JP2956601B2 - Fault segmentation device for distribution system - Google Patents

Fault segmentation device for distribution system

Info

Publication number
JP2956601B2
JP2956601B2 JP20542496A JP20542496A JP2956601B2 JP 2956601 B2 JP2956601 B2 JP 2956601B2 JP 20542496 A JP20542496 A JP 20542496A JP 20542496 A JP20542496 A JP 20542496A JP 2956601 B2 JP2956601 B2 JP 2956601B2
Authority
JP
Japan
Prior art keywords
switchgear
section
ground fault
information
power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP20542496A
Other languages
Japanese (ja)
Other versions
JPH1032924A (en
Inventor
孝 土居
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nissin Electric Co Ltd
Original Assignee
Nissin Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nissin Electric Co Ltd filed Critical Nissin Electric Co Ltd
Priority to JP20542496A priority Critical patent/JP2956601B2/en
Publication of JPH1032924A publication Critical patent/JPH1032924A/en
Application granted granted Critical
Publication of JP2956601B2 publication Critical patent/JP2956601B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Locating Faults (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、変電所から引出さ
れた配電線の地絡事故が発生した区間を、その区間の
分開閉器を開放状態にロックして上流の健全区間から
切離す配電系統の故障区間区分装置に関する。
[0001] The present invention relates to a substation drawn from a substation.
A section ground fault distribution line occurs which relates the fault section sorting apparatus of the distribution system disconnecting lock ward <br/> component switch of the section in the open state from the upstream of each sound interval.

【0002】[0002]

【従来の技術】従来、配電系統においては、図8に示す
ように、上流の変電所1の系統電源2から遮断器3を介
して3相の配電線4が引出され、この配電線4が複数の
開閉装置VS1,VS2,…の区分開閉器5により複数の
区間#0,#1,#2,…に区分される。
Conventionally, in a power distribution system, as shown in FIG. 8, distribution lines 4 of three phases through the circuit breaker 3 from the system power supply 2 of the upstream substation 1 is pull-out, the distribution lines 4 The plurality of switches VS 1 , VS 2 ,... Are divided into a plurality of sections # 0, # 1, # 2,.

【0003】さらに、各開閉装置VS1 ,VS2 ,…は
区分開閉器5とこの開閉器5を開閉する開閉器制御装置
6により形成され、この開閉器制御装置6は変圧器7,
8を介したそれぞれの区分開閉器5の上流側(電源側又
は変電所側),負荷側のいずれか一方の系統電源により
動作する。
[0003] Further, each switchgear VS 1, VS 2, ... is formed by switch control device 6 for opening and closing the switch 5 of the section switch 5 Toko, the switch controller 6 transformers 7,
The operation is performed by using either the system power supply on the upstream side (the power supply side or the substation side) or the load side of each of the segmented switches 5 via the switch 8.

【0004】そして、従来は各開閉器制御装置6に時限
式故障区間検出機能が付加され、いずれかの区間で地絡
事故が発生すると、つぎに説明する遮断器3の再投入,
再々投入による配電線4の試充電により、地絡事故が発
生した故障区間が系統から切離される。
[0004] Conventionally, a timed failure section detection function is added to each switch control device 6, and if a ground fault occurs in any section, the breaker 3 will be re-closed as described below.
The fault section in which the ground fault has occurred is disconnected from the system by the trial charging of the distribution line 4 by the re-injection.

【0005】すなわち、図9に示すように配電線4に上
流側から順の5個の開閉装置VS1,…,VS5 が設け
られ、時刻taに開閉装置VS3 の負荷側自区間#3で
地絡事故が発生したとすると、図10に示すように、地
絡の発生に基づく配電線4の過電流通電により遮断器3
がトリップして閉(ON)から開(OFF)になる。
Namely, switchgear VS 1 order of five from the upstream side to the distribution line 4 as shown in FIG. 9, ..., VS 5 is provided, the load-side self-section # 3 of the switchgear VS 3 at time ta Assuming that a ground fault has occurred in FIG. 10, as shown in FIG.
Trips and changes from closed (ON) to open (OFF).

【0006】そして、遮断器3の開放により配電線4の
系統電圧が消失すると、各開閉装置VS1 〜VS5 の区
分開閉器5が開放される。
[0006] When the system voltage of the distribution line 4 is lost by opening the circuit breaker 3, sectionalizing switch 5 of the switchgear VS 1 ~VS 5 is opened.

【0007】つぎに、地絡発生から1分経過してtbに
なると、遮断器3が再閉路し、この再閉路により区間#
0が復電すると、所定の投入時限τonで最上流の開閉
装置VS1 の区分開閉器5が投入されて閉じる。
Next, when one minute elapses from the occurrence of the ground fault and reaches tb, the circuit breaker 3 is reclosed, and the reopening causes the section #.
0 When resuming, closed sectionalizing switch 5 of the most upstream switchgear VS 1 is turned in a predetermined charged timed Tauon.

【0008】この投入によりtcに開閉装置VS1 の自
区間#1が復電すると、開閉装置VS1 はその開閉器制
御装置6により区分開閉器5の投入から所定の検出時限
τd(<τon)内に区間#1の系統電圧が消失するか
否かを監視する。
[0008] own interval # 1 of the switchgear to tc VS 1 This turned the power recovery, switching device VS 1 is predetermined detection time period τd from the input of the section switch 5 by the switch control unit 6 (<τon) It is monitored whether or not the system voltage of the section # 1 disappears within the period.

【0009】そして、区間#1は健全で検出時限τdが
経過しても区間#1の系統電圧が消失しないため、区間
#1の復電から投入時限τonの経過後につぎの区間#
2の開閉装置VS2 の区分開閉器5が投入されて閉じ
る。
Since the section # 1 is sound and the system voltage of the section # 1 does not disappear even after the detection time τd elapses, the next section # 1 after the power-on time τon elapses from the power recovery of the section # 1.
The switchgear 5 of the second switchgear VS2 is turned on and closed.

