JP2785662B2 - Roofing method for folded thin steel sheet and its equipment - Google Patents

Roofing method for folded thin steel sheet and its equipment

Info

Publication number
JP2785662B2
JP2785662B2 JP30567893A JP30567893A JP2785662B2 JP 2785662 B2 JP2785662 B2 JP 2785662B2 JP 30567893 A JP30567893 A JP 30567893A JP 30567893 A JP30567893 A JP 30567893A JP 2785662 B2 JP2785662 B2 JP 2785662B2
Authority
JP
Japan
Prior art keywords
machine
folded
hoist
floor
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP30567893A
Other languages
Japanese (ja)
Other versions
JPH07158223A (en
Inventor
文雄 阿部
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Koa Corp
Original Assignee
Koa Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Koa Corp filed Critical Koa Corp
Priority to JP30567893A priority Critical patent/JP2785662B2/en
Publication of JPH07158223A publication Critical patent/JPH07158223A/en
Application granted granted Critical
Publication of JP2785662B2 publication Critical patent/JP2785662B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Automatic Assembly (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、薄鉄板からなる屋根板
材の屋根貼り作業を現場の移動作業床に組み込んだ折板
成形機を通して直接屋根に貼り付け施工する薄鉄板折板
材の屋根貼り工法並にその装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of applying a thin iron plate to a roof by directly attaching the roof to a roof through a folding plate forming machine incorporated in a moving work floor at a site. It also relates to the device.

【0002】[0002]

【従来の技術】高層鉄骨建築に於ける薄鉄板からなる折
板材の屋根貼り作業は、材料を供給するのに従来は材料
メーカーがその都度現場を見て屋根寸法を当ってこれを
工場に持ち帰り、工場で成形加工の後屋根長さに合せた
所要の寸法に切断して屋根材とし、これを現場にまとめ
て搬入して1枚づつ多数の人手によって施工箇所に持ち
運び貼り付け作業をしていた。
2. Description of the Related Art In a high-rise steel building, the work of attaching a folded sheet made of thin steel sheet to a roof is conventionally performed by a material maker who visits a site each time, supplies a material, hits a roof dimension, and takes it back to a factory. After the forming process at the factory, the roofing material is cut into required dimensions according to the roof length, and the roofing material is collectively brought into the site, carried one by one to the construction site by many people, and pasted. Was.

【0003】[0003]

【発明が解決しようとする課題】従来の屋根貼り工法で
は屋根材料は工場で折板などの成形加工をし、現場に合
せた所要の長さ寸法に切断してから施工現場に搬入して
いたので、材料搬入までの手間が煩雑で時間がかかる
上、薄鉄板の場合はたわんで複雑に変形することから持
ち運びや施工作業の場合の取り扱いが極めて不便であ
り、また折板は例えば幅500mm厚さ1mm以下の薄
鉄板で長さ12m前後あり施工箇所へ運び入れるのに数
人の人手が必要で危険も伴いてんびんで吊り上げる場合
でも施工に時間がかかるなどの問題点があった。
According to the conventional roofing method, the roof material is formed into a folded plate or the like at a factory, cut into a required length according to the site, and then transported to the construction site. Therefore, it takes a lot of time and effort to carry in the material, and in the case of a thin iron plate, it is extremely inconvenient to carry and carry it because it deforms in a complicated manner, and the folded plate is, for example, 500 mm thick. It is a thin iron plate of 1 mm or less and has a length of about 12 m. It takes several people to carry it to the construction site, and there is a problem that it takes a long time to carry out the construction even if it is lifted with danger.

【0004】[0004]

【課題を解決するための手段】本発明の第一は屋根材の
原料となる工場出荷のホットコイルを施工現場に直接搬
入し、施工する建物に沿って移動する移動作業床に組み
込んだ折板成形機によってホットコイルから引き出した
薄平鉄板を施工直前に成形加工して屋根板材となし、そ
のまま屋根枠面に送り出し搬送してその屋根長さに合せ
てその都度切断し貼り付け施工をする工法を特徴とした
ものである。
The first aspect of the present invention is a folded plate in which a factory-shipped hot coil, which is a raw material of a roofing material, is directly carried into a construction site and is incorporated in a movable work floor moving along a building to be constructed. A method of forming a thin flat iron sheet drawn from a hot coil by a forming machine into a roof sheet material just before construction, and sending it to the roof frame surface as it is, transporting it, cutting it each time according to the roof length, and attaching it to the construction It is characterized by.

