JP2780848B2 - Bottom grouting method for concrete structures - Google Patents

Bottom grouting method for concrete structures

Info

Publication number
JP2780848B2
JP2780848B2 JP2122475A JP12247590A JP2780848B2 JP 2780848 B2 JP2780848 B2 JP 2780848B2 JP 2122475 A JP2122475 A JP 2122475A JP 12247590 A JP12247590 A JP 12247590A JP 2780848 B2 JP2780848 B2 JP 2780848B2
Authority
JP
Japan
Prior art keywords
concrete
grout material
concrete structure
concrete structures
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2122475A
Other languages
Japanese (ja)
Other versions
JPH0416632A (en
Inventor
克也 松下
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Misawa Homes Co Ltd
Original Assignee
Misawa Homes Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Misawa Homes Co Ltd filed Critical Misawa Homes Co Ltd
Priority to JP2122475A priority Critical patent/JP2780848B2/en
Publication of JPH0416632A publication Critical patent/JPH0416632A/en
Application granted granted Critical
Publication of JP2780848B2 publication Critical patent/JP2780848B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

【発明の詳細な説明】 [産業上の利用分野] この発明は、コンクリート構造物を基盤上に載置して
一体に接合し、これらコンクリート構造物と該基盤との
間隙にグラウト材を注入して該間隙を埋めるコンクリー
ト構造物の底部グラウト方法に関するものである。
[Detailed description of the invention] [Industrial application field] This invention puts concrete structures on a base and joins them together, and injects grout into the gap between these concrete structures and the base. And a bottom grouting method for a concrete structure for filling the gap.

[従来の技術] 例えば、地下室や地下収納庫等の地下構築物を構築す
る場合、現場打ちコンクリートに代わる方法として、本
出願人は、非公開ながら地盤を掘り下げた地下空間に、
複数のU型のコンクリート構造物を接合して一体化し、
地下室等を設ける手段を考案した。
[Prior art] For example, when constructing an underground structure such as a basement or an underground storage, as an alternative to cast-in-place concrete, the present applicant has disclosed in an underground space where the ground has been dug up undisclosed.
Joining and integrating multiple U-shaped concrete structures,
We have devised a means to provide a basement.

第4図(A)、(B)、(C)、(D)、(E)は、
上記地下構築物を構築する際の工程を示す図面である。
4 (A), (B), (C), (D), (E)
It is a figure which shows the process at the time of constructing the said underground building.

この地下構築物を構築する際には、第4図(A)に示
すように、まず、地盤を掘り下げて地下に空間を設け、
この空間の底面を平らに均し、該底面にコンクリートを
捨て打ちして基盤1とする。この基盤1に、コンクリー
ト構造物2、3を配置するためのレベル出し鋼管4、4
…を設ける。次に、第4図(B)、に示すように、基盤
1上に、地下構築物の側壁及び床となる複数のU型のコ
ンクリート構造物2、2…を、側壁及び床が連なるよう
にコンクリート構造物2、2…の軸線方向に沿って配置
する。
When constructing this underground structure, first, as shown in FIG. 4 (A), the ground is dug down to provide a space underground,
The bottom surface of this space is flattened, and concrete is dumped on the bottom surface to form a base 1. Leveling steel pipes 4, 4 for placing concrete structures 2, 3 on the base 1
... is provided. Next, as shown in FIG. 4 (B), a plurality of U-shaped concrete structures 2, 2,. The structures 2, 2, ... are arranged along the axial direction.

次に、第4図(C)に示すように、配置されたU型の
コンクリート構造物2、2…の妻壁部分の壁となるコン
クリート構造物3、3…を据え付ける。そして、予め、
これらのコンクリート構造物2、2…及びコンクリート
構造物3、3…を貫通するように設けられたそれぞれ2
本の挿通孔5、5…にPC鋼材6、6…を挿通し、このPC
鋼材6、6…を、ジャッキで引張り、PC鋼材6、6に引
張応力を与えて、コンクリート構造物2、3を圧接接合
する。
Next, as shown in FIG. 4 (C), the concrete structures 3, 3,... Which will be the walls of the rear wall portion of the U-shaped concrete structures 2, 2,. And in advance,
Each of the concrete structures 2, 2,... And the concrete structures 3, 3,.
The PC steel materials 6, 6, ... are inserted into the through holes 5, 5, ...
The steel materials 6, 6,... Are pulled by jacks, and tensile stress is applied to the PC steel materials 6, 6, so that the concrete structures 2, 3 are pressure-welded.

