作の終了情報が書き込ま
れた場合には、その記憶領域に対応する事故の復旧操作
を開始する。すなわち、監視制御情報を上位システム10
2および上位系統103を中継して配電系統104の例えば幹
線開閉器142あるいは連係開閉器143に送り、これらを操
作して配電系統104の復旧を行う。
The recovery control unit 115 communicates with the memory 11 through the memory control unit 112.
The accident information is read from 1 and monitored, and when the end information of the accident recovery operation of the upper system 103 is written as the accident information, the accident recovery operation corresponding to the storage area is started. That is, the monitoring control information is
2 and the higher system 103 are relayed and sent to the distribution system 104, for example, to the main line switch 142 or the link switch 143, and these are operated to restore the distribution system 104.

以上のようにして配電系統制御システム101は、上位
系統103あるいは配電系統104において発生した複数の事
故に関する事故情報を、発生した事故ごとに管理し、上
位系統103における事故復旧操作の進展状況を把握す
る。そして、上位系統103の事故復旧操作の終了時点を
事故ごとにとらえ、個々の事故に対して的確なタイミン
グで配電系統104の事故復旧操作を実施する。
As described above, the distribution system control system 101 manages accident information on a plurality of accidents that have occurred in the upper system 103 or the distribution system 104 for each accident that has occurred, and grasps the progress of the accident recovery operation in the upper system 103. I do. Then, the end point of the accident recovery operation of the upper system 103 is taken for each accident, and the accident recovery operation of the power distribution system 104 is performed at an appropriate timing for each accident.

H.発明の効果 以上説明したように本発明の配電系統制御システム
は、上位システムが送出する事故メッセージから抽出し
た事故情報を記憶する記憶手段と、抽出した事故情報を
キーにして記憶手段に記憶されている事故情報を検索
し、これらの情報が関係するものをさがす情報検索手段
と、情報検索手段が関係するものを見つけたとき、抽出
した事故情報を、情報検索手段が見つけた記憶手段に記
憶されている事故情報と同一の記憶領域に記憶させ、一
方、情報検索手段が関係するものを見つけられなかった
ときは、抽出した事故情報を、検索した上記記憶手段に
記憶されている事故情報とは異なる記憶領域に記憶させ
る記憶制御手段とを備えている。
H. Effects of the Invention As described above, the distribution system control system of the present invention includes a storage unit for storing accident information extracted from an accident message transmitted from a higher-level system, and a storage unit for storing the extracted accident information as a key. The information retrieval means for searching for the accident information that has been searched for, and searching for the relevant information, and when the information searching means finds the relevant information, the extracted accident information is stored in the storage means found by the information searching means. When the related information is not found by the information searching means, the extracted accident information is stored in the same storage area as the stored accident information. Storage control means for storing data in a storage area different from the storage area.

従って、複数の事故が同時に発生し、これらに関する
事故情報がランダムに送信されてきても、事故ごとに事
故情報を適切に管理することができる。
Therefore, even if a plurality of accidents occur at the same time and the accident information relating to these accidents is transmitted at random, it is possible to appropriately manage the accident information for each accident.

また、上記記憶手段の記憶領域に記憶されている事故
情報をもとに、配電系統の開閉器を制御し、事故復旧操
作を実施する復旧制御手段を備えているため、上位系統
の事故復旧操作の終了時点を事故ごとにとらえ、個々の
事故に対して的確なタイミングで配電系統の事故復旧操
作を実施することができる。
In addition, since there is provided recovery control means for controlling the switch of the distribution system based on the accident information stored in the storage area of the storage means and performing an accident recovery operation, the accident recovery operation of the upper system is performed. The end point of the operation can be considered for each accident, and the accident recovery operation of the distribution system can be performed at the appropriate timing for each accident.

【図面の簡単な説明】[Brief description of the drawings]

第1図は本発明の一実施例の配電系統制御システムを備
えた電力系統を示すブロック図、 第2図は、同実施例において事故情報がいかに記憶され
るかを説明するための概念図、 第3図は従来の配電系統制御システムを備えた電力系統
を示すブロック図である。 101……配電系統制御システム、106……通信線、111…
…メモリ、112……メモリ制御部、113……情報検索部、
114……情報抽出部、115……復旧制御部。
FIG. 1 is a block diagram showing an electric power system including a distribution system control system according to an embodiment of the present invention. FIG. 2 is a conceptual diagram for explaining how accident information is stored in the embodiment. FIG. 3 is a block diagram showing a power system including a conventional distribution system control system. 101: Distribution system control system, 106: Communication line, 111:
... Memory, 112 ... Memory control unit, 113 ... Information search unit,
114: Information extraction unit, 115: Recovery control unit.

───────────────────────────────────────────────────── フロントページの続き (72)発明者 平井 英治 東京都府中市東芝町1番地 株式会社東 芝府中工場内 (72)発明者 庄司 正樹 東京都品川区大崎2丁目1番17号 株式 会社明電舎内 (56)参考文献 特開 昭57−71228(JP,A) 特開 昭63−316621(JP,A) (58)調査した分野(Int.Cl.6,DB名) H02J 3/00 - 5/00──────────────────────────────────────────────────続 き Continuing on the front page (72) Eiji Hirai, 1 Toshiba-cho, Fuchu-shi, Tokyo Inside the Toshiba Fuchu Factory Co., Ltd. (72) Masaki Shoji 2-1-1, Osaki, Shinagawa-ku, Tokyo Meidensha Co., Ltd. (56) References JP-A-57-71228 (JP, A) JP-A-63-316621 (JP, A) (58) Fields investigated (Int. Cl. 6 , DB name) H02J 3/00-5 / 00

Claims (3)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】配電線を接続または切断する開閉器を備え
た配電系統と、これに接続された上位系統によって構成
された電力系統に接続し、上記上位系統または上記配電
系統で発生した事故に関する複数の事故情報を含む事故
メッセージを、上記上位系統を監視制御する上記システ
ムから受け取り、この事故メッセージにもとづいて上記
開閉器を制御する配電系統制御システムにおいて、 上記事故メッセージから上記事故情報を抽出する情報抽
出手段と、 上記情報抽出手段が抽出した上記事故情報を記憶する複
数の記憶領域を持つ記憶手段と、 上記情報抽出手段が抽出した事故情報をキーにして上記
記憶手段に記憶されている各事故情報を検索し、関係す
るものをさがす情報検索手段と、 上記情報検索手段が関係する事故情報を見つけたとき、
上記情報抽出手段が抽出した上記事故情報を、上記情報
検索手段が見つけた上記記憶手段に記憶されている事故
情報と同一の記憶領域に記憶させ、上記情報検索手段が
関係するものを見つけることができなかったとき、上記
情報抽出手段が抽出した事故情報を、上記情報検索手段
が検索した上記記憶手段に記憶されている事故情報とは
異なる記憶領域に記憶させる記憶制御手段と、 上記記憶手段の上記記憶領域に記憶されている事故情報
をもとに上記開閉器を制御し、事故復旧操作を実施する
復旧制御手段とを備えたことを特徴とする配電系統制御
システム。
The present invention relates to a power distribution system having a switch for connecting or disconnecting a distribution line and an electric power system constituted by a higher system connected thereto, and relating to an accident occurring in the higher system or the distribution system. An accident message including a plurality of accident information is received from the system for monitoring and controlling the upper system, and the distribution system control system for controlling the switch based on the accident message extracts the accident information from the accident message. Information extraction means, storage means having a plurality of storage areas for storing the accident information extracted by the information extraction means, and each of the information stored in the storage means using the accident information extracted by the information extraction means as a key. An information search means for searching for accident information and searching for related information; and when the information search means finds relevant accident information. ,
It is possible to store the accident information extracted by the information extraction means in the same storage area as the accident information stored in the storage means found by the information search means, and to find the one related to the information search means. A storage control unit that stores the accident information extracted by the information extraction unit in a storage area different from the accident information stored in the storage unit searched by the information search unit; A power distribution system control system, comprising: recovery control means for controlling the switch based on the accident information stored in the storage area and performing an accident recovery operation.
【請求項2】上記事故メッセージは事故情報として事故
発生日時に関する情報を含むことを特徴とする請求項1
に記載の配電系統制御システム。
2. The accident message according to claim 1, wherein the accident message includes information on the date and time when the accident occurred.
2. The distribution system control system according to 1.
【請求項3】上記事故メッセージは事故情報として関連
設備に関する情報を含むことを特徴とする請求項1に記
載の配電系統制御システム。
3. The distribution system control system according to claim 1, wherein the accident message includes information on related equipment as accident information.
JP2328137A 1990-11-28 1990-11-28 Distribution system control system Expired - Lifetime JP2807338B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2328137A JP2807338B2 (en) 1990-11-28 1990-11-28 Distribution system control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2328137A JP2807338B2 (en) 1990-11-28 1990-11-28 Distribution system control system

Publications (2)

Publication Number Publication Date
JPH04197033A JPH04197033A (en) 1992-07-16
JP2807338B2 true JP2807338B2 (en) 1998-10-08

Family

ID=18206912

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2328137A Expired - Lifetime JP2807338B2 (en) 1990-11-28 1990-11-28 Distribution system control system

Country Status (1)

Country Link
JP (1) JP2807338B2 (en)

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5771228A (en) * 1980-10-20 1982-05-04 Tokyo Electric Power Co Automatic recovery operation deciding system
JPH0697811B2 (en) * 1987-06-19 1994-11-30 東京電力株式会社 Accident facility determination method for power system

Also Published As

Publication number Publication date
JPH04197033A (en) 1992-07-16

Similar Documents

Publication Publication Date Title
CN102035202A (en) Network reconfiguration system
CN109324501A (en) The battery management system of double MCU and its more redundant fault reconstructing methods
JPH0514975A (en) Centralized monitor system
CN113595245B (en) Testing system and method of accurate load control system based on 5G communication
CN100442632C (en) Automatic module configuration in a telecommunications power system and battery configuration with a click
JP2807338B2 (en) Distribution system control system
CN106655520B (en) Ensure the method that relay protection remote operation securely and reliably executes
CN201149993Y (en) Protection fault information processing apparatus based on switch quantitative deflection
JP2807339B2 (en) Distribution system control system
JP2599772B2 (en) Remote monitoring and control device
EP3598701B1 (en) Method and system for processing critical logic state
JP2825640B2 (en) Distribution system control system
JP2749442B2 (en) Distribution system control system
CN106528618A (en) Method, device and system for storing and querying data of power network monitoring system
JP2956601B2 (en) Fault segmentation device for distribution system
JP2807340B2 (en) Distribution system control system
JP3165269B2 (en) Distribution system operation device
CN113612228B (en) Multi-dimensional information fusion-based feeder automation active fault processing system, method and readable storage medium
JP2000032661A (en) Risk management apparatus for power equipment data
JPH08149582A (en) Remote monitor and control system
JPH1028321A (en) Fault-section detector for power distribution system
JPS639355A (en) Notification management system by telephone line
JPS59106824A (en) Method of automatically recovering original system
JPS6016141A (en) Power distributing operation monitoring device
CN117937735A (en) Fusion method, system, equipment and medium of fault wave recording and scheduling system