【0005】 上記工法を施工するための装置として
は、施工建物に沿って敷設したレール上を自走移動する
移動作業床の頂部床に折板成形機とその送り出し側に剪
断機を設置し、移動作業床の台床に軸置する薄鉄板のホ
ツトコイルから引き出した薄鉄板を折板成形機で折板加
工して送り出し、所要の寸法に切断するようにすると共
に、折板成形機に隣接してホイスト腕を突設した電源操
作盤を並設し、前記ホイスト腕には数個のホイストを固
定して各ホイストには吊り上げツクを懸吊し、夫々ホ
イストのフックには2個のモーター付駆動輪と2個の従
動輪を軸支した自走機を係脱自在に吊り下げ、更に各自
走機には先端に永久磁石により吸着自在とした磁力吸盤
を垂下せしめた横架棒を突設せしめた構成を特徴とした
ものである。
[0005] As an apparatus for carrying out the above-mentioned construction method, a folding plate forming machine and a shearing machine on a sending side thereof are installed on a top floor of a movable work floor which moves by itself on a rail laid along a construction building, The thin steel sheet drawn from the hot coil of the thin steel sheet placed on the bed of the moving work floor is folded and processed by the folding sheet forming machine, cut out to the required dimensions, and the sheet metal is cut adjacent to the folding sheet forming machine. juxtaposed power operation panel projecting from the hoist arm Te, the hoist arm is suspended a lifting off poke each hoist to secure several hoists to, respectively hoist two motors on the hook A self-propelled machine that supports a driven wheel and two driven wheels is hung in a freely detachable manner, and each self-propelled machine is protruded with a horizontal rod with a magnetic suction cup made to be attractable by a permanent magnet at the tip. It is characterized by the configuration provided.

【0006】[0006]

【作用】本発明は屋根材となる成形加工前の薄鉄板のホ
ットコイルを現場に搬入し、移動作業床に組み込んだ折
板成形機で成形加工しながら現場寸法に合せて切断し屋
根貼り施工することを特徴としたもので、移動作業床は
頂部床が屋根枠施工面と同じ高さに組み立てるものとし
屋根貼り施工箇所の作業進行に応じてレール上を自走移
動するものであり、台床に成形前の所要の厚さの薄鉄板
を巻いたホットコイルを軸支してこれから引き出した薄
鉄板を頂部床に設置した折板成形機に送り込んで所要寸
法に折板加工する。
According to the present invention, a hot coil of a thin steel sheet before forming processing to be a roofing material is carried into a site, and cut and adjusted to a site size while being formed and processed by a folding plate forming machine incorporated in a moving work floor, and a roof is applied. The movable work floor shall be constructed so that the top floor is assembled at the same height as the roof frame construction surface, and it will move on rails according to the work progress of the roof stuck construction site, A hot coil in which a thin iron plate of a required thickness before forming is wound on the floor is pivotally supported, and the thin iron plate drawn out from the hot coil is fed to a folding plate forming machine installed on the top floor to be folded into a required size.

【0007】 加工された折板はそのまま屋根施工面に
送り出されるが、施工に当っては最初の2列は人手によ
って貼り付け作業を行い、次に作業床上の電源操作盤か
ら突き出されているホイスト腕のホイストにフックで懸
吊した数台の自走機をホイストで持ち上げ、2列に貼り
付けた折板にモーター付駆動輪と従動輪を跨がらせて載
せた後、続いて折板加工されて送り出されて来る折板屋
根材を電源操作盤のスイッチを操作して順次自走させる
自走機の横架棒の磁力吸盤で順次吸着保持した後、各自
走機を同時に自走させることにより折板屋根材を施工部
まで運び入れ、同時にその施工個所の長さに合わせた
位置で剪断機で切断しそのまま貼り付け施工する。
The processed folded plate is sent out to the roof construction surface as it is, but in the construction, the first two rows are manually pasted, and then the hoist protruding from the power supply operation panel on the work floor Hook on arm hoist
After lifting several suspended self-propelled machines with a hoist, placing the drive wheel with motor and the driven wheel on the folded plates stuck in two rows, and then folding the plate to be processed and sent out Operate the switch on the power supply operation panel to sequentially move the sheet roofing material.After holding the magnetic suction cups of the horizontal rod of the self-propelled machine in sequence, hold each self-propelled machine at the same time to construct the folded sheet roofing material. Carry it to the site , and at the same time cut it with a shearing machine at a position corresponding to the length of the construction site and paste it as it is.