次に、第4図(D)に示すように、この地下構築物の
上に家屋を構築するための臥梁7、7…をコンクリート
構造物2、3の上に載置する。
Next, as shown in FIG. 4 (D), the berths 7, 7,... For constructing a house on the underground building are placed on the concrete structures 2, 3.

次に、第4図(E)に示すように、コンクリート構造
物2、3底部と基盤1との間隙に、例えばモルタル等の
グラウト材を注入してこの間隙を埋める。
Next, as shown in FIG. 4 (E), a grout material such as mortar is injected into a gap between the bottoms of the concrete structures 2 and 3 and the base 1 to fill the gap.

このような場合の一般的なグラウト方法は、第5図に
示すように、まず、グラウト材が漏れ出さないように、
接合されたコンクリート構造物2、3の外周の下端を例
えばゴム等のパッキン8で囲み、接合されたコンクリー
ト構造物2、3の一端から、例えばモルタル等のグラウ
ト材の注入管9、9…の吐出口を1列のコンクリート構
造物2、3に対して1本づつ差し入れ、グラウト材を充
填するものである。なお前記パッキン8のコンクリート
構造物2、3の他端側には、注入管9から充填されたグ
ラウト材が、コンクリート構造物2、3の底部にくまな
く充填されたことを確認するためにグラウト材排出孔10
を設けて置く。
In such a general grouting method, as shown in FIG. 5, first, the grout material is not leaked out.
The lower ends of the outer peripheries of the joined concrete structures 2, 3 are surrounded by, for example, a packing 8 made of rubber or the like, and injection pipes 9, 9,... The discharge ports are inserted one by one into the concrete structures 2 and 3 in a row, and the grout material is filled. On the other end side of the concrete structures 2 and 3 of the packing 8, grout material filled from the injection pipe 9 was used to check that the bottoms of the concrete structures 2 and 3 were completely filled. Material discharge hole 10
And place it.

そしてグラウト材の充填後、コンクリート構造物2、
3の上に臥梁7、7…を介して家屋を構成する構築物を
載せるものである。
And after filling with grout, concrete structure 2,
The building constituting the house is placed on the reference numeral 3 via the ligaments 7, 7,....

[発明が解決しようとする課題] ところで、一体化されたコンクリート構造物の一端か
らコンクリート構造物と基盤の間隙にグラウト材を注入
して、他端の排出口からグラウト材が排出された時点
で、グラウト材の充填を終了した場合に、コンクリート
構造物と基盤の間隙が完全にグラウト材で充填されたか
どうかを、排出口からグラウト材が排出されることによ
って判断している。しかし、排出口からグラウト材が排
出された時点で、実際にコンクリート構造物と基盤との
間隙にグラウト材が完全に充填されたかどうか確かめる
ことはできなかった。
[Problems to be Solved by the Invention] By the way, the grout material is injected into the gap between the concrete structure and the base from one end of the integrated concrete structure, and when the grout material is discharged from the outlet at the other end. When the filling of the grout material is completed, it is determined whether or not the gap between the concrete structure and the base is completely filled with the grout material by discharging the grout material from the outlet. However, when the grout was discharged from the discharge port, it was not possible to confirm whether or not the gap between the concrete structure and the foundation was actually completely filled with the grout.

例えば、グラウト材を1本の注入管で充填する際に、
基盤とコンクリート構造物の間に気泡ができてしまった
ような場合には、その気泡をまわりこんでグラウト材が
注入されていき、排出口から排出される場合がある。こ
の際には、排出口からある程度のグラウト材を排出させ
ても上記気泡が排出されない可能性が高い。
For example, when filling grout material with one injection tube,
If air bubbles are formed between the base and the concrete structure, the grout material may be injected around the air bubbles and discharged from the outlet. In this case, there is a high possibility that the bubbles will not be discharged even if a certain amount of grout material is discharged from the discharge port.

この発明は、上記事情に鑑みてなされたものであり、
基盤とコンクリート構造物との間隙にグラウト材をすき
間なく確実に充填することができるコンクリート構造物
の底部グラウト方法を提供することを目的としている。
The present invention has been made in view of the above circumstances,
It is an object of the present invention to provide a method for bottom grouting of a concrete structure capable of reliably filling a gap between a base and a concrete structure with a grout material without any gap.