【0010】この投入により開閉装置VS2 の自区間#
2がtdに復電すると、開閉装置VS2 の開閉器制御装
置6により検出時限τd内に区間#2の系統電圧が消失
するか否かを監視する。
[0010] By this input, the own section # of the switchgear VS 2
2 When resuming the td, monitors whether the system voltage of the section # 2 in the detection time period τd is lost by switch control unit 6 of the switchgear VS 2.

【0011】そして、区間#2も健全で検出時限τdが
経過しても区間#2の系統電圧が消失しないため、区間
#2の復電から投入時限τon経過後につぎの区間#3
の開閉装置VS3 の区分開閉器5が投入され、この区分
開閉器5がteに閉じる。
Since the section # 2 is sound and the system voltage of the section # 2 does not disappear even after the detection time τd elapses, the next section # 3 after the power-on time τon elapses from the power recovery of the section # 2.
Sectionalizing switches 5 switchgear VS 3 is turned in, the sectionalizing switch 5 is closed to te.

【0012】このとき、区間#3が地絡事故の発生した
故障区間であり、配電線4に再び過電流が流れ、遮断器
3が再びトリップして開放され、配電線4が停電する。
At this time, section # 3 is a faulty section in which a ground fault has occurred, an overcurrent flows again in the distribution line 4, the circuit breaker 3 is again tripped and opened, and the distribution line 4 is cut off.

【0013】この停電が区間#3の復電から検出時限τ
d内に生じるため、開閉装置VS3の開閉器制御装置6
は自区間#3の区分開閉器5を開放状態にロックする。
[0013] This power failure is detected from the power recovery in the section # 3 until the detection time period τ.
d, the switch control device 6 of the switch VS 3
Locks the sectional switch 5 of the own section # 3 in the open state.

【0014】そして、3分経過してtfになると遮断器
3が再々閉路し、その後、投入時限τonずつ遅れたt
g,thに区間#1,#2の開閉装置VS1 ,VS2
区分開閉器5が順次に時限投入され、故障区間#3の上
流の健全区間#0,#1,#2が順に復電する。
When three minutes have elapsed and the time tf has elapsed, the circuit breaker 3 is closed again, and thereafter, the time t is delayed by the closing time τon.
The switching devices VS 1 and VS 2 of the sections # 1 and # 2 are time-sequentially switched on at times g and th, and the healthy sections # 0, # 1 and # 2 upstream of the failure section # 3 are sequentially restored. To charge.

【0015】また、thに健全区間#2が復電しても故
障区間#3の開閉装置VS3 の区分開閉器5が開放状態
にロックされ、この区分開閉器5は投入されず、故障区
間#3及びその負荷側の各区間#4,#5が系統から切
離される。そのため、遮断器3の再閉路,再々閉路の試
充電により、故障区間#3が切離されてその上流側の健
全区間#0〜#2が復旧する。
Further, even if power is restored a healthy section # 2 in th is section switch 5 of the switchgear VS 3 Breakdown section # 3 is locked in the open state, the sectionalizing switch 5 is not turned on, the fault section # 3 and each section # 4, # 5 on the load side are disconnected from the system. Therefore, the fault section # 3 is separated by the test charging of the circuit breaker 3 for re-closing and re-closing, and the sound sections # 0 to # 2 on the upstream side are restored.

【0016】なお、故障区間#3より負荷側の健全区間
#4,#5の復電は、故障区間#3の検出に基づく復電
作業により、区間#4の開閉装置VS4 の区分開閉器5
を開放状態にロックした後、配電線4の負荷端の常開の
連係用開閉器(図示せず)を閉成し、この開閉器を介し
た他の配電系統により配電線4を負荷側から充電して行
われる。
[0016] Further, the malfunction section # 3 than the load side of the sound interval # 4, power recovery # 5, the Fukuden work based on the detection of a fault section # 3, sectionalizing switch of the switchgear VS 4 sections # 4 5
Is locked in an open state, a normally open linking switch (not shown) at the load end of the distribution line 4 is closed, and the distribution line 4 is disconnected from the load side by another distribution system via this switch. It is done by charging.

【0017】[0017]

【発明が解決しようとする課題】前記従来のように地絡
事故が発生したときに、変電所1の遮断器3の再閉路,
再々閉路により配電線4を時限順次試充電し、故障区間
#3を系統から切離す場合、その上流の健全区間#0〜
#2が復電するまでに時限順次試充電を2回行う必要が
あり、健全区間#0〜#2を迅速に復電することができ
ない問題点がある。しかも、再閉路の試充電により復電
した後再び配電線4が停電し、配電線4の複数回の停電
が発生する問題点もある。
When a ground fault occurs as in the prior art, when the circuit breaker 3 of the substation 1 is closed,
When the distribution line 4 is time-sequentially trial-recharged by a reclose circuit and the faulty section # 3 is separated from the system, the upstream healthy sections # 0 to # 0
It is necessary to perform the test charging twice in a time-sequential manner before # 2 recovers power, and there is a problem that it is not possible to quickly recover power in the healthy sections # 0 to # 2. In addition, there is also a problem that the power distribution line 4 stops again after the power is restored by the trial charging of the reclosing circuit, and a plurality of power failures of the distribution line 4 occur.