【0008】従ってたわんで変形し易いことから数人の
作業員を要した施工部位への運び入れは1人でよくしか
も材料成形から搬入そして施工箇所までの運び入れが極
めて迅速で作業能率がよくレール腕は命綱の替りにもな
る。台床のホットコイルは移動作業床のバランス錘とも
なり予備のホットコイルを並置すればバランスはなお良
くなる。
[0008] Therefore, it is easy to bend and deform, so it takes only one person to carry it to the construction site, which requires several workers, and it is very quick to carry in the material, carry it in and carry it to the construction site, and the work efficiency is good. The rail arm is a substitute for a lifeline. The hot coil on the bed serves as a balance weight for the moving work floor, and the balance is further improved if spare hot coils are juxtaposed.

【0009】[0009]

【実施例】 本発明は一旦現場寸法を当ってからそれに
合わせて工場で成形採寸した屋根材を現場に搬入し、折
板1枚毎数人の作業員で作業個所に運び込み貼り付け作
業をしていた従来の屋根貼り施工を、成形加工と採寸切
断を現場で行い施工部位までの運び入れも自動的に行う
ようにしたもので、装置の実施例としては施工屋根の高
さに合わせて組立て、建物に沿ったレール1上を自走移
動する移動作業床2の頂部床3に折板成形機4とその送
り出し側に接して剪断機5を設置し、移動作業床2の台
床6には所要厚さの薄鉄板を巻いた工場出荷のホットコ
イル7を軸支して、ホツトコイルから引き出した薄鉄板
8を折板成形機4で折板加工して送り出した折板屋根材
Aを、そのまま現場に合わせた寸法で剪断機5で切断す
るようにすると共に、移動作業床の頂部床3には折板成
形機4に隣接してホイスト腕10を突接した電源操作盤
11を並設し、前記ホイスト腕には、数個のホイスト1
2を固定して夫々吊り上げフック13を懸吊せしめ、夫
々のホイスト12には2個のモーター付駆動輪14,1
4と2個の従動輪15,15を軸支した自走機16を吊
り下げ、更に各自走機には先端に永久磁石で吸着脱自在
とした磁力吸盤17を垂下せしめた横架棒18を突出せ
しめた構成とした。はホットコイルで移動作業床の錘
荷重を大きくしてバランスをより安定させる
[Example] In the present invention, a roof material molded and measured in a factory is carried into a site in accordance with the size of the site once, and the folded plate is transported to a work place by several workers, and affixed. Conventional roof stitching work, molding and measuring and cutting are performed on site, and transport to the construction site is also performed automatically
As an embodiment of the apparatus, assembling according to the height of the construction roof, a folding plate forming machine 4 and a folding plate forming machine 4 are mounted on a top floor 3 of a moving work floor 2 which moves by itself on rails 1 along the building. A shearing machine 5 is installed in contact with the delivery side, and a hot coil 7 factory-shipped with a thin iron plate of a required thickness is pivotally supported on a bed 6 of the moving work floor 2 and the thin iron plate 8 drawn from the hot coil Is cut by a shearing machine 5 in a size corresponding to the site as it is, and a folded plate is formed on the top floor 3 of the moving work floor. A power control panel 11 having a hoist arm 10 projecting from and adjacent to the molding machine 4 is juxtaposed, and several hoists 1 are mounted on the hoist arm.
2 and the hoisting hooks 13 are hung respectively, and each of the hoists 12 has two driving wheels 14, 1 with a motor.
A self-propelled machine 16 supporting four and two driven wheels 15, 15 is suspended, and each self-propelled machine can be attached and detached with a permanent magnet at the tip.
The magnetic force sucker 17 is made to hang down and a horizontal bar 18 is made to protrude. 7 more stable causes the balance by increasing the weight load of the mobile work bed hot coil.