[課題を解決するための手段] この発明のコンクリート構造物の底部グラウト方法
は、基盤上に複数のコンクリート構造物をその軸線方向
に並べて載置し、コンクリート構造物同士を一体化する
工程と、該基盤とコンクリート構造物との間隙にグラウ
ト材を充填する工程と備えたコンクリート構造物の底部
グラウト方法であって、前記コンクリート構造物を据え
付ける前に、コンクリート構造物を据え付けるべき基盤
の位置に複数のグラウト材注入管をその吐出口の位置
が、コンクリート構造物の軸線方向に段階的にずれた状
態となるように変えてセットしておき、コンクリート構
造物の据え付け後、前記各グラウト材注入管を介して基
盤とコンクリートとの間にグラウト材を充填することを
特徴とするものである。
[Means for Solving the Problems] The method for grouting a bottom of a concrete structure according to the present invention comprises the steps of: placing a plurality of concrete structures on a base in an axial direction thereof, and integrating the concrete structures with each other; Filling a gap between the base and the concrete structure with a grout material, comprising: a bottom grouting method for the concrete structure, the method comprising: placing a plurality of concrete structures at the positions of the base where the concrete structure is to be mounted before installing the concrete structure. The grout material injection pipe is set so that the position of the discharge port is gradually shifted in the axial direction of the concrete structure, and after the concrete structure is installed, the grout material injection pipes are set. And a grout material is filled between the base and the concrete via the vial.

[作用] 上記構成によれば、コンクリート構造物の下に予めセ
ットされた複数のグラウト材注入管の吐出口の位置が、
コンクリート構造物の軸線方向に沿って、段階的にずれ
た構成になっているので、その位置のずれた複数の吐出
口を中心にグラウト材が広がって充填されていくことに
より、グラウト材の充填されない場所のできる可能性が
低く確実に充填することができる。
[Operation] According to the above configuration, the positions of the discharge ports of the plurality of grout material injection pipes set in advance below the concrete structure are:
The grout material is spread out and filled around the multiple discharge ports that are displaced because the structure is shifted stepwise along the axial direction of the concrete structure. It is possible to reliably fill the space where there is no possibility of being filled.

[実施例] 以下、この発明の第1の実施例を図面を参照して説明
する。
Hereinafter, a first embodiment of the present invention will be described with reference to the drawings.

第1図及び第2図に示す、この第1の実施例のコンク
リート構造物の底部グラウト方法は、この発明を、第4
図(A)、(B)、(C)、(D)、(E)に示す、本
出願人が考案したコンクリート構造物を接合して一体化
し、地下室等の地下構造物を施工する方法に応用したも
のであり、第4図等に示す方法と同様の構成要素につい
ては、同一の符号を付して説明を省略する。
The method for grouting the bottom of a concrete structure according to the first embodiment shown in FIGS.
As shown in FIGS. (A), (B), (C), (D) and (E), a concrete structure devised by the present applicant is joined and integrated to construct an underground structure such as a basement. Components that are applied and are the same as those in the method shown in FIG. 4 and the like are denoted by the same reference numerals and description thereof is omitted.

地下構築物を構築する際には、前述したようにまず地
盤を掘り下げ、地下空間を設け、この地下空間の底面を
水平な底面にならし、コンクリートを捨て打ちして、基
盤1を設ける。この基盤1上にU型のコンクリート構造
物2、2…を配置するためのレベル出し鋼管4(第4図
(A)に図示)を設ける。次に、コンクリート構造物
2、2…の軸線方向に沿って、第1図に示すように4本
のグラウト材注入管9を配置する。この際には、注入管
9の吐出口9aを所定の間隔ごとに、段階的にずらして配
置する。
When constructing an underground structure, as described above, the ground is first dug down, an underground space is provided, the bottom surface of the underground space is leveled, the concrete is thrown away, and the base 1 is provided. A leveled steel pipe 4 (shown in FIG. 4 (A)) for arranging U-shaped concrete structures 2, 2,... Next, four grout material injection pipes 9 are arranged along the axial direction of the concrete structures 2, 2,... As shown in FIG. In this case, the discharge ports 9a of the injection pipe 9 are arranged so as to be shifted stepwise at predetermined intervals.

次に、このレベル出し鋼管4に軸線方向を合わせてコ
ンクリート構造物2、3を設置し、これらコンクリート
構造物2、3をPC鋼材6、6…(第4図(C)に図示)
で圧接接合する。
Next, concrete structures 2 and 3 are installed along the leveling steel pipe 4 in the axial direction, and these concrete structures 2 and 3 are connected to PC steel members 6 and 6 (shown in FIG. 4 (C)).
Press-welding.