【0018】本発明は、地絡事故の発生時、配電線の試
充電をくり返すことなく、迅速に、かつ、停電のくり返
しを防止して故障区間を切離し、健全区間の復電が行え
るよにすることを課題とする。
According to the present invention, in the event of a ground fault, the faulty section can be separated quickly and the faulty section can be separated without repeating the trial charging of the distribution line to prevent the repetition of the power outage, and the normal section can be restored. The task is to

【0019】[0019]

【課題を解決するための手段】前記の課題を解決するた
めに、本発明の配電系統の故障区間区分装置において
は、開閉装置の開閉器制御装置に、配電線の停電中に
動作電源を給電するバックアップ電源と、自区間の電流
監視に基づき地絡事故の発生時に発生方向が自区間の上
流側,負荷側のいずれであるかを判別して検出し,地絡
方向を検出する手段と、地絡事故の発生により変電所の
遮断器が開放されて配電線が停電する間に,情報収集の
通信により,上流側又は負荷側の隣りの開閉装置の開閉
器制御装置から上流側又は負荷側の各区間の地絡方向の
検出結果を受信し,受信した情報に自区間の地絡方向の
検出結果を付加し,事故情報として負荷側又は上流側の
隣りの開閉装置の開閉器制御装置に伝送し,最も負荷側
又は最も上流側の開閉装置の開閉器制御装置に全ての開
閉装置の地絡方向の検出結果の事故情報を収集させる手
段と、 情報収集の通信の終了後の情報配信の通信によ
り,負荷側又は上流側の隣りの開閉装置の開閉器制御装
置から事故情報の収集結果を受信して上流側又は負荷側
の隣りの開閉装置の開閉器制御装置に伝送し,最も負荷
側又は最も上流側の開閉装置の開閉器制御装置に収集さ
れた全ての開閉装置の地絡方向の検出結果を情報収集の
通信の逆に伝送して各開閉装置に配信させる手段と、
信された事故情報の地絡方向の変化から故障区間を検出
する手段と、故障区間の検出結果に基づき自区間が故障
区間のときに自装置の区分開閉器を変電所の遮断器が投
入されて配電線が復電する前に開放状態にロックする手
段とを備える。
In order to solve the above-mentioned problems, in the fault segmentation apparatus for a distribution system according to the present invention, an operation power supply is supplied to a switch control device of each switchgear during a power failure of a distribution line. Backup power supply to supply and current of own section
When the ground fault occurs, the direction of the
A means for detecting and detecting the flow side or the load side, and detecting the direction of the ground fault.
While the circuit breaker is open and the distribution line goes out,
Opening and closing of the switchgear adjacent to the upstream or load side by communication
Of each section on the upstream or load side from the
The detection result is received, and the received information
Adds the detection result and provides the accident information on the load side or upstream side as accident information.
Transmit to the switch control device of the next switchgear.
Or, open all switches to the switchgear control unit of the most upstream switchgear.
Hand to collect accident information of detection result of ground fault direction of closed device
And communication of information distribution after completion of communication for information collection.
Switch control device of the switchgear adjacent to the load side or upstream side.
Received the accident information collection result from the
To the switchgear control of the switchgear next to
Collected in the switchgear control device of the side or the most upstream switchgear.
Of the detected ground fault direction of all switchgear
And means for distributing and transmitting the reverse communication to each switchgear, comprising: means for detecting a failure period from the ground fault the direction of change of the delivered that late information, the own section based on the detection result of the failure zone is fault zone Sometimes a substation circuit breaker throws its own switchgear.
Input has been distribution line is provided with a means for locking an open state before power recovery.

【0020】したがって、配電線のいずれかの区間に
絡事故が発生して配電線が停電すると、各開閉装置の開
閉器制御装置間の情報収集の通信により、各開閉装置の
地絡方向の検出結果が順次伝送により最も負荷側又は最
も上流側の開閉装置の開閉器制御装置に収集される。さ
らに、情報収集後情報配信の通信により、収集された
全ての開閉装置の地絡方向の検出結果が、情報収集の通
信の逆に配信されて全ての開閉装置の開閉器制御装置に
保持される。
Accordingly, when a ground fault occurs in any section of the distribution line and the distribution line is cut off, each switchgear is opened.
The communication of information gathering between 閉器controller, most load side or top by a ground fault direction detection result sequential transmission of each switchgear
Is also collected in the switchgear control unit of the upstream switchgear . Furthermore, after the information is collected, the detection results of the collected ground fault directions of all switchgears are transmitted through the information distribution communication.
The signal is distributed in the reverse direction and is held in the switch control devices of all switch devices .

【0021】そして、各開閉装置はそれぞれの開閉器制
御装置により、全ての開閉装置の地絡方向の検出結果
変化から地絡事故が発生した故障区間を検出し、自区間
が故障区間であれば、前記地絡事故による停電中に自区
間の区分開閉器を開放状態にロックする。
Each switching device has its own switch control.
Control device to detect the ground fault direction of all switchgears .
A fault section in which a ground fault accident has occurred is detected from the change , and if the own section is a fault section, the section switch of the own section is locked in an open state during a power failure due to the ground fault accident.

【0022】そのため、各開閉装置間の通信により、地
絡事故の停電中に故障区間が系統から切離され、配電線
の試充電をくり返すことなく、迅速に、しかも、復電に
伴う配電線の停電をくり返すこともなく、上流の健全区
間が復電される。
[0022] Therefore, the communication between the switchgears disconnects the faulty section from the system during the power failure due to the ground fault, so that the distribution line can be quickly and without the need to repeat the charging of the distribution line, and the distribution can be performed in the event of a power recovery. Power is restored in the upstream healthy section without repeating power outages.

【0023】[0023]

【発明の実施の形態】本発明の実施の1形態につき、図
1ないし図7を参照して説明する。配電系統を示した図
2において、図8の従来構成と異なる点は、従来の開閉
装置VS1 ,VS2 ,…の代わりに、区分開閉器5と開
閉器制御装置9とからなる開閉装置VS1,VS2,…
を設けるとともに、各開閉装置VS1,VS2,…の負
荷側近傍に系統電流を検出する3相の変流器10を設け
た点である。
DESCRIPTION OF THE PREFERRED EMBODIMENTS One embodiment of the present invention will be described with reference to FIGS. 2 shows the power distribution system, conventional configuration differs from the FIG. 8, a conventional switchgear VS 1, VS 2, ... instead of, comprising a section switch 5 switch controller 9 Metropolitan switchgear VS1 , VS2, ...
And a three-phase current transformer 10 for detecting a system current near the load side of each of the switching devices VS1, VS2,.