【0010】施工に当っては、施工建物に沿って移動作
業床2を屋根貼り施工箇所に移動させ台床6に軸支した
ホットコイル7から引き出した薄鉄板8を折板成形機4
に送り込んで1枚の折板に成形し、これを送り出すに当
って最初は従来のように数人の作業員で屋根施工面まで
持ち運び所要長さの位置で剪断機5で切断して貼り付け
施工する。このようにして2枚の折板Aを2列に人手に
よって貼り付けその後の自動搬送の足場にする。
At the time of construction, the moving work floor 2 is moved along the construction building to the place where the roof is stuck, and the thin steel sheet 8 drawn from the hot coil 7 supported on the bed floor 6 is folded.
To form a single folded plate, and to send it out, first carry it to the roof construction surface with several workers as before, cut it with the shearing machine 5 at the required length, and paste it. Execute. In this way, the two folded plates A are manually pasted in two rows to provide a scaffold for subsequent automatic conveyance.

【0011】 次に移動作業床2を横移動させてホイス
ト腕10のホイスト12に吊り上げフツク13で懸吊し
た数台の自走機16のモーター付駆動輪14と従動輪1
5を1組づつ2列の折板屋根材Aに跨がらせて載せ待機
させる。そして3目から成形されて送り出される3列
の折板屋根材Aをフックから取り外した自走機16の
横架棒18の先端に垂下した磁力吸盤17で吸着保持
し、モーター付駆動輪14を駆動して自走機を走行させ
て折板屋根材Aを貼り付け位置まで搬送する。そして貼
り付け部位に位置した時点で基部を剪断機5により切断
し、その位置で折板を貼り付け施工する。この場合送り
出され搬送される折板を見守り貼り付け作業をする作業
員は1人でよい。ホイスト腕は作業員の命綱を兼ねる。
自走機への通電は電源操作盤11からのリール電線9に
よつて行う。
Next, the mobile work floor 2 is laterally moved to be lifted on the hoist 12 of the hoist arm 10, and the motor driven wheels 14 and the driven wheels 1 of several self-propelled machines 16 suspended by the hooks 13.
5 are laid one by one on two rows of folded plate roofing materials A and put on standby. And three rows that are molded and sent out from the third sheet
The folding plate roofing material A eye is sucked and held by the magnetic force suckers 17 hanging down to the tip of the horizontal bridging rod 18 of the self-propelled machine 16 has been removed from the hook, and by driving the motor with driving wheels 14 to run a self-propelled machine The folded sheet roofing material A is transported to the attaching position. Then, the base is cut by the shearing machine 5 at the time of being located at the pasting site, and a folded plate is pasted at that position . In this case, only one worker needs to watch the folded plate sent and conveyed and perform the sticking operation. The hoist arm also serves as the worker's lifeline.
Power is supplied to the self-propelled machine by a reel wire 9 from a power supply operation panel 11.

【0012】貼り付け作業が終れば移動作業床を横移動
させてホイスト12によって吊り下げられた各自走機の
走行輪を新しく貼った折板上に移し替え同じように次に
送り出される折板を吸着保持して搬送し貼り付け作業を
順次繰り返す。移動作業床の台床上に予備のホットコイ
ルを置くときは、錘荷重が負荷されて作業床の安定が一
層よくなる。
When the sticking operation is completed, the movable work floor is moved laterally, and the traveling wheels of each self-propelled machine suspended by the hoist 12 are transferred onto the newly-attached folded plate. The work of adhering, holding and transporting is then sequentially repeated. When a spare hot coil is placed on the bed of the moving work floor, a weight load is applied, and the stability of the work floor is further improved.

【0013】薄鉄板の屋根材である折板は貼り付け位置
に運ぶのに人手による場合はたわんで変形するので数人
でも取り扱いにくく、不安定な高所作業では危険も伴い
手間もかかるが、本発明工法では自走機が吸着した材料
を運び入れ貼り付け作業を終えた折板毎に自走機をそれ
に移し載せ現場で成形された折板が送り出される毎に自
動的に所要寸法に切断されるので作業が極めて迅速能率
的で安全に施工できる。剪断機の切断作業は折板送りの
先端位置にセンサーを配線して位置を感知して自動的に
切断するようにもできる。
[0013] The folded sheet, which is a thin steel roofing material, is bent and deformed by hand when it is transported to the sticking position, so that it is difficult for several people to handle it. In the method of the present invention, the self-propelled machine carries the material adsorbed by the self-propelled machine, transfers the self-propelled machine to each folded plate that has been pasted, and automatically cuts it to the required dimensions every time the folded plate formed at the site is sent out. Work can be done very quickly, efficiently and safely. For the cutting operation of the shearing machine, a sensor can be wired at the leading end position of the folded plate feed to detect the position and automatically cut.