次に、第1図及び第2図に示すように接合されたコン
クリート構造物2、3の下端の周りをモルタル等で目貼
りし、グラウト材があふれださないようにする。次に、
接合されたコンクリート構造物2、3の両側面の目貼り
のためのモルタル部8aの各注入管9、9…の吐出口9a,9
a…に対応した位置の中間の位置に、6つのグラウト材
の排出孔10を設ける。
Next, as shown in FIG. 1 and FIG. 2, the lower ends of the concrete structures 2 and 3 joined together are stuck with mortar or the like to prevent the grout material from overflowing. next,
The discharge ports 9a, 9 of the respective injection pipes 9, 9,... Of the mortar section 8a for bonding the side faces of the joined concrete structures 2, 3
Six grout material discharge holes 10 are provided at intermediate positions between the positions corresponding to a.

次に、各注入管9、9…にグラウト材を供給する。こ
のグラウト材は、各注入管9、9…の吐出口9a、9…か
ら広がっていき、基盤1とコンクリート構造物2、3と
の間隙を埋めていく。そして、基盤1とコンクリート構
造物2、3の間隙にグラウト材が満たされた時点で、各
排出孔10、10…からグラウト材があふれ出す。
Next, a grout material is supplied to each of the injection pipes 9. The grout material spreads from the discharge ports 9a, 9 ... of each of the injection pipes 9, 9 ... and fills the gap between the base 1 and the concrete structures 2, 3. When the gap between the base 1 and the concrete structures 2 and 3 is filled with the grout material, the grout material overflows from each of the discharge holes 10.

グラウト材が排出孔10、10よりあふれ出したのを確認
して、グラウト材の注入を停止する。
After confirming that the grout material overflows from the discharge holes 10 and 10, the grout material injection is stopped.

以上のように、この実施例のコンクリート構造物の底
部グラウト方法によれば、コンクリート構造物、2、2
…の軸線方向に配置された4本の注入管9の吐出口9a、
9a…が所定の間隔をあけて段階的にずれて配置されてい
ることにより、各吐出口9a、9a…からグラウト材が広が
っていき、基盤1とコンクリート構造物2、3の間隙に
注入されるので、グラウト材をくまなく充填することが
できる。
As described above, according to the concrete structure bottom grouting method of this embodiment, the concrete structure,
The discharge ports 9a of the four injection pipes 9 arranged in the axial direction of ...
The grout material spreads out from each of the discharge ports 9a, 9a, ... and is injected into the gap between the base 1 and the concrete structures 2, 3, because the 9a ... are arranged stepwise at predetermined intervals. Therefore, the grout material can be filled all over.

また、6つの排出孔10をコンクリート構造物の両側面
の吐出口9a、9a…に対応した位置の中間の位置に設けた
ことにより、基盤1とコンクリート構造物2、2との間
の空気が速やかに排出され、気泡が基盤1とコンクリー
ト構造物2、3の間に閉じ込められる可能性が少ない。
Also, by providing the six discharge holes 10 at positions intermediate the positions corresponding to the discharge ports 9a, 9a,... On both side surfaces of the concrete structure, the air between the base 1 and the concrete structures 2, 2 is reduced. It is quickly discharged and there is little possibility that air bubbles are trapped between the foundation 1 and the concrete structures 2, 3.

また、4つの吐出口9a、9aよりグラウト材が注入され
るので、時間当たりの注入量が多く、短時間でグラウト
材の注入作業を終了することができる。
Further, since the grout material is injected from the four discharge ports 9a, 9a, the injection amount per time is large, and the grout material injection operation can be completed in a short time.

第3図は、この発明の第2の実施例を示す図面であ
る。
FIG. 3 is a drawing showing a second embodiment of the present invention.

この第2の実施例のコンクリート構造物の底部グラウ
ト方法は、第1の実施例において、複数の注入管9、9
…を、接合されたコンクリート構造物2、3の片側の端
部から配置したのに対して、両方の端部から複数の注入
管9、9…を配置したものであり、第1図等に示された
構成要素と同一の構成要素については、同一の符号を付
して説明を省略する。
The method for bottom grouting of a concrete structure according to the second embodiment is different from the first embodiment in that a plurality of injection pipes 9, 9 are provided.
Are arranged from one end of the joined concrete structures 2 and 3, whereas a plurality of injection pipes 9, 9 are arranged from both ends. Components that are the same as the components shown are given the same reference numerals, and descriptions thereof are omitted.