【0024】そして、開閉器制御装置9は図1に示すよ
うに構成され、変圧器7,8を介した系統電源により充
電されるバックアップ電源11,マイクロコンピュータ
構成の制御処理部12,隣りの開閉装置VS1,VS
2,…の開閉器制御装置9と無線通信する無線送受信器
13を備え、制御処理部12に情報等を保持する不揮発
性メモリ等の記憶部14が設けられている。
The switch control device 9 is configured as shown in FIG. 1, and includes a backup power supply 11 charged by a system power supply via the transformers 7 and 8, a control processing unit 12 of a microcomputer configuration, and an adjacent switch. Devices VS1, VS
The control processing unit 12 is provided with a storage unit 14 such as a non-volatile memory for storing information and the like.

【0025】また、変流器10は図1に示すように、相
毎の変流器10a,10b,10cからなり、各変流器
10a〜10cの検出電流の出力が制御処理部12に供
給される。
As shown in FIG. 1, the current transformer 10 includes current transformers 10a, 10b, and 10c for each phase, and outputs detected currents of the current transformers 10a to 10c to the control processing unit 12. Is done.

【0026】つぎに、制御処理部12について説明す
る。制御処理部12は予め設定された故障検出,開閉制
御及び通信制御のプログラムを実行し、つぎの各手段を
備える。
Next, the control processing section 12 will be described. The control processing unit 12 executes a preset program for failure detection, opening / closing control, and communication control, and includes the following units.

【0027】地絡方向検出手段 変流器10a〜10cの各相の検出電流を監視し,地絡
事故の発生時、各相の検出電流の大きさから相毎に地絡
事故の発生方向が自区間#1,#2,…の上流側,負荷
側のいずれであるかを判別して検出する手段であり、検
出結果は記憶部14に事故情報として保持される。
Ground fault direction detecting means The detected current of each phase of the current transformers 10a to 10c is monitored, and when a ground fault occurs, the direction of occurrence of the ground fault is determined for each phase from the magnitude of the detected current of each phase. This is means for discriminating and detecting whether it is on the upstream side or the load side of the own section # 1, # 2,..., And the detection result is stored in the storage unit 14 as accident information.

【0028】情報収集,情報配信の通信制御手段 無線送受信器13を介して隣りの開閉装置VS1,VS
2,…の開閉器制御装置9と、例えば無線のポーリング
通信で情報をやりとりし、つぎの情報収集,情報配信の
通信を行う手段である。
Communication control means for collecting and distributing information Adjacent switchgears VS1, VS via radio transceiver 13
It is means for exchanging information with the switch control device 9 of 2,..., For example, by wireless polling communication, and performing communication of the next information collection and information distribution.

【0029】(i)情報収集の通信 連続的(周期的)又は事故発生毎に、受信側に設定され
た上流側の隣りの開閉装置VS1,VS2,…からの受
信情報に記憶部14の自区間#2,#3,…の最新の事
故情報を付加して送信情報を形成し、この情報を送信側
に設定された負荷側の隣りの開閉装置VS2,VS3,
…に送信し、各開閉装置VS1,VS2,…の事故情報
を開閉装置VS1,VS2,…間で順に伝送して収集す
る通信である。
(I) Information collection communication Continuously (periodically) or every time an accident occurs, the storage unit 14 stores the received information from the upstream switchgear VS1, VS2,. The transmission information is formed by adding the latest accident information of the sections # 2, # 3,..., And this information is transmitted to the switchgear VS2, VS3 next to the load side set on the transmission side.
, And transmits and collects accident information of the switching devices VS1, VS2,... Sequentially between the switching devices VS1, VS2,.

【0030】(ii)情報配信の通信 情報収集の通信が終了する毎に、収集された全ての開閉
装置VS1,VS2,…の事故情報を情報収集と逆に順
に伝送して各開閉装置VS1,VS2,…に配信する通
信であり、配信された情報は各開閉装置VS1,VS
2,…の記憶部14に保持される。なお、1つの配電系
統の開閉装置VS1,VS2,…の数は、一般に7台前
後であり、1回の情報収集と情報配信の通信は、順次の
ポーリング通信であっても、遮断器3が地絡事故で開放
されてから再閉路するまでの時間(1分)より短い時間
内に終了する。
(Ii) Communication of information distribution Each time the communication of information collection is completed, the collected accident information of all switchgears VS1, VS2,. VS2,... VS2, VS2,.
2, are stored in the storage unit 14. The number of switchgears VS1, VS2,... Of one distribution system is generally about seven. Even if the communication of one information collection and information distribution is sequential polling communication, The operation is completed within a time shorter than the time (1 minute) from the time of opening due to a ground fault to the time of re-closing.

【0031】(iii)故障区間検出手段 記憶部14の配信された各開閉装置VS1,VS2,…
の事故情報から、地絡方向が逆転する境界の区間を故障
区間として検出する手段である。
(Iii) Fault section detection means Each switchgear VS1, VS2,.
From the accident information described above, a section at the boundary where the ground fault direction is reversed is detected as a failure section.

【0032】(iv)故障区間切離手段 故障区間検出手段により検出された故障区間が負荷側自
区間#1,#2,…のときに、区分開閉器5を開放状態
にロックして故障区間を系統から切離す手段である。
(Iv) Fault section separating means When the fault section detected by the fault section detecting means is the load-side own section # 1, # 2,... Is a means for disconnecting from the system.

【0033】つぎに、開閉装置VS1,VS2,…を5
台とし、図3に示すように区間#3に地絡事故が発生し
た場合について説明する。まず、区間#3の地絡事故が
Taに発生すると、図4に示すように、変電所1の遮断
器3が直ちにトリップして開き、配電線4が停電し、こ
の停電により、系統電圧の消失に基づいて各開閉装置V
S1〜VS5の区分開閉器5が開放される。
Next, the switching devices VS1, VS2,.
A case where a ground fault occurs in section # 3 as shown in FIG. 3 will be described. First, when a ground fault in section # 3 occurs at Ta, as shown in FIG. 4, the circuit breaker 3 of the substation 1 immediately trips and opens, and the power distribution line 4 experiences a power failure. Each switching device V based on the disappearance
The segmented switches 5 of S1 to VS5 are opened.