【0014】[0014]

【発明の効果】本発明は鉄骨建築の屋根貼り施工に於
て、たわんで取り扱いにくい薄鉄板の折板貼り付け作業
の貼り付け部位までの搬入と寸法合せ切断を自動化し、
しかもホットコイルから折板への成形と送りを移動作業
床を利用して現場で貼る直前に加工する工法であるの
で、屋根材料の取り扱いが極めて容易で人手少なく省力
化でき、安全でしかも施工時間が極めて短く作業能率が
著しく向上して施工期間を短縮できる効果がある。
According to the present invention, in roofing construction of a steel-framed building, the loading and sizing of a folded thin steel sheet to a place where the work is to be performed is automated, and
In addition, since it is a construction method that uses a moving work floor to process the forming and feeding from a hot coil to a folded plate just before pasting it on site, it is extremely easy to handle roofing materials, it requires less labor, labor saving, safe and construction time The work efficiency is significantly improved and the construction period can be shortened.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明装置の側面図である。FIG. 1 is a side view of the device of the present invention.

【図2】本発明の自走機の要部斜視図である。FIG. 2 is a perspective view of a main part of the self-propelled machine according to the present invention.

【符号の説明】[Explanation of symbols]

1 レール 2 移動作業床 3 頂部床 4 折板成形機 5 剪断機 6 台床 7 ホットコイル 8 薄鉄板 9 リール電線 10 ホイスト腕 11 電源操作盤 12 ホイスト 13 吊り上げフック 14 モーター付駆動輪 15 従動輪 16 自走機 17 磁力吸盤 18 横架棒 A 折板 Reference Signs List 1 rail 2 moving work floor 3 top floor 4 folded plate forming machine 5 shearing machine 6 bed floor 7 hot coil 8 thin iron plate 9 reel wire 10 hoist arm 11 power operation panel 12 hoist 13 lifting hook 14 motor driven wheel 15 driven wheel 16 Self-propelled machine 17 Magnetic suction cup 18 Horizontal bar A folded plate

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 施工現場に搬入した屋根板材料のホット
コイルを、施工する建物に沿って自走する移動作業床の
台床に軸置して移動作業床の頂部床に組み込んだ折板成
形機と剪断機によって折板に成形すると同時に、磁力吸
盤で吸着保持する自走機によって貼り付け位置まで搬送
し、その場で現場寸法に合わせて切断してそのまま貼り
付け施工することを特徴とした薄鉄板折板板材の屋根貼
り工法。
1. A folded plate forming method in which a hot coil of a shingle material carried into a construction site is axially mounted on a bed of a movable work floor which runs by itself along a building to be constructed and is incorporated into a top floor of the movable work floor. It is characterized in that it is formed into a folded plate by a machine and a shearing machine, and at the same time, is transported to a pasting position by a self-propelled machine that sucks and holds with a magnetic suction cup, cuts to fit the site dimensions on the spot, and pastes it as it is Roofing method of folded thin steel plate.
【請求項2】 建物に沿ったレール上を自走する移動作
業床の頂部床に折板成形機とその送り出し側に剪断機を
設置して、移動作業床の台床に軸置するホットコイルか
ら引き出した薄鉄板を折板に成形加工した後、所要寸法
に切断するようにし、移動作業床上の折板成形機に隣接
ホイスト腕を突設した電源操作盤を設置し、前記ホ
イスト腕に数個のホイストを固定して各ホイストには吊
り上げフックを懸吊し、夫々のホイストのフックには2
個のモーター付駆動輪と2個の従動輪を軸支した自走機
を係脱自在に吊り下げ、各自走機に先端に永久磁石から
なる磁力吸盤を垂下した横架棒を突設せしめてなる薄鉄
板折板材の屋根貼り装置。
2. A hot coil in which a folding plate forming machine and a shearing machine are installed on the top floor of a movable working floor that runs on rails along a building and that is on the delivery side thereof, and are axially mounted on a platform of the movable working floor. after a thin iron plate drawn out was formed into a folded plate from, so as to cut to the required dimensions, established the power control panel projecting from the hoist arm adjacent to the mobile work floor of the folding plate forming machine, said hoist arm several of the hoist and suspended the lifting hook is fixed to each hoist to, in each of the hoist hook 2
Hanging pieces of a motorized drive wheel and the free-running machine that pivotally supports the two driven wheels to disengageably, a permanent magnet in the distal end to each free-running machine
Lateral bridging bar roof adhering device of thin iron plate folded sheet comprising brought projecting a hanging down the magnetic force sucker made.
JP30567893A 1993-12-07 1993-12-07 Roofing method for folded thin steel sheet and its equipment Expired - Fee Related JP2785662B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP30567893A JP2785662B2 (en) 1993-12-07 1993-12-07 Roofing method for folded thin steel sheet and its equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP30567893A JP2785662B2 (en) 1993-12-07 1993-12-07 Roofing method for folded thin steel sheet and its equipment