この第2の実施例においては、基盤1上に注入管9、
9…を配置する際に、両端からそれぞれ3本の注入管9
をコンクリート構造物2、2…の軸線方向に沿って配置
し、各注入管9の吐出口9aを、所定の間隔をあけて段階
的にずらして配置する。そして第1の実施例と同様に、
コンクリート構造物2、3を据え付けて接合し、グラウ
ト材を注入する。
In this second embodiment, the injection tube 9 is placed on the base 1,
9 are arranged, three injection pipes 9 from each end
Are arranged along the axial direction of the concrete structures 2, 2,..., And the discharge ports 9a of the respective injection pipes 9 are arranged so as to be shifted stepwise at predetermined intervals. And, as in the first embodiment,
Concrete structures 2 and 3 are installed and joined, and grout is injected.

この第2の実施例のコンクリート構造物の底部グラウ
ト方法は、第1の実施例と同様の効果を奏するととも
に、両端から注入管9、9…を配置したことにより、さ
らに速やかにグラウト材を注入することができる。
The method for grouting the bottom of a concrete structure according to the second embodiment has the same effect as that of the first embodiment, and the grout material is more quickly poured by arranging the injection pipes 9 from both ends. can do.

なお、これら実施例においては、注入管9の本数を4
本もしくは6本としたが、これら注入管9、9…の本数
は、接合されたコンクリート構造物2、3底部の面積等
を考慮して決定されるものであり、4本もしくは6本に
限るものではない。また、この実施例では、地下構築物
をU型のコンクリート構造物2、2…を接合して構築す
る際に応用したが、本発明のコンクリート構造物の底部
グラウト方法は、基盤上に複数のコンクリート構造物を
据え付けて一体に接合し、このコンクリート構造物底部
にグラウト材を注入する方法であり、その用途は、地下
構築物の構築に限るものではない。
In these examples, the number of the injection pipes 9 was 4
The number of these injection pipes 9, 9... Is determined in consideration of the area of the bottoms of the joined concrete structures 2, 3 and the like, and is limited to four or six. Not something. In this embodiment, the underground structure is applied to the construction by joining the U-shaped concrete structures 2, 2,..., But the bottom grout method of the concrete structure according to the present invention is applied to a plurality of concrete structures on the base. This is a method in which a structure is installed and joined together, and a grout material is injected into the bottom of the concrete structure, and its use is not limited to the construction of an underground structure.

[発明の効果] 以上、詳細に説明したようにこの発明のコンクリート
構造物の底部グラウト方法によれば、コンクリート構造
物を据え付ける前に、コンクリート構造物を据え付ける
べき基盤の位置に複数のグラウト材注入管をその吐出口
の位置が、コンクリート構造物の軸線方向に段階的にず
れた状態となるように変えてセットしてあるので、上記
吐出口を中心にグラウト材が広がって充填されていくこ
とにより、グラウト材の充填されない場所のできる可能
性が低く、基盤とコンクリート構造物の間隙にくまなく
確実にグラウト材を注入することができる。
[Effects of the Invention] As described above in detail, according to the method for grouting a bottom of a concrete structure according to the present invention, before installing the concrete structure, a plurality of grout materials are injected into a position of a base on which the concrete structure is to be installed. Since the pipe is set so that the position of the discharge port is shifted stepwise in the axial direction of the concrete structure, the grout material spreads around the discharge port and is filled. Thereby, the possibility that there is no place where the grout material is not filled is low, and the grout material can be reliably injected into the gap between the base and the concrete structure.

【図面の簡単な説明】[Brief description of the drawings]

第1図及び第2図はこの発明の第1の実施例を示す図面
であって、第1図は基盤上に配置されたグラウト材注入
管の上に、コンクリート構造物を載置した状態を示す平
面図、第2図は基盤上で一体に接合されたコンクリート
構造物の斜視図。第3図はこの発明の第2の実施例を示
す図面であって、基盤上に配置されたグラウト材注入管
の上に、コンクリート構造物を載置した状態を示す平面
図、第4図(A)、(B)、(C)、(D)、(E)は
地下構築物の構築工程を示す斜視図、第5図は、従来の
コンクリート構造物の底部グラウト方法を示す平面図で
ある。 1……基盤、2……コンクリート構造物、 3……コンクリート構造物、 9……グラウト材注入管、9a……吐出口
1 and 2 are views showing a first embodiment of the present invention. FIG. 1 shows a state in which a concrete structure is placed on a grout material injection pipe arranged on a base. FIG. 2 is a plan view, and FIG. 2 is a perspective view of a concrete structure integrally joined on a base. FIG. 3 is a drawing showing a second embodiment of the present invention, and is a plan view showing a state in which a concrete structure is placed on a grouting material injection pipe arranged on a base, and FIG. A), (B), (C), (D), and (E) are perspective views showing a construction process of an underground building, and FIG. 5 is a plan view showing a conventional bottom grout method of a concrete structure. 1 ... foundation, 2 ... concrete structure, 3 ... concrete structure, 9 ... grout material injection pipe, 9a ... discharge port

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】基盤上に複数のコンクリート構造物をその
軸線方向に並べて載置し、コンクリート構造物同士を一
体化する工程と、該基盤とコンクリート構造物との間隙
にグラウト材を充填する工程とを備えたコンクリート構
造物の底部グラウト方法であって、 前記コンクリート構造物を据え付ける前に、コンクリー
ト構造物を据え付けるべき基盤の位置に複数のグラウト
材注入管をその吐出口の位置が、コンクリート構造物の
軸線方向に段階的にずれた状態となるように変えてセッ
トしておき、コンクリート構造物の据え付け後、前記各
グラウト材注入管を介して基盤とコンクリートとの間に
グラウト材を充填することを特徴とするコンクリート構
造物の底部グラウト方法。
1. A step of placing a plurality of concrete structures on a base in an axial direction thereof and integrating the concrete structures with each other, and filling a grout material in a gap between the base and the concrete structures. A bottom grouting method for a concrete structure, comprising: before installing the concrete structure, a plurality of grout material injection pipes at the position of the base where the concrete structure is to be installed, and the position of the discharge port thereof is a concrete structure. It is set so that it is displaced stepwise in the axial direction of the object, and after the concrete structure is installed, the grout material is filled between the base and concrete through the grout material injection pipes. A bottom grout method for a concrete structure.
JP2122475A 1990-05-11 1990-05-11 Bottom grouting method for concrete structures Expired - Lifetime JP2780848B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2122475A JP2780848B2 (en) 1990-05-11 1990-05-11 Bottom grouting method for concrete structures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2122475A JP2780848B2 (en) 1990-05-11 1990-05-11 Bottom grouting method for concrete structures

Publications (2)

Publication Number Publication Date
JPH0416632A JPH0416632A (en) 1992-01-21
JP2780848B2 true JP2780848B2 (en) 1998-07-30

Family

ID=14836769

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2122475A Expired - Lifetime JP2780848B2 (en) 1990-05-11 1990-05-11 Bottom grouting method for concrete structures

Country Status (1)

Country Link
JP (1) JP2780848B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2798150B1 (en) * 1999-09-07 2002-02-22 Atighechi Alain Tabatabai BUILDING FOUNDATION AND METHOD OF CONSOLIDATION OF A FOUNDATION OF FOUNDATION TYPE

Also Published As

Publication number Publication date
JPH0416632A (en) 1992-01-21

Similar Documents

Publication Publication Date Title
KR101708760B1 (en) Construction method for precast concrete wall
EP0070659A1 (en) Retaining wall and in situ method of construction
JP2957779B2 (en) Construction method of precast structure and precast concrete member used for the construction
JP3690437B2 (en) Seismic reinforcement structure for existing buildings
JP2780848B2 (en) Bottom grouting method for concrete structures
KR100387998B1 (en) Block for Containing Wall and Method of Consolidating Base for Containing Wall
JPH1113072A (en) Basement structural body, and construction method thereof
JP2781642B2 (en) Bottom grouting method for concrete structures
KR20090042395A (en) Retainning wall and its construction method
JP2001182152A (en) Grout injecting construction method at pc member joint part
JP2884495B2 (en) Rainwater storage tank
KR100659997B1 (en) Method and structure land-side protection wall using h-beam
JPH04330119A (en) Building foundation constructing method
JPS6146606B2 (en)
JP2023132748A (en) Building and construction method thereof
JPH0411121A (en) Joint process of whole pc foundation
KR102136255B1 (en) Underground vertical structure construction method using top-down method
JPH04185816A (en) Construction of beam in underground wall
JP2501709B2 (en) Foundation structure
JP2023180011A (en) Joint structure
JP4187897B2 (en) Method of joining precast reinforced concrete columns and beam members
JPH0274729A (en) Construction method of underground structure
JPS63293227A (en) Basement construction work and panel therefor
JPH04343917A (en) Footing of building