【0034】このとき、各開閉装置VS1〜VS5はバ
ックアップ電源11により動作し、それぞれの変流器1
0a〜10cの検出電流から相毎に地絡方向を検出し、
検出結果の事故情報を記憶部14に書込んで保持する。
At this time, each of the switching devices VS1 to VS5 is operated by the backup power supply 11, and the respective current transformers 1
The ground fault direction is detected for each phase from the detected currents 0a to 10c,
The accident information of the detection result is written and stored in the storage unit 14.

【0035】また、停電中に情報収集,情報配信の無線
通信が行われ、情報収集の無線通信により図5の破線ア
に示すように、予め設定された順序にしたがって各開閉
装置VS1〜VS5の開閉器制御装置9間で事故情報が
順次に伝送され、全ての開閉装置VS1〜VS5の事故
情報が収集される。
Further, during the power failure, wireless communication for information collection and information distribution is performed, and as shown by the broken line a in FIG. 5, the respective switching devices VS1 to VS5 are operated in a predetermined order by the wireless communication for information collection. The accident information is sequentially transmitted between the switch control devices 9, and the accident information of all the switch devices VS1 to VS5 is collected.

【0036】さらに、情報配信の無線通信により、図5
の破線イに示すように、情報収集の逆に収集された事故
情報が各開閉装置VS1〜VS5の開閉器制御装置9に
配信され、それぞれの記憶部14に保持される。
Further, by wireless communication for information distribution, FIG.
The accident information collected in the reverse of the information collection is distributed to the switch control devices 9 of the switchgears VS1 to VS5 and held in the respective storage units 14 as shown by the broken line A in FIG.

【0037】ところで、情報収集,情報配信の通信信号
は、例えば図6の(a)に示すように、先頭の伝送種別
エリアaと末尾の終了符号(エンドコード)のエリアb
との間に各開閉装置VS1〜VS5の事故情報のエリア
1 〜c5 を設けて形成される。
As shown in FIG. 6A, for example, a communication signal for information collection and information distribution includes a first transmission type area a and a last end code (end code) area b.
The area c 1 to c 5 accident information of each switchgear VS1~VS5 is formed is provided between the.

【0038】さらに、伝送種別エリアaは同図の(b)
に示すように、先頭から順の同期エリアa1 ,情報収集
/配信識別エリアa2 ,通信開始アドレス(ポーリング
スタートアドレス)のエリアa3 ,つぎの伝送先を示す
呼出アドレスのエリアa4 ,通信終了アドレス(ポーリ
ングエンドアドレス)のエリアa5 からなる。
Further, the transmission type area a is shown in FIG.
As shown in the figure, the synchronization area a 1 , the information collection / distribution identification area a 2 , the communication start address (polling start address) area a 3 , the call address area a 4 indicating the next transmission destination, and the communication consisting of area a 5 of the end address (polling end address).

【0039】そして、同期エリアa1 にはいわゆる同期
信号が書込まれ、識別エリアa2 には情報収集,情報配
信のいずれであるかを示す識別情報が書込まれ、各アド
レスのエリアa3 〜a5 には、情報収集を開始する開閉
装置VS1のアドレス,伝送にしたがって変化する送信
側の隣りの開閉装置のアドレス,情報収集の最後の開閉
装置VS5のアドレスが書込まれる。また、エリアbに
は終了符号(エンドコード)ENDが書き込まれる。
Then, a so-called synchronization signal is written in the synchronization area a 1 , identification information indicating whether to perform information collection or information distribution is written in the identification area a 2, and an area a 3 of each address is written. the ~a 5, the address of the switchgear VS1 to start collecting information, address switchgear next to the sender that varies according to a transmission, the last address of the switchgear VS5 collect information is written. In the area b, an end code (end code) END is written.

【0040】そして、各開閉装置VS1〜VS5の故障
情報をDVS1〜DVS5とすると、情報収集の通信時
は、伝送にしたがってエリアa4 のアドレスが開閉装置
VS2のアドレスから開閉装置VS5のアドレスに順に
書換えられるとともに、エリアc1 ,c2 ,…に順次に
それぞれの事故情報VDS1,VDS2,…が書込まれ
る。
[0040] Then, when the failure information of each switchgear VS1~VS5 and DVS1~DVS5, when communicating information gathering in order to area a 4 addresses the address of the switchgear VS5 from the address of the switchgear VS2 according to a transmission with rewritten, the area c 1, c 2, the successively each ... accident information VDS1, VDS2, ... are written.

【0041】そのため、情報収集の通信により、例えば
最初の開閉装置VS1から隣りの開閉装置VS2に伝送
するときの通信信号は図6の(c)に示すようになる。
For this reason, a communication signal transmitted from, for example, the first switchgear VS1 to the adjacent switchgear VS2 by the information collection communication is as shown in FIG. 6C.

【0042】また、最後の開閉装置VS5においては、
受信した通信信号に事故情報DVS1〜DVS4が含ま
れ、これらの情報DVS1〜DVS4と自装置VS5の
事故情報DVS5とにより全ての区分開閉装置VS1〜
VS5の事故情報DVS1〜DVS5が収集される。
In the last switchgear VS5,
The received communication signal includes the accident information DVS1 to DVS4, and all the switching devices VS1 to VS1 are determined by the information DVS1 to DVS4 and the accident information DVS5 of the own device VS5.
Accident information DVS1 to DVS5 of VS5 is collected.

【0043】さらに、情報配信の通信信号は、図6の
(d)に示すように、エリアc1 〜c5 に各開閉装置V
S1〜VS5の事故情報DVS1〜DVS5が書込まれ
た信号からなり、エリアa4 のアドレスが伝送によって
開閉装置VS4のアドレスから開閉装置VS1のアドレ
スに順に変化する。
Further, as shown in FIG. 6D, communication signals for information distribution are provided in each of the switching devices V in the areas c 1 to c 5.
Accident information DVS1~DVS5 of S1~VS5 consists written signal, the address of the area a 4 is changed in order to address the switchgear VS1 from the address of the switchgear VS4 by transmission.

【0044】つぎに、各開閉装置VS1〜VS5の開閉
器制御装置9は、記憶部14に保持された例えば図6の
(e)に示す配信情報に基づき、各開閉装置VS1〜V
S5の地絡方向を識別する。
Next, the switch control device 9 of each of the switching devices VS1 to VS5, based on, for example, the distribution information shown in FIG.
The ground fault direction in S5 is identified.

【0045】そして、区間#3で地絡事故が発生する
と、開閉装置VS3,VS4の地絡方向の検出結果が逆
転するため、この逆転により区間#3が故障区間である
と判別する。この判別に基づき、負荷側自区間#3が故
障区間になった開閉装置VS3の開閉器制御装置9は、
直ちに区分開閉器5を開放状態にロックする。
When a ground fault occurs in section # 3, the detection results of the direction of ground fault of switchgears VS3 and VS4 are reversed, so that section # 3 is determined to be a failure section by this reversal. Based on this determination, the switch control device 9 of the switchgear VS3 in which the load-side own section # 3 has become a failure section,
Immediately lock the sectional switch 5 in the open state.

【0046】以上の開放状態のロックに基づく故障区間
#3の切離しが、地絡事故の発生から遮断器3が再閉路
するまでの1分以内に行われる。そして、地絡事故の発
生Taから1分経過してTbになると、時限順次試送電
を行うため、図4に示すように変電所1の遮断器3が従
来と同様に再閉路する。
The disconnection of the failure section # 3 based on the lock in the open state is performed within one minute from the occurrence of the ground fault accident until the circuit breaker 3 is closed again. Then, when one minute elapses from the occurrence of the ground fault and reaches Tb, test transmission is performed in a time-sequential manner. Therefore, as shown in FIG. 4, the circuit breaker 3 of the substation 1 is reclosed in a conventional manner.

【0047】この再閉路により区間#0が復電すると、
Tbから投入時限τon経過後のTcに開閉装置VS1
の区分開閉器5が投入されて閉成し、区間#1が復電す
る。さらに、Tcから投入時限τon経過してTdにな
ると、開閉装置VS2の区分開閉器5が投入されて閉成
し、区間#2が復電する。
When power is restored in section # 0 due to this reclosing,
The switchgear VS1 is set at Tc after the passage of the closing time τon from Tb.
Are closed and closed, and section # 1 is restored. Further, when the switching time τon elapses from Tc and reaches Td, the sectional switch 5 of the switching device VS2 is closed and closed, and power is restored in the section # 2.

【0048】このとき、開閉装置VS3の区分開閉器5
が開放状態にロックされているため、区間#2の復電か
ら投入時限τonが経過しても開閉装置VS3の区分開
閉器5が投入されず、図7に示すように故障区間#3が
系統から切離され、その上流の健全区間#0〜#2が復
電する。なお、図7の矢印は地絡の検出方向を示す。
At this time, the sectional switch 5 of the switch VS3
Is locked in an open state, the section switch 5 of the switchgear VS3 is not turned on even if the turning-on time τon elapses after the restoration of power in the section # 2, and as shown in FIG. And healthy sections # 0 to # 2 upstream thereof are restored. The arrow in FIG. 7 indicates the direction in which the ground fault is detected.

【0049】そして、故障区間#3の切離しが地絡事故
の停電中に行われ、遮断器3の再閉路により健全区間#
0〜#2が復電するため、健全区間#0〜#2の復電が
従来の再々閉路により復電する場合より迅速に行われ
る。しかも、事故の発生後に健全区間#0〜#2が試充
電で停電することもない。
The disconnection of the faulty section # 3 is performed during the power failure due to the ground fault, and the breakage of the breaker 3 causes the healthy section # 3 to be disconnected.
Since the power is restored in 0 to # 2, the power restoration in the healthy sections # 0 to # 2 is performed more quickly than in the conventional case where the power is restored by the re-closed circuit. In addition, there is no power failure in the healthy sections # 0 to # 2 due to the trial charging after the occurrence of the accident.

【0050】なお、故障区間#3より負荷側の健全間#
4,#5については、従来と同様の復電操作により、連
係する他の系統から充電されて復電する。
It is to be noted that a period between the failure section # 3 and the healthy side on the load side #
For # 4 and # 5, the power is restored from other linked systems by the same power recovery operation as before, and power is recovered.

【0051】そして、各開閉装置VS1,VS2,…間
の通信で故障区間を検出して切離すため、例えば電力会
社の営業所に遠方監視制御の親局装置を設け、この親局
装置により各開閉装置の開閉器制御装置と情報をやりと
りして故障区間を検出し、この区間を親局制御で切離す
場合に比して高価な親局装置等が不要で設備コストがか
からず、経済的である。
In order to detect and isolate a faulty section by communication between the switchgears VS1, VS2,..., A master station device for remote monitoring control is provided, for example, at a business office of a power company. Information is exchanged with the switch control device of the switchgear to detect a faulty section, which eliminates the need for expensive master station equipment, etc. as compared with the case where this section is separated by master station control. It is a target.

【0052】ところで、開閉装置VS1,VS2,…の
台数や地絡方向の検出手法等はどのようであってもよ
く、例えば地絡方向の検出を全相一括で行うようにして
もよい。また、情報収集,情報配信の信号伝送方向は前
記と逆であってもよく、信号伝送を有線で行うようにし
てもよい。さらに、通信の信号形式等はどのようであっ
てもよい。
The number of switchgears VS1, VS2,... And the method of detecting the ground fault direction may be of any type. For example, the detection of the ground fault direction may be performed for all phases at once. Further, the signal transmission direction of the information collection and the information distribution may be opposite to the above, and the signal transmission may be performed by wire. Further, the communication signal format and the like may be any.

【0053】[0053]

【発明の効果】本発明は、以下に記載する効果を奏す
る。配電線4のいずれかの区間#0,#1,#2,…
地絡事故が発生して配電線4が停電すると、各開閉装置
VS1〜VS5の開閉器制御装置9間の情報収集通信
により、各開閉装置VS1〜VS5の地絡方向の検出結
果が、自装置の検出結果を付加しつつ事故情報として最
も上流側の装置から最も負荷側の装置又はその逆に順に
伝送され、最も負荷側又は最も上流側の開閉装置(例え
ば開閉装置VS5)に、全ての開閉装置VS1〜VS5
の地絡方向の検出結果を収集することができる。 さら
に、この情報収集後は情報配信の通信により、収集され
た各開閉装置VS1〜VS5の地絡方向の検出結果が、
情報収集の通信の逆に配信され、全ての開閉装置VS1
〜VS5の開閉器制御装置9に、各開閉装置VS1〜V
S5の地絡方向の検出結果を保持することができる。
して、各開閉装置VS1〜VS5はそれぞれの開閉器制
御装置9により、全ての開閉装置VS1〜VS5の地絡
方向の検出結果の変化から地絡事故が発生した故障区間
を検出し、自区間が故障区間であれば、配電線4の停電
中、すなわち地絡事故による停電中に自区間の区分開閉
器5を開放状態にロックすることができる。
The present invention has the following effects. When a ground fault occurs in any of the sections # 0, # 1, # 2,... Of the distribution line 4, and the distribution line 4 fails, information collection between the switch control devices 9 of the switchgears VS1 to VS5 is performed. Communication detects and detects the direction of the ground fault of each of the switchgears VS1 to VS5.
Results are added as accident information while adding the detection results of the own device.
Also from the upstream device to the most load device or vice versa.
Transmitted, the most load-side or most upstream switchgear (eg,
For example, the switchgear VS5) includes all the switchgears VS1 to VS5.
Can be collected. Further
After this information is collected, it will be collected
The detection results of the ground fault directions of the respective switchgears VS1 to VS5 are as follows:
It is distributed in the reverse of the information collection communication, and all switchgears VS1
To VS5 switch control device 9, each switchgear VS1-V
The detection result of the ground fault direction in S5 can be held. So
Each switching device VS1 to VS5 has its own switch control.
The control device 9 grounds all the switchgears VS1 to VS5.
Fault section where ground fault occurred due to change in direction detection result
Is detected, and if the own section is a failure section, the power failure of the distribution line 4
Opening / closing of own section during middle, that is, during power failure due to ground fault
The container 5 can be locked in an open state.

【0054】したがって、各開閉装置VS1〜VS5
開閉器制御装置9間の情報の通信により、地絡事故によ
る配電線4の停電中に故障区間を自動的に切離すことが
でき、この場合、配電線4の試充電をくり返すことな
く、迅速に、しかも、配電線4の停電をくり返すことな
く、上流の健全区間を復電することができ、配電系統の
著しい機能向上を図ることができる。
[0054] Thus, each switchgear VS1~VS5
Due to the communication of information between the switch control devices 9 ,
The faulty section can be automatically disconnected during a power outage of the distribution line 4 , and in this case, without repeating the trial charging of the distribution line 4, quickly and without repeating the power outage of the distribution line 4. Therefore, power can be restored in the upstream healthy section, and the function of the distribution system can be significantly improved.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の実施の1形態の開閉装置のブロック結
線図である。
FIG. 1 is a block connection diagram of a switchgear according to an embodiment of the present invention.

【図2】図1の開閉装置が設けられた配電系統の系統図
である。
FIG. 2 is a system diagram of a power distribution system provided with the switchgear of FIG. 1;

【図3】図2の配電系統に地絡事故が発生したときの系
統図である。
FIG. 3 is a system diagram when a ground fault occurs in the distribution system of FIG. 2;

【図4】地絡事故から復電するときの図2の系統各部の
動作説明用のタイミングチャートである。
4 is a timing chart for explaining the operation of each unit of the system in FIG. 2 when power is restored from a ground fault.

【図5】図1の各開閉装置間の情報収集,情報配信の通
信の説明図である。
FIG. 5 is an explanatory diagram of communication of information collection and information distribution between the switching devices of FIG. 1;

【図6】(a)〜(e)は図5の通信信号及び伝送され
る情報の説明図である。
6 (a) to 6 (e) are explanatory diagrams of the communication signal and the information to be transmitted in FIG. 5;

【図7】図2の配電系統の復電説明用の系統図である。FIG. 7 is a system diagram for explaining power restoration of the power distribution system of FIG. 2;

【図8】従来例の系統図である。FIG. 8 is a system diagram of a conventional example.

【図9】図8の配電系統に地絡事故が発生したときの系
統図である。
FIG. 9 is a system diagram when a ground fault occurs in the distribution system of FIG. 8;

【図10】地絡事故から復電するときの図8の系統各部
の動作説明用のタイミングチャートである。
FIG. 10 is a timing chart for explaining the operation of each unit of the system in FIG. 8 when power is restored from a ground fault.

【符号の説明】[Explanation of symbols]

4 配電線 5 区分開閉器 9 開閉器制御装置 10,10a〜10c 変流器 11 バックアップ電源 12 制御処理部 13 無線送受信器 VS1〜VS5 開閉装置 Reference Signs List 4 distribution line 5 division switch 9 switch control device 10, 10a to 10c current transformer 11 backup power supply 12 control processing unit 13 wireless transceiver VS1 to VS5 switch

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 上流の変電所から引出された配電線を複
数の開閉装置の区分開閉器により区分し、前記各区分開
閉器の負荷側の区間を前記各開閉装置それぞれの自区間
とし、前記各開閉装置の開閉器制御装置により前記各区
分開閉器の開閉を制御して地絡事故が発生した故障区間
の直前の区分開閉器を開放状態にロックする配電系統の
故障区間区分装置において、 開閉装置の前記開閉器制御装置に、 前記配電線の停電中に動作電源を給電するバックアップ
電源と、前記自区間の電流監視に基づき地絡事故の発生時に発生
方向が前記自区間の上流側,負荷側のいずれであるかを
判別して検出し, 地絡方向を検出する手段と、地絡事故の発生により前記変電所の遮断器が開放されて
前記配電線が停電する間に,情報収集の通信により,上
流側又は負荷側の隣りの開閉装置の前記開閉器制御装置
から上流側又は負荷側の各区間の地絡方向の検出結果を
受信し,受信した情報に前記自区間の地絡方向の検出結
果を付加し,事故情報として負荷側又は上流側の隣りの
開閉装置の前記開閉器制御装置に伝送し,最も負荷側又
は最も上流側の開閉装置の前記開閉器制御装置に全ての
開閉装置の地絡方向の検出結果の事故情報を収集させる
手段と、 前記情報収集の通信の終了後の情報配信の通信により,
負荷側又は上流側の隣りの開閉装置の前記開閉器制御装
置から事故情報の収集結果を受信して上流側又は負荷側
の隣りの開閉装置の前記開閉器制御装置に伝送し,最も
負荷側又は最も上流側の開閉装置の前記開閉器制御装置
に収集された全ての開閉装置の地絡方向の検出結果を前
記情報収集の通信の逆に伝送して各開閉装置に配信させ
る手段と、 配信された事故情報の地絡方向の変化から前記故障区間
を検出する手段と、 前記故障区間の検出結果に基づき前記自区間が前記故障
区間のときに自装置の前記区分開閉器を前記変電所の遮
断器が投入されて前記配電線復電する前に開放状態に
ロックする手段とを備えたことを特徴とする配電系統の
故障区間区分装置。
1. A power distribution lines drawn from the upstream substation classified by sectionalizing switches of the plurality of switchgear, each segment open
The section on the load side of the switchgear is the section of the switchgear itself.
And a switching section control device for each switching device to control the opening and closing of each of the switching sections to lock the switching section immediately before the fault section in which the ground fault has occurred in an open state. In the switch control device of each switching device , a backup power supply that supplies operating power during a power outage of the distribution line, and a power failure occurs when a ground fault occurs based on current monitoring of the own section.
Whether the direction is the upstream side of the section or the load side
Means for discriminating and detecting the direction of the ground fault, and the circuit breaker of the substation being opened due to the occurrence of a ground fault.
During the outage of the distribution line, information collection communication
The switch control device of the switchgear adjacent to the flow side or the load side
From the ground fault direction of each section on the upstream or load side.
The received information is used to detect the ground fault direction of the own section.
And add accident information as the accident information
Transmission to the switch control device of the switchgear
Are all the switchgear controllers of the most upstream switchgear.
Collect accident information of the detection result of the direction of ground fault of switchgear
Means and communication of information distribution after the end of the communication of information collection,
The switch control device of the switchgear adjacent to the load side or the upstream side.
Received the accident information collection result from the
To the switchgear control device of the switchgear next to
The switch control device of the load side or the most upstream switchgear
The ground fault direction detection results of all switchgear collected in
The data is transmitted in the reverse of the information collection communication and distributed to each switchgear.
That means and means for detecting said fault section from ground fault the direction of change of the delivered that late information, the sectionalizing switches of the own device when the self interval based on the detection result of the failure zone is the failure interval Equipment at the substation
Sectional device failure interval sorting apparatus of the distribution system in which the distribution line is turned is characterized in that a means for locking an open state before power recovery.
JP20542496A 1996-07-15 1996-07-15 Fault segmentation device for distribution system Expired - Lifetime JP2956601B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP20542496A JP2956601B2 (en) 1996-07-15 1996-07-15 Fault segmentation device for distribution system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP20542496A JP2956601B2 (en) 1996-07-15 1996-07-15 Fault segmentation device for distribution system

Publications (2)

Publication Number Publication Date
JPH1032924A JPH1032924A (en) 1998-02-03
JP2956601B2 true JP2956601B2 (en) 1999-10-04

Family

ID=16506627

Family Applications (1)

Application Number Title Priority Date Filing Date
JP20542496A Expired - Lifetime JP2956601B2 (en) 1996-07-15 1996-07-15 Fault segmentation device for distribution system

Country Status (1)

Country Link
JP (1) JP2956601B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5381415B2 (en) * 2009-07-01 2014-01-08 三菱電機株式会社 Distribution line protection system and protection relay
KR101064508B1 (en) 2009-09-08 2011-09-16 한전케이디엔주식회사 fault location automatic separation method of terminal for distributing automation

Also Published As

Publication number Publication date
JPH1032924A (en) 1998-02-03

Similar Documents

Publication Publication Date Title
US6539287B1 (en) Distribution control system capable of isolating fault section without using time limited sequential shift function
US6963793B2 (en) Distribution network monitoring and control system
US6816757B1 (en) Control unit for a power-distribution network
JP5112124B2 (en) Power distribution system operation device
JP2956601B2 (en) Fault segmentation device for distribution system
Gomes et al. Distribution automation case study: Rapid fault detection, isolation, and power restoration for a reliable underground distribution system
JP2956596B2 (en) Fault detection device for distribution system
JP3141806B2 (en) Automatic distribution line switchgear
JP3141807B2 (en) Automatic distribution line switchgear
JP3241073B2 (en) Distribution system controller
JPH0334292B2 (en)
JPH1080057A (en) Distribution automating system
JP3075740B2 (en) Accident point separation device
JPH10201081A (en) Automatic section switch for distribution line
JP3221342B2 (en) Automatic distribution line switchgear
JPS6115522A (en) Power distribution line defect zone deciding system
JP3255450B2 (en) Distribution line accident section separation method
JPH0783564B2 (en) Ground fault point recognition device for distribution lines
JP3306597B2 (en) Distribution line switch control method and apparatus
JP3175958B2 (en) Distribution line accident section separation method
JPH1014100A (en) Ground self-breaking type automatic section switch
CN101527445B (en) Protection control device
JPH05137279A (en) Remote monitor control system for distribution line protective equipment
JPH0549153A (en) Reclosing equipment for power distribution line
JPH05103419A (en) Operation equipment for power distribution system