Publications (2)

Publication Number Publication Date
JPH07158223A JPH07158223A (en) 1995-06-20
JP2785662B2 true JP2785662B2 (en) 1998-08-13

Family

ID=17948044

Family Applications (1)

Application Number Title Priority Date Filing Date
JP30567893A Expired - Fee Related JP2785662B2 (en) 1993-12-07 1993-12-07 Roofing method for folded thin steel sheet and its equipment

Country Status (1)

Country Link
JP (1) JP2785662B2 (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5205868B2 (en) * 2007-08-27 2013-06-05 株式会社大林組 Roof replacement unit and roof replacement method for existing buildings
CN102653970A (en) * 2012-05-16 2012-09-05 北京士兴钢结构有限公司 Overhead roof production system and overhead roof pavement method
JP5569560B2 (en) * 2012-06-07 2014-08-13 株式会社大林組 Roof replacement unit and roof replacement method for existing buildings
JP5569559B2 (en) * 2012-06-07 2014-08-13 株式会社大林組 Roof replacement unit and roof replacement method for existing buildings
CN104895260A (en) * 2015-04-01 2015-09-09 陈伟冬 Prestressed arched plate high-altitude casting and translation process
CN105442772A (en) * 2015-12-31 2016-03-30 沈阳三新实业有限公司 Super-long color steel roof board construction process and tool
JP6893848B2 (en) * 2017-08-07 2021-06-23 株式会社竹中工務店 Roofing method

Also Published As

Publication number Publication date
JPH07158223A (en) 1995-06-20

Similar Documents

Publication Publication Date Title
JP2785662B2 (en) Roofing method for folded thin steel sheet and its equipment
CN211812423U (en) Electromechanical device loading platform
CN104176624A (en) Hoisting gripper
CN214935500U (en) Lifting equipment for road and bridge construction
JP2008297703A (en) Erection equipment for plate material such as alc plate
JP2500474B2 (en) A device for attaching a thin iron plate to the outer wall using a moving work floor
JP2022102642A (en) Conveying and adhering device for floor tile
CN116845783B (en) Building basement ceiling cable traction laying equipment
JP2540578B2 (en) Weight control device for the spreading machine
JP2795228B2 (en) Automatic transfer equipment for roofed folded plate
CN209797312U (en) Indoor lifting machine
JPH03285602A (en) Apparatus for arranging, moving and loading nursery box
CN219238987U (en) Vertical conveying device
CN214527681U (en) Better hoist device of stability for construction
CN215207385U (en) Stacking device for producing waterproof coiled materials
CN211057385U (en) Noose nail detains all-in-one
JP2964431B2 (en) Hot-dip plating equipment
CN215854465U (en) Fabric window decoration lifting detection winding machine
JP2585975B2 (en) Anchor plate transfer device
CN211995742U (en) Full-automatic manipulator operation type spinning vehicle
CN109374100B (en) Weighing device
JPH0629368Y2 (en) Concrete block stacking equipment
JP2007062886A (en) Patch taking device and its method
JPH06342727A (en) Assembling device for coil of amorphous core
JPH10226489A (en) Building board molding/carrying system

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees